Loading...
AGENDA DOCUMENTS / - '-" AGENDA DOCUMENTS PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 96-262 TO: Carrie Parker City Manager -----n /1 Tambri J. Heyden I "/_t.J Planning and Zonirig Director FROM: DATE: May 15, 1996 SUBJECT: Copies of Development Plans of Current Projects Scheduled for Review by the City Commission at the May 21, 1996 City Commission Meeting Please find attached five (5) sets of plans for the following current development projects: Conditional Use St . Joseph's Episcopal Church and School COUS - 96-002 New Site Plan Nautica Sound (FKA Knollwood Groves PUD) NWSP - 96-001 Knuth Road PCD Service Station NWSP 96-003 Major Site Plan Modification Boynton Beach Mall Department Store F MSPM 96-001 The Vinings at Boynton Beach - Phase II MSPM 96-003 Note: Please return the plans/documents to the Planning and Zoning Department following the meeting. If I can be of further assistance, please contact me. TJH:bme Attachments a:trans21.MAY/P&D PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 96-271 Agenda Memorandum for May 21, 1996, City Commission Meeting TO: Carrie Parker City Manager Tambri J. Heyden 1c;tl Planning and Zoning Director FROM: DATE: May 16, 1996 SUBJECT: The Vinings at Boynton Beach - Phase II - MSPM 96-003 Major Site Plan Modification Please place the above-referenced item on the May 21, 1996 City Commission agenda under Development Plans. DESCRIPTION: CCL Consultants, Inc. agent for Boynton Beach II Limited Partnership, a Florida limited partnership, owner of the future Phase II of The Vinings at Boynton Beach within the Woolbright Place PUD, is requesting to amend the previously approved site plan to increase the number of apartment buildings from 12 to 16, omit building types III and V, add a volleyball court and reconfigure other recreation amenities, alter building types II and IV, add a building type VI and reconfigure the parking and access areas. The Vinings is located on the east side of S.W. 8th Street, approximately 1900 feet north of Woolbright Road. Attached Planning and Zoning Department Memorandum No. 96-245 provides further details for this request. RECOMMENDATION: The Planning and Development Board, with a 7-0 vote, recommended approval of the request, subject to the comments in the attached Exhibit C, with the following revisions to Comment #12, #18, #38 and #43: Comment #12: Recommendation is to delete (i.e. - retain concrete median within entrance way). Comment #18: Add to the end of #18; "unless wheel stops are provided in Phase I for purposes of consistency". Comment #38: Replace first Certificate of Occupancy with the eighth Certificate of Occupancy to represent completion of the south half of the buildings within Phase II. Comment #43: Recommendation is to delete the note and add after the reference to the hedge along the south property line of Phase II that, provided unified control of both phases is verified at time of replatting of Phase II, the south hedge shall not be required, including filing of a landscape appeal. TJH:dim Attachments xc: Central File a:CCagMSPM. Vin C I T Y 0 F BOY N TON B E A C H PLANNING & DEVELOPMENT BOARD MEETING AGENDA DATE: Tuesday, May 14, 1996 TIME: 7:00 P.M. PLACE: Commission Chambers 100 E. Boynton Beach Boulevard Boynton Beach, Florida 1. Pledge of Allegiance. 2. Introduction of Mayor, Commissioners and Board Members. 3. Agenda Approval. 4. Approval of Minutes. 5. Communications and Announcements. A. Report from the Planning and Zoning Department 1) Final disposition of last meeting's agenda items. 6. Old Business: None 7. New Business: A. PUBLIC HEARING Conditional Use 1. PROJECT NAME: St. Joseph's Episcopal Church and School AGENT/ APPLICANT: Jerome F. Milord OWNER: St. Joseph's Episcopal Church and School LOCATION: 3300 South Seacrest Boulevard DESCRIPTION: Request to construct a 7,591 square foot new library, art and lecture building, housing a preschool facility, and a 299 square foot addition to the Classroom #5 building in place of the demolished library and lecture/art buildings. Rezoninq 2. PROJECT NAME: Hills at Lake Eden, PUD AGENT: Burl Gentry APPLICANT/ OWNER: Newport Properties, Inc. LOCATION: 15.45 acres located at the west side of the intersection of Seacrest Boulevard and Gulfstream Boulevard Page 2 Planning & Development Board Meeting Agenda for May 14, 1996 DESCRIPTION: Request to amend original rezoning conditions to reduce the required minimum unit size to be constructed in the PUD from 2,400 to 1,800 air- conditioned square feet and reduce the required average size of the units to be constructed in the PUD from 2,600 to 2,400 air-conditioned square feet. Land Use Amendment/Rezoninq 3 . PROJECT NAME: The Boynton Beach Development Corporation Community (CDC) AGENT: APPLICANT/ OWNER: LOCATION: DESCRIPTION: B. SITE PLANS New Site Plan Law Office of Allen Wm. Martincavage, Sr. The Boynton Beach Community Development Corporation (CDC) Three parcels totaling 0.339 acre at 2191 Seacrest Boulevard (southwest corner of Gateway Boulevard and Seacrest Boulevard) Request to amend the land use from Moderate Density Residential to Office Commercial and to rezone from R-l (Single Family Residential) to C-l (Office/Professional) 1. PROJECT NAME: Nautica Sound (FKA Knollwood Groves PUD) AGENT: APPLICANT/ OWNER: LOCATION: DESCRIPTION: Karyn I. Janssen Kilday and Associates, Inc. Alan Fant, GL Homes of Boynton Beach I I Corporation Northwest corner of Lawrence Road and the LWDD L-19 canal. Request for site plan approval of private recreation, common area landscaping, and project signage for a 424 unit, single-family residential PUD. 2 . PROJECT NAME: Knuth Road PCD Service Station AGENT: Kieran Kilday Kilday and Associates, Inc. APPLICANT: Andrews & Copans Gas & Oil Company, Inc. Page 3 Planning & Development Board Meeting Agenda for May 14, 1996 OWNER: LOCATION: DESCRIPTION: Bill R. Winchester, Elsie A. Winchester individually, Elsie A. Winchester as Trustee, Ruby A. Winchester, The Winchester Family Partnership, Ltd. Southwest corner of Boynton Beach Boulevard and Knuth Road Request for site plan approval to construct a convenience store with gasoline sales and car wash on 1.13 acres. Maior Site Plan Modification 3. PROJECT NAME: Boynton Beach Mall Department Store F AGENT: APPLICANT: OWNER: LOCATION: DESCRIPTION: Cormac C. Conahan, Esq. Hodgson, Russ, Andrews, Woods & Goodyear DeBartolo Inc. Properties Management, Boynton-JCP Associates, Inc. Ltd., a Florida limited partnership 801 North Congress Avenue Request to amend the previously approved site plan to construct a 162,502 square foot department store with parking structure. 4. PROJECT NAME: The Vinings at Boynton Beach - Phase II AGENT: APPLICANT\ OWNER: LOCATION: DESCRIPTION: C . OTHER Discussion CCL Consultants, Inc. Boynton Beach I I Limi ted Partnership, a Florida limited partnership, and its assigns East side of S.W. 8th Street, approximately 1900 feet north of Woolbright Request to amend the previously approved site plan to increase the number of apartment buildings from 12 to 16, omit building types III and V, add a volleyball court and reconfigure other recreation amenities, alter building types II and IV, add a building type VI and reconfigure the parking and access areas. Page 4 Planning & Development Board Meeting Agenda for May 14, 1996 1. Change to Environmental Regulations to codify Comprehensive Plan policies regarding preservation areas for environmentally sensitive land. 2. Change to Community Design Plan to no longer disallow drive-through windows facing rights-of-way provided landscape buffer and building design criteria are met. 9. Comments by members 10. Adjournment NOTICE ANY PERSON WHO DECIDES TO APPEAL ANY DECISION OF THE PLANNING AND DEVELOPMENT BOARD WITH RESPECT TO ANY MATTER CONSIDERED AT THIS MEETING WILL NEED A RECORD OF THE PROCEEDINGS AND FOR SUCH PURPOSE MAY NEED TO ENSURE THAT A VERBATIM RECORD OF THE PROCEEDING IS MADE, WHICH RECORD INCLUDES THE TESTIMONY AND EVIDENCE UPON WHICH THE APPEAL IS TO BE BASED. (F.S. 286.0105) THE CITY SHALL FURNISH APPROPRIATE AUXILIARY AIDS AND SERVICES WHERE NECESSARY TO AFFORD AN INDIVIDUAL WITH A DISABILITY AN EQUAL OPPORTUNITY TO PARTICIPATE IN AND ENJOY THE BENEFITS OF A SERVICE, PROGRAM, OR ACTIVITY CONDUCTED BY THE CITY. PLEASE CONTACT JOYCE COSTELLO, (407) 375-6013 AT LEAST TWENTY (24) HOURS PRIOR TO THE PROGRAM OR ACTIVITY IN ORDER FOR THE CITY TO REASONABLE ACCOMMODATE YOUR REQUEST. xc: Central File a:agP&Dmtg.514 7.B.4 MAJOR SITE PLAN MODIFICATION THE VININGS AT BOYNTON BEACH - PHASE II I PLANNING AND ZONING DEPARTMENT MEMORANDUM #96-245 SITE PLAN REVIEW STAFF REPORT FOR PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION May 14, 1996 DESCRIPTION OF PROJECT: Project Name: Applicant: Agent: Location: me No.: Land Use Plan Dt>.sigm1tion: Zoning Dedp;ation: Type of Use: Number of Units: Square Footage: Surrounding land uses and Zoning District: North - South - East - West - Existing Site Characteristics: The Vinings at Boynton Beach and The Vinings II at Boynton Beach Boynton Beach II Limited Partnership CCL Consultants, Inc. East side of S.W. 8th Street, approximately 1,400 feet north of Woolbright Road. MSPM 96-003 Moderate Density Residential Planned Unit Development (PUD) Multi-Family Residential (apartments) Total - 548; Phase 1- 252 (under construction), Phase 11-296 Site Area: Building Area: 1,475,193 sq. ft. (33.87 acres) 628,452 sq. ft. (FAR floor area) (see Exhibit "A" - location map) Lake Boynton Estates, a single-family residential neighborhood, zoned RI-A, Single-Family Residential, and an undeveloped part of Woolbright Place, zoned PUD. Mortons Way (unimproved right-of-way) and farther south is the Shoppes of Woolbright; a partially developed project, zoned PCD, Planned Commercial Development. Seaboard Coast Line Railroad tracks and farther east is undeveloped land, zoned M-l, Light Industrial. S.W. 8th Street (city street) and farther west is undeveloped property, planned for a church, and a man-made water management tract within Woolbright Place, zoned PUD The south portion of the project titled, The Vinings at Boynton Beach (Phase I), is under construction and includes 252 apartment units 2- Page 2 Memorandum #96-245 The Vinings at Boynton Beach and The Vinings II at Boynton Beach MSPM 96-003 Proposed Development: Concurrency: a. Traffic- b. Drainage- Driveways: Parking Facility: Landscaping: BuDding and Site Regulations: within 11 buildings. Phase I was platted. This request is to modify the northern unbuilt 15.91 acre portion which is vacant with the exception of a City owned and operated lift station located in the northwest corner of the site. The north portion of the project is titled The Vinings II at Boynton Beach (Phase II) and will include 296 units. (see Exhibit "B" - proposed site plan and Exhibit "C" - approved site plan) The proposed request is limited to The Vinings II at Boynton Beach (Phase 11). The original approval of 296 units remains unchanged. However, the proposed modification would change the total building count from 12 to 16 buildings. Twelve of the sixteen buildings will have six garages in each building. A volleyball court is proposed to be added to the five existing private recreational amenities. Relocation of a tennis court is also proposed. Modifications to the vehicle use area and landscaping are also part of the request to accommodate the two new building designs which include garages. It is anticipated that Phase II will be platted. The project, as a part of Shoppes of Woolbright PCD and Woolbright Place PUD settlement agreements, was reviewed by the Palm Beach County Traffic Division. It was determined at that time that the PCD and PUD met the requirements of the Traffic Performance Standards of Palm Beach County in effect in 1986. Since this request does not change the total number of units from what was approved, this project is in compliance with traffic concurrency. Insufficient drainage information has been submitted for the Engineering Division to certify compliance with the City's drainage levels of service at the time of site plan approval, as required. The Engineering Division is recommending that this be postponed to time of permit review. Access to the 548 unit apartment complex is provided by one (1) four lane ingress and egress with a median. This gated access is located on S. W. 8th Street. Access to Phase II is provided by an access easement through The Vinings at Boynton Beach (Phase I). Six hundred twenty two (622) parking spaces are required to support the 296 units and recreation amenities located in Phase II. Six hundred and twenty three (623) spaces are provided. Following compliance with staff comments the landscaping will comply with the landscape code and previously approved buffer requirements. (See attached Exhibit "D" - approved Woolbright Place PUD north property line buffer plan) The height and location of the proposed buildings comply with the regulations specified on the approved master plan. The plans indicate 3 Page 3 Memorandum #96-245 The Vinings at Boynton Beach and The Vinings II at Boynton Beach MSPM 96-003 that the maximum building height will be 37'10". The 548 total number of units is unchanged from the original site plan approval of September 20, 1994. The L.U.I. percentages remain less than the maximum allowed for the PUD with a L.U.I. of 5. Community Design Plan: The design and color of the proposed buildings will be consistent with the existing eleven (11) buildings located within Phase. I. Signage: Project signage was approved as part of Phase I and no additional signage is shown with this request. RECOMMENDATION: The Planning and Zoning Department recommends approval of this site plan request, subject to the comments included in Exhibit "E" - Conditions of Approval. The TRC recommends that the deficiencies identified in this exhibit be corrected on the set of plans submitted for building permit. MEH:dim xc: Central File A:STREVIN2.MSP/mh4 .. 4 E X H I BIT .. A II ~ L ':'CATION iv':\P VININGS AT BOYNTON BEACH PHASE II ;~t:t:JJ:J, :,y',' -l1.1t-7t"""1 '_'_ __ ,;~ r-r'J-!:~_ ~= H I IIill,r I-I ~ '~t ::::j c: I t>l~ ~.:;;. ~ ~ ,r ~, ~ f--, I- r---: ]Gr - · ~ ' :':::11 = 1-- l:::=1 _ --4- .TZ./lJ 1/ I I I.Ti~-\~ '= _. - ,- f-- ,- ~ ~ ~~~~B;'--1i' ~~",~~~.= -~:~ I~ -~! J I ~'. ~-I --rv ~~ _ - I ~ jhlt/-~ ! , ..~ II~ J@ , ~~ -= 1 ~ J~" [ ~ ,i_.. I ~ ~ ' I ~ ' . ="':.,_":1 . "-....... -- - -- -',' : ] t' ~R" lTTTIf 1= . L1Ti ;T ~ '. 8""". . ..~/-) r; , It It I" .IHCI D ~ , r .. ~, IIIIIITrl1 !;rn.. ~ .;, \1~rtl~ ~ffl"~j;HHI!!!HP~~l I !~3.,;,>_~::: : - . ~ j ,r~~i I iUl1~' +IJr;~l ~ !J.t:1~re ~I~: ~ ~ ~ l ...... 'i. : .' I I ; It I 'Ii . AE I ~ .J.~.~/ Pili :::; V :~: :~. '.rr I! ~ r.K:.rn~~ lill I ;;;"t~ ',' (; : ' ) .\~'~. r TT-f( ~ IIII!1lli1W '/'Y-fl I: I:::, " C~I .- ~ .. .oe llif" ~ ..:..J ~m::'"-- ~J ~~lrnl ~ \ ':"'-~'~.: ~:~. ~ ~Hj~tftt{tm+ r+ ~ l L ,'- {-. -t- I..~! I .- '-' ,..','" ~eb't ~_lLII;I!i I - , - 1- < .~ + \ . t .::-- . ,fI!!":!, .~. :/!.'. -' . I _ I I'---~l.ri~'nm[ "lfl ,~ i:...: -' ~.~' .. -r ..w::b \ [~~W:.:~:C1W;~ r - *r\ fj - 1.1 U III t'j-' 1 lTIli n ~ IT E :::i:'~::.:.:::'::::~$:~:W i -:- "r: - . ~: .., ~ J-UJ f ~ W ....!J ~ · l~t(;).:.?-}/?:\ln f~'1 ; l tK~I<~""~ . ~' 'ii. r \,.\, .::;;Jtfiftf~~fllml1.{~ -- , ,ie\ \ (~I . ilR.'V/ I I " \ '-... (ffL.;:::::::::::::::::::::::::::. \ n' _' \l~ _ ~~ .' \', .. ,."...~j~~~:~!~~gU~i}}j@tJ.!ji!{ ~1 ," \ . .,':\ "'" ~ l.L..J-,~ -rr .: -\ W::i::,:;:,:,:::,:1::,:,,:,:,:,.:.::'::!ii:'::i:::::;:::',.;,:::::' \~) ~<: "\ ~~"~ ~' ~. i.. 'J~ ~~}if.f~~~m~...~HWtJ~W;~ I I" \<~X ~.~~ '.' r ~I\~ 1__ ~/:'~'l:~:'// ..\~~l'W~DLB~b~~ I )('~'/". '.' . " ".''"2 lr~LAC:E" , , ,~. ,,\ ' ~ ~ I ,.-t1 r....\, >:' "'\\" ',0 \ -= I ; r ~ 1 " \ .r', \-'. E"- 3 ,; I (\ '\. i ., , r-" -', 1\ \....... \ ,~ ~11 '~"")'J _:llt~~ I "; \';~ P, cliJ-- f ~/i Ii. .'''. ~!.llrr.T:I;rlj i r,.. , D J --. J I., l.~ ~~\~\ L. J U,I, r.,' ~,.!I;1 ~)~~~. _ I: :J~ _:~. _ -- oj. U/~. '. -:---'-"-------- - ---,.- . " , - , ~ , R:3 ~~ :.-----;.;-; -. " ~ ITf".7V"8~"N;t "~~: 1 //'-- Ca :# '\f . _ ~'x~l!L~? 4lLlY' 'f)'L !'If ;. - T '~ "I. I-. j' ----' , \., (' ~,-J f-: ~ClEC'", ^'~~,,:~~ ~ :~I J:j--1 'R ~ .)'^\X)~~B J ---- ~.. :!J ~ . ~..~ :~J llll11181 . MI~ESI . ~/ ! 'J.'O 400.800 FEET ~' I IT ' DI - ... /: o~r. 5-9'- 1/" I ~ I ~ "I ~ I " I I '~ =--- -~ '~--~ , ! t ! ,1 ! I ! ! ! ! I r l l ~ L i, l ~ L I. L II""! ," , ' := ~ ~ i T II T lilt- 18 '/ ': ii, p. =: ~....... , ~ ~~.i r\~[ U -=- = - I' -=- .: !f) , --=- ~ ~ III 1- '- ::; ...."'l - . - - ,,== . -- " ~ ..- "'Sl . R ~ f'.~ I! t=: ,:' ~ ~~~ c ==.lll.LL' ==- ::: ~ I ~ .,. .UIillIlI 1 I /i I I~ 1". II": .- 8CH " ~ (. ! ~ ..~ "n' _~..: '" ,,_ ,I" . , ~ 1:!!::'::::lrl!il ~ I !f.tJ~ '~:~: Ij'~ffifHfi_ I ~= ~~wrr~ -t. - ' _I ,I II, II I T . I . I I 11 i i t II I. I rT'!I., r--'~:' I -J I I 'It- -I,t'~ --t: I t J ;1 I T .L IAl ~ Ji't .. .r I I II"4CIL~" }, -+~, ' ~-Tffl r-m=uJi ~-TI'T't r ITITEIIJL_ ~lIII-=I' Ellffim 9Iill_~ I ~~HIRm:;[ ~~~',"I.~m:~ r ~nlI.IJILU LT ~II" '!I,'.:1~1- PU L.Wii6ITlJ 1 crelli~ll . - Ll 'I' I . , .,., t:.=-, It. I - - [-J rr-~Tr,l ~_. 'U:::-w ) : I ~ .I,TlT1nIlT[il ...~ '(jft ~ ",...,-t~LJ '-. '~!l~ ~ REC I z~= '.m-!: / rL . ~ Ii /11 . ~~ ~'c=3""",,wLl-l' '/1 :r- _..--C~= ,e, .,,,mn= -. . i i puc . ..1. l.U~. - - -- -r -A;:UlL!:V'l1Clr'r ,~_u:; ~~.~8"04" cr- __ ~ 11 , --PUC- I 11 6 ... _ ~D1]~.c: 7f. /: ~I(~r /1 .' ~e~ t:: &T:~-d r/-;P~' ~ ~~ "-~-1-,L1 t1j ~-< ~ I' . I ,m:j:l ~ J 11,bJ.-t j,,/ ~ ~ ~I \ E X H I BIT .. B II 1 II I. I. il.. J I it i Ii ,,' j..... Iii III f 111111 i Ij Ii ii',' i ii II' 'ii Ii ,: i Ii 'I: 'I i i I,' Ii i Ii Ii r ",,1"1 !I/I I I " I I I 11'::111", !lj i 11111 ',1111 J Ii II P I II II 'IIi f II! I . >', ~ ,I I. , ! 'I J I r I 1 ~ , I I I,' i " l r, ,."., ., I' "" . I I r I . .. I . II i1! I I ! . I ~ '! : I :: :: I I II r II' IIIII I II j . P .---- r \ p I ~ I ! "'" 1'1'1" ~ " ! nil i;:: ; i 11 i i Ji II ! II' :11 i I! I ' I 'I ,i 'III I I I 'II II II II' I( I II 011 II I',! i I : I! i I' '1111 I jlll'll II i r i 'I I' ij~~! \ ! L. 'h: d I I, II' , ,-)! ;~ I ~ ~ I II I ! I I~ ' I'i I ,I .Ii.. Iii i..II.i. I _I" . .. ..... 11'" I: H I 1111111111111111111 Willi i 'i i I j I j I i Ii Ii i Ii Ii I Ii I I ! I I !i j Ii 11'1111111 11I!lflIIIPl!llllql'111l11 - 'I ii lilj i 1:: :iIHi:: i iii iiiiiiiiiii i ii i i ! >J" III I ~ oj iiii i 111 i:1iiiii ill :::;::::Hl: H p: !'III!" 1!II'ql" \ 11,111I11'11'! 1I':j :1111: i 111'1111111 'II I,: I I: I I, I I I I ' I j:l II II !II 'I '1 I . I , I , III I I I I- i i i l! i i i I! I i i i II ",.~ .." , .:1 . ,: i'l' . :' Q -:. I : 1:\ : I " I, I ,'::. i i ! ,', ,: i L: ,1 !il i , ~ i i i I I I I I \ i~ \, ,I II . ,:~ "'I' ~ . . I I r- I : "tJ . ; ..... -.,' 'II 1'1 : H!I:' .:1 , ' J :IJ :i' ~ . 'Ili': : I . "II ~ .1:11 TH. VININGS AT BOYNTON .BACH II Ba;NTON !lEACH FlORIDA ... F<I~5l()F.l'\jfL"'l. "'t'A~tMlNT cc.l/'.........._It~ITV UEYf:l.OPIr:D f:5'1' TRAMMEll CROW RESIDENTIAL aOCA ~ATON, FLOlIIOA g E X H I BIT "C" ~ ~:~. ,.- lilli' 1IIIItIIIUlllllllllllllllllllllllllllllllllllllt en m "'C. -4 m 3:- CD m ::c ~ .. .... CO ~~~ ~ ;. . , l~ ~ ;11 Ii': II I ::';Illl! Ii 1~ (J) =r m "'C ~. Z )>. "'C "'C ::c Q. <: m c '"" en c: g. (1). (') ... ... o (') o ~ Q. -. . ... C)" ~ en - a Q) "C "C ~ Q) - - , t III ! i f I , .. . .. . .. . . .. .. - ~!!'Ii~il illl' ii I:' i ,ji ;iil~' ~jili~ii~II:IIII~~~1 r I'PI Iii !i.II, Irll!'1 11,111111 I 'I i "I:lli I~: !il! i! I I Ii :Ill 1111111111'11' III . f.1l11jl I I' I. iil! I II ;j i j Ii llil iiiiiiiiiiiii i ii ~ I 11 i i i i i; i i ii I';:;:::::;:::: i ~; ilt " ,..........,..,-" I I' . I nl.1 111 1p'IUI'1 '''"1'"1"1\ I't ;: I' "I l,.r,," 1111,"1,'" ',I " " " II: I'. 11.1 :'" · I \ \ . ',III: I II I I , I I I I I ill if if 1'1 i/ II I . I . I I I " , IIOUOH" '!AY THE VINiNGS AT .OYTON BEACH " .....NttAl, ~""'...~ ........., "VS~"'I' " '''.'''''U A'''' ,rl.&t""'.... ~ .. !l..oo_._ to E X H I BIT .. D II II z nil 0 ~ :I 1 "'tJ J] 0 "'tJ m ~ r- - z m OJ c: " till " ~ m :c II "'tJ n ): z ~ 0 r- OJ :c - "".~ G) ~ "'tJ ( ffl I r- '. ~ j il m ! I "'tJ C C ~ I II f II iii -- ", . I' - '2 E X H I BIT "E" I '3 EXHIBIT "E" Conditions of Approval Project name: Vinings at Boynton Beach Phase II File number: MSPM 96-003 Reference: The plans consist of twenty-three (23) sheets with an April 22. 1996 Planninq and Zoninq Department stamp mark and the followinq file number written in the upper lefthand corner of sheet 1 of 23 Major Site Plan Modification MSPM 96-003 (Control Plans) . I DEPARTMENTS I INCLUDE I REJECT I I PUBLIC WORKS None I I I Comments: UTILITIES Comments: 1. For operation and maintenance only, palm trees will be permitted with utility easements, (Sec.26-33 (a)). FIRE Comments: 2. Conflicts between landscaping and fire hydrants must be resolved. A clear view of the hydrant is required from the roadway. 3. Lift station access by the Fire Department is required for rescue operation. 4 . Street names and numbers must be reviewed by the Fire Department before being assigned. POLICE Comments: NONE ENGINEERING DIVISION Comments: 5. All plans submitted for specific permits shall meet the city's code requirements at time of application. These permits include, but are not limited to the following; site lighting, paving, drainage, curbing, landscaping, irrigation and traffic control devices. Permits required from agencies such as the FDOT, PBC, SFWMD and any other permitting agency shall be included with a permit request. 6. Plat review and approval required. Chap.5, Art. I I , Sec.1,pg.5-1 7. Sidewalks are required on both sides of all local and collector streets. Chap.6,Art.III,Sec.11A,Pg.6-3 8 . Provide certification by developer's engineer that drainage plan complies with all City codes & standards. Chap.6,Art.IV,Sec.5A,pg.6-7 and Chap.23,Art.IIF,pg.23-8 9. Minimum pavement width is 22' (11' lane for local road) . Chap.6,Art.IV,Sec.l0C,pg.6-11 Recommend appropriate cross-hatching on either side of entrance to guide traffic into single land area. ('f Page 2 Conditions of Approval Vinings at Boynton Beach Phase II MSPM 96-003 DEPARTMENTS INCLUDE REJECT 10. Parking lot section must conform to City code. Chap.6,Art.IV,Sec.l0F,pg.6- 12 11. Need SFWMD & LWDD acceptance prior to Engineering approval. Chap.6,Art.VII,Sec.4B,pg.6-24 12. Remove concrete median within entranceway. Chap.22,Art.I,Sec.4,pg.22-1 Recommend appropriate cross-hatching on either side of entrance to guide traffic into single lane area. 13. Photometrics must be approved for both pedestrian and parking lot lighting before building permit can be issued. Chap.23,Art.II,A1a,pg.23-6 14. Landscaped areas in parking lots must be protected by wheel stops or curbs. Cha p . 23 , Art. I IE, pg .,23 - 7 15. Provide 27' backup area, all stalls. Chap.23,Art.II,I1,pg.23-9 16. All parking lots shall meet or exceed State Handicap Code requirements and comply with the Standard Building Code and the Countywide amendments thereto. Chap.23,Art.IIK,pg.23-9 17. Provide a handicap stall within the visitor parking area. Chap.23,Art.IIK,pg.23-9. Note: This parking area will require acceptable lighting. Recommendations: 18. Consider continuous curb in lieu of wheel stop to reduce tripping hazard and to provide two additional feet of pervious area. BUILDING DIVISION 19. The building plans will be reviewed per the technical codes applicable at the time of permitting. Depending on the time of submittal, it may be the present 1991 Edition of the Standard Building Code or perhaps after June it may be the 1994 Edition. PARKS AND RECREATION Comments: NONE FORESTER/ENVIRONMENTALIST Comments: ,~ Page 3 Conditions of Approval Vinings at Boynton Beach Phase II MSPM 96-003 DEPARTMENTS 20. Two large Live Oak (hardwood) trees have been found on site. The original tree survey submitted by the consultants CCL Company showed no hardwoods on the site. The applicant should contact the Forester/ Environmentalist Department in reference to these trees prior to issuance of the clearing permit. PLANNING AND ZONING Comments: 21. Delineate on the site plan the areas of Phase I that are being modified or place a note on the site plan indicating that there are no changes proposed for Phase I. 22. To verify that the parking areas and landscape areas comply with code regulations and/or previous approvals regarding size and/or dimension, add to the sheet titled "Site Plan" (sheet 1 of 23) the appropriate horizontal control dimensions. The control dimensions shall identify the distance through the property from north to south and east to west. The control dimensions shall include the following measurements: a) The distance from all property lines to the vehicle use areas. b) The length of the parking spaces. c) The width of the access aisle/ back-up space. d) The width of the landscape area adjacent to the building. e) The width of the sidewalks adjacent to the building. f) Maintain the distance between buildings as shown on the plan. 23. With a distinguishable symbol show, label and dimension on the site plan (sheet 1 of 23) the approved setback along the east property line and the south setback that separates Phase I from Phase II. Show and label these setbacks on the landscape plan (sheet 3 of 23). I' INCLUDE REJECT Page 4 Conditions of Approval Vinings at Boynton Beach Phase II MSPM 96-003 DEPARTMENTS 24. To ensure that the building overhang or building structures that are located above the building footprint area depicted on the plan view drawings sheets 1 of 23, 2 of 23 and 3 of 23 do not encroach into an easement or setback line, delineate with a symbol and dimension on the first floor plan drawings (including recreation building), second floor plan drawings, third floor plan drawings and all elevation view drawings the width of the overhang or building structure that is not shown on the building footprint depicted on the plan view drawings. Also place a statement on the site plan (sheet 1 of 23), preliminary master plan (sheet 2 of 23) and landscape plan (sheet 3 of 23) indicating what part of the building is depicted by the footprint shown on the plan. Also show, using the symbol found on sheet 1 of 23, the location of the two story portions of the buildings in Phase II. 25. Dimension the width of the access aisle leading to Phase II. Minimum width for two-way traffic is 20 feet. However, a 27 foot back-up space is required adjacent to the parking spaces at the tennis court. Dimension the plan accordingly. 26. The survey submitted with the request does not show the utility easement along the north property line adjacent to the existing residential homes that exists on Lake Boynton Estates Plat 2 (PB 14, Pg. 17 P.B.C.R.). Correct the survey accordingly. 27. Place a note on the site plan (sheet 1 of 23) indicating that there is a recorded easement agreement which allows access to Phase II through Phase I. Also indicate on the sheet the recording data. 28. In the total parking data provided on sheet 1 of 23, indicate which total is for Phase I and Phase II. 29. The detail drawing included with the submittal (sheet 2 of 23) identifies the length of the parking spaces as 16 feet. If this is correct, show with a distinguishable symbol the remaining two feet of the required eighteen (18) foot long parking space. The eighteen foot long parking space shall not encroach into the required width of landscape areas or sidewalks. Clarify the drawings and show compliance with code regulations. I') INCLUDE REJECT Page 5 Conditions of Approval Vinings at Boynton Beach Phase II MSPM 96-003 DEPARTMENTS 30. It is also evident from reviewing the data found on the floor plan drawings and the L.U.I. computations that some of the area that was identified as part of the FAR found on sheet 1 of 23 includes area that could be deducted from the FAR computations. Amend the FAR data to show the accurate total FAR area. 31. On sheet 2 of 23 specify the color and height of the dumpster enclosure. 32. The applicant has indicated that the colors of the buildings in Phase II will match the colors of the buildings in Phase I, however, the color of the porch railings identified on the plans indicate the color of the railings will be forest green and the existing porch railings in Phase I are white. Pleast match. 33. Change the location of the volleyball court shown on the site plan and preliminary master plan to match the location of the court shown on the landscape plan. 34. Provide elevation view drawings including identifying types of material and colors of the structure identified as BBQ. Also dimension the location of the structure consistent with the approved setbacks. 35. Modify the north PUD boundary planting plan to match the buffer planting plan approved by the City Commission. Also modify the design of the landscape material shown on the detail buffer drawing titled Section A (north buffer of the PUD) to match the approved buffer planting plan. 36. To ensure that the location of trees and structures do not encroach into an easement, add to the site plan and landscape plan, where applicable, notes and symbols that show the location, size and type of proposed and existing easements. Amend the plan accordingly. 37. On the plant list and landscape plan delineate with a symbol the trees that are required for the tree management plan. 38. Place a note on the site plan and landscape plan indicating that the buffer landscaping required for the north property line of the Phase II project shall be completed prior to the first C.O. being issued for a building in Phase II. This comment is a condition of the original site plan approval September 29, 1994. It INCLUDE REJECT <t.' :,,; ,-,;- -.-J ,___ ~ _ C I T Y TECHNICAL o F BOY N TON REVIEW COMMITTEE AGENDA B E A C H MEETING DATE: Tuesday, April 23, 1996 TIME: 9:00 A.M. PLACE: Conference Room, 2nd Floor, Mangrove Park School 1. Introduction 2. Old Business NONE 3. New Business A. REVIEW OF TECHNICAL REVIEW COMMITTEE SITE PLAN REVIEW COMMENTS RECEIVED Maior Site Plan Modification 1. PROJECT: The Vinings at Boynton Beach - Phase II LOCATION: East side of S. W. 8th Street, approximately 1900 feet north of Woolbright. DESCRIPTION: Request to amend the previously approved site plan to increase the number of apartment buildings from 12 to 16, omit building types III and V, add a volleyball court and reconfigure other recreation amenities, alter building types II and IV, add a building type VI and reconfigure the parking and access areas. 4. Other Business NONE 5. Comments by members 6. Adjournment The City shall furnish appropriate auxiliary aids and services where necessary to afford an individual with a disability an equal opportunity to participate in and enjoy the benefits of a service, program, or activity conducted by the City. Please contact Joyce Costello, (407) 375-6013 at least twenty-four (24) hours prior to the program or activity in order for the City to reasonably accommodate your request. MEH:bme a:TRCMTG23.apr PLANNING AND ZONING DEPARTMENT MEMORANDUM #94-273 -~11:4 {;py ~ f{,(~- 11- f jJl1\~. ff /J''/J.v;, t,( ,;:/1)(V IP/fJ' SITE PLAN REVIEW ~TAFF REPORT FOR PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION September 9, 1994 DESCRIPTION OF PROJECT: project Name: The Vinings at Boynton Beach and The Vinings II at Boynton Beach Applicant: TCR south Florida Apartment~, Inc. Agent: eCL consultants Inc. Location: East side of S.W. 8th street, approximately 1,400 feet north of woolbright Road File No.: NWSP 94-007 Land Use Plan Designation: Moderate Density Residential (Development under court ordered settlement stipulation) Zoning District: planned Unit Development (PUD) Type of Use: Multi-Family Residential (apartments) Number of Units: Total - 548; phase 1-252, Phase 11-296 square Footage: 'site: 33.87 acres Building: Footprint Total floor area 1,475,193 sq. ft. 309,276 sq. ft. 760,459 sq:ft. surrounding Land Uses and Zoning District: North - Lake Boynton Estates, a single-family residential neighborhood, zoned R-1A, single-familY residential, and an undeveloped part of Woolbright Place, zoned PUD, planned unit Development. south - Mortons Way (unimproved right-of-way) and farther south is the Shoppes of Woolbright, a partially developed proj ect, zoned PCD, planned commercial District. East Seaboard coastline Railroad tracks and farther east is undeveloped land, zoned M-l, light industrial. w..t a.w. 8th 8tr..t (city str..t) .n~ f.rtn.~ w.st 1. undeveloped property, planned for a church, and a man-made lake within woolbright Place, zoned PUD, planned unit Development. Existing site Characteristics: undeveloped land. The site is partially cleared, Proposed Development: recreational amenities. finish floor. Multi-story residential apartments with Maximum overall height is 40 1-1" from concurrency: Drainage and Traffic - upon incorporation of staff comments the concurrency requirements, as they pertain to the court order, will be met. Driveways: One ingress/egress entrance/driveway with security gates is proposed off of S.W. 8th Street. I ~eport for The Vinings memorandum #94-273 Landscaping: The landscaping will meet code specifications and buffer requirements when incorporation of staff comments are complete. Parking Facility: Upon incorporation of department comments, the parking space count will be provided as per code; Provided Required Phase I Phase II Total 530 633 530 618 1,163 1,148 Building and Site Regulations: All bUilding setbacks comply with the setbacks established on the master plan. Since this is the first development proposed for the Woolbright Place PUD, the number of units is within the number allowed per the stipulation agreement and the total floor area is within the L.U.I. requirements. Community Design Plan: N/A - The project is not located within a Communi ty Design district. The bUilding colors are earth tone and the textured stuccoed walls are tan with a light accent color for the trim. The finish roof material is tile and the color is also earth tone. The stair and balcony handrails have a contrasting dark green color that compliments the earth tone colors proposed for the buildings. Signage: A comprehensive sign package is included as part of the site plan submittal. The design of the signage is simple and not obtrusive and the colors match colors proposed for the buildings. It is recommended that additional signs be approved administratively, if they meet the specifications of the sign code and are aesthetically in harmony with the design and color of the proposed signage. The sign code for PUDs was structured to not set forth specific sign criteria due to the large variation of uses allowed in PUDs. REVIEW OF DEPARTMENTAL COMMENTS: Below is a list of those departments that have comments regarding this request. DEPARTMENT ATTACHED MEMORANDUM Public Works Utilities Fire Police Engineering Building Parks & Recreation Forester/Environmentalist Planning and Zoning #94-214 #94-280 #94-268 N/A #94-265,94-262,94-259 and 94-245 #94-200 #94-321 and 94-293 ~94-312 and 94-292 Memorandum dated August 31, 1994 Every department except the Police Department has comments. It is anticipated that compliance with the staff comments will not substantially change the concept of the project, therefore, staff recommends the proj ect proceed through the approval process. Compliance with all staff comments shall be incorporated into permit set of drawings. 2 ~ \ .( ,/ \' ", . A" c~ ;:.-.....' ./ , ,"" \ , /\~ , / f ~. MEMORANDUM \ )' j' ,,\ '" '/ '/, ," ;.,,. .... '..~ I "' FROM: Tambri Heyden Planning & Zoning Director Michael E. Haa~~ Zoning and Site e elopment Administrator August 31, 1994 1U)' / \'" ,;' . "J (\) DATE: RE: Site Plan Project: Review - 2nd Review - New Site Plan The Vinings at Boynton B~ach and The Vinings II at Boynton Beach Woolbright Place PUD CCL Consultants, Inc. NWSP 94-007 Location: Agent: File No: The following is a list of comments regarding the second review of the above-r~ferenced project. It should be noted that the comments are divided into two (2) categories: The first category is a list of comments that identify unresolved comments either from the first review or neN comments as a result of the second review. To show compliance with these comments will not sUbstantially al ter the configuration of the site and the design of the building. The second category is a list of recommendations I believe will enhance the aesthetics and function of the project. All comments and recommendations can be rectified on the plans at tim9 of permitting if the site plan request is approved. The applic3nt must understand that additional comments may be gen~rated upon re'/iew of the documents and working drawings submitted to the Buil6ing Department for permits for the proposed project. i. SITE PLAN REVIEW COMMENTS: Y Submit a survey of the sl1bj ect property that does not show a phase line. 2. fI""" Specify on the plans the height of the dumpster enclosures and identify the color of the walls for the single enclosure. 3.11'" Specify on the elevation view drawings the manufacturer of the colors proposed for the bUildings. Add to the elevation view drawings of the recreation buildings the color, color number and manufacturer for each exterior finish material depicted on the drawings. 4 . Submit a cost estimate, to be reviewed by city staff, for the five (5) required recreation amenities. A bond adjustment shall be made, within 30 days of the city's approval of the ~~~i~3te: by phases, based on the value of these improvements. Pursuant to condition 50, page 6 of 7 of the October 17, 1990 agreement between Tradel1inds and the City. ;: The total number of parking spaces, by phases, identifie~ in th€ parking calculations are in the wrong column. COIT?ct accordingly. ~, l review comments The Vinings phase I is four parking spaces deficient. Show and list no less than the required number of parking spaces for Phase I. Landscaping - correct the following deficiencies: / ~(j) t@ @ tie V rp ,ArD ",e- ~\V /* y ;: north buffer - The required landscape buffer is shown over an easement in the wrong location (sheet LP-1 section A) . vehicle use area visual barrier - On the plant list indicate 24" on center spacing for required perimeter hedge material. tree preservation - Delineate the trees required from the tree preservation ordinance analysis, incorporate same into the landscape plan. Add the following notes to the landscape drawing: ii. Indicate that plantings may be field adjusted due to interference with structures. The code spacing specifications for required shrubbery, hedges or trees supersedes the number shown under quantities in plant list. place a note on the plan that indicates the requirements of landscape code section 7.5-35 (c)(2) shall apply when nuisance species of tree are used (example - Use of Ficus Benj amina) . On the section view drawings of each berm indicate the overall height of the berms and/or identify the slope. Note the height shall not be less than the original approval of four (4) feet for the berm required along the north property line and five (5) feet for the berm required along the <;tast propertY--.J.~n~ What are you proposing for the height of the erm identified as Section C? Modify the tabular data and plans to be consistent with the code specifications regarding the landscaping for the following sections of the landscape code; multifamily housing developments, foundation landscaping, required landscaping adj acent to public rights-of-way and abutting properties, and interior landscaping. Add to the plans the hedging required on the north side of the property line that separates the Vinings project from the 14 acre parcel. This material shall be installed with the Vinings landscaping. Indicate on the landscape that the landscaping and fencing required between the Vinings project and the 14 acre parcel shall be completed prior to a certificate of occupancy being issued for the first building in phase I. 8.~ pr~vide a copy of the association document 9V (~,""e.. ermi ts . city approved and recorded homeowners' prior to the issuance of building (9 ~ rovide updated tabular data that sho~s that the L.U.I. of 5.00 is being complied with, consistent with the overall PUD maximum permitted floor area. show on the site plan and/or landscape plan the type, size and location of the fencing required to separate the Vinings project from the 14 acre parcel. ~c:t