Loading...
REVIEW COMMENTS PROJECT NAME: COOL CARE. INC. CONTACT PERSON: NAME: ALAN M. STRASSLER. R.A. 8895 NORTH MILITARY TRAIL, BLDG. D, SUITE 201 PALM BEACH GARDENS, FL 33410 PHONE: (561) 627-0336 FAX: (Q'14) h?l..-07?O TYPE OF APPLICATION: NEW SITE PLAN FILE NO: NWSP 97-008 1ST REVIEW COMMENTS DUE: 4/10/97 PUBLIC NOTICE: ADMINISTRATIVE TRC MEETING: 4/1/97 TRC MEETI NG DATE: 4/8/97 RESUBMITT AL DATE: 2ND REVIEW COMMENT DUE: LAND DEVELOPMENT SIGNS POSTED: PLANNING & DEVELOPMENT BOARD MEETING: 4/'1/97 4/'J-9/Q1 , r CITY COMMISSION MEETING: 5/6/97 BOARD OF ADJUSTMENT MEETING: A:PROJECT .FRM SITE PLAN REVIEW PROCEDURES (for reviewer) - Following submittal of 2nd review plans CooL fA fU::. F i 1 e ff I//ws(J 97'{.>7) d- Title of project {U;vir,,JJ tJrJ';:; ~l~ 1 . C Lor::. 'Il ~ kf\&t-~J 2. Obtain 2nd review plans - P&Z "control Planfl (Check for - attachments and/or for the submittal of required appeals and/or varlances) Obtain 1st review comments from all departments , O:';'\Jli<vJ . ot)~ I" ,)..) L-'1 N~ 3. Obtain amended plans checklist 'II 1"\-~4) <'i~v cP" ' ~____ l. was amended application submitted L lll. (--;,~Hn~-::r~S~. ..o' ~ lV. It...- ~ NO ~)\~ 4. 0\1- 5. tJ\~ 6. elL- "7 ! . (II or P ~\ pf 8. oiL. 9. ~"f~k 'f\~1) S'1- ____ 1). i1. (including were wall an , _ NO ;'JIA were color samples was an overlay of submitted site landscape plan plan or v. were photographs submitted Prepare Public Notice for conditional use approval request Prepare Land Development sign(s) meeting date Use 1 P&D and CC Using form memo prepare 2nd review comments Using form memo prepare staff report - Site plan report e-r- Co n&:i-t ion <'l L-.tJ.&e-r epo r t Check for Palm Beach County's response regarding traffic Prepare locator map with overlay prepc.re, where applicable, reduced copy of si te plan/landscape plan and overlay - label reduced copy wlth file number and project title 11. Ensure nL1e (9) sets of plans are available for P.5<D meeting 1::: . Prepare cover letter to the appl icant re':Jarding board and ci ty Co:nmission meeting dates and Building Depan:.ment checklist 13. Retrieve plans from P&D meeting and prepare memo to sent f:L\le (5) sets of plans to the City Manager (for Ci c.',. Commission meetlng). , /' ./' .,_./ - - I$r R C:..\/ I :::'1A..) Co,v'C; f?i;v't,v:> ol'.)L~ Co "'"'. IV\. Co ~t- ~ TECHNICAL REVIEW COMMITTEE MEMBERS ~ ~~' Kerry Willis, City Manager .L~d::~7;:~~ Carel Fisher, Acting Public Works Director 1/ (Y1tfW if q~_OUo AI Newbold, Acting Development Department Director fiJi-Db :1 f::.tJ0. Ken Hall, Department of Development ~~flJ~Jdl(J William Cavanaugh, Fire Prevention Officer / ~.q1~_<?O(~ Sgt. Marlon Harris, Police Department ___ NO______ John Wildner, Parks Superintendent .\/ ~MP 01--130 Kevin Hallahan, Forester/Environmentalist _____NO Clyde "Skip" Milar, Utilities Chief Field Insp. vi ves. Mike Haag, Planning & Zoning Department IVIA Jerzy Lewicki, Planning & Zoning Department oJ'f'1.l ,,1f;~ obt. J h Y d C.ty E . er " _____'l ~__.____ 0 n een, I nglne ? ToOu KotAS ECONOthl(.. Oev~1 ^- A4~l),~kt'oR o ,~ '!'RACK..a.riG ....JG - SI'l'E PLAN REVIEW blJBMJ.'f'l'AL P RuJ l::C'l' '1'1'1' LE : 1.l~l:iL;RIE'1'10N : 'l'Y PI::: UNl'E REC' D : COOL CARE, INC NEW SITE PLAN NEW SITE PLAN 3/24/97 AMOUNT: FILE NO.: NWSP 97-008 MAJOR SITE PLAN MODIFICATION 750.00 RECEIPT NO.: * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * TWELVE (12) SETS SUBMITTED: COLORED ELEVATIONS REC'D: (Plans shall be pre-assembled. The planning & Zoning Dept. will number each sheet of their set. The Plannillg Dept. set will be used to check the remaining sets to ensure the number and type of sheets match.) * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * APPLICATION & SUBMITTAL: DATE: ACCEPTED DENIED DATE: DATE OF LET'fER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES: 2nd SUBMIT'I'AL : DATE: ACCEPTED DENIED DATE: DATE OF SUBMITTAL ACCEPTANCE LETTER: REVIEW8R'S NAME: * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * , (Label TRC uepartments on each set of plans) DATE AND MEMO NUMBER OF MEMO SENT TO TRC TO PERFORM INITIAL REVIEW. DATE BEN'l': RETURN DATE: 4/10/97 MEMO NUMBER: 97-112 1st REVIEW COMMENTS RECEIVED PLANS MO H / DATE / IIC"-. . . ., / -.!:fL1:L/ (/' -0 ~(/~/~ , (6 tJf.N~ / ~7. - >>:f I 4/2; I C--, .OOd- ( I 4(2.., I ~ Planning Building Engineer Engineer !:'orestel- ~LANS 'Y / Y MEMO H / DA1'E I'f~ Cj1-1-S-'j>, [91 o,~ ~ V{:O I er7- ('Yo /J1h / "e" /- I~ I- I- /~ util. E'.W. E'al-ks E'ire Police Y t ~YPE OF VARIANCE(S) DATE OF MEETING: DATE OF LETT~R SENT TO APPLICANT IDENTIFY~NG TRC REVIEW COMMENTS: (Aesthetic Review App" dates of board mtgs. ~ checklist sent out w/ comments NINETY DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID: DATE 12 COMPLETE SETS OF AMENDED PLANS SUBMITTED FOR 2nd REVIEW: (Must be assembled. Reviewer shall accept amended plans & support documents) COLORBD BLBVATIONS RIC' D : MEMO SENT TO TRC TO PBRFORM 2nd RBVIEW. DA'l'E SENT: MEMO H:_ RETURN DATE: 2nd REVIEW RECOHHINDATION/DBNIAL PLANS MIMO .. / DATB /IIR/DII PLANS HEMO .. / DATB /IIR/OII Utile / / Planning / / P.W. / / BUilding / I Parks I / Engineer I / Fire / / Engineer / I Police / / Forster / I LETTER TO APPLICANT RBOARDING TRC APPROVAL/DBNIAL AND LAND DBVBLOPMBNT SIGNS PLACBD AT THB PROPBRTY DATI SBNT/SIONS INSTALLID: SCHEDULE OF BOARD MEETINGS: PAD CC/CRA DATE AP~ROVAL LETTER SENT: A: 'l'RACk.lNli. tiP PROJECT: AGENT: Phone: Fax: Applicant: Phone: Fax: COOL CARE, INC. Alan M. Strassler, R.A. 8895 North Military Trail, Bldg. D, Suite 201 Palm Beach Gardens, FL 33410 (561) 627-0336 (954) 624-0720 Michael Bianco, President, Cool Care, Inc. 601 N.W. 12th Avenue Deerfield Bch, FL 33442 (954) 698-0067 (954) 698-0207 Property Owner: Cool Care, Inc. 601 N.W. 12th Avenue Deerfield Beach, FL 33442 Phone: Fax: (954) 698-0067 (954) 698-0207 THRU: Carel Fisher, Acting Public Works Director . rn ffi (p) G-'--"-~ ffi r '\ n ~, --,,-, I C:~.. ~'Il 7 ~l APf) ,:; , " _ _.,,~,---1 "'-....--.. Pt.(l.; ~ c,~, ~.~~; /~~~D _._p:;t~l!:i2_k",('l PUBLIC WORKS DEPARTMENT MEMORANDUM #97-061 TO: Tambri Heyden, Planning & Zoning Director FROM: Larry Quinn, Sanitation Superintendent SUBJ: New Site Plan - 1 st Review - Cool Care Inc. DATE: March 2, 1997 The Public Works Department will be unable to service the dumpster location as shown on the site plan. City code number 10-26, A. requires that there be clear ingress and egress to all dumpster locations. The plans shows a loading ramp that obstructs clear ingress and I was unable to find a side view drawing of the ramp to know if we can drive across it. review, the attached plans for Phase II show no dumpster locations at all. Larry Quinn Sanitation Superintendent LQ/cr ! m ~ @.J ilIVl ~ fii1 ,~I APR I 51991 ~ MEMORANDUM Utilities # 97-093 TO: Tambri Heyden. Planning & Zoni~irector FROM: John A. Guidry, 0 ~ Director of Utilities ~ \ Date: April 14, 1997 SUBJECT: Cool Care, Inc. , New Site Plan, First Review Staff has reviewed the above referenced project and offer the following comments: I. Sanitary Sewer Service as shown has insufficient cover. 2. Palm Beach Health Department permit may be required, (Sec. 26-12). 3. Plan shall show location of all utility easements, existing and proposed, (Sec. 26.33(a)). 4. City water will not be supplied for irrigation. Please show source and location on your plans, (City Compo Plan, Policy 3C.3.4). 5. Fire hydrants shall be within 200' of all points on every commercial building, (Chapter 6, Art. IV, Sec. 16). 6. Palm trees will be the only tree species allowed within utility easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future, (Sec. 7.5-18.1) It is our recommendation that the plan proceed through the review process. If you have any questions regarding this subject, please contact Skip Milor at 375-6407 or Peter Mazzella at 375-6404. sm! cool xc: Clyde "Skip" Milor Peter Mazzella File PLANNING AND ZONING DEPT. FIRE PREVENTION DIVISION Memorandwn No. 97-228 roo l~ lili ~ ~ w rn rn APR _ 3 1997 PLANNING AND ZONING DEPt TO: Tambri Heyden, Director Planning & Zoning Department FROM: William D. Cavanaugh, FPO I Fire Department / IUr{~c~ ( DATE: April 2, 1997 SUBJECT: Cool Care, Inc. Thor Drive NWSP 97-008 The following shall apply: 1, No portion of any building shall be over 200' from a fire hydrant. 2. All turning radii shall be 50'. CC: Acting Chief Ness FPO II Campbell File TO: TAMBRI HEYDEN, PLANNING & ZONING DIRECTOR DATE: 2 APRIL 97 'i P, n ~ri R fj " I----...~'..:...-'''.. ) - n, i , , ' 'LAPR ~ 3 1997 Il!)l FILE: t.. . , -- .~ , ,........".~"..._ .Z:~i';\' :',i...; utriL CITY OF BOYNTON BEACH, FLORIDA INTER-OFFICE MEMORANDUM FROM: SUBJECT: COOL CARE,INC. 1st REVIEW-NEW SITE PLAN SGT. MARLONHARRI~ REFERENCES: 97-0021 POLICE DEPARTMENT ENCLOSURES: I have reviewed the above plans and have no comments. DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. 97-066 ,~ ~,.\ ':0 !ill R fJ nn R m r (iDl!;UVlLS APR , 0 1997 ~ PLANNING AND Z NING DEPT. April 10, 1997 TO: Tambri 1. Heyden, Planning & Zoning Director AI Newbold, Acting Director of Development ~ j. COOL CARE (PHASE 1 ONLY) - NEW SITE PLAN FROM: RE: We have reviewed subject project and have the following comments: Building Division No comments - Recommend project proceed to Planning and Development Board for approval. Engineering Division 1. Excavation and/or fill permits will be required. Chap.8, Art.I, Sec.2, pg.8-l 2. All plans submitted for specific permits shall meet the City's code requirements at time of application. These permits include, but are not limited to the following; site lighting, paving, drainage, curbing, landscaping, irrigation and traffic control devices. Permits required from agencies such as the FDOT, PBC, SFWMD, L WDD, FPL and any other permitting agency shall be included with your permit request. Chap. 1, Art.!, Sec.6, par.A, pg.1-3 3. Provide certification by Developer's Engineer that drainage plan complies with all City codes and standards. Chap.6, Art.V, Sec.5A, pg.6-7 and Chap.23, Art.IIF, pg.23-8. 4. Provide details of catch basins C-5 & C-7 on Sheet C-2 which are called out on Sheet C-l. 5. Provide traffic control markings and signage. ChapA, Sec.7B2, pgA-5 Recommendations: 1. Consider R.C.P. in lieu of C.M.P. in truck loading area. 2. Locate site lighting to eliminate shadowing due to tree canopies and/or adjust tree plantings. KH:AO/ck attachment: Building Division plans xc: Ken Hall Anthony Occhiuzzo C:\My Documents\coolcare I.doc RECREATION & PARK MEMORANDUM 97-136 ,- ;1 ~ ~ ~R~~ !~g~~ - PLM-lNING AND ZON\NGJlE~1. RE: Tambi Heyden, Planing and Zoning Director Kevin John Hallahan ,Forester / Environmentalist {)if- Cool Care, Inc.-New Site Plan_1st Review TO: FROM: DATE: April 7, 1997 The topography sheet for the above project indicates that there are four Cabbage Palms and one large Strangler Fig tree on the property.These trees should be preserved in place or relocated to a greenspace on the site. These trees should be shown on the landscape plan. [Environmental, Tree Preservation, Chpt.7.5,p.19]. The project should continue in the normal review process. kjh PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 97-112 TO: FROM: Kerry Willis, City Manager Clyde "Skip" Milor, Utilities Dept. Chief Field Insp. Carel Fisher, Acting Public Works Director John Wildner, Parks Superintendent Bill Cavanaugh, Fire Prevention Officer Sgt. Marlon Harris, Police Department AI Newbold, Acting Development Department Director Ken Hall, Department of Development Kevin Hallahan, Forester/Environmentalist Tambri J. Heyden, AICP f).a~ Planning & Zoning Director II] DATE: March 28, 1997 RE: SITE PLAN REVIEW PROCEDURES 1 st Review - New Site Plan Project Cool Care, Inc. Location Thor Drive Agent Alan M. Strassler, R.A. File No. NWSP 97-008 Find attached for your review the plans and exhibits for the above-referenced project. Site Plan Review approval for this project will be granted by the City Commission. This project has been authorized by the city manager's office to be expedited. Therefore, plans and exhibits need to be reviewed and formal written comments transmitted to the Planning and Zoning Department no later than 5:00 P.M. on April 10. 1997. The comments shall be separated into two categories. The first category comments with code sections referenced and the second category references recommendations that you believe will enhance the project. If you believe the plans are substantially complete with regards to code compliance and that your outstanding comments and/or recommendations may be addressed at time of permit review rather than requiring the applicant to prepare amended plans for a 2nd submittal indicate in your 1st review written comments that you recommend the project proceed to the Planning and Development Board and City Commission for approval. If you recommend the project move forward for approval with one review, please attach the 1st review plans to your written comments, with the exception of the Development Department which may retain the plans as the control plans for the project. Adhering to the following review guidelines will promote a comprehensive review and enable the applicant to efficiently obtain Technical Review Committee approval: 1. Use the review standards specified in Part III, Land Development Regulations, Chapter 4, Site Plan Review, Section 8 of the Code of Ordinances to review and formulate comments. 2. The documents submitted for the project were determined to be substantially complete based on the submittal requirements identified in Section 7 of the Site Page 2 Cool Care, Inc. To: TRC Members Re: Planning & Zoning Memo 97-083 Plan Review Ordinance. However, if the data provided to meet the submittal requirements is insufficient to properly evaluate and process the project based on the review standards or the documents show code deficiencies, additional data and/or corrections should be requested by the reviewer through the Planning and Zoning Department. 3. Each comment shall reference the section of the code that is incorrectly depicted on the documents. 4. Technical Review Committee member(s) shall identify in their comments when the plans depict or when the location and installation of their departmental required improvements may conflict with other departmental improvements. 5. When a TRC member finds a code deficiency that is outside of his/her review responsibility, the comment and the specific code section may be included in the review comments with the name of the appropriate TRC member that is responsible for the review specified. 6. If a TRC member finds the plans acceptable, he/she shall forward a memo, within the time frame stated above, to the Planning and Zoning Director stating that the plans are approved with no comments and with a recommendation that the project be forwarded through the approval process. All comments shall be typed, addressed and transmitted to the Director of the Planning and Zoning Department for distribution to the applicant. Please include the name and phone number of the reviewer on this memo. Jerzy Lewicki will be the Planning and Zoning Department staff member coordinating the first review of the project. The Planning and Zoning Department will send the applicant a cover letter which includes the comment(s) and directions to amend the plans to comply with the comments and the procedures for resubmission. When the Planning and Zoning Department receives the amended plans, they will distribute the plans with a cover memo to all TRC members for review and approval. T JH:bme Attachment XC: (Memo Only) Jim Ness, Acting Fire Chief Charlie Frederick, Recreation & Parks Director Marshall Gage, Police Chief John Guidry, Utilities Director Todd Kotas, Economic Development John Yeend, City Engineer Central File s Iprojects\coolcarelnwsp\ 1 strev.wpd T~~~~~"~""~~~ \ \ il ~ ~\1--;---_._--@):-------:--~~---:t~@-;- ~\ 1 i ~\ ",. 1. \ n ~~,.... ~ ~\;~ ~ I,l' ~I~ ~~\@ ~I I ",\ " ,,\ ': ~\ ~\ I \ I I -L . . .'i I I \ I InN \ i ~ l\l:~ (, _ C\ -----~ ----- ~ ~-"'~~_L.1n. .' ----~ ~ I '> " "1 J" :; ~ ~ :> 7' -1 \01'0 ~~ .,.- :--q ... ... o 0 ~ ~ @ ~fj\ ~ \J \ \~ ~~ l..: ,.... -- ---- j ~.... ~ -- -- " '--- '- 3 "<;1,-:>'" '" "<;1,1 ~ ~~;i :i ~~. F , ~'"'\O.: ~ ~~~ '5 ~__Cl Cl ~ - c; 1'\.... '" ::t: l'\ ~ ~ ,.. ~ '" ~ - ~ ~ '" ~ ~ ~~ ; ~ :< :; ; .. ~ ;a, " :l ~ 0 ;; 8 ; ~ u " ~ '" .;. a'IC"'~ I' 'JI-" ." > ;; Jl ...... e. ~ ; ~, \ i \ \ \ \ \ . , , ': \ " I , I , \ , , . , ~ , : , , . I ; , I , , , , I I I I I , I , I , , I , I I \ , , , I , , I , , , \ I I . I I I , I I i I I , , I I I , I I , , I I I I I I I I I I I , I I I I 1 I I I I I 1 I I '- ~... ~i ~a ... 3 '" ... 11-,.. ~N .... ,," I::!i II- ~ ('\ .,. :z l> r ...." ~~ ............-- .....--- --- --- --- --- --- .......-......- -.-- -. C4:'vf.L -- -- , - \ ---1 IQUl p;=i ..t"I '" ,.,'=' ..~ >- -- '--- -'- "- "--, '-- "-- ...... ... <J'o \' .... 0,. ~ '" ... N~~ P p ~t,. ~ ")10 """ 15 lS~\:l: ~ ~~~ is .. .. n o ~ " 3 1III \~)l I, ;:tv ~ ~ '-- -................a. -- '--... St4B 04RD C04 STUNt R41LW4 r . , :~ l"~ , ~ ~. .= ~ ~ ~ ... .. !!. ... i -0 :0 o -0 o (j) rn c (j) =i m -0 I )> Z f -i~ .... ..D I.~ t~ Q" ALAN STRASSLER ;I -=IIIC. ~---_.... ---. - - .--- ------ --- IJCKT INO\lS1llIAL 8UIlJlIllG FaR: ~ COOL CARE. INC. .. lllOR DR. Jl(rtNTllN IIEAOI- fUlRlIl" ..... SlTt: PLAN _ PHASE I $CAlL ,".2.0' ~ ~~---_..-- ----------...-- \ ~ _\ -. l \ l \ l . \ ... t"" \ ~.~ l O. t:: , u \ ~ , . . "l:l I \ '$ , 'fA _ _ _ l ~ ----\.. .-- l l \~ i~ _ ~,""C --. ~\ -~F\..J \i _....~ ..-.-~.--::;;::::; , ..;.....".,j.. . - . ...... .~: --.--;-~:-~ .~ -0 -g -0 o % o r- ~ o (J) C> ~ {f\ -0 r-- ~ CANAL . ~. . <t ~ \ i\ \~ \\ . at U .~ - \ \' ~ \\ \ .. '\.\ \\ \ 'i. '\ \ \ ~ 'f <;111 ~ 11 11\ , . \ \ , \.1 \ ~\\ l \\\\\\\\\\\\ \ \ \ \ \ \ \ \ \ ,\\ ~ ~ I , · . \ · · \ ., '. . . . . . , i \ .. W\~~~~~~\ \ ... ~ .- ~. -.-.---..-- ." - ,. .~_.._..__....._..~....--_..._...--. ~ ....J-"'I!:* ."" BOYNTON BEACH COOL CARE TRAF:FIC IMPACT ANALYSIS #97828. RPT March 21, 1997 Prepared By David Plum er Associates, Inc. 901 Northpoint P kway, Suite 108 West Palm Beach, L 33407 @EJ BOYNTON BEACH COOL CARE TRAFFIC IMPACT ANALYSIS INTRODUCTION It is proposed to construct 42,000 SF of industrial space in the City of Boynton Beach. The site is located on Thor Drive east of Congress Avenue (Exhibit 1). Access to the site is via a driveway connection to Thor Drive. The proposed buildout of this project is 2002. The purpose of this analysis is to determine if the proposed project is in compliance with the Traffic Performance Standards, Article 15 of the Palm Beach County Unified Land Development Code. EXISTING TRAFFIC CONDmONS Existing (1996) 24-hour average daily traffic volumes provided by the Metropolitan Planning Organization of Palm Beach County are shown on Exhibit 2 for the surrounding roadway network. Peak hour volumes, also shown on Exhibit 2, were determined by factoring the average annual daily traffic volumes by a "K" factor of9.3%. Existing roadway laneages, daily service volumes and levels of service are also shown on this exhibit. Congress Avenue is a six (6) lane divided facility throughout the study area. ROADWAY IMPROVEMENTS The FY 97-2001 Transportation Improvement Program from the MPO of Palm Beach County was reviewed to determine if any roadways within the study area are scheduled to be improved. No study area roadways are scheduled for improvements. 1 @ @EJ FUTURE BACKGROUND TRAFFIC In order to properly account for future traffic conditions, historic growth trends and committed development traffic in the area must be analyzed. Historic growth data for the last three years was examined for the surrounding area and is shown on Exhibit 3. Historic growth rates along Congress Avenue are negative, but a growth rate of I % will be applied to these links to provide a more conservative analysis. In projecting future traffic conditions, growth from committed developments in addition to historic growth needs to be examined. The major projects list published by Palm Beach County was used to identify major projects within the area. The Delray Park of Commerce was identified, but is not projected to have a 10% impact on the study area roadways within the buildout time frame of the proposed development. TRIP GENERATION Section 10.8 of the Palm Beach County Unified Land Development Code, Fair Share Road Impact Fees was reviewed to determine acceptable trip generation rates. Peak hour trip generation rates were obtained from the Institute of Transportation Engineers (ITE), Trip Generation, Fifth Edition. Daily, AM and PM peak hour trips associated with the project are shown on Exhibit 4. In determining compliance with requirements of the Traffic Performance Standards, the daily trip generation of 293 was utilized. Based on this daily trip generation, the Test 1 radius of 2 @ @El development influence is one-half mile and the Test 2 radius includes only the directly accessed link of Congress Avenue. TRIP DISTRIBUTION AND ASSIGNMENT In order to determine the impact of the proposed development's traffic on the surrounding roadway network, a directional distribution was developed to be used in assigning traffic volumes associated with the project. Existing travel patterns were examined. Exhibit 5 shows the overall assignment of daily, AM and PM peak hour traffic for the proposed development. LINK TEST (fEST 1) The first step in this analysis was to identify if any roadway links required to be analyzed are projected to operate below adopted levels of service. Exhibits 6A, 6B and 6C show future daily and peak hour traffic conditions respectively for the analyzed roadway links. No roadway links within the Test 1 radius are projected to operate below the adopted level of service standards on an average daily or peak hour basis. Therefore, the requirements of Test 1 are met. MODEL TEST (fEST 2) The next step in the analysis was to determine if the proposed development meets the requirements of Test 2 of the Traffic Performance Standards. The directly accessed link of Congress Avenue from Lake Ida Road to 23 Avenue is not a Test 2 deficiency, therefore, the proposed development meets the requirements of Test 2. 3 @ @E) INTERSECTION ANALYSIS In addition to the Link Test and Model Test, major intersections for which a project adds more than 10% of the total traffic on any link connecting a major intersection must also be analyzed. In analyzing the proposed development's impact in the study area, no intersections meet this requirement. AM and PM peak: hour project driveway volumes are provided on Exhibit 7. CONCLUSIONS This analysis shows that the proposed development meets all of the requirements of the Traffic Performance Standards of Palm Beach County. 4 @ @EJ EXHffiITS @ @E) [TJ BOYNTON BEACH BLVD Cl ~ W U Z W ~ ~ WOOLBRIGHT RD SW 23 AVE -l ~ I- >- ~ ~ ::i ~ LAKE IDA RD BOYNTON BEACH COOL CARE w ;;: Vl Vl W ~ " z o u w ;;: z o I- Z ~ Vl N.T.5. Cl ~ CD I- Vl W ~ u LS Vl NE 8 5T 3/21/97 STUDY AREA EXHIBIT 1 [TJ BOYNTON BEACH BLVD Cl a:: w u z w ~ ~ 6LD 29572 (2750) -47500- 4LD 0 (D) 17701 ( 1 646) -31100- C (C) WOOLBRIGHT RD 6LD 28240 (2626) -47500- C C 2L 8616 (801 ) -14300- C (C) SW 23 AVE 6LD 28115 (2615) -47500- C (C) -l ~ I- >- ~ ~ ::i ~ 6LD 23197 (2157) -47500- C (C) LAKE IDA RD BOYNTON BEACH COOL CARE N.T.S. 4LD 29258 (2721) -31100- D (D) 2L 10222 (951 ) -14300- o (D) THOR D Cl ~ CD I- Vl W ~ u LS Vl w ;;: Vl Vl W ~ " Z o U LEGEND 6LD - ROADWAY LANEAGE 28115 - MDT (2615) - PEAK HOUR TRAFFIC -47500- - DAILY SERVICE VOLUME C - DAILY LOS (C) - PEAK HOUR LOS 3/21/97 EXHIBIT 2 EXISTING (1996) TRAFFIC CONDITIONS 97828.RPT EXHIBIT 3 BOYNTON BEACH COOL CARE HISTORIC GROWTH (1) I...... . ,.. .1 .. .bAiLY:~C;::f{ .. .......1.. ... ::):;::=;:;}::" :::;:;:;:;:;:;:; .... 19C>>{,:?(rl996.. .......". ..... ... .. . . ..... \ ROADWAY ::: :::: : Congress Avenue North of Lake Ida Road 26372 23197 South of 23 Avenue 31030 28115 North of 23 Avenue 30507 28240 North of Woolbright Road 33005 29572 23 Avenue (Golf Road) West of Congress Avenue 8305 8616 East of Congress Avenue 9805 10222 Woolbright Road East of Lawrence Road 15327 17701 West of 1-95 28878 29258 (1) Source: Palm Beach County Traffic Data. @ .!I. ....... ...... ............ m)GROWiA "." n. . ..' _ ....... ....... .... .... .... :(:RAm) -4. 19%/yr. -3.23%/yr. -2.54%/yr. -3.59%/yr. l.23%/yr. 1.4O%/yr. 4.92%/yr. O.44%/yr. ..ij 3/21/97 @E) 97828.RPT (1) (2) @ EXHIBIT 4 BOYNTON BEACH COOL CARE TRIP GENERA nON . . . ,. . .. .. - - . ., ... . .., . . .' .... .... .......,.. .... .. ," . .,...... . .... . .. .. ... ..'..... ... ..... ... .....1)..... .. :Y.. . TlUP" ....... .. ... .. ",- . ,. ." ..>G~TlON...................:. . ... ...,. . ., -- .,., .."'.. ...... ..... ... ... \.. i.)} RAm(1(?i .. . ....,. ., _...0.. .. . ... ." .. 6.97/1,000 SF . -,..,.... .. . -. .. . .. .... ..... .. . . . . . . . ... . - . . . ; ; . ; ; .'.AM.PEAI(tt()JJll'.~...:;.";...'.; ; iJAM.PEAK.; HOlm 1'lUPS ; . ; ; . ... '0.. ; ; . ; . .; ..... GENERA'rtON( . . . . . ; . ; . . ;. L . . . . IiATElEQtJA116N~ ; ; ; . . . . ; . IIi . ) 'foW . ; ; . . ; ;;..... . . ; ; 0 9 2/ 1 000 SF (8 8/ 1 7) 3 2 7 39 , i~M~\&~.: :i:tA'ljUEQti~:ttQN::~~" ...... 0.98/1,000 SF (12/88) ...... .... ........ ......... ............................... .. . . ...... -. -...... .................... -.... ......"....... ..::.:...rMF~IQpg.~. 41 Source: Section 10.8 of the Palm Beach County Unified Land Development Code, Fair Share Road Impact Fees. Source: Institute of Transportation Engineers (ITE), Triu Generation, Fifth Edition. 3/21/97 @E) [TJ BOYNTON BEACH BLVD Cl a:: w u z w ~ ~ 57- 15 m 0.057- WOOLBRIGHT RD 2% SW 23 AVE 6 m 0.04% -l ~ I- >- ~ ~ ::i ~ LAKE IDA RO BOYNTON BEACH COOL CARE 12% 35 gj 0.07% 35% 103 U:j 0.37- 537- 155 f~~~ 0.3% 57- 15 m 0.1% 60% 176 g;~ 0.47- w 40% ;;: 117 Vl n~j ~ 0.27- ~ o u N.T.S. Cl ~ CD I- Vl W a:: u LS Vl LEGEND 607- 176 (23) [25] - % DISTRIBUTION - DAILY PROJECT TRAFFIC - AM PEAK HOUR PROJECT TRAFFIC - PM PEAK HOUR PROJECT TRAFFIC - 70 OF LOS '0' DAILY SERVICE VOLUME 0.47- 3/21/97 EXHIBIT 5 PROJECT TRAFFIC ASSIGNMENT BOYNTON BEACH BLVD Cl ~ W U Z w a:: ~ WOOLBRIGHT RD SW 23 AVE 28115 1730 176 30021 D N.T.S. THOR D Cl ~ CD I- Vl W ~ u L5 Vl -l W <( > a:: 23197 4: I- 1427 Vl >- 117 Vl a:: w ~ 24741 ~ " ::i C Z ~ 0 u [TJ LAKE IDA RD BOYNTON BEACH COOL CARE LEGEND 28115 - EXISTING TRAFFIC 1730 - BACKGROUND GROWTH 176 - PROJECT TRAFFIC 30021 - TOTAL VOLUME D - LOS 3/21/97 EXHIBIT 6A TOTAL (2002) DAILY TRAFFIC CONDITIONS [TJ BOYNTON BEACH BLVD Cl ~ W U Z W ~ ~ WOOLBRIGHT RD SW 23 AVE -l ~ I- >- ~ ::i ~ LAKE IDA RD BOYNTON BEACH COOL CARE N.T.S. 2615 161 23 2799 D w > 2157 <( 1 3.3 Vl 16 ~ 2306 ~ C 5 u Cl ~ CD l- I/) W ~ u LS Vl LEGEND 2615 - EXISTING TRAFFIC 161- BACKGROUND GROWTH 23 - PROJECT TRAFFIC 2799 - TOTAL VOLUME D - LOS 3/21/97 EXHIBIT 6B TOTAL (2002) AM PEAK HOUR TRAFFIC CONDITIONS BOYNTON BEACH BLVD Cl ~ W U Z w a::: 3: :5 WOOLBRIGHT RD SW 23 AVE N.T.S. 2615 161 25 2801 D THOR D Cl ~ CD I- Vl W a:: u L5 Vl -l ~ <( a:: 2157 <( I- 133 (/) ~ 16 Vl w ~ 2306 a::: " :J C Z ~ 0 u [TJ LAKE IDA RD BOYNTON BEACH COOL CARE LEGEN 0 2615 - EXISTING TRAFFIC 161- BACKGROUND GROWTH 25 - PROJECT TRAFFIC 2801 - TOTAL VOLUME D - LOS 3/21/97 EXHIBIT 6C TOTAL (2002) PM PEAK HOUR TRAFFIC CONDITIONS [TJ 0::: o 0::: o I I- BOYNTON BEACH COOL CARE / N.T.S. LEGEND 7 - AM PEAK HOUR (36) - PM PEAK HOUR 3/21/97 EXHIBIT 7 PEAK HOUR PROJECT DRIVEWAY VOLUMES