RE:
~
C~-V.A LUGANO - P~MMENTS (PAVING AND DRAINAGE ONLY)
__----0
s:(k/
~
We recommend approval of the request subject to the following comments:
. .
1. Add to sheet 7 of8 a detail drawing of the proposed 4-foot wide sidewalk. The drawing
shall include a section view that identifies the type of material and thickness. Also, include
either a partial plan view drawing or add to the section view drawing specifications that
identify the distance between control joints and the type of surface finish proposed for the
sidewalk.
2. Add to sheets 2 of 18,3 of 18, 4 of 18, 5 of 18 and 6 of 18 notes that will identify the
location, type of material and width of the on-site sidewalks. Add a note to sheets 5 of 18
and 6 of 18 that indicates the construction specifications for the on-site sidewalk is located
on sheet 7 of 18.
3. Modify the Parking Stall detail drawing to reflect actual conditions.
4. To verify the proposed finish floor elevations submit a copy of the South Florida Water
Management District permit.
5. Add a note to both ramp detail drawings found on sheet 7 of 18 indicating that ramps with
a rise greater than 6" handrails, constructed in compliance with the accessibility code, shall
be installed on both sides of the ramp. Add to both detail drawings a 6' long level landing
at the top and bottom of the ramps. Also, modify both drawings to show return curbs or
flare sides on both sides of the ramp.
.. .
6. To verify the total number of regular and accessible parking spaces provided on the plans. ..
is not less than the required amount add to sheets 2 of 18 and 3 of 18 the provided and
required parking space computations. Where applicable label the parking spaces located
within garages.
MH/ck '.
Xc: Bulent Kastarlak
Michael Haag
C:\My Documents\Via Lugano Bldg.Plal Comments P&D.doc
(;-:> I I /'.
,__ ~ t'vi. t ttH~ b,
FEB. 4.1998 10:35AM
M. B-C:;CHORAH ASSOC.
NO. 180
P.2/3
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. 80 98--027
TO:
Ken Hall, Eog. Plans Check InspectorlTethnical
Don Johnson. Deputy Building OffiCial~
February 2, t 998
VIA LUGANO - PLAT COMMENTS (PAVING AND DRAINAGE ONLY)
,-r.,\ 13 r:': ~ . rr:. ~: I
. .~ In I~ ., . L~ .
. ) ~ -"~..--.;;.....
~I ~
..' FEB - 3 I.; _ J '
I -
I ---J
.......f~.'-P' .
L. .._-~,~..~G
FROM:
DATE:
RE:
We recommend approval of the request subject to the following comments:
1. Add to sheet 7 or8 a detail drawing Of the proposed 4-foot wide sidewalk. The drawing
shall include a section view that identifies the type of material and thickness. Also, include
either a partial plan view drawing or add to the section view drawing specifications that () 1<.
identify the distance between control joints and thel type of surface finish proposed fur the
sidewalk. '(
2. Add to sheets 2 of 18. 3 of 18, 4 of 18, 5 of 18 and 6 of 18 notes that will identify the
location. type of material and width ofthc on-site sidewalks. Add a note to sheets 5 of 18 0 l<.
a.nd 6 of 18 that indicates the construction specifications for thll OI1-site sidc:lwa.lk is located
on sheet 7 of 18.
3. Modify the Parking Sta.ll detail drawing to reflect actual conditions. DIL - ;tl ~0" (IN.
4. To verify the proposed finish floor elcvations submit a copy of the South Florida Water
Management District pennit. 0 ~ - AL~'i SVS-y..'u'''nb:> "'f'Cl K.E-N ~.Ll..
5. Add a note to both ramp detail drawings found on sheet 7 of 1 ~ indicating that ramps with j) I ~ ACo1'Z
a rise greater than 6" handrails, constructed in compliance with the accessibility code, shall
be installed on both sides of the ramp. Add to bothldctail drawings a 6' long Icvellanding
at the top and bottom of the ramps. Also. modify both drawings to show retum curbs or
flare sides on both sides of the ramp. 1>t'!rGr12...4t ~ 4' s.(p~u'-.s
6.
To verify the total number ofregular and accessible parking spaces provided on the: plans
is not less than the required amount add to sheetS 2 of 18 and 3 of t 8 the provided and ,.'
required parking space computations. Where applLcabte label the parking spaces located
within garages.
or:.
MH/ck
Xc: Bulent Kastarlak
Michael Haag
C:lMy DuCI.I""<IlftlA\Via Lupau Bld...P111t c.:omments P&D.dcc
t--\ & r4t-
~ P 2- ~
'3
~ .- y.- -'t (
PLANNING AND ZONING DEPARTMENT
MEMORANDUM NO. 97-592
""",--,
TO: Ken Hall
Eng. Plan Check Inspector
THROUGH: Tambri Heyden, AICP f-jjJ
Planning and Zoning Director
a,:c
FROM:
Jerzy Lewicki ... --. - \f ,
Senior Planner ~
DA TE:
December 4, 1997
SUBJECT:
Preliminary Plat review - 1 st review
Project: Via Lugano
Location: Melear PUD (multifamily)
File No.: PLAT 97-005
The following is a list of 1 st review comments regarding the subdivision plat for Via
Lugano development in Melear PUD.
COMMENTS
1. Provide Declaration of Covenants and Restrictions of the proposed development
for staff review prior to recordation.
~ ~i-
/[0 '. '~~22 \' Lb'LJ Lc..~l
xc: Central File
S:\Planning\SHARED\WP\PROJECTS\MELEAR\Via Lugano\PLA TI1st-rev com plat vialug,doc
/2!23/r7~R..-Z'( -luts S'u\:)0G~{f~~~~bL (5
Chv'\)bL t5 (\"~'h.B; ~"-"ti~-s~rp [c.-O~VI)
\>'---~A-S'~ {>~vLb~ 'A- ~\.J~b ~~IC~~tv'C~ ..
()1i'- ~ ,~""c.T C'Wh' '''. '2lVT . r[I*A,J\::..~ b1--:,
1110[.5 -- L~S 5\Jl~_\ Ge( (t42-Ce:L (S ~- '- K- b G 6> '":)
t00l ~ S0 -~ D IJ\.S\ OJv' -- 'S'<-~ 1>~\::II-Jcrl~IV . .J
c - ~~~~ .
ENGINEERING MEMO #97-230
CJ W m 0 \Yl m ~
001- ,1&7 l~
. PLANNING AND
ONING DEPT.
DATE: December 1, 1997
TO: BILL CAVANAUGH, FIRE PREVo OFF.
MARK LIPS, P.W. FOREMAN
SGT. MARLON HARRIS, P.D.
JERZY LEWICKI, ASST. PLANNER
SKIP MILOR, UTIL. CHIEF FIELD INSP.
MIKE HAAG, BLDG. PERMIT ADMIN.
JOHN WILDNER, PARKS SUPER. & KEVIN HALLAHAN, FORESTER
FROM: KEN HALL, ENG. PLANS CHECK/INSPECTOR 375-6283 @
SUBJECT: T.R.e. FIRST REVIEW - PRELIMINARY PLAT REVIEW - VIA LUGANO
Please review the attached plat and send engineering your written comment(s) no later than
December 15, 1997. Retain the plan for any future reference. We look forward to your timely
response.
KRH/krh
C:
Bulent Kastarlak, Dev. Oir,
AI Newbold, Dpty. Dev. OiL
Steve Gail, Dpty. Fire Chief
Lt. Steve Graham, P,O,
Pete Mazzella, Asst. to Uti!. Dir,
Charlie Frederick, Rec.fPks. OiL
Larry Roberts, P.W, Dir,
memotrc