REVIEW COMMENTS EXHIBIT "C" Conditions of Approval Project name: Orchard Landing File number: NWSP 97-011 Reference: The plans consist of 4 sheets identified as 1st Review. New Site Plan. File # NWSP 97- 011 with an April 29. 1997 Plannina and Zonina Department date stamp markina. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS Comments: None UTILITIES Comments: 1. Department HRS permits will be required for the water and sewer systems serving this project, (Sec. 26-12). 2. A capacity reservation fee will be due for this project upon request for my signature on the Health Dept. Application forms or within 30 days of site plan approval. This fee will be determined based upon final meter size, (Sec. 26-34[E]). 3. Water and Sanitary Sewer plans will be reviewed again by the Utilities Department at the time of application for permit to HRS. 4. The proposed sanitary sewer for this project appears to be connecting to a privately owned and maintained gravity sanitary sewer system. Please provide a copy of your agreement to connect to this system for review. FIRE Comments: None POLICE Comments: None ENGINEERING DIVISION Comments: 5. Road does not meet city codes. LOR Chapter 6, ArtA, Sec.1 OB, pg. 6-11. 6. Need a cross section through E-W section of Orchard Lane showing paved sections and utility easements, existing and proposed, and drainage features. 7. Recommend that all of Tract A in addition to being an Page 2 Orchard Landing File No. NWSP 97-011 DEPARTMENTS INCLUDE REJECT ingress/egress easement, also be identified as a utility and drainage easement to allow other utilities to locate outside the existing FP&L easement and for purpose of drainage. BUILDING DIVISION Comments: None PARKS AND RECREATION Comments: None FORESTER/ENVIRONMENTALIST Comments: 8. Suggest the placement of a barricade to identify the "clump" of mangroves located on the easterly side of Lots 2 and 3 when any coastal area construction is undertaken. 9. A Management Plan (1-2 page description)should be provided in the Homeowner Association documents for proper maintenance of the mangroves. This plan will also be required at the site clearing permit stage for the project. PLANNING AND ZONING Comments: 10. The location and width of the proposed utility easement in the northern portion of the proposed right-of-way is different that the one depicted on the approved master plan and proposed plat. Coordinate location and width of this easement on: . master plan . site plan . plat 11. City's Land Development Regulations, Chapter 7.5, Article II, Section 5.E requires that vehicular use areas be screened with a perimeter hedge not less than four (4) and no more than six (6) feet in height. The proposed hedge is depicted as Ficus Benjamina which is a non-native Florida specie. Also, Ficus Benjamina hedge is not allowed in utility easements as its root system has a detrimental effect on underground utility lines. Provide an on-site perimeter hedge meeting the native requirement of fifty percent of the required landscape planting Page 3 Orchard Landing File No. NWSP 97-011 DEPARTMENTS INCLUDE REJECT (Comprehensive Plan Policy 4.4.6). Specify hedge species acceptable in utility easements. 12. On the Landscape Plan provide a summary of the planting material to include a "landscape material required by the code" category. Also, provide relevant calculations for the landscape buffer adjacent to the right-of way and along abutting properties. In these calculations include perimeter distances of the parcel for which the landscape buffer hedge material is being calculated and determine the amount of required landscape material (Chapter 7.5, Article II - Landscape Code). 13. On the site plan provide site calculations as required by Land Development Regulations, Chapter 4, Section 7.E. 14. On the site plan indicate traffic control markings as required by Land Development Regulations, Chapter 4, Section 7.8.2. 15. It is recommended that the proposed Cypress mulch be replaced with another kind of mulch, such as Melaleuca, Eucalyptus, etc. 16. Incorporate the above calculation into the tabulation of the landscape material provided for the site. All native species shall be distinguished from non-native species with a recognizable symbol. 17. On the Landscape Plan indicate the height of the hedge material proposed for the site in inches rather than in gallons. 18. The submitted traffic statement shall be approved by the Palm Beach County Division prior to issuance of the building permit. 19. Proposed lighting shall be shown on both site plan and landscape plan.. 20. In order to eliminate potential conflicts between the landscape material and existing on-site and/or proposed easements show these easements on the landscape plan. ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS 21. To be determined ADDITIONAL CITY COMMISSION CONDITIONS Page 4 Orchard Landing File No. NWSP 97-011 22. To be determined Ibme s:lprojectslcond of apprl 5-29- 'I 997 2: 46P~,1 FROH LAKE WORTH DRAINAGE 561 495 9694 P.1 oo~rn @ LLJL~,.._~? rn! f i i Ii! I Board 01 Sl/pem$llf$ M^V29 !no!..! U Ii. C,StaoleyW~aver M I ' .': : " L.j ! Kermlt[)eM :, .' ,John I. Witwotth III _._~.--.J I ~r8l.I)<iM.n"'~ PLA"^ij:'jG '!'ID . j Willit.m G. Winters "" .- , I~,I I AQ.iSWl1 Nel~ ZONING D~rL ,. ~ _.. Ron.ld ~. CrOll. Al1Omoy Perry & Schone, ~A. ~'88 LAKE WORTH DRAINAGe DISTRICT 13081 MILITARY TRAIL OELRAY BEACH. FLORIDA 33484 May 29,1997 Tambri J. Heyden. AICP Director PlaMing and Zoning City of Boynton Beach P.O. Box 310 Boynton Beach, FL 33425-0310 Subject: Technical Review Committee Agenda Dear Ms. Heyden: The Lake Worth Drainage District offers the following comments regarding the item(s) on the meeting agenda: 1) Orchard Landing - Project is not located in the LWDD Service Area, As always, we thank you for being given the opportunity to comment. Sincerely, LAKE WORTH DRAINAGE DISTRICT ~~~ Chief Inspector SJW:kjr c: Ronald L. Crone, Assistant Manager, LWDD 1(,',0.1.'1' A,MAlt'YlCOCS\U'TER$\ J l<)1DOJl(,.~ TAA:\QA T.~'."A"'y\JXX;SIt.!;:Tl'US\1207DOllC,L r.. Oelray Beactl & Boca Raton (5611 4g$.53l:13. Boynton Beach & West Palm Beach (561) 737-3835 . Fax (561) 495-9694 TO: , i ;.~ f'~"-"''''''-- ,,". '. i. i RECREATION & PARK MEMORANDUM-#97-240 UU I rw 2 2 Il!:! ~.---' PLANN!iJG AND ZONING DEPT. Tambi Heyden, Planing and Zoning Director FROM: Kevin John Hallahan ,Forester I Environmentalist !:! II- Orchard Landing-New Site Plan Existing Mangroves Letter RE: DATE: May 22,1997 The applicant has addressed my previous comments in reference to the existing Mangroves on the site. The attached latter should become part of the project and implemented in content during the excavation and fill or clearing permit. A Management Plan (1-2 page description) should also be provided in the Homeowner Association documents for proper maintenance of the mangroves. This Plan will also be required at the site clearing permit stage for the project. The project should continue in the normal review process. xc: file kjh M. Jeffrey Semko Design Consultant May 16,1997 The City of Boynton Beach Department of Forest/Environmentalist 100 E Boynton Beach Blvd. Boynton Beach, FL 33425 Attn: Mr. Kevin Hallahan Re: Orchard Landing SBMP 96-002 (Master Plan) NWSP 97-011 (Site Plan) Dear Kevin: Pursuant to our recent conversations regarding the mangroves located on the above referenced project, I had conversations with both Tim Rach and Frank Sperbe regarding any mangrove fringe distance objections or other potential problems involving the disturbance of such. Both parties felt that due to the scope of the project (three (3) single family residential dwelling units) and the proximity of the mangroves on site, was of no concern. They did suggest the placement of a barricade to identify the "clump" located on the easterly side of Lots 2 and 3 when any coastal area construction is undertaken. Regards, M. Jeffrey Semko 1815 High Ridge Road, Lake Worth, FL 33461 (407) 533-7846 PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 97-230 FROM: Jerzy Lewicki TO: Tambri Heyden, AICP Planning and Zoning Director DATE: May 16, 1997 SUBJECT: New Site Plan - 151 Review Project: Orchard Landing Location: East of Federal Highway File No.: NWSP 97-011 The following is a list of 1 st review comments regarding the site plan review of the plans for the above-referenced project. The applicant shall understand that all documents and plans submitted for site plan review are subject to additional comments. I recommend that the applicant/agent contact me regarding questions related to the comments. If the applicant is not intending to correct code deficiencies, he should contact Planning and Zoning Department regarding the procedures, application forms, fees and submittal deadline dates for seeking relief from the code requirements. COMMENTS 1. The location and width of the proposed utility easement in the northern portion of the proposed right-of-way is different that the one depicted on the approved master plan and proposed plat. Coordinate location and width of this easement on: . master plan . site plan . plat 2. It is recommended that the proposed Cypress mulch be replaced with another kind of mulch, such as Melaleuca, Eucalyptus, etc. 3. City's Land Development Regulations, Chapter 7.5, Article II, Section 5.E requires that vehicular use areas be screened with a perimeter hedge not less than four (4) and no more than six (6) feet in height. The proposed hedge is depicted as Ficus Benjamina which is a non-native Florida specie. Also, Ficus Benjamina hedge is not allowed in utility easements as its root system has a detrimental effect on underground utility lines. Provide an on-site perimeter hedge meeting the native requirement of fifty percent of the required landscape planting (Comprehensive Plan Policy 4.4.6). Specify hedge species acceptable in utility easements. 4. On the Landscape Plan provide a summary of the planting material to include a "landscape material required by the code" category. Also, provide relevant calculations for the landscape buffer adjacent to the right-of way and along abutting properties. In these calculations include perimeter distances of the parcel for which the landscape buffer hedge material is being calculated and determine the amount of required landscape material (Chapter 7.5, Article II - Landscape Code). 5. Incorporate the above calculation into the tabulation of the landscape material provided for the site. All native species shall be distinguished from non-native species with a recognizable symbol. Page 2 1st Review - Orchard Landing File No. NWSP 97-011 6. On the Landscape Plan indicate the height of the hedge material proposed for the site in inches rather than in galons. 7. On the site plan provide site calculations as required by Land Development Regulations, Chapter 4, Section 7.E. 8. The submitted traffic statement shall be approved by the Palm Beach County Division prior to issuance of the building permit. 9. Proposed lighting shall be shown on both site plan and landscape plan.. 10. In order to eliminate potential conflicts between the landscape material and existing on-site and/or proposed easements show these easements on the landscape plan. 11. On the site plan indicate traffic control markings a s required by Land Development Regulations, Chapter 4, Section 7.B.2. JL:bme xc: Central File J:\SHRDA TAIPlanning\SHARED\WP\PROJECTSIORCHLAND\1 st-rev com site plan orch-Iand.doc PUBLIC WORKS DEPARTMENT MEMORANDUM #97-093 TO: Tambri J. Heyden, AICP, Planning & Zoning Director Carel Fisher, Deputy Public Works Direct~ THRU: FROM: Larry Quinn, Sanitation Superintendent SUBJ: Site Plan 1 st Review - Orchard Landing DATE: May 16, 1997 ';1 , ~ '-~'.='~''''-'~''''''.".."".,,,, The Public above. Co o s Department has no comments in reference to the new site plan listed mmend the project proceed to the Planning & Development Board and City on for approval. Larry Quinn Sanitation Superintendent LQlcr )) j " i ill MAY , 4 1991 ill ~@~llW~ DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. 97-090 PLANNING AND ZONING DEPT. May 14, 1997 RE: Tambri J. Heyden, Planning & Zoning Director Al Newbold, Acting Dircctor of Development ~ r III l1e~ ORCHARD LANDING - NEW SITE PLAN 1ST REVIEW TO: FROM: Building Division No comments. Recommend approval Engineering Division We have reviewed subject project and have the following comments: 1. Need a cross section through E- W section of Orchard Lane showing paved sections and utility easements, existing and proposed, and drainage features. 2. Road does not meet City codes. LDR Chapter 6, ArtA, Sec. 1 OB, pg. 6-11. 3. Recommend that all of Tract A in addition to being an ingress/egress easement, also be identified as a utility and drainage easement to allow other utilities to locate outside the existing FP&L easement and for purpose of drainage. Recommend proposal be moved forward to Planning & Development Board for consideration. AN/ck attachment: Bldg. Div. Plans xc: Ken Hall C:\My Documents\Orchard Landing New Site Plan.doc ~ rn ~@~~w~ MAY 151m RECREATION & PARK MEMORANDUM PLANNING AND ZONING DEPT. TO: Tambi Heyden, Planing and Zoning Director Kevin John Hallahan ,Forester I Environmentalist K)' II Orchard Landing-New Site Plan FROM: RE: DATE: May 14,1997 The applicant has not addressed my previous comments in reference to the existing Mangroves on the site. The project should continue in the normal review process. xc: file kjh MEMORANDUM Utilities # 97-132 , .! I~~ f:'~: f~.'): i .) r"':""", 1111 ~ I f1 '\ ! '" ",: 'I)' I udL:_...~. 3 ..""~'~. jl_ll.ll.. rL~N;JJ '~G, ~\.ND ZONJ1;G DfPT. _......,....,,-----~....'_.-..,~~ TO: Tambri Heyden. Planning & Zo . FROM: John A. Guidry, Director of Utilities Date: May 12, 1997 SUBJECT: Orchard Landing, New Site Plan, First Review Staffhas reviewed the above referenced project and offer the following comments: 1. Department of HRS permits will be required for the water and sewer systems serving this project, (Sec. 26-12). 2. A capacity reservation fee will be due for this project upon request for my signature on the Health Dept. Application forms or within 30 days of site plan approval. This fee will be determined based upon final meter size, (Sec. 26-34[ED. 3. Water and Sanitary Sewer plans will be reviewed again by the Utilities Dept. at the time of application for permit to HRS. 4. The proposed sanitary sewer for this project appears to be connecting to a privately owned and maintained gravity sanitary sewer system. Please provide a copy of your agreement to connect to this system for review. It is our recommendation that the plan proceed through the review process. If you have any questions regarding this subject, please contact Skip Milor at 375-6407 or Peter Mazzella at 375-6404. sml orchard4 xc: Clyde "Skip" Milor Peter Mazzella File PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 97-201 TO: TECHNICAL REVIEW COMMITTEE MEMBERS Kerry Willis, City Manager Carel Fisher, Acting Public Works Director AI Newbold, Acting Development Department Director Ken Hall, Department of Development William Cavanaugh, Fire Prevention Officer Sgt. Marlon Harris, Police Department John Wildner, Parks Superintendent Kevin Hallahan, Forester/Environmentalist Clyde "Skip" Milor, Utilities Chief Field Insp. Mike Haag, Planning & Zoning Department Jerzy Lewicki, Planning & Zoning Department John Yeend, City Engineer FROM: Tambri J. Heyden, AICP Planning & Zoning Director DATE: May 9,1997 SUBJECT: Administration Technical Review Committee Meeting - Tuesday, May 13, 1997. On May 13, 1997, a staff-only meeting will be held to discuss the projects identified below in the 2nd Floor Conference Room C, West Wing, City at 9:00 A.M. following the regularly scheduled Applicant TRC meeting. 1. Old Business None 2. New Business A. SITE PLANS New Site Plan 1. PROJECT: Orchard Landing AGENT: Harvey Lang LOCATION: East side of Federal Highway (U.S.#1), approximately 180 feet south of Golf Road. DESCRIPTION: Request for approval of common area landscaping for a subdivision. NOTE: Written comments are due to the Planning and Zoning Director no later than 5:00 P.M. Thursday, May 15, 1997. 4. Other Business A. Discussion presented by FPL on trees planted in FPL easements, conflicts with site development, Utility Department and code requirements. B. Discussion regarding preliminary review of Orchard Landing (see attached Engineering Memo #97-074). C. Discussion regarding preliminary review of East Ridge (see attached Engineering Memo #97-069). D. Review and sign-off rectified master plan for Orchard Landing. E. Review and sign-off rectified master plan for Grove Plaza. F. Review and sign-off rectified master plan for East Ridge. 5. Comments by members 6. Adjournment S:\agenda\adm\A TRC051397 .doc ---------------~-_._--- - ----- ENGINEERING MEMO #97-06~ m I @ rn Ii .., ~I ,. ~ .1 n I Li : .~ ;~IJ .~l=R ')Q 'i; II ..," '. - ~'# --1 ..... J ; Pl~,NN'NG ;~H) I ZOHING f,~PT j DATE: April 28, 1997 TO: BILL CAVANAUGH, FIRE PREVo OFF. 735-0272 TONY OCCHIUZZO, BULID. PERMIT ADMIN. 6352 J. WILDNER, PKS SUPT. 6227 & K. HALLIHAN, FORSTR. 6227 SGT. MARLON HARRIS, P.O. 6163 MIKE HAAG, PLAN. COORD. 626~t.::::::::::::.. SKIP MILO~ UTIL. CHIEF F.IBlli::Ria:R~::,.375-6407 THRu:L::::::~~:;:~::~\ ~r n FROM: KEN HALL, ENG. PLANS.::'9fI~:~KII~'~~~frOR 6283 ~ :. ::. :::.;/ .:..:...:...;.....:...:.:.::; :::::;,:: SUBJECT: PRELIMINARY PLAT REVIEW;.;:ltASr RinGE,P.U.D. PLEASE REVIEW THE SUBJEeTPL~T.:.:AND'PL.~:::~di.'liicuSSION OF YOUR C: Memo Only: John Yeend, City Eng. Tambri Heyden, P. & Z. Dir. John Guidry, Util. Dir. eastridge Thank You I ENGINEERING MEMO #97-074 DATE: May 1, 1997 TO: BILL CAVANAUGH, FIRE PREVo OFF. 735-0272 TONY OCCHIUZZO, BULID. PERMIT ADMIN. 6352 J. WILDNER, PKS SUPT. 6227 & K. HALLJHAN, FORSTR. 6227 SGT. MARLON HARRIS, P.O. 6163 MIKE HAAG, PLAN. COORD. 626o..",,~:/' ,....;.::::::::::::::.~.. . SKIP MILOR, UTIL. CHIEF fIBfiQ;;~lNfig~.375-6407 ::::::::::~;~:::~ftOR 6283 @ "-:;.( .,( ,''; ,';':": ........... \; '::{ t :) /::>:.::":..:...:.):+ \i' SUBJECT: T.R.C. REVIEW - THEtLAT.OF:::OItCH~~.:::~:~ING ~~:'~~~~~~~i~~~ga41,~~~~: tJJ: 5/13/91 DOCUMENTS AT THE ENDOETSE.:MBETIN .:, .::::::,:ftlM011l~WltmaiA: COMMENTS KRH C: Memo Only: John Yeend, City Eng. Tambri Heyden, P. & Z. Dir. Al Newbold. Act. Dev. Dir. Pete Mazzella. Asst. to Dir. Tfiaiik You I O'C~D FIRE PREVENTION DIVISION Memorandum No. 97-242 [D)ffi@uwm~ lfI1 MAY I 2 1991 . U!J PLANNING AND ZONING DEPT. TO: Tambri Heyden, Director Planning & Zoning Department William Cavanaugh, FPO I /; Jf /1 i/ Fire Department /t~r 'l(l&tittdu:/L DATE: May 8,1997 FROM: SUBJECT: NWSP 97-011 Orchard Landing Federal Hwy. South of Golf Rd. We have no objections at this time. CC: Deputy Chief Gale FPO II Campbell File CITY OF BOYNTON BEACH, FLORIDA INTER-OFFICE MEMORANDUM rD) ffi lll. ffi 0 WI ffi rn U\l MAY~ZIll ~ TO: TAMBRI HEYDEN, PLANNING & ZONING DIRECTOR DATE: 2 MAY 97 F FROM: SUBJECT: ORCHARD LANDING - NEW SITE PLAN 1 st REVIEW SGT. MARLON HARRI'B(}};( REFERENCES: 97-0031 POLICE DEPARTMENT ENCLOSURES: I have reviewed the above plans and have no comments/recommendations. PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 97-192 TO: FROM: Kerry Willis, City Manager Clyde "Skip" Milor, Utilities Dept. Chief Field Insp. Carel Fisher, Acting Public Works Director John Wildner, Parks Superintendent Bill Cavanaugh, Fire Prevention Officer Sgt. Marlon Harris, Police Department AI Newbold, Acting Development Department Director Ken Hall, Development Department John Yeend, City Engineer Kevin Hallahan, Forester/Envi~onmentalist :J5~~ Tambri J. Heyden, AICP Fo'~ Planning & Zoning Directo ~ DATE: May 1,1997 SITE PLAN REVIEW PROCEDURES RE: 1 st Review - New Site Plan Project - Orchard Landing Location - East of Federal Hwy. (U.S. #1) 180 feet south of Golf Road (S.E. 23rd Avenue on the west side of the intracoastal waterway) Agent - Harvey Lang File No. - NWSP 97-011 Find attached for your review the plans and exhibits for the above-referenced project. Site Plan Review approval for this project will be granted by the City Commission. To ensure that the project stays on line with the review time frame, I request that the plans and exhibits be reviewed and formal written comments transmitted to the Director of the Planning and Zoning Department no later than 5:00 P.M. on Mav 15. 1997. The comments shall be separated into two categories. The first category comments with code sections referenced and the second category references recommendations that you believe will enhance the project. If you believe the plans are substantially complete with regards to code compliance and that your outstanding comments and/or recommendations may be addressed at time of permit review rather than requiring the applicant to prepare amended plans for a 2nd submittal indicate in your 1st review written comments that you recommend the project proceed to the Planning and Development Board and City Commission for approval. If you recommend the project move forward for approval with one review, please attach the 1st review plans to your written comments, with the exception of the Development Department which may retain the plans as the control plans for the project. Adhering to the following review guidelines will promote a comprehensive review and enable the applicant to efficiently obtain Technical Review Committee approval: 1. Use the review standards specified in Part III, Land Development Regulations, Chapter 4, Site Plan Review, Section 8 of the Code of Ordinances to review and formulate comments. 2. The documents submitted for the project were determined to be substantially complete based on the submittal requirements identified in Section 7 of the Site Plan Review Ordinance. However, if the data provided to meet the submittal requirements is insufficient to properly evaluate and process the project based on the review standards Page 2 of2 Orchard Landing To: TRC Members Re: Planning & Zoning Memo 97-192 or the documents show code deficiencies, additional data and/or corrections should be requested by the reviewer through the Planning and Zoning Department. 3. Each comment shall reference the section of the code that is incorrectly depicted on the documents. 4. Technical Review Committee member(s) shall identify in their comments when the plans depict or when the location and installation of their departmental required improvements may conflict with other departmental improvements. 5. When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the comment and the specific code section may be included in their review comments with the name of the appropriate TRC Member that is responsible for the review specified. 6. If a TRC member finds the plans acceptable, he/she shall forward a memo, within the time frame stated above, to the Planning and Zoning Director stating that the plans are approved and they do not have any comments on the plans submitted for review and recommend the project be forwarded through the approval process. All comments shall be typed, addressed and transmitted to the Director of the Planning and Zoning Department for distribution to the applicant. Please include the name and phone number of the reviewer on this memo. Jerzy Lewicki will be the Planning and Zoning Department staff member coordinating the review of the project. The Planning and Zoning Department will send the applicant a cover letter which includes the comment(s) and directions to amend the plans to comply with the comments and the procedures for resubmission. When the Planning and Zoning Department receives the amended plans, they will distribute the plans with a cover memo to all TRC Members for review and approval. T JH:bme Attachment XC: (Memo Only) Jim Ness, Acting Fire Chief Charlie Frederick, Recreation & Parks Director Marshall Gage, Police Chief John Guidry, Utilities Director Central File s:\projects\orchlandlnwsp\ 1 streview-Ietter APPLICATION TRACKING LOG PROJECT TITLE: ORCHARD LANDING FILE #: NWSP 97-011 PROJECT LOCATION: E. OF FED.HWY (U.S.#1) 180 FT. S. OF GOLF RD. (S.E. 23RD AVE ON THE W.SIDE OF INTRACOASTAL WATERWAY TYPE OF APPLICATION: NEW SITE PLAN - LANDSCAPE PUBLIC NOTICE REQUIRED: (Y IN) 0 AGENT: HARVEY LANG AGENT PHONE: 954-382-1075 DATE REC'D: 4/29197 AMOUNT: 12 SETS OF PRE-ASSEMBLED PLANS SUBMIITED FOR REVIEW: 2 OF 12 SETS SIGNED AND SEALED 0 SURVEY 0 LANDSCAPE PLAN 0 FLOOR PLAN 0 SITE PLAN WITH SITE DATA 0 APPLlCATION/SUBMIITAL: DATE ACCEPTED: REVIEWER'S NAME: ADDRESS: 642 N.UNIVERSITY DR.. PLANTATION. FL. 33324 FAX: 954-382-1123 750.00 RECEIPT NO.: DRAINAGE PLAN ELEVATION VIEW DRAWINGS COLORED ELEVATIONS RECEIVED MATERIAL SAMPLES RECEIVED PHOTOGRAPHS RECEIVED o o o o o DATE DENIED: DATE OF LEITER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES: DATE OF SUBMIITAL ACCEPTANCE LEITER: INITIAL 1ST REVIEW MEMO: DATE SENT: MEMO NO. 97-192 RETURN DATE: ~ tJAJt: R"UI~"<..J OA)J'I tVe~ /l1A~, ~A.. ~Nt..j 1 ST REVIEW COMMENTS RECEIVED UTIL. P.W. PARKS FIRE POLICE PLANNING BUILDING ENGINEER FORESTER ECON. DEV. COORD. 5/15/97 91- -:l 'fa 5' rJ,l(c/1 DATE OF LEITER SENT TO SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENTS: 90 DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID: DATE 12 COMPLETE (ASSEMBLED) SETS OF AMENDED PLANS SUBMIITED FOR 2ND REVIEW: PRE-ASSEMBLED PLANS SUBMIITED FOR REVIEW: AMENDED APPLICATION 0 2 OF12 SETS SIGNED AND SEALED 0 SURVEY 0 LANDSCAPE PLAN 0 FLOOR PLAN 0 SITE PLAN WITH SITE DATA 0 2ND REVIEW MEMO: DATE SENT: DRAINAGE PLAN ELEVATION VIEW DRAWINGS COLORED ELEVATIONS RECEIVED MATERIAL SAMPLES RECEIVED TRANSPARENCY RECEIVED PHOTOGRAPHS RECEIVED o o o o o o MEMO NO. RETURN DATE: NJA ~ 2nd REVIEW COMMENTS RECEIVED PLANS MEMO# DATE PLANS MEMO# DATE UTIL. 0 PLANNING 0 P.W. 0 BUILDING 0 PARKS 0 ENGINEER 0 FIRE 0 FORESTER 0 POLICE 0 ECON. DEV. 0 COORD. BOARD MEETING DATE: BOARD: LAND DEVELOPMENT SIGNS PLACED AT THE PROPERTY. DATE SENT 1 SIGNS INSTALLED: DATE: CITY COMMISSION: DATE: DEVELOPMENT ORDER RECEIVED FROM CITY CLERK: 0 DATE: DEVELOPMENT ORDER SENT TO APPLICANT: 0 DATE: S:\FORMS\TRACKING LOG FORM revised 4/25/97