REVIEW COMMENTS
~
Co '..
)
" .1.
~.,
1&61) J/~-
--"~Jk.., .,. ~ k
MURRAY-DUDECK & ASSOCIATES
TRAFFIC ENGINEERING CONSUL T ANTS
January 14, 1986
David Levy
1600 South Dixie Highway, Suite SC
Boca Raton, Florida 33432
RE: Traffic Report For The Overall Impact Study On The Developments In The
Vicinity Of SW 8th Street & Woolbright Road In The City Of Boynton
Beach In Palm Beach County
HDDl'1 Project #85-180
Dear David:
I am pleased to submit
subject project. The report
findings and recommendations.
the Traffic Impact Analysis
outlines the evaluation and
Report for the
summarizes the
I appreciated the
service. Please advise
required on this report.
opportunity of providing this traffic engineering
if further information and/or clarifications are
Sincerely,
D~ ~:::;.~
fl.
. L-PLANTATION OFFICE: 936 WEST TROPICAL WAY. PLANTATION, FLORIDA 33317. (305) 584.0073
BOCA RATON OFFICE: 21464 WOODCHUCK WAY. BOCA RATON, FLORIDA 33433. (305) 487-3231
MURRAY-DUDECK & ASSOCIATES
TRAFFIC I~WACT ANALYSIS REPORT
ON THE OVERALL WOOLBRIGHT ROAD -- SW 8TH STREET PROJECTS
LOCATED JUST WEST OF 1-95 -- WOOLBRIGHT ROAD INTERCHANGE
IN THE CITY OF BOYNTON BEACH
~
MURRAY-DUDECK & ASSOCIATES
n ':74 IV)
Prepared By: pCI~ 'pY//~
Daniel N. Nurray, P.E.
J!Jf-/P6
Date
MURRAY-DUDECK & ASSOCIATES
TABLE OF CONTENT
----------------
----------------
Page
Introduction..................................................1
Site Location Map -- Figure #1................................2
Project Land Use Data.........................................3
Trip Generation...............................................4
Project Internal Trips........................................5
Other Related Project Trip Generation.........................6
Trip Distribution.............................................7
Daily Traffic Assignment......................................7
Peak Hour Development Traffic.................................7
Trip Distribution Percentages Figure #2....................8
Trip Distribution Percentages Figure #2A...................9
Trip Distribution Percentages Figure #2B..................I0
Trip Distribution Percentages Figure #2C..................l1
Average Daily Development Traffic Assigned -- Figure #3......12
Area Average Daily Traffic Assigned -- Figure #4.............13
AM Peak Hour Traffic.........................................14
PM Peak Hour Traffic.........................................15
Other Development Peak Hour Traffic..........................16
Peak Hour Traffic Assignment.................................16
AM Peak Development Hourly Traffic -- Figure #5..............17
PH Peak Development Hourly Traffic -- Figure #6..............18
Traffic Performance Standards Category Evaluations...........19
Traffic Performance Standard Evaluation -- Figure #7.........20
Highway Capacity Analysis....................................21
Highway Link Capacity -- Figure #8...........................22
Highway Capacity Level Of Service Summary....................23
Relative Weighed Comparisons Of Developments.................24
SW 8th Street Corridor Highway Requirements..................2S
Fair Share Traffic Impact Fees...............................26
Trip Generation Comparison...................................27
Trip Comparison -- PCD.......................................27
Conclusions..................................................28
Appendix "A"
Appendix "E"
Traffic Counts
Highway Capacity Analysis
~
MURRAY-DUDECK & ASSOCIATES
INTRODUCTION
------------
------------
The purpose of this traffic report is to undertake a detailed traffic
impact analysis on Woolbright Place, Woolbright Center, and the Shoppes At
Woolbright Place, based on site plan data prepared by Kilday & Associates,
Landscape Architects/Planners. Included in the overall analysis ~ill be a
traffic incremental assessment of active projects in the vicinity of
Woolbright Road & ~T 8th Street, so that accurate transportation needs &
improvements can be established & implemented, which will insure the
maintenance of a reasonable traffic level of service. Other specific
projects included in the analysis were: Palm Beach Commerce Center, Pylon
Interstate Park and the HI Parcel between RR & 1-95.
The significant impact areas will be the SI,T 8th Street corridor
between Boynton Beach Road & I':oolbright Road, the intersection of Sl'] 8th
Street & Woolbright Road and the 1-95 signalized ramp intersections at
Woolbright Road. As secondary impact areas, the intersections of Congress
Avenue & Woolbright Road, Congress Avenue & Ocean Drive, and SW 8th
Street & Boynton Beach Road were analyzed. For further details on the
project location & impact areas, reference should be made to the Site
Location Map--Figure #1.
To ensure that the traffic flow and safety issues are properly
addressed, the City of Eoynton Beach has required the developer of
Woolbright Place to submit a overall traffic impact analysis & report,
which addresses the total impact of ALL RELATED PROJECTS. Furthermore, the
report has to adequately examine the project traffic generation levels to
determine if the project generates a siznificant impact as indicated in the
Palm Beach County Traffic Performance Standards. Hurray-Dudeck &
Associates, Traffic Engineering Consultants have been retained by
Tradewinds Development Corporation to investigate and determine the overall
traffic impacts created by the several proposed & approved developments.
In conducting the traffic evaluation it was necessary to examine the
adjacent highway links to assess the development access and its interaction
with the roadways. Additionally, a detailed revievr of the City of Boynton
Beach files was conducted to obtain any information on other projects.
Thirdly, manual counts during the peak periods at the critical
intersections werc obtained from Palm Beach County & the Department of
Transportation and were conducted by }WRRAY-DUDECK & ASSOCIATES. This data
is reflected in Appendix "A". Likewise, an examination of the surrounding
highway network & adjacent trip attractions & trip productions was made, to
be determinc reolistic route sclections and trip patterns.
-1-
MURRAY-DUDECK & ASSOCIATES
SITE LOCATION MAP
-----------------
-----------------
Figure #1
Old Boynton Beach Rd.
Ocean Drive
Congress
Ave.
**************
* Hoolbright *
* Place PUD *
************:~*
**************
**************
1-95 SB
Off-Ramp
* Woolbright *
* Center *
**************
* Shoppes At *
* \<loolbright *
* Place *
J
**************
Woolbright Rd.
********':c****
*******************
* Hini *
* Warehouse *
*************
* Palm Beach *
* Commerce Center *
*******************
1-95 SB
On-Ramp
SW 8th St.
-2-
t NORTH
1-95
Boynton Beach Rd.
,
,
,
t
,
t
t
,
, **********
t * HI *
, * Parcel *
, **********
t
t
t
,
, I-95 NB
, On-Ramp
,
,
t
t
,
,
t
t
, 1-95 NB
t Off-Ramp
t
t
t
1-95
MURRAY-DUDECK & ASSOCIATES
PIWJECT LAND VSE DATA
---------------------
---------------------
The "Traffic Impact Analysis" '''3S based on the site plan data obtained
fro~ Kilday & Associates for Woolbright Place & the Shoppes At Woolbright
Place and developer committed maximUfl square foot data on the office area
of Woolbright Center. Specifically, the pertinent data used for traffic
engineering purposes is as follows:
.. ..... ................... ...... ........ ............ ..... ..... ..............
..... ......... .................. ........ ........... ................ .... ....
Project Description
Proposed
-------------------
-------------------
--------
--------
Woolbright Place pun
a. multi-fanily units
b. church--school
1. 1st. phase
640 d. u.
2. 2nd. phase
500 seat church
100 school students
fellO'i!ship hall
500 school students
1,200 seat church
1--
3. 3rd. phase
c. recreation
1. public -- active
2. puhlic -- p2ssive
2. private
neighborhood sports field (7.0 acres)
wooded park (1.7 acres)
internal use for residential development
Woolbright Center
a. general office
62,000 sf
Shoppes At Woolbright Place
a. main center
b. outparcel fl
c. outparcel #2
d. outparcel #3
137,795 sf
3,000 sf
3,000 sf
3,200 sf
-------
-------
IM),795 sf
5 acres
Hini-\'Jarehouses
... ........ ......... ....................... .... ........ ....................
... ....... ......... ......... ................... ..... ... ........... .........
-3-
MURRAY-DUDECK & ASSOCIATES
TIUP GENETIATION
---------------
---------------
In determining the trip generation for the proposed project it was
necessary to use the recently published Institute of Transportations
Engineers Trip Generation--Third Edition Publication. Additionally, data
from other traffic studies prepared by tlliRTIAY-DUDECK & ASSOCIATES was
referenced. The subsequent calculations reflect the method of traffic
generation analysis at full built development generation capGcity:
...... ......................... .................. ..........................
...... ...... ....... ....... ..... ........................... ..... ............
Type of Facility
Unit Size
Trip Hate
Daily Trips
Woolbright Place PUD
c. school
640 units 6.6 trips/unit 4,224 vpd
1,200 seats
1070 occupancy 1.0 trips/seat 120 vpd
507~ occupancy 0.8 trips/seat (480 vpd)
8m~ occup8ncy 0.8 trips/seat (768 vpd)
6m~ occupancy 0.8 trips/seat (576 vpd)
oJ,~'# (1,82/+ vpd)
"',~"-j"
500 students 1.02 trips/student 510 vpd
a. residential
b. church
1. weekday
2. ,,'eekend
a. 1st service
b. 2nd service
c. evening service
Woolbright Center
a. bank
b. general office
c. medical office
5,000 sf
L,2,000 sf
15,000 sf
192.0 trips/ksf
17.7 trips/ksf
54.6 trips/ksf
Shoppes At
Woolbright Place
146,795 sf
66.7 trips/ksf
1,920 vpd
726 vpd
601 vpd
3 , 2L~ 7 vpd
9,791 vpd
243
------
------
18,135 vpd
Nini-1-!arehouses
5 acres
48.6 trips/acre
. Total Daily Trips =
~
0:":: NOTE: (l,824 vpd) is weekend traffic which is not
included in the daiJy traffic figures
..... ................. ....................... ............................ ...... ...... ...........
................ ............... ........................... ......1.. I................ ........ ... ...........
-1,,-
MURRAY-DUDECK & ASSOCIATES
I'ROJECT INTERNAL TRIPS
----------------------
----------------------
It is important to recognize that several trips generated by
the development are attracted to other locations within the development
area. Such trip purposes as home base to office or home base to shopping
are examples of these trip patterns. Therefore, it is essential to factor
in an adjustment for internal trips. By utilizing the established TRIP
PURPOSE ( work trip = 30%, school trip = 10%, shopping trip = 18%, social &
recreational trip = 21%, business trip = 12%, and other trip = 9% )
realistic estimates can be made. The subsequent calculations reflect the
estimated internal trips:
A. Residential Home-Base Trip
1. work trip = 4,224 vpd x 5% = 211 vpd
2. school trips = 4,224 vpd x 1% = 42 vpd
3. shopping trips = 4,224 vpd x 10% = 422 vpd
4. social & recreational = 4,224 vpd x 10% = 422 vpd
,.... 5. business trip 4,224 vpd 2% 84 vpd
= x =
6. other trips(medical) = 4,224 vpd x 2% = 84 vpd
---
1,265 vpd
B. Multi-Purpose Trip Attractions
1. office--shopping = 3,247 vpd. x 10% = 325 vpd
2. school--shopping = 510 vpd. x 5% = 25 vpd
3. church-school = 510 vpd. x 10% = 51 vpd
4. church--shopping = 120 vpd. x 5% = 6 vpd
5. office--school = 510 vpd. x 5% = 25 vpd
6. office--church = 120 vpd. x 5% = 6 vpd
--
438 vpd
.... ....................... ...... ................................................. ....... ...................
.... ... ............. .............. ......... ........ ........ .... ..................
RESULTING EXTERNAL TRIPS = 18,135 - 1,265 - 1,265 - 438 = 15,167 vpd.
.... ........ ............... ......................................................... ........ ...................
.. ........................................................... ........................... ..............................
-5-
~
MURRAY-DUDECK & ASSOCIATES
OTHEf~ RELATED PI(OJECT TRIP GE}JEEATION
-------------------------------------
-------------------------------------
An accurate measurement of the traffic impact on the adjacent
intersection can not be undertaken, unless traffic from other related
projects is recognized and factored into the analysis. Therefore, it is
important to t~:e into account the Boynton Commerce Center (includes the
Pylon Interstate Park) which is located on the southside of Woolbright Road
along hath sides of SW 8th Street. Lil:ewise, the Ml zoned property between
the railroad & 1-95 on the northside of Woolbright Road will introduce
additional traffic, which has to be considered.
The land use data based on discussions v!ith the property owners &
estimated daily traffic for the above indicated developments are calculated
by using the ITE Trip Generation Rates as follows:
.... "'.. .... '" '" '" '" '" "'.. '" ............ '" '" "'.... ........ .... '" "'.. .......... '" '" "'.. '" '" ...
'" ......... '" .... ... ........... '" ..... '" .............. ................. ... .....
Project Description
Unit Size
Trip Rate
Daily Trips
-------------------
-------------------
---------
---------
-----------
-----------
-,
Palm Beach Comnerce Center
a. office
b. industrial
c. motel
=
619,800 sf
25.4 Gcrcs
150 rOODS
(80% occupnncy)
10.9 trips/ksf
62.8 trips/acre
10.14 trips/occup.
roon
6,756 vpd
1,595 vpd
1,217 vpd
-----
9,568 vpd
478 vpd
-----
9,090 vpd
=
assume 5% internal trips
... ...... ..... ... .... .... .... .... ........ ...... ............ ...... ...... ....
HI Property
=
20 acres
62.8 trips/acre
1,256 vpd
::: ::::: ::::: :::::: ::::::::::::::::::: ::::::::::::::::::: :::: ::::::::::::::
TOTAL EXTEENAL DAILY TRAfFIC
=
9,090 + 1,256 = 10,346 vpd
... ..... ..... ...... ..................... ....... .......... ..................
...... ........ ..... ................... ......... ......... ....... .... ........
-6-
MURRAY-DUDECK & ASSOCIATES
TRIP DISTRIBUTION
-----------------
-----------------
To deterr:1ine realistic traffic distribution percentai;es, it is
important to recognize the trip production & attraction characteristics,
\.,hich were previously classi fied undcr n~IP PURPOSES. Also, motorists
select specific routes based on travel cOQfort, travel time, travel safety,
etc. Thus it is important to recognize the alternative highway links in
considering trip route selection. Therefore after a careful review and
evaluation of the surrounding trip influencing factors, the trip percentage
distributions were determined as depicted in the Trip Distribution
Percentages -- Figure #2, #2A, f2B, & #2C.
DAILY TI~AFFIC ASSIGK:lm:T
------------------------
------------------------.
By utilizing the trip distribution percentages indicated in Figure #2,
#2A, f2B & #2C the various project traffic on each affected highway link
within the area of influence can be determined. The computations are
depicted in Average Daily Development Traffic Assigned -- Figure #3.
To determinc the overall impacts on the transportation network, it is
necessary to recognize the traffic impacts on each of the highway links
within the area of influence of the subject development. Therefore, the
traffic levels under current conditions and due to tIle project generated
traffic have to be assigned onto the transportation network. The critical
traffic figures, which include the existing traffic, the related
development traffic, and the background traffic, are depicted in the Area
Average Daily Traffic Assigned -- Figure #4.
PEAK HOUR DEVELOP}IENT TRAFFIC
-----------------------------
-----------------------------
Since the real traffic impact is measured by calculating the peak hour
capacity impacts at critical nodal points, it is important to deterrinc the
average peak hour traffic. Based on the vnrious land use projects, the
evening peal: hour period is the most critical tinc. HO\:c\'cr, the morning
peak hour period \,rill generate suhstantial levels of traffic, especially
the office land use category and usually different critical lane
requirements are needed for this peak period. Therefore, both peak hour
periods \Yere c81culated by using the ITE peak period trip rates, as
follows:
-
-7-
-
TRIP DISTRIBUTION PERCENTAGES (residential/school/church)
----------------------------- t NORTH
-----------------------------
Figure #2
Old Boynton Beach Rd.
, (5%) 5%1
....... .......
5% (5%) Boynton Beach Rd.
( s%r- 5%
~ ~
Y(ls%) 1s%l
Yls% (ls% ) ..
...oIl(
- 10% Ocean Drive
(10%)
~
Y(25%) 25%.
1-95 SB 1-95 NB
YlO% (10%) . Off-Ramp On-Ramp
Y75% (75%). Y(20%) 2o%A
-c: ......-: ...oIl( ...oIl(
Woolbright Rd. 20% _(50%) (30% )_ _(10%'
- --
(20%) 50% 30% 10%
~ ~ ~ ~
YlO% (10%)1 Y5% (5%). Y 20% .(20%)
I-95 SB 1-95 NB
Congress Ave. On-Ramp Off-Ramp
Sfl 8th St.
LEGEND
******
_. (75%) Ingressing Traffic Distribution
75% Egressing Traffic Distribution
-8-
MURRAY DUDECK & ASSOCIATES
MURRAY-DUDECK & ASSOCIATES
-----------------------------
--------------------~---------
Tlnp DISTRIBUTION PlmCENTAGES (office & mini-warehouses)
Old Boynton Beach ]~d.
......
5'7
5~L
~
Y(5n
5" ,
n~
y 15/~ (15;;) .
Figure #2A
........
5% Ocean Drive
(5~; )
~
y (l 0:;) 107J
y 5%
(51.;).
y 90i~
......c
15/;
(l5~6)
~
(90;';).
......c
70~{
70/6
~
Hoolbrioht Rd.
y lO~~ (lO~O .
y 5/~ (Sin.
Congress Ave.
SU 8th St.
LEGE~lD
*:.le;:.: ~:.~ ~:.:::~
(90%) 1ngressinb Traffic Distribution
90% Egressing Traffic Distribution
-9-
1-95 SD
Off-Ramp
Y(30%)
Y 307~
1-95 SB
On-Ramp
t t)ORTlI
Boyn ton Beach l~d.
1-95 NB
On-Ramp
1-95 I\B
Off-Lamp
MURRAY-DUDECK & ASSOCIATES
TTIIP D1STIUBUTIm; PERCENTAGES (shopping)
Figure 1!2B
t NOETH
-----------------------------
-----------------------------
Old Boynton Beach Rd.
--
5C.
10
Boynton Beach Rd.
(5%)
.-
):::5%):~
, (lC~) 10% 1
--
10~~ Ocean Drive
( 10/0)
--
':'5~;':' , (20/~) 20% 1
y 10%
(l 0%) 1
1-95 SB
Off-RClmp
1-95 NB
On-Ramp
1 07, ,
>:<10%>:<
Hoolbright
, 80%
......c
Rd. 35%
(35%)
--
(80%) 4
......c
40%
40%
--
(5%)4
, (l 0% )
y ls/~
(15;;) 1
y 5%
y 1 O~~
Congress Ave.
1-95 SD
On-Rnmp
. (l O~ )
1-95 NB
Off-Pamp
S\.' 8th St.
LEGEND
~~:~:::::**~:;:
(80%) Ingressing Traffic Distribution
80% Egressing Traffic Distribution
*5%* Residential Off-system Trip Percent Attraction
-10-
w (l 0% )
, <l O/~>
W 10%.
, [5~'~]
MURRAY-DUDECK & ASSOCIATES
TRIP DISTRIBUTIOli PERCEt{TAGCS (other projects)
-----------------------------
------------------------------
t 1;QI:TI!
Figure #2C
Old Boynton Beach Rd.
.....
5/~
Boynton Beach Rd.
5C!
h
~
y (5/~) 5% A
.....
S/~ Ocean Drive
(5n
:.-
y (1O~~) 10/; A
10% A
[10%]
.....
1 OO~~
( 10m: )
~
1-95 SB
Off-Eamp
1-95 NB
On-Eamp
W 902
, <52>
(901-..-.') !
[5;; J .
w (30/0.')
, <35/:>
30%
[35n i
-.c
<5/~>
5<:'
1-
59
;,
[5%]
~
:~5%:':~
(lO/~) A
<52>
w Sic; (5%)
'<100%,> [100;;;] A
301~
Y[35%]
A (30/~)
<352>
1-95 SB
On-Ibnp
1-95 1m
Off-Rar:1p
Consress Ave.
(80;;)
80%
<100Z>
[ 1 001, ]
* 5~;~::~
S\~ 8th St.
LEGE1.JD
..'.. ..I....t.. ..'~ oJ.....I..
.......,...........'....1....1..
IngressinB Traffic Distribution For HI Property
Er,ressing Traffic Distri bution For tll Property
1ngressing Traffic Distribution For Palm Beach Commerce Center
EgressinE Traffic Distribution For PaIr.J Beach Comuerce Center
Residential Off-system Trip Percent Attraction
-11-
MURRAY -DUDECK & ASSOCIATES
"'{12}
351
[143]
(880)
<1386>
*125*
-909-
{25}
~ 350
[287]
(1319)
<1981>
*126*
-455-
Congress
Ave.
AVERAGE DAILY DEVELOPMENT TRAFFIC ASSIGNED
------------------------------------------
------------------------------------------
Old Boynton Beach Rd.
LEGEND
******
\- {l2}
175
[143]
(00)
<330>
*63*
-00-
{219}
2630
[2581]
(7037)
<12467>
~ *1130*
-454-
'"-{170}
1754
[2008]
(3518)
<7450>
*816*
-6818-
SH 8th St.
Figure #3
t NORTH
Bo nton Beach Rd.
Ocean Drive
{36}
351
[430]
(440)
<1257>
*188*
-1591-
{98}
1052
[ 1148]
(2638)
<4936>
*440*
-3636-
{36 }
351
[430]
(440)
, <1257>
, *188*
, -1591-
i~~}~ ~~~}
[00] [144] ~
(440) (879)
<615> <1561>
*00* *63*
-00- -00-
'" {12} {l2},.(
351 351
[143] [143]
(440) (880)
<946> <1386>
*63* *63*
-00- {37} -00- {24}~
701 877
[430] [287]
(2199) (1759)
<3367> <2947>
*251* *126*
-1364- -00-
\~oolbri ht Rd.
{37}~
701 {12} ~
[430] 175
(3079) [143]
<4247> (440)
*251 * <770>
-1818- *63*
-9090-
I-9s NB
On-Ramp
{36}
351 ~
[ 430]
(440)
<1257> 1-95 SB
*188* On-Ramp
-1591-
~
1-95
I-95 NB
Off-Ramp
{26}
{36} 350
351 [288]
[430] (1758)
(440) <2422>
<1257> *64*
*188* -454-
-1591-
{170}
1754
[2008]
(3518)
<7450>
*816*
-6818-
Mini-Warehouse Daily Traffic
Woolbright Place PUD (Residential/School/Church) Daily Traffic
Woolbright Center (Office) Daily Traffic
Shoppes At Woolbright Place (Shopping) Daily Traffic
Total Project Development Daily Traffic
M1 Parcel (Other Project) Daily Traffic
Boynton Commerce Center (Other Project) Daily Traffic
-12-
MURRAY-DUDECK & ASSOCIATES
AREA AVERAGE DAILY TRAFFIC ASSIGNED
-----------------------------------
-----------------------------------
Old Boynton Beach Rd.
25510
(26125)
-26125-
*14500*
<40625>
\. 25510
(25840)
-25903-
*14500*
<40403>
614
(2175) ~
-2238-
*1000*
<3238>
" 2940
(3886)
-3949-
*1000>::
<4949>
2000
(3386)
-3449-
*1000*
<4449>
12126 12616 00 00
(13512) (15983 ) (2947) (12467)
-14546- -17598- -3073- -14051-
* 11 000* * 11400* *1000* *2000:'''
<25546> <28998> <4073> <16051>
)r Woolbri ht Rd. ~
" ~ A
12126 12616 ~ 12616
( 14107) (16863 ) 00 (20066)
-14688- -18932- (770) -27700-
* 11 000* *11400* -9923- *14500*
<25688> <30332> *1000* <42200>
<10923>
Congress
Ave. S\~ 8th St.
LEGEND
******
Figure #4
Bo nton Beach Rd.
Ocean Drive
4890
(6147)
-7926-
*500cr'<
<12926>
17449
(22385)
-26461-
*24550*
<51011>
+ NORTIl
6330
, (7587)
, -9366-
, *5000*
'<14366>
,
22282
(24704)
-25222-
*10050*
<35272>
Existing 1984 Average Daily Traffic
Existing + Development Average Daily Traffic
Existing + Development + Boynton Commerce Center + M1 Average Daily
Traffic
50% Background Average Daily Traffic
Total Average Daily Traffic
12616
(20066)
-27700-
*14500*
<42200>
-13-
1-95 SB
Off-Ramp
4910 ~
(6167)
-7946-
*5000* 1-95 SB
<12946> On-Ramp
4450
(5707)
-7486-
*5000*
<12486>
MURRAY -DUDECK & ASSOCIATES
M" PEAK nom; TEAFFIC
--------------------
--------------------
\:ooHright Place PUD
--------------------
--------------------
tesidcntiul = 640 elu x 0.1 tpu =
= 640 du x 0.4 tpu =
School = 500 child ",'a. D.11 tpc
= 500 child x 0.05 tpc =
Church = 60 vpd x 5/~
60 vpd 5c'
= x Ie =
subtotal =
In
Ou t
256 vph
25 vph
3 vph
---
'),./, vph
~U"'"
64 vph
55 vph
3 vph
Woolbright Center
..... ................. ... ........................................ ............... ................ .....
................................ ................ ........................................................... ....
122 vph
-----------------
-----------------
Bank
= 5,000 sf x 3.00 t/ksf =
= 5,000 sf x 0.30 t/ksf =
= 42,000 sf x 1./15 t/ksf =
x 0.25 t/ksf =
15,000 sf x O. GL, t/ksf =
x 0.21 t/ks[ =
Office
l<edical office
SU:Jtotnl
::::: :::::: ::::::::::::: ::::::::::: :::::::: ::::::::::::::::: :::::::::::::::
=
In Out
15 vph
2 vph
61 vph
11 vph
10 vph
3 vph
--- ---
86 vph 16 vph
Shoppes At Woolbright Place
---------------------------
---------------------------
Shopping Center
146,795 sf x
x
0.9 t/ksf
0.8 t/ksf
subtotal
=
In Out
132 vph
117 vph
---- ---
132 vph 117 vph
... ..... ............ ................... ............ ...... .......... ........
.. ......... ...... ... ....... ............. .............. ..... ............. .......
=
l':ini-\,7arehouses
warehouses
5 acres x 1.45 t/acre =
=
7 vph
7 vph
. .......... ........ ............ .......... ........... ......... ....... ... .....
.. ............... ... ........... ..................... ................ ........
Totals
347 vph
424 vph
=
-14-
... ... ............... .... ..... ............. ......... ......... ..............
. ... ....... ...... ............. ... ...... ...................... ...... .... ....
MURRAY -DUDECK & ASSOCIATES
Pl1 PEAl: HOllE TRAffIC
--------------------
--------------------
":001 bright Place PUD
--------------------
--------------------
6 vph
Out
128 vph
8 vph
6 vph
---
142 vph
In
Resic'ential == 6LfO cu X O. q tpu
== 64CJ du x 0.2 tpu ==
School 500 child x 0.015 tpc ==
== 500 child x 0.015 tpc ==
Church == 60 \'pd x 1 O~~ ==
== 60 vpd x 10/~ ==
subtotal ==
256 vph
S vph
270 vph
..... ...... ............ ................... ... ...... .......... ..............
. .......... ............... ....... ....... ............. .........-..... .......
v.'oolbright Center
-----------------
-----------------
In Out
Bank == 5,000 sf x 1q .00 t/l:sf 70 vph
== 5,000 sf x 15.10 t/ksf == 78 vph
I... Office == 42,000 sf x 0.19 t/ksf 8 vph
==
x 1. lL~ t/ksf == 48 vph
l'ledical office == 15,000 sf x 0.89 t/ksf == 13 vph
x 3.05 t/ksf == 46 vph
---
subtotal == 91 vph 172 vph
..... .......... ... ........ ....... .......... ........ ........ ............. ...
..... ........... ....................... ............. ..... ............. .....
Shoppes At Woolbright Place
---------------------------
---------------------------
In
Out
Shopping Center
==
146,795 sf x
x
2.9 thsf
3.1 t/ksf
==
426 vph
==
455 vph
subtotal
==
426 vph
455 vph
......................................... .... ............. ............... ...
................ ....................... ............. ......... .... ...... .......
l':ini-\Jarehouses
warehouses
==
5 acres
x
2.45 t/acre ==
12 vph
12 vph
....... ........... .... ............. ........ ... ........................ ......
....... .............. .............. ........ ........................ ... .....
Totals
==
799 vph
7t:l vph
........ ...... ..... .......... ......... ..... ....... ...... ............... .....
............ .... .......... ............... ............ .................... .....
-15-
MURRAY -DUDECK & ASSOCIATES
OTHEI{ DEVELOP;':E:~T PEAl: IIOur~ 'l'RAFFIC
-----------------------------------
-----------------------------------
To take into considerution the peak hour impacts of the Boynton
Comfi1crce Center & the ~i1 property, it is important to co~pute the
anticipated peak traffic figures. By utilizing the ITE Trip Generation
Date for the pCElk All & Pi; periods, the follov:ing calculations wcre made:
....... ..... ......... ............ ....... ............ I" I...................
....... .............. ............ ...... ................... .................
A;'1 Peal: Traffic
Boynton COfi1merce Center In Out
-----------------------
a. office 619,800 sf x 1. 78 trips/ksf llC3 vph
0.18 trips/ksf 112 vph
b. industrial 25.4 acres x 10.1 trips/acre 257 vph
3.2 trips/acre 81 vph
c. rr:otel 150 rooms x 0.37 tri ps/room 44 vph
( Bne;' occupancy) 0.37 trips/rool1 44 vph
V/o
HI Property 20 acres 10.1 trips/acre 202 vph
----------- 3.2 trips/acre 64 vph
--- ---
1606 vph 301 vph
..... ............................................. ......... ................
............. .......................... .......... ... ........ ...............
PC' Peak Traffic
fj
Eoynton Coml1erce Center In Out
-----------------------
a. office 619,EOO sf x 0.23 trips/ksf 143 vph
1,70 trips/ksf 1054 vph
b. industrial 25.Lf acres x 3.0 trips/acre 76 vph
9.4 trips/acre 239 vph
c. motel 150 rooms x 0.325 trips/rool1 39 vph
(80% occupancy) 0.325 trips/room 39 vph
I'll Property 20 acres 3.0 trips/acre 60 vph
----------- 9.4 trips/acre 188 vph
-~-- ---
3H3 vph 1520 vph
...... ............... .......... ................................ ...... ......
.. ... ........ ....... ........ ............. .............. ...... ... ..... ......
PE1X HOUR TRAFFIC ASSIGNl In;T
----------------------------
-----------------------------
Based on the aforementioned peak hour data, the development traffic &
other related projects are assigned to the crjtical aoj<;cent intersections
as depicted in the All 8. Pil Peak Developnent Hourly Traffic -- Figure #5 &
{6.
-16-
MURRAY-DUDECK & ASSOCIATES
~1 PEAK DEVELOPMENT HOURLY TRAFFIC
Figure #5
;
----------------------------------
----------------------------------
NORTH
Congress Ave.
Old Boynton Beach Rd.
[7]
(4)
12
.....
Ocean
Drive
6
'f
[7]6....
~ 6( 4)( 1 }
~ A ~
14 14 14
[6] (1)
{l}
Boynton
Beach Rd.
~15(1)[6]
SW 8th St.
<13><73><42>
{I} {s}
[41] [6][47]
. (2) (1)(11)
57 14 142 ~61(60)[53]{s}<131>
Jr 'f ..... ~<1053>
Woolbright Rd.
~ A ~
<40>(1}[46](13)24""" <47> 7 <178>
<284>..... (4)
[7]
<22>
I-95 SB Off-Ramp 1-95 NB On-Ramp
<552>
(2}
[13 ]
(17)
24 <II( 37(43)[40]{3}<632> <II( 13(26)[27]{1 }<80>
Woolbright ~ Road
<118> {3}[ 35]( 6 )85 ~ <102> {2)[ 12]( 5)57 ~ '"
<102>{1}[12](s)s7..... <16>{1}[23](1)28 ~ 24
(17)
[13]
{2}
<552>
1-95 SB On-Ramp I-95 NB Off-Ramp
LEGEND
******
85
(6)
[35]
{3}
<118>
Residential/School/Church -- peak hour traffic
Office -- peak hour traffic
Shopping -- peak hour traffic
Mini-Warehouse -- peak hour traffic
Boynton Commerce Center & Ml -- peak hour traffic
-17-
MURRAY-DUDECK & ASSOCIATES
I
PH PEAK DEVELOP~1ENT HOURLY TRAFFIC
Figure #6
t
----------------------------------
----------------------------------
NORTH
Congress Ave.
Old Boynton Beach Rd.
[21]
(5)
27 "15(9)[23]
..... Ocean
Drive
SW 8th St.
<38><21><122>
{2} (I} (8}
[159][ 23][ 182]
(26) (9) (120)
28 7 71 ~135(63)[171]{8}<39>
Jr . ..... -41( <194>
"Toolbright Rd.
13 ~13(5)(l}
. Boynton
" A -'f Beach Rd.
[ 21]14..... 7 7 7
[23] (9)
(l}
" A ~
<12>{2}[149](14)s4-'f <266> 14 <999>
<52>..... (5)
[21]
{1 }
<70>
1-95 SB Off-Ramp
<108> 1-95 NB On-Ramp
(4}
[43]
(27)
54 -41(81(36)[128]{4}<125> -41(27(9)[85]<17>
Woolbright Jr Road
<1121> {4}[ 136]( 68 )43 ~ <522> {4)[ 46 ](52) 28 ~ "
<522>{4} [46](52)28..... <77>[90](16)15 ~ 54
(27)
[43]
{4}
<108>
1-95 SB On-Ramp 1-95 NB Off-Ramp
LEGEND
***..~**
43
(68)
[136]
{4}
<1121>
Residential/School/Church -- peak hour traffic
Office -- peak hour traffic
Shopping -- peak hour traffic
Mini-Warehouse -- peak hour traffic
Boynton Commerce Center & Ml -- peak hour traffic
-18-
MURRAY-DUDECK & ASSOCIATES
TRAFFIC PERFORMANCE STANDARDS CATEGORY EVALUATIONS
--------------------------------------------------
--------------------------------------------------
As mandated by Palm Beach County, all highway links within the
influence area of traffic impact have to be analysed to determine if there
are critical traffic capacity constraints. Specifically, when the existing
traffic is over level of service "D" on any link and the development
significantly impacts the traffic level, then the project is a Category
"A". Likewise, when the link total traffic exceeds level of service "D" and
the development significantly impacts the traffic level, then the project
is a Category "B".
""
Thus a detailed analysis of the "19" affected links within the traffic
zone of influence was undertaken. The results are depicted in the Traffic
Performance Standard Evaluation -- Figure #7. Based on this evaluation the
following comments are offered:
#1 The development satisfies the necessary requirements of Category "A"
on all "19" affected links examined.
#2 Under the proposed development at full capacity the project is a
Category "B" Project.
#3
Under Category "B" phasing
generate traffic in excess of
required, unless substantial
alleviate the traffic impacts.
examination, this project does
the standard, therefore phasing is
roadway improvements are made to
-19-
~"
MURRAY-DUDECK & ASSOCIATES
TRAFFIC PERFORNANCE STANDARD EVALUATION
=======================================
Figure #7
t NORTH
Old Boynton Beach Rd.
Bo nton Beach Rd.
nMEn",(
<B>
~
"SI"
<B>
~
~
n~fEn
<B>
Ocean Drive
~
~
"SEn
<B>
nSI"
<B>
I-95 SB 1-95 NB
nSI" nSIn Off-Ramp On-Ramp
"SIn nSI" <B> <B>
<B> <B> )r "SIn ,
"SI" <B> ' "SIn
<B> ~ , <B>
\.Joolbri ht Rd.
~ ~ nSI';( "'-"SI"
~ "SI" "SI" nSI" ~ <B> <B>
nSln <B> ~ <B> <B> 1-95
<B> "SEn 1-95 SB 1-95 NB
<B> On-Ramp Off-Ramp
Congress
Ave.
SW 8th St.
LEGEND
******
<B> Performance Standard Category With Development Impacts
nSIn Performance Standard Category With Significant Impacts
nSEn Performance Standard Category With Significant Effect
"ME" Performance Standard Category With Minor Effect
-20-
MURRAY-DUDECK & ASSOCIATES
HIGHWAY CAPACITY ANALYSIS
-------------------------
-------------------------
To determine the level of service of the adjacent highway links, which
the subject project will impact, it is essential to examine the highway
carrying capacity. Reasonable and acceptable traffic movement can be
achieved if the roadway sections are operating at or above level of service
"D". For a 2-lane undivided highway a total of 14,200 vehicles per day
results in "D" service, for a 4-lane divided highway the figure is 33,500
vehicles per day, for a 6-lane divided highway the figure is 51,300
vehicles per day. These service volumes were taken from the Table 31-1 of
the acceptable DRI standards of which a copy is included in Appendix "B".
Furthermore, to achieve the optimum expected traffic flow it requires that
all links operate at level of service "c" or better, which is 11,800
vehicles per day for a 2-lane undivided highway, 27,900 vehicles per day
for a 4-lane divided roadway, 42,700 vehicles per day for a 6-lane divided
roadway.
A careful examination of the daily traffic figures shown in Figure #4
was made so that the highway link capacities (refer to Figure #8) could be
determined. Under the existing traffic levels it is evident that Congress
Avenue both north & south of Woolbright Road is operating at "D" level of
service. However, Palm Beach County has scheduled in fiscal year 86/87 to
reconstruct this section of highway to a 4-lane divided facility, which
will alleviate the capacity deficiencies. The section of Woolbright Road
between the intersection & SW 8th Street & I-9s ramps will be impacted with
a substantial level of turning movement traffic. Thus even though the link
capacity analysis indicates that this section of highway is at "c" level of
service based on the Daily Service Volumes presented in Table 31-1, the
true indicator of level of services are realistically determined by
performing a critical lane analysis of the AM & PM peak traffic.
To determine the peak hour impacts, it is necessary to evaluate the
traffic movements at the critical adjacent intersections, which are
Woolbright Road & SW 8th Street, Woolbright Road & I-9s ramps, Congress
Avenue & Ocean Drive, and Boynton Beach Road & SW 8th Street. By utilizing
the Transportation Research Circular #212, the Critical Movement Analysis"
methodology, a determination of the actual level of services can be made.
The analysis as shown in Appendix "B" clearly substantiates that
intersectional capacity problems will result, with the future traffic
impact due to the development traffic & due to the Boynton Commerce Center.
To alleviate these critical intersectional capacity deficiencies, it will
be necessary to incorporate certain positive traffic operational
improvements. A level of service summary at Woolbright Road & SW 8th
Street and at Woolbright Road & 1-95 Ramp Signals depicts the traffic
operatonal conditions under different intersectional geometrics.
-21-
MURRAY-DUDECK & ASSOCIATES
HIGHWAY LINK CAPACITY EVALUATION
================================
Figure #8
+ NORTH
Old Boynton Beach Rd.
Bo nton Beach Rd.
"B"
<B>
(B)
~
"A"
<A>
(A)
:.-
"C"
<C>
(C)
Ocean Drive
~
"A" "A"
<A> <A>
(B) (A)
"B" Level of Service With Existing Daily Traffic
<B> Level of Service With Existing + Development Project Daily Traffic
(C) Level of Service With Existing + Development Project + Boynton
Commerce Center + Ml Parcel Daily Traffic
-B* Adjusted Level of Service Due To Reconstruction Of Congress Avenue
To 4-Lane Divided In 86/87 Palm Beach County Work Program
-22-
MURRAY -DUDECK & ASSOCIATES
HIGHWAY CAPACITY LEVEL OF SERVICE SUMNARY
=========================================
Description
Level of Service
-----------
-----------
----------------
----------------
I) Intersection of Woolbright Road & SW 8th Street
a. AN Peak Traffic (No RTOR)
b. AN Peak Traffic -- (With RTOR)
c. AM Peak Traffic -- (With RTOR & 6 Lanes On
Woolbright Road)
d. PM Peak Traffic (No RTOR)
e. PH Peak Traffic -- (With RTOR)
f. PM Peak Traffic -- (With RTOR & 6 Lanes On
Woolbright Road)
" E"
"E"
"D"
"E"
"E"
"D"
II) Intersection of Woolbright Road & 1-95 NB Off-Ramp
a. Existing AH Peak Traffic -- (No RTOR) "B"
b. Existing + Development AM Peak Traffic (No RTOR) "E"
c. Existing + Development ~1 Peak Traffic (With RTOR) "E"
d. Existing + Development A~1 Peak Traffic (With RTOR "D"
& Double Left Lanes -- NB & SB)
e. Existing + Development ~1 Peak Traffic (With RTOR "D"
& Double Left Lanes -- NB & 6 Lanes On Woolbright Road)
f. Existing PM Peak Traffic -- (No RTOR) "e"
g. Existing + Development PM Peak Traffic -- (No RTOR) "E"
h. Existing + Development PM Peak Traffic -- (With RTOR) "E"
i. Existing + Development PM Peak Traffic -- With RTOR & "D"
Double Left Lanes -- NB & SB)
j. Existing + Development PM Peak Traffic -- (With RTOR & "c"
Double Left Lanes -- NB & 6 Lanes On Woolbright Road)
III) Intersection of Woolbright Road & 1-95 SB Off-Ramp
a. Existing AN Peak Traffic -- (No RTOR) "B"
b. Existing + Development AH Peak Traffic (No RTOR) "E"
c. Existing + Development AH Peak Traffic (With RTOR) "c"
d. Existing + Development AH Peak Traffic (With RTOR & "B"
6 Lanes On Woolbright Road)
e. Existing P~1 Peak Traffic - (No RTOR) "c"
f. Existing + Development PM Peak Traffic (No RTOR) "E"
g. Existing + Development PM Peak Traffic (With RTOR) "E"
h. Existing + Development PH Peak Traffic (With RTOR & "D"
6 Lanes On Woolbright Road)
IV) Intersection of Congress Avenue & Ocean Drive
a. Existing PH Peak Traffic
b. Existing + Development PM Peak Traffic
"A"
"A"
V) Intersection of Boynton Beach Road & SW 8th Street
a. Existing PM Peak Traffic
b. Existing + Development PM Peak Traffic
"A"
"A"
-23-
MURRAY-DUDECK & ASSOCIATES
RELATIVE WEIGHED COHPARISONS OF DEVELOPMENTS
--------------------------------------------
--------------------------------------------
It is important to recognize that each type of development will
generate traffic that distributes differently over the entire day. Since
the critical impact periods are the peak AM & ~l periods normally, those
development which impact these periods tend to create more impact than
developments that generate more uniform traffic. Obviously, a high trip
generation development which creates uniform traffic as compared to a low
trip generator will have much more impact even though the traffic is
distributed over several hours.
To better understand the TRUE I~WACTS of the developments analyzed,
the following daily, AM & PM traffic percentage comparisons have been made:
Development Da i1 y Peak Period
---------- Traffic % >>1 % PM %
----------
------- --- --- -- ---- ---
-------
PUD 2678
a. residential 4,224 14.6% 320 12.0% 384 11.2%
b. church 120 0.4% 6 0.2% 12 0.4%
c. school 510 1.8% 80 3.0% 16 0.5%
subtotal = 16.8% 15.2% 12.1%
PCD
a. offices 3,247 11.2% 102 3.8% 263 7.7%
b. shopping center 9,791 33.8% 249 9.3% 881 25.8%
c. mini-warehouses 243 0.9% 14 0.5% 24 0.7%
subtotal =
45.9% 13.6% 34 .2%
Ml Property 1,256 4.3% 266 9.9% 248 7.2%
----------
Boynton Commerce Center 9,568 33.0% 1,641 61.3% 1,590 46.5%
-----------------------
------ ----- ---- ----- ----- ------
------ ----- ------
28,959 100.0% 2,678 100.0% 3,418 100.0%
-24-
MURRAY-DUDECK & ASSOCIATES
SW 8TH STREET CORRIDOR HIGInvAY REQUIRENENTS
-------------------------------------------
-------------------------------------------
To properly serve the proposed development and to provide safe &
reasonable highway conditions for the traveling public, it is essential to
establish recognized transportation guidelines for the SW 8th Street
corridor. The follmving comments address the recommended highway
requirements:
#1 SW 8th Street shall be constructed as a 4-lane divided highway between
Woolbright Road & the Industrial Access Road to the }11 property.
#2 Only one median opening shall be provided between Woolbright Road &
the Industrial Access Road, which shall jointly serve the office
complex on the westside & the shopping area on the eastside. The
median shall be spaced midway between the two intersecting roadways.
#3 In developing the main access to the church, it shall be aligned
directly opposite the Industrial Access Road, so that a common median
opening can be utilized.
#4 The Industrial Access Road shall be a 2-lane undivided highway with
adequate right of way to expand to a 4-lane urban collector.
#5 A secondary access to the shopping center shall be positioned a
minimum of 330 feet from the intersection of SW 8th Street.
#6 Access to the mini-warehouses shall be off of the Industrial Access
Road.
#7 The access to the residential housing sites shall be spaced so that a
minimum of 660 feet between access intersections or any sideroad
intersection be maintained. This will facilitate the construction of
left turn lanes & right turn lanes at these two access and thereby not
require that SW 8th Street be a 4-lane divided highway thru this
section.
#8 The location of the access to the residential housing parcel #2 shall
be constructed directly opposite the access to the recreational area
on the westside of SW 8th Street.
#9 All development access onto SW 8th Street Road shall have a left turn
& right turn lane for both ingressing & egressing traffic.
#10 Access on Industrial Access Road shall have ingress turn lanes only.
#11 The intersection of Industrial Access Road & SW 8th Street shall
include two thru lanes, one left turn lane, & one right turn lane for
the north & south approaches and one left turn lane & one right-thru
lane for the east & west approaches.
-25-
~
MURRAY -DUDECK & ASSOCIATES
#12
The transition area between a 4-lane divided
undivided highway has to be carefully delineated
balance & continuity retained. Signing & pavement
incorporated into the design to insure positive
unexpected lane drop or lane change.
highway & 2-lane
and proper lane
markings shall be
guidance and no
#13 The intersection of SW 8th Street & Woolbright Road shall include a
double left turn lane,a single thru lane, and a free right turn lane
on the north & south approaches. The east approach shall include a
double left turn lane, two thru lanes, and a free right turn lane.
The west approach shall include a single left turn lane, two thru
lanes, and a free right turn lane. Also, the intersection shall be
signalized and coordinated & interconnected with the 1-95 signalized,
when the signal is warranted.
FAIR SHARE TRAFFIC I~WACT FEES
------------------------------
------------------------------
Based on the Palm Beach County Ordinance #85-10, developers are
required to pay a fair share fee for impacts created by their development
traffic. This ordinance has established fee rates for various type of lane
development activity. The following calculations depict the land
development categories, the dollar rate, and the total fee assessment:
Type of Land Development Activity
Units
. ....... ......... ...... .......... .......... ........ .... ..... ...... ..... ....
. ........ ........ .......... ...... ...... ................ .... ......... .......
Cost
Multi-family residential
Church 1/7(1824)
School
640 du
261 vpd
510 vpd
subtotal
=
General Offices
Shopping Center
Mini-warehouses (30% coverage)
62 ksf
146.795 ksf
65.340 ksf
development subtotal =
Fee Rate/Unit
$562.00
$26.79
$26.79
$482.00
$1,752.00
$134.00
$359,680.00
$6,992.19
$13,662.90
$380,335.09
$29,884.00
$257,184.84
$8,755.56
... ...... ........ ................. ........ ........ ... ......... ......... ....
$676,159.49
M1 Industrial (25% coverage)
Industrial (25% coverage)
Office
Motel
217.800 ksf
276.606 ksf
619.800 ksf
150 rooms
$161.00
$161.00
$295.00
$375.00
$35,065.80
$44,533.57
$182,605.00
$56,250.00
$318,454.37
Total Impact Fees = $994,613.86
********************************
26-
MURRAY-DUDECK & ASSOCIATES
TRIP GENERATION COHPARISON -- Church/School/Residential
--------------------------
--------------------------
If the PUD development did not include the church, then it would be
permissible to increase the residential units from 640 dwelling units to
760 dwelling units. The question of comparable traffic between church trips
& residential trips needs to be clarified. The following comments are
important in making this comparison:
#1 Residential trips occur daily whereas the major church trips occur
only once a week.
#2 The real impact is during the peak periods, which residential
will impact, but the church activity will not.
#3 Sunday morning when the major portion of the church traffic is
generated, is the lowest daylight traffic period.
#4 The following comparison of weekly traffic generation indicates that
the total trip generation is almost equal between the two generators:
Residential
= 120 d.u. x 6.6 trips/d.u. x 7 days
= 5,544 tpw
Church
School
= 120 vpd x 6 days +
= 510 vpd x 5 days
1,824 vpd (Sunday) = 2,544 tpw
= 2,550 tpw
5,094 tpw
#5 The following peak hour comparison indicates that the residential will
have a great impact on the traffic
Residential = 120 d.u. x 0.6 trips/unit = 72 vph
Church = 120 vpd x 10% = 12 vph
School = 500 child x 0.03 = 15 vph
--
27 vph
TRIP COMPARISON -- PCD
----------------------
----------------------
If the PCD was developed as a office park complex, the trips would be
substantially reduced. The following reflects the potential trips if the
PCD were developed as a office complex completely:
76,000 sf + 395,525 sf = 471,525 sf x 10.9 trip/ksf = 5,140 tpd
Current proposal's daily trips
= 13,281 tpd
-27-
MURRAY-DUDECK & ASSOCIATES
CONCLUSIONS
-----------
-----------
#1 The proposed Woolbright Place PUD, Woolbright Center, and Shoppes
At Woolbright Place will generate a substantial level of traffic onto SH8th
Street, therefore ALL the requirements stated in page 25 of this report
shall be incorporated, to insure proper traffic flow & safety.
#2 The project will generate a significant level of traffic onto
the highway system. However, since Woolbright Road has low daily traffic,
this roadway does not create a Category "A" situation. But the traffic
distributed onto Congress Avenue will create some problems, if you assume
that Congress Avenue is not going to be widened. However, in evaluating
the recent Palm Beach County 5-Year Work Program, this section of Congress
Avenue is scheduled to be 4-laned in fiscal year 86/87. This capacity &
safety improvement will eliminate the traffic concern on this section of
highway.
#3 The Palm Beach Commerce Center will be generating traffic
especially during the peak hours. However in the approval process there
were minimum improvements required. Probably the most critical improvement
necessary is a \\Tl3 double left turn lane to accornodate the heavy morning
peak hour traffic.
#4 Since the intersection of SW 8th Street is at the bottom of a
downgrade for westbound vehicles, it is essential that traffic flow be
smooth and coordinated. This will not eliminate the rearend accidents, but
can alleviate this real accident concern. Therefore, ALL the
intersectional improvements suggested in the SW 8th Street Corridor Highway
Requirements section are strongly recommended.
#5 All driveway accesses shall meet the sight triangle requirements.
#6 All necessary traffic controls shall be in conformance with the
Manual of Uniform Traffic Control Devices.
#8 In evaluating the magnitude of traffic impacts of each of the
projects, it is suggested that the fair share percentage impact of each
project be determined by using the following percentages derived from the
daily project generated traffic figures and the peak hour traffic, as
indiated on page 24 of this report.
-28-
MURRAY-DUDECK & ASSOCIATES
#9 By enhancing SW 8th Street to Woolbright Road, it will encourage
motorists to use that route rather than proceeding north on SW 8th Street
to Boynton Beach Road or to Ocean Drive & Congress Avenue. To further
discourage these corridors, certain traffic controls such as reduced speed
limits, truck restriction, turn restrictions, traffic divertors, etc. could
be implemented if local problems result.
#10 SW 8th Street once built to the north, will provide a direct
connection between Woolbright Road & Boynton Beach Road. Certain minor
alignment & profile changes are recommended in conjunction with the
construction of the SW 8th Street extension. Further improvement of this
corridor has to be a City policy decision. Either thru measures indicated
in item #8 the City will decide to keep the volume low or thru right of way
acquisition & roadway expansion, improve the corridor so it serves as a
minor north--south collector.
#11 With the continually growth in the surrounding area, as well as
the anticipated traffic from these specific projects, the need to 6-lane
Woolbright Road prior to the build-out period will most like be of
consideration. Of specific concern, is the need to six lane Woolbright
Road between SW 8th & 1-95 interchange area. It is suggested that the fair
share impact fees obtained from these surrounding projects be applied to
this project recommendation. Additional funds if necessary should be
supplemented by Palm Beach County, because there already exist over 12,000
daily trips on Woolbright Road. This improvement to the transportation
system should be government responsibily since several projects will be the
causation of such a transportation need.
#12 Since the 1-95 Northbound Off-Ramp signalized intersection will
be substantially impacted by the surrounding development, it is recommended
that this project construct a second northbound ramp left turn lane, so
that traffic proceeding westbound on Woolbright Road will have reduced
delay and the signalized intersection will have more green time on
Woolbright Road.
With the aforementioned transportation improvements, the traveling
public will not be adversely affected by the traffic generated by the
subject development.
-29-
1.-_
MURRAY-DUDECK & ASSOCIATES
APPENDIX "A"
-----------
-----------
MANUAL PEAK HOUR TRAFFIC COUNTS
-------------------------------
-------------------------------
I) Intersection of Woolbright Road & 1-95 NB Off-Ramp
II) Intersection of Woolbright Road & 1-95 SB Off-Ramp
III) Intersection of Congress Avenue & Ocean Drive
IV) Intersection of Boynton Beach Road & SW 8th Street
..#-
.~ .1:
i 6'/
VEHICLE & PEP[STRIAH VULUM[ SHEET
Silnrnary Sheet
~arter Hourly
Location
J
lJ.)oO(... ~~I ~HT "I I. - ~ 5
Date J'A t-l v~ ny 1 - \"'\ 8l
Weather
Road Surface Condition
Type Traffic Control
FROH 1I0RTH 011 FROH SOUTH Oil FROM WEST 011 FROM EAST Oli QUARTER
TIME J:-~S :1:.- '5 W DO l. 6 ri "'" T ~C)(.. g(t(4#1f 110UR PE[;E.STfdA~1i
STARTS L S R l S R l S R l S R TOTAL A e c [)
7 ~ 00 - 7: 15 2-0 . 2 41 ,q 4? 104 -4 f ~2.. R , ~ 3 .
7:15 - 7:30 ,q :~ ~B 2. "1. Irj ~ 1 ... 2 5'2 4 (~ !, 0 '2 qR
7~30 - 7:115 '71 .-.I.~ 5(, I 8 I.~ l "14 {" ~ 3 le1 \''2-
7:115 - 8:00 3 I ~1 ii' 1."2.. I. <\ 2. l Z 81 74 le8 ,2.2-
8:00 - 8:15 24 C;, l,1 Al 5"<1 2?_f? '69 i,1 lctl. '18
8:15 - 8:30 2~ L3 ~r 24- I~ 2. %.6 \ .." Si z.oq IO!
8:30 - 8:115 33 S-I c,3 Z.O 5"2. H~q il4 4 ( leu ,\4,
8: 115 - 9:00 '2~ 4~ 4" '2~ Aq 112- 5'2.. 41 I-'l., ~ I
.--
I
11 : 00 - 11: 15 I, 4\ 3'\ :lot., 4'2..11~1 .~e ~9 15"'1 l.1
11: 15 - 11:30 Z4 "'7 4~ 3 , 51 11;3 4"Z.. 4(, I'~~ 74
11:30 - 11:115 lGl 4113 -r9 28 4 R 114 ~I 5""1 I 71 t. 3
11:115 - 12:00 33 trq (, ~ 31 4(" J(.~ "72- (,,3 ,,,- S-~
12~00 - 12:15 z.~ ~..., &8 41 50 1';7 (,5' {" 0 1'4 iDS
12: 15 - 12:30 2-(, ~l 54 32. '5(., I ~q SiB 52- ,~tt ~8
12:30 - 12:115 '1 50 4. Z-4 4-1. 1(..1 + "7 5~ lS'1 ..q.c;
12:115 - 1:00 z.q ~"l 1.)2- z.~ 4_~ )53 52. 4 q I (, I 5"~
,:00 - 3:15
3:15 - 3~~0
3:~0 - ~:1I5
3:115 - 11:00
II: 00 - II: 15
II: 15 - 11:30
11:30 - 11:115
11:115 - 5:00
5:00-5:15
5: 15 - 5:30
5:30-5:115
5: 115 - 6: 00
TOT AL
TOT AL
OF L.8.' R.
2'1
.~4
Z8
.o4J
I~ ~
71
5"2
~4
4'1 Cd
5(, (. q
u9 ,3
,e. ,q
hi I.-q
~S ~R
"5Ct e:;~
f.tt> & 3
~ l 49 '41 5 3; ~ I 111 5""\
39 571(,9 Lal {,I 1I,,~~3
42. ~!J 1 e I.. q '513 1 R4 ill
~I '1 21 ,3 ~'11214 '7:;-
4& {..~ 228 (.'2.. ~, Zoz" in
43 1.0 Zl4 {. 5 ~ 8 JqlJ. 1.3
?l1 5"" 1't4 SO l)"3 ,~i[ <.t,
-40 S-I leo 5'4 ~.q 17C 54
I
I
VEHICLE & PEO[STRIAN VOLUME SHEET
SlIlTrnary Sheet
Quarter Hourly
Location
c..o~ G r~.s ~
\
c:..
.
O~t:J.qt-.l "\) r i IJE:.
Date 0'i}..J U A-I \{ L - l'i eGo
Weather
Road Surface COndition
Type Traffic Control
FROM IORTH 011 FROH SOUTH 011 FROIol WEST Oil FROM EAST Oil QUARTEFl PED(SH IA")
TIME CO ,),,.(.$') CoN&j"~~$ o c..l?f.ttJ hOUR
STARTS l S R L S II l S R L S R TOTAL A e c D
7:00 - 7:15
~
7:15 - 7:30
7:30 - 7:115
7:115 - B:OO
B:OO - 8:15
B:15 - 8:30
B:30 - 8:115
8:115-9:00
I
I
I
11:00 - 11:15 2.-0 III I ~l 3 to 17
11:15 - 11:30 24 131 141. (, q ZL;
11:30-11:115 1'1 141 l~" 4 J 1 1/"
11: 115 - 12: 00 7_s.> lve ,~-; 2- \'Z.. 1<.-
12:00 - 12:15 2.'Z- I P> 1 17'1 5 ., 21
12: 15 - 12:30 ~ I' ~ I ~ <i 4- I~ IFS
12:30 - 12:115 z.4 I~Z. \~3 i 12 2.7.-
12:1l5 - 1:00 Zl 1 ~ '2.. t~1 ~ 8 ILt
3:00 - 3:15
~:lS - 3:30
,
~:'l0 - '3:115
3:115 - 11:00
ll:OO - 11:15 23 I ~., ,~ \ z.. \4 "
Ii: 15 - 11:30 2.1 lu3 11q 1 C\ 2.2-
ll:30 - Jl:1I5 3~ 1'12 I~ ~ , I ZL 1<1
II: 115 - 5:00 .~ I 1 ~>S'.. 202 5 \(" 2.4.
5:00 - 5:15 ?2 t ~7 Ie, g t~ 2.tJ
5: 15 - 5:30 2.'1 1(, '\ , (,~ ~ Z3 ,g
5:30 - 5:115 Zl. I, r I,l. 12. Il- 1.1
5:115 - 6:00 go I t;{ Ll I ~ 1 I l5 19
TOTAL
---
TOl Al
OF' L.a.' R.
k,
~'
FLORIDA DEPART~"T OF TRANSPORTATION
TR N'flC COUNT SlJMMNW SHEET
~ -
CD
IndiQllte
North
~ 0,'0 \~ c>'( t.J" l,HJ 't:?, c> po. \:)
Vlhld~~ _P\~F
nme &: Thru Lift Totol ....
.a. \"\ .2 I?\ I:' ._/
.. ,".:. \ e.~ \0'';' .1;2.
I"'... \ 5'$ "II
~b 0 ...\~ . bS
I ~ ~ or .....
F "'" ~ *- -!l(
Q ~- Jr' ~ -*(
M \';l 3 5\ Lob
f II ;> e,c:- '1':,
J "1 3 61 76 ...,e
K ,';)0 S 7.1 -,8
L "'t- '" .,. ~
eRr \\S 1"'1 5-'9 i \ \
'""24 Hr
t A- 7 .... to e .... '~~9
'~Ic 8 ".11\. to 9 a.m. \bl<1
, 10 .
c. 9 a.lIl. to A.m. \'.: i;;l
,- 10
~,. D." ..... -~.. 1:6- ..m. ~ '-'l-,:,}--l
E. Ti a.m. to 12 noon
- -
,: u.. ftOOI1 to 1 D.Il.
rY' 41= 1 P WL 10 2 P III
H- 2 ft...... to ~ p..m.. \'\~b
~~ , I - 3 I) .. .. to ... 'D.... \'O~!.:>
- -
"J - 4 p.m. . S p.m. 'f'I~?
,y -
K- 5 ~. m._ to 6 p.a. \...Ob
L- '6 p.m. ... 7 p.m.
iii' r--
, ,
p
~. ~.
'.
~
~:;;: ,I
(l
'U}
~.
'd.
,{
~.,
f
f
~.
t::
c
,. .
".
~,
~"t;
"~~--~
TIIM Code
.. 7' ('( !
~ "J ~ I
,
I .A ~ ~ 0 1;1" .>> - 0 ,.
o;fl (f-
.... (, -\' V ~ "1\ -- :r r' ~ ~
r r .3l -0 -C' ('J.' os- r-
_I i I I I ,
i I I , i I
tIOl,.!'!! .. I,; , , ! - ! , . \" .--t I~;I '1
.J - ,- -' ... ...., ~ ....if';...... '~lir'~ .-.;.
A>
\'\ ~. (!':! )
~ r- cr "'" l1)
0 - J1 _'j (;.,. .~: ~
r r 0 ~~ ~ , .. .. . 1"1 r-
-0 ... (. ,..- ,-..... ! \0
.... .....1 .'_ ~'.
f'~ I I I
-
.l:J C 4' ~ .- '" .!) ;:. l''' ~ .~
- '" C'l. t'i
.
I - .w . ~. ~ ~ ..J ~I;
... -
.. CIO..
t I
r
..~
"edli81:
'-riM
A
B
-
.~
.\
!~ 41 ~
cr'
<fl. .
.
I ~ lo.Il C't ..~ ./; ...... .;g er
l"'\ ~') ('I ... .. ~ N T t;;P f)
I r d> J:> -.J> r- M (Jl '"
F
I ,_, j I I ' ,"0"
I 1 at. P':I,-r:L jl,.... j I "'I " (.' "" j
. .2'1""1"1 s. f'" ~ ... >1'"J It ~ir #~ ..:
:ii: .... -
'-'" -r J: ~ \" :9*rf'l.'~ ....,
0,' , f, \fI ~ '.
M ~ (Jl ~ l" ... ~:~ \('" .~
r (P ..n \.'1 ..0 .p i'j"
r.t ~ (t d:I 0 I:(C ~I~ .
- \0' -f .tt...
V) fit) :r 1\ 1'1 l'-
',,< .' .'
J J .' :J
c i. u Q I... ~ . :a:; ... ~ ~
. I
Ug
~
t[\j
ill
'1.~
~ .-
_1-,
7 -,}
r E'~\~\"~
I 0\.0 .. ......\
\-:.r-Yf,-rt>\ 1 ~I
it)!...D "~'. r~'
h~~~ ~
... -~. 7" ' ...rrJ ('
,'0.: l~ k"
.~rq
l~
~.
~
'--
~
.0
ttIl
r.-;: ..
.. n \ r-;r.::'l.
.""" \~04J'
,.... ..
~ W' "8~ c, ~-' i
.", '. _ ll;:\:.
.'
': .. .. ~
tT- :-,
~. I..-ft' '.'. ;hru ftlaM 1b.' . .\r-t
~.;l... ... \ \~ ~( ;..>
l'i ;1, fir:. ~. ~- , ~'1
. II ,..z,. "1 ;;:.:)
:) l~ Ie> n ~b
r- "'" .f" .~ ~b
f .to<. .. "'. ~ ;;6
Q -:>>r;. . ~'. ~ ~(9
H l~ " \ . \... 30
S 13 ";1.., jS 'to
tJ :1. e l!.: I ~,'1 .<>l
K "'\ , .. l 19 .:i'1
L ~ '""" 4lr >S
R a.. 1C.11 q \;.l '3; f)llc;.
, 'J~ ",.... Ii- 1'1 ,
I--.__.~~ --- .
,
_____~________o'o_._
..O~
SECTION q 3:<. 0 Q
9tate Road _;3oi
Local Nu.e e~'(. \?,'<:~. \~\.-JC
Intersection with
-.-
C't \) \~':"'(f-')l~I..)? oA~ .
SLD MP
CoWlty "?P.LM i:.\;'I"<:~
Ci ty /Torrm ~~"YN 1 ::)).) \?, ~
Date ~ I;;:t ')!. !'iF I .
Weather 0:/,21 fAIl< E);'~ r:AfN
Cbservcr
,......
.
AvC/. Commercial Percents
Nortt. Approach
South Approach
--
Eas t Approach
West Approach
"~',<\:'
" 1 1"~ ~
MURRAY-DUDECK & ASSOCIATES
APPENDIX "B"
-----------
-----------
HIGHWAY CAPACITY ANALYSIS
-------------------------
-------------------------
I) Intersection of Woolbright Road & SW 8th Street
a. AM Peak Traffic (No RTOR)
b. ~1 Peak Traffic -- (With RTOR)
c. AM Peak Traffic -- (With RTOR & 6 Lanes On
Woolbright Road)
d. PM Peak Traffic (No RTOR)
e. ~1 Peak Traffic -- (With RTOR)
f. PM Peak Traffic -- (With RTOR & 6 Lanes On
Woolbright Road)
.-
II) Intersection of Woolbright Road & 1-95 NB Off-Ramp
a. Existing AM Peak Traffic -- (No RTOR)
b. Existing + Development AM Peak Traffic (No RTOR)
c. Existing + Development AM Peak Traffic (With RTOR)
d. Existing + Development AM Peak Traffic (With RTOR
& Double Left Lanes -- NB & SB)
e. Existing + Development AM Peak Traffic (With RTOR
& Double Left Lanes -- NB & 6 Lanes On Woolbright Road)
f. Existing PM Peak Traffic - (No RTOR)
g. Existing + Development PM Peak Traffic -- (No RTOR)
h. Existing + Development PM Peak Traffic - (With RTOR)
i. Existing + Development PM Peak Traffic -- With RTOR &
Double Left Lanes -- NB & SB)
j. Existing + Development PM Peak Traffic -- (With RTOR &
Double Left Lanes -- NB & 6 Lanes On Woolbright Road)
III) Intersection of Woolbright Road & I-95 SB Off-Ramp
a. Existing AM Peak Traffic -- (No RTOR)
b. Existing + Development AM Peak Traffic (No RTOR)
c. Existing + Development AM Peak Traffic (With RTOR)
d. Existing + Development ~j Peak Traffic (With RTOR &
6 Lanes On Woolbright Road)
e. Existing PM Peak Traffic -- (No RTOR)
f. Existing + Development PM Peak Traffic (No RTOR)
g. Existing + Development PM Peak Traffic (With RTOR)
h. Existing + Development PM Peak Traffic (With RTOR &
6 Lanes On Woolbright Road)
IV) Intersection of Congress Avenue & Ocean Drive
a. Existing PH Peak Traffic
~ b. Existing + Development PM Peak Traffic
V) Intersection of Boynton Beach Road & SW 8th Street
a. Existing PM Peak Traffic
b. Existing + Development PM Peak Traffic
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEMENT ANALYSIS
WOOLBRIGHT RD. & SW 8TH ST.
AM PEAK NO RTOR
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE E
SATURATION 105
CRITICAL N/S VOL 346
CRITICAL E/W VOL 1388
CRITICAL SUM 1734
*************************************
NORTIfBOUND
LANE MOV WIDTIf
1 R.. 12.0
2 Too 12.0
3 L.. 12.0
4 L.. 12.0
5
6
NORTHBOUND
LEFT
THRU
RIGHT
47
40
178
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
TRUCKS (%)
5
5
5
5
LANE GEOMETRY
SOUTHBOUND EASTBOUND WESTBOUND
MOV WIDTIf MOV WIDTIf MOV WIDTH
R.. 12.0 R.. 12.0 R.. 12.0
T.. 12.0 T. . 12.0 T.. 12.0
L.. 12.0 T.. 12.0 T.. 12.0
L. . 12.0 L. . 12.0 L. . 12.0
L.. 12.0
TRAFFIC VOLUMES
SOUTHBOUND EASTBOUN~
WESTBOUND
247
94
114
124
1288
284
1053
1221
310
LOCAL BUSES (#/HR)
o
o
o
o
PEAK HOUR FACTOR
.95
.95
.95
.95
BOTH TURNS PROTECTED (WITH OVERLAP)
BOTH TURNS PROTECTED (WITH OVERLAP)
o - 99 (IPEDS/lffi)
N/S :4.
EN :4.
PEDFSTRIAN ACTIVITY 1.
CYCLE LENGTH : 100 SECONDS
G/C - NB & SB THRU : .15
G/C - EB & WE THRU :.44
PHASING
CRITICAL LANE VOLUMES BY MOVEMENT
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUNp
THRU -RIGHT 196 126 747 708
LEFT 28 150 143 641
LEFT TURN CHECK
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
INPtIT VOLUME 47 247 124 1053
CAPACITY 203 257 0 0
NEED PHASE? N/A N/A N/A N/A
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEMENT ANALYSIS
WOOLBRIGHT RD. & SW 8TH ST.
>>1 PEAK WITH RTOR
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE E
SATURATION 96
CRITICAL N/S VOL 194
CRITICAL E/W VOL 1388
CRITICAL SUM 1582
*************************************
NORTHBOUND
LANE MOV WIDTH
1 R.. 12.0
2 T. . 12.0
3 L.. 12.0
4 L. . 12.0
5
6
NORTHBOUND
LEFT
THRU
RIGHT
47
40
o
NORTHBOUND
SOUTIfBOUND
EASTBOUND
WESTBOlTh'D
TRUCKS (%)
5
5
5
5
LANE GEOMETRY
SOUTHBOUND EASTBOUND WES1'BOUl\'D
MOV WIDTIl MOV WIDTH MOV WIDTH
R. . 12.0 R.. 12.0 R. . 12.0
T. . 12.0 T.. 12.0 T. . 12.0
L. . 12.0 T. . 12.0 T. . 12.0
L.. 12.0 L. . 12.0 L.. 12.0
L.. 12.0
TRAFFIC VOLUMES
SOUTHBOU~'D EASTBOUND
\-.'ESTBOUND
247
94
o
124
1288
o
1053
1221
o
LOCAL BUSES (I/HR)
o
o
o
o
PEAK HOUR FACTOR
.95
.95
.95
.95
BOTH TURNS PROTECTED (WITH OVERLAP)
BOTH TURNS PROTECTED (WITH OVERLAP)
o - 99 (IPEDS/HR)
N/S :4.
E/W : 4 .
PEDESTRIAN ACTIVITY 1.
CYCLE LENGTH : 100 SECONDS
G/C - HB & SB THRU : .15
G/C - EB & WB THRU : .44
PHASING
CRITICAL LANE VOLUMES BY MOVEMENT
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
THRU -RIGHT 44 103 747 708
LEFT 28 ISO 143 641
LEFT TURN CHECK
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
INPUT VOLUME 47 247 124 1053
CAPACITY 203 257 0 0
NEED PHASE? N/A N/A N/A N/A
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEMENT ANALYSIS
WOOLBRIGHT RD. & SW 8TH ST.
AM PEAK WITH RTOR & 6L WooLB.
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE D
SATURATION 82
CRITICAL N/S VOL 194
CRITICAL E/W VOL 1162
CRITICAL Silll 1356
*************************************
LANE GEOMETRY
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
LANE MOV WIDTH MOV WIDTH MOV WIDTH MOV WIDTH
1 R.. 12.0 R.. 12.0 R.. 12.0 R.. 12.0
2 T. . 12.0 T. . 12.0 T. . 12.0 T.. 12.0
3 L.. 12.0 L. . 12.0 T.. 12.0 T.. 12.0
4 L. . 12.0 L. . 12.0 T. . 12.0 T.. 12.0
5 L. . 12.0 L.. 12.0
6 L.. 12.0
TRAFFIC VOLUMES
NORTHBOU1'D SOUTHBOUND EASTBOIDW WESTBOUND
LEFT 47 247 124 1053
THRU 40 94 1288 1221
RIGHT 0 0 0 0
TRUCKS (%) LOCAL BUSES (IIHR) PEAK HOUR FACTOR
NORTHBOUND 5 0 .95
SOUTHBOU1'D 5 0 .95
EASTBOUND 5 0 .95
WESTBOUND 5 0 .95
NIS :4.
. EN :4.
PEDESTRIAN ACTIVITY 1.
CYCLE LENGTI:! : 100 SECONDS
GIC - NB & SB THRU : .15
G/C - EB & WE THRU : .44
BOTH TURNS PROTEC1'ED (WITH OVERLAP)
BOTH TURNS PROTEC1'ED (WITH OVERLAP)
o - 99 (IPEDS/HR)
PHASING
CRITICAL LANE VOLUMES BY MOVEMENT
NORTHBOUND SOUTHBOUND EASTBOUND
THRU -RIGHT 44 103 521
LEFT 28 ISO 143
LEFT TURN CHECK
NORTHBOUND SOUTHBOUND EASTBOUND
INPtIT VOLUME 47 247 124
CAPACITY 203 257 0
NEED PHASE? NIA H/A N/A
WESTBOUND
494
641
WESTBOUND
1053
o
H/A
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOV~7 ANALYSIS
WOOLBRIGHT RD. & SW 8TH ST.
PM PEAK NO RTOR
DATE OF CO~7S: 1/7/86
**********************************
LEVEL OF SERVICE E
SATURATION 147
CRITICAL NIS VOL 1410
CRITICAL E/W VOL 1021
CRITICAL SUN 2431
*************************************
LANE GEOMETRY
NORTIlBOUND SOUTHBOUND EASTBOUND WESTBOUND
LANE MOV WIDTIl MOV WlDru MOV WIDTIl HOV WIDTIl
1 R.. 12.0 R. . 12.0 R. . 12.0 R.. 12.0
2 T. . 12.0 T. . 12.0 T. . 12.0 T.. 12.0
3 L.. 12.0 L. . 12.0 T.. 12.0 T.. 12.0
4 L. . 12.0 L. . 12.0 L.. 12.0 L. . 12.0
5 L.. 12.0
6
TRAFFIC VOLUMES
NORTHBOillt'D SOUTIlBOUJIi'D EASTBOUND WESTBOUND
LEFT 266 503 231 194
THRU III 61 1293 1298
RIGHT 999 253 52 416
TRUCKS (%) LOCAL BUSES (#/HR) PEAK HOUR FACTOR
NORTIlBOUND 5 0 .95
SOUTHBOUND 5 0 .95
EASTBOUND 5 0 .95
WESTBOUND 5 0 .95
PHASING
BOTH TURNS PROTECI'ED (WITII OVERLAP)
BOTH TURNS PROTEC1'ED (WITH OVERLAP)
o - 99 (#PEDS/HR)
NIS :4.
EIW :4.
PEDESTRIAN AC1'IVITY 1.
CYCLE LENGTH : 100 SECONDS
GIC - NB & SB THRU : .15
GIC - EB & WE THRU : .44
CRITICAL LANE VOLUMES BY MOVEMENT
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
THRU -RIGfIT 1104 279 750 753
LEFT 161 306 268 118
LEFT TURN CHECK
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
INPlIT VOLUME 266 503 231 194
CAPACITY 236 186 0 0
NEED PHASE? NIA N/A NIA N/A
~
MURRAY -DUDECK & ASSOCIATES
CRITICAL MOVEMENT ANALYSIS
WOOLBRIGIIT RD. & SW 8TH ST.
PN PEAK WITH RTOR
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE E
SATURATION 97
CRITICAL N/S VOL 582
CRITICAL E/w VOL 1021
CRITICAL SUM 1603
*************************************
NORTIlBOUND
LANE MOV WIDTII
1 R.. 12.0
2 T.. 12.0
3 L.. 12.0
4 L.. 12.0
5
6
NORTIlBOUND
LEFT
TIlRU
RIGHT
266
111
250
NORTIlBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
TRUCKS (%)
5
5
5
5
N/S :4.
EN :4.
PEDESTRIAN ACTIVITY
CYCLE LENGTH
G/C - NB & SB THRU
G/C - EB & WE THRU
PHASING
LANE GEOMITRY
SOUTHBOUND EASTBOUND WESTBOUND
MOV WIDTIl MOV \\TJDTII MOV WIDTII
R.. 12.0 R.. 12.0 R.. 12.0
T. . 12.0 T. . 12.0 T. . 12.0
L. . 12.0 T. . 12.0 T.. 12.0
L. . 12.0 L. . 12.0 L. . 12.0
L.. 12.0
TRAFFIC VOLUMES
SOUTHBOUND EASTBOUND
WESTBOUND
503
61
o
231
1293
o
194
1298
o
LOCAL BUSES (#/HR)
o
o
o
o
PEAK HOUR FACTOR
.95
.95
.95
.95
BOTH TURNS PROTECTED (WITIl OVERLAP)
BOTH TURNS PROTECTED (WITH OVERLAP)
1. 0 - 99 (IPEDS/HR)
: 100 SECONDS
: .15
: .44
CRITICAL LANE VOLUMES BY MOVEMENT
NORTIlBOUND SOUTHBOUND EASTBOUND WESTBOUND
THRU -RIGIIT 276 67 750 753
LEFT 161 306 268 US
LEF"f TURN CHECK
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
INPUT VOLUME 266 503 231 194
CAPACITY 236 186 0 0
NEED PHASE? N/A N/A N/A N/A
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEMENT ANALYSIS
WOOLBRIGHT RD. & SW 8TH ST.
PM PEAK WITH RTOR & 6L WooLB.
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE D
SATURATION 83
CRITICAL N/S VOL 582
CRITICAL E/W VOL 794
CRITICAL Silll 1376
*************************************
LANE GEOMEI'RY
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
LANE MOV WIDTH MOV WIDTH MOV WIDTH MOV WIDTH
1 R.. 12.0 R.. 12.0 R.. 12.0 R.. 12.0
2 T. . 12.0 T. . 12.0 T.. 12.0 T. . 12.0
3 L.. 12.0 L.. 12.0 T.. 12.0 T. . 12.0
4 L.. 12.0 L.. 12.0 T. . 12.0 T. . 12.0
5 L.. 12.0 L.. 12.0
6 L. . 12.0
TRAFFIC VOLUMES
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
LEFT 266 503 231 194
THRU III 61 1293 1298
RIGHT 250 0 0 0
TRUCKS (%) LOCAL BUSES (R/HR) PEAK HOUR FACTOR
NORTHBOUND 5 0 .95
SOUTHBOUND 5 0 .95
EASTBOUND 5 0 .95
WESTBOUND 5 0 .95
H/S :4.
EN :4.
PEDESTRIAN ACTIVITY: 1.
CYCLE LENGTH : 100 SECONDS
GIC - NB & SB THRU : .15
G/C - EB & WE THRU : .44
BOTH TURNS PROTECTED (WITH OVERLAP)
BOTH TURNS PROTECTED (WITH OVERLAP)
o - 99 (IPEDS/HR)
PHASING
CRITICAL LANE VOLUMES BY MOVDfENT
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
THRU -RIGHT 276 67 524 526
LEFT 161 306 268 118
LEFT TURN CHECK
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
INPUT VOLUME 266 503 231 194
CAPACITY 236 186 0 0
NEED PHASE? NIA NIA N/A N/A
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEMENT ANALYSIS
WOOLBRIGHT RD. & 1-95 NB OFF-RAMP
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
PHASING N/S
EN
PEDESTRIAN ACI'IVITY
CYCLE LENGTH
G/C - NB & SB THRU
G/G - EB & WE TIiRU
LANE
1
2
3
4
5
6
LEFT
THRU
RIGHT
TIiRU -RIGHT
LEFT
INPUT VOLUME
CAPACITY
NEED PHASE?
EXIST B-1 PEAK
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE B
SATURATION 63
CRITICAL N/S VOL 254
CRITICAL E/W VOL 825
CRITICAL SUM 1079
*************************************
NORTHBOUND
MOV WIDTH
LANE GEOMETRY
SOUTHBOUND EASTBOUND
MOV WIDTH MOV \'r'IDTH
WESTBOUND
MOV WIDTH
R.. 12.0
T.. 12.0
T.. 12.0
WESTBOUND
o
980
376
PEAK HOUR FACTOR
.95
.95
.95
.95
WESTBOUND
568
o
WESTBOUND
o
o
NO
R.. 12.0
L.. 12.0
T.. 12.0
To. 12.0
L.. 12.0
NORTHBOUND
TRAFFIC VOLUHES
SOUTHBOUND EASTBOUND
230
o
100
o
o
o
LOCAL BUSES (#/HR)
o
o
o
o
222
810
o
TRUCKS (%)
5
5
5
5
: 1. NEITHER TURN PROTECTED
: 2. HEAVIEST TURN PROTECTED
1. 0 - 99 ('PEDS!HR)
: 100 SECONDS
: .25
: .44
CRITICAL LANE VOLUMES BY MOVEMENT
NORTHBOUND
110
254
SOUTHBOUND
o
o
EASTBOUND
470
257
LEFT TURN CHECK
NORTHBOUND
230
447
NO
SOUTHBOUND
o
447
NO
EASTBOUND
222
o
N/A
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOV~ffiNT ANALYSIS
WOOLBRIGHT RD. & 1-95 NB OFF-RAMP
LANE
NORTHBOUND
MOV WIDTH
1
2
3
4
5
6
R.. 12.0
L.. 12.0
EXIST + DEV IIH PEAK
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE E
SATURATION 119
CRITICAL N/S VOL 926
CRITICAL E/W VOL 1117
CRITICAL SUM 2043
*************************************
LANE GEOMETRY
SOUTHBOUND EASTBOUND
MOV WIDTH MOV WIDTH
T.. 12.0
T.. 12.0
L.. 12.0
WESTBOUND
MOV WIDTH
R.. 12.0
T.. 12.0
T.. 12.0
TRAFFIC VOLUMES
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
LEFT 838 0 400 0
THRU 0 0 879 1127
RIGHT 100 0 0 376
TRUCKS (%) LOCAL BUSES (#/HR) PEAK HOUR FACTOR
NORTHBOUND 5 0 .95
SOUTHBOUND 5 0 .95
EASTBOUND 5 0 .95
WESTBOUND 5 0 .95
PHASING N/S
E/W
PEDESTRIAN ACTIVITY
CYCLE LENGTH
G/C - NB & SB THRU
G/C - EB & WE THRU
THRU -RIGHT
LEIT
NORTIIBOUND
110
926
1NPlIT VOLUME
CAPACITY
NEED PHASE?
NORTIIBOUND
838
447
YES
: 1. NEITHER TURN PROTECTED
:2. HEAVIEST TIJRN PROTECTED
1. 0 - 99 ('PEDS/HR)
: 100 SECONDS
: .25
: .44
CRITICAL LANE VOLUMES BY MOVEMENT
SOUTHBOUND
o
o
EASTBOUND
510
464
WESTBOUND
653
o
WESTBOUND
o
o
NO
LEIT TURN CHECK
SOUTHBOUND
o
447
NO
EASTBOUND
400
o
N/A
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEMENT ANALYSIS
WOOLBRIGHT RD. & 1-95 NB OFF-RAMP
LANE
NORTIIBOUND
MOV WIDTII
1
2
3
4
5
6
R.. 12.0
L.. 12.0
EXIST + DEV 8M PEAK W RTOR
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE E
SATURATION 119
CRITICAL N/S VOL 926
CRITICAL E/W VOL 1117
CRITICAL SUM 2043
*************************************
LANE GEOMETRY
SOUTIfBOUND EASTBOUND
MOV WIDTIl tiOV WIDTIl
WESTBOUND
MOV WIDTIl
T.. 12.0
T.. 12.0
L.. 12.0
R.. 12.0
T.. 12.0
Too 12.0
TRAFFIC VOLUMES
NORTIIBOU~'1) SOUTIIBOUND EASTBOUND WESTBOUND
LEFT 838 0 400 0
THRU 0 0 879 1127
RIGHT 0 0 0 0
TRUCKS (%) LOCAL BUSES (I/HR) PEAK HOUR FACTOR
NORTIIBOUND 5 0 .95
SOUTIIBOUND 5 0 .95
EASTBOUND 5 0 .95
WESTBOUND 5 0 .95
PHASING HIS
E/W
PEDESTRIAN ACTIVITY
CYCLE LENGTH
G/C - NB & SB THRU
G/C - EB & WE THRU
THRU -RIGHT
LEFT
NORTHBOUND
o
926
INPUT VOLUME
CAPACITY
HEED PHASE?
NORTHBOUND
838
447
YES
: 1. NEITIIER TURN PROTECTED
: 2. REA VIEST TURN PROTECTED
1. 0 - 99 (IPEDS/HR)
100 SECONDS
: .25
: .44
CRITICAL LA~~ VOLUMES BY MOVEME~7
SOUTHBOUND EASTBOUND WESTBOUND
0 510 653
0 464 0
LEFT TURN CHECK
SOUTHBOUND EASTBOUND \I'ESTBOUND
0 400 0
447 0 0
NO H/A NO
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEMENT ANALYSIS
WOOLBRIGHT RD. & 1-95 NB OFF-RAMP
EXIST + DEV PM PEAK W RTOR & NB&EB2L
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE D
SATURATION 80
CRITICAL N/S VOL 486
CRITICAL E/w VOL 896
CRITICAL Silll 1382
*************************************
LANE
NORTIlBOUND
MOV WlDTII
R.. 12.0
L.. 12.0
L.. 12.0
LANE GEOHETRY
SOlITHBOUND EASTBOUND
MOV WIDTIl MOV WIDTIl
Too 12.0
T.. 12.0
L.. 12.0
L.. 12.0
TRAFFIC VOLUMES
SOUTHBOUND EASTBOUND
838
o
o
o
o
o
400
879
o
WESTBOUND
MOV \HDTH
R.. 12.0
T.. 12.0
T.. 12.0
WESTBOUND
o
1127
o
LOCAL BUSES (#/HR)
o
o
o
o
PEAK HOUR FACTOR
.95
.95
.95
.95
WESTBOUND
653
o
WESTBOUND
o
o
NO
1
2
3
4
5
6
NORTIlBOUND
LEFT
THRU
RIGHT
TRUCKS (%)
5
5
5
5
NORTHBOUND
SOUTHBOUt.'D
EASTBOUND
WESTBOUND
PHASING His
E/W
PEDESTRIAN ACTIVITY
CYCLE LENGTH
GIC - NB & SB THRU
GIC - EB & WE TIlRU
THRU -RIGHT
LEIT
NORTIlBOUND
o
486
INPIIT VOLUME
CAPACITY
NEED PHASE?
NORTIlBOUND
838
447
YES
: 1. NEITHER TURN PROTECTED
:2. HEAVIEST TURN PROTECTED
1. 0 - 99 (IPEDS!HR)
: 100 SECONDS
: .25
: .44
CRITICAL LANE VOLUMES BY MOVEMENT
SOUTHBOUND
o
o
EASTBOUND
510
243
LEIT TURN CHECK
SOlITHBOUND
o
447
NO
EASTBOUND
400
o
N/A
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEMENT ANALYSIS
WOOLBRIGHT RD. 8. 1-95 NB OFF-RAMP
EXIST + DEV AN PEAK W RTOR 8. NB2L & EB/WBJT
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE D
SATURATION 82
CRITICAL HIS VOL 486
CRITICAL E/W VOL 920
CRITICAL SUM 1406
*************************************
LANE
HORTIIBOUND
MOV WIDTII
R.. 12.0
L.. 12.0
L.. 12.0
1
2
3
4
5
6
LANE GEOl1ETRY
SOUTHBOUND EASTBOUND
MOV WIDTH MOV WIDTH
T.. 12.0
T.. 12.0
T.. 12.0
Loo 12.0
WESTBOUND
MOV WIDTH
R.. 12.0
T.. 12.0
T.. 12.0
Too 12.0
TRAFFIC VOLUMES
NORTHBOUND SOUTHBOUND EASTBOUl'm WESTBOUND
LEFT 838 0 400 0
THRU 0 0 879 1127
RIGHT 0 0 0 0
TRUCKS (%) LOCAL BUSES (#/HR) PEAK HOUR FACTOR
NORTIIBOUND 5 0 .95
SOUTHBOUND 5 0 .95
EASTBOUND 5 0 .95
WESTBOUND 5 0 .95
PHASING His
EIW
PEDESTRIAN ACTIVITY
CYCLE LENGTH
GIC - HE 8. SB THRU
GIC - EB & WE THRU
TIIRU -RIGHT
LEFr
NORTHBOUND
o
486
INPtrr VOLUME
CAPACITY
NEED PHASE?
NORTHBOUND
838
447
YES
. I....
: 1. NEITHER TURN PROTECTED
:2. HEAVIEST TURN PROTECTED
1. 0 - 99 (IPEDS/HR)
: 100 SECONDS
: .25
: .44
CRITICAL LANE VOLUMES BY MOVEMENT
SOUTHBOUND
o
o
LEIT TURN CHECK
EASTBOUND
356
464
WESTBOUND
456
o
WESTBOUND
o
o
NO
SOUTHBOUND
o
447
NO
EASTBOUND
400
o
NIA
~
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEHEKT ANALYSIS
WOOLBRIGHT RD. & 1-95 NB OFF-RAMP
EXIST PM PEAK
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE C
SATURATION 68
CRITICAL N/S VOL 286
CRITICAL E/W VOL 877
CRITICAL Silll 1163
*************************************
LANE
NORTIIBOUND
MOV WIDTH
LANE GEOMETRY
SOlITHBOUND EASTBOUND
MOV WIDTH MOV WIDTII
WESTBOUND
MOV WIDTH
R.. 12.0
L.. 12.0
T.. 12.0
T.. 12.0
L. . 12.0
R. . 12.0
T.. 12.0
T.. 12.0
1
2
3
4
5
6
TRAFFIC VOLUMES
NORTHBOUND SOlITHBOUND EASTBOUND WESTBOUND
LEFT 259 0 246 0
THRU 0 0 816 1021
RIGHT 166 0 0 254
TRUCKS (%) LOCAL BUSES (#/HR) PEAK HOUR FAcroR
NORTHBOUND 5 0 .95
SOlITHBOUND 5 0 .95
EASTBOUND 5 0 .95
WESTBOUND 5 0 .95
PHASING N/S :1. NEITHER TURN PROTECTED
E/W :2. HEAVIEST TURN PROTECTED
PEDESTRIAN AcrIVITY 1. 0 - 99 (iPEDS/HR)
CYCLE LENGTH : 100 SECONDS
G/C - HE & SB THRU : .25
G/C - EB & WE THRU : .44
CRITICAL LANE VOLUMES BY MOVEMENT
NORTHBOUND SOlITHBOUND EASTBOUND WESTBOUND
THRU -RIGHT 183 0 473 592
LEFT 286 0 285 0
LEFT 'TIJRN CHECK
NORTHBOUND SOlITHBOUND EASTBOUND WESTBOUND
INPUT VOLUME 259 0 246 0
CAPACITY 447 447 0 0
NEED PHASE? NO NO N/A NO
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEM~7 ANALYSIS
WOOLBRIGHT RD. & 1-95 NB OFF-RAMP
EXIST + DEV PM PEAK
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE E
SATIJRATION 132
CRITICAL N/S VOL 547
CRITICAL E/W VOL 1714
CRITICAL SUM 2261
*************************************
LANE
NORTHBOUND
MOV WIDTH
LANE GEOMETRY
SOUTHBOUND EASTBOUND
MOV WIDTH MOV WIDTH
WESTBOUND
MOV WIDTH
R.. 12.0
L.. 12.0
T.. 12.0
T.. 12.0
L.. 12.0
R.. 12.0
Too 12.0
T.. 12.0
1
2
3
4
5
6
TRAFFIC VOLUMES
NORTHBOlJ},'1) SOUTHBOmm EASTBOUND WESTBOUND
LEFT 495 0 898 0
THRU 0 0 1014 1159
RIGHT 166 0 0 254
TRUCKS (%) LOCAL BUSES (#/HR) PEAK HOUR FACTOR
NORTHBOUND 5 0 .95
SOUTHBOUND 5 0 .95
EASTBOUND 5 0 .95
WESTBOUND 5 0 .95
PHASING N/S: 1. NEITHER TURN PROTECTED
E/W :2. HEAVIEST TURN PROTECTED
PEDESTRIAN ACTIVITY 1. 0 - 99 (#PEDS/HR)
CYCLE LENGTH : 100 SECONDS
G/C - NB & SB THRU : .25
G/C - EB & WE THRU : .44
CRITICAL LANE VOLUMES BY MOVEMENT
NORTHBOUND SOUTHBOUtm EASTBOUND WESTBOUND
TIIRU -RIGHT 183 0 588 672
LEFT 547 0 1042 0
LEFT TIJRN CHECK
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
INPlIT VOLUNE 495 0 898 0
CAPACITY 447 447 0 0
NEED PHASE? YES NO N/A NO
.~
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEMENT ANALYSIS
WOOLBRIGHT RD. & 1-95 NB OFF-RAMP
EXIST + DEV PM PEAK WITH RTOR
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE E
SATURATION 132
CRITICAL N/S VOL 547
CRITICAL E/W VOL 1714
CRITICAL SUM 2261
*************************************
LANE
NORTHBOUND
MOV WIDTH
LANE GEOMETRY
SOUTHBOUND EASTBOUND
MOV WIDTH MOV WIDTH
WESTBOUND
MOV WIDTH
R.. 12.0
Loo 12.0
Too 12.0
Too 12.0
Loo 12.0
R.. 12.0
Too 12.0
Too 12.0
1
2
3
4
5
6
TRAFFIC VOLUMES
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
LEFT 495 0 898 0
THRU 0 0 1014 1159
RIGHT 0 0 0 0
TRUCKS (%) LOCAL BUSES (#/HR) PEAK HOUR FACTOR
NORTHBOUND 5 0 .95
SOUTHBOUND 5 0 .95
EASTBOUND 5 0 .95
WESTBOUND 5 0 .95
PHASING N/S : 1. NEITHER TURN PROTECTED
E/W :2. HEAVIEST TURN PROTECTED
PEDESTRIAN ACTIVITY 1. 0 - 99 (IPEDS/HR)
CYCLE LENGTH : 100 SECONDS
G/C - NB & SB THRU : .25
GIC - EB & WE THRU : .44
CRITICAL LANE VOLUMES BY fofOVD1ENT
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
TIlRU -RIGHT 0 0 588 672
LEIT 547 0 1042 0
LEIT TURN CHECK
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
INPUT VOLUME 495 0 898 0
CAPACITY 447 447 0 0
NEED PHASE? YES NO NIA NO
MURRAY -DUDECK & ASSOCIATES
CRITICAL MOVE}IENT ANALYSIS
WOOLBRIGHT RD. & 1-95 NB OFF-RAMP
EXIST + DEV PM PEAK WITH RTOR & NB/EB2L
DATE OF COUNTS: 117/86
**********************************
LEVEL OF SERVICE D
SATURATION 88
CRITICAL N/S VOL 287
CRITICAL E/w VOL 1219
CRITICAL SUM 1506
*************************************
1
2
3
4
5
6
NORTHBOUND
MOV WIDTH
R.. 12.0
L.. 12.0
L.. 12.0
LANE GEOMETRY
SOUTHBOUND EASTBOUND
MOV WIDTH MOV WIDTH
T.. 12.0
Too 12.0
L.. 12.0
1.. 12.0
WESTBOUND
MOV \HDTH
Roo 12.0
T.. 12.0
T.. 12.0
LANE
TRAFFIC VOLUMES
NORTHBOlTh1> SOUTHBOUND EASTBOUND WESTBOUND
LEFT 495 0 898 0
THRU 0 0 1014 1159
RIGHT 0 0 0 0
TRUCKS (%) LOCAL BUSES (#/HR) PEAK HOUR FACTOR
NORTIIBOUND 5 0 .95
SOUTHBOlTh'D 5 0 .95
EASTBOUND 5 0 .95
WESTBOlTh'D 5 0 .95
PHASING N/S: 1. NEITHER TURN PROTECI'ED
EN : 2. HEAVIEST TURN PROTECTED
PEDESTRIAN ACTIVITY 1. 0 - 99 (IPEDS/HR)
CYCLE LENGTII : 100 SECONDS
G/C - NB & SB THRU : .25
G/e - EB & WE THRU : .44
CRITICAL LANE VOLUMES BY MOVEMENT
NORTHBOU},'D SOUTHBOUND EASTBOUND WESTBOUND
llIRU -RIGlIT 0 0 588 672
LEFT 287 0 547 0
LEFT TURN CHECK
NORTHBOUND SOtITlIBOUND EASTBOUND WESTBOUND
INPUT VOLUME 495 0 898 0
CAPACITY 447 447 0 0
NEED PHASE? YES NO N/A NO
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEMENT ANALYSIS
WOOLBRIGHT RD. & 1-95 NB OFF-RAHP
EXIST + DEV PM PEAK WITH RTOR & NB/EB2L & EB/WRiT
DATE OF COUNTS: 117/86
**********************************
LEVEL OF SERVICE C
SATURATION 76
CRITICAL N/s VOL 287
CRITICAL E/W VOL 1016
CRITICAL Sill! 1303
*************************************
LANE GEOMETRY
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
LANE MOV WIDTII MOV WIDTH MOV WIDTH MOV WIDTH
1 R.. 12.0 T. . 12.0 R. . 12.0
2 L. . 12.0 T.. 12.0 T. . 12.0
3 L.. 12.0 T. . 12.0 T. . 12.0
4 L.. 12.0 T. . 12.0
5 L.. 12.0
6
TRAFFIC VOLUMES
NORTHBOUND SOUTHBOUND EASTBOUND \\1ESTBOUND
LEFT 495 0 898 0
THRU 0 0 1014 1159
RIGHT 0 0 0 0
TRUCKS (%) LOCAL BUSES (U/HR) PEAK HOUR FACTOR
NORTHBOUND 5 0 .95
SOUTHBOUND 5 0 .95
EASTBOUND 5 0 .95
\\1ESTBOUND 5 0 .95
PHASING N/S :1. NEITHER TURN PROTECTED
E/w :2. HEAVIEST TURN PROTECTED
PEDESTRIAN ACTIVITY 1. 0 - 99 (#PEDS/HR)
CYCLE LENGTH : 100 SECONDS
G/C - HE & SB THRU : .25
G/C - EB & WE THRU : .44
CRITICAL LANE VOLUMES BY MOVEME~7
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
THRU -RIGHT 0 0 410 469
LEFT 287 0 547 0
LEFT TURN CHECK
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
INPUT VOLUME 495 0 898 0
CAPACITY 447 447 0 0
NEED PHASE? YES NO N/A NO
MURRAY -DUDECK & ASSOCIATES
CRITICAL MOVEMENT ANALYSIS
WOOLBRIGHT RD. & 1-95 SB OFF-RAMP
EXIST AM PEAK
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE B
SATURATION 63
CRITICAL N/S VOL 242
CRITICAL E/W VOL 839
CRITICAL SUM 1081
*************************************
NORTHBOUND
MOV WIDTH
LANE GEOMETRY
SOUTHBOUND EASTBOUND
MOV WIDTH MOV WIDTH
LANE
1
2
3
4
5
6
R.. 12.0
L.. 12.0
1.. 12.0
R.. 12.0
T.. 12.0
T.. 12.0
WESTBOUND
MOV WIDTH
T.. 12.0
T.. 12.0
L.. 12.0
TRAFFIC VOLill1ES
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
LEIT 0 110 0 208
THRU 0 0 1032 772
RIGHT 0 219 256 0
TRUCKS (%) LOCAL BUSES (#/HR) PEAK HOUR FACTOR
NORTdBOUND 5 0 .95
SOUTHBOUND 5 0 .95
EASTBOUND 5 0 .95
WESTBOUND 5 0 .95
PHASING N/S : 1. NEITHER TURN PROTECTED
E/W :2. HEAVIEST TURN PROTECTED
PEDESTRIAN ACTIVITY 1. 0 - 99 (IPEDS/HR)
CYCLE LENGTH : 100 SECONDS
'G/C - NB & SB THRU : .25
GIC - EB & WE THRU : .44
CRITICAL LANE VOLUMES BY MOVEME~7
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
THRU -RIGHT 0 242 598 447
LEFT 0 63 0 241
LEFT TURN CHECK
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
INPUT VOLUME 0 110 0 208
CAPACITY 447 447 0 0
NEED PHASE? NO NO NO N/A
~
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOV~fE~7 ANALYSIS
WOOLBRIGHT RD. & 1-95 SB OFF-RAHP
EXIST + DEV AM PEAK
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE E
SATURATION 110
CRITICAL N/S VOL 914
CRITICAL E/W VOL 983
CRITICAL SUM 1897
*************************************
1
2
3
4
5
6
LANE GEOMETRY
SOlITHBOUND EASTBOUND WESTBOUND
MOV WIDTII MOV "''IDTII MOV WIDTH
R.. 12.0 R. . 12.0 T.. 12.0
L.. 12.0 . T.. 12.0 T. . 12.0
L. . 12.0 T.. 12.0 L.. 12.0
NORTIIBOUND
LANE MOV WIDTII
TRAFFIC VOLID-fES
NORTIIBOUND SOlITHBOUND EASTBOUND WESTBOUND
LEIT 0 110 0 208
THRU 0 0 1279 1527
RIGHT 0 827 433 0
TRUCKS (%) LOCAL BUSES (#/HR) PEAK HOUR FACTOR
NORTIIBOUND 5 0 .95
SOlITHBOUND 5 0 .95
EASTBOUND 5 0 .95
WESTBOUND 5 0 .95
PHASING N/S : 1. NEITHER TURN PROTECTED
E/W : 2. HEAVIEST TURN PROTECTED
PEDESTRIAN ACTIVITY: 1. 0 - 99 (IPEDS/HR)
CYCLE LENGTII : 100 SECONDS
G/C - NB & SB THRU : .25
G/C - EB & WB THRU : .44
CRITICAL LANE VOLID-lES BY MOVEMEt\7
NORTHBOUND SOlITHBOUND EASTBOUND WESTBOUND
THRU -RIGHT 0 914 742 886
LEFT 0 63 0 241
LEFT TURN CHECK
NORTIIBOUND SOlITHBOUND EASTBOUND WESTBOUND
INPlIT VOLUME 0 110 0 208
CAPACITY 447 447 0 0
NEED PHASE? NO NO NO N/A
MURRAY-DUDECK & ASSOCIATES
CRITICAL HOVEMENT ANALYSIS
WOOLBRIGHT RD. & 1-95 SB OFF-RAMP
EXIST + DEV A}l PEAK WITH RTOR
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE C
SATURATION 70
CRITICAL N/S VOL 228
CRITICAL E/W VOL 983
CRITICAL SIDI 1211
*************************************
NORTIIBOUND
LANE MOV WIDTIl
1
2
3
4
5
6
NORTHBOUND
LEFT
THRU
RIGHT
o
o
o
TRUCKS (%)
5
5
5
5
NORTIIBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
LANE GECX1ETRY
SOUTHBOUND EASTBOUND WESTBOUND
MOV WIDTH MOV WID1l1 MOV WIDTIl
R.. 12.0 R.. 12.0 T. . 12.0
L. . 12.0 T. . 12.0 T. . 12.0
L.. 12.0 T. . 12.0 L.. 12.0
TRAFFIC VOLUHES
SOUTHBOU~~ EASTBOUND
WESTBOUND
208
1527
o
no
o
207
o
1279
o
LOCAL BUSES (#/HR)
o
o
o
o
PEAK HOUR FACTOR
.95
.95
.95
.95
PHASING N/S: 1. NEITHER TURN PROTECTED
EN :2. HEAVIEST TURN PROTECTED
PEDESTRIAN ACTIVITY 1. 0 - 99 (#PEDS/HR)
CYCLE LENGTII : 100 SECONDS
G/C - NB & SB THRU : .25
G/C - EB & WB THRU : .44
CRITICAL LANE VOLUMES BY MOVEMENT
NORTHBOUND SOUTIIBOUlm EASTBOUND WESTBOUND
THRU -RIGHT 0 228 742 886
LEFT 0 63 0 241
LEFT TURN CHECK
NORTIIBOUND SOUTHBOUND EASTBOUND WESTBOUND
INPUT VOLUME 0 no 0 208
CAPACITY 447 447 0 0
NEED PHASE? NO NO NO N/A
~
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVE1ENT ANALYSIS
WOOLBRIGHT RD. & 1-95 SB OFF-RAMP
EXIST + DEV AM PEAK WITH RTOR & EB/WB3T
DATE OF COUNTS: 117/86
**********************************
LEVEL OF SERVICE B
SATURATION 57
CRITICAL Nls VOL 228
CRITICAL Elw VOL 759
CRITICAL SUM 987
*************************************
NORTHBOUND
LANE MOV WIDTH
1
2
3
4
5
6
NORTHBOUND
LEFT
THRU
RIGHT
o
o
o
TRUCKS (%)
5
5
5
5
NORTIIBOUND
SOUTHBOUND
EASTBOUND
WESTBOilliD
PHASING Nls
E/w
PEDESTRIAN ACfIVITY
CYCLE LENGTII
GIC - NB & SB THRU
GIC - EB & WB THRU
TH.RU -RIGHT
LEIT
NORTHBOUND
o
o
INPUT VOLUME
CAPACITY
NEED PHASE?
NORTHBOUND
o
447
NO
LANE GEOMEI'RY
SOUTHBOUND EASTBOUND WESTBOUND
}lOV WIDTII MOV WIDTH MOV vHDTH
R.. 12.0 R.. 12.0 T.. 12.0
L. . 12.0 T.. 12.0 T. . 12.0
L.. 12.0 T.. 12.0 T. . 12.0
T. . 12.0 L. . 12.0
TRAFFIC VOLUMES
SOUTHBOUND EASTBOUND
WESTBOUND
llO
o
207
o
1279
o
208
1527
o
LOCAL BUSES (R/HR)
o
o
o
o
PEAK HOUR FACfOR
.95
.95
.95
.95
: 1. NEITHER TURN PROTECTED
: 2. REA VIEST TURN PROTECTED
1. 0 - 99 (IPEDS/HR)
: 100 SECONDS
: .25
: .44
CRITICAL LANE VOLUMES BY MOVEMENT
SOUTHBOUND
228
63
EASTBOUND
518
o
WESTBOUND
618
241
LEIT TIJRN CHECK
SOUTIIBOUND
llO
447
NO
EASTBOUND
o
o
NO
WESTBOUND
208
o
H/A
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEMENT ANALYSIS
WOOLBRIGHT RD. & 1-95 SB OFF-RAMP
EXIST PM PEAK
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE C
SATURATION 67
CRITICAL N/S VOL 275
CRITICAL E/w VOL 884
CRITICAL SUI'l 1159
*************************************
LANE
NORTIlBOUND
MOV WIDTIl
LANE GEOI1ETRY
SOlITHBOUND EASTBOUND
MOV WIDTII MOV WIDTH
WESTBOUND
MOV WIDTH
1
2
3
4
5
6
R.. 12.0
L.. 12.0
L.. 12.0
R.. 12.0
T.. 12.0
T.. 12.0
T.. 12.0
T.. 12.0
L.. 12.0
NORTHBOUND
TRAFFIC VOLUHES
SOUTHBOUND EASTBOUh~
\\'ESTBOUND
LEFT
THRU
RIGHT
o
o
o
240
o
249
o
1062
231
231
790
o
NORTIlBOUND
SOlITHBOUhTD
EASTBOUND
WESTBOUND
TRUCKS (%)
5
5
5
5
LOCAL BUSES (#/HR)
o
o
o
o
PEAK HOUR FAC"fOR
.95
.95
.95
.95
PHASING N/S: 1. NEITIfER TURN PROTECTED
EN : 2. REA VIEST TURN PROTECTED
PEDESTRIAN ACTIVITY 1. 0 - 99 (#PEDS/HR)
CYCLE LENGTIl : 100 SECONDS
GIC - HB & SB THRU : .25
GIC - EB & WE THRU : .44
CRITICAL LANE VOLUl1ES BY MOVEHENT
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
THRU -RIGHT 0 275 616 458
LEFT 0 139 0 268
LEFT TURN CHECK
NORTIlBOUND SOUTHBOUND EASTBOUND WESTBOUND
INPUT VOLUl1E 0 240 0 231
CAPACITY 447 447 0 0
NEED PHASE? NO NO NO N/A
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOV~ffiNT ANALYSIS
WOOLBRIGHT RD. & 1-95 SB OFF-RAMP
LANE
1
2
3
4
5
6
LEIT
THRU
RIGlIT
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
EXIST + DEV PM PEAK
DATE OF COUKTS: 1/7/86
**********************************
LEVEL OF SERVICE E
SATIJRATION 129
CRITICAL N/S VOL 536
CRITICAL E/W VOL 1680
CRITICAL S~j 2216
*************************************
NORTHBOUND
tolOV WIDTH
NORTIIBOll.1)
o
o
o
TRUCKS (%)
5
5
5
5
PHASING N/S
E/W
PEDESTRIAN ACTIVITY
CYCLE LENGTIl
G/C - NB & SB THRU
G/C - EB & WB THRU
THRU -RIGHT
LEFT
INPtIT VOLID-lE
CAPACITY
NEED PHASE?
NORTIlBOUND
o
o
NORTHBOUND
o
447
NO
LANE GEOMETRY
SOUTHBOUND EASTBOUND
MOV \\'IDTII MOV WIDTH
WESTBOUND
MOV \\'IOTH
R.. 12.0
L.. 12.0
L.. 12.0
R.. 12.0
Too 12.0
T.. 12.0
T.. 12.0
T.. 12.0
L.. 12.0
TRAFFIC VOLUMES
SOUTHBOUND EASTBOUND
WESTBOUND
231
1164
o
240
o
485
o
2434
883
LOCAL BUSES (#/HR)
o
o
o
o
PEAK HOUR FACTOR
.95
.95
.95
.95
: 1. NEITIIER TURN PROTECTED
: 2. HEAVIEST TURN PROTECTED
1. 0 - 99 (IPEDS/HR)
100 SECONDS
: .25
: .44
CRITICAL LAKE VOLUMES BY MOVEMENT
SOUTHBOUND EASTBOUND WESTBOUND
536 1412 675
139 0 268
LEFT TURN CHECK
SOUTHBOUND EASTBOUND lr.'ESTBOUND
240 0 231
447 0 0
NO NO N/A
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOV~1ill1T ANALYSIS
WOOLBRIGHT RD. & 1-95 SB OFF-RAMP
EXIST + DEV PM PEAK WITH RTOR
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE E
SATURATION 106
CRITICAL N/S VOL 139
CRITICAL E/W VOL 1680
CRITICAL SUM 1819
*************************************
LANE
NORTHBOUND
MOV WIDTII
LANE GEOHETRY
SOUTHBOUND EASTBOUND
MOV WIDTH MOV WIDTH
WESTBOUND
MOV WIDTH
1
2
3
4
5
6
Roo 12.0
L.. 12.0
Loo 12.0
Roo 12.0
Too 12.0
T.. 12.0
Too 12.0
T.. 12.0
L.. 12.0
TRAFFIC VOLUMES
NORTHBOUND SOUTIIBOUND EASTBOUND WESTBOUND
LEFT 0 240 0 231
THRU 0 0 2434 1164
RIGHT 0 121 221 0
TRUCKS (%) LOCAL BUSES (#/HR) PEAK HOUR FACTOR
NORTHBOUND 5 0 .95
SOUTHBOUND 5 0 .95
EASTBOUND 5 0 .95
WESTBOUND 5 0 .95
PHASING N/S:1. NEITHER TURN PROTECTED
E/W : 2. HEAVIEST TURN PROTECTED
PEDESTRIAN ACTIVITY 1. 0 - 99 (#PEDS/HR)
CYCLE LENGTH : 100 SECONDS
G/C - HB & SB THRU : .25
G/C - EB & WE THRU : .44
CRITICAL LANE VOLUMES BY MOVEMENT
NORTHBOUfl'D SOUTHBOUt.'D EASTBOUND WESTBOUND
THRU -RIGHT 0 133 1412 675
LEIT 0 139 0 268
LEIT TURN CHECK
NORTHBOUfl'D SOUTHBOUND EASTBOUND WESTBOUND
INPUT VOLUME 0 240 0 231
CAPACITY 447 447 0 0
NEED PHASE? NO NO NO H/A
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVI)lliNT ANALYSIS
WOOLBRIGHT RD. & 1-95 SB OFF-RAMP
EXIST + DEV PM PEAK WITH RTOR & EB/WB3T
DATE OF COUNTS: 1/7/86
**********************************
LEVEL OF SERVICE D
SATURATION 81
CRITICAL N/S VOL 139
CRITICAL E/W VOL 1254
CRITICAL SUM 1393
*************************************
NORTHBOUND
LANE MOV WIDTH
1
2
3
4
5
6
NORTHBOUND
LEFT
THRU
RIGHT
o
o
o
TRUCKS (%)
5
5
5
5
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
LANE GEOMETRY
SOUTHBOUND EASTBOUND WESTBOUND
HOV WIDTH HOV WIDTH HOV WIDTH
R. . 12.0 R.. 12.0 T.. 12.0
L. . 12.0 T. . 12.0 T. . 12.0
L. . 12.0 T.. 12.0 T. . 12.0
T. . 12.0 L. . 12.0
TRAFFIC VOLUMES
SOUTHBOUND EASTBOUND
WESTBOUND
240
o
121
o
2434
221
231
1164
o
LOCAL BUSES (i/HR)
o
o
o
o
PEAK HOUR FACTOR
.95
.95
.95
.95
PHASING H/S: 1. NEITHER TURN PROTECTED
E/W : 2. REA VIEST TURN PROTECTED
PEDESTRIAN ACTIVITY 1. 0 - 99 (IPEDS/HR)
CYCLE LENGTH : 100 SECONDS
G/C - NB & SB THRU : .25
G/C - EB & \o.'B THRU : .44
CRITICAL LANE VOLUMES BY MOVEMENT
THRU -RIGHT
LEIT
NORTHBOUND
o
o
INPUT VOLUME
CAPACITY
NEED PHASE?
NORTHBOUND
o
447
NO
SOUTIlBOUND
133
139
EASTBOUND
986
o
WESTBOUND
471
268
LEIT TURN CHECK
SOUTHBOUl'.'D
240
447
NO
EASTBOUND
o
o
NO
WESTBOUND
231
o
N/A
, ..
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEHENT ANALYSIS
CONGRESS AVE. & OCEAN DR.
EXIST PM PEAK
DATE OF COUNTS: 1/6/86
**********************************
LEVEL OF SERVICE A
SATURATION 47
CRITICAL N/S VOL 761
CRITICAL E/W VOL 92
CRITICAL Sill1 853
*************************************
LANE GEOMETRY
NORTHBOUND SOtITHBOUND EASTBOUND WESTBOUND
LANE MOV WIDTH MOV WIDTH MOV \HDTH MOV WIDTH
1 R.. 12.0 R. . 12.0 RT. 12.0 R. . 12.0
2 T. . 12.0 T. . 12.0 T. . 12.0 T. . 12.0
3 L.. 12.0 L. . 12.0 L. . 12.0 L. . 12.0
4
5
6
TRAFFIC VOLillmS
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
LEIT 0 105 0 69
THRU 689 678 0 0
RIGHT 36 0 0 84
TRUCKS (%) LOCAL BUSES (#/HR) PEAK HOUR FACTOR
NORTHBOUND 5 0 .95
SOUTHBOUND 5 0 .95
EASTBOUND 5 0 .95
WESTBOUND 5 0 .95
PHASING N/S
E/W
PEDFSTRIAN ACTIVITY
CYCLE LENGTH
G/C - NB & SB THRU
G/C - EB & WE THRU
: 1. NEITHER TURN PROTECTED
: 1. NEITHER TURN PROTECTED
1. 0 - 99 (#PEDS/HR)
80 SECONDS
: .55
: .15
CRITICAL LANE VOLUMES BY MOVEME~7
THRU -RIGHT
LEFT
NORTIlBOUND
761
o
SOUTIIBOUND
749
464
EASTBOUI\'D
o
o
WESTBOUND
92
76
LEIT TURN CHECK
INPUT VOLUME
CAPACITY
NEED PHASE?
NORTIlBOUND
o
237
NO
SOUTHBOUND
105
226
NO
EASTBOUND
o
315
NO
WESTBOUND
69
315
NO
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEMENT ANALYSIS
CONGRESS AVE. & OCEAN DR.
EXIST + DEV P}j PEAK
DATE OF CO~7S: 1/6/86
**********************************
LEVEL OF SERVICE A
SATURATION 50
CRITICAL N/S VOL 761
CRITICAL E/W VOL 144
CRITICAL SUM 905
*************************************
LANE GEOHETRY
NORTIIBOUND SOUTHBOUND EASTBOUND WESTBOUND
LANE MOV WIDTH MOV WIDTII MOV WIDTII MOV WIDTH
1 R.. 12.0 R. . 12.0 RT. 12.0 R. . 12.0
2 T. . 12.0 T. . 12.0 T. . 12.0 T.. 12.0
3 L. . 12.0 L. . 12.0 L.. 12.0 L. . 12.0
4
5
6
TRAFFIC VOLUMES
NORTHBOUND SOUTHBO~'D EASTBOUND WESTBOUND
LEFT 0 158 0 69
THRU 689 678 0 0
RIGHT 36 0 0 131
TRUCKS (%) LOCAL BUSES (#/HR) PEAK HOUR FACTOR
NORTHBOUND 5 0 .95
SOUTHBOlTh'D 5 0 .95
EASTBOUND 5 0 .95
WESTBOUND 5 0 .95
PHASING N/S : 1. NEITIfER TURN PROTECTED
E/W : 1. NEITHER TURN PROTECTED
PEDESTRIAN ACTIVITY 1. 0 - 99 (IPEDS/HR)
CYCLE LENGTH : 80 SECONDS
GIC - HB & SB THRU : .55
G/C - EB & WE THRU : .15
CRITICAL LANE VOLUMES BY MOVF11ENT
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
TIIRU -RIGHT 761 749 0 144
LEFT 0 698 0 76
LEFT TIJRN CHECK
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
INPUT VOLUME 0 158 0 69
CAPACITY 237 226 315 315
NEED PHASE? NO NO NO NO
, ..
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOV~fENT ANALYSIS
BOYNTON BEACH RD. & SW 8TH ST.
EXIST PM PEAK
DATE OF COUNTS: 5/23/84
**********************************
LEVEL OF SERVICE A
SATURATION 35
CRITICAL N/S VOL 85
CRITICAL E/W VOL 536
CRITICAL S~l 621
*************************************
LANE
NORTHBOUND
MOV WIDTII
1
2
3
4
5
6
RTL 12.0
LEFT
THRU
RIGHT
NORTHBOUND
12
o
15
TRUCKS (%)
5
5
5
5
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
LANE GEOHETRY
SOUTHBOUND EASTBOUND
MOV WIDTH MOV WIDTH
WESTBOUND
MOV WIDTH
RTL 12.0
RT. 12.0
T.. 12.0
1.. 12.0
RT. 12.0
T.. 12.0
L.. 12.0
TRAFFIC VOLUMES
SOUTHBOUND EASTBOUND
WESTBOUND
61
3
14
LOCAL BUSES (#/HR)
o
o
o
o
15
909
17
22
754
110
PEAK HOUR FACTOR
.95
.95
.95
.95
PHASING HIs: 1. NEITIIER TURN PROTECTED
EN : 1. NEITHER TURN PROTECI'ED
PEDESTRIAN ACI'IVITY 1. 0 - 99 (#PEDS/HR)
CYCLE LENGTII : 80 SECONDS
Gle - NB & SB THRU :.2
Glc - EB & WE THRU :.6
CRITICAL LANE VOLUMES BY MOVEMENT
NORTHBOUND SOUTHBOmm EASTBOUND WESTBOUND
THRU -RIGHT 29 85 536 498
LEFT 0 0 66 97
LEFT TURN CHECK
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
INPtIT VOLUME 12 61 15 22
CAPACITY 373 375 126 64
NEED PHASE? NO NO NO NO
MURRAY-DUDECK & ASSOCIATES
CRITICAL MOVEMENT ANALYSIS
BOYNTON BEACH RD. & SW 8TH ST.
EXIST + DEV PM PEAK
DATE OF COU~7S: 5/23/84
**********************************
LEVEL OF SERVICE A
SATURATION 36
CRITICAL N/S VOL 99
CRITICAL E/W VOL 555
CRITICAL SU}l 654
*************************************
LANE
NORTHBOUND
MOV WIDTIl
1
2
3
4
5
6
RTL 12.0
NORTHBOUND
LEFT
THRU
RIGHT
42
7
32
TRUCKS (%)
5
5
5
5
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
LANE GEa-IETRY
SOUTHBOUND EASTBOUND
MOV WIDTH MOV WIDTH
WESTBOUND
MOV WIDTH
RTL 12.0
RT. 12.0
T.. 12.0
L.. 12.0
RT. 12.0
T.. 12.0
L.. 12.0
TRAFFIC VOLUMES
SOUTHBOUND EASTBOUND
WESTBOUND
41
754
110
61
16
14
15
909
52
LOCAL BUSES (#/HR)
o
o
o
o
PEAK HOUR FACTOR
.95
.95
.95
.95
PHASING N/S :1. NEITIlER TURN PROTECTED
E/W : 1. NEITIlER TURN PROTECTED
PEDESTRIAN ACTIVITY 1. 0 - 99 (IPEDS/HR)
CYCLE LENGTH : 50 SECONDS
G/C - HE & SB THRU :.2
G/C - EB & WE THRU :.6
CRITICAL LANE VOLUMES BY MOVEMENT
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
THRU -RIGHT 88 99 555 498
LEFT 0 0 66 181
LEFT TURN CHECK
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
INPUT VOLUME 42 61 15 41
CAPACITY 360 351 126 29
NEED PHASE? NO NO NO YES