REVIEW COMMENTS
~
. ' ..
.
,
MEHORANDUM
February 26, 1985
TO: Mr. Carmen Annunziato,
Director of Planning
FROM: Tom Clark,
City Engineer
Re: Master Plan Revision, Lakes of Tara
Conunents:
1. The angle of repose as indicated on the lake
cross-section appears to be steeper than normal
for a stable bank slope below the water tab~e.-
'. The angle of repose for sand belm.; water should
be shown.
2. Final cross-sections of the lake should be sub-
mitted when construction is complete.
"
aV
-
Vc;
Tom Clark
TAC :r.tb