CORRESPONDENCE
-
DeBartolo
David H. Curl
'.It,... President
Ot.,....lopmt.nt I'1:lI1nill~
l;' ;\l:ul:\~...mellt
April 5, 1993
Courier Mail
2nd Day Delivery
678-501-0-78193
Mr. Chris Cutro
Planning Director
The City of Boynton Beach
100 E. Boynton Beach Blvd.
Boynton Beach, FL 33425
Re: SEARS AUTO SERVICE CENTER
BOYNTON BEACH MALL
Dear Chris:
,
In accordance wi th our recent discussion, we are transmitting
herewith three (3) copies of our current Development Plan (#SE-35A
dated 3/5/93), which indicates the~. proposed location and
configuration for the Sears Auto ServicaiCenter in the northeast
quadrant of the existing Boynton Beach Mall site. The proposed
Auto Service Center building will include approximately 21,048
sq. ft. composed of approximately 4032 sq. ft. dedicated to retail
sales, approximately 2704 sq. ft. dedicated to parts & service, and
approximately 14,312 sq. ft. for 14 auto service bays and required
inventory & equipment storage areas.
The proposed location of the Auto Service Center is consistent with
the original ADA and Development Order Resolution for Boynton Beach
Mall first adopted by Palm Beach County on May 7, 1974. The site
plan included in the original ADA indicated an auto service center
to be constructed in approximately the same location as is now
proposed for the Sears Auto Service facility.
This proposed land use and location is a part of the vested Boynton
Beach Mall Development of Regional Impact. The City of Boynton
Beach Resolution #R91-37, the Amended Development Order for Boynton
Beach Mall, provides under the termination date paragraph on page
4 of the order, in part, that "nothing herein shall limit or
extinguish any vested rights of the applicant, its successors or
assigns, regarding the existing 1,108,000 square feet of gross
leasable area of the existing Boynton Beach MalIn. In addition to
this Development Order provision, it is also noted that the
applicant has fully complied with all impact mitigation
requirements in both the original and amended development order
. with respect to the currently approved 1,108,000 sq. ft. of gross
leasable area. Based upon these conditions, the proposed Sears
Auto Service Center would not be subject to any requirements for
The Ed\vard J. DeBartolo Corporation
-f<:O \Llr;"'l'l St . !)() ~~(l'( ::',;- . '. '1Jr:~....tll\"n. 1:'H -!...:,,)~ nil,,,.:; . I~::\I-~,"'''':'l: . F.\\ ,::hl -::'-~5q~
THE EDWARD J, DeBARTOLO CORPORA) ,uN
Mr. Chris cutro
Re: Boynton Beach Mall
April 5, ~993
Page Two
off-site improvements or the payment of any City of Boynton Beach
or Palm Beach County impact fees or similar charges.
In addition to the overall Boynton Beach Mall Development Plan, I"
am also including one (1) copy of the following preliminary plans
related to the Sears Auto Service facility:
~. site Plan dated 2/2/93.
2. Landscape Plan dated 2/2/93 (note: this plan is intended to
indicate the landscape screen that is being proposed along the
north side of the building adj acent to the Boynton Canal
right-of-way).
3. Exterior elevations & building sign~g~ dated 2/5/93 (2 sheets) .
Based upon this information, please advise what specific steps and
procedures are required by the City of Boynton Beach, Palm Beach
County, and any other governmental agencies having jurisdiction in
order to obtain all approvals and clearances which are pre-
requisite to the issuance of the formal building permit for the
Auto Service facility.
If you have any questions concerning the information submitted,
please let me know at your earliest convenience. I look forward to
hearing from you soon regarding this request.
~::iiIDours.
DAVID H. CURL
DHC/jmp
Attachments
c: Carrie Parker
&II
THE EDWARD J. DeBARTOLO CORPORATION
7620 MARKET ST. . P.O. BOX 3287
YOUNGSTOWN, OH 44512-6085
(216) 758-7292 FAX (216) 758-3598
- overnight courier -
April 17, 1989
Mr. Peter Mazella
Department of Utilities
City of Boynton Beach
124, Boynton Beach Blvd.
Boynton Beach~ FL 33435
RE: BOYNTON BEACH SEARS - SITE PLAN APPROVAL
Dear Mr. Mazella,
As discussed, we have reviewed your request relative to the clean-outs
per the conditions of approval of the Technical Review Board (i.e.~ Item 1).
Attached you will find correspondence from our engineers on this matter.
Please review this further and provide written documentation if this require-
ment must be met. As we are moving forward with plan revision~ your immediate
attention would be appreciated.
Separately, our people will be going to Sears in regard to their acceptance
of the current water line location along the proposed westerly fascade. When
we receive their response, I will give you a call.
Management
GGW/dlb
cc: John Guidry (Director of Utilities)
Jim Golden (Planning)
Carmen Annuniato(Planning)
Don Jaeger (Building Dept)
ltBCBlVBD
I\fiJR .19 JIll
PLANNING DEPT.!.
- -!.!,l
.. . "
"
-~
--
,..
&II
March 31, 1989
THE EDWARD J. DeBARTOLO CORPORATION
7620 MARKET ST, . P,O. BOX 3287
YOUNGSTOWN, OHIO 44512-6085
(216) 758-7292 FAX (216) 758-3598
Mrl. James J. Golden
Senior City Planner
City of Boynton Beach
Office of the Planning Director
200 North Seacrest Blvd.
P.O. Box 310
Boynton Beach, FL 33435
Re: Boynton Beach Sears Addition - Technical
Review Board COmments
Dea r Mr. Golden:
As discussed, we earlier received your package of Technical
Review Board comments (attached) and accordingly have made
revisions to our plans and resubmitted these on March 27, 1989.
For your convenience, the comments are addressed as follows:
SITE DEVELOPMENT-BUILDING DEPARTMENT (Don Jaeger)
Item 1. We have reviewed the Sears plans for its compliance to
the Code. We understand this area is required to have three
screen walls for the dumpster and loading area. Sears plans
Sheets 2.0 (plans), Sheet 4.0 (elevation #04) provide details for
the loading and dumpster area. The area is bounded by three
screen walls--those being on the westerly and easterly sides and
the building facade serves as a third wall. The walls stand 10'-
6;" above finish floor and accordingly we feel this meets the
objective of the Code.
Item 2. Sign details are provided by Sears on the 11 x 17 sign
sheets #2, 19,20 and 22 which depict the sign element and
attachment methods for each sign.
Item 3. A review by the Environmental Review Committee was held
on March 22. We expect to review this project further on the
next agenda in April.
Item 4. All survey, site, drainage, water and sewer documents
have been submitted with the appropriate signature and seals.
THE EDWARD J, DeBARTOLO CORPORATION
Mr. James J. Golden'
2
Ma rch 31, 1989
Item 5. An updated signed and sealed survey has been provided
(Sheet 1 and 2 of 2, O'Brien) depicting the new access easement
so as to be consistent with the current site plan. The boundary
description for the developer's parcel has also been updated.
Item 6. Except for ,the provision of curb stops, we believe the
proposed parking lot conforms to all city ordinances and
standards. It is our understanding that the City Attorney will
be providing a reading wherein the Developer will be exempted
from the curb stop requirement.
CITY ENGINEER (Torn Clark)
Item 1. Dry pretreatment locations and details have been
provided on Site Plan il. South Florida Water Management
District is now writing up the approval for the project and this
should meet the City's requirements for parking lot standards.
Item 2. See Item 1 above. The project will and does flow into
an existing detention system.
Item 3. The original mall development did not accommodate "sump"
areas for suspended solids. The existing and modified water
management ponds will provide the same benefit for suspended
solids control.
Item 4. The head-in parking with the 8.5 ft.
deleted (see Site Plan #1). Accordingly, all
metered CV 9' requirement.
5 ta 11
s ta 11 s
has been
mee t the
FORESTER/HORTICULTURIST (Kevin J. Hallahan)
Item 1. A tree management plan will later be provided.
CITY PLANNING (Jim Golden)
Item 1. See Item 1 City Engineer response.
South Florida Water Management District is in
writing this project up for approval.
As noted befor e,
the process of
Item 2. Head-in spaces have been removed
Also see plans SP-l and SP-4.
( see Site Plan # 1 ) .
I
I tern 3 .
response.
See Item 1, Site Development-Building Department
.
THE EDWARD J. DeBARTOLO CORPORATION
Mr. James J. Golden
3
March 31, 1989
Item 4. Sheet SP-l has been updated with the parking denoted for
each row.
We hope this package meets or exceeds your expectations. We will
be ready to review these and other concerns with you further at
the April 4 meeting of the TRB. If you have any questions,
please feel free to call.
Id G. Williams
lopment Coordinator
lopment Planning and Management
GGW/wp4
Enclosure
c: Mac Conahan
Carmen Annunziato
Torn Clark
Don Jaeger
File: Site Plan Approval
bc: Tom Marsicano
David Curl
Dick Greco
Jordan Nichols
Pete pusnik
File: Site Plan Approval (w/all)
~:::-
TO:
&II
Mr. Cormac Conahan
HODGSON, RUSS, ANDREWS, WOODS & GOODYEAR
2000 Glades Road
Suite 400
Boca Raton, Fl 33431
RE: RE: BOYNTON BEACH
THE EDWARD J. DeBARTOLO CORPORATION
7620 MARKET ST, . p, 0, BOX 3287
YOUNGSTOWN,OH 44512-6085
(216) 758.7292 TELEX 982408
- overnight courier -
DATE: Mrlrrh?LL lQA!}
PRINT NO.
DESCRIPTION
1 of 2
2 of 2
SP1
SP4
L-1X
L-2X
L-3X
L-4X
L-5X
L-6X
1 of 3
2 of 3
3 of 3
1
M-1
M-2
M-3B
1-A
1-B
3
3-A
5
L-1
L-2
L-3
L-4
L-5
L-6
1-1
1-2
REV.NO.
dated 3/15/89
dated 3/15/89
dated 3/16/89
dated 3/16/89
dated 3/17/89
dated 3/17/89
dated 1/26/89
II
II
II
dated 3/13/89
II
II
dated 3/9/89
dated 3/12/89
dated 3/13/89
dated 3/14/89
dated 3/16/89
dated 3/16/89
dated 3/13/89
dated 9/19/88
dated 3/21/89
dated 3/17/89
da ted 3/17/89
dated 3/9/89
dated 10/12/88
dated 12/15/88
dated 12/15/88
dated 3/20/89
dated 11/23/88
Boundary Survey Signed and Sealed
Boundary Description
Site Plan
Landscaped Area
Landscape Plan
Landscape Plan
II
II
II
II
LWDD Canal Relocation Higgins Drawings Signed and Sealed
II
II
EJD Site Plan Signed and Sealed
EJD Storm Sewer Signed and Sealed
EJD Sanitary Sewer Signed and Sealed
EJD Water Plan Signed And Sealed
EJD Paint Stripes and Signing
EJD Paint Stripes and Signing Details
EJD Grading Plan
EJD Drainage Run-off Plan
EJD Sidewalk Plans
EJD Demolition Relocation Protection Plan
EJD Planting Plan
EJD Relocation Planting
EJD Planting Details and Noes
EJD Topsoil Plan
EJD Topsoil Plan
EJD Site Irrigation Plan
EJD Site Irrigation Plan
Enclosure(s) :
Prints
Reproducibles
Specifications
Other
FROM: Gerald G. Williams
Development Coordinator
Development Planning & Mgmt.
x
Copy to:
Peter Pusnik, David Curl, File: Site Plan Approval
FORM NO. CORP, 306
TO:
Mr. Cormac Conahan
Page 2
III
THE EDWARD J. DeBARTOLO CORPORATION
7620 MARKET ST, . P. O. BOX 3287
YOUNGSTOWN.OH 44512-6085
(216) 758.7292 TELEX 982408
RE:
DATE:
PRINT NO. REV.NO. DESCRIPTION
1-3 dated 3/20/89 Site Irrigation EJD
1-4 dated 11/23/88 Building Perimeter Irrigation EJD
1-5 dated 11/23/88 Irrigation Details EJD
E-2R dated 11/23/88 Public Lighting Details EJD
ES-2A dated 11/9/89 ALS/EJD Arch. Tuminaire EJD
ES-5A dated 11/9/88 Area Lt1g Standard Bracket Assembly EJD
ES-5B dated 11/9/88 Bracket Assembly Detail EJD
2 dated 1/6/84 Building Location Plan EJD
M-4 dated 3/14/89 Gas Plan EJD
E-1 dated 3/9/89 Public Lighting Plan EJD
E-4 dated 3/1 0/89 Site Elec. EJD
E-5 dated 3/9/89 Site Telephone EJD
2 Sears Signed Graphics
19 II
20 II
22 II
Enclosure ( s) :
Prints
Reproducibles
Specifications
Other
FROM:
Copy to:
FORM NO. CORP. 305
South Florida
Water Management District
John R. Wodraska, Executive Directo
Tilford C. Creel, Deputy Executive Directo
Mr. S. Jordan Nichols, P. E.
Higgins Eh;Jineering, Inc.
4623 Forest Hill Blvd., SUite
West Palm Beach, FL 33415
114
U \:. c//:__
i +1', r I
~\(~ t, ~}J9J
. l\
IV
.,' <. ) b \/
~' ~./
,1
0/ if'
7J
Post Office Box 24680 3301 Gun Club Road
West Palm Beach, Florida 33416-4680
Telephone (407) 686-8800
Florida WA TS Line 1-800-432-2045
INREPLYREF,ERTO; , .
our F~le: Appl~cat~on No. 09278-1
Resource Control Department
January 19, 1989
/,/
Dear Mr. Nichols: (J;)~, ,.
'.
SUbject: Application Number 09278-1, Pennit MOD #50-00860-S;' Boynton Beach Mall
Expansion, Boynton Beach, Palm Beach County, S19/T45S/R43E
We have received infonnation from you on December 20, 1988. '!he infonnation
received was incomplete and did not adequately address the following item.
Accordin;J to Rule 40E-4, Florida Administrative Code (FAC), review of this
project cannot be corrplete:i without this infonnati.on.
1. since additional pavement is proposed to be lcx::ated on a tract of lam
excluded for development and the intende:i land use is C01t1IOOI'Cial, dry
pretreatJnent must be provide:i for the additional inpervious area. Please
revise plans and calculations, accordingly.
In accordance with 40E-1. 603 (5) FAC, if the requeste:i infonnation is not receive:i
within 30 days of the date of this letter, this application may be prcx::essed for
denial, if not withdrawn by the applicant. Please submit rotJR copies of the
requested infonnation. Should you have any questions, please call Brian Gentry.
Sincerely,
aF>>-
RECEIVED
Edward W. Yaun, P. E.
SUpervis~ Professional
SUrface Water Management Division
~
JAN 26 1988
PLANNiNG DE.PT~
...,
cc: Palm Beach County Eh;Jineer
Boynton Beach City Engineer
lake Worth Drainage District/Florida Department of Envirorunental Regulation
Nancy H. Roen
Chairman - Plantation
James F. Garner
Vice Chairman - Ft. Myers
Nathaniel P. Reed
Hobe Sound
Oscar M, Corbin, Jr,
Ft. Myers
J.D, York
Palm City
Doran A, Jason
Key Biscayne
Arsenio Milian
Miami
Fritl Stein
Belle Glade
Mike Stout
Windermere
C~
HIGGINS ENGINEERING. INC.
Mr, Jim Golden
City of Boynton Beach
200 North Seacrest Road
Boynton Beach, Florida 33435
January 13, 1989
Re: Proposed Expansion for Boynton Beach Mall
Dear Mr, Golden:
Enclosed, please find six sets of engineering construction plans
for the proposed L-23 Canal relocation and enclosure at the
Boynton Beach Mall, These plans were inadvertently omitted from
the set of plans forwarded to your office on January 11, 1989 by
The Edward J. DeBartolo Corporation.
Should you have any questions or need any additional information,
please feel free to give us a call.
Very truly yours,
HIGGINS ENGINEERING, INC.
4/c!-~
S. Jordan Nichols, P.E,
C--
SJNjam
86-10
Enclosures
cc: Gerald Williams wjsepia
Bob Higgins wjo
4623 Forest Hill Blvd" Suite 114 West Palm Beach. FL 33415
(305) 439-7807
Water Resources - Land Development