Accompanying this memo, you will find a copy of a letter
from Iraj Motazedi to Mr. Clark which requests three revisions
to the previously revised master plan. The previously requested
revisions were approved by the Planning and Zoning Board on
October 12, 1982.
PID modifications are addressed procedurally in Appendix
A, Section 7N of the Boynton Beach Code. Specifically, the
process is two-fold. First, a determination must be made by
the City Council as to the degree of the change; that is, whether
or not the change is "substantial". If the change is determined
by Council to be "substantial", a new application for PUD approval
shall be required. If the change is determined to be not of
a substantial nature, the application for modification may be
approved by the Planning and Zoning Board based on a finding that
the modifications requested are consistent with current regula-
tions and the intent and purpose of the comprehensive plan.
On Tuesday, December 28th, 1982 and Wednesday, December
29th, 1982, the Technical Review Board reviewed the changes
requested for consistency with the approved PID master plan
concepts. After review of the plans, the Board found that
the changes requested are consistent with the approved Planned
Industrial Development master plan concepts, and therefore
recommends to the City Council that a finding of no substantial
change be made. In addition, the Technical Review Board recommends
to the Planning and Zoning Board that the revised master plan
be approved as submitted.
CSA:rnpc
Attach.
CC: TRB Members
Central File
c~ (rc ~~x.
Carmen S. Annunz' to
City Planner
'*'
CENTUR~ CONSTRUCTION CORPORATION
· 89] East Palmetto Pk. Rd.. Boc.a Ralon, Florida 33432. (305) 368.9363
December 28, 1982
Mr. Thomas Clark
City Engineer
City of Boynton Beach
120 N.E. 2nd Avenue
Boynton Beach, Fla. 33435
Re: Boynton Commerce Center
Revisions to approved Master Plan
Gentlemen:
We hereby request approval for three (3) revisions to the
previously approved master plan for the subject project.
Revision #1 involves the site storm drainage system which
the South Florida Water Management District would not .
approve in its original design.
Revision #2 involves the existing 16" water main in the
NW quadrant of the property.
Revision #3 involves minor modifications to the proposed
sanitary drainage system due to the revisions to the storm.
drainage system.
Following items are submitted herewith for consideration of
these revisions:
1) Centure Construction check in the amount of $50.00 for
processing fee.
2) Conrad Schaefer Consulting Engineers, Inc. drawings
and storm drainage calculations.
Your continuing interest and assistance in this project is
appreciated.
Very truly yours,
/'
//
- /
~/ T'" .:.-
II
I _----------
Iraj A. Motazedt-------
Centure Construction Co.
IAM/jc