Loading...
REVIEW COMMENTS STAFF COIv'l.1.1lENTS CEDAR RIDGE APARTMENTS SITE PLAN BUILDING DEPARTMENT: See attached memo. ENGINEERING DEPARTHEN'r: See attached memo. UTILITIES DEPART!'1ENT: See attached memo. PUBLIC WORKS DEPARTHENT: Contact Public Works prior to pouring dumpster slab. RECREATION AND PARKS DEPARTMENT: Provide details of jogging trail construction. FOREl6TER: See attached memo. . ******************************************************************************~l * SYSTEM ID - 84-150 * UPPER HYDRAULIC GRADIENT - 24.00 M.S.L. j * LOWER HYDRAULIC GRADIENT - 14.30 M.S.L. , * LENGTH OF MAIN::: 640.0 FEET ~ * TARGET GRADIENT::: .015156 * * CO --VALUE) ::: :1: * TO ~ * PI · * TOTAL CA ::: J * TIME OF CONCENTRATION (C) - MINUTES I * It~TENSITY = IN. /HR. ~ * FLOW ( Q) ::: C. F . S. ;~ * CALCULATED PIPE DIAMETER::: 9.8 INCHES J *------------------------------------------------------------------------------* * PIPE DIAMETER::: 9.8 INCHES PIPE DIAMETER::: - INCHES * * TIME IN THE PIPE::: .398 MINUTES TIME IN THE PIPE ::: ~ MINUTES * * SLOPE OF PIPE::: 1.515 % SLOPE OF PIPE::: .156 % * * VELOCITY::: 4.608 FT./SEC VELOCITY::: 1.963 FT./SEC * * HEAD LOSS::: 1.667 FEET HEAD LOSS = .171 FEET t ******************************************************************************~~ ,~ .Ii ****************************************************************************** * SYSTEM ID ::: 84-150 * UPPER HYDRAULIC GRADIENT - * LOWER HYDRAULIC GRADIENT ::: * LENGTH OF MAIN ::: * TARGET GRADIENT ::: * COEF. GHNESS CN-VALUE) ::: * TO * F'I * TOTAL CA ::: .410 * TIME OF CONCENTRATION (C) ::: 15.93 MINUTES * INTENSITY::: 5.74,8 IN./HR. * FLOW (Q) = 2 M 36 c. F. S. * CALCULATED PIPE DIAMETER::: 9.7 INCHES *------------------------------------------------------------------------------ * PIPE D I A~1ETER == 9. 7 INCHES PIPE D I AI"IETER ::: - I NCHESi * TI~1E IN THE PIPE == . 14:,"j MINUTES TIME II"~ THE PIPE ::: ~ MINUTES ;! * SLOPE OF PIPE::: 1.515 % SLOPE OF PIPE == .149 % ~ * VELOCITY == 4.583 FT./SEC VELOCITY::: 1.920 FT./SEC ~ * HEAD LOSS == .606 FEET HEAD LOSS == .060 FEET l *******************************************************************************: 24.00 M.S.L. 14.30 M.S.L. 640.0 FEET .015156 .014 t ~, 'it :t . ,j ~ ~ ~ ~ ~ ***************************************************************************** * SYSTEM ID = 84-150 * UPPER HYDRAULIC GRADIENT = * LOWER HYDRAULIC GRADIENT - * LENGTH OF MAIN = * TARGET GRADIENT = * CO F. OF ROUGHNESS (N-VALUE) = * TO * PI _ :t: * TOTAL CA = 3.050 t * TIME OF CONCENTRATION (C) = 16.67 MINUTES t * INTENSITY = 5.650 IN./HR. ; * FLOW (Q) = 17.23 C.F.S. % * CALCULATED PIPE DIAMETER = 20.5 INCHES ~ *-----------------------------------------------------------------------------~ * PIPE DIAt'IETER = 20.5 INCHES PIPE DIAMETER = - INCHES j: * TIME IN THE PIPE = .354 MINUTES TIME IN THE PIPE =~ MINUTES · * SLOPE OF PIPE = 1.515 % SLOPE OF PIPE - .198 % J * VELOCITY = 7.537 FT./SEC VELOCITY = 3.511 FT./SEC ~ * HEAD LOSS = 2.424 FEET HEAD LOSS = .316 FEET ~ ******************************************************************************;1 24.00 M.S.L. 14.30 M.S.L. 640.0 FEET .015156 1 ;t ., "" ******************* *********************************************************:~ * SYSTEM ID = 84-150 * UPPER HYDRA . GRADIENT = 24.00 * LOWER HYDR?~UL I 'AD lENT = 14. 30 :t. * LENGTH OF MAIN = :t: * TARGET GRADIENT = ~ * CoEF. OF ROUGHNESS ~ * CATCH BASIN "* 4 :t: * PIPE LENGTH = t: * TOTAL. CA = * * T I ME OF CoNCENTRA T I ON MINUTES * * INTENSITY = IN. /HR. t * FLOW (Q) = C. F. S. * * CALCULA TED PIPE I NCHES ~ * ------------_._------,----- ----,---------,_._------"-------,-:~ * PIPE DIAMETER = INCHES PIPE DIAME 36.0 INCHES * * TIME IN THE PIP MINUTES TIME IN THE p, 1.094 MINUTES * SLOPE OF PIP~ % SLOPE OF PIPE % * VEL.OCITY = 7.537 FT./SEC VELOCITY = FT./SEC * HEAD Lo~' 2.424 FEET HEAD L.OSS = .120 FEET . ********** ***********************'*************************** '***********~ J ,~,," ******************************************************************************** * SYSTEM ID = 84-150 :t: * UPPER HYDRAULIC GRADIENT = 20.50 M.S.L. ~ * LOWER HYDRAULIC GRADIENT = 14.30 M.S.L. * * LENGTH OF MAIN =: 125.0 FEET * * TARGET GRAD lENT ,- .049600 * * C 'vALUE) * * TO * * PIjE LENGTH * * TOTAL CA = .700 * * TIME OF CONCENTRATION (C) = 15.00 MINUTES * * INTENSITY = 5.876 IN. /HR. * * FLOW (0) = 4.11 C.F.S. * * CALCULATED.PIPE DIAMETER = 9.6 INCHES * : --;.;;:~-~~~~~~~~-:- ----;~:-----~~~~~;------;.;;.~-~~~~~~ ~~-:-- ---,..-~~~~~; ---; * * TIME IN THE PIPE = .254 MINUTES TIME IN THE PIPE =' .622 MINUTES * * SLOPE OF PIPE = 4.958 % SLOPE OF PIPE = .454 % ~ * VELOCITY = 8.217 FT./SEC VELOCITY = 3.352 FT./SEC * * HEAD LOSS = 6.198 FEET HEAD LOSS = .567 FEET * ***************************************************~,~~************************** " ", ***************************************~~**************************************1 * S~2TEM ID = 84-150 ~ * UPPER HYDRt-:IJLIC GRADIENT = 20.50 M.S.L. ~ * LOWER HYDRAULIC GRADIENT = 14.30 M.S.L. ~ ~ LENGTH OF MAIN = 1,130.0 FEET ~ * TARGET GRADIENT = .005487 ~ * COEF UGHNESS - l * l * PI ' * TOTAL CA =: * TIME OF CONCENTRATION (C) =: MINUTES * INTENSITY = IN./HR. * FLOW (0) =: . 82 C. F. S. * CALCULATED PIPE DIAMETER = 7.9 INCHES *------------------------------------------------------------------------------: * PIPE D I A~1ETER =: '7. 9 II\JCHES PIPE D I {~METER =: - INCHES * * TIME IN THE PIPE - .346 MINUTES TIME IN THE PIPE = ~ MINUTES * * SLOPE OF PIPE - .548 % SLOPE OF PIPE = .018 % * * VELOCITY = 2.407 FT./SEC VELOCITY = .670 FT./SEC * * HEAD LOSS = .274 FEET HEAD LOSS = .009 FEET * ******************************************************************************* ****************************************************~**************************~ * SYSTEM ID == 84-150 ;:.: * UPPER HYDRAULIC GRADIENT == 24.00 M.S.L. * * LOWER ~-~YDRAULIC GRADIENT = 14.30 M.S.L. ~ * LENGTH OF MAIN == 640.0 FEET * * TARGET GRADIENT - .015156 * * CO N-VALUE) == ;; * TO * * P I LENGTH ..::.60.0 1- EEl' * * TOT AL CA == 1 . 750 * * TIME OF CONCENTRATION (C) == 15.70 MINUTES ~ * INTENSITY == 5.779 IN. /HR. * * FLDl>J (Q) == 10. 11 C. F. S. :t * CALCULATED PIPE DIAMETER == 16.8 INCHES * *_____________________________________________________--------------------------l * PIPE DIAMETER == 15.0 INCHES PIPE DIAMETER == - INCHES * * TIME IN THE PIPE == .526 MINUTES TIME IN THE PIPE == ~ MINUTES * * SLOPE OF PIPE - 2.743 % SLOPE OF PIPE - 1.037 % * * VELOCITY == 8.241 FT./SEC VELOCITY == 5.723 FT./SEC * * HEAD LOSS == 7.132 FEET HEAD LOSS == 2.697 FEET * *******************************************************************************~ ., . *******************************************************************************~ * SYSTEM ID == 84-150 ~ * UPPER HYDRAULIC GRADIENT - 24.00 M.S.L. * LOWER HYDRAULIC GRADIENT = 14.30 M.S.L. * LENGTH OF MAIN == 640.0 FEET * TARGET GRADIENT == .015156 * COEF ~--VALUE) * TO * PI _ 60.0 * TOTAL CA == 2.640 * TIME OF CONCENTRATION (C) == 16.46 MINUTES * INTENSITY == ~:;. 678 IN. /HR. * FLOW (Q) == 14.99 C. F. S. * CALCULATED PIPE DIAMETER == 19.4 INCHES *------------------------------------------------------------------------------; * PIPE DIAMETER == 18.0 INCHES PIPE DIAMETEFi == - INCHES * * TIME IN THE PIPE == .118 MINUTES TIME IN THE PIPE - ~ MINUTES * * SLOPE OF PIPE - 2.279 % SLOPE OF PIPE = .491 % * * VELOCITY == 8.482 FT./SEC VELOCITY = 4.771 FT./SEC * * HEAD LOSS = 1.367 FEET HEAD LOSS == .295 FEET * ******************************************************************************* ***.***************************************************************************~ * SYSTEM ID = 84-150 * UPPER HYDRAULIC GRADIENT = * LOWER HYDRAULIC GRADIENT = * LENGTH OF MAIN = * TARGET GRADIENT == * CO f,"'!?"1LUE) * TO * PIPE LENGTH == ().O * TOTAL CA == .790 * TIME OF CONCENTRATION (C) == 15.00 MINUTES * INTENSITY == 5.876 IN./HR. * FLOW (Q) = 4.64 C. F. S. ~ * CALCULATED PIPE DIAMETER == 12.5 INCHES ~ *------------------------------------------------------------------------------~ * PIPE DIAMETER = 12.5 INCHES PIPE DIAMETER = ~ INCHES * * TIME IN THE PIPE == .491 MINUTES TIME IN THE PIPE == .70~ MINUTES * * SLOPE OF PIPE - 1.515 X SLOPE OF PIPE = .578 X * * VELOCITY = 5.430 FT./SEC VELOCITY = 3.783 FT./SEe * * HEAD LOSS = 2.424 FEET HEAD LOSS = .925 FEET * ******************************************************************************** 24.00 M.S.L. 14.30 M.S.L. 640.0 FEET .015156 ., ... M E M 0 RAN DUM February 7, 1985 TO: Mr. Carmen Annunziato, Director of Planning FROM: Tom Clark, City Engineer Re: Cedar Ridge P.U.D. change to Master Plan Corrunents: 1. Complete working drawings should be submitted for the private street lighting required for private streets and parking lots. Plans should show the following: .. 1) Type of luminaire 2) Number of lumens . 3) Locations 4) Approximate average footcandles provided between lights 5) Structural and foundation details for light standards 6) Conductor wiring, etc. according to code v;=- Ef'~ Tom Clark TAC: mb cc: Craig Grabeel MEMORANDUM 6 February 1985 TO: Carmen S. Annunziato, Planning Director FROM: Kevin Hallahan, Forester/Horticulturist RE: CEDAR RIDGE cONDOMINrm1S - SITE PLAN In reference to the subject site plan, there are existing South Florida Slash Pines on the property. In accordance with Ordinance No. 81-21, Section 7-A-7, the developer should provide additional information pertaining to these trees - l. An accurate count of the total number of trees. 2. The number of trees to be removed. ~, 3 . The number of trees remaining after clearing. " 4 . The trees to be saved must be protected with a wooden barrier before excavation (Section 7-A-15) . 5. The landscape plan must reflect an equal quantity of newly planted trees to the number of existing South Florida Slash Pine trees. 6. Landscape plan must reflect foundation landscape plantings for the multi-family units in accordance with Ordinance No. 81-22 Section 7-A-35L (pg. 11). ~ ikj7/~ { KEVI~ HALLAHAN /bks MEMORANDUM TO: Mr. Carmen Annunziato Director of Planning RE: Cedar Ridge P.U.D. February 1, 1985 Please be advised that as of this date the engineer has only furnished the city with schematics for as builts. Prior to any construction, the engineer must furnish us detailed as builts as normally required by this Office for field check. We are returning the plans. - . apt Attachment (f~ah Perry A. Cessna, " Director of utilities