Loading...
CORRESPONDENCE " ~d ~ iG~~ TECHNICAL REVIEW COMMI'rrEE MEMORANDUM TO: Robert Eichorst, Public Works Director Al Newbold, Deputy Building Official William Cavanaugh, Fire Prevention Officer Lt. Don Thrasher, police Department John Wildner, Parks Superintendent Kevin Hallahan, Forester/Environmentalist Mike Kazunas, Utilities Engineer Vincent Finizio, Engineering Department Richard Staudinger, Gee & Jenson Consulting Engineers FROM: Dorothy Moore, zoning & Site Plan Reviewer DATE: March 2, 1993 RE: Technical Review committee Meeting Thursday, March 11, 1993 Please be advised that the Technical Review Conunittee will meet on Thursday, March 11, 1993, at 9:00 A.M. in Conference Room "C" (West wing) to discuss the following: MASTER PLAN - RESUBMISSION PROJECT NAME: Boynton Seacrest (f.k.a. Cedar Grove) A Planned Residential Conununity LOCATION: South Seacrest Boulevard APPLICATION: Julian Bryan III FILE NO. Planning Department File *697 NOTE: Please return all conunents and plans previouslJ distributed for this resubmission to the ENGINEERING DEPARTMENT no later than 5 : 00 p . m. Tuesday, March 16, 1993. --- Technical Review Committee Page 2 WAIVER - SIDEWALK PROJECT: Clifton Homes, Inc. LOCATION: 905 S.E. 3rd Street APPLICANT: Philip A. Binns FILE NO.: Planning Department File #728 DESCRIPTION: Requesting a waiver of a requirement for a sidewalk at this location. NOTE: Please coordinate review of plans and submission of written comments with BUILDING DEPARTMENT c/o Al Newbold. DISCUSSION 1. Review of the following site plans for inter-departmental conflicts: a. Lighthouse Grille Restaurant b. Red Lobster Restaurant c. 610 Industrial Avenue ~:~) Dorothy Moore DM/jm Att. cc: J. Scott Miller, City Manager City Commission (5) Don Jaeger, Building Official Ed Allen, Fire Chief Charles Frederick, Recreation & Parks Director Edward Hillery, Police Chief John Guidry, Utilities Director Steve Campbell, Fire Department Bob Gibson, Public Works Central File Christopher Cutro, Planning & Zoning Director Tambri Heyden, Senior Planner Mike Haag, Zoning and Site Development Administrator Project File Chronological File A: TRCAGDA.JM r -.--.-- ..--.---.-- ~~. .--I' .,IL. ('^~A( ;,/1 J I J */ I-'C- tz>l (ft'l fo~ :;J;t f2cff)~TS SITE PLAN REVIEW ~ $:,tf..fI.A,J,e~JI~ STAFF REPORT FOR PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION (date) proj ect Name: ~.? L(.? '\ ,o"-'-r ';" /.....!,.,...I l l) i Applicant: GE1,,1E::J"~Jfl l'y~i.! S' RES,T/;, r' S )NC~ , , / Agent: ~}" .\/1 C I) '" \ Ii i.- L V /-t! \'-..\ PR () I'V( l::- {\J It DE !1/} A ) I coNGRESS A-vbf..,JUt::. Location: Land Use Plan Designation: Zoning Designation: C --< .- --' Type of Use: Number of Units: ') I) Square Footage: S? 0/f,eE hoT :8,// ,i;\//lJG r::::/ F -.,-~€ :Ju -r C'c c;:: cj ~. ,I 5 p,.jGI E ST:J'f2:..1 8 399' / / Description of proj ect: ,.4 L-.E /:t5 ED pr.;;: () I;' r:::J.J Ii ..-' C C e: 1--1 -rE R I -r-~' E L/ r/J ."". } f' T-V! ':::.....=_..I".! . . )": 1-'~ ill :. ,,- "'"".... ~ Review of Departmental Comments: Please find attached the comments from the following departments: Recommendation: ----l.~.... %e City of 'Boynton 'Beacli Pfanning & Zoning 'lJepartnunt 100 'E. 'Boynton 'BetUn 'Boulevard P.O. 'Bo~31O 'Boynton 'BetUn, ~wrUfa. 33425-0310 (407) 738-7490, 'j".jilX: (407) 738-7459 February 22, 1993 James McIlvain 2607 S. Woodland Avenue Suite 267 Deland, FL 32720 (904) 734-7491 RE: Acceptance - Site Plan Review Application & Submittal Documents New Site Plan - Red Lobster Restaurant File No. 726 Mr. McIlvain: On February 22, 1993, your submittal for Site Plan Review of the above referenced project was reviewed for completeness. It has been determined that the submittal is substantially complete and accepted for further processing. Dorothy Moore will be responsible for the review and coordination of your site plan thru the remainder of the Site Plan Review process. The next step in the review process is for the Technical Review Committee to review the submittal for compliance with the review standards identified in Part III, Land Development Regulations, Chapter 4, Site Plan Review, Section 8 and all applicable sections of the Boynton Beach Code of Ordinances. The results of the review will be forwarded to you within twenty (20) days of the date identified in the first paragraph of this letter. If I can be of further assistance, please do not hesitate to contact me. Very truly yours, ~~ Christopher cutro Planning and Zoning Director XC: Central File Chronological File Project File 5fmema's gateway to tlie (julfstream MEMORANDUM TO: Christopher cutro, Planning and Zoning Director FROM: Dorothy Moore, zoning and Site Reviewer DATE: March 8, 1993 RE: Site plan Project: Location: Review - New Site Red Lobster Restaurant Leased outparcel at Boynton Beach Promenade (Congress Avenue) General Mills Restaurants, Inc. 726 Applicant: File No.: The following comments are in response to the submittal of the site plan for the above referenced project. The comments for the project will be discussed at the March 11, 1993, Technical Review Committee meeting. The site plan was reviewed for consistency with the review standards specified in section 8 of Chapter 4, Site Plan Review, Part III, Land Development Regulations of the code of Ordinances. The applicant shall amend the drawings and documents to show compliance with the following comments: 1. Submit a recent certified property survey of the site, clearly illustrating existing conditions and ownership. There are inconsistencies between the submitted site plan application and the Red Lobster site development plans concerning ownership of the property. 2. We have found inconsistencies in the total summation of the horizontal control dimensions and the setback dimension at the south boundary line as shown for the Red Lobster building on the site development plan and the previously approved IlBoynton Beach Promenade, Alterations and additions toll site plan. These inconsistencies will be documented as amendments to the approved Boynton Beach Promenade site plan and will be filed as such. 3. The dimensions as provided on the Red Lobster site development plan for the south boundary horizontal control dimensions do not add up to 59'0" as shown on the plans but rather 58'0". Correct the dimensions accordingly. 4. There are inconsistencies between the previously approved "Boynton Beach Promenade" (Alterations and additions to) site plan and the submitted Red Lobster site development plan. To clarify these inconsistencies between the two sets of plans, please submit and make a part of the Red Lobster site plan the project data that is consistent with the approved site plan for the flBoynton Beach Promenade, Alterations and Additions to." Include this information onto your site development plan page C-2, fiRed Lobster." 5. The architectural design and colors are different than the existing structures on the site. The Planning and Development Board will make a determination if the design, colors and materials are acceptable. Also, the inclusion of neon as a signage is not included in any of the signage of the approved sign program. The planning and Development Board will make a determination if the signage is acceptable. (see attached Section 8, Review standards, 8.5 to 8.5.4, Building and other structures) ~J Dorothy Moore C:REDLOBST.ALD ENGINEERING DEPARTMENT MEMORANDUM NO. 93-073 TO: Christopher Cutro Planning & Zoning Director FROM: Vincent A. Finizio Deputy City Engineer DATE: March 9, 1993 RE: Technical Review Committee Comments Red Lobster Restaurant at The Promenade I have reviewed the above referenced plan submission and herein provide the following conditions of approval: 1) Page CI of the Engineer's plan(s), that being Caulfield and Wheeler, Inc., under Notes, paragraph #1 indicates that General Mills Restaurants, Inc. are the owners of the outparcel depicted with bold lines on the submitted plans, including a statement that the submitted survey is, in fact, "Plat". According to the City of Boynton Beach, Florida Code of Ordinances, specifically Appendix "A", "zoning", Section 11,1, "Location of Off Street Parking Spaces", subsection 12, General Mills Restaurant must purchase the required number of parking stalls in order to satisfy this section of the City's ordinances which states as follows: '~equired parking spaces for all other uses (except dwellings) shall be owned by the owner of the building lot to be served, and shall be located on the same lot, or not more than 300' distance, as measured along the nearest pedestrian walkway." In accordance with the aforementioned City code, the owner shall purchase the required number of parking stalls necessary to serve the proposed Red Lobster site, unless relief is granted by the City via legislative and/or administrative action necessary to meet the intent of this ordinance. By copy of this memorandum to the City Attorney, I am requesting a legal opinion as to whether or not the aforementioned code may be satisfied, reference it's intent, by the original land owner providing a shared parking agreement to General Mills Restaurants,Inc. 2) This outparcel, being a separate subdivision of the main parcel, would be in a state of non-compliance with the codes as currently exists no street frontage and/or guaranteed access from public rights-of-way to this location, therefore, the applicant shall provide an ingress/egress access agreement commencing from a point at the Congress Avenue right-of-way at the Boynton Beach Mall access road and terminating at a point to the parking facility which shall serve this structure. 3) A determination as to whether or not the applicant shall be responsible to plat this outparcel and/or submit a request for an exception or exemption from the subdivision regulations, will be considered and discussed during the Technical Review Committee meeting wherein all factors will be considered prior to generation of that decision. The Engineering Department reserves the right to submit comments regarding this issue after the first consideration of this plan by the Technical Review Committee. RECE1\lE:O MAR 9 1993 Technical Review Committee Comments/Red Lobster Restaurant Engineering Dept. Memo No. 93-073 March 9, 1993 Page #2 4) Plat is for the building site and dumpster location only. All parking lot improvements are labeled "by others". 5) Surface water management permit for the Boynton Promenade should be supplied by the applicant to verify the impervious area being added by the addition of the restaurant and the deletion of the islands does not negatively impact the pervious/impervious ratio or the location of storm sewers or operation of the storm water management system. 6) Applicant should supply grading information on the modified parking lot adjacent to this site so we can verify that the grading on the building matches and is compatible with the adjacent parking lot. LL---3- "Q~o== Vincent A. Finizio .,. VAF/ck cc: J. Scott Miller, City Manager w. Richard Staudinger, P.E., City Engineer (as directed) James Cherof, City Attorney (request legal opinion, Item #1) U;;I. Ut:l. \:::1;;1 I U4:50 PM >t<GEE &. .JENSON POl -,,- ""-'--"-' --..-. _. ..---- n Gee & JENSON El1gH1oors-Architects-P1anncrs, I,)~ One H8tV$~ Cir'l;;ie West Palm eeactc, FL 33400 Telephone (407) 683,3301 Fax (40716Be,"~46 MeMORANDUM TO: FAOM: Vince Flnl~o W. Richard Staudin e I City Engineer DATE: March 3, 1993 R!: Technical Aevlew Board Comments for the Red Lobster Site Plan Based on Leased Site Only 1. Plat is for the building site and dumpster location only, All parking lot Improvements are labeled "by others.. 2. Surface water management permit for the Boynton Promenade should be supplied by the applicant to verify the Impervious area being added by the addition of the restaurant and the deletion of the Islanda does not negatively Impact the perviousjimpeNious ratio or th" location of storm sewers or operation of the storm water management system. 3. Applicant should supply grading Information on the modified parking lot adjacent to this site so we can verify that the grading on the building matches and i$ compatible with the adjacent parking lot. WRS/bf 93-049 RECEIVED _ \a PLM~N\NG Ot.Pl~ ----------- MAX DEVELOPERS INC. 7312158 P.02 MIA% Il})JEVlEILC[J)J1DJEJE~9 llNCCo March la, 1993 MR. CHRIS CUTRO DIRECTOR PLANNING AND ZONING DEPARTMENT CITY OF BOYNTON BEACH 100 E BOYNTON BEACH BLVD. BOYNTON BEACH, FLORIDA 33425-0310 RE: MAX DEVELOPERS, INC. & GENERAL MILLS RESTAURANTS BUILDING PERMIT APPLICATION bear Chris: By this letter please be advised that the above applicants ~iGh to wi thdraw their pending application at this time. General Mills has decided to revise the particular prototype building to be built on this site and will submit revieed drawings within the next 30 days. We requeet that upon the resubmission that the City will apply the original applicaticn ~ee to the revised application package. If you should have any queetione please feel free to contact me. Y JARRETT cc: John J. Hoecker Bruce Geise MAX DEVELOPERS, INC. 1101 North Congress Avenue · Suite 201 · Boynton Beach, FL 33426. (407) 731.1630 RECEIVED MAR 12 PL-"\Ni\'~ ."" f!Pl'fl" . -, 'ol -e.:r.;.:- ~ 'e&t ~ H\IG- PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 93-035 TO: Robert Eichorst, Public Works Director Vince Finizio, Admin. Coordinator of Engineering Richard staudinger, Gee & Jenson Al Newbold, Deputy Building Official Bill Cavanaugh, Fire Prevention Officer Michael Kazunas, utilities Engineer Lt. Don Thrasher, Police Department John Wildner, Parks Superintendent Kevin Hallahan, Forester/Environmentalist ~~ FROM: Christopher cutro, Planning & Zoning Director DATE: February 22, 1993 RE: SITE PLAN REVIEW PROCEDURES New Site Plan Project - Red Lobster Restaurant Location - Boynton Beach Promenade - outparcel Applicant - General Mills Restaurants, Inc. File No. - 726 Find attached for your review the plans and exhibits for the above referenced project. Site Plan Review approval for this project will be granted by the City Commission. To ensure that the project stays on line with the review time frame, I request that the plans and exhibits be reviewed and formal comments transmitted to the Director of the Planning and Zoning Department no later than 5:00 P.M. on March 8, 1993. Adhering to the following review guidelines will promote a comprehensive review and enable the applicant to efficiently obtain Technical Review Committee approval: 1. Use the review standards specified in Part III, Land Development Regulations, Chapter 4, Site Plan Review, Section 8 to review and formulate comments. (See planning & Zoning Department memo #92-020) 2. The documents submitted for the project were determined to be substantially complete based on the submittal requirements identified in Section 7 of the Site Plan Review Ordinance. However, if the data provided to meet the submittal requirements is insufficient to properly evaluate and process the project based on the review standards, additional data should be requested by the reviewer through the Planning and Zoning Department. To: TRC Members Re: Planning & Zoning Memo, 93-35 page Two of Two 3. Each comment shall reference the code section and include the language of the submittal requirements and review standards that require the data to be submitted for review. 4. Technical Review Committee member (s) shall identify in their comments when the plans depict or when the location and installation of their departmental required improvements may conflict with other departmental improvements. 5. When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the comment and the specific code section may be included in their review comments with the name of the appropriate TRC Member that is responsible for the review specified. 6. If a TRC member finds the plans acceptable, he/she shall forward the plans and a memo, within the time frame stated above, to the Planning and Zoning Director stating that the plans are approved and they do not have any comments on the plans submitted for review. All comments shall be typed, addressed and transmitted to the Director of the Planning and Zoning Department for distribution to the applicant. Please include the name and phone number of the reviewer on this memo. Dorothy Moore will be the Planning and Zoning Department staff member coordinating the review of the project. The Planning and Zoning Department will send to the applicant a cover letter which includes the comment(s) and directions to amend the plans to comply with the comments and the procedures for resubmission. When the Planning and Zoning Department receives the amended plans, they will distribute the plans with a cover memo to all TRC Members for review and approval. Attachment xc: (Memo Only) Don Jaeger, Building Official Ed Allen, Fire Chief Charlie Frederick, Parks & Recreation Director Edward Hillery, Police chief John Guidry, utilities Director project File chronological File A: lREVIEW. WP5