REVIEW COMMENTS TRB MEMORANDUM .!~nua~y 27, 9~9 To: Tom Clark From: Bill Flushing Re: Zicaro's plumbing 1. A letter is required explaining why the first hour of a three year storm (2.5 in.) is not retained on site as is required by Boynton Beach Code. Copies of all permits and agreements shall be included. 2. There should be no storm water flow over the sidewalk. 3. Certification shall be provided indicating that the light poles comply with chapter 12 of the standard Building Code (120 MPH wind loading) as per parking lot ordinance. Bill Flushlng M E M 0 RAN DUM January 5, 1989 TO: CRAIG LIVINGSTON FROM: TAMBRI J. HEYDEN, ASSISTANT CITY PLANNER RE: ZICARO'S PLUMBING AT BOYNTON BEACH DISTRIBUTION CENTER SITE PLAN SUBMITTAL Please be advised of the Planning Department's comments with respect to the above-referenced request: 1. Provide a cross section of the perimeter landscape strip showing the deepening of this area to provide additional on-site retention. 2. Contractors require one (1) parking space for every 500 square feet of gross floor area. Forty (40) parking spaces would be required for this building; only twenty- five (25) are shown. 3. Additional lighting information is needed including minimum illumination level, photocell activation, and a pole detail (parking lot lighting must be mounted on poles around the perimeter of the lot). 4. Any freestanding signs must be located on all plans and a detail provided indicating size, height, color, materials, lettering style, and wording. If this information cannot be provided at this time, a future site plan approval for signage will be needed. 5. Dumpster detail is not labeled and the width is not dimensioned. (Inside dimension must be 10 feet by 10 feet.) 6. Sidewalk should continue across driveway on site plan. ~u~.~ TAMBRI J. H DEN TJH:ro cc Central File MEMORANDUM February 6, 1989 TO: Mr. Jim Golden Senior City Planner FROM: Tom Clark City Engineer RE: Site Plans, Zicaro's Plumbing, Boynton Beach Distribution Center COMMENTS: 1. Street lighting is required in the public Rights-of-Way. The street lights are a bonded improvement and are shown on sheet 1 of 4 of the subdivision development plans. A plan and cost estimate has been requested by the City Engineer from Florida Power & Light Company, who will use their own plans (approved by City) for street light installation. Upon receipt of funds (as per F.P.& L. cost estimate) from the developer or Surety Company, F.P.& L. will be authorized to install the street lights. 2. Drainage plans shall include inlet structures in dry grassed ponds or swales. Storm sewers may be connected to inlet structures in the R.O.W. No sheet flow across sidewalks is allowed, even though the Water Management plan included the run-off from the platted lots. Regrading of the parking lot may be necessary to accomodate the collection of rai.n fa.llon:site. 3. The current City standard for turnouts into the R.O.W. i.s not swaled. Elevations indicating a swaled turnout should be revised as should the typical section. 4. Stop signs should be 7 feet above grade. 5. Grassed swales should be 8 inches below crown grade of the street. New sod is required where grass is dead. 6. Roof drainage could connect directly to the storm sewers. 7. Refer to bill Flushing's memo of January 27, 1989. =p::=. cf?~ Tom Clark TAC/ck attachment MEMORANDUM TO Carmen Annunziato Planning Director DATI! February 3, 1989 I'lL I! F"OM Kevin J. Hallahan Forester/Horticulturist SUaJI:CT Zicaro's Plumbing Site Plan The following comments pertain to the landscape plan for the above project: 1. Thirty percent (30%) of all hedge materials must be native species. 2. The irrigation system should provide water to the road R.O.W. y~~ ~.~~ -Kevin J. allahan . Forester/Horticulturist KJH:ad MEMORANDUM February 3, 1989 TO: CHAIRMAN AND MEMBERS PLANNING AND ZONING BOARD FROM: CARMEN S. ANNUNZIATO, PLANNING DIRECTOR RE: ZICARO'S PLUMBING SITE PLAN-STAFF COMMENTS Please be advised of the Planning Department's comments with respect to the above-referenced request for site plan approval. 1. The on-site retention comment from the January 5, 1989 Planning Department memorandum was not addressed. The swale section provided does not indicate the depth of the swale; nor does the drainage plan show spot elevations at the bottom of the swale along the eastern and northern property lines. Provide a cross section of the perimeter landscape strip showing the deepening of this area to provide additional on-site retention. 2. Indicate proposed colors on elevations. 3. Indicate setback and provide details of freestanding sign including colors, lettering style, wording, materials, height, and colored elevations prior to the Community Appearance Board deadline February 8, 1989 at 5:00 p.m. If this can not be met, a future site plan approval will be required. (2~~ ,/~ CARMEN S. ANNUNZIAT CSA:ro cc Central File M E M 0 RAN DUM TO: Carmen Annunziato, Planning Director FROM: Don Jaeger, Site Development - Building DepartmE:nt DATE: February 3, 1989 RE: SITE PLAN APPROVAL - ZICARO'S PLUMBING As a condition of site plan approval, the following comments should be incorporated into the related documents by the applicant: 1. Curbing is required around landscaped areas adjacent to parking stalls. 2. South Florida Water Management Distr~ct approval is re- quired. 3. Details of signage must be submitted for Community Appearance Board and City Commission approval. 4. Details on handicap accessibility to the building must be provided. 5. The site plan shows trees, hedges and light poles proposed in utility easements. Approval from the applicable utilities must be secured prior 'to permitting. The applicant's prompt compliance with the preceding comments will insure a timely permitting process. DJ:eaf cc:E.E.Howell MEMORANDUM TO DATil Mr. James Golden 30 December 1988 ,.11..1: F"OM 5UB.JI:CT Lt. Dale S. Hammack ';Z.ic aro As per our discussion at the Technical Review Board on 29 December 1988, I am recommending the following: 1 . l~ighting details. 2. stop bar and pavement markings. 3. Comply with city's Construction Security Ordinance. ~Q~~ DSH/cgrn TRB MEMORANDUM n~cflmber JO. liRR To: Jim Golden From: Bill Flushing Re: Zicaro's plumbing 1. The lighting fixtures are to be pole mounted at property line, (building mounted fixtures are acceptable) . the not 2. A lighting level array in candle power shall be provided or a statement by a registered engineer as to what the average minimum light level is. 3. The lights shall be photo-cell controlled. 4. The handicap parking stall striping shall be blue. 5. The normal parking stall striping on concrete shall be black. 6. A stop sign detail is required. 7. A wheel stop detail is required. 8. A stop bar and directional arrows are required. 9. A letter is required explaining why the first hour of a three year storm (2.5 in.) is not retained on site as is required by Boynton Beach Code. /~/ '\ ... .f ~ . 1:?11 t . -1-..__ Bill UShini cc: 'I'om Clark MEMORANDUM Date: Carmen Annunziato, Planning Director~ \ John A. Guldcy, Dlcectoc of Utllltles-1~ December 30, 1988 ~ To: From: Subject: TRB Review - Zicaro's Plumbing - Site Plan We request that a reduced pressure backflow preventer be specified for the domestic water service to this building. instead of a double check valve. The backflow preventer may be a Watts 909, Febco 825Y or pre-approved equal. dmt bc: Peter Mazzella D nCTl.,...-'- ---;, . .n..n " 'J.. . 'T", .. "1_-. 'i -.-u..!..J .jAN :1 _;-:C~l fLA:~: ; .. ~' - "r-