Loading...
CORRESPONDENCE %e City of tBoynton tBeac/i P4~::t ~ Pfanning & :::.oning 'Department 100 E. 'Boynton 'Beach 'Boulevara P.O. 'Bo{.31O 'Boynton 'Beach, J"{oritia. 33425-0310 (407) i'38.7490, .7:U': (407) 738.7459 April 21, 1993 Mr. Terry Larkin 610 Industrial Ave. Boynton Beach, FL 33435 Dear Mr. Larkin: I am sorry that it has taken so long to respond in writing to our meeting, but unfortunately, I have no control over the infections running rampant in our society. As I outlined to you and Mr. Resnick at our on-site meeting, if you wish to set up a separate structure as a paint booth, I will consider that structure to be an accessory structure that can be submitted for a building permit without site plan review. The parking lot must still go through site plan review. Your designer should correct the plans submitted based on comments made on the parking lot only. Comments regarding the structure can be ignored. As agreed to by the City Manager, we will not consider the loft in the structure to be floor space and this loft can remain because it has been permitted. As a side note I have with Mr. Blanchette, who was under the impression that no site plan review would be required for anything, I told him what I have stated above. I hope this letter is of some help to you. If you should have any questions, please feel free to call me. Sincerely, ~~ Christopher cutro Planning and Zoning Director CCjjm cc: Robert Resnick .1 me nca ~~ yateway to the yuifstream rrFie City of 'Boynton 'Beacli Pfanning & Zoning 'lJepartttunt 100 'E. ~oynton ~eadt. ~oufevara P.O. ~o7(310 ~oynton ~eadt., :Jforitfa 33425-0310 (407) 738-7490, :JJU: (407) 738-7459 February 9, 1993 Mr. steve Scowden 6900 Arbor Lakes Road West Palm Beach, FL 33413 (407) 734-3330 RE: Acceptance - Site Plan Review Application & Submittal Documents Major Site Plan Modification 610 Industrial Avenue - Addition to an existing metal building File No. 722 Mr. Scowden: On February 9, 1993, your submittal for Site Plan Review of the above referenced project was reviewed for completeness. It has been determined that the submittal is substantially complete and accepted for further processing. Dorothy Moore will be responsible for the review and coordination of your site plan thru the remainder of the Site Plan Review process. The next step in the review process is for the Technical Review Committee to review the submittal for compliance with the review standards identified in Part III, Land Development Regulations, Chapter 4, Site Plan Review, Section 8 and all applicable sections of the Boynton Beach Code of Ordinances. The results of the review will be forwarded to you within twenty (20) days of the date identified in the first paragraph of this letter. If I can be of further assistance, please do not hesitate to contact me. Very truly yours, ~~ Christopher cutro Planning and Zoning Director XC: Central File Chronological File Project File ~merica's yateway to tlie (ju{fst'--~~______