REVIEW COMMENTS
STAFF COMMENTS
SUNSHINE CAR WASH
ADMINISTRATIVE SITE PLAN
BUILDING DEPARTMENT:
See attached memorandum
UTILITIES DEPARTMENT:
See attached memorandum
MEMORANDUM
TO:
Tim Cannon
Acting Planning Dire~ctor "
John A. Guidry
Director of Utilities
DATE: January 3, 1990
FROM:
SUBJ: TRB Review -
Sunshine Car
Wash - Site Plan
We can approve this project, subject to the following condition:
There is an existing A.C. water main located near the
right-of-way line at this location. Excavation within 5' of
this water main would likely result in its failure. The
applicant shall field locate this water main and adjust the
location of his sign to provide 5' of undisturbed clearance.
dmt
bc: Michael E. Kazunas, P.E.
MEMORANDUM
January 2, 1990
TO: Timothy P. Cannon, Interim Planning Director
FROM: Michael E. Haag, Development Compliance Administrator
RE: SITE PLAN FOR SUNSHINE CAR WASH - FREE STANDING SIGN
Upon review of the above-mentioned project, the following
comment must be addressed in order to conform with Boynton Beach
City Codes:
Provide a site plan drawing identifying the location of the
sign by showing setback dimensions from two adjacent property
lines to the sign structure.
In order to facilitate the permitting process, the following
information should be included within your documents submitted to
the Building Department for required permits:
1. The definition of a free-standing sign allows this sign to
identify the title of project or one main use only.
2. Provide written verification from Florida Power and Light and
Southern Bell that the location of sign structure is
acceptable.
3. Sign structures exceeding thirty-two square feet (32') require
drawings prepared by a Florida registered engineer or
architect showing original signature and seal. Drawings to
include, but not limited to, the following:
a. A statement verifying sign and sign structure is designed
to withstand wind pressure of fifty pounds (50*) per square
foot.
b. Detailed drawings identifying type and sizes of all sign
material.
c. Detailed drawings showing method of connection at all
critical design points.
-b~~ ;b
MEH:eaf
xc:Don Jaeger
SUNSHINE.SDD
'"
D CA..'
/J l i'
I/i '
(, ,',
,") T;+ r f (' 0 If ,At E AI Cs
5 ,.. J ~. {- ,.,. -,.~ Av' ,-
- V( /\; 7 ;-r_ J-, ' ~
-.- I j J '<-
/'A A" i ( , A. C ft/
l '/' L..v/j j II
/+'.', l) J\.; T/V' I' <;- t C' A ", . ~r u /':..
/ \ (, l -, 'i _' I ^, J, / V /-
, /) "
il ~{\. Vl-"
, !
1,........./1
r\
J~" (, -i. J
('
,
,'-
\o.r : V\-1 I 1..-[
? -<
Ii
J
'....
(' ~-l' _. f) 1_';4-, j /
j-f, J.~- - /~
c
r~ :0
..--- '- -
J.
L.f
r;,4 ; ,I .." l
( JI/
I '
!/1 _ (~.:; ~ "Vi.. (j v\..... {;~
.---'-