APPLICATION M. Jeffrey Seroka Design Consultant ~~tc g February 20, 1997 The Director of Planning The City of Boynton Beach 100 E Boynton Beach Blvd. Boynton Beach, FL 33425-0310 Re: Application for the subdivision of a 2-acre parcel of land into 3 lots for single family dwelling units. Applicant: Harvey Lang - Orchard Landing Applicant's Agent: M. Jeffrey Semko Location: East of Federal Highway and approximately 180 feet south of SW 23 Avenue (Golf Road) on the west right- of-way of the Intracoastal Waterway. Current Zoning: R-3 Existing Site Improvements: The existing site is vacant. Existing Site Vegetation: There are no select or significant species of trees or other vegetation within the proposed building areas exclusive of utility and or drainage easements. The northeasterly portion of the site has some mangrove vegetation and three large australian pine trees. This areas falls within the 40' drainage easements and will not be built upon. There is a small cluster of mangrove located approximately 80' south of the northeast property corner on the west bank of the Intracoastal Waterway. All mangrove vegetation will be preserved as governed by law. Along the southerly property line is an australian pine hedgerow. With the cooperation of the adjacent Co-op Association, the developer proposes to remove this hedgerow and replace it with a species more in keeping with todays accepted standards and landscape designs. Upon completion of the residential dwelling units, sod, landscape materials, trees and irrigation systems will be installed in accordance with all local governing requirements. Site Condition: The average existing site elevation within the proposed building area is 5.5' above mean sea level and will require a minimum of 2.0' of fill material to obtain the minimum floor elevation of 7.5'. All fill material and placing of fill material will be in strict accordance of local governing code requirements. 1815 High Ridge Road, Lake Worth, FL 33461 (407) 533-7846 Page 2 Soil Conditions: Preliminary soil analysis performed by Fraser Engineering and Testing indicates medium density fine sand to a depth of 10' with soft organic silt to a depth of 25'. Upon approval of the proposed subdivision and prior to the placing of fill on the site, in depth soil analysis will be prepared. Following the engineering recommendations based on the existing site conditions, the material will be placed. Drainage will be provided in accordance with all city codes and standard practices. Site Development: The existing 2 acre parcel of land is proposed to be subdivided into 3 individual single family building lots consisting of the following areas: Lot 1 - 20,703.10 s.f. = 0.48 acres Lot 2 - 18,268.42 s.f. = 0.42 acres Lot 3 - 23,286.20 s.f. = 0.54 acres The remaining area consisting of 25,082.48 s.f. = 0.565 acres and identified on the proposed master plan as "Tract A", will be utilized to serve as ingress/egress, drainage, and utility easements. There are no plans to provide private recreation facilities or apply for half credit, therefore, a dedication requirement based on 3 single family dwelling units @ .0180 acres = .054 acres fee is requested in lieu of land. The developer will request the minimum right-of-way width be reduced from 50 feet to 25 feet due to the existing property configuration and ingress/egress available. Site Utilities: There are utilities available to this site and will be provided by the appropriate agencies. The location of existing utilities are along the westerly property line (parallel with U.S. Highway Northbound) and along the southerly property line of proposed subdivision located on the northerly property of the existing co-op known as "Hampshire Gardens". Upon approval of the proposed master plan and prior to the start of construction, the location of the utility tie-ins will be Page 3 researched, engineered, and applied for to the appropriate agencies. All utilities to the residential dwelling units will be underground in accordance with local governing code requirements. Individual Site Development: the developer is proposing to construct a custom two-story single family dwelling unit consisting of an estimated conditioned area of 3000 s.f., two car garage, pool and boat dock. All plans and specifications will be prepared on an individual lot basis and will be submitted to local governing agencies for approval prior to construction. The elements of design will be at the discretion of the owner, conducive to the neighboring properties. Homeowners Association: The developer will create a homeowner's association as a non-profit corporation to provide for the preservation and enhancement of property values, amenities and opportunities and for the maintenance of the properties and improvements. This association will be established to control and operate the common areas. This homeowners association will be created and governed by the requirements of all local and state guidelines set therein. General Considerations: The developer will prepare all documentation required for specific permits and will comply with all code requirements in effect at the time of application. These permits required from local, county, state and federal, or any other permitting agency shall be included with a request for permit. Respectfully submitted, M. Jeffrey Semko Applicant's Agent /I I r I, TRAFJi'IC IMPACT ANALYSIS ORCHARD LANDING BOYNTON BRACH, FWRlDA PREPARED BY: OLSAK & ASSOCIATES, INC. WEST PALM BRACH, MRIDA SEPTKMBER 1996 t' _._.ll~ - ' / ,/ I 'j ~ /j ,., //1 /? f/ /~. >1J;/l -fA!;A"f / <tAN 271991 . . ... TABLE 011 CONTiNTS IN'rRODUc-I'ION. . . . . . . . . . . . . . . . . . . . . . . . . . . .1 IOCATION MA,P............................2 PERCENT TRAFFIC DISTRIBUTION............3 TRAFFIC GENERATION RATES................4 PROJEc-I'S BUILOOUT.......................5 MAJOR PROJECT MAP.......................6 TEST 1 & 2..............................7 TEST 1 TRIP DISTRIBUTION.................8 EXISTING AND PROPOSED LEVEL OF SERVICE..9 PEAK HOoo.........................10 - 11 - 12 RECOMMENDATIONS & CONCLUSIONS..........13 ..' '... ~ .\ I NTROOOCT ION \ '/ Orchard Landing is the site of a prOpbsed 3 lot, s1n&le family ( " subdivision, which will be located on the east side,of US 1, 1/2 mile south of SK 15th Avenue. This site is in the municipal limits of Boynton Beach Plorida. The ~pose of this Traffic Impact Analysis is to determine the impact of these 3 single family dwelling units on the surrounding roadway system and compliance with Palm Beach County's Traffic Performance Standards. Access to the site will be from private roadway onto US 1. . !-: -1- IllCATIQN MAP .... ... . . po VE 2 3 4 E St Ancllewi Club T455 T4&S -2- '- ~ 'I... ;.: c. PERCRNT TRAFFIC DISTRIBUTION US 1 4 lane 701 t r- Project Entrance Road -3- _.._._'-------"...__._._--_.~--_....._._-~_._---_.,,-.-'_._-.._-~._---_._-_.~--- '--~--.._- TRAFFIC GRNRRATION RATES Trip Generation Rates are taken from Palm Beach County"s Fair Share Contribution for Road Improvements and are as follows: Units: Sinale Family Dwelling Units 3 x 10 Trips Per Dwellini Unit Total Trips Per Day: = 30 T/D Tbe Traffic Performance Standards require that the 30 external trips/day be distributed throughout the roadway network assum1n& 100% occupancy and development based upon the trip distribution identified on the previous pase. This Traffic assignment constitutes Test #1 identified in the County"s Mandatory Traffic Performance Standards. In this test with the project traffic less than 200 trips per day, the projects external traffic must be distributed is required to be distributed to the directly accessed link, or US 1. -4- PROJRCT BUlLOOUT All Buildini Permits for the proposed project are expected to be obtained prior to the fall of 1997. This data includina the historical growth rate will be added to the surrounding roadway network. Based on these ass~tions, buildout for this project will be a twelve month time period, endin& in the fall of 1997. -5- MAJOR PROJRCT MAP Provisions of the Traffic Performance Code dictate that all major projects within the project radius of influence during the build out period of the proposed project shall be specifically accounted for in projecting background traffic. A major project is defined as: Any PROJECT, including those within IIWlicipalities, which is: (A) A Developnent of Regional Impact; (B) A PROJRCT which ienerates more than seven thousand (7,000) trips; (e) Any PROJRCT of any type or size which is contractually bound to financing or constructing any portion of a Major Thoroughfare which is not site related; Given the short buildout time frame for this project, and the location there are no major projects within the Study Area which will influence the project. -6- RADIUS OF D1MUllPHRNT INFIlJRNCR TEST 1 & 2 TEST 1 - The Traffic Performance Standards require under Test 1 that the projects traffio be distributed throughout the roadway system identified in Table 2 as outlined below: Net Trip Generation Maximum Distance 1 - 200 adjacent roadway Traffic distribution shown on page 8 of this report. distributes traffic throuahout the road system in acoordance with Test #1. The direotly a.ccessed link in this case. US 1 will be analyzed. The results indioate on paae 9 of this report that none of the roadway links exceed Level of Service D. This request therefore does not violate Test #1. TEST 2 - As the total trips are less than 60 trips per day~ this projeot also passes Test 2 as provided for in the Traffic Performance Standards Ordinance. -7- 20639 *21* 20660 20639 *9* 20648 LlGlmD TRST #1 - TRIP DISTRIBUTION US 1 4 lane 20639 PROJECTED 1996/97 AI1r BASED ON TRAFFIC INCREASE OF 3%,IYKAR *21* PROJECT TRAFFIC 20660 TOTAL TRAFFIC 30 Project Entrance Road -8- N - BIB EXISTING & PROPOSRD LKVRL OF SERVICR BIB "-- . US 1 Projects Entrance -9- PRAK HOUR Peak Hour Generation Rates are shown on pages 11 3& 12 of this report for the single family subdivision. These ra.tes were obtained from the ITK Trip Generation Manual and are as follows: 3 Sinile Family Dwelling Units: a) A.M. Peak Hour .867 x In 43 + .398 = 4 TripelHour b) P.M. Peak Hour .902 x In 43 + .528 = 5 TripelHour Direotional splits are based upon the following: AM PEAK HOUR VQLUMll: .4 Ri PEAK HOUR VOllJMR 5 RNTERING 1 ~ITING 3 ENTERING 3 RXITING 2 -10- "._--~-_._----_..~---"--_.,--_._--~ .. PROJRCTS AM PEAK HOUR TRAFFIC ~ N US 1 t3 r Projects Entrance LRGRND 3 - PROJICTS PEAK HOUR TRAFFIC -11- . '. PROJECTS PM PRAl HOUR TRAFFIC 1 US 1 N t:::2 r Projects Entrance LRGRND 3 - PROJECTS PIAK HOUR TRAFFIC -12- . . REcniMKNDATIONS ,\ OONCLUSIONS This project passes both Test #1 and Test #2'j)f Palm Beach County's Traffic Performance Standards Ordinance. Test #1 requires the projects traffic be assigned throughout the roadway network and then added to the existina traffic volumes. None of the roadway links exceed their roadway capacities. This project also passes Test #2, which requires that sites with less than 50 vehicle trips per day not be required to address any link of roadway. The highest peak hour volume for vehicles entering the site occurs in the FM peak hour. An estimated 3 vehicles per day is projected to turn ri&ht into the site from US 1. None of the peak hour volumes shown on pa,ae 11 & 12 require additional roadway tmprovements, or signal requirements. -13-