CORRESPONDENCE
--
-t-\ \~)
CITY of
BOYNTON BEACH
~ Mailing:
~' Telephone:
Post Office Box 310
Boynton Beach. Fl 33425-0310
(407) 738-7487
100 E. Boynton Beach Blvd.
Boynton Beach, F1 33435
OFFICE OF THE CITY ENGINEER
Mark A. Bidwell, Director of Planning and Engineering
Coscan Florida, Inc.
Suite #400 - East Building
1900 Corporate Boulevard Northwest
Boca Raton, Florida 33431
May 17, 1990
Re: Request for Retroactive Time Extension for Preliminary Plat and Site Plan
Quail Run Phase II
Dear Mr. Bidwell:
Please be advised that the City Carmission during their regular May 15, 1990
meeting ruled favorably upon your request for a retroactive time extension for
the above referenced project.
Carmencing May 15, 1990 the site plan will be extended for a period not to
exceed one (1) year and the preliminary plat has been extended for a period not
to exceed six (6) m::nths. Should you have any additional questions relative to
this action, please feel free to contact me at the following telephone m:rnber:
(407) 738-7487
Very truly yours,
l \. -~ +~~~. o1S
Vincent A. Finizio
Acting Assistant to the City Engineer
cc: J. Scott Miller, City Manager
Timothy Cannon, Interim Director of Planning
Don Jaeger, Director of Building and Zoning
CITY of
BOYNTON BEACH
~
@....,,120E.BOYnton
, . -....
;"'..1, P. O. Box 310
..~..., Boynton Beach,
"""'-
Beach Blvd.
-
Florida 33425-0310
(407,) 738-7490
OFFICE OF THE PLANNING DIRECTOR
January 18, 1989,
Jay G. Foy, P.E., Vice President
Shalloway, Foy, Schofield, etal
1201 Belvedere Road
West Palm Beach, FL 33405
Re: Quail Run - Woolbright Road
Dear Jay:
Please be advised that on Tuesday, January 17, 1989, the City
Commission made a determination to relieve Coscan of the
responsibility of constructing Woolbright Road from S.W. 26th
Street west to Knuth Road.
Incorporated in this decision, however, is the requirement that
road impact fees are due when permits are applied for.
If you have any questions concerning this matter, please do not
hesitate to contact me.
Very truly yours,
CITY OF BOYNTON BEACH
c~ _~
CARMEN S. ANNUNZIATO, AICP
PLANNING DIRECTOR
CSA:ro
cc City Manager
City Engineer
Utilities Director
Central File
Director of Roadway Production, Palm Beach County
....
",.' ----. ...,,-,
~('
~\.
r.J
. I
'-
BID
S C H E D U L E
QUAIL RUN .- PHA.SE I I
BOYNTON BEACH FLORIDA
DECEMBER 5, 1988
PROJECT TOTAL,S
STORM DRAINAGE SYSTEM
$ '25, 8to3.D~
$ __ 58) 3B8~50_
$ 28) J'-I / . 50
,-
$ /Z l./ 205,96>,
} .
SANITARY SE~ER SYSTEM
:J,.,'.~R DISTF<.IBUTION SYSTEH
EARTH\WRK, PAVING AND GF'.ADING
TOTAL CONS::'2lJCTION COSTS-------------------------$ 230, 598.,cjo
;,
4. ~~~~:~~~~::.u~9~~c~~LER, INC.
r.-..'YMI' 7301 A West Palmcllo P<lrk Road' Suile l00A
Boca Ralon, florlcl" 33~3:1
005 . 3!l2 1991
BID
S C H E D U L E
QUAIL RUN PHASE II
BOYNTON BEACH~ FLORIDA
DECEMBER 5, 1988
SANI'rARY SEWER S~STEN
ITEM DESCRIPTION
NO.
ESTIMATED UNIT
QUANTI TY
UNIT
PRICE
TOT AL
PRICE
1. FURN I SH AND INSTALL
PRECAST MANHOLE, (01- 6'CUT)
3. }?URN I SH AND INSTI\.LL
8" D.I.P. SrsWER PIP;.s (0'- 6ICU'I')
3 EACH $ /100.00 ~ 3 o~.5!.o
829 L.F. $ /'2.00 $ q Qt./8.oc
--~--
60 L.F. U~()O ':L.~q.O.OO
2. FURNISH AND INSTALL
8" V.C.P. SEWER PIPE(O'- 61CUT}
4 . F' URN ISH AN DIN S TAL L 6" P. V . C .
SERVICE PIPE INCLUDING FITT:NGS
AND PLUGS
7, CORE INTO EXIS'l'ING l'1ANHOLE
lO50 L.F. $ '/. 00 435,Q!!O
1 EACH $ /35.0D fL-J 35.00
29 EACK $ (g0.00 ~7t./O.OO
3 EACH ~?O. 00 $ Z,550. 60
5. FURNISH AND INSTALL
CLEAN OUTS & PLUGS
6. FURNISH ANJ INSTALL 8~iX6:1 'VrY.E
'I'O'fAL ESTIMATE FOR SANI'rl~RY SEWER SYS'l'El:1 ____________________ ~5) 8IP3.00
BID
s C H E D U L E
QUAIL RUN PHASE II
BOYNTON BEACH, FLORIDA
DECEMBER 5, 1988
WATER DISTRIBUTION SYSTEM
ITEM DESCRIPTION
NO.
ESTIMATED UNIT
QUANTITY
UNIT
PRICE
TOTAL
PRICE
1.
2.
3.
4.
5.
6.
7.
8.
9 .
10.
FURNISH AND INSTALL
6" D.l.P. WATER Ml>.IN
2350
L .F. $ //50
$ ~?, oz5c
FURNISH AND INSTALL
D.I. FITTINGS
0.91
TONS
$3500.00 0~5.0C.
FURNISH AND INSTALL FIRE HYD.
ASSEMBLIES, INCLUDING LATERAL
PIPE, VALVE AND HYDRANT
4
EACH
c / c..j DO . ODe 5 0 DO. (.
Y-!...___ :L--t--:----.
FURNISH AND INSTALL
6" GA'l'E VALVE & BOX
7
EACH $ t/-/?- OOL~ B 10.0<'
EACH fiJOO.OO ~ /I~OO.O(
EACH ~60.60L81500.0
L.F. L ~50 $ l,ot./8.5
--- ,.
EACH .~ 3{)o. 00 $ 1, '200. C
.
L.F. _~
3.50 L 735.(J1
FURNISH AND INSTALL
SAMPLE POINTS
6
L.F. ~
5. 00 ~ /,0'25. c
.
J7URNISH AND INSTALL 2" SERVICE
CONNECTION INCLUDING SADDLE, TAP,
CORP. STOP, CURB STOP & ADAPTORS
17
TOTAL ES'l'IMATE FOR WATER DISTRIBUTION SYSTEM _________..___________ $ 58/388.50
FURNISH & INSTALL 2" SERVICE PIPE
233
FURNISH AND INSTALL 1.1/2" SERVICE
CONNECTION INCLUDING SADDLE, TAP,
CORP. STOP, CURB STOP & ADAPTORS
24
FURNISH & INSTALL 1 1/2" SERVICE
PIPE
210
FURNISH AND INSTALL 3" P.V.C.
SCH. 40 CASING PIPE
205
BID
S C H E D U L E
QUAIL RUN PHASE II
BOYNTON BEACH, ULORIDA
DECEHBER 5, 1988
STORM DRAINAGE SYSTEM
I T E i'1 DESCRIPTION ES'l'IMATED UNIT UNIT TOTAL
NO. QUANTITY PRICE PRICE
---
l. FURNISH ,.. INSTALL 21:1 R.C.P. 127 L. F'. ~23...50 $ 'Z 98tf.50
c: I
'2 , FURI\'ISH &. I NSTi'.l:"L 113" R.C.P. 327 L.F. Llq.OO $ (p ~J3.00
I .
? FURr:-!ISH & INSTALL 15" R.C.P, 282 L. F'. ~L/7..{)O_ i 4 1CJt/..oO
oJ .
I
4 . F'URN IS ;,1 & INSTALL 2:1. 11 C.A.P. 20 L.F fLj?5.j;?O ~ 500.00
~ __"P__O_____
r FURNISH IX INS '1' AL L 18" C.A.P, 40 L.F. $ 2/..5D ~O:!?O
.) .
6. FURNISH 8: His'rALL 15" (~.F~.P. 20 L . lt~ . Ll!l.. 59_ L3CJO.OO
7. FURNISH & INSTALL 'i' Y P E (: e"
CATCH :3ASIN 10 EACH !ii/QO. DO ~) 000.00
8. FURNISH ~'" Ii.-JSTALL 21 :1 C.A.P.
.\.
PRECAST C0NCRErrE COLLAR 1 EACH L-L./oo.ooL 400.00
~
c. Z;:JRNISi-l ,.. I NS'Ll\.L.L 1 e ~f C.iLE' .
:; , '.x
PRECAST CONCRETE: COLLAR " EACE ,$ 35D.OO c 1D~~O
L. 'r'
10. FU1~NISH .~ IN S'I' ~j.LL 151; C.A.P.
PRECAST CONCRETfE COLLAH 1 EACH ~()O. 00 .2. 300.00
-------
'l'O'f}\L ES'l'H1A'i'E FOZ:;, STORM DRAINAGE SYS'I'Ei"1 -------------.----- 1- 28-+~4/. ~o
IL_LP_~__tL_E__I2--1L~
QUAIL RUN PHASE II
BOYNTON BEACH, FLORIDA
DECEMBER 5, 1988
PAVING AND GRADING
ITEM DESCRIPTION ESTIMATED UNIT UNIT TOTAL
_ N Q:.-_________________._________._________Q.'d A~I T I_,.tt_.____.____? R I ~E-_.__ p Rl~~__
1.
2.
3.
4 .
5.
6.
7.
8.
9.
10.
F'Ur{N1SII AND INS'I'ALL
11/1\" TYPE 8-':1. A.C.S.C.
S.Y.
s3.00
._l.~_._____.___.___
~~ /~ 905". DC.
:L____I_ -----.---.- .
:) (;:3 ")
FURNISH AND INSTALL
n" LIME/SHELL ROCK BASE
S.Y.
s to. DO
.:L__.____
i:.~53o.c
525::>
FURNISH AND INSTALL
6" LIME/SHELL ROCK BASE
S.Y.
~ ~OO.
c 3 135.0(
:1'__==+-=____
627
FURNISH AND INSTALL
12" STABILIZED SUBGRADE
5882
S.Y. $ 2./0 ~/'2)352.Z
FURNISH AND INSTALL
HEADER CURB
330
L . F ~ $ '1. ()O
L"2,3/D.O
.
FURNISH AND INSTALL
CONC WHEEL STOPS AND STRIPING
32
EACH ~.OO $
t/8o.ol
FURNISH AND INSTALL
STREET SIGNS
5
EACH $ Z~O.OO ~_J,2_~(). 0'
ACRE ~5..00.:..00 03_QO~~~
CLEARING AND GRUBBING
10.6
SUPPLY AND COMPACT PAD FILL
(9862 BCY FILL, BLDG)
BCY.
L5.00
$ '-/9,'310. ()
.
9862
ROADWAY EARTHWORK
(961 BCY CUT, ESTIMATE)
BCY.
1.. /. 70
G~ 3~.:.?(
961
TOTAL ESTIMATE FOR PAVING AND GRADING __________________________ $/~~205.7
__:..:..J____
*BCY. = BANK (IN-PLACE) CU. YD.. - NO SHRINKAGE OR SWELL FACTORS INCLUDED
.
Coscan Flori
Inc.
Suite 400 East Building
1900 Corporate Boulevard N.W.
Boca Raton. Florida 33431
(407) 994-1433
HAND DELIVERED
Mr. Tom Clark
City Engineer
City of Boynton Beach
200 North Seacrest Boulevard
Boynton Beach, Florida 33425-0310
Re: Quail Run, Phase II
September 26, 1988
Dear Mr. Clark:
Please find attached the preliminary plat for Quail Run,
Phase II. Should you have any questions, please contact
myself or our consultant, Caulfield & Wheeler.
Thank you very much.
StJleBr ~'
/ ~
Thomas J. ~ira
Director of Planning & Development
TJL:pr
Attachment
Boca: (407) 994-1433. Dade: (305) 935-1292. Broward: (305) 427-3204. N. Palm Beach: (407) 736-8118