REVIEW COMMENTS MEMORANDUM August 21, 1989 TO: Jim Golden Senior City Planner VIA: Ann Toney Acting Engineering Administrator FROM: Roger Kuver Engineering Inspector RE: TRB Comments Vander Woude Site - Lot 13, Boynton Beach Distribution Center 1. Provide a lighting plan consistent with Article X, to include a statement declaring the design to be capable of withstanding a 120 MPH wind load. Light levels should be addressed on plan. Section 5-l4l(n), 5-142(a) 2. Specify base material to be used in construction of paved areas, as well as the locations of expansion/control joints. Section 5-l41(n) 3. Provide a drainage vlan which includes pavement elevatipns, swale elevations and direction of intended flow. Sheeting stormwater offsite is prohibited. Section 5-142(f), 5-l4l(n), Appendix C Zoning Section 5A, 5B Roger Kuver 44 RK/ck MEMORANDUM To: Carmen Annunziato, Planning Director ~ / UtilitieS~ From: John A. Guidry, Director of Date: August 21, 1989 Subject: TRB Review - Vander Wonde Warehouse, Lot 13 - Site Plan (Resubmittal) We can approve this project, subject to the following conditions: 1. Relocate the oak tree so as to allow clear access to the sewer service and cleanout. 2. Indicate the location, model and size of the reduced pressure backflow preventer to be installed on the building side of the water service. dmt bc: Peter Mazzella MEMORANDUM TO: Mr. James Golden FROM: Lt. Dale Hammack RE: Vander Woude Warehouse Building (Lot 13) DATE: August 18, 1989 As per our discussion at the Technical Review Board Meeting of 17 August 1989, I am recommending the following: 1. Comply with Construction Security Ord. (5-8G) i) DalJ. ~._~ Lt. Dale Hammack DH/cm Orayare · P.O. Box 2944 ~rto.ro8.T FC:Jr:1~'243.52S0 REPLY MESSAGE Fold At (.) To Fit GraY8lc Window Envelope' EW10P REORDER ITEM" F269 r: ~~~ c:;;;;;;--.~ TO ~I"""- c:::;-~ ~~.-...)"1L- -, FROM K~Q::r- ~~~T" -Ptr.,...,....J<a. COSt_f(:_ Wc>~P'~~~L SUBJECT: ____'!t!!.P~~_~~_t.!~~___Y1~~~_~~__________~~__{!_______________j)A TE:.___~:::._! 7 ~- POLO. p(.l.gp~ \)e-H-''-L.1Oi --r-'Uca..r.> A/2.()~O ~u,s.\ ~E 5l-4"'~,.J O,J S'rT"'!5'"" RAU G....--r~-r RB:,L..lC- WOe:..~ """10 Wc>e..~ ~ I > Ou'l I 1.1f'~ 7~:J.y' PLEASE REPLY TO . REPLY DATE: SIGNED Item II F269 G,aya,c, P.O. Box 2944, Hartford, CT 06104-2944 @ W'-IerGroup.lnc.1982 THIS COPY FOR PERSON ADDRESSED .L PERSON ADDRESSED RETURN THIS COpy TO SENDER ! MEMORANDUM August 17, 1989 TO: Steve Scowden FROM: James J. Golden, Senior City Planner RE: Vander Woude Warehouse Building (Lot 13) Administrative Site Plan With respect to the above, please be advised of the following: 1. Approach to dumpster enclosure to be deepened by relocating the dumpster enclosure farther back in the swale area. 2. Parking spaces No. 9 and 10 to be eliminated to allow sufficient turn-around area for front-end loader. 3. Details of loading zone to be shown on north wide of building. 4. The ratio of parking provided is for warehouse, storage, and wholesaling uses only. Manufacturing establishments and contractors cannot be licensed at this location, as additional parking spaces would be required (Section 11.H.16.f of Appendix A, Zoning). -A-"'. t. ~ ames p. Golden JJG:cp MEMORANDUM TO: Carmen Annunziato Planning Director FROM: Kevin J. Hallahan Forester/Horticulturist DATE: August 21, 1989 RE: Vander Woude Warehouse Lot #13 & 15 Tarr Warehouse Building Lot #14 The following landscape comments pertain to the above three sites because of the similarity in landscape materials proposed. 1. The surnam cherry hedge is not a native species and should be substituted with a native hedge. 2. The hedge material along the road R.O.W. must be 36" in height at the time of planting. 3. The applicant should review how any existing overhead power lines may interfere with proposed trees for the sites. ~~?: ~,~UAW Kevin J. allahan Forester/Horticulturist KJH:ad DOC:A:VWW