REVIEW COMMENTS
M~M.Q.R.BNP.W..M.
'fo: dJ.m EioldE~n
Senior City Planner
();:5/02/El9
From~ Vincent A. Finizio
Engineering Department
pi::\gE~ :I. o-f .<_
Subject~ T.R.B. Comments -for Village Shoppes ot Boynton
1 .. P lac:: t? t h f.-:! Ir' E~ qu i r" t:,,\c] lJ tvla!5 t E?j'"' Plan" !st at. E!mf.o'n t '5 I'" Eg ,,:~I'" cj in g thE'
availability of required utilities on plans and further indicate
the location of all tElephone, power, gas and all other existing
utili.ti(~,'s in accor-dancE,' with (lIPp. "e" Subdivision i:!.nd PI<:,t.t.inq,
Article VIII, Section 4-17.
2. The Developer's Engineer shall submit ~ cost estimate
including a summary of quantities for the required improvements
In accordance with Article VIII, Section 5, B, 2, (d).
~. Developer's Engineer shall submit a statement of technical
compliance and establish surety in the form of a performance bond
110 % ) of Engineer's cost estimate for the required
improvements plus an administration fee which shall equal two (2)
percent of the Engineer's cost estimate, including but not.
lim:i.t,(,~!d to o,;i>; (6) !Sf:~ts:, of cons;tl~uction plal"'ls, ha\/:i.ng Ht,,::'alth
Department approval at the time of the submission for final plat.
Article VIII, Section 5, D, 5 and Section 7 inclusive.
4. F'l'" ov :i. d(?' i:, P '::,ir" k :i. \,,', 9 1. ot
requirements of Boynton Beach
Section 5-142 (a) required
standards inclusive.
lighting plan consistent wit.h the
Parking Lot Regulations, Article X,
lighting and 5-141 (n) lighting
5. Irid:i.cc\tf.-:! on f::.lan!':;. thf.-:! r"equilr'ed "FIF:E
signage in accordance with Section 5-142 (ml
LtiNE" !str-:iping
.firt? lanes.
ar',d
6. Landscaping plan details for bermed and/or at grade planting
areas, conflicts with engineering plan details for swaled
retention at these areas. Modify the landscaping plans so thev
compl:i.m(-:!nt. engi,nE'f::I'-inc:.1 plan details.. I~)PP "C" I:.i,!,..ticl(?, X, SE'ct.ion
5, B, drainage and Section 5-141 (n) drainage standards.
I" F'l'-ovide "j:)(?r'lch mar-k!s" ,:'!nd <:\pplicc~ble sUI"vey~s for" sit(-:!
development in accordance with Article VIII, Section 5-2 (g)"
8" South Florida Water Management approval required and
Palm Beach County construction within R..O.W. permits required
9. Based on comprehensive plan traffic circulation elements and
Section 5-140 (a) safety objectives, the City of Boynton Beach
Engineering Depart.ment recommends the construction of a de-
acceleration lane at the extreme north-west ingress/egress
approach t.o facilitate vehicular turning movements o-ff of
Con q I'" E.,' !::; !::. (:~ \/ E' "
T.R.B. Village Shoppes of Boynton cont'd
pc?gf.'? 2 0+ :?
10. HE~\li~;e "I"'ic~ndicc~p'l parkinq ,=,tall c:olol~!::, fl'''Dm ~'Jhit.f..~ to blue c:"!:;
I'" E' qu i I'" f'f!d i 1"', ~:3E~C t i 0\"", :=..i.....141 .; 1"', ) h ,,:In d :i. c: ap ',:; t. ,:"-1'1 d '::,\1'" d!S.
11. Error in boundary dimensions and/Dr legal description.
Northeast perimeter property line dimension of 381.38' as shown
on plat document, conflicts wit.h legal description text. which
indicates a distance of 301.38'. Revise text and/or plat
document accordingly.
12.. Add construction note that all shellrock utilized in the
const.ruct.ion of pavement areas shall conform to the requirements
of Article X, Section 5-141 (n) construction standards.
Note: Shellrock meetinq the above referenced specifications, may
no longer be available in the Palm Beach County area. Limerock
meeting D..D.T. standards may be used as an alternate base
material if deemed suitable for construction by the Developer's
E~nqi neel'-..
13. Provide plans and construction
c:l'-o':;s....'~.Jal k ,:,\nd 1"'(.:=.,1 c?t~?d "t 1 ,::\~;hi nq
Boulevard.. SBCCI Section 103, plans.
d f.-:! t. cd Is".
liqht."
for the pedestrian
system at Quantum
14. Developer's plans indicate sidewalks through ingress/egress
approach areas in conformance with Section 5-141 (n) sidewalks..
{.~I'''c:h :i, tE'c t s; p 1 i;:'.n~.:. 1:.tP............f.J,,q:t. f"E.f 1 pet th is c::ond it :i. Dn.. r:;:t;:'\l i se the
architectural plans accordingly.
15. Provide details for the swale sections within Congress Ave.
R.D.W. as shown on plans.
16. Provide a street lighting plan
inst.alled within that portion ot
abutting plat boundaries, alDng with
street lights to be installed, and a
the cost estimate made payable to the
for the street lights to be
t.he eonqress Avenue R.D.W.
a cost estimate for the
check in the full amount of
City of Boynton Beach..
Note~ A Florida Power and Liqht plan is currently on file with
F.. F' .. L.. ".. ~::':'p r"I~2Sf.:.>nt i::\t i Vf2 (i.. G.. I' F;:u s:;t y" F;:u'o,;!o;i 11 <:), J r.... t el ~ 2]H.....3::~:; 11 .
Contact Mr. Russillo for cost estimates which shall re-flect t.he
cost of street lights along your plat boundaries. Verification
of costs by Mr. Russillo and applicable fees, shall be submitt.ed
to the Engineering Department at time of submission for final
p.l.at..
17.. Provide owners approval and easements for the irrigational
line that will draw water from the off-site lake not included in
t.h:i.=-:; pli::1t.
Respectfully submit.t.ed,
\~:~;;tA~~~i~L~~j":~::_---
MEMORANDUM
Date:
Carmen Annunziato, Planning Directo~l~
John A. Guidry, Director of Utilities ~~
May 3, 1989
To:
From:
Subject:
TRB Review - Village Shoppes Preliminary - Plat
We can approve this project, subject to the following conditions:
1. The water main near the theater must be moved out from under
the dumpster enclosure.
2. Add an additional valve on the fire hydrant near the theater,
plus an additional main-line valve near the hydrant at Building
"E."
3. We question the need for a 2" meter on the bank parcel.
4. A 2" x four 1" brass adapter may be used to allow 4 meters on
one 2" service. Add additional service lines as necessary for
those services showing more than 4 meters.
5. Type "K" copper is required on all water services with either
end under pavement, which appears to be all services on this
site. Meters may be relocated to grassed areas so as to
shorten the services, if desired.
6. A tapping sleeve and valve will be required for the hydrant
line near buildings "L" and "M." Also, indicate the water
service to be tapped into the hydrant line, rather than the 16"
water main. Add a gate valve near the hydrant.
7. Water mains are not permitted in sidewalks in that they pose a
trip hazard to pedestrians.
8. Specify the size and materials used for sanitary services.
9. Add a detail showing raised curb areas around garbage can and
dumpster wash areas, which must be directed to the sanitary
sewer system. Alternatively, provide a detail showing how
these areas will be contoured to preclude storm water from
entering the sanitary system, as prohibited by code.
10. Water services and meters must be included in utility
easements.
dlh
bc: Peter Mazzella