Loading...
LEGAL APPROVAL il LEGALI APPROVAL DOCUMENTS ~1.q1 ~~ DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA APPLICANT: Malcolm Butters-Butters Contruction & Development (Sun Sentinel Distribution Facilitv at Quantum) APPLICANT'S AGENT: Malcolm Butters-Butters Construction & Development HEARING BEFORE CITY COMMISSION: Mav 20. 1997 TYPE OF RELIEF SOUGHT: Reauest approval of Site Plan. LOCATION OF PROPERTY: Southeast comer of Park Ridee Boulevard and Alpha Drive (Lot 46-A in Quantum Corporate Park) DRAWING(S): SEE EXHIBIT "A" ATTACHED HERETO. THIS MATTER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: 1.. Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. 2. The Appli9Bnt ....L HAS HAS NOT established by substantial competent evidence a basis for the relief requested. 3 The App~nt's application for relief is hereby _ GRANTED subject to the conditions marked as "include" in Exhibit "C" hereto. DENIED 4. This Order shall take effect immediately upon issuance by the City Clerk. 5. All further development on the property shall be made in accordance with the terms and conditions of this order. 6. Other: DATED: May 20. 1997 ('I /i)' I) , " I ,"r(,. , 1.- / (' Y v / JJ . ,1.1 City Attorn,; ~ v S 2 .I~-I City Clerk swp\DeptsIPlanninglSunSentinel Dev Order 3UN SENTINEL LOCATION MAP \~;;1A~/ : I - "MOTORDLA,: .- -~I' . /'.~~\\ I ,'.Ie . f" :. ~..., ~lC ItlOct! .~ -. :~ . I'l/ t--} I I ! t~::, I A I , ~I G .. :I irir: L - 1"-1: I ~. ~, - EXHIBIT "C " Conditions of Approval Project name: Sun Sentinel Distribution Facility at Quantum File number: NWSP 97-004 Reference: The plans consist of 13 sheets identified as 2nd Review. New Site Plan. File # NWSP 97 -004 with an April 14. 1997 Plannina and Zonina Department date stamp markina. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS Comments: None UTILITIES Comments: 1. A capacity reservation fee of $2370.06 is due within thirty (30) days of Commission approval, (Sec. 26-34[E]). 2. Utilities requests a meeting with the project engineer to discuss revisions to the water and sanitary sewer detail sheet to conform with current utility standards. . 3. A building permit for this project shall not be issued until the Utilities Department has approved the plans for the water and/or sewer improvements required to serve the project, (Sec. 26.15). FIRE Comments: 4. There shall be no vehicles stored within or driven through the bays. Previous fire experience in newspaper distribution involved a vehicle fire within the bay. POLICE Comments: 5. It is recommended that the handicapped parking SpdceS be modified to meet the criteria that has been adopted by federal guidelines and are to be up to standard by October, 1997. ENGINEERING DIVISION < Comments: 6. All plans submitted for speCific permits shall meet the city's code requirements at time of application. These permits include, but are not limited to, the following: site lighting, paving, drainage, curbing, landscaping, irrigation and traffic control devices. Permits required from agencies such as the FOOT, PBC, SFWMD and any other permitting agency shall be included with your permit request. Chap. 1, Art.I, Sec.6, par.A, pg. 1-3. Page 2 Sun Sentinel Distribution Facility at Quantum File No. NWSP 97-004 DEPARTMENTS INCLUDE REJECT 7. Specify the total number of employees on a maximum shift for the three lease spaces and the number of visitor parking spaces for a determination of the number of required parking spaces. Chap.2, Sec.7H2, pg.2-63. 8. Provide certification by developer's engineer that the drainage plan complies with all city codes and standards. Chap. 6, Art.v, Sec.5A, pg.6-7 and Chap.23, Art.IIF, pg. 23-8. 9. Photometrics must be approved for both pedestrian and parking lot lighting before a permit can be issued. (Modify lighting plan to eliminate all readings within parking lot that fall below % ft. candle and specify on plan that parking lot has a minimum average light level of 1 ft. candle). Chap.23, Art.IIA1a, pg.23-6. 10. Striping and markings and typical exfiltration trench shall conform to City Standard Drawings #B-90012 & B-91 007 respectively. . BUILDING DIVISION Comments: 11. Plans do not provide any data or details regarding proposed site signage, if any. Such information shall be provided prior to building permit issuance. PARKS AND RECREATION Comments: None FORESTER/ENVIRONMENTALIST Comments: 12. The applicant should submit a written comment that they do not plan to apply for a microsite on the parcel. This is in accordance with the Development of Regional Impact development order requirements. 13. The landscape plan, sheet (L 1), indicates landscape and irrigation improvements in the median of Park Ridge Boulevard which is under the maintenance of the Quantum Community Development District. The applicant must notify this group that the area should be maintained in accordance with the Development of Regional Impact development order. PLANNING AND ZONING Comments: 14. Any roof top equipment shall be screened from view at a distance of 600 feet. If such equipment is planned, indicate its , Page 3 Sun Sentinel Distribution Facility at Quantum File No. NWSP 97-004 DEPARTMENTS INCLUDE REJECT location and the height of the equipment above the roof level. Provide elevations of the structure showing the roof top equipment and the required screening (all reduced to a small scale) and draw in on these elevations the lines-of-sight connecting the highest point of the equipment with eye level from a distance of 600 hundred feet from the building (LOR, Chapter 9, Section 11. E). 15. Land Development Regulations, Chapter 2 - Zoning, Section 7.H.3 requires the distance between two driveways within a PID district to be no less than 150 feet. No building permits can be issued until a zoning variance is granted from the above requirement by the Board of Zoning Appeals for the following distances: . between Sun Sentinel's driveway and Safety Kleen's driveway along Alpha Drive, and . . between Sun Sentinel's driveway and Flowers Distribution Center's driveway along Park Ridge Boulevard 16. Sign age, although requested by staff, was not submitted with this site plan. It is recommended that signs will be approved administratively, subject to compliance with the Land Development Regulations and the approved Quantum Corporate sign program. 17. I n order to allow staff to monitor the amount of traffic generated by the industrial and commercial uses in Quantum Park and to determine how the anticipated traffic counts for the specific lots relate to the overall traffic study counts for the entire Quantum Corporate Park, on the site plan, sheet SP-1, indicate the anticipated number of peak hour trips per day and total trips per day. 18. Provide required parking calculations in accordance with Land Development Regulations, Chapter 2 - Zoning, Section 7.H.2. Denote on the site plan the anticipated number of employees on a maximum shift for each tenant space. 19. Proposed on-site lighting shall be shown on both the site plan and landscape plan as required by LOR, Chapter 4, Section 7.B.2 to eliminate potential conflicts with landscape material and with the existing on-site or proposed easements. 20. All landscape material shall be shown within the boundaries of the subject site - Lot 46-A. Four Live Oaks along Alpha Drive shown on the Landscape Plan, Sheet L-1, are proposed to be planted within the right-of-way of Alpha Drive. Remove these oaks from the right-of-way and incorporate them within the required, on-site landscape buffer. 21. Chapter 7.5, Article II - Landscape Code, Section 4.0.1 of the Page 4 Sun Sentinel Distribution Facility at Quantum File No. NWSP 97-004 DEPARTMENTS INCLUDE REJECT Land Development Regulations states that within the required landscape buffer screening required for a vehicular use area, a tree shall be planted every 40 feet o.c. Incorporate an additional native tree into the required buffer screening north of the western part of the parking area. Existing trees, can be credited for the above requirement when information is provided regarding these existing on-site trees, documenting that the requirements of the landscape code are met. 22. On sheet A-4 containing elevation drawings of the proposed building provide a legend of all depicted colors. 23. It is recommended that every lease space have a separate loading zone since no internal connection between the lease spaces exists. Alternatively, a note shall be made on the site plan stating that future users of both lease areas will be limited to operations not requiring a loading zone. 24. In accordance with LOR, Chapter 4, Section 7.E, amend the site . plan tabulation to include the following site distribution percentages: . landscaped open space (minimum 20 percent required) . vehicular use areas . other paved areas . building coverage (not to exceed 60 percent) . total lot coverage . number of loading zones provided. 25. On sheet A-4, containing elevation drawings of the proposed building, eliminate inconsistencies in background visibility of "office towers" between west and east elevations. 26. On the colored elevation sheet, the northern building elevation contains an erroneous depiction of the easternmost portion of the building projection. This projection should be depicted with colors #1 and #2 and not #4. 27. It is recommended that the proposed color #4 (or #5) depicted as T-107 Mint Green be replaced with an earth-tone color. 28. It is recommended that, in order to maintain architectural compatibility of the buildings in this section of Quantum Corporate Park, the front elevation of the warehouse facing Park Ridge Boulevard be altered as follows: . incorporate at least one window opening in each exterior wall panel . if window openings are not necessary or they limit the functionality of the warehouse space, use of an alternative way of emphasizing the significance of the front elevation, such as Page 5 Sun Sentinel Distribution Facility at Quantum File No. NWSP 97-004 DEPARTMENTS INCLUDE REJECT simulated window openings, glass blocks, wall offsets, exterior finish material differentiation, ceramic tiles, sheet metal squares and/or stucco joints. . to further emphasize the significance of the front elevation increase the height of the parapet wall, or a part of it, a minimum of 2 feet. Note: Other forms of architectural expression will be acceptable as long as the objective of emphasizing the front elevation is achieved. ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS 29. None . ADDITIONAL CITY COMMISSION CONDITIONS 30. To be determined /bme s:\projects\sun sent\cond of appr\ ... ADDITIONAL CONDITIONS FROM COM11ISSION MEETING 1. 2. 3. 4. s. 6. 7. 8. 9. 10. MEE7ING MINUTES REGULAR CITY COMMISSION BOYNTON BEACH, FLORIDA MARCH 17, 1998 2. Regular City Commission Meeting of March 3, 1998 Commissioner Titcomb moved approval. Mayor Pro Tem Tillman seconded the motion that carried 5-0. B. Bids - Recommend Approval - All expenditures are approved in the 1997-98 Adopted Budget 1. "Purchase and Install Two Utility Truck Bodies" - BID #038-501-98/SP - Approve award to Rayside Truck & Trailer, Inc. of West Palm Beach, Florida, in the amount of $8,570 2. "Cleaning, Sand Blasting and Painting of a Steel and Concrete Potable Water Clarification Basin (INFILCO Accelator)" - BID #013-401-98/SP - Approve award to Atlantic Painting & Sandblasting of Boynton Beach, Florida, in the amount of $46,500 3. "Annual Local Manpower for the Clean Up of Martin Luther King, Jr. Blvd. - Target Area" - BID #052-722-98/0D - Approve one-year extension of this bid to: BLC Lawn & Maintenance of Delray Beach, Florida, in the amount of $29,200. C. Resolutions: 1. Proposed Resolution No. R98-48 Re: Authorizing the abandonment of a 10' utility easement located approximately 540 ' east of the southeast corner of Congress Avenue and SW 23rd Avenue to be known as Grand Park ALF of Boynton Beach 2. Proposed Resolution No. R98-49 Re: Accepting a letter of Credit from NationsBank as surety for required water and sewer improvements for the Sun-Sentinel Building located in Quantum Park Item IV-C.2, Proposed Resolution No. R98-49, was deleted from the agenda during Agenda Approval at the request of City Attorney Cherof. 3. Proposed Resolution No. R98-50 Re: Accepting a Letter of credit from Sun Trust Bank as s.urety for required water and sewer improvements for Hampton lakes, located outside City limits 4. Proposed Resolution No. R98-51 Re: Approving a Subordination of Easement Agreement for an existing utilities easement now located in the Congress Avenue right-of-way 5 MINUTES REGULAR CITY COMMISSION MEETING BOYNTON BEACH, FLORIDA MAY 20,1997 Motion Vice Mayor Titcomb moved to approve Item IX.C, request for site plan approval to construct an 8,939 square foot church for 284 seats (main sanctuary) on 1.25 acres of land, subject to staff comments and the Planning and Development Board comments. Commissioner Bradley seconded the motion, which carried 5-0. D. Project: Sun-Sentinel Distribution Facility at Quantum Park PID Malcolm Butters, Butters Construction and Development, Inc. Quantum Associates Southeast corner of Park Ridge Boulevard and Alpha Drive Site Plans - Request for site plan approval to construct a 22,791 square foot distribution facility on 1.52 acres of land (lot 46A in Quantum Corporate Park PI D). Agent: Owner: Location: Description: Mr. Butters was in agreement with staff's comments, as well as the Planning and Development Board comments. No ond in the audience wished to address this item. Motion Vice Mayor Titcomb moved to approve the request for site plan approval to construct a 22.791 square foot distribution facility on 1.52 acres of land (lot 46A in Quantum Corporate Park PID), the Sun-Sentinel distribution facility, subject to staff comments and the Planning and Development Board comments. Commissioner Jaskiewicz seconded the motion. Commissioner Bradley asked how many jobs this distribution center will provide. Mr. Butters did not know, but promised to get that information to Commissioner Bradley. The motion carried 5-0. E. Project: Agent: Automotive Service Uses in PCDs Anna Cottrell 30 MEETING MINUTES PLANNING & DEVELOPMENT I.. .JARD BOYNTON BEACH, FLORIDA MAY 13, 1997 Motion Vice Chairman Golden moved to recommend approval of the site plan for Lakeside Church to construct an 8.939 square foot church for 284 seats on 1.25 acres of land, subject to staff comments including the two clarifications from Mr, Aguila. Mr, Wische seconded the motion which carried unanimously, CHAIRMAN DUBE DECLARED A BRIEF RECESS. THE MEETING RECONVENED AFTER 10 MINUTES. 3. Project: Agent: Sun-Sentinel Distribution Facility at Quantum Park PID Malcolm Butters Butters Construction and Development. Inc. Quantum Associates Southeast corner of Park Ridge Boulevard and Alpha Drive Request for site plan approval to construct a 22,791 square foot distribution facility on 1.52 acres of land (Lot 46A in Quantum Corporate Park PID). Owner: Location: Description: Malcolm Butters. 2005 NW 62 Street, Fort Lauderdale. Florida. explained that the proposed use is consistent with the overall plan of the Park. He requested clarification on Comment #23. Mr, Lewicki explained that the plan indicates one loading zoning and three leased areas. Staff's recommendation is that each area have a separate loading zone, or a note is to be placed on the site plan indicating that the other uses will not require loading zones. Mr. Butters agreed with all of the comments contained in Exhibit "C". Mr. Butters also added that the applicant will commit to including another window or some form of glass on the exterior glass. Mr. Myott questioned whether a planter system is proposed along the north elevation. Mr. Butters responded negatively, but advised that there will be plantings underneath the Royal Palm trees. Mr. Aguila requested that this board review the individual signage when the second and third tenants come into the building. He wants to make certain there is conformity. Vice Chairman Golden referred to Item #15 on Page 10. He clarified that this should read PID district rather than PCD district. Motion Vice Chairman Golden moved to recommend approval of the site plan for the Sun-Sentinel Distribution Facility to construct a 22.791 square foot distribution facility on 1.52 acres of land at Lot 46A in Quantum Park PID, subject to staff comments. Mr. Rosenstock seconded the motion which carried unanimously. 14