Loading...
REVIEW COMMENTS \ MEMORANDU1v. TO Peter Cheney City Manager DATE December 29,1982 FIL~ FROM Carmen S. Annunziato City Planner SUBnCT Master Plan Modification/ Boynton Beach Commerce Center Accompanying this memo, you will find a copy of a letter from Iraj Motazedi to Mr. Clark which requests three revisions to the previously revised master plan. The previously requested revisions were approved by the Planning and Zoning Board on October 12, 1982. PID modifications are addressed procedurally in Appendix A, Section 7N of the Boynton Beach Code. Specifically, the process is two-fold. First, a determination must be made by the City Council as to the degree of the change; that is, whether or not the change is "substantial". If the change is determined by Council to be "substantial", a new application for PUD approval shall be required. If the change is determined to be not of a substantial nature, the application for modification may be approved by the Planning and Zoning Board based on a finding that the modifications requested are consistent with current regula- tions and the intent and purpose of the comprehensive plan. On Tuesday, December 28th, 1982 and Wednesday, December 29th, 1982, the Technical Review Board reviewed the changes requested for consistency with the approved PID master plan concepts. After review of the plans, the Board found that the changes requested are consistent with the approved Planned Industrial Development master plan concepts, and therefore recommends to the City Council that a finding of no substantial change be made. In addition, the Technical Review Board recommends to the Planning and Zoning Board that the revised master plan be approved as submitted. CSA:rnpc Attach. CC: TRB Members Central File c~ (rc ~~x. Carmen S. Annunz' to City Planner '*' CENTUR~ CONSTRUCTION CORPORATION · 89] East Palmetto Pk. Rd.. Boc.a Ralon, Florida 33432. (305) 368.9363 December 28, 1982 Mr. Thomas Clark City Engineer City of Boynton Beach 120 N.E. 2nd Avenue Boynton Beach, Fla. 33435 Re: Boynton Commerce Center Revisions to approved Master Plan Gentlemen: We hereby request approval for three (3) revisions to the previously approved master plan for the subject project. Revision #1 involves the site storm drainage system which the South Florida Water Management District would not . approve in its original design. Revision #2 involves the existing 16" water main in the NW quadrant of the property. Revision #3 involves minor modifications to the proposed sanitary drainage system due to the revisions to the storm. drainage system. Following items are submitted herewith for consideration of these revisions: 1) Centure Construction check in the amount of $50.00 for processing fee. 2) Conrad Schaefer Consulting Engineers, Inc. drawings and storm drainage calculations. Your continuing interest and assistance in this project is appreciated. Very truly yours, /' // - / ~/ T'" .:.- II I _---------- Iraj A. Motazedt------- Centure Construction Co. IAM/jc Palm Beach (305) 734-3332. Broward 421.3755. Dade 949.5934. Telex 56-8655