Loading...
AGENDA DOCUMENTS ITEM DESCRIPTION QUANTITY UNIT UNIT COST ESTIMATED COST Type III Roads 1. Repair patches, potholes and depressions 1 JOB $ L.S. $ 0.00 2. Remove deteriorated edges (1100'+ )( 3 ' :!:.) 1 JOB $ L.S. $ 0.00 3. Apply "Roundup" herbici~e to base (500 :!:. S. Y .) . 1 JOB $ L.S. $ N/A 4. Add new base, finish and prime (500 :!:. S. Y . ) 1 JOB $ L.S. $ 0.00 5. Apply "Hyvar" herbicide to base before priming 1 JOB $ L.S. . $ 0.00 6. 1 1/4" Type S-3 A.C.S.C. (includes tack coat) (50~) ( 2400..:t. S. Y . ) 1 JOB $ L.S. $ 4.550.00 . . 7. Misc. grading/cleanup/ restoration 1 JOB $ L.S. $ 500.00 SUB-TOTAL: $ 5.050.00 -2- ITEM DESCRIPTION QUANTITY Type IV Roads 2. 3. 4. 6. 1. Remove existing pavement (4000 ~ S.Y.) 1 Remove existing base (2600 ~ S~Y.)' 1 Apply "Roundup" herbicide to base (4100 ~ S.V.) 1 Add new base material (2600 ~ S.V. x 4" + thick) 'This Item in- cludes raising grade on Swallow Drive near Teal Way. 1 5. Apply "Hyvar" herbicide to base before priming (4100 ~ S. V . ) 1 7. Finish and prime base (4100 + S.V.)' 1 1 1/4!'-Type S-3 (50ejo) , A.C.S.C. (4000 ~ S.V.} 1 8. Misc. grading/cleanup/ restoration 1 9. Additional for reworking 3 intersections with Meadows Blvd. 1 Miscellaneous Road Work 1. Street/stop signs (2) 1 2. Maintenance of traffic 1 -3- UNIT UNIT COST JOB $ L.S. JOB $ L.S. JOB $, L.S. JOB ~ L.S. JOB $ L.S. JOB $ L.S. JOB $ L.S. JOB $ L.S. JOB $ L.S. SUB-TOTAL: JOB $ L.S. JOB $ L.S. SUB-TOTAL: TOTAL - ROADS: ESTIMATED COST $ 0.00 $ 0.00 $ N/A $ 0.00 $ 0.00 $ 0.00 $ 6.000.00 .$ 500.00 $ 800'.00 $ 7.300.00 $ 450.00 $ 500.00 $ 950.00 $ 23.750.00