Loading...
CORRESPONDENCE ! ~ JO:T ~ ;~:~-~ ~ ~_ J~ , L..-.-, ,- - ,: ,,_-:'::---3 l;L.'\,'~' -;"~J ~,l-iU ZONiNG DE-PI. ENINGEERING Memo # 97~201HH To: Sue Kruse, Tambri Heyden, Pete Mazzella CC: Al Newbold From: Ken Hall Date: 1011 0/97 Re: Recorded Plat Copy - Boynton Commons Replat ATTACHED IS YOUR COpy OF THE RECORDED PLAT . , 1 ENGINEERING MEMO #97-131 \D)~@~6W~~ lIU JUL 2 9 1991 ~ NING AND ONING DEPT. DATE: July 25, 1997 TO: SUE KRUSE, CITY CLERK PETER MAZZELLA, ASST. TO DIR. T AMBRI HEYDEN, PLAN. DIR. MIKE HAAG, PERMIT ADMINISTRATOR THRU: AL NEWBOLD, ACf. DEV. D1R. ~ FROM: KEN HALL, PLAN CHKlINSP/TECH~/ . SEBASTIAN PUDA, ENG. INSP. f/' SUBJECT: RECORDED PLATS-- BOYNTON COMMONS, P.C.D., CEDAR RIDGE ESTATES, P.U.D., AND WOOLBRIGHT 100. j HERE ARE COPIES OF THE SUBJECT PLATS FOR YOUR RECORDS. KRH plats,rwo , . , ,- , - i. Sr.f~ P L -, I V" ,,,.....[ \ I,. DEPARTMENT OF DEVELOPMENT BUILDING DIVISION MEMORANDUM NO. 00-200 TO: Diane Reese, Finance Director /. / ~f.~ Michael E. Haag, Building Code Administrator .. FROM: RE: . RETURN OF LANDSCAPE CASH BOND - TON COMMONS DATE: July 6, 2000 On November 16, 1998, we sent you a memo (copy attached) regarding a cash bond of $1 0,654.23 for the completion of the landscaping and irrigation at an off-site drainage area that serves the Boynton Commons Shopping Center. The owner of the off-site land is now Wal*Mart. The responsibility for the installation of the landscaping and irrigation is now part of the required improvements for the Wal*Mart project. The Planning & Zoning Division has approved the improvements and the permit has been issued to Wal*Mart to install the landscaping and irrigation. The release of this bond was approved by the City Commission on July 5, 2000. Therefore, please return the bond to Boynton Beach Development Associates, L.P. Attached is a Direct Payment Requisition. DJ:bg Attachments XC: Boynton Beach Development Assoc., L.P., 1435 Crossways Blvd., Ste. 300, Chesapeake, VA 23320 Michael Schroeder, One Boca Place, Suite 3I9-Atrium, 2255 Glades Rd., Boca Raton, FL 33431-7383 Mike Rumpf, Planning & Zoning Director Permit files #97-4259 & 00-0286 \\CH\MArN\SHRDA T A \Development\Building-6870\Documents\Memos in Word\Retum of Cash Bond-Boynton Commons,doc DIRECT PAYMENT REQUISITION PLEASE MAIL CHECK DIRECTLY Please issue a check in the amount of $ 10,654.23 To: Boynton Beach Development Associates, L.P. 1435 Crossways Blvd., Suite 300 Chesapeake, VA 23320 For: Retu"rn of cash bond for the landscaping & irrigation at Boynton Commons. Approved by City Commission on 7/5/00. Requested by Department of Development Date July 6, 2000 Approvals: Dept. Head fi~t' ~ :-;elEoHaag Finance DePt~ ) City Manager 1: o...17/"J 1'1"-"1" ~.,]IJ.)p 11. FUND DEPT BASIC ELE OBJ AMOUNT 001 0000 220 99 00 10,654.23 10,654.23 bg l:\SHRDA T A\Development\Building-6870\Documents\121 Fonns\Cash Bond Return-Boynton Commons.doc CITY OF BOYNTON BEACH AGENDA ITEM REQUEST FORM Rt:quested City Commission Datt: FlOal Form '"Iust be Turned Requested City Commission Date Final Form Must be Tumt:d '"Ieeting Dates in to City Clerk's Oftice MeetinlZ Dates in to City Clerk's Office 0 March 21, 2000 March 8, 2000 (5:00 p,m.) 0 May 16, 2000 May 3, 2000 (5:00 p.m.) 0 April ~. 2000 March 22. 2000 (5:00 p,m.) 0 June 6, 2000 May 17,2000 (5:00 p.m.) 0 Apri I 18, 2000 April 5. 2000 (5:00 p.rn,) 0 June 20, 2000 June 7. 2000 (5:00 p.m.) 0 '"Iay 2, 2000 April \ 9.2000 (5:00 p,m.') cgj July 5. 2000 June 21, 2000 (5:00 p.m.) '- NATURE OF AGENDA ITEM o Administrative cgj Consent Agenda o Public Hearing o Bids o Announcement o Development Plans o New Business o Legal o u nfmished Business o Presentation RECOM::\-IENDA nON: To release cash bond for $ W,654.23 to Boynton Beach Development Associates, L.P. EXPL.;\...,,"ATION: On :'oiovember 16, 1998, the Building Division sent to the Finance Department a cash bond for SID, 654.23, which was for the completion of landscaping and irrigation that was part of the off-site improvements associated with the Boynton Commons Shopping Center project. The owner of the off-site land is now Wal*:Ylart. The responsibility for the installation of the landscaping and irrigation is now part of the required improvements for the Wal*Mart project. The Planning & Zoning Division has approved the improvements and the permit has been issued to Wal*Mart to install the landscaping and irrigation. PROGR-\...'1 IMPACT: None FISCAL nIPACT: None AL TER,,"A TlVES: None ~M' City Manager's Signature Development Department Name City Attorney I Finance,' Human Resources Attachment/copy of check XC: Permit files #97-4259 & #00-0286 J:lSHRDA T A \Development\Building Templates\Agenda - Bond Release,dot DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. BD 98-222 TO: Diane Reese, Finance Director ~ ~.t.1 Michael E. Haag, Building Code Permit Administrator \ Bulent 1. Kastarlak, Director ofDevelopment3~ tJ November 16, 1998 FROM: THRU: DATE: SUBJECT: LAN~~CAPE BOND - BOYNTON COM:MONS Please place the attached $10,654.23 check (#0716), from the Boynton Beach Development Associates, L. P., in the appropriate account for monies that have been accepted for a landscape bond. The bond money is being given to the City in lieu of the applicant installing required landscaping and irrigation at an off-site drainage area that serves the Boynton Commons Shopping Center. The shopping center is located at 333 North Congress Avenue. The off-site drainage area is located approximately 538 feet west of Winchester Park Boulevard and 260 feet south of Old Boynton Road. The landscaping that is required to be installed within and around the drainage area is depicted on sheet L-6 of landscape plans for landscape permit number 97-4259. The backup information for the amount of money that is being remitted to the City is located in the permit file. After the applicant requests and receives an approved landscape inspection and after the bond release is approved by the City Commission, the money will be returned to the Boynton Beach Development Associates, L. P. If the inspection is not approved by May 10, 1999, the City will use the bond money to hire contractors to install the required landscaping and irrigation. J.\;IEH:bg Attachment/ check XC: Boynton Beach Development Associates, L. P. 1435 Crossways Blvd., Suite 300, Chesapeake, VA 23320 Don Johnson Permit file #97-4259 J:\SHRDAT A\DevelopmentlBuilding-6870\Documents',Memos in Word\Landscape Bond. Boynton Commons.doc %e City of r.Boynton r.Beacli 100 'E. fJ3ognton. tJ3eac1i tJ3ou1e.vartl P.O. tJ3~310 tJ3oynton. tJ3eadi, !fforitfa33425-0310 City 9fafl: (561) 375-6000 !f.9lX: (561) 375-6090 't' { ~ ! ,'- '1 , 'I, ,; V " ,", " .,....,. ., 1 ' i."" (\~':f.,~ Mr. Barry L. Musselman Group Vice President SouthTrust Bank Riverfront Plaza East Tower 951 East Byrd Street, Suite 610 Richmond, Virginia 23219 RE: Boynton Commons Shopping Center, Boynton Beach, Florida Dear Mr. Musselman: This letter is a verification of the currently approved development orders for the Boynton Commons Planned Commercial Development (PCD). The site currently has a Master Plan approval for 213,650 square feet of retail shopping center. This approval was granted August 1996, with comments, as outlined in the Development Order signed by the City Attorney on August 20, 1996. The site plan for the project was approved in October 1996, by the City Commission, following the outline and square footage established by the Master Plan for the project. This site plan was approved with comments as outlined in the Development Order signed by the City Attorney on October 15, 1996. Currently, the developer has submitted to the City for plat approval. These plans are proceeding through the normal review process through the Engineering Division. Among other things, these plans are being reviewed for consistency with the currently approved site and master plans. With the site plan approval, the developer has the ability to submit for building permits for the project. These building permits, however, cannot be issued until the plat has been signed and recorded in the public records. In addition, the applicant has discussed with staff further changes to the approved site plan including a right turn out driveway onto Old Boynton Road (recently resolved) and revisions to certain tenant locations and their building footprint. These revisions can be made as a future minor site plan modification as part of the building permit review process if they fall within the attached criteria set forth in the code which defines what constitutes a minor versus a major site plan change. Very truly yours, -=-L/"--?-cfJ. dych-.J Tambri J. Heyden, AICP Planning and Zoning Director T JH:dim Attachment S:\PLANNINGISHAREOIWP\PROJECTSIBOYCOMM\PLAT\BOYNCOM, T JH ~71UrU;a's (jateway to tfu (jutfstream LAN D . Land Planning DESIGN Landscape Architecture Environmental Consultation SO UTH 561-478-8501' FAX561-478-5012. Congress Business Center' 1260 N, Congress Avenue . Suite 215. west Palm Beach. AorIda 33409 March 17, 1997 Revised March 27, 1997 Ms. Tambri Hayden Planning Director 100 Boynton Beach Boulevard Boynton Beach, Florida 33437 Dear Tambri, Several weeks ago, we had a conversation regarding the Boynton Commons PCD. Our office later received a letter from you which included the status of the approvals on the project. The developer of the project is in the process of closing on the property; but the lender, who will be financing the project, has requested that we provide them with as much information on the property as possible. Among the information needed is the status of the Master Plan and Site Plan approvals, and the ability ofthe developer to submit for building permits for the tenants on the project. When we last spoke, you were willing to provide us with a letter that could be given to the lender, providing that we forward a draft to your office of what the letter needed to contain. Attached, is the information that the lender is requesting. This narrative gives a brief overview of the status of the approvals, and what is to be completed. I respectfully request that you review the attached draft, and if acceptable, provide this letter for the purpose of the lender's closing. I understand that your time is limited, but I would appreciate it if you could complete this letter as soon as possible. I will be calling your office to arrange a time schedule for this letter to be picked up, rather than having it go through the mail system. If you have any questions regarding this request, please do not hesitate to contact me. Thank you for your cooperation on this matter. Sincerely, LAND DESIGN SOUTH Joseph D. Lelonek, Director JD L/lb II etters/tambribc.doc File247,IOa March 17, 1997 Revised March 27, 1997 Barry L. Musselman, Group Vice President SouthTrust Bank Riverfront Plaza East Tower 951 East Byrd Street, Ste. 610 Richmond, VA 23219 Re: Boynton Commons Shopping Center, Boynton Beach, Florida Dear Mr. Musselman: This letter is a verification of the currently approved development orders for the Boynton Commons Planned Commercial Development (PCD). The site currently has a Master Plan approval for 213,650 square feet of retail shopping center. This approval was granted August 1996, with comments, as outlined in the staff report. The site plan for the project was approved in October 1996, by the City Commission, following the outline and square footage established by the Master Plan for the project. This site plan was approved with comments as outlined in the staff report approved as part of this Ordinance. Currently, the developer has submitted to the City for plat and engineering plan approval. These plans are proceeding through the normal review process through the Engineering Department, with our department reviewing the documents for consistency with the currently approved site and master plans. With the site plan approval, the developer has the ability to submit for building permits on the project. These building permits, however, can not be issued until the plat has been signed and recorded in the public records. At the time the project was approved before the City Commission, an agreement was made this office to allow two minor changes to the site plan. One was the addition of the right out access with the required 100' entry throat onto Old Boynton Rd. This was reviewed by the TRC immediately following the City Commission approval. The second change was regarding a limited change to the building footprints to move Old Navy to the north set of buildings, to shift PetsMart to the east where Old Navy was, apd to revise the remaining in-line box users located west of the PetsMart store. This change ~ t~ be completed at the time of building permit by submitting revised site plans with the permit packages. Very truly yours The City of Boynton beach OFFICE OF THE DIRECTOR OF UTILITIES Utilities Department 5469 W Boynton Beach Blvd. Boynton Beach, Florida 33437 Phone (561) 375-6452 FAX: (561) 731-0065 ~~~'--."".l rn @ ~ n \vLJL, ;,; 00 MAR 18 " ~; ~ ~,,,,_-,,..,l PLIl.NNING AND ZONING DEPT. I ~.J March 17, 1997 Mr. Donald Stiller Boynton Commons Corp. 7040 W. Palmetto Park Road Boca Raton, FL 33433 RE: ~~Olnm ns - apacity Reservation Fee Dear Mr. Stiller: I! k ; h JJ /,),sp 1"10 - () (.. "-, Please accept this letter as confirmation of water and sewer capacity reservation for the following meter sizes, to serve the Boynton Commons property: Eight - 1" meters and Five - 0.75" meters (For a total of 52.60 Equivalent Residential Units, generating a capacity of 0.020 million gallons per day.) This capacity will be reserved for a period of one year from March 12, 1997, or until full capital facilities charges are paid. I trust this letter meets your needs. Any questions on this matter should be directed to Peter Mazzella of this office. incere1Z, v'e J A. Guidry Director of Utilities JAG/PVM xc: Skip Milor Tambri Heyden, Planning Director Joel Wantrnan, P.E. File America's Gateway to the Gulfstream CITY OF BOYNTON BEACH m rn@rnnw~rn1 ~ f j ~ , d illl FEB I 8 ,;. , I' I: I ' :~'!::' i i;" , ' ! 1....,. MEMORANDUM PLANNltJG AND ZONING DEPI TO: Ken Hall, Engineering Plans Inspector Mike Haag, Planning and Zoning Michael J. Pawelczyk, Assistant City Attorney 'JIll )If Boynton Coinmons Declaration of Covenants and Restrictions /!~ (~ ~~ ~-v0 plM- ~fu~ FROM: RE: DATE: February 18, 1997 Enclosed herein is a copy of the letter I received from attorney, Alan Pellingra regarding the Declaration of Easements, Restrictions and Protective Covenants for the Boynton Commons Shopping Center. Also enclosed is a black line version indicating recent changes and a clean copy, both provided to me by Mr. Pellingra. The last time I was involved with this project was to approve the draft declaration as to legal form on or about October 31, 1996. Accordingly, I am unaware of what progress has been made since then. Please review the letter and the black line version of the Declaration. I have reviewed the changes and accept them as to legal form, but I wanted to make sure you each did not have any comments as to the revised Declaration before commenting to Mr. Pellingra. Further, please address the four (4) items listed on page 2 of the Pellingra letter. I have indicated to Mr. Pellingra's office that these matters must be forwarded through your respective departments. Should you have any questions, please contact me. MJP/aa wpldevelopmentslboynton cornmonsldeclarotion memo cc: Al Newbold, Deputy Building Official (w/o encls.) Tambri Heyden Planning & Zoning Director (w/o encls.) PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 97-067 TO: AI Newbold Acting Development Director THRU: Tambri J. Heyden, AICP Planning and Zoning Director FROM: Michael E. Haag Current Planning Coordinator DATE: March 20, 1997 SUBJECT: Boynton Commons plat - 2nd review comments File No. PLAT 96-006 Please be advised of the following comments regarding the review of the fourth submittal of the above-referenced request: 1. Considering that the configuration of the site depicted on the submitted paving and drainage plans does not match the approved master plan, modify the paving & drainage drawings to show compliance with the previous development orders and the city code of ordinances including but not limited to the following: a. Chronologically number the parking spaces depicted on the plan. b. Show parking space computations indicating the number of regular and handicapped parking spaces required for no more than 213,650 square feet of gross leasable floor area using the ratio of one (1) space for each two hundred (200) square feet of gross leasable floor area. c. Show parking space computations indicating the number of regular and handicapped parking spaces provided on the site. d. Show on the plans no less than the required number of regular and handicapped parking spaces. e. Delineate with a labeled symbol the location of the nine (9) required loading zones. Also dimension the loading zones consistent with the size regulations identified in the zoning code including the required block wall screening. f. Add to the plan computations to verify that the area of the landscape islands located within the parking area meets the interior parking area landscape requirements specified in the landscape code. g. Add to the plans horizontal control dimensions that show the parking lot is designed consistent with the dimensions identified on the city standard drawings (B-90012 and 8-90013) and parking lot regulations. Also, show the location and specifications for the traffic control signs and pavement markings. h. Modify the plans to show the location of the curbing required to protect the landscaping in compliance with the code. i. Indicate on the plan with a labeled symbol the location of the site lighting and pedestrian light poles/fixtures in compliance with the code regulations. j. Delineate on the plan with a labeled symbol the location of the parking spaces that use a portion of the landscaped area as part of the parking space. Also provide a dimensioned detail drawing for