LEGAL APPROVAL
j .
'fJJie City of
r.Boynton r.Beacli
100 'E. 'Boynton 'Beadi. 'Boulevara
P.O. 'Bo;l(310
'Boynton 'Bead!.1 :Jf.orUfa 33425.0310
(407) 738.7490
:J5fX: (407) 738.7459
pfanning tJ)eparttnint, City 9faf[ CompWc 'West 'J1..ing
OFFICE OF THE PLANNING DIRECTOR
August 6, 1991
Ms. Michelle Tomaselli
Hunters Run
3700 Clubhouse Lane
Boynton Beach, FL 33436
RE: site Plan Modification - Hunter's Run, Tract A, "Southport"
Type VIII Units (Hard Roof Screen Enclosure and Room
Addition to the Side of the Unit and the Enclosure of Rear
Hard Roof Screen Enclosure - File No. 628
Dear Ms. Tomaselli:
Please be advised that on Tuesday, July 30, 1991, the Technical
Review Board approved the above-referenced administrative site
plan modification sUbject to staff comments, copies of which are
attached.
These plans were approved subj ect to your compliance with the
attached stipulations and must now be modified to incorporate
same. To initiate your sign-off procedure, please submit two (2)
sets of modified plans to the Office of the Site Development
Division of the Building Department, which will record the
required identification markings on each set of the modified
plans.
After both sets of modified plans have the appropriate markings,
you should proceed with your sign-off to obtain signatures on
both sets of plans from each Technical Review Board member who
had comments. The sign-off procedure requires that the
Engineering Department sign-off first (if comments were made)
followed by all other departments with the exception that the
Planning Department sign off next-to-Iast (if comments were made)
.9lmtrica's (jate.uJay to tfu. (julfstream
..
TO: Michelle Tomaselli
-2-
August 6, 1991
and the Building Department sign-off last (whether comments were
made or not). The Zoning & site Development Administrator will
provide the Building Department sign-off. One (1) set of final
signed-off plans will remain with the Building Department and the
other set of plans will be returned to you to be retained at the
job site.
To help facilitate the sign-off process, appointments should be
made to meet with each Technical Review Board member to allow
them sufficient time to review and sign-off the modified plans.
After securing all the required Technical Review Board member
signatures and completing processing by the Site Development
Division, you may apply for building permits by SUbmitting the
appropriate documents and fee to the Plan Review and Permitting
Division of the Building Department. The Building Department
will advise you as to any additional permits which may be
required, such as Palm Beach Health Department (water and sewer),
clearing/grubbing, excavation/fill, drainage, paving, site
lighting, landscaping and irrigation.
The approval of the City entitles you to construct only the
improvements shown on the site plan. The site plan will be
viewed procedurally as an as-built or record drawing. If you
have any questions concerning this matter, please do not hesitate
to contact me.
Very truly yours,
~~
CHRISTOPHER CUTRO, AICP
Planning Director
CC: jrn
Encs
cc: Technical Review Board
Apprltr
-_.._--'---~---~._----