APPLICATION
"
'-
'" ~............. >
$ITE PLAN APPROVAL APPLICATION
-City of Boynton Beach, Florida
Planning and Zoning Board
This application must be filled out completely and accurately and
submitted in one (1) copy to the Planning Department. Incomplete
application~ will not be processed.
Please print legibly or type all information.
I. GENERAL INFORMATION
1. Project Name:
Boynton Beach Multipurpose Recreation Facil ity
2. Date this application is accepted:
(to be filled out by Planning Dept.)
3. Applicant's name (person or business entity in whose name
this application is made):
City of Boynton Beach
Address:
P.O. Box 310
Phone:
Boynton Beach, FL 33425
" (407) 734-8111
4. Agent's Name (person, if any, representing applicant):
Address:
Spi"is Candela & Partners, Inc.
800 Douglas Entrance
Coral Gables, FL 33134
(305) 444-4691
Phone:
5. Property Owner's (or Trustee's) Name:
City of Boynton Beach
Address:
P.O. Box 310
Boynton Beach, FL 33425
Phone:
(407) 734-8111
6. Correspondence address (if different than applicant or
agent)*:
* This is the address to which all agendas,
letters, and other materials will be mailed.
Planning Dept. 1/89
'.
'--
Page 2
7. What is applicant's interest in the premises affected?
(Owner, buyer, lessee, builder, developer, contract
purchaser, etc.) Owner
8. Street address or location of site: 128 East Ocean Ave;ue r
,
Boynton Beach, FL 33425
9. Legal description of site and property control #:
. See attached.
10. Intended use{s) of site: Civic Center
11.
Developer or builder:
City of Boynton Beach
12. Architect: Spillis Candela & Partners~ Inc.
Site Planner:
WRT
WRT
13.
14.
Landscape Architect:
15.
16.
Engineer:
Spillis Candela & Partners, Inc.
Surveyor: Ri~1'\ard L. Shephard and Assoc iates. Inc.
l'
....
Planning Dept. 1/89
.,
. ./
,/
Page 3
II. SITE DATA
The following information must be filled out below and must
appear, where applicable, on all six (6) copies of the site plan.
1.
Land Use Category shown in
the Comprehensive Plan Publ ic & Private Institutional Governmental
Hlgn Oenslty KeSl0entlal
2.
3.
Zoning District REC/R-3
\
Area of Site
:t 3.8
acres r166,000
sq. ft.
4. Land Use -- Acreage Breakdown
a. Residential, including
surrounding lot area or
grounds
acres
% of site
b. Recreation Areas *
(excluding water area)
acres
% of site
c. Water Area
acres
% of site
d. Commercial
acres
% of site
e. Industrial
acres
% of site
f. Public/ln~titutional
g. Public, private and
Canal rights-of-way
3.8
acres
100
% of site
acres
% of site
h. Other (specify)
acres
% of site
i. Other (specify)
acres
% of site
j. Total area of site
3.8 acres
100
.% of site
* Including open space suitable for outdoor recreation,
and having a minimum dimension of 50 ft. by 50 ft.
5. Surface Cover
a~ Ground floor building 43,000 sq.ft. 25 % of site
area ("buil~ing footprint"~
b. Water area 0 sq.ft. 0 % of site
c. Other impervious areas,
including paved area of
public & private streets,
paved area of parking
lots & driveways (ex-
cluding landscaped areas),
and sidewalks, patios,
decks, and athletic
courts. 83,000 sq.ft. 50 % of site
d. Total impervious area 126.000 sq. ft. 7fl % of site
e. Landscaped area 11.000 sq. ft.
inside of parking lots
(20 sq. ft. per interior
parking space required-
see Sec. 7.5-35(g) of
Landscape Code).
7
% of site
Planning Dept. 1/89
~.
"-
Page 4
f. Other landscaped areas, 21,000 sq. ft. 13 % of site
excluding water area
g. Other pervious areas,
including golf courses,
natural areas, yards, and
swales, but excluding
water areas 8,000 sq. ft. 5 % of site
,
h. Total pervious areas 40.000 sq. ft. ?!i % of site
i. Total area of site 166.000 sq. ft. 100 % of site
6. Floor Area
a. Residentia;L sq. ft.
b. Commercial/Office sq. ft.
c. Industrial/Warehouse sq. ft.
d. Recreational sq. ft.
e. Public/Institutional 38tOOO sq. ft.
f. Other (specify) sq. ft.
g. Other (specify)
Mechanical equipment building
1 , 500 sq. ft.
h. Total floor area
38,000 sq. ft.
7. Nwnber of Residential Dwelling Units
a. Single-family detached dwelling units
b. Duplex . dwelling units
c. Multi-Family ( 3 +
attached dwelling units)
( 1 ) Efficiency dwelling units
( 2 ) 1 Bedroom dwelling units
( 3 ) 2 Bedroom dwelling units
( 4 ) 3+ Bedroom dwelling units
d. Total multi-family dwelling units
e. Total nwnber of dwelling units
8.
9.
Gross Density
dwelling units per acre
Maximum height of structures on site
56
feet
?
stories
10. Required off-street parking
a. Calculation of required
number of off-street
parking spaces
Refer to parking study
b. Off-street parking spaces
provided on site plan
1-:3 ~
Planning Dept. 1/89
Page 9
IV. MISCELLANEOUS
The following materials must be submitted in one (1) copy:
(check)
N/A
1. A ch~ck, payable to the city of Boynton Beach, as per
the attached fee schedule.
N/A
2. For projects that generate at least three thousand
\ (3,000) vehicle trips per day or two hundred and fifty
(250) single directional vehicle trips in a one (1)
hour period, a traffic impact analysis must be submitted
N/A
3. Any other engineering and/or technical data, as may be
required by the Technical Review Board to determine
compliance with the pro~isions of the City's Code of
Ordinances.
V. CERTIFICATION
(I) (We) understand that this application and all papers and
plans submitted herewith become a part of the permanent
records of the Planning and Zoning Board. (I) (We) hereby
certify that the above statements and any statements or
showings in any papers or plans submitted herewith are true
to the best of (my) (our) knowledge and belief. This
application will not be accepted unless signed according to
the instructions below. .
Date
r Trustee,
or other
VI. AUTHORIZATION OF AGENT
J I ik~
Signature of/Authorized Agent
S" .21- 8 1
Date
(I) (We) hereby designate the above signed person as (my) (ou
r)
this application.
Date
of Trustee,
iz Principal if property
by a corporation or other
entity.
SPACE BELOW THIS LINE FOR OFFICE USE ONLY
Review Schedule:
Date Received:
Technical Review Board
Planning & Zoning Board
Community Appearance Board
City Commission
Date
Date
Date
Date
St"ipulations of Final Approval:
Other Government Agencies/persons to be contacted:
Additional Remarks:
Planning Dept 1/89
~
/
'%i I
/"101 "
\ :~I ~y I
ht,j
I 1
I .
1 I \
HlEW ..CONCIIITE
SiDeWALK
1;1," _"..r,
. )>. )';fi;>~;..: ;'.'
.-~1d-",>" ;,' ..~... ,.:'",.
~ ~~-":,,.~~::.~1'f'i;-::.-..,..;-::.::-..~."":..~.,\
.~ "Y......"."~..~............,":""~..,.......,.........,.",.,,..................... ..
\ "'/ ., ' . I J
'IS ~ .". I :',
t ~ '-t ..... I
,! ~:.~ ~:. I "
r ~ i ." ICW ..~CRl1I SlorWAU (.::. ;:1
t: ~ "\.. :,
hit fo..... .l
i~ i.. ('~, Hrw s. CONCRrTl .'" '.J
., tr:'. I'> I .,orWALII .-1.... T
i! ,. ") , ~ 25=.un;mrR .. .1
':' .~ .'; 'I
, ...J:..n 'AINTIO TRA"IC ""ROWS ''''''
., 'J', I
.. . ~\ ~. I
. I
r1
,.,
"
.
~.r
i
.
i
.1
~,..
I't', '
A LION ~
~::lt,:":-~~:-~,,-:,~. !
:'J~.~;...2._-_..:"\-: :
:~
~\
.~
...
~
3a
ALION
~WJVC: 1f.'~~IITom
'1'
l
,
~
~'
~
~
.;. '
(
"
1
I
I
, I
, I
I
I
I
I
,
':
II
PUTUIII ACMIIIIS1lIATlOlI .'1
IUILllIlIO -r
I
, I
",,:
I ' ~
! ,., ..,-----: ,--------", ii"-
.... ~ \ JI PCW DIIIVIWAT 'I
.. _ CUAS . OUTTU
w/////
y/. 1
.~
IIIW .. CONClIITE
SID[WALK
I
. -~ ~
, " II
~ ._-~~--_#~"'--------- ~. tI'
:;;' '~'~'.:s! ;~'J~'::; ~ ~-~-= :': = = ~*~
1
'AINT STRI'INO ITYIt.
sn DETAIL
,t
. . . i," 'TICW ........
',:':' \HlEU~,~~.,i.ff.j~. /.TItE~~" 'CO:EMnt~t\f1NT
. \. ..\oI~,I.' / .. / .
i'W'U
'-
I
I
'd<<loo-:'
jHlEW s' CUll. . OUTTIR
-
/ ,.
I
1a1,
~F:~
,
I
~~
I
I
,
L.
I
I.' I
; I
I
I
Nrw S. COIIC"ITI
SIDeWALII
, -. - - - -'- - - - -
II
I
I
,
;'.
I,
ICW .. COIICIIITE __
IIIW'. OllIICIIUI ~
';'~.
" .. -
:1i+)~~
\ \~~ ~
0'<;:"1); .,
, y :I~'~, f-.
, . .;~l ~;: IJ
, .... il
VAl ...,.....
~
~T!!1l lIJ'JiO.. '"
IUI': INO."'..... . ,
."" ,;':'. . .
10' /' .t>' 'X 1~ f.
i/ .,-
1ft
..
..
I
I
I,
I,
.1
I
I
;
I
A:. I
I,
:~ :1'
.... I
~ -'ii': I
~I
'" II
il II
I", I
~ I
(I
r, ~
1:::= 'A
ICW S. _ . IIITTlll
I ' I
.,..
HlW _LYIC
_ITE MVlIIIINT
,
/'"
-
V
('./~: . I ~ ~ r~-,-r-':;-,-,,'T-:
,'.. I-..... '111" I
IIn IIULTI PUR'OII ..; I I I I 1 ,
I X' : 'ACILITT -' I NIW .. COIICIllTllIOnN
~",,'~;'~ !:\:'1!~~ar...yg:" - ri llJ_LllJJ_'-
: " ' '-=:::UC~~~IVI - A(' '/In ~. R:t 1- - - - - - - -..::'
: i? ~ ~~ .;; .......~ ('~"!1;; II I r I '- /-
I /' ~~~, . III / \~dOO' A.....~ i.1 ~. ' .~,
I "(~ 7 '.; . '\.. b .f ~ '
I __~" 'f. ~ ~ n n [ (). n "Y. '..r~~~ 'II. W"/
, ,l' 'L;:,. ~ '/
: ~ /J/~' {.b 0 ( ~. f f ~ ...PA....~ ..... !0...~;. ~ ~:-.S'bo.OO.
J-: ~ -~ g g~' ~ I - ~~.~~ J'lk:~
;r: !r.;i !! I ~~..~ !j..,. j'l I ,~" ~
~ ~rr -.J' ~ _...~...~ w .~: ~(. Ift\ h'~
,~' ~~": i':~"<? .11111 r.~'I~ I iT :H - ~i,~~~~~~':=:~~=~
,'~ ' '::j' \wi. . '^ ~rJ _, ... .. , .::::
~ .
-'/ './1 LI NIW..$C)(WALK
./ ," HlEW ~ c,~ L-NIEW ASI'tlALTlC CONCRI 11 MVr.MlII~
HIW HANOICA' lTYllCALl-.--- HlWS.CUll. S OUTTIR
UIl! lTT~ICALI . IUCIIIIT. IOULIY""0 .i.. _
HlEW ~ COIICII€TE 1101_
JIDI
" _ I._TIOII OITAIIIO,PIIQII u,p " 11_ ~.
...,... lID _IATlI, "flO ,._.
I. III _.. ..., .. U_"
. . ~... ,.--" ~-,
~
"
LOCATION MAP
MULTI-PURPOSE BUILDING
.f!
.1
~.
,.~.._.,....
," -'.
" '
, .
.. :.: "
. . , .
limE':"'"
. I' .
.
" . .
I'" --' -, "
. .
"I _ '.'
" '
l'!
i
!
u
I
o
1/8
1/4
MILES
'0
400. 'SOO
1600 FE~T
Pt.ANNIN 6 pc-pro 5/B7
.:('0.'
",ti/;,~-r
;..... ~~~..~\/' ~
,.~..{t
'.j ,,/ ,....,... ~
.,.. .)
;f:-';l~~
... "J., '....
l". "
. ,
...... ".;.::~'. ..' "." ..~.~t:.. f .
~~~~-------~-------~-~~-
.~ ". '" . ~..,. ':',... _~' I'." \ ,II _. ..
,. . "'7'''''......,,/.,':;.,,/~I''':..'''''''''''~:...,.....V'~..'"'~'..''''..... ,I 1".-' -1,.1,... ...~
\ ......~ ,'. . I . J I'" '-.p. 10 ' I "
~ a; ,'" I . '. '<ll - ~;r , . .
t. f '1 .. - ~ 1 I .. t ...... .
.! . f:.t ~.: , . .. . 1 " ,. ~
, !' _..CCIlCIIITI ttDI...~. .1 _g"" I....... .... ft' r' I ,,,"cuO ~ S'~.,; -
-1 d , - J .', ; -' .tt! :.,.;.' .:. 1 .l", '; .,. .ko I, ~ =
., . . ...-- ,.1 ~ I";~ ". . . 1'1"' TO ...~. '0'
;-,-;. ::~
~..; t.~'; ". ',i. " ,.'~' ~, .t~ t~~~~.". I ~ +- . "r,:=1:! 0
'i i,,' (~, IotWI.CONColTl :.:, l0 G o(~ ..'.. . I .' ~'-- \. -
!!. I'({" 1: 'I"IIIDIW.~II I I ,; .',. - . . t.n ~ N
a: ~ . .... ..-"- t ~ .fJi'~'l.I#~:~"'i' ...... r, .IN~rltll."."" ""
~h '''1 .' '. . ~S=.D~vi~tflll .. -.;;f~~ '-;-IJ..l. i:~.~' I --
, ~f~ "~'d ,;.;~, M'd' "'~: ' ~ ~ ~, :,~~~:i!rr~' !ri' r IIII :In'l I I I I ~ /'- (,'f'
:..',,' 'I 10' ~~ JI".. - t IIII ItOWW" I
· . .. 7V,~~a =~ . 1/. '
. v. ; rli,: ';;, V I Y\:~~ ~ u'"r' ~. .~.~ ..il
~ ;.,. ~ \ .\~[L. ~ ~I I
0\ ~...'., ,I ~ ,,--.L I .' I , "r~
\;..~'~'. "'" ~_': 'F: A ~~;':'1 '. 't:rJ ~/, ~ !,
. . ' . ..:~fit,:":~-:'"~",.-:':.,,! ~ ~ ,. . .;~" ~' V '-~....~ :.~ ,:1'
.~ ''Jllr:'';''''';---'':",,:'; // I ;J(:v' -.: I..... 1 /' ,0"01100. 4 'I
. ~ A~IDN '.Y ~z ~ 1 u.soT -€>:
~ VI I NTU.J IOJ~ ..
~I\O~E: 1:..r...'OTl. /,1 J:! : IU~~~~..' , . - . , .... i : I
~
~
::.::.':""'- I '" '2~~"':) !:\:'J!:"MoW _: i'! ljiLUj'J~
I .., ~,y~ "f+J---------
I , 1... ' I'-=..~~.~~IVI - , I .
. ~ 0'. ,-
I I ... ..... OIIAw'711O ".11 ..... ..... r ,....... ~..I'
1 .". - .....p~.., . . "
l ~~~ ,,*dDO'~ 2>1 if
: r~ t'i"I "-' ,WI / \ '!J 'r' 1..,1'/, ~. / .~,
I "(r-~.,1~f . t-~ /'0 0 0 ~ o. 0 ":f.-i.;~~ VI. r$ /
I , (~..~ I.J-.. 0 L...,. 'l.. . _):.,~ p,:<2 /.
I ~ ~/ r""..\; VV ( ~. ., ~ III ~.euo,' .90' ~\!!J'".o:~!'f ~ 4-'_.~'co'OO.
, 1"- -~, 9 0 . .... rr I. - ..<oj' l J I ~
:t-: .. , 0 0 flit - pt- , 1 "x~ ~
~ ~I~ ~ ~'I ' ~.~
j" ! I h l50{~ :J>~.. ~ ,,'! ,,,,,,, ' ..,' u' /' iJ~ ,_.
\.fT .--;-.,} ;".'1 .... ......&I'~ ... .1~1 &.J> ~ I'~
nT' ~.. I~.' ":!oJ I', I ,[.,J ." .""1 "'\, .1, . .> .".
'@1 ~ ~ f-, I;: ;;J~ ~ 01 III ~~ IISIIII D~oaj I~I ...~~.:~~-----
~\~ j..o' . "" t- \. il ~ ':.~...-------...::
30'~ . - . ~ -~, .-
V .., '-HIW'.$Cl(WO~.-
.0. "'ITYw",':,c". '-_ .'~H&UIC CONC.I T[ ....~..lH
NlW HAHDICA~ __1 Ill"". CUll. · GUnlo I'
IIA"! ITY"CA~I . IUCIII:ST. IOULEVARD "~ _
.
-:.
"r
\. .
~
''<Ii
I
I
'I
'I
1
I
,
I
I
I
I
:'1
MUOI .CW'HIStll&T1Oll :1
"'1~D1HO "'
I
HIW .. COHCll~ ! I
"DI"'A~. '" ....1
'" '1
.7.' .1
': ....----"1 /--------...... ~
" , , "' :' i '"
... .. \ J' Hl'" CIIlVfWAY I
.._ CUR.' ounfo
. _~ l
, 'I' /I
"._-----_#~.,--------- '/.,,'
:;' &!';';;'':!i:! ~;;.J=:,;;,,; = :-.. == = :...;.~ ~
"'INT tT.I~IHO ITY,,'
.n DlT&l~
\ .
w/////.
,
..
..
. .
~
(~
I
,
{
,
" "
.'.
.f
~
'I' .. ..IlOl:.....
t I . -'1 :', :.,,'.
, '. _"'.. CUlII.:..;.... , . ..:. r-=.Nlw ._.~tlC
\ . ';1;~..ir,I" liT, ,!"EIT CDHCllITl ~. oIlNT
- \ ,'~ ',:.1 . I' / .
JOC" .. cuo. . GUTTlO
,crDl1DD"; /. -
~F-:?
,
I
.1 {FI1l..m JU
I
~l
e 1.1.
~-@
II
1/
HIW .. CONCIIITI
I'DlWA~
. -- ----.-----
"
I
I
_ .. COIIC'llTl 1IllCII"
HfW I. CIDNC'll TI __
.'
_ .. CURl . IUTTI'
H(W _~Y1C
CONCIIITI ....vtllDlT
l:
JIlm
1. ICUCIU1 ..,....,"011 ClUlllrtD /W1C urn II IICMAlt ...
...,.. AlII .u*1I.TII. ..'U 1-........
t, III _... ...., .. u...,.
....
WRT
BOYHTOH' BEACH MULTI-PURPOSE RECREATIONAL FACILITY
SOIIIIARY OF .ALTERHATIVE SITE COH'CEPrS
DE~ 7, 1987
~
TABLE OF COHTEHTS
Page
1. Summary of Program Requirements
2. Summary of Parking Requirements
3. Minimum site Requirements
4. Congress Avenue site Concept
5. Downtown site Concepts
6. Evaluation criteria
1
1
1
2
2
5
A. Cost Considerations
B. Operations/Logistic Considerations
C. Neighborhood (Traffic) Impacts
D. Service Accessibility
E. Economic Impacts
F. Policies/Intangibles
7. Summary/Conclusions
Appendix - Traffic Impact Analysis
5
7
7
8
9
9
11
.'
1. S1~ry of Pr""JLcs.a RequireJaents
Based upon input from the City of Boynton Beach and a number of
civic and cultural organizations a "wish list" of activities
desired for multi-purpose facilities was prepared. This
preliminary program totaled some 74,000 square feet, of which
approximately 56,000 square feet comprises an "auditorium
program" which would accommodate major sports activities
(basketball, gymnastics, etc.) as well as cultural and civic
events, meeting rooms, etc. The remaining 18,000 square feet
comprises m.ore specialized activities and their related
facilities. within the available.budget only the 56,000 square
foot auditorium and multi-purpose rooms can be accommodated.
The remaining 18,000 square feet of specialized facilities must
therefore be treated as a second phase of construction. Thus,
the building footprint for the initial phase of construction is
approximately 1.3 acres. If and when the building is expanded,
the building footprint expands to approximately 1.7 acres not
including parking or open space.
2. S1~ry of ParJdnq Requ.i.re.ents
The following are conclusions of parking demand analysis for
each major program element.
sports - Youth and Adult Activities - 25 cars
sports - Special Events/Tournaments - 300 cars
Major Performances - 500 cars
Minor Events (Dances, Banquets) - 120 cars
Dance StUdio/Exercise - 25 cars
Arts & Crafts - 30 cars
Music Rehearsal - 50 cars
Because many of the above activities use the same spaces and
would occur at different times, the parking demand numbers are
not additive. The "worst case" would be associated with a
capacity crowd of 1,500 persons attending a major performance
concurrent with any other activity. Because the City of Boynton
Beach could make schedule adjustments to eliminate such overlaps
the minimum required parking is determined to be 500 spaces.
However, it is acknowledged that some additional reserve
capacity would be desirable. The "footprint" associated with
the 500 parking space minimum is approximately 3.5 acres.
3. wini... site Requi.reaents
Minimum site size requirements can be determined by adding
together the parking and building "footprints" along with some
reasonable factor for circulation and open space. Assuming a
portion of the site would be reserved for future addition of
special activity rooms, the total size requirements is
approximately 6.0 to 6.5 acres.
1
4. Congress Avenue site Concept
Figure 1 depicts a conceptual site plan for the facility at
Congress Avenue community Park. At ~he west edge of the
property is a wetland area which is assumed to be unsuitable for
construction. To the south is a portion of the thirty acre site
recently sold by the City for a radio facility. To the north is
the existing tennis center depicted with the planned addition of
eight courts.
The multi-purpose facility is positioned in the approximate
center of the property, on axis-with a new boulevard entrance
from Congress Avenue located at the existing median cut. The
building entrance is also on axis with an extension of the
landscaped pedestrian mall which presently extends southward
from the tennis center clubhouse. Just south of the entrance
boulevard is a bermed and landscaped area provided as a visual
buffer to the property to the south.
Located in three large lots to the north and south of the
multi-purpose building are three large parking lots which
provide a total of some 670 parking spaces. This supply is
considered more than adequate to meet the needs of the
multi-purpose building as well as the expanded tennis center and
other park activities.
5. Davntovn site Concepts
Figures 2, 3 and 4 depict conceptual short-range, mid-range and
long-range site plans for the development of the multipurpose
building as part of the downtown governmental/civic complex.
Each concept depicts the multi-purpose building on the site
presently occupied by the Civic Center on the block bounded by
Ocean Avenue, Seacrest Boulevard, S.E. 1st Avenue and S.E. 1st
street.
a. Short Ranqe Concept
Figure 2 depicts a concept for the construction of the
multi-purpose building which can be completed in the
least amount of time and for the least cost. This
objective is met by avoiding any immediate reliance on
the acquisition of non-city owned properties including
the elementary school and the fourteen condominium units
at S.E. 1st street. The 56,000 square foot auditorium
component is located mid-block between Seacrest
Boulevard and S.E. 1st street with a main entrance
facing a landscaped culdesac/drop-off area on Ocean
Avenue. To the east and west of the building are new
parking lots on the remainder of the Civic Center site
providing a total of some 162 spaces. In order to meet
the minimum requirement for 500 spaces some degree of
joint use of existing City and school parking facilities
is required. Based on an analysis of the total demands
upon existing City parking facilities, the following
2
. '
~
L-..
our.......,..
[-
I
II
CONGRESS AVENUE
TOT Al PARKING SPAceS-i;70
~. LI:::J
1"-50'-0" \:J.7
~\\"allare Robert~ &: T( ,dd
::=.~-=-~=--;~~~~ BOYNTON BEACH
MULTIPURPOSE CENTER SITE SELECTION STUDY
CONGRESS AVENUE SITE FIGURE 1
conclusions were drawn regarding the availability of
existing parking spaces to meet peak requirements of the
multi-purpose facility.
Existinq Facility
Parking Garage
ci ty Hall Lot
East Lot
West Lot
Library .
Madsen Center
Tennis Center
Total Spaces
Spaces Available
140
51
60
23
59
17
41
90
o
60
23
o
o
~
173
TOTAL AVAILABLE - city Parking
Thus, with the addition of these joint use spaces, a total
parking supply of 335 spaces is available, 165 short of the
required 500 spaces. However, some 48 spaces are available at
the elementary school which, with a joint use agreement with the
school board could be made available to meet peak demands.
Thus available parking using existing and new City lots as well
as school parking totals 383 spaces, 117 spaces short of the
required 500. Three options are available to meet this deficit.
Option 1: On-Street/Church Parking
The least costly option is to utilize on-street parking in
the immediate vicinity as well as the parking lot at the
United Methodist Church across Seacrest Boulevard. Within
two blocks of the site a total of 200 spaces are available
on-street and at the Church. Although this option has no
associated cost, it could contribute to periodic impacts in
the immediate neighborhood.
option 2: Provide A Garage At The East Lot
The second option to meet the parking deficit is to
construct a parking deck of at least three levels at the
city's existing East Lot. Assuming a unit cost of $6,500
per space, total cost is estimated at $780,000. The
present budget for the multi-purpose building cannot
accommodate this additional cost.
option 3: Acquire The Condominium Properties
The third choice is to acquire the 14 condominium units to
the east of the multi-purpose building. Using this property
to expand the on-site parking provides for approximately 73
more spaces. However, a deficit of some 44 spaces would
remain. Cost of acquisition and demolition is estimated to
be $650,000, plus $73,000 for parking lot paving, producing
a total cost of $723,000.
3
JJ lL - -- -===,=-~,~ -- J :
=_CO.- -~ . BO,!,~TON B[ACH ~OULEVAIW - J
! i5=O~~=---'-~--~-'---) I-
I n II
I I I, I
I 110 SPACES I I
i l, AVAILABLE I I.
. I .J I I
_J Ll~~~ 1_
l
I
I
I
-~
l~
I ~ I
I ~ i
I ~ J
~
-1
I
_.---1
~
fl-tl. LlI[\
'.-50'-0" \J7
BOYNTON BEACH
MULTIPURPOSE CENTER SITE SELECTION STUDY
DOWNTOWN SITE - SHORT RANGE
r--
I I
, I
I .
I I
J I
.b----:::
~--
I
I
I
I
L_ _
r --=-, -~-
I - r'
I ":~." 8 G l~ tJ r'::'.",
! -. ---- I
l B B i ":'~.'-l_ I
.____._l'-~_~----~
S.E. 2ND AVENUE
r-~-----=ll r-
CWRr Wallac~ R,-,~:t~ ~.~I(:- .
",,--. t.............___. ~.,...I:--"'-..--
. ~_.......~....__.'__' '- h.I.:JI:M. ~(,'..
::i'IOHT ';'AI~ul:. LJl: Vl:l Uf'I.1U4I I :JUo 1:1:.111
A&:iUMP1IuNS
-SCHOOL R~MA.lt..S
-SCHOOL PARKING t.....ANuLlJ/AV....U "-uIL
- CO"DOM'NIUUS Nul ACOUlHLO
. SPECIAL ACTIVITY ROOUS 11" 0001
HOl CONSTRUCTED
. PEA.. PERIOD PARKING "V"""IlIE
381 SPACES - OFF STHEET
uP J IONS
- ON-S1REET I CHURCH. 230 S""CL:'
- ACOUIRE CONDOS
-DECK tiO SPACE LOT
FIGURE 2
b. Mid Ranqe Concept
The mid range concept is assumed to occur at such time
that the school properties are transfered to the City
and funds are available for the acquisition of the
condominiums at S.E. 1st street.
As depicted in Figure 3 the large school site is
refurbished to house expanded special activities which
the present multi-purpose building budget cannot
accomodate. The smaller historic school building is
shown transformed as a museum as currently proposed.
Both structures are located in an extensively landscaped
park-like setting which becomes a central amenity and
theme for the entire civic/governmental complex. The
elimination of the many portable structures on the
school property will permit an expansion of parking
facilities. In addition, the acquisition of the
condominiums at S.E. 1st street is required to
accommodate the expanded activities at the school
buildings. Total parking available in this scheme is
559 spaces, not including on-street or church parking.
c. Lonq Ranqe Concept
The City of Boynton Beach has recently completed a long
range concept for its governmental/civic complex which
did not include consideration of the multi-purpose
facility. Therefore, it is necessary to consider the
consequences of locating the multi-purpose facility
here and the probable need for incremental expansion of
government facilities into the long term (beyond 1995)
future.
Figure 3 depicts a "buildout" condition which would
accomodate two new City buildings facing Seacreast with
facades continuous with and footprints similar to the
existing engineering/planning building. It can
reasonably be assumed that increased parking demand and
land values will require that long range parking be
provided in multi-level garages. This concept depicts
two new garage structures located south of the planned
structure, perhaps spanning Ocean Avenue.
A key to the success of such an intense activity core is
the creation of an effective internal pedestrian
circulation system. Figure 3 depicts two future north-
.south arcade walkways. One extends south from the
existing engineering/planning building connecting to
future city buildings between N.E. 1st Avenue and S.E.
1st Avenue and directly to the Library. The other
north-south arcade is proposed to link the presently
planned and future garages with the Madsen Center and
tennis center to the south.
4
II
,I
~ .---dJ
-II
II
.,
I:'
r
Iii
_--.Jjj
-,\'
"
I
If
Jl
III
II,
~;~
=---'
--1"': ~
It i 'I
tn .
I!, is I
111 ~ I
_-I!
-II)
~
I
~
i!
i
!I
-'~
~Il
\1- !IL-.
lL-------- _Jj L_
---- BOYNTON BEACH BOULEVARD
- I
o II
'I I
, eo .~ACU I: I
, AVAILAeLE I
L I. I
___ ~_---.JJ I
-
I
:1 I
, 1
1 '
., I
i I
i
I
I
I
: --: I
-,
L
MID RANGE DEVELOPMENT 1990-199
ASSUMPTIONS:
-SCHOOL ACOUlREDIAENOVATnl FOA AE-t
-CONDOMINIUMS ACQUIRED FOR ~ARKING
-SPECIAL ACTIVITY ROOMS IN SCHOOL
-~EAK PERIOD PARKING AVAILABLE-SU SP
PAA~NA liD 0- DD - ~. I I
, - ~D D D D ; H.A I I
. i I
~- I i I
,10 0 I ....,~.. I 1
l~ .::Y- L__
S.E. 2ND AVENUE
------ll r
rl-f1 LIICJ
18-50'-0. Q7
BOYNTON BEACH
MULTIPURPOSE CENTER SITE SELECTION STUDY
DOWNTOWN SITE-MID RANGE FIGURE 3
I
I
I
I
I
"--
r
I ~~~:~~~~
I
~~
_H,
I
I
I
_J
I
I
I
I
-~
l~
I ~
I ~
I ~
~
l
I
I
I
I
-~
~
II '
I' J
"
,-'--- - - - - --=-= ----:- - --
-"-- - -- -- - ---
=c--=~ BOYNTON BEACH BOUlEVAHD
-------
r ;~I
FuliuRE a: I
P"~ING i ~ .
1 :~I
G".m ~ I
I
I
I __d I I ,
l__~JlB 8~ :^,'.G'^J~ J L __
S.E. 2ND AVENUE
r------~.=-lllf-=
n-rJu. eJ9
TTTT" ,M-50'-0"
\t\ ~ Wallace Roherts &Tocld
~. l.~~' ~....,f~",,'_'
,,'c..__._.c..~'-">>''''~_O'"' BOYNTON BEACH
MULTIPURPOSE CENTER SITE SELECTION STUDY
DOWNTOWN SITE - LONG RANGE FIGURE 4
L
..
East-West pedestrian circulation is accomodated along
Ocean Avenue which becomes pedestrianized with
decorative paving, landscaping and fountains accenting
and linking the entrances to the auditorium and
renovated school buildings. A second east-west
pedestrian connection is provided to the rear of the
school buildings in a park-like setting just south of
N.E. 1st street. The overall urban design result is the
creation of a critical mass of civic activities creating
an "urban edge" along Seacrest, Boynton Beach Boulevard
and S.E. 1st street with an interior "courtyard park",
the center-pieces of which are important landmarks in
the City's history.
6. Eva1uation Criteria
In order to facilitate a carefully reasoned selection of the
appropriate site, seven criteria have been used to evaluate
each. While the consultant team can objectively determine the
relative "performance" of each site under these criteria, the
final decision must be also determined by a largely subjective
"weighting" of the relative importance of these criteria.
A. Cost Considerations
Perhaps the most important criteria for the site selection is
the diffential in capital costs associated with the development
of multi-purpose buidling. Because the Congress Avenue site is
free of significant constraints and sufficient in size to
accomodate the full development program, it is considered a
baseline in terms of a comparison of capital costs. Therefore,
any cost differentials will be associated with cost savings or
additional expenditures uniquely associated with the downtown
site. These differentials, described below relate to the
specific time frames and assumptions' specified for each.
Short Ranqe Cost Differentials
The short range concept for the downtown site has a cost
advantage associated with the value of jointly utilizing
existing and planned parking facilities in the
governmental/civic complex. In this concept 173 existing or
planned spaces are utilized to meet the minimum requirement of
500 spaces. Assuming a cost of surface parking of $1,000 per
space, this savings totals $173,000, assuming the same total
number of spaces would be provided at the Congress Avenue site.
This savings, however, is only realized if the City relies on
on-street parking to gain the total of 500 parking spaces.
Counter-balancing this savings on parking are extra costs
associated with the demolition of the Civic Center and the
temporary accomodation of these activities elsewhere.
Demolition and site preparation costs are estimated to be
$20,000. The cost of renting temporary replacement space is
5
..
estimated to total $110,000.* Based upon these assumptions the
downtown site could result in a savings of $43,000 compared with
the Congress Avenue site. However, this small savings could be
consumed if it becomes necessary to provide longer term
temporary facilities for those civic Center activities which
cannot be accommodated in the new multi-purpose building.
Therefore, the Congress Avenue and downtown sites can be
considered approximately equal in terms of their short range
capital cost implication.
Mid Ranqe Cost Differentials
The mid range cost differential calculation is based on two
assumptions:
First, that funds will be made available for the provision of
the 18,000 s.f. of special activity rooms that the present
budget cannot accomodate. In the downtown site this space will
be accomodated by renovating the large school building and at
the Congress Avenue site the large multi-purpose building will
be expanded with new construction.
Second, the condominiums on S.E. 1st Street will be acquired to
expand available parking.
The cost to renovate 18,000 square feet in the school building
is estimated to be approximately $30/s.f. less than the cost of
expanding the multi-purpose building at the Congress Avenue
site. This produces a savings of approximately $540,000. The
cost to acquire and demolish the 14 condominium units on S.E.
1st Street is estimated to total $650,000. Thus, on balance
costs in mid range, under the assumptions herein described, are
approximately $110,000 higher for the downtown site. However,
again this cost differential is considered to be small
relative to the total investments involved.
Lonq Term Cost Differentials
The only long term cost differential worthy of discussion is
that associated with jointly utilizing parking required by the
multi-purpose building. At the downtown site as expanding city
buildings create new demands for parking, this joint utilization
becomes increasingly valuable as scarce land resources require a
conversion to expensive structured parking. However, at the
Congress Avenue site the large number of parking spaces required
* 10,000 s.f. @ $7.00/s.f. for 18 months plus $5,000 allowance
for leasehold improvements.
6
to meet demands associated with special performance events will
continue to be largely underutilized during daytime/weekday off-
peak periods. Thus, the greater joint utilization of
increasingly expensive parking facilities at the downtown
location would give this site an important long range cost
advantage.
Summary:
Short range cost advantage:
Mid range cost advantage
Long range cost advantage
Downtown site (using on-street
parking)
Congress Avenue site
Downtown site
B. Operations/Loqistic Considerations
operation and logistic considerations represent one set of
criteria for which the Congress Avenue site has certain clear
short term advantages. Because the multi-purpose facility at
the downtown site displaces the existing civic Center, staff
will be burdened with the need to locate appropriate temporary
space, negotitate a lease and relocate staff and facilities.
Upon completion of the multi-purpose facility (and/or the school
renovation) these facilities and staff would again be relocated.
During this process users and on-going programs would also be
expected to experience some disruption. Similarly, because the
civic Center would need to be vacated, demolished and cleared,
the construction process is lengthened and complicated.
Other complicating factors include the need to obtain an
agreement with the school board to utilize their parking in the
short range, and in the mid range the city must wait for the
transfer of school property in order to provide for special
purpose activity rooms. Also in the short or mid range the City
must begin the process of acquiring the 14 condominiums on S.E.
1st Street. This process will not only consume considerable
staff time, but also raises the possibility of litigation and
resulting delays and legal fees. One final negative factor
associated with the downtown site is the more complicated
construction logistics on a small site with limited areas
available for storage of materials and equipment.
These disadvantages of the downtown site, however, are only
related to the initial development process. After the problems
associated with the school, condominiums and the existing civic
center are resolved in the short and mid range, the
consolidation of staff and parking at the downtown site could
have certain operational advantages.
c. Neiqhborhood (Traffic) Impacts
Regardless of where the multipurpose facility is located, mid
and long range traffic impacts are limited to short-term
congested conditions associated with turning movements onto
Congress Avenue and Seacrest/Boynton Beach Boulevard following
7
major events. Both sites will increase traffic volumes
on Congress Avenue/Seacrest Boulevard, however, peak traffic
impacts would occur after volumes drop on surrounding streets,
and would be of short duration. In the short range, if the
City relies on on-street parking to obtain the required 500
spaces, periodic neighborhood through-traffic impacts may occur.
Although in the short range, neighborhood impacts may slightly
favor the Congress Avenue site, if on-street parking is used, in
the long range the advantage shifts to the downtown site.
Because of.the age and condition of residential structures in
the vicinity of the downtown site long range revitalization,
redevelopment and perhaps intensification will likely be
required. Proximity to major civic activities and amenities is
likely to be an important advantage and catalyst for such
re-investment surrounding the downtown site.
D. Service/Accessibility
Because both sites exist on or near major highway arterials only
several miles apart, vehicular accessibility to both sites is
considered very nearly identical. However, there are certain
differences associated with the likely levels of service
associated with each.
- Because the downtown site historically has accomodated
the city Hall, Library, Madsen Center, civic Center
and Tennis Center, many residents are well accustomed
to traveling to the downtown site for civic activities.
Travel patterns are not as well developed for the
Congress Avenue site.
- Because of the urban development patterns surrounding
the downtown site this location affords "walk to"
opportunities which are not likely to exist at the
Congress Avenue site.
- Larger proportions of moderate income households
having greater reliance on public sector recreation
opportunities and on walk-to facilities reside east
of I-95, nearer to the downtown site.
- As westerly population growth continues to occur in
the long range, many more residents will reside west
of I-95 than reside to the east. As build-out occurs,
the Congress Avenue site may be somewhat better
positioned to serve this growth.
Although both sites would provide entirely satisfactory levels
of accessibility to the City as a whole, on balance the downtown
site is considered more advantageous, at least in the short and
mid range. However, in the long range this advantage may shift
to the Congress Avenue as new residential development occurs at
a considerable distance from downtown.
8
E. Economic Impacts
Because of the size and type of use proposed for the
mUlti-purpose building there will be no direct positive economic
impacts, e.g. the multi-purpose building will not create a
"market" sufficient to support new development. Similarly,
because traffic impacts on adjacent neighborhoods are somewhat
small, the multi-purpose building should not exert any
significant negative influence on nearby property values at
either site. Therefore, in the short and mid range few, if any,
economic impacts should occur.
However, in the long range the multi-purpose building in
downtown could have some positive, indirect benefits.
Specifically, as downtown redevelopment becomes successful,
bringing new retail shops and restaurants in the vicinity of
Ocean Avenue, the users of the multi-purpose building could
become an important source of market support. Because of the
short walking distance from the multi-purpose facility along
Ocean Avenue to a revitalized historic downtown there exists an
opportunity for patrons ta stroll to nearby shops and
restaurants. Thus the multi-purpose facility could become the
"anchor" for a higher level of pedestrian activity on Ocean
Avenue in support of new commercial ventures.
Because opportunities for "walk to" commercial development do
not exist in the vicinity of the Congress Avenue, such positive
economic benefits would not be realized.
F. Policies/Intanqibles
The decision on the location of the mUlti-purpose facility ought
not to be made solely on the basis of the factors of cost and
efficiency described above. This is particulary true where the
application of such factors does not result in a clear
preference. At least as important are a number of intangible
values and implicit policies associated with the site decision.
A Committment to Downtown vs. A Committment to the Suburbs
In adopting a downtown redevelopment plan and in creating a
Community Redevelopment Agency, the City of Boynton Beach has
made an explicit committment to encourage downtown
revitalization. From this demonstrated committment it could be
construed that the City has an obligation to see to it that its
own resources are devoted to the creation of a strong center.
specifically, this could mean that all civic facilities which
serve the entire population should be located in its center so
as to assist in the creation of a "critical mass" of downtown
activity which does not presently exist. A decision to locate
the City's most important civic and cultural facility outside
downtown defeats such a policy.
9
Imaqe
As depicted in Figure 2 the multi-purpose facility at the
Congress Avenue site is located in a spacious park-like setting.
Like the tennis center, the appropriate design theme would
reflect the image of modern, well planned suburban development.
This spacious modern image contrasts with the rather cramped and
fragmented conditions which would exist at the downtown site in
the short range. However, in the mid and long range the
downtown site could emerge an as integrated urban setting, a
central civ.ic gathering spot with a strong sense of place and a
high level of day and nighttime pedestrian activity. similary,
with the restoration and re-use of the historic school
buildings, the downtown civic space could be designed to reflect
the best of old and new Boynton. The opportunity to create a
true civic space in which there exists a strong sense of history
and a critical mass of activity does not exist at the Congress
Avenue site.
Hiqhest and Best Use
with the expanded library and other recreational activities to
the south and with the school and government offices to the
north, civic/governmental and cultural activities will remain
the highest and best use of the civic center block.
Thus, if the multi-purpose facility were to be located at
Congress Avenue, the existing civic Center could become
increasingly obsolete neighborhood-oriented facility.
Conversely, if the multi-purpose building were located downtown,
the Congress Avenue site could be utilized for a variety of
active recreation uses including ballfields and perhaps other
income-generating activities appropriate for a district park.
Thus, placing the multi-purpose building downtown could allow
the Congress Avenue site to become a true park, for which the
property was originally dedicated.
10
7. S1~ry/COnc1usions
As depicted in the chart below, the relative advantages and
disadvantages favor Congress Avenue in the short range and
downtown in the longer range.
Summary of Relative Advantaqes
Short Ranqe Mid Ranqe Lonq Ranqe
Cost Neutral* Congress Ave Downtown
Operations/
Logistics Congress Ave Congress Ave Downtown
Neighborhood
Impact Congress Ave * Neutral Downtown
Service/
Accessibility Downtown Downtown Neutral
Economic
Impact Neutral Neutral Downtown
POlicies/
Intangibles Congress Ave Downtown Downtown
* Assumes use of on-street parking and associated cost savings
and traffic impacts associated with the downtown site.
1 1
,'---
Ibvntcn Beach Recrnaticnal Facilitv
Traffic Generaticn
rail v: 327 parki..rq spaces x 3.1 trips per space = 1,014 vehicle trips/day
(CaIpares with traffic generation based upon intividual daily uses
of 1,000 trips per day)
Peak Period of Facilitv (1:00 - 2:00 p.m.)
11.3% x 1,014 = 115 vehiclesjhcur
(~~ upon observations on S.W. 2rrl Avenue adjacent to library am
tennis courts)
Peak Hour of Roadwavs (4:30 - 5:30 o.m.l
8.0% x 1,014 = 81 vehicle tripsjhour
Special Event (Even.i.rgs am Weekends generally)
500 cars (1500 people) x 2 trips per car = 1,000 vehicle trips
Peak Period Arrival: 7:00 - 8:00 p.m. = 500 vehicle trips
Peak Period Departure: 10:00 - 11:00 p.m. = 500 vehicle trips
~ site Traffic Distr:i.bItion/Assicmment
u.s. 1 North - 6%
Seacrest North - 8%
I -95jBoynton Beam Boulevard West - 44%
OCean Avenue East - 10%
U.s. 1 South - 5%
Seacrest South - 25%
Comress Avenue site Traffic DistribJtion/Assicmment
Cargress North - 90%
Cargress South - 10%
498000. j sl
-1-
- --- _._------..~-=--'
--- -~--- --------------- -~---,- --, - -.-_._----- ---------------------------
Traffic T~ (Two-way Hourly Volumes)
~ site 1-2 P.M. 4:30-5:30 P.M. 7-8 P.M. 10-11 P.M.
U.S. 1 North 7 5 30 30
Seacrest North of B.B. Blvd. 9 6 40 40
Seacrest Scuth of B.B. Blvd. 60 42 260 260
Seacrest Sc:uth of s. w. 2m 29 20 125 125
Boynton Beach Blvd West of
Seacrest 51 36 220 220
U.S. 1 Sa.lth 6 4 25 25
Ocean AVeIUlB East 12 8 50 50
Cor~u::ess Avenue site
~ North 104 73 450 450
~ Scuth 11 8 50 50
Traffic T~ A~."..tt
Dc::Mnt.own site:
1) Normal daily use inpacts are relatively small (60 vehicles per hour or
less) which coupled with IIIlltiple directions for access in:licates no
prc:blems.
2) Special event peaks occur after traffic volumes drq;> dramatically on
surrc:un:i.iIg streets. Iblice will prc:bably be needed for traffic
UJul...1.ul on Seacrest adjacent to site for special events.
Cbn::JreSS Site:
1) Normal daily use inpacts are relatively small (104 vehicles per hour or
less) which coupled with 4-lane capacity on Cbn::JreSS Avenue does rrt
present a prcblem.
2) Special event peaks occur after traffic volumes drq;> dramatically on
Colgress Avenue. Iblice u:'Ull...1.ul or traffic signal control will
prc:bably be needed at Col'ig:(ess Averue access for special events.
498000.jsl
-2-
PaI:idrn IBnarrl
Normal Daily Usage: 60,000 sq. ft. x 4 spaces/1,000 sq. ft. = 240 spaces
Special Event: 1,500 peq>le at 3 peq:>le per space = 500 spaces
Parki.rg SUWly: 327 off-street spaces for no:rmal daily use
500 off-street spaces for special events
200 on-street arrl _church off-street spaces potentially
available for special events within 2 bloc:ks of the site.
498000.jsl
-3-
A P PLlilllX
ECONOMIC IMPACT EVALUATION
Evaluation of possible alternative sites for the proposed
Multi-Purpose Recreational Facility in Boynton Beach included
cons ider at ion of potent i al economic impacts f rom the development.
The focus of Laventhol & Horwath's research and analysis was
directed towards the determination of possible impacts on the value
of residential properties adjacent to and surrounding the subject
sites.
Through
a
program
involving
limited
direct
research,
evaluation of the firm's. internal base of information on public
facilities and associated economic impacts and worksessions with
other members of the consulting team, Laventhol & Horwath concludes
the following:
Residential property values adjacent to
and/or near the subject sites are not likely
to be impacted positively or negatively,
based on the scope of the facility proposed,
the positioning of the alternative sites
(downtown ad Congress Avenue) and the nature
and frequency of Programs/activities
envisioned for the proposed facility.
Key factors supporting the foregoing conclusion include:
The . variety and timing of activities
programmed for the proposed facility do not
result in sufficient potential direct market
support for private spin-off development
adjacent to or surrounding the property.
..
-2-
In the case of both sites, there is no
substantive change in the fundamental land-
use which might otherwise impact existing
uses and/or development opportunities and
constraints on adjacent properties. For
example, existing and probable future use of
the identified downtown site is public in
nature with or without the proposed facility.
Although there are no identifiable economic impacts noted
which distinguish either of the alternative sites in the near-term,
long-term considerations could favor the downtown site from an
economic development standpoint.
While the development of the
proposed multi-purpose recreational facility does not represent a
free-standing base of support for spin-off development, it may in
combination with other development initiatives contribute to the
potential revitalization of downtown Boynton Beach.
The proposed
facility complements the various administrative and other government
functions in the downtown complex and could enhance the potential
for this complex to serve as both a catalyst and an anchor for
downtown development in the long-term.
REVISED SITE CONCEPTS
"-1
'; Ii.,' .
(7 C"
I .
'rL '. '; J\ '1 { V.. .. . <-
.~ U '
/:1-<. u iLt I;, ~ i~
, /J
/I".~... '.,' :/."~'" '_(I
L'/~J/T"'J t ;,..--.....1- .
? i~/i<j d. )< ~/~~.
YhtJA. '- J A,,'.ny>IJ'
/
WRT
BOYBTOIf BEACH MULTI: -PURPOSE BUILDING
Figures 1 and 2 depict conceptual short-range and mid-range
site plans for the development of the multi-purpose building as
part of the downtown governmental/civic complex. Both concepts
depict the multi-purpose building on the site presently occupied
by the civic Center on the block bounded by Ocean Avenue,
Seacrest Boulevard, S.E. 1st Avenue and S.E. 1st street.
Consideration has been given to the possibility of retaining the
existing civic Center. However, this option was determined to
be impractical and not cost-effective.
In addition, consideration has been given to the possibility of
constructing the multi-purpose building on more than one level.
Because only spaces other than the large hall are capable of
being "stacked", this option would produce a small net reduction
in the building "footprint". The possibility of raising the
entire building over a level of parking would result in
increased construction costs greater than a nearby free-standing
parking garage and therefore, is not considered advantageous.
a. Short Ranqe Concept
Figure I depcits a first phase of the development of the
multi-purpose building and adjacent properties. This concept
requires the demolition of the existing civic Center, the
condominium units at S.E. 1st street and the existing Madsen
Center, tennis courts and related parking south of S.E. 1st
Avenue. All existing facilities and operation of the school are
presumed to remain.
The 56,000 square foot multi-purpose building is located
mid-block between Seacrest Boulevard and S..E. 1st street with a
main entrance facing a landscaped plaza/drop-off area on Ocean
Avenue. To the east and west of the building are new parking
lots on the remainder of the Civic Center and condominium sites
providing a total of some 223 spaces. To the south a new
parking lot on the Madsen Center site provides 90 spaces located
in convenient proximity to the library. The previously planned
library parking lots have been consolidated and expanded from 58
spaces to 80 spaces. Fifty of these spaces are presumed to be
available to serve the multipurpose building. other changes
made to the library site include a simplification of the
driveway configuration and an expanded landscaped area at the
entrance. Thus, between Ocean Avenue and S.E. 2nd Avenue new
parking totaling some 363 spaces has been provided to serve the
multipurpose building. North of Ocean Avenue the existing east
lot (60 spaces), west lot (23 spaces) and 90 spaces in the new
WRT
parking garage are presumed to be available to meet the needs of
the multi-purpose building. Thus, combined with the new parking
lots south of Ocean Avenue, a total of 536 City owned,
off-street spaces will be available. Further, if the existing
46 school parking spaces were assumed to be available to meet
peak demands, the total available parking increases to 582
spaces. However, the City need not rely on such joint use of
the school parking, nor does the City need to rely on on-street
parking.
Immediately to the south of the multi-purpose building is a
mini-park designed to meet local recreation needs and provide a
"soft edge" to the adjacent neighborhood. The centerpiece of
the park is a north-south pedestrian mall located at mid-bloCk,
on axis with the multipurpose building. The north end of the
mall ends with a small plaza extending across S.E. 1st Avenue
with special pavers to slow vehicular traffic. The south end of
the mall also ends in a small plaza which functions as the
"gateway" to the civic area from the neighborhood and also
provides seating areas for parents supervising the adjacent
community playground. Further east of the playground are two
replacement tennis courts and a landscaped area at the corner of
S.E. 1st street and S.E. 2nd Avenue.
b. Mid-Ranqe Concept
The mid-range concept is assumed to occur at such time that the
school properties are transferred to the City. As depicted in
Figure 2, the large school is refurbished to house special
activities which the present multi-purpose building budget
cannot accommodate. The smaller historic school building is
shown transformed as a museum as currently proposed. Both
structures are located in an extensively landscaped park-like
setting which becomes a central amenity and theme for the entire
civic/governmental complex. The existing east lot is
reconfigured to increase parking from 60 to 84 spaces.
Similarly, the west lot is expanded from 23 spaces to 84 spaces.
However, the existing 46 space school lot behind the large
school is eliminated and replaced with landscaping to enhance
the grounds of the school buildings and to provide an improved
"green edge" to the City administrative complex to the north.
These parking alterations increase the total supply to 621
spaces available to meet the needs of the multi-purpose building
and the renovated school buildings.
c. Lonq Ranqe Concept
The City of Boynton Beach has recently completed a long range
concept for its governmental/civic complex which did not include
consideration of the multi-purpose facility. Therefore, it is
WRT
necessary to consider the consequences of locating the multi-
purpose facility here and the probable need for incremental
expansion of government facilities into the long term future.
A possible "buildout" condition could accommodate two new City
buildings facing Seacrest Boulevard with facades continuous with
and footprints similar to the existing engineering/planning
building. It can reasonably be assumed that increased parking
demand and land values will require that long range parking be
provided in multi-level garages. Two new parking structures
could extend southward from the garage presently under
construction to S.E. 1st Avenue. Another important long range
consideration relates to the potential for the multipurpose
building and other civic functions to act as an eastern "anchor"
of a revitalized downtown, linked by a pedestrianized Ocean
Avenue mall.
l
J
l
r
'-1
1
j)
I
I
i
J
l
I
..-', r-
. I ,
--- , I
eo '~"'CII I I
...V...IL....LI I
- ~]~JJ L_
,
,-
--
S.E. 2ND AVENUE
~ - -~_..-~~C=....1 rr-
~LllD
WRf WallaceROOerts&Todd 1--50'-0- c.D
..-- . L--......-- . ~.........................
...__._.e.._.._._.. BOYNTON BEACH '
MULTIPURPOSE CENTER SITE CONCEPT -PLAN
DOWNTOWN SITE - SHORT RANGE FIGURE t
.J
-3
1
I
I
i
J
l
lL--__ .---~J lL-
c:=--~ BOYNTON BEACH BOULEVARD ~
_.~~ I-
I I
I I
10 .~...C!, ,
.......Il....l I
! J
---.I L__
r-
:1 I
" I
1 '
j I
L._
J
l
.
ri
I
I
I
: oL_
!-
I
i
I
i
lb~
r=
. [l...f1EB
"tATTTr 1--50'-0-
VV ~ WallaceRobens&Todd
____ 4 "-~ . u.-...,_____~
.__._.c.._0l~"'_""" BOYNTON BEACH
MULTIPURPOSE CENTER SITE CONCEPT PLAN
DOWNTOWN SITE-MID RANGE FIGURE 2
S.E. 2ND A VENUE
.. .ACI AV.u..A&.I'
.:'
"
,,"h' i':-O '
. " " l' I' .
1"., . , .: . _.'. 'i:' ,~~~ :
, ".".,.,:;;.. , . '. .
'Hi. ~,...________"",._..,_____ _._....,,.._\
~r. .... . . '-. .. ': ',.' .i.; I' .' "
t. ...,........,......"":../'......~~..,........,.....~,.....,,..,..,........,""''''., I
~ ,.... '. I J
~ ~ ; I. :'j
.t~, - . - ~.... f
. t t ; I "
,. . HeW ..CONCIllTl "OIWA~K
t 1 i (.: :. /1
;., -, I::
,,".. i i ",
rill 1 ~.'" . .l
... "., ". 'I
Ie I . I . ~ "IW.. CONC"lTI ..'
i .~. " I 1I01WA~1l .---L- . I
~;~ ~I I ... ~~;.o""1.1t11" "I
.:, .;~<' , :
~ . ~~~lW ''''''110 tll"",C M"OW' In"'l I
.. 1'-"\;' .i
~." . .. f:
-/':..... ,'I
\.' II
.~~'.~. '.' "~'G" . I
?Tt,-~,-~~-;~\;1 )1
. ,~.:J5.~"'----";\",,,; /
. .~.. "LIGN
.~
, -
-:.
~.. ,
.,
,
l..r~ I
/:;1 i5 . j
:1 ~ I
\,~:~.i
II I I
I I
I '
: '\
NlW 4' CCIHClIlTl
"OIWA~K
~WJVM rt.'lIlom
~
," "
~~.
~
~
I
~
I
I
I'
'I
I
I
I
I
I
-,
I
II
ruM~~~~~lnoATIOIl :I
.1
I
NIW .. CONC;llITl .1
SIOIWA~K'.~ ,.:
..1
"
,
"
~
i
"
~
, '
{....
:~,. ~----.., r--------, I
":, 'I ...
....... ,__)1 IIlWllI"VEWA' ... I
_ CU"I I GUTTE"
01
~.
. . '.' TtCW ."_WAUl
<"~ \IIlWl.,~~.,i.,. ':~T. /,!Rr~~" 'CO:!Mnt~t~INT
.:.. \. '.:1. ' /. / .
-W:JLj
Wi
I I
IcfoI1oo~
jNlW .. CUIlI Ii OUTTU
7 "
~~
v
rif.' I I ~ ~ r'"T-;-,...;~-,-,..,.-.'
.t'., r...... , , , 1 I I I
IlCW IIULTI~II'OIl . I I I I 1 ,
, ~' : '''C'L.'' I:
~<;~ !!t~:irNLml' -~ - rlllj'_LUj'J7
i 1 '-NlWOICOIIATIVI - ~ Y@: 'ftt-----------
I , ... 'IOIWAl.KIIlI .jJ J c1" ~. .. _ _ .
I I ... .... OIIAw'7"." .,...~ . , rAo..... ~,..-~
17 - ~~ .. .... ,,:....
I, ~ Y
: ....H.o~~ \9dbd0l1' / ..
I "'-'\.(j), ~. ~ '. III / I A :.;;;.,~ .r;, &.,' ,.".
I .I( .~CS'. . V . . ,,- 7/. ,Of ~'\ ...,
I v. __~...J;?~~ . I--~ /' 0 () () ~ n. n "Y"LYIlI~ 'l.~ V7/
t"~'i: ~ L:;, . 2 /
I i\. LL''''/M''~~ Lb 0 ( ~, ,. I ~.. ....C.....~, ,.... actl..+-~"f ~ '&-:-.5"00'00-
I ,1Jll: ~ -.",.. 0 Q.... 'T I po .%.11 ~ J I.~
~: "..I . 0 0 -:... ~ I~ u' \ \~ 1 ~ ~
.. "~I I ~".L"> · . t 10 'I-~'\ ;.
j! ,lV'] H:f }~.. -: ,,- , ~..,;, , /- , ' //
-;- \. r;;;. . ~ ua,": .....::- ... . SJlll.Ct1..J &... 'h ;:'
I inT 'Ol~~). 1-' 1"1111- I,m,''',. '~I_I \\i l ,/.'". .>./.~,~
::~,~~--.~~;>~~;.n---.d) ';;> ~. .~ ~ ~. ' >Jr~ ~ t. J;l1':~~==~_=====~
:, _:,;. '" ~ i1.t... ~......... ~ '"' ~:,~ :T:,:"O IT"", 17 '!r~W..J:,C~ r l-HEWAII'HA~TIC COt<~::W,::r.'::A~.-
III O[TAlL - "IW HANOICA' 'I I.. -\ ..l""",_NlW'.CUIlI Ii GUTTI" t'
" . "AN! ITT"CAU . '!ACRES". IOUUVARD .~ _
.
~ ! .-I~ ~ii}, :j II (: I e L.
I
.~t-;."" . r . ft' ,... i. ...."u... "r ~ :....-. II
'~11...~ ..,": I U, .'..L..! -
...'? , i~ n' ~ .-:;0-
,tf .~r:... ..' -r . :t-:;"
~ I ~ '~'i':.' ' "' I ~ 1_ ~ _
,/ .Lf I-S: .~~~.,'.;~ft.i..;...- d' ..J ~ . :~... .......... .",
~ ~~~ ~.iit~r;k1.1I1111 ~h1.IIIII1! r--.~
I '\'1 '\"~': . . ,.
'1 ~
h'~.
I' .: '0' .... . i.l ~.
)' V ;61~~ ~
. I ,,; >tS:. ~ i,i)
.~~. ~ 1/
~. '.,
A~ ~ I'" J~
~
PUTU" ~ :' ~r
.U~~ >'N< .~'f," ... ,
~ .;'1.... ,.
I'" ,. 1IIl' ' ~,~
i/ ~
-
1,:-'
I hi"i
II!!
~-.
lOUt lilT
"LOt G
1\1
II.T1 ~;L-
rJ. _"~'~
/'~ I
[1"1..
, t;j -)
",
,.,
..
I
--:c:.
/'
.....,
"" I-,.) " _
10"00'00"_ f---.-
r r
".SO
i..
IIDI
" _ 1"_'''' "'A"O.- _m " 11_ L.
__ MD _lAm, """'._.
I. III _.. 111-1 .. L_..
-.1.-1:....
'.
~F:~
.
,
I
NIW ." CO_ITI
"OIWA~
r - - - - - -'- - - - ..
II
I
,
v,
I
I
"
II
.1
I
I
HeW .. COOICIIITI __
NIW.. COHCIllTI ~
I
I
"
;~ 11
. -@)!/
III II
,i ,
~ I
~ I
N[W .. C\lIlI Ii IIUTTIII
~?t'r"~J:llDlt
0'_
IIlW r CllNCIlITl .DlWAU
LO~A TION MAP
MULTI-PURPOSE BUILDING
..... ..
'f!
.~
~.
I.::~"-""-"
~.' .
". .
.' .
. ~ : .
i::mE'......
.. ,
. ,I .
.
':' ; ~ '''''-
. '
~
i
t
u
l
I
.~
.
o
1/8
1/4
MILES
'0 .400. '800
r:;".
.~- ---.-~_.
~~ ,~:-
--~:~:::-.:~
",I',
-.;~r;..~~;k.:~J:;::-:-..... "