Loading...
CORRESPONDENCE KATZ, BARRON, SQUITERO & FAUST, P. A. ATTORNEYS AT LAW RECEIVED 2599 SOUTH B....VSHORE DRIVE SUITE 700.... 1'011....1'011. FLORID.... 33133 ""G 24 1987 PLANNli'~G DEPT. August 21, 1987 O....OE(30S) 856-2444 BROW....RO (30S) 781-4720 . 522-3636 TELEX 51- 5017 TELECOPIER 285 - 9227 The Honorable Nick Cassandra Mayor Town of Boynton Beach 211 South Federal Highway PO Box 310 Boynton Beach, Florida 33425-0310 Re: Boynton Lakes Plaza, Boynton Beach, FL Dear Mayor Cassandra: This law firm represents the developer of the above-refer- enced project, Edge Equities Incorporated. It has come to our attention that another developer, Sybar Development Corporation, is to appear at a public hearing before the Planning and Zoning Committee on September 8, 1987 and before the City Commission on September 15, 1987, seeking site plan approval for a project at Sybar Square formerly known as Savannah Square, designed to include an eight-screen cinema. Because there are already nine screens located at Congress Avenue and Boynton Beach Boulevard, and our client's receipt some time ago of site plan approval for the eight scroens under development at Boynton Lakes Plaza, our client has requested that we advise you of its vehement objection to the approval of any additional movie screens in the area. We would agree with the views of certain members of the Council who have expressed concern that the area cannot support additional movie screens. Our client has also requested that we write to you to advise the status of the Boynton Lakes Plaza project, as certain inaccurate rumors have come to its attention. Boynton Lakes Plaza is very much underway, and as you know, has received all requisite site plan approvals (which include approval for an eight-screen cinema). Permi ts are not required to be pulled until mid-1988. Additional approvals respecting the Health Department, Department of Transportation, Water Management, Army Corps of Engineers and others have been applied for and are currently being processed. A land loan is in place, and a construction package is currently being considered by the project The Honorable Nick Cassandra August 21, 1987 Page Two. construction lender. Leasing, of course, is plans and specifications for construction (reflecting the eight screen cinema) are complete. In short, Edge Equities is actively Boynton Lakes Project, and looks forward to timely completion. underway, and the of the project approximately 75% proceeding with the its successful and I f we may be of any assistance, please do not hesitate to contact Edge Equities Incorporated, 350 South U. S. Highway *1, Jupiter, Florida 33477 (747-9177), or the undersigned. We look forward to an equitable resolution of this matter, and would like the opportunity to address the Planning and Zoning Board and City Commission at their respective hearings. Very truly yours, KATZ, BARRON, SQUITERO & FAUST, P.A. ~~ Howard L. triedberg For the Firm By: HLF: jdk HLFJ6 cc: Ralph Marchese, Vice-Mayor Dee Zibelli, Commissioner Leonard Mann, Commissioner Ezell Hester, Jr., Commissioner Carmen Anunziato, Planning Director STAFF COMMENTS SYBAR SQUARE SHOPPING CENTER SITE PLAN Building Department See attached memo Engineering Department See attached memo Utilities Department See attached memo. Police Department See attached memo Planning Department See attached memos (2) Forester/Horticulturist Memo to be distributed at meeting Public Works Department: Contact Public Works Department prior to pouring dumpster pad MEMORANDUL. TO CarIren Armunziato Plarming Director DATil: October 7, 1987 I'ILE ""OM Kevin J. Hallahan Forester/Horticulturist SU.JRCT Sybar Square - Site Plan The following items pertain to the landscape plan for the above project: I. Fifty percent of all tree species and quantities should be native. 2. All interior parking lot trees nmst have a clear trunk of 51 at ti1re of planting. This ~uld require these trees to be larger than 8' height. 3. I ~uld recannend the landscape plan include a larger variety of shade trees in the parking lot areas. This is a very large ccmrercial cooplex and perhaps the applicant should provide increased shading in this area. . ~~--<- ~- ilat Lfl~ Kevin J. all an ,L.. KJH:ad MEMORANDU.' , TO I'ItOM Carmen Annunziato Planning Director DAT. October 7, 1987 I"'L. _U.JECT Preliminary Plat and Site Plan Approval: Sybar Square Don Jaeger Building Department 12. 13.. 14. 15. As a condition of preliminary plat and site plan approval, the following comments should be incorporated into the related documents by the applicant: 1. 2. 3. 4. 5. 6. 7. 8. 9. The light standards on the lighting intensity layout match the location on sheet E-l, site lighting plan. must be designed to withstand a 120 m.p.h. wind load with Chapter 12, Standard Building Code. Easements are required to be dedicated on the plat document for fire hydrants and water services. South Florida Water Management District approval is required. Sidewalks must continue through turnouts and must be ramped for handicapped accessibility. Buffer walls must be stuccoed and painted to match the color scheme of the shopping center. Notes on the plat document prohibit the planting of shrubs and trees in drainage easements. This occurs on the east side of Tract A. Dumpster enclosures are required to maintain an inside dimension of 10 feet by.lO feet. The theater is considered a threshold structure and must be permitted and inspected as such, under state law. The landscaped area between Tract B and Quantum Blvd. is required to be 5 foot wide. The plans show a 3 foot bicycle path encroachment and a two foot vehicle overhang encroachment into this area. The buffer wall must be setback two feet from the property line for maintenance and landscape purposes. The site plan and the paving and drainage plans conflict as to the location of handicapped access ramps. Submit details of the ramp construction. All swales in right-of-ways must be sodded. The marquee sign must not exceed 10 percent of the theater face area. Drainage easements must be provided on Plat 1 of Quantum Park to accommodate the proposed off site construction for Sybar Square drainage use. Turnout permits must be secured from the County Highway Department. sheet do not Light standards in accordance 10. 11. The applicant's prompt compliance with the preceding comments will insure a timely permitting process. DoO~J~ RECEI'lED DJ:bh XC: E. E. Howell OCT '( 1981 PLANNING D~r;r. M E M 0 RAN DUM October 7, 1987 RECEf\TED TO: Mr. Jim Golden Senior City Planner OCT 7 1981 PLAN N Il'i G D EPT. FROM: Tom Clark City Engineer RE: Sybar Square, Preliminary Plat and Site Plan Comments: I. Cost estimate should include ~he cost for a traffic signal at Quantum Blvd. and Congress Ave. 2. Street lights on Quantum Blvd. should be shown or a reference to the Quantum Commercial Park lighting must be made. 3. The plat should document the agreement that allows construc- tion for "drainage etc. on a 2nd party's property. What is the width for the seed mulch in Section "A-A". Seed and mulch should be grass sod. 4. Swale shown in Section "B-B" should have grass sod. 5. Street lights by Florida Power & Light in Congress Ave. should be shown or referenced by note and included in the cost estimate. 6. Easements for the outfall storm sewers or reference to documented agreements should be shown. 7. Update of drainage calculations is required. 8. Sheet #7 of development plans should show off-site elevations. 9. Storm drains and structures should not extend into the Lake Worth Drainage District's right-af-way without a license from said District. 10. A permit from the Lake Worth Drainage District is required. 11. The cross-section thru the lake should be shown graded to the slope as required by the Water Management District. Seeding and sodding should continue to the water's edge. 12. All utility easements should be shown on the plat with dimen~ sions and bearings. con It. . . . . . , To: Mr. Jim Golden October 7, 1987 Re: Sybar Square, comments con1t. Page 2 Comments: 13. A cross-section thru the landscaped areas to show the inlet structures should be shown. Inlet structures should be several inches above the swale bottom. 14. Sidewalks should extend thru the turnouts at driveways. IS. Cost estimate to include improvements as per report from Murray, Dudeck & Associates, including signalization at north entrance to Congress. 16. Details for the existing outfall control structure should be included. 17. Refer to Bill Flushing1s memo of October 5, 1987. v;.... ,efJ- Torn Clark TAC:ck attachment MEMORA.NDUI TO Planning Dept. Attn: J. Golden OAT. October 7, 1987 "ILIl' I'ltOM Lt. D. Thrasher Po 1 i ce Dept. SUaJI:CT Sybar Square As per the TRB meeting 6 October 1987, the following is recommended: 1. "Right turn only" sign, South exit onto Quantum Blvd. 2. "Stop" signs at median and side of traffic way, for Northbound traffic exiting onto Quantum Blvd. DT:as M E M 0 RAN DUM October 7, 1987 TO: CHAIRMAN AND MEMBERS PLANNING AND ZONING BOARD FROM: CARMEN S. ANNUNZIATO, PLANNING DIRECTOR RE: SYBAR SQUARE SHOPPING CENTER-STAFF COMMENTS Please be advised of the Planning Department's comments in connection with the above-referenced request for site plan approval: 1. Developer to post a bond for a proportionate share of the signalization of Quantum Boulevard and Congress Avenue based on traffic impact, as determined by the County Traffic Engineer, prior to the issuance of a building permit. 2. Lighting along the northern property boundary to be directed away from the abutting residential-zoned district (Dos Lagos). 3. Roof top and ground mounted mechanical equipment to have proper screening and noise mitigation. 4. The addition of coolers onto the rear of any building will require a site plan modification. 5. The sidewalk adjacent to the northern right-of-way line for N.W. 22nd Avenue should be continued to the eastern boundary of the lake to be continuous with plat no. 1 of Quantum Park. 6. The engineering plans should conform to the site plan with regard to the elimination of the parallel parking spaces within the parcel located on the north side of Quantum Boulevard, and with regard to the "paver area" adjacent to the N.W. 22nd Avenue driveway within the parcel located on the south side of Quantum Boulevard. CCII - -~ _ JL ~ CARMEN S. ANNUNZIA~ CSA:ro M E M 0 RAN DUM October 6, 1987 TO: CHAIRMAN AND MEMBERS PLANNING AND ZONING BOARD FROM: CARMEN S. ANNUNZIATO, PLANNING DIRECTOR RE: SYBAR SQUARE-SHARED PARKING ALLOCATION Section 11-H(13) of the Zoning Code contains the following provision for shared parking: 13. Parking spaces required in this Ordinance for one use or structure may be allocated in part or in whole for the required parking spaces of another use or structure if quantitative evidence is provided showing that parking demand for the different uses or structures would occur on different days of the week or at different hours. Quantitative evidence shall include but not be limited to the following: (a) Field studies and traffic counts prepared by a traffic consultant experienced in parking studies. (b) Adjustments for seasonal variations. (c) Estimates for peak parking demand based on statistical data furnished by the Urban Land Institute or some other recognized land planning and design organization. All data furnished must be statistically valid. In addition, a minimum buffer of 10% shall be provided to ensure that a sufficient number of parking spaces are available at times of peak hour use. Said buffer is to be calculated based on the following formula: Buffer = surplus shared parkingl 2 x 100% on-site + shared parking provided IShared parking spaces not required by the City of Boynton Beach zoning regulations for the proposed use. 2parking spaces required for the proposed use as per the City of Boynton Beach zoning regulations. Evidence for joint allocation of required space shall be submitted to the Technical Review Board, and approval of joint allocation of required parking spaces shall be made by the City Commission, after review and recommendations by the Planning and Zoning Board. with respect to Section 11-H (13) of the Zoning Regulations, Carlos Diaz of Matthews and Associates, agent for Sybar-Savannah Square Joint Venture, is requesting approval of a shared parking allocation in connection with a request for site plan approval for the Sybar Square (formerly Savannah Square) shopping center. The subject property is located at the northeast corner of North Congress Avenue and Northwest 22nd Avenue, and is bisected by Quantum Boulevard, which divides the overall parcel into two smaller parcels. The parcel located on the north side of Quantum Boulevard is 5.13 acres in size, while the parcel located on the south side of Quantum Boulevard is 13.167 acres in size. -2- The proposed site plan for the Sybar Square Shopping Center consists essentially of two independent site plan requests for the parcels located on the north and south sides of Quantum Boulevard. The parcel located on the north side of Quantum Boulevard consists of 58,100 square feet of floor space, including 45,100 square feet of retail floor space and 13,000 square feet of office floor space. The parcel located on the south side of Quantum Boulevard consists of 115,100 square feet of floor space, including 66,600 square feet of retail floor space, 13,000 square feet of office floor space, and a 35,500 square foot (2,288 seat) cinema consisting of eight screens. The Shared Parking Study prepared by Murray-Dudek and Associates for Rossi and Malavasi Engineers has been documented to provide for two independent shared parking allocations for the parcels located on the north and south sides of Quantum Boulevard. The study assumes that due to the existence of Quantum Boulevard, which forms a physical barrier between the north and south parcels, no sharing will occur between these two parcels. Rather, all sharing is to occur within each individual parcel. The documentation prepared by Murray-Dudek for the parcel located on the north side of Quantum Boulevard indicates that the peak parking accumulation for this site would occur on weekdays at approximately 2:00 P.M. and would require approximately 246 of the 264 parking spaces provided (291 spaces would be required by code). This projection of peak hour parking demand is based on Urban Land Institute data which has been adjusted in part to incorporate site-specific conditions. Of the 65 parking spaces that would be required by code for the office building, 38 have been provided on-site, with the remaining 27 parking spaces being shared from the unoccupied parking available from the retail development. The remaining 16 surplus parking spaces not required by the retail development at the 2:00 weekday peak are allocated toward the calculation of the required 10% buffer as follows: 16 38 + 27 x 100% = 24.6% Therefore, given the worst case scenario of total parking accumulation (weekdays at 2:00 P.M.), the shared parking allocation for the northern parcel would still allow for a statistical surplus of twenty four (16) parking spaces. The documentation prepared by Murray-Dudek for the parcel located on the south side of Quantum Boulevard indicates that the peak parking accumulation for the retail development, the office building, and the cinema combined would occur on weekdays at approximately 8:00 P.M. and would require approximately 648 of the 798 parking spaces provided (970 spaces would be required by code). This projection of peak hour parking demand is based on Urban Land Institute data which has been adjusted in part to incorporate site-specific conditions. Of the 572 parking spaces that would be required by code for the cinema, 400 have been provided on-site with the remaining 172 parking spaces being shared from those parking spaces left unoccupied by the retail and office developments. The remaining 144 surplus parking spaces not required by the retail and office developments at the 8:00 P.M. weekday peak are allocated toward the calculation of the required 10% buffer as follows: 144 400 + 172 x 100% = 25.2% Therefore, given the worst case scenario of total parking accumulation (weekdays at 8:00 P.M.), the shared parking allocation for the southern parcel would still allow for a statistical surplus of 144 parking spaces. -3- On Tuesday, October 6, 1987, the Technical Review Board met to review the plans and documents submitted, at which time they recommended approval of the Murray-Dudek Shared Parking Study as submitted. It was the consensus of the Technical Review Board that the proposed shared parking allocation was prepared and documented in accordance with code requirements, and that sufficient opportunity exists for shared parking to occur on-site, given the mix of uses in the proposed shopping center. ~ Ca... . rJ.- ~ CARMEN S. ANNUNZ 0 JJG:ro cc Central File I1EJ'10RANDUJ'1 TCI: Car~en Annunziato. Planning DiredClr ~ _ ~.#J Utilities r7 Fro~: John A. Guidry. Director of Date: October 6. 1987 Subject: TR8 Review - Sybar Square - Plat and site plan We can approve this project subject to.the following conditions: 1) Specify the ~eter sizes for all ~eter5. Z) Provide flow calculations for each ~eter bank having ~ore than four ~eters on a single Z" line. Flow de~and per ~eter is to be . based upon the architect's esti~ate. or the ~axi~u~ sustained flow rate of t~e ~eter. 3) J'1cters are not to be located in walkways. parking spaces. or areas used for vehicular traffic. Indicate the treat~ent and specific location of each ~eter grouping on the site plan. specifically stating what the ~eters are to be located in (e.g. grassy area. asphalt paving. etc.) 4) Ease~ents ~ust be shown for all water services. ~eters. fire hydrants. and sprinkler lines up to the post indicator valve. 5) Provide the latitude and longitude of the lift station serving this plat. 6) Each building cluster separated by a 4-hour wall should have its own feed line for the fire sprinkler syste". 7) Du~psters or du~pster pads ~ust npt be located in utility ease~ents. xc: Peter J'1azzella M E 1_ M 0 R_ R s_ A ~ D u M october 5, 1987 Tu: Tom Clark From: Bill Flushing Re: Plat of Sybar Square Subject plat deficiencies are as follows: 1. No dimensions or bearings on utility easements 2. Additional PRMs chapter 177.091 are required (7)) along the East line (See 3. The tenth (10) is incorrect, course Distance in the it should be 360.25. legal description 4. The same co~rse on the Plat is also shown incorrectly, it should be 360.25. Bi~~ MEMOR-ANDUA. TO CarIren Armunziato PI arming Director DATIf August 31, 1987 RECEIV1IC ,.ILI' ""0" Kevin J. Hallahan Forester/Horticulturist 5UeJllrCT Sybar Square - Site Pl~OG 31 198'1 PLANNldG I;l!;P r~ 1. Fifty percent of the tree species and quantity nmst be native. 2. Thirty percent of the shrubs and ground cover nmst be native. 3. Hedge material along road R.O.W's nmst be 36" in height at the ti1re of planting. 4. 'Ihe type of sod should be specified. 5. The irrigation system should be detailed. 6. Ci ty water carmot be used for irrigating the landscaped areas. 7. Each out parcel nmst sutrni t a separate landscape plan for approval. -4.4': ~....;j~ J Kevin J. lahan ).:..1 KJH:ad MEMQRANDU'\. TO Canren Armunziato Plarming Director DATR August 311 1987 RECENED FILa I'ltOM Kevin J. Hallahan Forester/Horticulturist 5UBJI!CT Sybar Square AUG 31 ]981 PLANNING DEPT. 1. Sheet #4 (of 8) shows a water line being jack and bored across Congress Avenue. Perhaps the City can coordinate with the develop- er to provide irrigation to the grassed xredian for future landscape irrproverrents. 2. A master landscape plan is required for the site. This should be coordinated with the landscape plan sul:tnitted with the site plan. .J;L~'5i.y)J~~ Kevin J. allahan KJH:ad M E M'O RAN DUM September 3, 1987 TO: Mr. Jim Golden Senior City Planner FROM: Tom Clark City Engineer RE: Sybar Square, Preliminary Plat and Site plan Comments:- I. update of drainage calculations is required. 2. Sheet #7 of development plans should show off-site elevations. 3. Storm drains and structures should not extend into the Lake Worth Drainage District's right-of-way without a license from said District. 4. A permit from the Lake Worth Drainage District is required. 5. The cross-section thru the lake should be shown graded to the slope as required by the Water Management District. Seeding and sodding should continue to the water's edge. 6. Utility easements should be shown on the plat. 7. A sidewalk should extend from N.W. 22nd Ave., at the main entrance, to a point where pedestrians would cross the traffic lanes when leaving the parking lot. 8. Ramps for handicapped persons should be shown. 9. A cross-section thru the landscaped areas to show the inlet structures should be shown. Inlet structures should be several inches above the swale bottom. 10. Sidewalks should extend thru the turnouts at driveways. II. Lighting intensity in the area of the retail stores should be shown. If lighting is to be provided from the Building Security lighting, it should be so indicated. 12. Cost estimate to include improvements as per report from Murray, Dudeck & Associates, including signalization at north entrance to Congress. 13. Comments from Bill Flushing are included in the attached memo, dated September I, 1987. TAC/ck attachment ~v~ d2t----. Tom Clark M E M 0 RAN DUM September 2, 1987 TO: PLANNING AND ZONING BOARD MEMBERS FROM: JAMES J. GOLDEN, SENIOR CITY PLANNER RE: SYBAR SQUARE-STAFF COMMENTS Please be advised of the Planning Department's comments in connection with the above-referenced request for site plan approval: I. Section 5-141(g)(6) of the Parking Lot Regulations requires a 100 foot "throat" for major shopping center driveways. The main driveway onto N.W. 22nd Avenue does not meet this requirement. 2. A six foot high concrete block wall is required along the northern property boundary adjacent to residential-zoned property. The proposed pre-cast wall does not meet this requirement. 3. Site data information on the site plan must be revised to indicate the proper parking calculations (see correct parking calculations in shared parking study). 4. There appears to be a conflict between the buffer wall and drainage system along the northern property boundary. J 1 i. ! . 7)-'It7--iO 1 i' )):JrP i /It;..j ,;1,:-_,,4c-tn Y t' r:' , (f.,."" <7. 'yL ~ l-~ () F i-l;e SJ &teL (,/ 7' Life' (.L reJf a~."/""c f\o ':- ( ,.L, t''' fo U J v(" S --' A (, (' 11 (.{ @ tL f (! .,. VI. 1-'-.... f.( ~ I ~ ~ c- f. {, fJ", I~j.~ ~ES J{i GOLDEN JJG:ro cc Central File M EM,OR-AN D U · - : TO Planning Dept. Attn: J. Golden DATI: September 1, 1987 ,.ILI' F"OM Lt. D. Thrasher Police Dept. 5UaJI'CT Sybar Square As per the TRB meeting of 1 September 1987, the following is recommended: 1. Pole mounted exterior lighting to be photo activated. 2. Right turn only signs on all egresses where needed. 3. Marking on the parking lots for traffic direction. 4. Recommend eliminating parrallel parking spaces if possible 5. Ingress/egress onto N.W. 22 Ave. difficult, not enough interior access aisle, should be minimum of 100 feet. 6. Traffic pattern from rear of building (South plat) to N.W. 22 Ave. and around the retail stores extremely hazardous. Intersection at this location also dangerous. Traffic flow at the intersection will increase as vehicles find they cannot make a left turn from the rear service road. Lt. D. Thrasher Police Department ~.. DT:as ,_ TO --> I {'vL G-o L D L-?AJ t>LfTNiU f N-(~ :\>~'1- -, FROM L,Cr'lr> (~V t;<fAJ;f {j.-6~--If Pi 12-b -()t::~PT SUBJECT: _____:~~_=~_l__~~~:______.~_q---~J1=~1?::S~-----=--~--~-~.....___.DA TE:__._Z=~__~_~______ ~OLD . ,) ,F--/f2b L--N-1J6-S /A/ t9-~D e:-~L-(~{F z-) <a ( (;-1\) I~-C~. FDa- ;==112-5 L..f9-I\j e-s / IU ~,Vt-Tl{ Cti4-n- 3) (2DA--9 lVA,-( ~ ~ /):)/1, fc I ,0 C~ ~~A);J ( If t' 'f / FI ~'c- &-c/Jf- (( ;:Jb 72--19- Tl [."71.) ~ SIGNED ,0/;,' ~ /Iv?:/ REPLY~~~/~ / ; / \...-/. PLEASE REPLY TO . !cu0l</LCV- ;C /6/f /fl DATE: / SIGN ~ Item # F269 @ Wheeler Group Inc. 1979 THIS COP MEMO.RANDUM Camen Annunziato Planning Director DAn August 31, 1987 RECEIVED I'lL. 1)111 Kevin J. Hallahan Forester /Horticulturist SU."_CT Sybar Square - Site PI~lJ6 31 1001 PLANNING Dl;ff, 1. Fifty percent of the tree species and quantity ImlSt be native. 2. 'n1irty percent of the shrubs and ground cover nmst be native. 3. Hedge material along road R.O.W' s must be 36" in height at the tine of planting. 4. 'l11e type of sod should be specified. 5. 'l11e irrigation system should be detailed. 6. City water cannot be used for irrigating the landscaped areas. 7. Pach out parcel must sul:mit a separate landscape plan for approval. -&~_: ~'-IJ ~--rd Kevin J. lahan KJH: ad .' '0 ;'110" MEMrOR'ANDUM RE,CEIVED Carmen Annunziato Planning Director SEP 2 198r September PCArt~fi{'G DE-Pl'. DATE "ILI Don Jaeger Building Department 5U.JECT Site Plan Review: Sybar Square As a condition of site plan approval, the following comments should be incorporated into the related documents by the applicant: 1. 2. All documents submitted for public record by a registered professional in the state of Florida must be signed and sealed. Indicate on the plans the proposed type of construction for each building in accordance with Section 601.1.1, Standard Building Code, 1985 Edition. Indicate which buildings will be fully sprinkled. All structures must comply with Table 400, Standard Building Code, for allowable area and Table 600, Standard Building Code, for ratings on exterior walls and percent of allowable openings. . All proposed sidewalks adjacent to this site must be completed prior to the certificate of occupancy being issued. Sidewalks should be continued through all turnouts and must be ramped for handicapped accessibility. In order to assure safe pedestrian access to the site, we recommend that several sidewalks be included from the right- of-way leading into the site. The office building in the northwest section of the site must have a side yard setback of 30 feet due to the site being adjacent to a residentially zoned parcel. The Code considers two parcels adjacent when they are separated only by a "right-of-way under ownership of.... a governmental agency". Separate permits are required for all signage. Free standing signs must comply with Section 21-15 E(3) of the Boynton Beach Code of Ordinances. The proposed site lighting does not comply with the City's minimum recommended light levels. All light poles must be engineered in accordance with Section 1205, Standard Building Code for a fastest mile of wind of 120 m.p.h. The landscaping plan does not address the proposed treatment of the 20 x 100 foot section of the property adjacent to and bordering on the lake, at the east property line. All landscaping must be 100% irrigated by an automatic irrigation system which does not utilize City water. The bank of the Lake Worth Drainage District canal should be seeded and mulched as well as the lake bank adjacent to the site. Handicapped ramps should be provided along the fronts of the building walkways, at a maximum of 100 foot intervals in accordance with the State Handicapped Code. All handicapped parking stalls should have access to the buildings within close proximity to the stalls, including the stalls in the southeast corner of the south parking lot. 3. 4. 5. 6. 7 . 8. 9. The following information is for the applicant's information: In order to facilitate the permitting process, the following documents should be submitted to the Building Department for review at the time permits are desired: Memo to Carmen Annunziato RE: Site Plan Review: Sybar Square September 2, 1987 Page Two 1. Copies of the South Florida Water Management District approval. 2. Signed and sealed energy forms in compliance with the State Energy Code. 3. Soil borings with the soil engineer's recommendation for obtaining the necessary soil bearing values. 4. Restaurants and food handling services require the approval of the Palm Beach County Health Department. 5. Turnout permits from the County Highway Department are required for the proposed driveways on N.W. 22nd Avenue and N. Congress Avenue. 6. Complete sets of construction documents and plans, signed and sealed by the relevant design professionals, licensed in the state of Florida. The applicant's prompt compliance with the preceding comments will insure a timely permitting process. ~~9~ Don Jaege DJ:bh XC: E. E. Howell MEMORANDUW- o Carman Annunziato Plarming Director DATE October 7, 1987 I'ILE ItOM Kevin J. Hallahan Forester/Horticulturist SU.JECT Sybar Square - Site Plan The following items pertain to the landscape plan for the above project: 1. Fifty percent of all tree species and quantities should be native. 2. All interior parking lot trees nmst have a clear trunk of 5 I at tirre of planting. This ~uld require these trees to be larger than 8 I height. 3. I would reccmnend the landscape plan include a larger variety of shade trees in the parking lot areas. This is a very large cc::rmercial canplex and perhaps the applicant should provide increased shading in this area. . .JI-,_-J- ~- ~ L.// Lk-.;r KevJ.n J. al an ..... ., ' KJH:ad \\ , . "- ; , I , , I I: II I I, ~t (kR 11 E)(.' Ii liT {I f ( 0 f1 f! /3 )/ 75 CV E Jt A- [);: ro!\ T /I F f R [5 {f /1 j.AI A-;C 1 t . ~ f l Jr r A-PI!( 0 VA-L Fo/< Q L{ A--NT L{ If />/I-)? k /JIIC L [;[ (;(3 J P (? ;V ;J J Jv tL 0 F A- 5" -f Cl )/ It- L .Jr r- c c A/ tA A !5 5_S A r/ .E )./u E flk/Vi) Q uA-A/;u/1 f3 L [/ /J. .Jt-{[o;: fJ +J/~ Te roJi) i l . Tfi E (+ r '( I'! * 'j )loT ItJt--V/3 j(' t3 Q G{.f ;e L: 1'J .s-v( ^ I- f7 It fc~ 1< llr- J S S'-{ (Z AI Jr-l Lu-f TE /1 g c 0 !~ Trf~u 1113J!C!) m______ I: I' i! It [: -i)l/ /<" ~ V r E ~/ f-kCc iJ.A-N )j [{A\f< ./t 7 '5 t r.:- TTf: R i (oNe E r<Nl>VtL T P Jt-FF -I-C J/11::'f2{) VEA !::- A/T5 A-r I ~7 't[)A-f~ S6(C{kf2~./ /tt: Ft-ELS T/t.-+r A- J}=rcA/A-C- A-r frt-r? A-L5<D Vi: LC!cA-TfcJA/ /1A-i! A/oT [5/~ (E>f--S4-- {5'-- Lt:-j j)rAE To rite ,bf:S rk/vCE ?IJ-o/1 /'/(-[ l~ X +-<; J- j: )/ ~ s F cZ.-A/.1- L /1- r A( cv- G ex? 02 A/,D Jr Vc (- + 1- [.:. /1 rz ) J 7-/rJ;1Jj: TtrJrT /Iv}: ;1I{3~D TO +,4IYEsTPCZA-TL TIt!: ;tv () cl ("3: " f~S. 'fUC( SltoU!-D *[50 TJrj:t~ k CtCJ5l: took A-T -lTcJt ;IF 3 Of /J.A-)v~ cc:rr!3~ - ') (. " ( .' I~ v I,d P ~ 'f-- /' Cl VI. .. J-.. ~ ({v" ,\.- ./~nc-f- I~ " r .J I ('~ f L "'- (... (.. -L,S ~. cJ '<7 (,.[ , , t A-, / '-y,- C / / MEMORANDUM November 5, 1986 TO: Chairman and Members Planning and Zoning Board FROM: Carmen S. Annunziato planning Director RE: Quantum Park Preliminary Plat - Staff Comments Please be advised of the Planning Department's cowments in connection with the above-referenced request for Preliminary Plat approval: 1. Notes on plans which read "centerline of entrance" at median cuts do not predetermine driveway locations. 2. Cross section for N.W. 22nd Avenue must show the required bike path (sheet no. 49 of 68). 3. Developer to submit a copy of the property owner1s documents to the City for review and comment. 4. Developer to dedicate an access easement to the public to provide access to the proposed public park. 5. Developer to document concurrence by Gould and Joa for the abandonment of High Ridge Road. 6. On plat no. 4 clarify the use of tract G. 7. Construct a median cut/turn lane for'the future City Park at the center point of frontage. 8. It is recommended that the developer post a bond for the following improvements required in the Development Order: a) Establishment of a vegetated littoral zone (item # 9). Page Two. flat b) Establishment of a buffer zone of native upland edge vegetation around wetland and deep water habitats which are preserved or constructed on-site (item # 10). c) Developer to provide signalization and turn lanes at the intersection of Congress Avenue and the p~oject access road (Savannah Square) and at all proj~ct entrances on Northwest 22nd Avenue as necessary to maintain service level "C" (item # 29). ('.-:L....-.- J c~~ CARMEN S. ANNUNZlia.: 0 (:~ MURRAY-DUDECK & ASSOCIATES, P.A. TRAFFIC ENGINEERING CONSUL T ANTS September 17, 1987 t.) {-; L Jim Golden, Planner Planning Department City of Boynton Beach 120 NE 2nd Avenue Boynton Beach, FL 33435 RE: Second Revision To Shared Parking Calculations On The Northern Portion Of The Sybar Square Project MDDM Project #87-0074 Dear Jim: Due to the reduced parking on the northerly section of the Sybar Square Project it was necessary to update the Shared Parking computations. Specifically, the available parking was reduced from 272 spaces down to 264 spaces. The attached Ordinance No. 86-8 reflects the new 264 parking spaces. With this reduction the buffer calculation is reduced from 36.9% to 24.6%. Additionally, it was indicated that you would need a graph printout on the Anchor Retail Parking Accumulation Percents. Originally you did indicate that the calculations would be sufficient by attaching Exhibit #28 from the Urban Land Institute's Shared Parking Publication. However, in compliance with your request I am attaching the graph Figures #lA and #5A for Anchor Retail for both weekday and Saturday activities. We are attaching five (5) copies of this supplement to be included in the previous report package. Please advise if there are any additional information or clarifications needed. Sincerely, A~~~~ Daniel N. Murray, P.E. E T:lrr ,.' 1".1>.1 r.', '." oi- 1 ~ ." . . "-...._l ~_.~,._. ."..."....,D' '. J '..... ... ..:' '" ,-,'," Atttachment ,..._M' >I~' :Cd7 DNM/kl IF.' '.' q-..' " _" 'j'~w .. cc: Carlos Diaz Enrico Rossi Sybar Square Development MERRITT ISLAND OFFICE: 100 PARNELL STREET' MERRITT ISLAND, FLORIDA 32953' (305) "'59-2905 CORPORATE HDQTRS.: 7301-A' W. PALMETTO PARK ROAD' SUITE 302-A. BOCA RATON, FLORIDA 33...33. (305) 391-MDDM MURRAY-DUDECK & ASSOCIATES, P.A. TRAFFIC ENGINEERING CONSUL T ANTS August 31, 1987 Jim Golden, Planner Planning Department City of Boynton Beach 120 NE 2nd Avenue Boynton Beach, FL 33435 RE: Revisions to Shared Parking Calculations On The Northern Portion Of The Sybar Square Project MDDM Project #87-0074 Dear Jim: As as result of our discussions, I Retail portion on the northerly section Project. Specifically, the 25,600 square evaluated as an Anchor Retail. have stratified the of the Sybar Square feet is now being The parking accumulation percentages for Anchor Retail are based on Exhibit 28 in the ULI Publication, (refer to attached copy of Exhibit 28). Included in Table 1A and 2A of dated August 26, Ordinance No. 86-8 attached. the updated revisions is the the previously submitted Shared 1987. Also, a reanalysis and has been made. Copies of these refiguring of Parking Study recomputing of revisions are Based on this reanalysis, there is adequate parking to serve the needs of the Sybar Square Project and to meet the City of Boynton Beach parking requirements. Please advise if you have any further questions on this matter. I appreciate your professional approach and cooperation efforts in finalizing the Shared Parking Report on this Project. Sincerely, t1 ,/ // ~ fi~ /V',P'?/*'" Daniel N. Murray, P . DNM/kl cc: Carlos Diaz L Rick Rossi Sybar Square Development MERRITT ISLAND OFFICE: 100 PARNELL STREET. MERRITT ISLAND. FLORIDA 32953. (305) 459-2905 CORPORATE HDQTRS.: 7301-A. W. PALMETTO PARK ROAD' SUITE 302-A. BOCA RATON. FLORIDA 33433. (305) 391-MDDM "r"..... ,,~ - MURRAY-DUDECK & ASSOCIATES, P.A. TRAFFIC ENGINEERING CONSUL TANTS August 26, 1987 RECEIVED ,// Tom Clark City ~ngine oynton Beach 120 NE 2nd Avenue Boynton Beach, FL 33435 ,/,. Al 1(; 26 1987 PLANNL;JG DEPT. Re: Traffic Statement Evaluation Sybar Square Project MDDM Project # 87-0074 Dear Tom: At the request of Mr. Rossi, Murray-Dudeck & Associates, P.A., undertook a Traffic Comparative Analysis of the Sybar Square site pIan prepared by Matthews & Associates and the previous site pIan which was entitled Savannah Square. The primary evaluation consisted of reviewing the January 1985 Kimley-Horn Traffic Impact Analysis to determine if their findings and recommendations would be consistent with the current proposed Sybar Square project. Based on our traffic analysis, the following comments are offered: 1. The proposed shopping center square from 186,400 square feet to 173,200 square in a trip reduction of 341 trips per day Beach County Trip Generation Rates for The shopping center formula is indicated Kimley-Horn Report. footage was reduced feet. This results utilizing the Palm shopping centers. in page 4 of the 2. Utilizing the same methodology for determining Peak Hour Traffic will result in a reduction of 15 ingress and 15 egress trips during the PM Peak Hour. The methodology used in determining the Peak Hour Trips is realistic. -1- MERRITT ISLAND OFFICE: 100 PARNELL STREET - MERRITT ISLAND. FLORIDA 32953 - (305) '459-2905 CORPORATE HDQTRS.: 7301-A - W. PALMETTO PARK ROAD' SUITE l02-A - BOCA RATON. FLORIDA 33<433- (lOS) 391-MDDM -M/iJIr MURRAY-DUDECK & ASSOCIATES 3. In determining the actual external trips onto the roadway system for a shopping center, it is very reasonable and acceptable within the Traffic Engineering profession to reduce the total trips by a minimum of 15% and a maximum of 25% for captured trips. Captured trips being normal motorists that would traverse Congress Avenue and on their way to another trip destination would decide to make a side stop at the Sybar Square Shopping Center. This phenomenon was indicated in the Kimley-Horn Report on page 5, but no traffic reduction was applied. In calculating the traffic impacts fees, I would recommend that a 15% reduction of the daily traffic be applied. In other words, rather than stating a total external trips of 10,413, it is our professional opinion the true external trips should be 8,851 which is 85% of the total trips. 4. A review of the traffic distribution was made based on the recognized trip attractions and existing and near future highway network. The indicated percent distributions on page 5 of the Kimley-Horn Report are reasonable and acceptable. 5. A review of the 1986 Daily Traffic Figures published by the Palm Beach County MPO indicates a slight increase on Congress Avenue from the 1984 volumes indicated in the Kimley-Horn Report. The amount of increase is not significant and would not change the basic capacity analysis results. 6. A detailed review of the traffic figures indicated in Figure #2 of the Kimley-Horn Report was made and a review of the capacity analysis in the appendix was conducted. The traffic figures and analysis are correct. 7. An evaluation of the proposed roadway improvements was made based on the capacity analysis and the recognized need for efficient traffic flow and safety at the project accesses. The proposed highway geometric improvements are adequate and proper. In fact, they will provide a sufficient level of safety to the traveling public. -2- -Mii)r MURRAY-DUDECK & ASSOCIATES 8. The one concern in the recommended improvements as depicted in the Savannah Square Roadway Requirements - Figure #3 is the future signal at the intersection of Congress Avenue and the north project entrance. I would be very hesitant to consider signalization at that access because of the limited spacing between that intersection and the intersection of NW 22nd Avenue and Congress. If in some future date it was critical to install that signal, then positive coordination would be essential between that signal and the NW 22nd Avenue signal. However, the Sybar Square traffic does have access to NW 22nd Avenue which provides alternative access to proceed southbound on Congress Avenue. In summary, the proposed Sybar Square project will not cause any increased incremental impacts from the original project, as outlined in the January 1985 Kimley-Horn Traffic Impact Analysis Report. By mandating all indicated improvements in the 1985 Report with the possible exception of the signalization of the north project access, then the traffic flow and safety at the development accesses and on the highway system will be maintained at a reasonable and acceptable level of service. There wil1 not be any significant adverse impacts to the traveling public if these recommendations are implemented. Sincerely, ~~' '//:4/~ Daniel N. Murray, P.~ ~ DNM/kl cc: Jim Golden Matthews & Associates Rick Rossi, P.E. Sybar Development Company -3- r~ -MB)r MURRAY-DUDECK & ASSOCIATES SHARED PARKING STUDY FOR SYBAR SQUARE CITY OF BOYNTON BEACH PREPARED FOR: ROSSI & MALAVASI ENGINEERS BY MURRAY-DUDECK & ASSOCIATES, P.A. .J~#/o/7 ~~/ Daniel N. Murray, P.E. Date AUGUST 26, 1987 MDDM Project #87-0074 ,... ~- -MB)r MURRAY-DUDECK & ASSOCIATES INTRODUCTION ------------ ------------ This study is designed to address and document the parking requirements for shared uses at the Sybar Square Plaza, a proposed mixed use commercial development at the northeast corner of Congress Avenue and NW 22nd Avenue in the City of Boynton Beach, Florida. Since Quantum Boulevard which is a 4-lane divided highway severs a portion of the retail/office from the cinema it was felt that a separate shared parking analysis should be conducted for the development north & south of Although the parking on the opposite side of the roadway is reasonably convenient for patrons using any of the facilities, it is more desirable to not encourage pedestrian traffic across Quantum Boulevard. Thus, independent parking area analysis was the method used in making a determination as to the viability of shared parking usage. Because of the varied make up of uses within the development, namely, cinema, retail, restaurant & office on the south portion and retail & office on the north portion, it is believed that a shared parking usage study would be appropriate for this proposed project. Because of the varied requirements and usage of parking spaces during different hours of the day, it is felt that this study, using the interactions associated with shared parking phenomenon as published by the Urban Land Institute (ULI), is appropriate. The Urban Land Institute 1983 publication is the methodology used in this report. Additionally, the formula required by the Ordinance No. 86-8 of the City of Boynton Beach was calculated to ensure the proper buffer was maintained within this proposed project. BACKGROUND ---------- ---------- Sybar Square is a mixed-use development proposed for the Northeast corner of Congress Avenue and NW 22nd Avenue in the City of Boynton Beach, Florida. The land use proposals for the project are outlined below: -1- -.11'- MURRAY-DUDECK & ASSOCIATES South of Quantum Boulevard -------------------------- -------------------------- Of fi ce = Cinema = Retail = Restaurant = North of Quantum Boulevard -------------------------- -------------------------- Retail = Office = ... .... .... ........ .... .... ........ ........ ........ .... .... ...... ... .... ............ .... .... ........ ........ ............ .... ...... 13,000 Square Feet 13,000 Square Feet 2,288 Seats 61,600 Square Feet 5,000 Square Feet 45,100 Square Feet The City of Boynton Beach requirements, taken separately, would result in the parking requirements outlined below: South of Quantum Boulevard -------------------------- -------------------------- Cinema (2,288 Seats x 1 parking space per 4 seats) = Retail/0ffice a. Retail (61,600 Square Feet @ 5 spaces per 1,000 Square Feet) = b. Office (13,000 Square Feet @ 5 spaces per 1,000 Square Feet) = c. Restaurant (5,000 Square Feet @ 5 spaces per 1,000 Square Feet) = Total Spaces Required 572 Spaces 308 Spaces 65 Spaces 25 Spaces ... .... .... .... .... .... ................ .... ................ ...... ........ ... .... .... .... ........ .... ..... ... ................ ...... 970 Spaces North of Quantum Boulevard -------------------------- -------------------------- Retail/Office a. Retail (45,100 Square Feet @ 5 spaces per 1,000 Square Feet) = b. Office (13,000 Square Feet @ 5 spaces per 1,000 Square Feet) = -2- 226 Spaces 65 Spaces 291 Spaces . .. -M/i)r MURRAY-DUDECK & ASSOCIATES The Urban Land Institute methodology allows for a calculation and assumption of shared parking capacities which would result in an overall site plan which would provide for more efficient parking on the site. Therefore, it is this methodology that is used in the compilation of this report in order to allow a more efficient usage of parking area within the site based on the proposed land use. ULI METHODOLOGY -------------- --------------- The basis for the Urban Land Institute's research was to define the characteristics of parking demands for single land uses. Then, by analyzing parking accumulations at mixed use centers, the shared parking concept was quantified. The ULI recommends the following procedure be adherred to in determining shared parking: 1. Initial Project Review: Knowledge of the site and the intended land uses is very important in beginning the shared parking analysis. Results from the initial review for Sybar Square has been presented in earlier sections in terms of square footage and land uses proposed. 2. Adjustment for Peak Parking Factor: The factors are those specified in the City of Boynton Beach detailed earlier in this report and indicate a need spaces, for the section of development south of Boulevard. 3. Analysis of Hourly Accumulations: Parking accumulation curves are selected by reviewing the ULI data nd incorporating site specific conditions. 4. Estimate of Shared Parking: The hourly parking demand for each land use is merged to estimate overall shared parking demand. This is simply the hour by hour addition of parking demand for each use to estimate aggregate demand. parking Code as for 984 Quantum THE ANALYSIS ------------ ------------ Applying the ULI methodology to Sybar Square yielded the hourly parking accumulation curves for each of the four land uses for weekday and Saturday conditions. Figure 1 - Retail Parking Accumulation - Weekday Figure 2 - Office Parking Accumulation - Weekday Figure 3 - Restaurant Parking Accumulation - Weekday Figure 4 - Cinema Parking Accumulation - Weekday -3- ~ ooogoog~oooooooogoog o 0 0 .' .. .. 0 0 0 0 0 0 0 0 0 .- .- -. ._ ." ." 0 .-t (\j _" __ .- .- -' .- .- .. 0 --' C\.I ~ro~_.-t.-t~C\.I~~m~~ro~.-t.-t.-t HOUR OF THE DA't REI AIL \JEEKDAY FIGURE # 1 c==MDJYr tljRRAY-DUDECK . ASSOCIATES, PA 7301 \/. pA\.METTD PARK U. SUITE 208 BOCA RATON. f\.DRIDA (305) 391-6336 ------------~- ..-------- 100 90 z 80 0 ...... ~ <t -l 70 ~ ~ ~ u 60 u <I: L1 50 z t--< ~ ~ <I: 40 Q.. ~ <I: 30 w 0... ~ 20 0 l- Z 10 w u ~ w 0 0... :L <r 0 0 lJ) *" ~ 0000... 000 000000000000000000 9996~ru0999999996~ru ~m~~__~ruM~m~~m~_-- HOUR OF THE DAY OFFICE WEEKDAY FIGURE #2 c=::=M~ MURRAY-DUDECk .. ASSOCIATES, PA 7301 V. PALMETTDPARK RD. SUITE 208 BOCA RA~ FLORIDA (3C)S) 391-6336 100 90 z 80 0 ....... I- <I: --I 70 ~ ~ ~ u 60 u <I: L:J 50 z ....... ~ ~ <I: 40 CL ~ <[ 30 w CL u.. 20 0 I- Z 10 w U 0:: W 0 CL L <[ 0 0 IJ) .. L ooOCL 000 000000000000000000 o 0 0 - __ -. 0 0 0 0 0 0 0 0 -. .. -- .. .. -- 0 ~ (\j 0 _.. -- -- -. -. -- -- -- 0 .-4 C\J ~ro~.-4__~NM~mlJ)~ro~--- HOUR OF THE DAY RESTAURANT \JEEKDAY FIGURE #3 ===M~ MURRAY-DUDECk It ASSDCIATES, PA 7301 V. PALMETTD PARK RD. SUITE 208 BOCA RAT~ FLORIDA (305) 391-6336 100 90 z 80 0 ....... r- <I: -l 70 :::> ~ :::> u 60 u <I: CJ 50 z ....... ::::.c ~ <I: 40 Q... ~ <I: 30 w Q... lL.. 20 0 ~ z 10 w u ~ w 0 Q... ::E <[ 0 0 \D ~ ooOCL 000 000000000000000000 ~996~ru0999999q96~ru ~m~~~_~ruMv~\D~m~-~- HOUR OF THE DAY CINEMA 'WEEKDAY FIGURE #4 =M~ MURRAY-DUDECk , ASSOCIATE$, PA 7301 V. PALMETTO PARK RD. SUITE 208 IDCA RATON, FLORIDA (305) 391-6336 100 90 z 80 Cl - I-- <[ 70 ..J ~ ~ :::) u 60 u <[ l:J 50 z ..... ~ ~ 40 <[ Q. ~ <[ 30 w Q. u.. 20 (J I-- Z 10 w u ~ w 0 0.. ~ <[ 0 g \0 ~ oooggg~ooooooccggg coo-_-oocccoccc--- - - - 0 _ N - - - - - - - - c _ N ~m~___~NMv~\O~m~___ HOUR OF THE DAY ANCHOR \JEEKDAY FIGURE itA MURRAY-DUDECK & ASSOCIATES, P.A. 7301 'W. PALMETTO PARK RD. SUITE 208 BOCA RATON, FLORIDA (305) 391-6336 -M/j)M- MURRAY-DUDECK & ASSOCIATES Figure 5 - Retail Parking Accumulation - Saturday Figure 6 - Office Parking Accumulation - Saturday Figure 7 - Restaurant Parking Accumulation - Saturday Figure 8 - Cinema Parking Accumulation - Saturday Retail in Sybar Square is expected to be made up mostly of small stores with some medium size stores that might act as anchors, but are not anchor stores in the traditional sense of a grocery store or large retail store. A wide range of businesses could be tenants in these Retail stores. These retail businesses do not exhibit the same parking characteristics as the ULI data. These businesses also tend to close sooner in the day than a traditional anchor. The office complex will exhibit the normal traffic characteristics of a professional office which includes a high peaking effect during the morning hours and continued through the noon time. The afternoon hours tend to be dispersed as a lot of professionals are in fact on field trips or away from the office. Figure #2 exhibits the parking accumulation activity during the normal weekday office operation. The amount of parking activity at an office after 6:00 p.m. substantially drops off. Furthermore, the utilization of the office facility on Saturday is significantly less than the weekday operation. Utilizing the ULI data, there is a factor adjustment of 1/6 the parking demand during Saturday as compared to weekday operations. This would offer substantial shared parking capacity during the Saturday time periods. The restaurant facility will be a which will generate the normal noon time activity. Figure #3 reflects the normal for this type of restaurant, which parking needs are after 6:00 p.m. substantially utilized during that time quality type restaurant activity and dinner hour parking characteristics reflects a predominant This facility would be period. The cinema parking activities are different than the other uses. Guided by the ULI data, conservative estimates of parking accumulation were used. It was assumed that weekday matinees would be offered and patronized. Furthermore, it was assumed that each weekday evening would be a sellout at each of the screens. This is a virtual impossibility, but these assumptions have been used to present the worst case and to provide enough parking during these times. -4- 100 90 z 80 0 I-< I- <I: -.J 70 :::> ~ :::> u 60 u <I: CJ 50 z I-< ~ ~ <I: 40 Q.... ~ <I: 30 w Q.... L... 20 0 ..... z 10 w u ~ w 0 (L ~ -<I: 0 0 ~ ~ ~ 000(L 000 000000000000000000 9996~ru099q999996~ru " 0) Q'\ ....... _ _ ..::. (\J (Y) ~ If) ~ f'-. (X) (J'\ - ~... - HOUR OF THE DAY RET AIL SATURDAY rIGURE # 5 ~ c==M~ MURRAY-DUDECk , ASSDCIA YEs, P.A. 7301 V. PALMETTO PARK RD. SUITE 208 BOCA RATON, F"LDRlDA (3C)S) 391-6336 - .... 100 90 z 80 0 ..... t- <[ --I 70 :J ~ :J U 60 u <I L:J 50 z -' ~ fr: <[ 40 0.. ~ <[ 30 w 0.. l1.. 20 0 ~ z 10 w U Q: W 0 (L ~ <I: 0 0 \,0 ~ L 000(L 000 000000000000000000 o 0 0 -, _..- 0 0 0 0 C> 0 0 0 - - -. -. . - -- 0 ....... (\j 0 .. - .- -- .- -- .- -. 0 --' C\l ~ro~--,--,--,~ruM~m\'o~ro~--,--,--, HOUR OF THE DAY OFFICE SATURDAY FIGURE # 6 c=M~ MURRAY-DUDECk , ASSOCIATE$, PA 7301 W. PALMETTD PARK RD. SUITE 208 IDCA RAT~ F"LDRIDA (305) 391-6336 ", 100 90 z 80 0 t-l ~ <[ ....J 70 :J ~ ::> u 60 u <[ L:J 50 z t-l ~ ~ <[ 40 0- ~ <[ 30 w 0- u... 20 0 t- Z 10 w u ~ w 0 CL ~ <[ 0 0 \D .. L DODO- 000 000000000000000000 9996~ruD999999996~ru ~oo~___~ruM~m\D~OO~-__ HOUR Dr THE DAY RESTAURANT SATURDAY c==:MfDJ::J- MURRAY-DUDECk , ASSDCIA TE$, PA 7301 V. PALMETTD PARK RD. SUITE 208 BOCA RATON. n..DRIDA (305) 391-6336 FIGURE # 7, 100 90 z 80 0 ....... I-- <[ -l 70 ~ ~ ~ u 60 u <r l:J 50 z I-l ~ fr: <[ 40 0.... ~ <[ 30 w 0.... L... 20 0 I- Z 10 w U Q::' W 0 CL ~ <r C> C> \D r ~ c>c>c>g~,g~c>c>c>oooc>c>g~g 000--"::"-- 00000000--"::"-- - -- -. 0 o-i ru 0 -- -- -- -- -- -- -- .- 0 .-l C\.I ~ro~o-i.-l.-l~ruM~m\D~ro~.-l.-l.-l HOUR OF THE DAY CINEMA SATURDAY FIGURE #8 ===M~ tlJRRA Y -DUDECk , ASSDCIA TE$, P.A. 7301 V. PALMETTO PARK RD. SUITE 208 IDCA RAT~ FLORIDA (305) 391-6336 -_____~m'_._.__~______.~___._,.__._.____~~._____ 100 90 z 80 0 - ~ ~ -I 70 ::> ~ ::> u 60 u ~ l:) 50 z - ~ 0:: ~ 40 0- ~ ~ 30 w a.. u.. 20 0 J- Z 10 w u ~ w 0' Q.. ~ <[ 0 0 \0 ~ oooggg~ooooooooggg gggO~NoggggggggO~N ~m~___~NM~~~~m~-__ HOUR OF THE DAY ANCHOR SATURDAY FIGURE tt5A MURRAY-DUDECK Ie ASSOCIATES, P.A. 7301 'W. PALMETTO PARK RD. SUITE 208 BOCA RATON, FLORIDA (305) 391-6336 .. -M~ MURRAY-DUDECK & ASSOCIATES Seasonal variations are addressed in the ULI report, and the City of Boynton Beach Ordinance. In each case, the variations would tend to decrease the parking demands during the off-season. Because the ULI data has been collected nationwide, seasonal variations do not describe experiences in South Florida. It is assumed in this report that the peak season for general retail office, restaurant and cinema all occur at the same time, and that no shared parking benefit can be derived from the relation of different peak seasons. Once again, this assumption serves to present the worst case, and supply the most parking. Percentages for the parking accumulation curves have been applied to peak hour demand for parking in each land use to arrive at calculation of shared parking values. Table 1 & lA shows the total parking demand for weekdays, and Table 2 & 2A for Saturdays, for the southerly & northerly section of the development respectively. CONCLUSIONS ----------- ----------- Weekday shared parking demands peak at 8:00 p.m. in the evening, for the southerly portion, largely due to the cinema use. The peak demand from the ULI methodology is 648 spaces. The northerly portion parking peak demand occurs during 2:00 pm, with a maximum of 195 spaces required. Saturdays have a peak hour demand of 622 spaces, at 8:00 p.m for the southerly portion and 142 spaces at 1:00 pm for the northerly portion. Since a greater aggregate peak hour demand occurs on the weekday, it will be used for design purposes. Boynton Beach requires a buffer of ten (10%) percent above the ULI calculations to provide for natural turnover of parking and unexpected fluctuating peaks. If this was provided at Sybar Square, 713 spaces & 215 spaces for the southerly & northerly sections respectively would be supplied. The current site plan 272 spaces respectively for the of the Sybar Square Development. concept is applicable to this allows southerly Therefore, project. for 798 & northerly the shared spaces & sections parking -' -5- ,.. -Mfj).t- MURRAY -DUDECK & ASSOCIATES TABLE 1 WEEKDAY PARKING ACCUMULATION (Southerly Section Of The Development) TIME OFFICE RETAIL CINEMA RESTAURANT TOTAL ----------------------------------------------------------------- 6:00 a.m. 2 0 0 0 2 7:00 13 24 0 1 38 8:00 41 54 0 2 97 9:00 61 60 0 3 124 10:00 (~ 90 0 5 160 11:00 120 0 8 193 / 18^~-')lld)85 12:00 noon 59 13 337 I ; ,.1:~ t :> II 1:00 p.m. 59 I ;)"--- 400 180 tALi' 143 18 2:00 63 180) 200 15 458 ---...---' 3:00 61 172 229 15 477 4:00 50 157 343 13 563 5:00 31 145 400 18 594 6:00 15 91 458 23 587 7:00 5 60 514 eSI 604 -----'<-, ~ ' \ ....----, 76 1i\0l'?'~Y 8:00 (5' (572 \ l~ ' ! "-.-) ~/ 9:00 2 24 572 ',25 623 10:00 2 19 \\:~!3) 23 621 11 : 00 0 0 458 18 476 12:00 mid. 0 0 400 13 413 ----------------------------------------------------------------- ----------------------------------------------------------------- .\ 100% Parking Spaces 65 308 572 25 970 ~ MURRAY -DUDECK & ASSOCIATES TABLE lA WEEKDAY PARKING ACCUMULATION (Northerly Section Of The Development) ANCHOR TIME OFFICE RETAIL RETAIL TOTAL ----------------------------------------------------------------- 6:00 a.m. 2 0 0 2 7:00 13 11 8 32 8:00 41 24 18 83 9:00 61 54 19 134 ,/ - 10:00 ,/65" 87 29 181 11:00 65 112 38 215 , / -. (, -"" 12:00 noon 59 125 .,5a 242 1:00 p.m. 59 G2~' 58 245 2:00 63 125 " 58 ( 2 z(6) ~. ~--/ 3:00 61 122 56 239 4:00 50 112 51 213 5:00 31 102 47 180 6:00 15 105 29 149 7:00 5 114 20 139 8:00 5 112 15 132 9:00 2 78 8 88 10:00 2 41 7 50 11:00 0 17 0 17 12:00 mid. 0 0 0 0 ------------------------------------------------,----------------- ----------------------------------------------------------------- 100% Parking Spaces 65 128 98 291 ,..--. ... , -M~ MURRAY-DUDECK & ASSOCIATES TABLE 2 SATURDAY PARKING ACCUMULATION (Southerly Section Of The Development) TIME OFFICE RETAIL CINEMA RESTAURANT TOTAL ----------------------------------------------------------------- 6:00 a.m. 0 0 0 0 0 7:00 3 10 0 1 14 8:00 7 30 0 1 38 9:00 11 91 0 2 104 10:00 11 136 0 2 149 11:00 11 151 0 3 165 12:00 noon 10 166 172 8 356 1:00 p.m. 10 180 285 11 486 2:00 11 161 400 11 583 3:00 11 157 400 11 579 4:00 9 151 400 11 571 5:00 6 115 400 18 539 6:00 3 61 458 23 545 7:00 1 40 514 24 579 8:00 1 24 572 25 622 9:00 0 6 572 25 603 10:00 0 0 572 24 596 11 : 00 0 0 458 21 479 12:00 mid. 0 0 400 18 418 ----------------------------------------------------------------- ----------------------------------------------------------------- 100% Parking Spaces 11* 308 572 25 970 *Note: Office Parking Adjusted for Saturday (1/6) ~ MURRAY-DUDECK & ASSOCIATES TABLE 2A SATURDAY PARKING ACCUMULATION (Northerly Section Of The Development) TIME OFFICE ANCHOR RETAIL RETAIL TOTAL 6:00 a.m. o o o o 7:00 3 7 4 4 11 8:00 13 10 30 9:00 11 39 29 79 10:00 11 58 44 113 11:00 12:00 noon 10 94 109 49 53 154 11 172 1:00 p.m. 10 128 58 196 2:00 11 125 52 188 3:00 11 122 51 184 4:00 9 112 49 170 5:00 6 102 37 145 6:00 3 105 20 128 7:00 1 114 13 128 8:00 1 112 8 121 9:00 o 78 3 81 10:00 o 41 o 41 11:00 o 17 o 17 12:00 mid. o o o o ------------------------------------------------------------------ ----------------------------------------------------------------- 100% Parking Spaces 11* 128 98 237 *Note: Office Parking Adjusted for Saturday (1/6) ,-_. . -M6>r MURRAY-DUDECK & ASSOCIATES ORD}NANCE NO. 86-8 CITY OF BOYNTON BEACH Using the formula specified in Ordinance 86-8, a buffer of at least ten percent (10%) needs to be provided "to ensure a sufficient number of parking spaces are available at times of peak hour use." surplus shared parking Buff er = on-site + shared parking provided For Sybar Square Plaza (South of "nG IJ- 'f-'r Buffer = x 100% = Quantum Boulevard) ,;15'. ;Z ~ ~% 400 + 172 This is further supported below: Ro = Retail (includes office + restaurant) needs by Ordinance Ru = retail (includes office + resturant) needs by ULI Ra = retail available = Ro - Ru Co = cinema needs by Ordinance Total = provided on-site At Sybar Square Plaza (South of Quantum Boulevard) Total = 798 parking spaces Ro = 398 Ru = 76 Co = 572 -6- ~' ...- , ~~ MURRAY-DUDECK & ASSOCIATES The following calculations apply: Ra = Ro - Ru = 398 - 76 = 322 On-Site = Total - Ro = 798 - 398 = 400 Shared Parking Provided = Co - On-Site = SPP = 572 - 400 = 172 S, Buffer = 150 x 100% ---------- = 26.0% 400 + In Therefore, sufficient buffer exists to satisfy the City of Boynton Beach shared parking ordinance. -7- MURRAY-DUDECK & ASSOCIATES ORDINANCE NO. 86-8 CITY OF BOYNTON BEACH Using the formula specified in Ordinance 86-8, a buffer of at least ten percent (10%) needs to be provided "to ensure a sufficient number of parking spaces are available at times of peak hour use." surplus shared parking Buffer = on-site + shared parking provided For Sybar Square Plaza (North of Quantum Boulevard) r' 16 Buffer x 100% 24.6% 38 + 27 This is further supported below: Ro Retail needs by Ordinance Ru retail needs by ULI Ra retail available = Ro - Ru 0 office needs by Ordinance Total = provided on-site At Sybar Square Plaza (North of Quantum Boulevard) Total 264 parking spaces Ro 226 Ru = 183 ) o 65 -8- MURRAY-DUDECK & ASSOCIATES The following calculations apply: Ra = Ro - Ru 226 - 183 = 43 On-Site Total - Ro 264 - 226 = 38 Shared Parking Provided o - On-Site = SPP 65 - 38 = 27 S, Buffer 16 x 100% ---------- = 24.6% 38 + 27 " Therefore, sufficient buffer exists to satisfy the City of Boynton Beach shared parking ordinance. -9- .) .\r- -- - EXHIBIT 28 REPRESENTATIVE HOURLY ACCUMULATION BY PERCENTAGE OF PEAK HOUR Hot~' R"I.dul1al RUldf'n. cO...t'....Cf COftv.. Offiu R.w! b'U\ltut ('UIf'1M faon CBb] h.aJ teBD) (iuUI Room lI:ut.',UUl Lounllt R.... lJoe Ana , 1 _"0.. W..kdoy Salunloy 1lle.kdoy !ia1UlUy 1lleekdoy 5.aturUy Doily "'......eli, s"turd.ly Doldy Wrl"lld.) 5.1&011.0..)' \I.1rt'.~)' "lIU.4.)' Deily Deily den 30. 100"" lOO".. 100"" 1(10.... OU"'I 20"" :01'" 6 00 am, " 20 200(1 BOb 3qfJ 20", '" 87 Q5 QS Sc 70 20 20 700 am, - " ':00 a m 63 60 18 10 5 3 70 SR 'l0 (>5 00 20 20 SOOn 50"u \) 00 am. 03 80 42 30 10 6 73 81 87 55 cO 20 20 100 100 1000 a,m 100 80 68 45 20 8 cR 7.; 85 15 10 20 20 100 100 1100 a,m, 100 100 87 73 30 10 SQ 71 85 ,;5 35 30 30 100 100 IZOO Noon 90 100 97 85 50 30 30''., cO 71 ~5 30 30 50 30 100 100 1:00 p.m 90 80 100 95 70 45 70 50 70 85 30 30 70 45 100 100 Z:OO p,m 97 60 97 100 60 45 70 cO 71 85 35 35 60 45 100 100 3:00 pm, 93 40 95 100 60 45 70 61 73 85 33 40 55 45 100 100 .:00 p,m, ii 40 87 90 50 45 70 co 75 87 -15 50 50 45 100 100 5:00 pm, 47 20 79 75 70 60 70 " Sl 00 60 bO 70 60 100 100 6:00 pm, 23 20 82 65 90 90 80 8.5 85 92 70 70 00 90 ,100 100 7:00 p.m 7 20 !i9 60 . 100 95 90 o.j !i7 04 75 SO 100 95 100 100 8:00 pm, 7 20 87 55 100 100 100 '/6 92 Ob 00 00 100 100 100 100 9:00 p,m, 3 61 40 100 100 100 08 05 08 95 95 100 100 100 100 10:00 p,m, 3 32 38 90 95 100 09 9b 00 100 100 00 95 50 50 11 00 pm, 13 13 70 85 80 100 48 100 100 100 70 85 IZ:OO Mid, 50 70 70 lOO 100 100 100 100 50 70 night . ~ ... \,.. J :5 :3.. '.::: .~ ~::g :--~ o--~ .:e~. . t::e e c.f J:-S :1>i :1::. :::e ng . .11 of 'in ~.... ,1, '5 involving office, regional retail, and residential facili- ties (see exhibit 28)_ Nonroom-related hotel activities and entertainment uses varied significantly, howe\Ter. If site-specific data are not available for these two land uses, survey results could be used. Accumulation curves are then estimated for each land use, based on the selected hourly values de- scnbed in terms of the percent of maximum design-day parking demand expected at every hour during the day, The parking demand factor (step 2) multiplied by quantity of land use (step 1) produces an estimate of peak parking demand. This value multiplied by each hourly percentage produces an estimate of parking demand for every land use component by hour of day. ITtP 4: ESTIMATE OF SHAlED 'AIkINC The hourly parking demand for each land use is merged to estimate overall shared parking demand for a proposed project. This step is simply the hour-by- hour addition of parking demand for each use to esti- mate the aggregate accumulation. As noted previously, the method described above should be used for week- day and Saturday conditions to test for the controlling value. - SAMPLE USE If THE METHODOLOGY The following sample situation has been devised to demonstrate the use of the recommended methodology. 1. Objective: To estimate the peak parking require- ments for a proposed mixed-use development. 2. Plan: The proposed development has the following components: · Office = 400.000 square feet GLA · Retail = 300,000 square feet GLA · Hotel = 500 rooms plus 5,000 square feet of restaurant and conference facilities with 200-seat capacity. 3. Location: The project will be located in the down- town of a medium-size urban community whose regional population is approximately 1.5 million. 4, Mode split:17 Based on surveys conducted at exist. ing developments in the downtown, it is estimated that 7S percent of employees and patrons and 50 percent of hotel guests will use autos. The number of persons per auto is assumed to be typical (1.2 for employees, 1.8 for patrons, 1.4 for hotel guests). 17"Mode split" refers to the percentage of people ata site who use a particular mode of transportation. with the total of all modes equaling 100 percent. 47 , ~. ,s t (f A /Z tJ c{l1J..;' j( E ,<; J [~ P{A-~ 'f..-. _~'1 T t j);' T!r -i-)./ Fo R 11 Jr T+ o},/ 0/1 .{f n- porN f!ff:[)5 TO /3 t f:.f3 v;r;5 ~ [) To T),;j)kJtIt: p;::.oPf5A) PAl<. fc.j Nt:.. C/tuuL krro),/~ .2. )5 A- (uJo.P-c Tf:. JrFfJC .5 +(();!rL- )vEfPEP III Ou, kJ.J T u. /{ tfL v Ok)J j) N2 u 51:: c T C J/ T!0lt Ai {. i::S ;; -I f 5D J j),f \/-1- J fo)J () F f2t:5 /,0)J5 r!3 f- Lf r '( / fJoA/JJ+ ~ . ;t f'/<. (:: c fu. T (o N c, L5 L /.:. wJ\-U Fs N' 0/,05 t: j) "+-{v/V~ rrfe ).10 f2 Tit r: R AI /'/2o/,;::/?Jr 1301) /ij[)Jr/< Y (';JoN J ~ .. por;~ WkLL JJvTEf<Ff;-j2E r;vFTlt p;<M))A6..r::-- . .5 T!< fA L T CA. R F 5 ;I- (.o)),{ }/ 0 ;< 1ft l;!< 0 f' r: R r'( lJ (/ u )/ lit! 5 . \ ct!tc( ~ :Pv T F;< :(0/< [A )JlH{ M-' J Nt. - j2 I~);-j( .1 - ~ (7 ( -r" ," ;') 1""" ;:1 ''I:;; () ,/ )j" 7 ') L [ r:= Ij~. {t 0 . 11(..0 1'\ ( 1'" H,1 , 0 LV . ,\(;, ,,- -z Ai;) /1 v I/:: .5 jj3 /t/~ 54:' elA- /2!:- 5/f/rR {~j) fA--'A ;C.r)/ ~ ;. It (It. 5 T I::: [-=- ;:- ;: /< [~)V L!: .5~ f'> /~- C ;;~ ;1-= :f C C1 L-{ j) 0 ( e,{ /\-~j{/ ,It- )j l~ [t - Jr R IJ I;;:: f'> C{ (5 { -reA- r it 0 )/ j A/ ;2[= J'l C) /~ j- ;z, tWit t Af(!; t'A/~jc+)v~ /l-ce (,v't iAc--t r-.roA; (' u^, Vj35 ~_C;ij--() w Iv ;=-cJ /~ _~'/\- r LA /~p,lf- 'f (Iv /-f-E)! It-l--~[tr:;s T ~1{ ( L{ J1 u (. It- r +0 AI OC'( 0 f2 s ()//;:-!-~;fj) AI S ? r 3 ' tvlt y j) () fs TI1 i: P c/t- k P/t)2 /~':rA/~ he (<</'1&{ c A- r -fo Jl/ fc)!( T If E (/ FF j'{ /~ [j u;r [J}:r A/~ o~~{ rA/2 A- T l.f'f-' (;} 0 /'> J1 Lv if E JV t f? f vIo U _5 /2 /3 j\;:J /C!-) --> 0j}.Jt:r r( ,L~L) 7(:) T If ~r S 0 F f ~rc E _T)} /) -r ( A-- r t~';) 71th / f /:.-::-: A-/c !/+-f(k~rJj( hccu/[0{tkT 70/(; 101-\ S-TJ1+tA-/2 () /::/;:;jC E (J~5f~ (P/o [A{ L) /)L-A}~ ;f r ;tJ>I~RoX-J--/(A-jf~{, I {) : 00 - 1/ ;'00 A-,Jt ? Y S_0S: J>l fA ~______(' /,t if /<L~l) l~ /,f) J-- +=-1lI t.. ___ (1 )Jc-/(Jr-{colJ~J::: _5-7.2 -I~+[/OFf.FcE {co/);:J -_sr~-"31r 70 (/tL I2I--=Q CA+/~_I---=-/-\ - 170 J.!/ 74L- /'/'(0 v-Ft\SP == 7rct fl /3/ Jr-/- L / 0 FJ~ +tE 0# _.5-1' r r: (J)) L- J(A- 0); - 5 -r r E 3trJrRr:-P Jt-v).J[ A L';C[:: JrF r: 00 f3 F - ~ f; ,2 <6 '0 - f7,2 ~ / ~ / _ -~ '~([I n ~ / - j c!J ..3 /0- .'5 {Ai /~Cf'.-.- =:: 0 _ ~;iP /'- <:./'-"/0 ~. /r: too T / 7.2 0<. - -Jlff - - too - - ;ZC(~ - o /< / If- .> ~ 100 -i 0200 = 2. 1/ 3f/t c f: 5 ,RI5Q C(+;2 ~-P ,1 7 ;( C; /).At: [-=.-5- f) ft:'> 0 v r- jJ I-~ /J j r <,)l/l-CL-~~) /Ij/E /5 P j5fJ Ii , ~~ , \ , t '--'r ~ I I < 5' 'f OJr-f( _~ r1 rA *12- E ->+ T}~~ f~___ fl- Ec tJ 1'1 Jrl END [) f< I v E W' *7 {' 0 )/,)//~(..r ~p)l_ _ __._..._.._ .. f F -~~ -- pDJ 2 ~ [fJ ,~\j~F~/<- GvA-U AD j A-c~.)JT (v.;(Je g r j;--.lj(.D f)~ISL~Y' I /Jl.j uNDA-f2 Y Jju ff:S .NoTAPli/"3.1f},? 10 /J L- .2t !~;;~L. t f/< 0 ^ P (J 0 P 0((, Tee /10 0- #/)!-'IS X . -......-'... _.- I o ill) c l.(:~" , v /0 4' 0 f-~L!;j '?~u~P';.~.-l{'~.~-~~~I~'_-.- ! l f <' < 0 J f /,t c. .> '1M. ~ '" - ~- .tL~ '" - __'L tj2~-~A-71"o."l'1-- ,---- liB < . ~ [, , " c, "" L /"--~j -"-U.~_ A 'u~"Jf' J~ <(l-<2-Vl-- - I, I, < fr < ''''r K. < r) aLJ-JL r -,",_",-,'",--c. '-'{._~.-~--~-..-...--_..- . It.iC~o ~ ~ {)L t ~ <-_F{~ ~'_dE IAJ' r \vtJ~.j'-'j~":.t.'o._~_..1o, _-t-[.~___..____ i l _ "- /, - (, / /) '( tlf- i if I ,5 5 H. f{Vt (~ <2 f- ^,-.jJ"1.1 L_~.I. I/LfP'C_v ..\AI1..'. .. L.._. ....-.----.------------.. ! ~ v @fl..0' J ~. L '(Y (~ ~(Jt" .~(~~ ~:~"-, = ;;-Zl- ~-~;=t:,:;=~-- !' to v~ 'PI:, ~L:r<--<>, "-""-';F- f '-Jt}:,~ .-A~L1'--~::::J--- I' v C s ,-1.. ... 1-, ~J::.o V' A- ~- ---------- -.- - evl! k 00 l fer rl-~t~4=:1 ~~a_~~I~1_~ ~~~~Ji~ 'r :(f:: ~e:< 't~~-[~~:L5C~:-~--~~~~-= @ : Ie ~ : j ), ' r ~M. , f. LO" L ~ ~ J--,L~L~L=: ,~~l~;;- . t ~ " r 1 , :r Lv,' tL"y-"'" '.e .nA 5- 'l~cTL,,- --,,-il-~ J,~-, (Z)n [ f, ',t ": Jk ~~-~ 1 1<' deL, v" ".JCC-.f~-l';fyn--- G)!:p/"J' ',,,, (u :Jv~0/^r -;r~~[~!~l.F'lf .. 5' /~- l('" ^ M C0 c UI "J( r d'? " '" ~ (' Ie < ~ ," _ ," 1 <'.VI I Ji1. '0 'I- C .>' ::( <' # ~J</h1. ~tJ.A.u-- ) ~ g~ .. ~ \~ "XL2001 XL2002 ~+ ~ ~ XL2003 XL2004 Mounting Styles Wattage Lamp Voltage Color Specification Example XL21JOl . 4~ HPS ~ 11/ PC/F2 OBZ A Mounting Style F Options B Wattage PR Photo Receptacle only C Lamp Type PC Photo Receptacle & Cell MV Mercury Vapor HS 9{)0 House Shield -... MH Metal Halide PS Polycarbonate Shield HPS High Pressure Sodium F1 Single Fuse (120, 240, 271) 0 Voltage F2 Double Fuse (208, 480) TM Tenon Top Mounting 120, 208, 240, 277, 480 MT (Multi-tap) G Color E Light Distributions DBZ Duranodic Bronze (313) DBK Duranodic Black I, II, III, V NA Natural Anodized (- STANDARDS OPTIONS . FINISH: ACRYLlC-"BZ", BRONZE OR FINISHES: DURANODIC BRONZE (313) - "BK", BLACK - SPECIFY - "DBZ", DURANODIC BLACK - "DBK" (STRAIGHT POLES ONLY) . BASE COVER - 2 PIECE · POLE CAP: CAST ALUMINUM ALUMINUM - "BC" . HANDHOLE WITH COVER . WEATHERPROOF RECEPTACLE - . ANCHOR BOLTS, NUTS, WASHERS & "RECP" TEMPLATE . HINGED BASE - "HB" . PROTECTIVE WRAPPING FORSHIPMENT . TENON TOP - "TT", SPECIFY SIZE & HEIGHT . GROUND LUG - "GL" (EPA: 80 MPH WIND) SQUARE STRAIGHT ALUMINUM CATALOG NO. POLE SHAFT WALL BASE EPA APPROX. HEIGHT SIZE THICKNESS TYPE WEIGHT 1 ~HAFT SSAB6308-5 8' 3" ,125 A 10,0 25 SIZE SSAB6408-5 8' 4" ,125 B 15,0 26 POLE CAP t8~'. ;j SSAB6310-5 10' 3" ,125 A 6,9 '28 SSAB6410-5 10' 4" ,125 B 12,0 31 SSAB6312-5 12' 3" ,125 A 5,0 29 ~ ~ SSAB6412-5 12' 4" ,125 B 10,0 36 !.2 SSAB6412-0 12' 4" ,250 B 17.4 61 w 'li_ J: SSAB6314-5 14' 3" ,125 A 3,6 33 ~ 7' BOLT CIRCLE SSAB6414-5 14' 4" ,125 B 8,0 41 HANOHOLE SSAB6414-0 14' 4" ,250 B 13,9 70 & COVER BASE TYPE" A" SSA B6416-5 16' 4" ,125 B 7,5 45 ( SSA B641 6-0 16' 4" ,250 B 11,0 79 SSAB6418-5 18' 4" ,125 B 6,75 51 t:"W:j SSAB6418-0 18' 4" ,250 B 8,6 87 t10'~.~ SSAB6420-5 20' 4" ,125 B 5,0 56 SSAB6420-0 20' 4" ,250 B 7,0 96 ~ SSAB6620-8 20' 6' ,188 C 17,0 123 ~ SSAB6620-0 20' 6" ,250 C 20,0 155 SSAB6424-0 24' 4" ,250 C 3,0 114 SSAB6624-8 24' 6" ,188 C 15,0 135 SSAB6624-0 24' 6' ,250 C 18,0 182 SSAB6628-8 28' 6" ,188 C 10.0 155 87~. BOLT CIRCLE 12" BOLT CIRCLE SSAB6628-0 28' 6" ,250 C 16,0 209 SSAB6630-8 30' 6" ,188 C .8.0 165 BASE TYPE "B" BASE TYPE "C" SSAB6630-0 30' 6" ,250 C 13,0 237 SSAB6635-0 35' 6" ' ,250 C 8,0 271 l ROUND STRAIGHT ALUMINUM CATALOG NO, POLE SHAFT WALL BASE EPA APPRO X, HEIGHT SIZE THICKNESS TYPE WEIGHT ~~h'=:j RSAB6308-5 8' 3" ,125 A 5,0 19 RSAB6310-5 10' 3" ,125 A 4,0 22 RSAB6410-5 10' 4" 125 B 7,0 32 ~~ RSAB6312-5 12' 3" ,125 A 3,0 25 o BOLT CIRCLE RSAB6412-5 12' 4" ,125 B 6,0 36 A( - BASE TYPE "A" RSAB6314-5 14' 3" ,125 A 2,0 28 RSAB6414-5 14' 4" ,125 B 5,0 40 RSAB6416-5 16' 4" ,125 B 4,0 44 RSAB6418-0 18' 4" ,250 B 6,3 70 RSA 86418-5 18' 4" ,125 B 3,5 48 RSA86420-0 20' 4" ,250 8 5,3 77 RSAB6420-5 20' 4" ,125 B 3,0 52 RSAB6424-0 24' 4" ,250 B 3,0 91 RSAB6524-0 24' 5" .250 C 5,0 115 ( , BASE TYPE "B" f1' BOLTClRCLE 6Vo" BOLT CIRCLE BASE TYPE "C" 4658 Old Peachtree Rd. D Norcross, GA 30071 D Toll Free 1-800-24143170 In Georgia 1-800-243-9393 or 404448-1972 -~- -- - (i) TM XLG Series TrlmbleHouse Area Lighter ( ( Luminaire Dimensions Watllge A B Mounting Arm f,P.A, 3S thru 175 16" SQ 8';," 2"x5"x6" Long 18 250 thru 400 20"SQ, 8'4" 2"x5"x6" Long 2,2 1000 24"SQ, 8'4" 2"x5"x6" Long 2,9 Mounting Styles Available 9 6 J20 XLG2001 XLG2002 XLG2003 (. ~ KJ ~ " XLC2005 XLS2fXJ4 XLG2007 Specification Features Housing One piece extruded aluminum side panel. Single corner welded and sealed_ Minimum wall thickness ,125. Press-formed aluminum top cover interlocks with housing extrusion. Internally sealed for weather proofing with tubular silicone gasket, Lens Assembly One piece heavy gauge ~xtruded aluminum door frame securely seals heat tempered impact resistant glass lens_ Door internally sealed for weather proofing with silicone gasket. Door frame hinged at one end and is com- pletely removable for cleaning without the use of a single tool, Two spring loaded stainless steel latches close and seal the optical chamber. Vandal resistant Lexan shield can be mounted to the door frame as an option. Optical Chamber One piece hydro formed reflector is standard with Specular Alzak finish in an IES type'" distribution_ Uniquely designed spun-faceted reflector avail- able in type V square pattern. (Types I & II distributions available upon request.) Lamp Socket Porcelain mogul base. Appropriate 4KV or 5KV pulse-rated socket provided for High Pressure Sodium Lamps. Socket securely mounted to reffector housing provided with quick disconnect fasteners. Ballast Assembly Ballasts are High Power Factor (90% or better) capable of providing reliable lamp restarting down to -200 F/ -29'> C, Assemblies mounted on unitized module for easy removal and to facilitate field wiring, Mounting Bracket Heavy gauge (.125) rectangular extruded aluminum arm is standard with internal centering guides for ease and accuracy in mounting luminaire to pole or wall. Two W steel mounting rods are standard. Optional yoke bracket available for pole top mounting. Finish Architectural Crass I Duranodic (313) bronze is standard finish on housing_ Clear anodized a(uminum is standard on (ens frame, UL listed for wet locations. Ordering Information , Specification Guide A Mounting Style B Wallage C Lamp Type MV Mercury Vapor ---- MH Metal Halide HPS High Pressure Sodium o Voltage 120. 208, 240,277. 480 MT (Multi-tap) f Light Distributions 1,/i,/fI. V F Options PR PC HS PS Fl F2 TM Photo Receptacle only Photo Receptacle & Cell 90" House Shield Polycarbonate Shield Single Fuse (120. 240. 277) Double Fuse (208. 480) Tenon Top Mounting G Color OBI Duranodic Bronze (313) OBK Ouranodic Black NA Natural Anodized Specification Example I XLG2001 I 400 HPS A I B lei 0 : f I I PC/F2 I DBZ 208 11/ 4658 Old Peachtree Rtf. 0 Norcross. GA 30071 0 Toll Free 1-800-241-4317 D In Georgia 1-800-243-9393 or 404448-1972 c OSpeclflcatlon Guide I MIJd~ No. I WIttIge I limp Specification Example I THFt158 I 1(J() I MV B 'c 0 Options F1 A Model Number: THF2758 B Wattage: Maximum 150 watts CLamp IHC -Incandescent MV - Mercury Vapor ----MH - Metal Halide HPS - High Pressure Sodium LPS - Low Pressure Sodium (Maximum 35 watts, no reflector required) o Voltage: 120, 208. 240. 277 (100 watt MH and 18 watt LPS available in 120 or 277 volts) E Options HS9 - 9(JJ House Shield PE - Button Photo Cell F1 - Single Fuse F2 - Double Fuse (208 volts) GFR - Ground Fault Receptacle F Color See Inside Back Cover Vo/tIgI CIJIor FG c' o 120 Top C,p Cast Louvers Optic,' Assembty L,mp Holder B,I/,st Assembly Posl Construction 8%. aD. ~B'se PI,te ~ ;" ~' Top Clp - One piece heavy gauge prec(slOli spun alum/flum(.l?5 wall) retained by'.(3) W zinc electrOiJlated mternal sUPPOfJJ'rods. Sides are straight and smooth with a maxlmum1J taper. No expoSiJiJ,hardware. Cut l.ouvIrr - Decorative heavy gauge 'cast aluminum secured to top cap and bottom post with (3) %"zlnc electro-plated support rods. Post ConItructlIlll - One piece heavy gauge (.188 wall) extruded aluminum secured to top by (3) %" threaded zinc electro-plated internal support rods and to cast base by (4) flush mounted stainless steel set screws. 8m PI,t, - Heavy duty cast aluminum provided with (3) ~" x 12" zinc electro-plated anchor bolts. nuts and washers, Ballast support structure is welded to base for rigidity. Optlell Ass,mbly - Precision formed upper collecting reflector is standard with specular Alzak finish and designed for sharp cut-off. limp Holder - Porcelain with nickel plated grip screw shell for l1Iedium base lamps, Secured to ballast structure for lamp protection and ease of relamping, B,lIlSt Assembly - High power factor (90% or better) capable of providing reliable lamp restarting down to -2f1IF/-z11C. Assemblies mounted on "unitized module" for easy removal. Provided, with quick disconnect fastener. ,.~.'!<,{, !t:'i",o/'j' Rnlsh. Trimcote'" hard-surfaced acrylic ena,m.. ei coating. Variety of colors. ,j~ ETL listed for wet IocItIIIIII 'J Horizontallnitisl Footcandles I5DWIR&. 35 W u.s. 100 W M.~ /IJIWU /50WH.P.1 Distance in Feet 6.0 10.3 9.0 18.2 34_3 ./ 3 1.8 3.1 2.7 5.5 10.3 V / ) j I I 6 V 1/ / / 1/ / .63 1.1 .94 1.9 3.6 9 ....- ,/ / / .29 .49 .43 .85 1.6 ,./ / 1/ 12 .17 .30 .26 .53 1.0 - ,/ 15 .12 .46 V / / .08 .14 _24 18 .05 .08 .07 .14 .27 V /' 21 V ....- .02 .04 .03 _06 _11 24 3 6 9 12 15 18 21 Report based on 42" Bollard Height " ;\; ", " ':.:^', .:.,. , ,:v' CL 1602 MOUNTING STYLES ORDER INFORMATION CU60l @"",,, . ~",-: ',;,j,<, I A MOUNTING STYLES B MAXIMUM WATTAGE c lAMP CL1604 o E VOLTAGE FINISH A. Select mounting style from above chart B. 250/MV, 250/MH, 150/HPS (maximum wattage available), C. Mercury Vapor = MV, Metal Halide = MH,""-- High Pressure Sodium = HPS. D. 120,208, 240, 277, 480, MT. E. 313 Bronze acrylic enamel = BZ Black acrylic enamel = BK F. Gold Reflector = GT Single Fuse = F1 Double Fuse (208, 480) = F2 900 Houseside cut-off = HS9 Asymmetric distribution = A Button Photocell = PE CL 1605 y~ NUMBER OF APPROXIMATE LIGHTS WEIGHT I E.P,A, (SQ, FT.) . }..~ F 1 29 2 68 3 102 4 136 WALL MOUNT 34 N)'A-'-Not Applicable 1,3 3,1 4,1 4,9 N/A POLE ORDERING DATA d ROUND STRAIGHT ALUMINUM CATALOG NO, HEIGHT RSAB-{i410-5 10FT, RSAB-{i412-5 12 FT, RSAB-6414-5 14FT EXAMPLE: lCL ~6021-11~01-lH~SI-12981-IB,ZI-~ , ABC 0 E F < RSAB-6416-5 16FT , See page 21 for additional pole data. :j",,"" , ROUND STRAIGHT ALUMINUM = RSAMB SERIES With Ornamental Cast Base Trimble House manufactures its ornamental posts from high grade extruded aluminum (alloy 6005-T61 in- tegrally welded to heavy duty decorative bases. The shaft is 3 %" o.d. .125 minimum wall extruded aluminum. A 3" o.d. by 4" high ,250 wall tenon is securely welded to the shaft. The decorative base is 30" tall and has a wiring access hole with a cover plate. Cast aluminum anchor bolt nut covers are secured in place with tamper proof screws. All poles are lightly sanded before they are cleaned to insure a superior finish once our premium abrasion and fade resistant finish coat of acrylic enamel is applied. A 313 Bronze or Black acrylic enamel is standard. CATALOG POLE SHAFT WALL NO. HEIGHT SIZE THICKNESS RSAMB-8 8' 3~ .0.0. .125 RSAMB-10 10' 3*,'0.0. .125 RSAMB-12 12' 3~.0.0. .125 RSAMB-14 14' 3~.0.0. .125 (4) %H x 18" Bolts provided STANDARD FEATURES (All Poles) · Bronze or Black Acrylic Enamel finish . Hand Hole with cover for wiring access · Base cover or cast nut covers '. . 3" o.d. tenon when required · Anchor Bolts, nuts, washers and template . Protective wrapping for shipment OPTIONS (All Poles) . Ouranodic 313 Bronze "OBZ" · Ouranodic Black "OBK" . \llkather proof Receptacle "Recp" · Ground Lug "GL"