CORRESPONDENCE
:~- ..
Q~;t F
PLANNING AND ZONING DEPARTMENT
MEMORANDUM NO. 92-041
FROM:
Robert Eichorst, Public Works Director
Mike Kazunas, city Engineer
Al Newbold, Deputy Building Official
Bill Cavanaugh, Fire Prevention Officer
Pete Mazzella, Assistant to Utility Director
Lt. Dan Remchuk, Police Department
John Wildner, Parks Superintendent
Kevin Halla~n, Forester/Environmentalist
,.-,/ /1/ ~ /1 ""7f-;-
""d~t..b.1-<-' . ,~ (.)'t-)J A*,~OA ~
ClirJ.stopher ro IPlanniii'gTzorllng Director
March 11, 199~
TO:
DATE:
RE: NEW SITE PLAN - Waste Manage!llent of Palm Beach -
Mulching Facility
LOCATION - Boynton Beach Distribution Center -
North side of cul-de-sac at the East end
of Industrial Way
APPLICANT - Michael P. OIBrian, General Manager,
Waste Management of Palm Beach
FILE NO.: 671
Find attached for your review the plans and exhibits for the
above referenced project. Site Plan Review approval for this
project will be granted by the city Commission. To ensure that
the project stays on line with the review time frame, I request
that the plans and exhibits be reviewed and formal comments
transmitted to the Site Development Division of the Planning and
Zoning Department no later than 5:00 P.M. on March 25, 1992.
Adhering to the following review guidelines will promote a
comprehensive review and enable the applicant to efficiently
obtain Technical Review Committee approval:
1. Use the review standards specified in Part III, Land
Development Regulations, Chapter 4, Site Plan Review,
section B to review and formulate comments. (See attached)
2. The documents submitted for the project were determined to
be substantially complete based on the submittal
requirements identified in section 7 of the Site Plan Review
Ordinance. However, if the data provided to meet the
submittal requirements is insufficient to properly evaluate
and process the project based on the review standards,
additional data should be requested by the reviewer through
the Planning and Zoning Department.
To: TRC Members
Re: Waste Management, # 92-041
Page Two of Two
3. Each comment shall reference the code section and include
the language of the submittal requirements and review
standards that require the data to be submitted for review.
4. Technical Review Committee member(s) shall identify in their
comments when the plans depict or when the location and
installation of their departmental required improvements may
conflict with other departmental improvements.
5. When a TRC Member finds a code deficiency that is outside of
his/her review responsibility, the comment and the specific
code section may be included in their review comments with
the name of the appropriate TRC Member that is responsible
for the review specified.
6. If a TRC member findd the plans acceptable, he/she shall
forward the plans and a memo, within the time frame stated
above, to the Planning and Zoning Director stating that the
plans are approved and they do not have any comments on the
plans submitted for review.
All comments shall be typed and addressed to the Planning and
Zoning Director and transmitted to the Site Development Division
for distribution to the applicant. Please include the name and
phone number of the reviewer on this memo.
The Site Development Division will send to the applicant a cover
letter which includes the comment(s) and directions to amend the
plans to comply with the comments and submit to the Site
Development Division within 90 days twelve (12) sets of amended
plans for review. When the Site Development Division receives the
amended plans, they will distribute the plans with a cover memo
to all TRC Members for review and approval.
Attachment
xc: (Memo Only)
Don Jaeger, Building Official
Ed Allen, Fire Chief
Charlie Frederick, Parks & Recreation Director
Edward Hillery, Police Chief
John Guidry, utilities Director
Project File
Chronological File
C:WASTMGMT.SDD
TECHNICAL REVIEW COMMITTEE
MEMORANDUM
March 20, 1992
TO: Robert Eichorst, Public Works Director
Mike Kazunas, City Engineer
Al Newbold, Deputy Building Official
Bill Cavanaugh, Fire Prevention Officer
Pete Mazzella, Assistant to Utility Director
Lt. Dan Remchuk, Police Department
John Wildner, Parks Superintendent
Kevin Hallahan, Forester/Environmentalist
FROM: Dorothy Moore, Zoning & Site Plan Reviewer
RE: Technical Review Committp.e Meeting - March 31, 1992
Please be advised that the Technical Review Committee will meet
on March 31, 1992, at 9:00 a.m. in Conference Room "c" (West
Wing) to discuss the following:
REVIEW OF TECHNICAL REVIEW COMMITTEE COMMENTS
PROJECT:
LOCATION:
APPLICANT:
FILE NUMBER:
Exxon Service Station
S.E. corner of Congress Ave. and Woolbright Rd.
RJ Properties and Developments, Inc.
669
PROJECT:
Waste Management of Palm Beach - Mulching
Facility
Boynton Beach Distribution Center
Michael O'Brian
671
LOCATION:
APPLICANT:
FILE NUMBER:
Both projects to be discussed as Conditional Uses.
DISCUSSION
Documenting amount of time spent reviewing plans
~7--4~~-<L
Dorothy Moore
XC: City Manager
Don Jaeger
Ed Allen
Charlie Frederick
Edward Hillery
John Guidry
Christopher Cutro
Tambri Heyden
Steve Campbell
Central File
City Commission
ProJect File
rz7ie City of
'lJtJynton ~eacli
.".J... '.
100 'E. 'Boynton 'Beadr. 'Boulevard
P.O. 'Bo~310
'Boynton 'Beacli, ~forUia 33435.0310
City:J-fa[[: (407) 734-8111
~jU: (407) 738.7459
THE CITY ENGINEER
May 18, 1992
Dan Weisberg
Senior Registered Civil Engineer
Palm Beach County Traffic Division
P.o. Box 21229
West Palm Beach, Florida 33416-1229
Re: Waste Management of Palm Beach
Mulching Facility
Traffic Impact Study
Dear Mr. Weisberg:
The above commercial site is scheduled to be before our Planning
and Development Board for review in June 1992. The developer has
submitted the trip generation analysis attached. Due to the low
number of anticipated trips (27), we propose the traffic impact
study be waived.
Attached for your information is a site plan and location maps.
Please notify us if you agree with our request.
Very truly yours,
CITY OF BOYNTON BEACH, FLORIDA
~ . . C~ .1'1"""'1'''''' T,rD' ~
RL.. . t.L V~-
Jill 19
PLANNh~G DE-PT.
~~'b-"
Michael E. Kazunas, P.E.
City Engineer
MEK/ck
attachments
-
cc: Chris Cutro, Planning & Zoning Director
Michael P. O'Brien, General Manager, Waste Mgmt. of P.B.
~merica's gateway to tlie (julfstream
/
WaJSte.Management of Palm Beach
.A WMI Service Center
651 Industrial Way
Boynton Beach, FL 33426
(407) 547-4000
(407) 272-5855
~
'e?I
A Waste Management Company
April 1., 1.992
Mr. Michael Haag
zoning and site Development Administrator
city of Boynton Beach
1.00 East Boynton Beach Boulevard
Boynton Beach, Florida 33426
Dear Mr. Haag:
Waste Management of Palm Beach is proposing to develop a waste
reduction f~cility for the purpose of mulching vegetative
materials.
In regards to this process our operating plans include the
following assumptions:
o The waste reduction facility will employ-five full-time
employees.
o The waste reduction facility will take delivery of some
30 in-bound loads of vegetative (only) materials; or,
some 600 cubic yards, each working day.
o The mulching process will reduce the volume of in-bound
materials by about 3:1 generating some 200 cubic yards
of mulch each day. Mulch will be loaded into 100 cubic
yard transfer trailers for out-bound transport.
Summarily, our operation will add a net of 27 daily trips.
5
30
~
37
<10>
27
Employee Trips
In-Bound Truckloads
Out-Bound Truckloads
Gross Daily Trips
Current Dailv TriDs *
Net Daily Trips
* Ten (10) collection route vehicles
will each deliver its last daily load
to the waste reduction facility in
conjunction with returning to our
existing hauling operation compound ;,
thus requiring no additional daily
trips.
PLANNING AND ZONING DEPARTMENT
MEMORANDUM NO. 92-077
April 29, 1992
TO: Robert Eichorst, Public Works Director
Mike Kazunas, City Engineer
Al Newbold, Deputy Building Official
Bill Cavanaugh, Fire Prevention Officer
Pete Mazzella, Assistant to Utility Director
Lt. Don Thrasher, Police Department
John Wildner, Parks superintendent
~~vin_Ha~lahan, Forester/Environmentalist
~~
FROM: Christopher Cutro, Planning & Zoning Director
RE: Second Review - New Site Plan
Waste Management of Palm Beach - Mulching Facility
Boynton Beach Distribution Center
FileNo.: 671
Attached is the amended site plan for the above referenced development for
your final review and recommendation.
We would ask that you review this amended site plan to determine if the
plans have been adjusted to satisfy comments made previously by your
department.
If the comments have been satisfied or if your comments can be met at time
of building permit, please advise the Planning and Zoning Department in
writing.
If your comments have not been met or must be met by correcting the site
plan again, please advise the Planning and Zoning Department in writing.
Finally we would ask that you recommend to us if the the plan should be
forwarded to the Planning and Zoning Board for review or held for further
revisions by the applicant.
Please return your memo and the revised plans to the Planning and Zoning
Department by 5:00 P.M. on May 6, 1992
If you should have any questions regarding this plan, please feel free to
call Mike Haag at 228 who is coordinating the review of this development.
XC: (Memo Only)
Don Jaeger
Ed Allen
Charlie Frederick
Edward Hillery
John Guidry
Project File
Chronological File
C: 2REVIEW. SDD
The property in question is legally described as follows:
. ,
A portion o~ the N.W. 1/4 o~ the N.W. 1/4 of section 16, Township 45
South, Range 43, Palm Beach County, Florida, more particularly described
as ~ollows:
BEGINNING at the Southeast corner of Lot 16, BOYNTON BEACH DISTRIBUTION
CENTER, accordinq to the plat thereof, as recorded in Plat Book 47, Pages
100 and 101, of the public Records of Palm Beach county, Florida;
THENCE North 00000'07" East, 232.02 feet;
THENCE South 87042'35" East, 449.23 feet;
THENCE South 00006'46" West, 232.00 feet;
THENCE North 87042'35" West, a distance of 138.99 feet to a point on the
arc of a non-tangent curve concave to the Southwest (said point bears
North 55025'13" East from the radius point of the next described curve);
THENCE Northwesterly, alonq the are of said curve having a radius of
50.00 feet, a delta of 95057'48" an are distance of 83.74 feet to a Point
of Reverse Curvature with a curve concave to the Northwest;
THENCE Southwesterly, along the arc of said curve, having a radius of
25.00 feet of delta of 42050'00" an arc distance of 18.69 feet to a Point
of Tangency;
THENCE North 87042'35" West, 218.80 feet to the POINT OF BEGINNING;
Said lands lying in the City of Boynton Beach, Palm Beach County,
Florida, containing 102.961 square feet, (2.364 acres) more or less.
CHECKLIST
The following list and information is provided as a checklist to ensure
that the submittal of amended plans and documents is substantially complete
for review. Turning in the list and the app~opriate plans and documents
w1ll enable the submittal to be efficiently checked prior to being accepted
by the Site Development Division of the Planning and Zoning Department.
Project Name: ;VtJtt:::. /l.IIIAh<J(~/l1E-.:Nr (muLCH/Nt.. F/.JelLi
1.
,p(.
{,
..."Ii
,....1'
oj'
C.'\I
v I, /
J}v,./
.r"" ",P
. I ....t/
,:" ,'''''
<;I l.\<-'
, ~,P
2.
0\'-
3 .
oiL-
4.
oiL
5 .
oiL
(?~ .
7.
elL
'i-a.
o
Submit an amended site Plan Review application form that reflects the
changes that were made as a result of amending the plans and documents
to comply with the Code of Ordinances and the Technical Review
Committee comments. A copy of the original form with a distinguishable
symbol identifying the change(s) may be submitted or a completed new
form with the changes identified. It is the agent of the owners
responsibility to notify the owner(s) of changes. If there are no
changes required to be documented on the application form, a letter
from the applicant stating same must be turned in with the amended
submittal.
Submit twelve (12) assembled and complete sets of plans and documents
that show compliance with the Code of Ordinances and comments made by
the Technical Review Committee. Two (2) of the sets shall have the
appropriate legible raised seal and signature of the designer
responsible for the drawing(s). Plans and documents shall be assembled
in twelve (12) individual complete packages with the title of the
project on all pages and/or sheets and each page or sheet numerically
numbered such as the following example: 1 of 3, 2 of 3, 3 of 3.
Submit a completed Community Appearance Board (CAB) review application
form with fifty dollars ($50.00) application fee payable to the City
of Boynton Beach. Copies of the form are available at the Site
Development Division of the Planning and Zoning Department.
Submit a locator map that identifies the location of the site and the
surrounding roadways and zoning districts. (Refer to directions on the
CAB application form)
Submit color photographs of the buildings on the site that are to
remain in their existing condition and photos of existing buildings on
sites that abut the subject property. (Refer to directions on the CAB
application form)
Submit a legible 8 1/2" by 11" transparency of the landscape site plan
drawing. (Refer to directions on the CAB application form) .
Submit colored elevation view drawings - Duplicate drawings of the
drawings submitted for site plan review that have been colored.
(Not mounted - Refer to directions on the CAB application form)
Submit color samples of the proposed color(s). (Refer to directions on
the CAB application form)
A:CHECKLST.CAB
~ City of
. ':Boynton 13eacn
P!anni.ne & Zonirre 'Departmtnt
100 'E. llJoynton 1lJea&. 'Boukvanf
P.O. llJo't,310
llJoynton llJeadt,::J{orUfa 33425-0310
(407) 738.7490, iJJU: (407) 738-7459
March 30, 1992
Mr. Ron Dorris
Ron Dorris Architects
311 N.E. 8th Street, Suite 202
Homestead, FL 33030
RE: Initial Review Comments
Waste Management of Palm Beach - Mulching Facility
File No. 671
Mr. Dorris:
The City of Boynton Beach has completed its first review of the
site plan for the above referenced project. Attached are comments
made by the reviewing departments during their initial review of
your project.
In order to complete the review process, the site plan and
documents must be amended to comply with these comments within 90
days of the date of this letter. (If amended plans are not
submitted in 90 days, a new application fee will be required.)
When there are comments made by the reviewers that you feel are
not applicable to the approval of the project or will be
addressed separately and you have not amended the plans to comply
with the comment(s), you must prepare written explanation for
each comment stating why the comment is not applicable and return
the explanation with the amended plans and documents.
After amending the plans and documents, please submit twelve (12)
complete sets of the plans to the Planning and Zoning Department.
When the amended plans and documents have been submitted to the
Planning and Zoning Department, they will be distributed to the
reviewing departments for a second review and the reviewers will
recommend if the site plan will be placed on a board approval
schedule (see attached). If there are major comments not
addressed by new plans or the reviewers recommend that the plan
not be forwarded to the Planning and Zoning Board, this office
will notify you on your alternatives regarding the site plan as
soon as possible.
JImeri.ca's gateway to tlie gulf stream
To: Mr. Ron Dorris
Re: Initial Review Comments, File No.: 671
Page 2 of 2
We have also enclosed for your convenience an approval schedule
and a checklist that contains information regarding the second
submission of the plans and documents for review.
If you should have any questions regarding the comments or on the
approval schedule, please feel free to call Dorothy Moore who is
coordinating the review of your site plan for the Planning and
Zoning Department.
Yours truly,
~~
Christopher cutro
Planning & Zoning Director
CC:ald
Attachments
xc: Central File
Chron. File
Project File
C:WASTEMT.SDD
... "~':
COND:IT:IONAL USES
P&Z
SUBMJ:SS:IOH p & Z C.A.B.
DEADL:INE HEARING MEETmG
Apr 7 May 12 May 14
May 5 JUn 9 Jun 11
Jun 9 Jul 14 Jun 16
CITY
COMMISSION
PUBLIC HEARING
May 19
Jun 16
Jul 21
'It P&Z
CAB
cc
= Planning & Zoning Board
= Community Appearance Board
= City Commission
CHECKLIST
The following list and information is provided as a checklist to ensure
that the submittal of amended plans and documents is substantially complete
for review. Turning in the list and the app~opriate plans and documents
will enable the submittal to be efficiently' checked prior to being accepted
by the Site Development Division of the Planning and Zoning Department.
Project Name:
1. Submit an amended Site Plan Review application form that reflects the
changes that were made as a result of amending the plans and documents
to comply with the Code of Ordinances and the Technical Review
Committee comments. A copy of the original form with a distinguishable
symbol identifying the change(s) may be submitted or a completed new
form with the changes identified. It is the agent of the owners
responsibility to notify the owner(s) of changes. If there are no
changes required to be documented on the application form, a letter
from the applicant stating same must be turned in with the amended
submittal.
2. Submit twelve (12) assembled and complete sets of plans and documents
that show compliance with the Code of Ordinances and comments made by
the Technical Review Committee. Two (2) of the sets shall have the
appropriate legible raised seal and signature of the designer
responsible for the drawing(s). Plans and documents shall be assembled
in twelve (12) individual complete packages with the title of the
project on all pages and/or sheets and each page or sheet numerically
numbered such as the following example: 1 of 3, 2 of 3, 3 of 3.
3. Submit a completed Community Appearance Board (CAB) review application
form with fifty dollars ($50.00) application fee payable to the City
of Boynton Beach. Copies of the form are available at the Site
Development Division of the Planning and Zoning Department.
4. Submit a locator map that identifies the location of the site and the
surrounding roadways and zoning districts. (Refer to directions on the
CAB application form)
5. Submit color photographs of the bUildings on the site that are to
remain in their existing condition and photos of existing buildings on
sites that abut the subject property. (Refer to directions on the CAB
application form)
6. Submit a legible 8 1/2" by 11" transparency of the landscape site plan
drawing. (Refer to directions on the CAB application form)
7. Submit colored elevation view drawings - Duplicate drawings of the
drawings submitted for site plan review that have been colored.
(Not mounted - Refer to directions on the CAB application form)
8. Submit color samples of the proposed color(s). (Refer to directions on
the CAB application form)
A:CHECKLST.CAB
, LOW T EST
Request Date:
Bill Fenno
21 Hay 1992
Keith & Sc:nnars
From:
Company a
Pbone:
305 776 1616
.,.
~--~~~--~------~~--~--~-~-~-------~--~--~-~-~~-~~~-----~-~----~
Location:
Commerce. Park
· D I A G a A Y ·
(Include direction, 5treet names, hydrant location, intersectiona,
a.nd main sizes)
n 4\
~6" 0
= S
.... 6"
QQ fa
=- rt
l'I
" Indu8t:%ial It Way
,... J
~
QQ
/II 6" II
1lO 6" "l:I
P- 1""
6" ',)/2
I
Hydrant 2:
now Read1nl:
? A P .....
Residual Readini:
(890 gpm)
35psi
Hydrant 1:
Static Read1ng: 44ps1
Assigned Date: 21 Kay 1992
Tested Da.te:
21 Kay 1992
Tested By:
U 1l'......o(y..
Time Teeteda 1500
AVAILABLE GPM AT 20 PSI R~SIDUAL:
1510 psi
PLOW TESt ~BE ---------------$ 7~.OO
MAIL FEE TO: BOYNTON BIACR FINANCE D!rA&TMBNT
100 E. BOYNTON B!ACH BOULEVARO
BOYNTON BEACH, FLORIDA 33435
" ,. .. f' '" '''''' I 4' .
M E M 0 RAN DUM
March 26, 1992
TO: Christopher Cutro, Planning & Zoning Director
FROM: Michael E. Haag, Zoning & Site Development Administrator
RE: Site Plan Review - New Site Plan
Waste Management of Palm Beach - Mulching Facility
Location: Boynton Beach Distribution Center -
North side of cul-de-sac at the East end of
Industrial Way
Applicant: Ron Dorris Architects
File No.: 671
The following comments are in response to the submittal of the
site plan for the above referenced project. The project is
scheduled for review of comments and discussion of conditional
use at the March 31, 1992, Technical Review Committee meeting.
1. The perimeter boundary of the proposed site shown on the
location map found on Sheet A-2 of 10 does not match the
existing site plan, the proposed site plan shown on the same
sheet, or the survey that was included with the submittal.
Amend the plans to show consistency in representing the
perimeter boundary of the new site.
2. The piece of land shown on the survey as not subdivided is
substandard in size and shall be incorporated into the size
of the new mulching facility lot. (Appendix C, Subdivision,
Platting, Article X, Section 7)
3. Amend the required off-street parking space count specified
on Sheet A-2 of 10 to read "4 spaces." [No fewer than four
(4) parking spaces shall be provided for any non-residential
use - Appendix A-Zoning, Section 11.H.5] Identify on the
plan the total number of employees that will be working at
the new facility. (Section 8.3.4, Chapter 4, Site Plan
Review)
4. Amend the provided off-street parking space count specified
on sheet A-2 of 10 to identify the total number of spaces
that are provided at the site, less the number of spaces
that are dedicated and required for the adjoining site.
(Section 8.3.4, Chapter 4, Site Plan Review)
5. Add the following parking space information to sheet A-2 of
10:
i. Identify and list the total number of parking spaces
that exist on the entire sire prior to the proposed
development
ii. Identify and list the total number of parking spaces
rh~r w,ll AY'~r nn rhA nln ~irp NfrAr rhp npw ~itp is
To: Christopher Cutro
Re: Waste Management - Mulching Facility
Page Two of Three
6 .
Add the following note to the proposed site
Sheet A-2 of 10; All landscaped areas shall
the installation of City approved curbing.
Chapter 4, Site plan Review)
plan drawing on
be protected by
(Section 8.1,
7. Correct the inconsistency on Sheet A-2 of 10 and the survey
with regards to the location and shape of the proposed
ingress/egress easement and new driveway.
8. This development order is subject to the Palm Beach County
Traffic Performance Standards Ordinance No. 90-40 since it
is a new non-residential project impacting county roads.
Submit information in letter form, regarding the number of
trucks and employees associated with this use and the amount
of mulch produced and shipped daily. If there are not any
trucks directly associated with the use list the number of
trucks that deliver organic material to the site and ship
same from the site on a daily basis. This information is
needed to determine the number of gross trips per day that
are generated by this use.
9. The attached Community Appearance Board (CAB) application
form must be completed and submitted, by the applicant, with
a fifty dollar ($50.00) application fee. Color samples of
the exterior finish materials are required to be submitted
with the application form. [Section 19-43, Article III,
Chapter 19]
10. Change the area identified on the landscape plan as existing
soil to an improved surface of appropriate landscape
material or an other acceptable surface. (Section 8.1,
Chapter 4, site Plan Review)
11. Indicate on the site plan drawing whether there is a
dumpster enclosure proposed to be placed around the dumpster
pad. If there is an enclosure proposed, show on the
landscape plan accent shrubs around three sides of the
enclosure. If there is not an enclosure, show on the
landscape plan hedge material two (2) feet on center around
three sides of the concrete dumpster pad. (Section 8.1,
Chapter 4, Site Plan Review)
12. To determine compliance with the Landscape Code, the
following information must be added to the landscape plan:
Identify the site specific landscape specifications
regarding the placement, location and spacing of required
landscape material. The specifications shall be noted as
identified in the text of the Landscape Code. Complete the
specifications by identifying the actual distance in feet
and/or area in square feet for each type of required site
specific landscaping for the proposed site. (Section 8.1,
Chapter 4, Site Plan Review)
., ~ 1\....:J..:J +-_ -I-l-.._ 1 __..:1__...,,__ _1....._ +-k_ __..........4.......,..,,1I'1r- "IP; r",,~l 1 ~"'"'...:IC'!I"...':3T"\~
PUBLIC WORKS MEMORANDUM NO. 92-037
TO: SITE DEVELOPMENT DIVISION OF PLANNING & ZONING
FROM: ROBERT EICHORST - PUBLIC WORKS DIRECTOR
DATE: MARCH 16, 1992
SUBJ: WASTE MANAGEMENT OF PALM BEACH .MULCHING FACILITY
Public Works does not have any concerns or problems with the
plans as submitted.
Time spent reviewing plans, approximately 15 minutes.
~/~
Robert Eichorst
RE:he
cc: file
...,...."c
,- nT"I""~
--..~ < 1:,.i.
'R "'!"
. """'
Jii~j.Ii\\j ,
>"-'--
..--.".'-----
-..-...-
ENGINEERING DEPARTMENT MEMO NO. 92-070
TO:
Christopher Cutro
Planning and Zoning Director
FROM:
Michael E. Kazunas
City Engineer
~o-
DATE: March 27, 1992
SUBJECT: Waste Management of Palm Beach
Site Plan Review Comments
We have reviewed the above site plan and can review pending
resolution of the following comments:
1) There exists a discrepancy between the location map and
site plan (sheet A-2) regarding the location of the east
property line. If the existing site is to maintain road
frontage at the cul-de-sac, the plan must reflect same
including width of this finger of land. If this is not
intended for road frontage, then this finger of land
shall be included into the newly formed parcel to assure
responsibility of maintenance.
2) Developer shall provide documents suitable to the City,
which describe the access, utility and parking
agreements with the property owner to the north.
3) The 5' concrete walk shall extend to the south property
line in the cul-de-sac area and connect to the existing
walk.
4) On page A-3 "Asphalt Pavement Typical Section", the
pavement driveway width does not agree with the dimension
shown on the site plan. City standard requires a minimum
width of 27' between parking bays. See attached.
5) The handicapped stall layout detail, page A-3, is not
in accordance with City detail. See attached.
6) Traffic signs must be installed per F.D.O.T. detail index
11865. Page A-3 detail Traffic Signs.
7) Hadicapped sign shall be D.O.T. FTP 26 per city detail. See
attached.
8) Approvals to construct within easements must be obtained from
FP & L and the Boynton Beach Utility Department.
Eng. Memo No. 92-070
-2-
March 27, 1992
9) Removal of existing asphalt lot and drive shown in existing
site plan should be addressed in the proposed site plan.
10) Drainage calculations addressing water quality and quantity
shall be provided. South Florida Water Management exemption
must be obtained. Pretreatment and run off discharges must be
in accordance with SFWMD or City ordinance, whichever is most
restrictive. Drainage calculations must address existing
site drainage from property to the north which now enters
this site. ORD. 91-73, 7.6.1
11) Curbs shall be provided at all internal radius and per city
standard, at all parking stalls abutting landscaped areas.
12) Traffic generation study must be provided to determine
whether concurrency requirements are met or whether a more
thorough study is necessary.
13) Surface treatment in the area of the mulching operator
machine and organic stockpile must be shown on plans. These
areas must also be defined by curb, wall, or surface
treatment to confine the stockpiles and work areas to
specified areas on the site.
14) Pervious areas for storm water treatment shall be covered
with vegetation. Article X, Section S.B
15) Catch basins shall be moved to grassy areas to provide
treatment prior to discharge into a closed sewer system.
Article X, Section S.B.
MK/cmc
C:WASTEMG
fYl <( /~
3.7(~1"7...
INTERDEPARTMENTAL MEMORANDUM
To: Mike E. Kazunas
City Engineer
jvlarch 17!, 1 QQ?
From: Vincent A. Finizio
Administrative Coordinator of Engineering
Re: Your Directive to Review Waste Mgmt. Mulching Station
Conceptual Plan Review
Technical Review Committee Comments
Pursuant to your directive to review the above referenced
conceptual plans, please accept the following comments and feel
free to delete, modify or disregard any or all of the comments
should you determine them to be not applicable or an incorrect
application of the City"s Code of Ordinances. The review and
analysis of these plans do not contain comments regarding
drainage nor engineering design, but are solely based upon a
review of compliance or non-compliance with City Codes,
specifically Chapter 19. It is my understanding that you will be
performing an engineering analysis of the overall design and
drainage.
In accordance with the City of Boynton Beach Florida Code of
Ordinances, specifically Chapter 19, the applicant shall submit
the following plan revisions, corrections, technical information
and data:
1. Provid~ plans which in accordance with Chapter 5, Article X,
"Boynton Beach Parking Lot Regulations", specifically Section 5-
138 (a), depict the upgra.Jing of the e~dsting parking lot ir.
order to comply with minimum City codes. Section 5-138 states:
"...compliance is required under any of the
following circumstances:
(a) When a parking lot serves an existing
building(s) where said building(s) is pro-
posed to be enlarged or when an additional
building(s) is proposed to be constructed."
END OF IV\EMO
RECEIVED
MAR 3 1 1992
SITE OEVEl
8OVHrON8EACH,~
l ) '=,=",A-A?~:l~(f-
Vincent A. Finizio
BUILDING DEPARTMENT
MEMORANDUM NO. 92-081
March 25, 1992
TO: Chris Cutro
Planning Director
THRU: Don Jaeger~ ~ /
Building oQ(~al
FROM: Al Newbold
Deputy Building Official
RE: TRC COMMENTS - SITE REVIEW FOR
WASTE MANAGEMENT MULCHING FACILITY
After reviewing the plans for the above referenced project, I
have no comments at this time. Our list of required submittal
documents will cover all permit comments.
Our review time for this project, including typing, was 2 3/4
hours.
~ //
/.~.
Al Ne
,
AN : bh
RECEIVED
M.1R 2$
PLANNING DfPT!
-
MULCHING. DOC
-
FIRE DEPARTMENT MEMORANDUM NO. 92-208 woe
TO:
crry PLANNER
FROM:
FIRE DEPARTMENT
DATE:
MARCH 18, 1992
RE:
WASTE MANAGEMENT MULCHING FACILITY
I FIND THE PROPOSED SITE PLAN ADEQUATE FOR FIRE PROTECTION
REQUIREMENTS.
~~~
WILLIAM D. 'AVANAUGH 1
BOYNTON BACH FIRE
wrnrnulch.wdc
pg
RTI(~Tfr~~r~T)
I Cf ~
,,^A.R. l;~
pLANN1,";lG
-------
M1H>RANIXJM
UTILITIES DEPAR'lMENT NO. 92 - 112
FRCM :
John A. Guidry, utilities Director
TO: Christopher cutro, Planning and Zoni
DATE: March 16, 1992
SUBJECT: Site Plan review - Waste Management of Palm Beach Mulching Facility
located at the Boynton Beach Distribution Center
We can approve this project subject to the following conditions:
1) The capacity reservation fee must be paid within 30 days of City
Carmission approval. Based upon a 1" meter size the reservation fee for
this facility is $ 790.02. (Sect. 26-34(E))
2) All water and sewer uti I i ties to be owned and operated by the city shall
be constructed in accordance with city standards. (Sect. 26-33(b))
3) We believe Dept. of H.R.S. permits will be required for the 8" water
main proposed for this project. (Sects. 26-11,-12)
4) Provide fire flow calculations or test data for this site. Water mains
must be sized to provide adequate fire flow. (Sect. 26-16)
5) Irrigation shall not be supplied with City water. (Camp. plan policy
3C.3.4)
6) The on-site water main and fire hydrant shall be centered in a 12-foot
wide uti! i ty easement, which shall be shown on the construction
drawings, and site plan. (Sect. 26-33(a))
Please refer any questions on this matter to Peter Mazzella of this office.
JAG/PVM
bc: Peter Mazzella
xc: Bi 11 Cavanaugh, Fi re Dept.
File
Ii If)
d.t.c 'C'7l"":' If'!" I-;)-"-~'
-C'.! ~i~' (:'f f' ,')
..--ei-_l I.
WRIU
PLANNiNG DEPT.
-
M E M 0 RAN DUM
Police No. 92-053
TO:
Chris cutro
Planning and Zoning Director
FROM:
Lt. Remchuk
Police Department
DATE:
March 17, 1992
REF:
Site Plan Review -
Mulching Facility - Waste Management of Palm Beach
After a complete review of the site plan for a new mulching
facility to be located at the North side of cul-de-sac at the
East end of Industrial Way, I find the plans acceptable.
L[~~
Lt. Remchuk
DR/jb
REceIveD
MAR 2 It 1992
80 SITE OEVEL
VNTcw BEAcH. Fl_
RECREATION & PARK MEMORANDUM 192-105
FROM:
Chris Cutro, Planning & Zoning Director
John Wildner, Parks Superintendent ~
File No. #671 (Waste Management - ~IChing Facility)
March 24, 1992
TO:
RE:
DATE:
The Recreation and Park Department has reviewed the new site plan
for the Waste Management Mulching Facility.
There does not appear to be any recreation-related issues on this
project.
JW:ad
RECEIVED
MAR 2 It 1992
SITE OEVEL.
BOVNTa. BEACH. FLOAD
RECREATION & PARK MEMORANDUM 192-102
TO:
Chris Cutro, Planning & Zoning Director
~~
FROM:
Kevin J. Hallahan, Forester/Environmentalist
#738-7443
RE:
Waste Management of Palm Beach
Mulching Facility - Site Plan
DATE:
March 17, 1992
The applicant should prepare a tree management plan in
conjunction with the submitted tree survey. This document should
outline what the developer will do to meet the tree preservation
ordinance.
[Env.Reg. 7.5 - 7.5-12,-13, pp. 598-599].
KH:ad
....
RECI!_~1lED
MAr-, -
," . ~.
. . .
PLANN""r
I ' Ij~l:1 D[PT.
-
ENGINEERING DEPARTMENT MEMORANDUM NO. 92-114
TO: Christopher Cutro
P~anning & zoning Director
FROM: Michael E. Kazunas
City Engineer
'~~~
DATE: May 5, 1992
RE: Waste Management of Palm Beach
Resubmitted Site Plan
Review Comments
We have reviewed the resubmitted site plan and can approve
conditioned on the following comments: (These comments replace
the previous comments, Engineering Department Memo No. 92-070)
1) The property southeast of the site labeled "Not a Part Portion"
must become part of a larger adjacent property to assure
responsibility of maintenance. Formation of a nonconforming
lot is not allowed.
2) Developer shall provide documents, suitable to the City, which
describe the access, utility and parking agreements with the
property owner to the north.
3) The proper dimension of the parking stall, layout sheet A-3, is
18' to edge of pavement, 16' to wheel stop.
4) Approvals to construct within easements must be obtained from
FP & L and the Boynton Beach Utility Department.
5) South Florida Water Management District exemption must be
obtained prior to permitting.
6) Stop sign post shall be concrete encased per F.D.O.T. standards.
7) Traffic study must be provided for review by Palm Beach County
to determine whether concurrency requirements are met.
MEK/ck
lL
--
!;N(::' JN~!;f':JNQQ!; F~',AE:Ttl!;,NT .t:I!;MPeANQWtl
To: Christopher Cutro
Planning Director
May 4, 1. ')192
From: Vincent A. Finizio
Admin. Coord. Engr.
F<E~: L.Jc:1 s;t, e Ivlan ag {;?men t "Ivlu], c I"', in q F <:IC i 1 :i, t 'r' 11
"Bookstop" at. T al"'qet. CommE'I'''c i al Center
Modular Model Home Sales Center
Please be advised that my original comment.s for t.he Wast.e
Management. "1'1ulchinq Facility" st.ands as ~.JI"itten. It IS my
understandinq that. should the Wast.e Management site utilize and
or purchase the existing manufact.uring building's
(situated to the nort.h of the Waste Management Sit.e) required
parking spaces, the existing building to the north may then have
an insufficient amount of required parkinq spaces placinq it in a
stat.e of non-compliance with Cit.y Codes. Therefore, in
conjunction with the construction of the Wast.e Management site,
the site to the north would have to be modified t.o comply with
current parking lot requirement.s of Chapter 5, Art.icle X, as
specified in fny previous memo to you.
Since this IS a zoning mat.t.er which will affect. the validity
and/or applicat.ion of my previous commentCs), I conclude that
your office will calculate the correct number of required stalls
for t.he exist.inq building to t.he north by taking into account
both the occupied and vacant portions of t.he northern st.ructure
including any other zoning review criteria necessary to det.ermine
compliance with the required parking elements of our Cit.y's Code
of Ordinances for both of the subject sites.
Additionally, I do not have comment.s relative t.o the Bookstore
and the Sales Center submission. The City Engineer will be
forwardinq t.o you under separat.e memorandum, his review comments
for the above referenced sites.
\. A~'
~""F'i;~'i';'i';;'-0~
cc: Mike E. Kazunas, City Engineer
Mike Haag, Site Development Compliance
RECEIVED
tMy, 4
PLANNING DEPT.
MEMORANlXJM
UTILITIES DEPAR'IMENT NO. 92 - 176
FRCl1 :
John A. Guidry, utilities Director
",,"
TO: Christopher cutro, Planning and Zoni
DATE: May 7, 1992
SUBJECT: site Plan review - Waste Management of Palm Beach Mulching Facility
located at the Boynton Beach Distribution Center - Second review
The fire flow calculations subrrdtted assumed a residual pressure of 50 psi
in the existing 8" main ~er fire_-:f1ow conditions. This is not necessarily
an accurate assumption, and incorrectly interprets the information provided
by this office, (i.e. static pressure under normal conditions). Therefore,
please support the calculations with actual test data fram a flow test on
the nearest hydrant. This information is required before the site plan may
be forwarded to the Camri.ssion.
All of our other ccmnents, shown below, may be addressed at time of
perrrdtting, or after Comrrdssion approval.
1) The capacity reservation fee must be paid within 30 days of City
Comrrdssion approval. Based upon a 1" meter size the reservation fee for
this facility is $ 790.02. (Sect. 26-34(E))
2) All water and sewer utilities to be owned and operated by the city shall
be constructed in accordance with city standards. (Sect. 26-33(b))
3) We believe Dept. of H.R.S. perrrdts will be required for the 8" water
main proposed for this project. (Sects. 26-11,-12)
4) Irrigation shall not be supplied with City water. (Camp. plan policy
3C.3.4)
Please refer any questions on this matter to Peter Mazzella of this office.
Enclosure
JAG/PVM
be: Peter Mazzella
xc: Bill Cavanaugh, Fire Dept.
File
REceIVED
HAY 7 '992
Time: Assistant to the Director - 30 minutes
j1~flc'N ~~ CA~_ . .
Vi~ \'1~~~~ or- efl\.ffi ~ - C~\rPlt-\ef .f-^Gl\.{T\"
.\
:=:""OWRATE IS EXPRESSED IN GPM AND PRESSURE IN PSIG
A SUMMARY OF THE ORIGINAL DATA FOLLOWS
THE RESULTS ARE OBTAINED ~FTER 2 TRIALS WITH AN ACCURACY = .00000
WASTE MANAGEMENT CHIPPING FACILITY
PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000
1 0 1 1500.00 8.98 .00 .00 9.57 44.89
2 1 2 1500.00 .91 .00 .00 17.02 182.24
JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
1 .00 107.02
'2 1500.00 106 . 11 cE-- If t;." "" I '7 2.Q r 5J R.~1) cJlt1.. :, o.K.
OL 0 Rh-rr:~
-S [; 6 Ai ~vJ RA11!X
Mr. Michael Haag
April 1, 1992
Page 2 of 2
~
'e?I
A Waste Management Company
Please feel free to call me directly if you have any additional
questions or concerns.
Very truly yours,
WASTE MANAGEMENT OF PALM BEACH
/;.~~
Michael P. O'Brien
General Manager
MPO/mf
'LOW TEST
Request Date:
Bill Fenno
21 May 1992
Keith & Schnar5
From:
Compan y:
Phone:
30S 776 1616
---~~----~-----~~~-~~--~-----------~~-~--~-~----~~-~~--~~--.~-~~
Loca.tion:
Commerce Park
* D I A G RAM *
(Include direction, street names, hydrant location. intersQctiona,
-.ad main sizes)
(') k
~6" 0 r-
= i
.... 6"
00 fD
::T rt
(J
" Indu9t:r:i.al tD Wa.y
.... :'l
Clo
OQ
. {II
6" 6"
;ll:I ~
~ 1'f'
611 ~#2
I
Flow Readini:
'lit p"of
Residual Readini:
(890 gpm)
35psi
Hydran~ 1;'
Hydrant 2;
Static Rea.ding: 44psi
Tested Date~
21 May 1992
Assigned Date: 21 May 1992
Tested By:
\t ~!lI1ft;]1J:l
Time Teeted: 1500
AVAILABLE GPM AT 20 PSI ~~SIDUAL~
ISl0 psi
PLOW TEST TBE ---------------$ 75.00
MAIL FEE TO: BOYNTON B.ACR FINANCE DEFARTM!NT
100 E. BOYNTON BEACH BOULEVARD
BOYNTON BEACH, FLORIDA 33433
" ,. ,. ,-.. "" I 1"'1" I... .
1't7~ oJ hr-m-j
'FtDWRA'rx IS iXPF.ISSED IN GR1 AND PRESSURE IN PSIG
A SUMtW<Y OB THE ORIGINAL DATA FOLLOWS
PIPS NO. NODE NOS. LENGTH DIAMETER ROUGHNESS MINOR LOSS K FIXED ap~uE
( FEET.I ( INCHES)
1 0 1 200.0 8.0 120.0 _00 .101.64
2 1 2 5.0 8.0 120.0 .00
JUNC'l'ION NUt1BHft
1
2
DEl1AND
.00
1500.00
ELEVATION
.00
.00
CONNECTING PIPES
1 2
2
OUTPUT SELECTION: ALL RESULTS ARE OUTPUT EACH PERlOD
THIS SYSTEl1 HAS 2 PIPES WITH 2 JUNCTIONS. 0 LOOPS AND 1 F'GNS
THE RESULTS ARB OBTAINED AFTER 2 TR1ALS WITH AN ACCURACY::; .00000
W.I\STE MANAGEMENT OF BOYNTON BE.I\CH - CHIPPING FACILITY
PIPE NO. NODE NOS.
i 0 1
212
FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/l000
1500.00 8.98 .00 .00 9.57 44.69
1500.00 . .91 .00 .00 17.02 182.24
JUlICTION NUMBER
1
2
DEt'Wm
.00
1500.00
GRADE LINE ELEVATION PRESSURE
92.66
91. 75 --- .3".2... tJs.. ." 2-.:. ,.~ I · ().1IlI! .
THi NET SYSTm:11:iKHAND = 1500.00
SUMMARY OF INFLOWS (+ j AND otJTF'JJJWS ( -) FROli FIXED GRADE NODES
PIPE NUMBER FLOWRATE
1 1500.00
THl NET FLOW IllrO THE SYSTEM FROM FIXED GRADE NODES: 1500.00
THE NiT I1UlW CUT OF THi SYSTEM IlJ'l'O 11XED GRAD(t NODES : _ 00
/j/cwR~~
'I1U City of
.tJJoynton r.Beacli
9A08'& ~
P!annine & Zonine 'Departmtnt
100 To. 'Boynton 'Buz& 'Boukvanf
P.O. 'Bo;c31O
'Boynton 'Buzdt.,:J{oritla 33425-0310
(407) 738.7490, 'fjU: (407) 738-7459
June 22, 1992
Mr. Ron Dorris
Ron Dorris Architects
311 N.E. 8th Street
Homestead, FL 33030
Re: Waste Management Mulching Facility - Conditional Use
(N.E. side of cul-de-sac at the end of Industrial Way)
Dear Mr. Dorris:
This is to advise you that on June 16, 1992, the City Commission
of Boynton Beach approved the Conditional Use for a vegetative
mulching facility at the above referenced location.
The approval of the Conditional Use was subject to the following
conditions:
1. All outstanding comments from the reviewing departments be
addressed at time working drawings are submitted for permit
review.
2. Sound reduction apparatus material and/or mufflers be added
to the mulching machinery and/or equipment to reduce the
sound level to the permissible commercial land use category
sound level of 65 (dB) decibels.
The Conditional Use approval entitles you to develop the property
as shown on the approved plans. If you wish to modify the plan
prior to submission of your building plan, please contact the
Planning and Zoning Department. Modifications during the building
permit process will be handled as part of that process. The
approval of the Conditional Use remains in effect for one year,
until June 16, 1993. If an extension is needed, please forward
your request to the Planning and Zoning Department 30 days prior
to the expiration date.
_ ,..,.
MEMORANDUM
May 29, 1992
TO: Christopher Cutro, Planning & Zoning Director
FROM: Mlchael E. Haag, Zoning & Site Development Administrator
RE: Site Plan Review - New Site plan
Waste Management of Palm Beach - Mulching Facility
Location: Boynton Beach Distribution Center -
North side of cul-de-sac at the East end of
Industrial Way
Appllcant: Ron Dorris Architects
Fi le No.: 671
The amended plans for the above referenced project have been
submitted and reviewed. The following comments from the original
set of comments have not been satisfactorily corrected on the
amended plans. The deficient comments shall be corrected.
However, it is acceptable to show compliance with the outstanding
comments on the plans that are required to be submitted to the
BUllding Department for permit review.
1. Add to the landscape plan the contlnuous visual landscape
barrier that is required along the north, south and west
property lines of the new site. The landscape barrier is
required to screen the on-site vehicle use area from the
abutting right-of-way and from the abutting property.
Identify on the plan: the specie, spacing and height at
planting of the required landscape material. (Maximum
spaclng is two (2) feet on center. Mlnimum height at
planting is eighteen l18) inches. Fifty (50) percent of the
total number of plants are required to be a native specie)
(Sectlon 8.1, Chapter 4, Site Plan Review)
2. Prior to the issuance of a bUilding permit to commence
construction, the applicant shall submit to the Planning aud
Zouing Department a copy of a survey that shows a recorded
ingress/egress easement through the new site that allows
access to the old site. A drainage easement should also be
incorporated into the final survey of the new site to allow
the owner of the old site access to work on the drainage
system that serves the old site.
3. Prior to the issuance of a building permit to commence
construction, the applicant shall submit to the Planning and
Zoning Department a City approved cross access agreement
slgned by both property owners.
4. The proposed use is designated as a conditional use and will
be evaluated consistent to the requirements identified in
Section 11.2 of Appendlx A-zoning of the Code of Ordinances.
ENGINEERING DEPARTMENT MEMORANDUM NO. 92-145
TO: Christopher Cutro
Planning & Zoning Director
FROM:
Michael E. Kazunas f/J1l::P.........
City Engineer <--J
DATE: May 29, 1992
RE: Waste Management of Palm Beach
Amended Site Plan (5/21/92)
Revised Review Comments
1) A power pole stands in the center of the existing lot. Minimum
drive width in the area of the pole must be 24'. Plan shall
reflect same. Pole area must be delineated by pavement marking .
We have reviewed the amended plan and offer the following observati
2) In the area of the pole and tanks there exists a landscaped area
Since no pavement exists in this area, activation of these stal s
cannot be considered maintenance, but must be considered recon-
struction and are therefore subject to upgrading to current
standards per City code. (estimate 6 or 7 stalls)
3) The remaining stalls designated P can be restriped under a main
tenance operation.
4) The stalls marked F are in a area where pavement does not now
exist. These stalls are subject to upgrading to current City
standards.
This department does not herein attempt to rectify the number of
existing and future parking stalls required, but refers the determi -
ation to Planning and Zoning.
Regarding previous comments (Memo 92-114 Revised) #2 and #4 have be n
addressed to our satisfaction. Comment #1 and #3 can be addressed
prior to building permit.
MEK/ck
RECEIVED
JIIN t UIA'
NOTICE OF PUBLIC HEARING
Ron Dorris Architects, appl1cant, has requested the following parcel to be
considered for Conditional Use to locate a vegetation recycling facility at
the following location:
Legal
Descript10n:
A port10n of the N.W. 1/4 of the N.W. 1/4 of Section
16, Township 45 South, Range 43, Palm Beach County,
Florida, more particularly described as follows:
BEGINNING at the Southeast corner of Lot 16, BOYNTON
BEACH DISTRIBUTION CENTER, according to the plat
thereof, as recorded in plat Book 47, Pages 100 and
101, of the Public Records of Palm Beach County,
Florida; THENCE North 00000'07" East, 232.02 feet;
TH~NCE South 87042'35" ~ast, 449.23 feet; TH~NCE South
00 06'46" West; 232.00 teet; THENCE North 8742'35"
West, a d1stance of 138.99 feet to a point on the arc
of a non-tangent curve concave to the Southwest (said
point bears North 55025'13" East from the radius point
of the next described curve); THENCE Northwesterly,
along the arc of sabd curve having a radius of 50.00
feet, a delta of 95 57'48" an arc distance of 83.74
feet to a Point of Reverse Curvature with a curve
concave to the Northwest; THENCE Southwesterly, along
the arc of said curve having a radius of 25.00 feet of
delta of 42050'0" an arc distance ot 18.69 feet to a
P01nt of Tangency; THENCE North 87 42'35" West, 218.80
feet to the POINT OF BEGINNING; Said lands lying 1n
the City of Boynton Beach, Palm Beach County, Florida,
conta1n1ng 102.961 square feet, (2.364 acres) more or
less.
Location: Vacant property at the Northeast end of Industrial way
cul-de-sac
Owner: James and Genevieve Rollyson
Agen~: Ron Dorris Architects
Proposed Use: Vegetative mulching, wood chipping and transfer
facility restr1cted to vegetative waste only
A HEARING BEFORE THE PLANNING AND DEVELOPMENT BOARD WILL BE HELD AT CITY
HALL COMMISSION CHAMBERS, 100 E. BOYNTON BEACH BOULEVARD, BOYNTON BEACH ON
JUNE 9, 1992, AT 7:00 P.M.
ALSO
A PUBLIC HEARING IS SCHEDULED BEFORE THE CITY COMMISSION AT CITY HALL
COMMISSION CHAMBERS, 100 E. BOYNTON BEACH BOULEVARD, BOYNTON BEACH ON
JUNE 16, 1992, AT 7:00 P.M., OR AS SOON THEREAFTER AS THE AGENDA PERMITS,
ON THE ABOVE REQUEST.
nll in~QrQ~~QA n~r~iQ~ ~rQ nn~ifip~ ~n RDDPRr at said hearinas in Dersoh or
PLANNING AND ZONING DEPARTMENT
MEMORANDUM NO. 92-138
June 26, 1992
FROM:
Don Jaeger, Building Official
~}~~
chrIStopher cutro, Planning and Zoning Director
TO:
RE:
TRANSMITTAL OF APPROVED SITE PLANS FROM THE
JUNE 16, 1992, CITY COMMISSION MEETING
Accompanying this memorandum you will find the approved site plan
package for the project(s) listed below. The site plan package
will include the following items:
1. A copy of the City issued approval letter
2. A copy of the comments made by the Technical Review
Committee (TRC)
3. A set of plans reviewed by the TRC
4. The original color elevation view drawing(s) and the
associated color samples
5. photographs of existing sites that abut the perimeter
of the subject property
1. Bovnton Amoco #60617: Service station with a convenience
store and an automatic car wash. The new site plan was
approved by the City Commission at their regular meeting
held on June 16, 1992.
2. Bookstop: New 11,772 square foot building with associated
parking and landscaping. The new site plan was approved by
the City Commission at their regular meeting held on
June 16, 1992.
3. Waste Manaaement Mulchina Facilitv: Vegetative mulching,
wood chipping and transfer facility restricted to vegetative
waste only. The new site plan was approved by the City
Commission at their regular meeting held on June 16, 1992.
CC:ald
Attachment
XC: (Memo Only)
Al Newbold
Central File
Project File
C?~:
~~~ / 'i.'.,
~:~
~ ka ~-
~~ if
<~ ~
/:1 ASSOC\
~CiS.dok - J~
2 North Street · Waldwick, New Jersey 07463 · (201) 652-4242
Fax · (201) 652-3253
June 10, 1992
\.
Ms. Suzanne Kruse
City Clerk
P.o. Box 310
Boynton Beach, FL 33424
RE: THE PROPOSED VEGETATIVB MULCH SITE AT
INDUSTRIAL WAY
Dear Ms. Krause:
Enclosed please find a copy of a letter sent to Mayor Arline Weiner
of Boynton Beach.
I would appreciate your copying this letter and submitting it to
each member of the Planning Board. Also, I would like very much to
have a list of the members on the Planning Board.
Thank you very much for your cooperation.
Sincerely,
KWARTLER ASSOCIATES, INC.
~a 1f.~
Robert A. Kwartler
Managing Agent for Regent
RAK:pm
~
C.e~
. ,o~ ..../rr 'l)
"-..1\f1\f1J\'O D{,,o_
~ '/
'-.-..~,
The above is submitted subject to change in price, corrections. errors or omissions, prior sale or lease or withdrawal from the market without notice.
t~kaJ
<~ ~
II .c1ssoc\
~CfB~ - J--'~
2 North Street · Waldwick, New Jersey 07463 · (201) 652-4242
Fax · (201) 652-3253
June 9, 1992
Mrs. Arline Weiner
The Mayor of Boynton Beach
P.O. Box 310
Boynton Beach, FL 33424
RE: THE PROPOSED VEGETATIVE HOLCH SITE AT
INDOSTRIAL WAY
Dear Mayor Weiner:
I represent the owners of the building and property located at 500
Industrial Way, Boynton Beach. This building is occupied by The
Palm Beach Post.
We fee very strongly that the proposed mulch site is totally
inappropriate at this location.
The odors caused by decaying vegetation and compost - regardless of
how quickly it may be chipped or mulched are noxious and a nuisance
to which I will not subject our tenants. We feel strongly enough to
fight this if necessary.
Please discuss this situation with the members of your council
before the Public Hearing which is scheduled for June 16th.
I finally request some sought of written response, in a timely
enough manner, to allow us to prepare for the Public Hearing.
Thank you very much for your attention to this important matter and
feel free to call for any discussion.
Very truly yours,
KWARTLER ASSOCIATES,INC.
Robert A. Kwartler
Managing Agent for Regent
RAK:pm
cc: Harry Kwartler
Beth & Jerry Barber
The above is submitted subject to change in price, corrections. errors or omissions, prior sale or lease or withdrawal from the market without notice.
PLANNING & ZONING DEPARTMENT MEMORANDUM #92-122
FROM:
J. Scott Miller
City Manager
~~.~ [:L:b>
Chrrst~pher Cutro
Planning & Zoning Director
TO:
DATE:
June 11, 1992
RE:
Waste Management of Palm Beach
Vegetative Recycling Facility
The applicant, Waste Management, Inc., is requesting a
conditional use to establish a vegetative recycling facility at
the east end of Industrial Way.
This plan has been reviewed by the Technical Review
Committee and found to be in compliance with all applicable City
codes.
It should be noted that staff included a condition regarding
the upgrading of the property to the north of this site.
However, because the subject site has been sold to Waste
Management, the condition has been removed. Instead, the
applicant must provide staff with an affidavit indicating the
land has been sold, a warranty deed, and a corrected application
sheet.
The Planning and Development Board, at its meeting of
June 9, 1992, reviewed this request for conditional use and
forwarded it to the City Commission with a recommendation for
approval.
This item has been scheduled for a public hearing before the
City Commission on June 16, 1992.
CC/jm
Att.
A:WASTEMGT.JM
To: Christopher Cutro
Re: Waste Management - Mulching Facility
Page Three of Three
15. Create the required perimeter landscape strip along the
North property line where said property line cuts across the
existing parking lot. Show the landscape strip at a minimum
width of two and one-half (2 1/2) feet containing hedge
landscape material spaced at two (2) feet on center and
eighteen (18) inches in height at planting. The remainder of
the landscape area shall be landscaped with grass, ground
cover or other landscape treatment. [Fifty (50) percent of
the hedge material shall be specified as a native specie].
(Section 8.1, Chapter 4, Site Plan Review)
16. Prior to the issuance of a building permit to commence
construction, the applicant shall submit to the Planning and
Zoning Department a copy of a survey that shows a recorded
ingress/egress easement through the new site that allows
access to the old site. I recommend that at this time, you
show a proposed twelve (12) foot wide drainage easement
centered over the existing drainage system shown on the
survey. This easement should be incorporated into the final
survey of the site to allow the owner of the old site access
to work on the existing drainage system.
17. Prior to the issuance of a building perm1t to commence
construction, the applicant shall submit to the Planning and
Zoning Department a City approved cross access and cross
parking agreement signed by both property owners.
18. The proposed use is designated as a conditional use and will
be evaluated consistent to the requirements identified in
Section 11.2 of Appendix A-Zoning of the Code of Ordinances.
ENGINEERING DEPARTMENT MEMORANDUM NO. 92-114 (Revised)
TO: Christopher Cutro
Planning & Zoning Director
FROM: Michael E. Kazunas /Yl ~ ~
City Engineer ~
DATE: May 19, 1992
RE: Waste Management of Palm Beach
Resubmitted Site Plan
Review Comments
We have reviewed the resubmitted site plan and can approve
conditioned on the following comments: (These comments replace
the previous comments, Engineering Department Memo No. 92-070)
1) Developer shall provide documents, suitable to the City, which
describe the access, utility and parking agreements with the
property owner to the north.
2) The proper dimension of the parking stall, layout sheet A-3, is
18' to edge of pavement, 16' to wheel stop.
3) South Florida Water Management District exemption must be
obtained prior to permitting.
4) Stop sign post shall be concrete encased per F.D.O.T. standards.
The above comments can be addressed at the time of building permit.
MEK/ck
ENGINEERING DEPARTMENT MEMORANDUM NO. 92-134
TO: Christopher Cutro
Planning & Zoning Director
FROM: Vincent A. Finizio
Administrative Coordinator of Engineering
DATE: May 26, 1992
RE: Waste Management of Palm Beach
1. In accordance with the City of Boynton Beach, Florida Code of
Ordinances, the applicant indicates that 100 parking stalls are
required but that they intend to construct only 80 parking stalls.
The applicant further states that future spaces are to be developed
by the tenants of the Rollyson Building.
Postponement of the construction of required parking stalls is in
violation of City ordinances and the 100 required parking spaces
shall be constructed concurrent with the development of this site.
(The City of Boynton Beach, Florida Review Standards, Section 8,
Subsection 8.3.4)
2. Noted plan deviations from City codes and omission of data necessary
for permitting this site, will be addressed at time of building permit
application.
: ~.~~. ~
Vincent A. Finizio
VAF/ck
cc: Michael E. Kazunas, City Engineer
~
~#
#~
~
MEMORANDUM
Utilities #92-207
TO: Christopher Cutro,
Director of Planning
FROM: John A. Guidry,
Director of Utilities
DATE: May 29, 1992
SUBJECT: Site Plan Review - Waste Management of Palm Beach
Mulching Facility - Boynton Beach Distribution Center
Second Review
We can approve this project, subject to the following comments,
which may be addressed at time of permitting or after Commission
approval:
1. The capacity reservation fee must be paid within 30 days
of City Commission approval. Based upon a 111 meter
size, the reservation fee for this facility is $790.02
(Sect. 26-34(E)).
, ~
2. All water and sewer utilities to be owned and operated
by the City shall be constructed in accordance with City
standards (Sect. 26-33(b)).
3. We believe Dept of H.R.S. permits will be required for
the 8" water main proposed for this project
(Sect. 26. 11-12).
4. Irrigation shall not be supplied with City water (Camp.
plan policy 3C.3.4).
aUI LOING
OEPARTMEN T
SUBHIrrAL DOCUMENTS
Congratulations on receiving Site Approval for your proposed construction within the City of Boynton Beach. We
appreciate your choosing to build within our City.
In order to ensure a timely permitting process, the following documents are required to be submitted in two (2)
sets. Each set must be stapled together to fOrll a single package. Incomplete sets can not be accepted.
I. A signed and sealed survey (not over six (6) months old) by a registered surveyor in the State of Florida
indicating:
A. All property lines
B. North arrow
C. Existing structures and paving
D. Existing elevations
E. Rishts-of-way, with elevations
F. Easements on or adjacent to the site
G. Utilities on or adjacent to the site
H. Legal description
I. Number of acres to the nearest one-hundredth (1/100) of an acre
J. Location sketch of property
K. Surveyor I s Certificate
II. A site plan properly dimensioned and to scale showing:
A. All proposed structures
B. All existing structures that are to remain on site
C. Setback lines for all structures drawn perpendicular from the property lines to the closest vertical
wall of the structures
D. Use of each structure (or uses within lDUltiple occupancies)
E. Use of adjacent properties including right-of-way lines for all streets and alleys, sidewalks) turn
lanes and driveways
F. Elevations of the lowest finished floor of all structures on the site
G. Location of existing utility lines on or adjacent to the site
H. Location of fire hydrants on or adjacent to the site
I. Location of dumpster enclosure and details of construction
III. A paving plan in conformance with the Parking Lot Code (Chapter 5) Article X of the Boynton Beach Code of
Ordinances) indicating:
A.
B.
C.
D.
E.
F.
G.
H.
Calculations for the maber of required parking stalls (see Appendix A-Zoning, Section IlH)
Cross sections indicating parking lot construction
Raised curbing meeting City Standards
Double striping meeting City Standards
Conformance with the Sidewalk Ordinance (Chapter 22, Boynton Beach Code of Ordinances)
Handicapped parking stalls in conformance with the State Handicapped Code
Dimensions for all parking stalls) back-up areas, driveways and traffic lanes
Traffic control devices and signs
IV. A drainage plan for the entire site including:
A. Finish grade and pavement elevations
B. Drainage calculations
C. Details of the drainage system. If total site area exceeds 25,000 square feet, plans must be prepared
by a Florida registered engineer and must be sealed
D. Inlets must be placed in grassy swale areas
V. A landscape plan showing conformance with the Landscape Code (Chapter 7.5, Article II) Boynton Beach Code
of Ordinances) showing:
A. Complete final landscape construction drawings
B. Automatic irrigation system plans with 100% coverage (no City water to be used)
C. Plant material must be keyed according to species, size and quantity
D. Site walls and fences must be indicated on the plans
E. Location and contours of proposed berms
VI. A lishting plan for the building exterior and site lishting including:
A. Exterior security lishting and pedestrian lighting
B. Lighting for driveways and parking lots
1. Location of lishting
2. Fixture types
3. Lamp types and sizes
4. Photometric plan showing illumination levels in footcandles
5. Lishting poles designed for wind loads in accordance with Chapter 12, Standard Building Code
~~
--
OFFICE OF THE CITY CLERK
MEMORANDUM
TO:
Mr. Chris Cutro
Planning Director
DATE: May 18, 1992
FROM:
Sue Kruse
City Clerk
RE: Conditional Use Application
Waste Management of Palm Beach
Attached please find a copy of the Notice of Public Hearing for the
Waste Management of Palm Beach Conditional Use application, which is
scheduled to be advertised in the Boynton Beach News on May 28, 1992.
Notices to property owners within 400' will be mailed on Wednesday,
May 27, 1992.
~~/
SK: sIb
attachment
cc: City Manager
.
~~\1