REVIEW COMMENTS
MEMORANDUM
August 21, 1989
TO: Jim Golden
Senior City Planner
VIA: Ann Toney
Acting Engineering Administrator
FROM: Roger Kuver
Engineering Inspector
RE: TRB Comments
Vander Woude Site - Lot 13, Boynton Beach Distribution Center
1. Provide a lighting plan consistent with Article X, to include a statement
declaring the design to be capable of withstanding a 120 MPH wind load.
Light levels should be addressed on plan. Section 5-l4l(n), 5-142(a)
2. Specify base material to be used in construction of paved areas, as well
as the locations of expansion/control joints. Section 5-l41(n)
3. Provide a drainage vlan which includes pavement elevatipns, swale elevations
and direction of intended flow. Sheeting stormwater offsite is prohibited.
Section 5-142(f), 5-l4l(n), Appendix C Zoning Section 5A, 5B
Roger Kuver
44
RK/ck
MEMORANDUM
To:
Carmen Annunziato, Planning
Director ~ /
UtilitieS~
From:
John A. Guidry, Director of
Date: August 21, 1989
Subject: TRB Review - Vander Wonde Warehouse, Lot 13 - Site Plan
(Resubmittal)
We can approve this project, subject to the following conditions:
1. Relocate the oak tree so as to allow clear access to the sewer
service and cleanout.
2. Indicate the location, model and size of the reduced pressure
backflow preventer to be installed on the building side of the
water service.
dmt
bc: Peter Mazzella
MEMORANDUM
TO:
Mr. James Golden
FROM:
Lt. Dale Hammack
RE:
Vander Woude Warehouse Building (Lot 13)
DATE:
August 18, 1989
As per our discussion at the Technical Review Board Meeting of 17
August 1989, I am recommending the following:
1. Comply with Construction Security Ord. (5-8G)
i) DalJ. ~._~
Lt. Dale Hammack
DH/cm
Orayare ·
P.O. Box 2944
~rto.ro8.T FC:Jr:1~'243.52S0
REPLY MESSAGE
Fold At (.) To Fit GraY8lc Window Envelope' EW10P
REORDER ITEM" F269
r:
~~~ c:;;;;;;--.~
TO ~I"""- c:::;-~ ~~.-...)"1L-
-,
FROM
K~Q::r- ~~~T"
-Ptr.,...,....J<a. COSt_f(:_ Wc>~P'~~~L
SUBJECT: ____'!t!!.P~~_~~_t.!~~___Y1~~~_~~__________~~__{!_______________j)A TE:.___~:::._! 7 ~-
POLO.
p(.l.gp~ \)e-H-''-L.1Oi --r-'Uca..r.> A/2.()~O ~u,s.\ ~E 5l-4"'~,.J O,J
S'rT"'!5'"" RAU G....--r~-r RB:,L..lC- WOe:..~ """10 Wc>e..~ ~ I > Ou'l
I
1.1f'~ 7~:J.y'
PLEASE REPLY TO .
REPLY
DATE:
SIGNED
Item II F269 G,aya,c, P.O. Box 2944, Hartford, CT 06104-2944
@ W'-IerGroup.lnc.1982 THIS COPY FOR PERSON ADDRESSED
.L
PERSON ADDRESSED RETURN THIS COpy TO SENDER
!
MEMORANDUM
August 17, 1989
TO:
Steve Scowden
FROM:
James J. Golden, Senior City Planner
RE:
Vander Woude Warehouse Building (Lot 13)
Administrative Site Plan
With respect to the above, please be advised of the following:
1. Approach to dumpster enclosure to be deepened by relocating
the dumpster enclosure farther back in the swale area.
2. Parking spaces No. 9 and 10 to be eliminated to allow
sufficient turn-around area for front-end loader.
3. Details of loading zone to be shown on north wide of
building.
4. The ratio of parking provided is for warehouse, storage, and
wholesaling uses only. Manufacturing establishments and
contractors cannot be licensed at this location, as
additional parking spaces would be required (Section
11.H.16.f of Appendix A, Zoning).
-A-"'. t. ~
ames p. Golden
JJG:cp
MEMORANDUM
TO:
Carmen Annunziato
Planning Director
FROM:
Kevin J. Hallahan
Forester/Horticulturist
DATE:
August 21, 1989
RE:
Vander Woude Warehouse Lot #13 & 15
Tarr Warehouse Building Lot #14
The following landscape comments pertain to the above three sites
because of the similarity in landscape materials proposed.
1. The surnam cherry hedge is not a native species and should
be substituted with a native hedge.
2. The hedge material along the road R.O.W. must be 36" in
height at the time of planting.
3. The applicant should review how any existing overhead power
lines may interfere with proposed trees for the sites.
~~?: ~,~UAW
Kevin J. allahan
Forester/Horticulturist
KJH:ad
DOC:A:VWW