Loading...
CORRESPONDENCE DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. PZ 99-062 TO: Bob Borden, Assistant Fire Marshal AI Kim, Public Works Mike Haag, Building Division Ken Hall, Engineering Division Kevin Hallahan, Forester/Environmentalist Pete Mazzella, Utilities Department Ofc. Robert Riggle, Police Department John Wildner, Parks Division Bob Donovan, Permit Application Group /f!t-., lZ Michael W. Rumpf Acting Planning and Zoning Manager FROM: DATE: March 3, 1999 SUBJECT: Lake Worth Christian School - MODIFIED (sign-off) File # CO US 98-004 The amended site plan for Lake Worth Christian School has been submitted for final sign-off by the Technical Review Committee. Three (3) sets of plans, each requiring your unconditional signature, are available for review in Planning and Zoning. A copy of the originally reviewed plans, staff comments and City Commission approval of the Site Plan Modification will be available for your use to perform the review. Please review and sign-off each of the three (3) sets of plans, NO LATER THAN 5:00 P.M., March 12, 1999. If the plans are not in compliance with your staff comments or City regulations, sign the plans "subject to memo", To facilitate the sign-off process, please resubmit written comments addressed to the Planning and Zoning Manager, NO LATER THAN 5:00 P.M., March 12, 1999. Thank you for your prompt response to this request. MWR:bme cc: William Bingham, Fire Chief Marshall Gage, Police Chief John Guidry, Utilities Director Sebastian Puda, Engineering Division Central File J:\sHRDATAIPLANNINGISHAREDIWP\PROJECTSILAKEWORTHCHRIST1AN SCHOOlICOUSIRECTIFIED - NWSP 9B-006,DOC f/t.- MEMORANDUM UTILITIES DEP AR TMENT WI n_O_ Ii If) ~ rm O~r:td 1-~00l I~ L I PLANNiNG AND ZONING DEPT. TO: Diane Reese, Finance Director fJ,/ FROM: ~ John A. Guidry, Utilities Director DATE: M, /2/199C, SUBJECT: Reservation fee transmittal for- Enclosed is a reservation fee for the subject project: Amount - -1 J). 0.5-: ~L Check no. - / 2 g J y __-~_~___ ,~~ ~ ,-kk~_!V~ r?"t'~ ,:J.'0 ----- From - Please deposit this fee in the appropriate account. You may refer any questions on this matter to Peter Mazzella of this office. JAGIPVM bc: Peter Mazzella xc: Michael Rumpf, Planning Director File FROM : G B CHURCH Et-["i 1 NEER A-10NE NO. +407 2787401 - Feb. 10 1999 09:05AM P1 ~r: <:. GERALDB. CHURCH, P.E. CONSULTING CIVIL ENGINEER 2575 So. Oc~an Boulevard. Suite 310 Highland Beach, P1 33481 Phone/Fax (561) 278-7401 F&bruary 9, 1999 Mr. Al F.derico, P.E. Senior Traffic Engineer Department of Engineering and Public Works Traf~ic Division P . 0 . 21229 West Palm Beach, Pl 33416-1229 '", RE: ,LAKE WORTH CHRISTIAN SCHOOL \, (TRAF.FIC PERFORMANCE STANDARDS REV)EW ~!OUR LaTTER OF DECEMBER 1, 19~'/' ~". .... Mr. f'eder.ico: Your office approved the subject tr~ffic study with a provision thal "site access to be one-way enter (south access) and one-way exit. right-turn only (north access). During our meeting at the site it was proposed that the one- way exit from the north driveway. would have ri9ht turns only during the peak hours when school starts and when achool ends. The turning restriction would be for the periods from 7:30 a.m. - 8:30 a.m. and 2:30 p.m. - 3:30 p.m. Cones would be place' in the driveway to direct the traffic flow aocordin91y. Kindly confirm that these conditions still comply with the Traffic Performance standards approved for the Lake Worth christian School. Sincerely, ~ /.7, .,('/' /' , ,. ,...J' I';? _<." ~:.lc:., ,<c-~\ /~',. _",'4' Gerald B. Church. P.E. c: ~t Len Stob, Principal, Lake Worth Christian School. t~~c7' J'Mr: Michael Rump"; Ci ty of Boynton Beach, y.a FpJ(, 74-Z. '" Mr. Don aryan, Architect [lO~_3 (.,-J( I' [~-_:J L J MICHAEL a;J. SCHORAH & ASSOCIATES, INC. Engineers. Planners. Development Consultants 1850 Forest Hill Blvd. · Suite 206 WEST PALM BEACH, FLORIDA 33406 (561) 968-0080 · FAX: (561) 642-9726 t~y: OF BOYNTON rLANNING DEPAKTMEWr ~and Delivered o Federal Express o Mailed o Other o Pick-up l~uu~~ (Q)~ u~~[N]@ffibD~uu ~l DATE I JOB NO, 3-3-99 94-802 ATTENTION MIKE RUMPF RE LAKE WORTH CHRISTIAN SCHOOL REVISED SIITE PLAN WE ARE SENDING YOU 0 Attached 0 Under separate cover via the following items. COPIES EACH SETS DESCRIPTION 3 SITE PT.I\N C:::P.1 THESE ARE TRANSMITTED as checked below. PB For approval 0 For your use 0 For signature o For review and comment 0 As requested 0 Other REMARKS WE HAVE IN.-CORPORATED ALL THE DEVELOPMENT ORDER COMMENTS. WE INTEND TO SHRMT'T' F'nR A SEPARATE PAVING AND DRAINAG PERMIT SHORTLY. , 1 DateJ!$/77' If enclosures are not as noted, kindly notify us at once. Signed ~~ MALCOLM COOPER,PROJECT ENGINEER FROM G B CHURCH Et~INEER A-iONE NO. +407 2787401 Feb. 10 1999 09:05AM Pi GERALD 8. CHURCH, f.E. CONSULTING CIVIL ENGISEER 2575 So. O~ean Boulevard, S~ite 310 Hi9hland Bea~h, Fl 33487 Phone/Fax (561) 278-740l February 8, 1999 Mr. Al rederico, f.E. Senior Traffi~ Engineer Department of Engineerin9 and Publi~ Works TraUicDi vision P. o. 21229 W..t Palm Beach, Pl 33416-1229 RE: LAKE WORTH CHRISTIAN SCHOOL TRAFFIC PERFORMANCE STANDARDS REVIEW YOUR LaTTER or DECEMBER 1, 1999 Mr. Federico; Your office approved the subject tr~ffic study with a provision that "site access to be one-way enter (south access) and one-way exit. right-turn only (north access). Durin9 our meeting at the site it was proposed that the on.- way exit from the north driveway, would have ri9ht turns only during the peak hours when school starts and when school ends. The turnin9 rest~iction would be for the periods from 7:30 a.m. - 8:30 a.m. and 2:30 p.m. - 3:30 p.m. Cone5 would be placed in the driveway to direct the traffic flow accordin91y. Kindly confirm that these conditions still comply with the Traffic Performance standards approved for the Lake Worth christian School. Sincerely, ~ ,.('-/' /' ./~~''''' aCd /;7" ....-c ,,:k"d<~~'i Gerald B. Church, P.E. c: ~~ Len Stob, Principal, Lake Worth Christian School. JMr. Michael Rump"" Ci ty of Boynton Baach . y.a t:'pJ( 74-2. t.z5ci Mr. Don Bryan, Architect ~.~.j' ~...... ~ :';,,:~;...N If; C~~:..~e~' .. ~II S,#/t'I1#.:'.Iur.$tI'A1 - 0 " I' ..- _....., I" ~ 00' o:t' 44 ~ ,'" . I~. 00' \ ,,~ . "/68' 4-6'14'" E " " ..' D- t _---~L___ _t~ \ # T-<' '74 '2., ~~' --:-- i ---c:::IJ. LI....: "'f r....~ f'~ \ '~ .p' \. ",& (y...f....' "".~? ~'> I v- \" / '}.", " \r / \ "" -Idl ~ \j -\ '" -- " ~ ~~" \\ .1\ J\J \ ~ \ CEDAR RIDGE. A P .u.n. & ~ HIGH RIDGE COMMERCE PARK. A P .\.0. ( PLAT BOOK 46. PAGES 58 - 61 ) Ij, "'~;. 1\ IL, J ~ -it> a!. Il\~ \ t -~~ I" ~;.r :/: ~ . ... ~ . 1 ~ , , " '.JI .. . . . . ~ . I ~ ,''. . '. '.... " o ~'1 y. ",II '1" I LPND IEs:RIPTlOO ( PARCEL' ) THE 5aJTH HALF (5.1/2) OF THE ~TH i-W..F (N.1/2) OF THE ~ 1/4 OF THE SW 1/4 OF SECTION 9, TOOSHIP 45 SaJTH, RANGE L\3 EAST, EXCEPTING THERE "- FR(Jw1 THE RIGHT OF WAY OF THE SEABOARD AIR RAILWAY, AND ~SO EXCEPTING . FR(Jw1 THE WEST i-W..F OF THE FMEGOING PREMISES THE SOUTH TEN FEET THEREOF f.S CONVEYED IN fEED Bcxl< ~7, PAGE 23, OF lHE Pua..IC RECORDS OF PALM BEAOi COJNTY, FLORIDA. LESS THE WEST 15.00 FEET THEREOF. .. CoNTAINING 9.9598 ACRES ~OR LESS. - ,.>-~'-'-';";,"~-'" .---.': "-',';-r ~.____... -" --,.-",.,. or-'- .,""",,"r ... ". - -- --I-- I I~ 1 r I 'IJ '-, , 1-1 , u , . I ~ HIGH RIDGE I , '. I 1 I I I I CLUB " /,-- --"-- - -.." - r---=-=--=----lr - , ,: f\ ' I , , , , , 'I , ,.. I . 71 ST S Fr" c a: Rd - :c "QBay CIl cr Ave Cl "C .- a:Arthur Ct S Atlantic Dr I L~ Rd n I u ffi COMMERCE :i PARK WAY :i I 0 ,.-_...-. .-.__C-l.. _ _ - - LOCATION MA~ ND'f' ""0 S.::AL". I ~ ~~. ~~-~,J U[ : -~=~-=-~~-.:;,;-:;;.-~- ,; - alpQl~ - -H9IH \ 'I .. B I ... ,... .; I .' ..I .: ~ I .: ; 1 . .r UI , , , , , ____________....J -~~ !l~~i In ' il :1 'I I 'I \ ,I US LJ\ · '1 gJ8.:l ,', "i (~~t ::1 L.- il \ ~~9 ~~r i ~ .~ Ii i ~;I i I I ~ ... t.~8~ ~%~~ i ~ ~ ~l ~ ~ ~ g jl . ... _ ~ IllS t" ! ~~ t Ii fH · n, if, A 111 ~S ~.~. .!~ ......... t... .j:'" 'ta!4 \- " ~..~ ~tt= IC.": <( ~ f'~ iiH j;az. D ~ ~.l q~: 21~ld ~i~i(Jn=ic~' w ~ ,5.. .n: i ton: r- ~, 6 i 'i i VI <UU~ nn~ Z <I -' Il IU I- d) -' <I ::J l- II IU II Z; ()~ ., ~ u.P_ ~-l-,._-------~----f--- <r , , I !________J I I ' L _____~ _________________ ----- I I I I I I I I I I I I I : II ;: . ... ...,;';! a . 1= i i :z J In : , 1..__-- _____ u~ =n:i !19 [I if II ji ii j: !I II ii :1 ii ii : ~ , [I /--- i: '/' / /~ i i i ." ji . -t I U.: 1~ .1 ~- [.~~ v.. ' "-" T - --- .. \~ ~ . / E/ l~~~JL~~;~~~d- .~ IJ .' ~ ~- ~ d ~~O~ ~y~~ -- - ~- - ~ - - -Q";I!O~ - -=9QI~ - -H9'.... DEPARTMENT OF DEVELOPMENT MEMORANDUM ENG 99-034 00 M4R 10" 00 TO: Michael W. Rumpf, Acting Planning & Zoning Manager Ken Hall, Engineering Plan Check Inspector/Technician ~ March 8, 1999 FROM: DATE: RE: LAKE WORTH CHRISTIAN SCHOOL (COUS 98-004) - MODIFIED SITE PLAN We have reviewed the subject plans and offer the following comments that should be addressed prior to the project being forwarded for Board review: 1. Remove all double arrow markings throughout the Site Plan to reflect single lane, one-way traffic. 2. Show "Do Not Enter" signs at the following locations: a. at the southbound egress lane onto High Ridge Road, b. at the egress aisle just north of the Elementary School drop off, c. at the proposed egress aisle for southbound one-way traffic between the two islands, and d. at the north end of the existing easternmost island facing northeast. 3. At the northeast comer of the new proposed parking show the two 24" stop bars across the full aisle width and across the northwest egress aisle just east of the dual exit onto High Ridge Road. Also add a "Do Not Enter" sign since it is one-way out. 4. At the north end ofthe circular driveway include a straight ahead arrow alongside the "Right Turn Only" arrow. 5. All signage, markings and striping changes shall be incorporated in the associated Paving and Drainage Plans. 6. Provide a letter stating that items 10 & 11 of the Conditions of Approval will be submitted with the paving and drainage permit application and that item 13 cannot be accomplished due to the right of way constraints of High Ridge Road, including County acknowledgement. KRick Xc: Raymond F. Davidson, P.E. Sebastian Puda C:\My Documents\Lake Worth Christian School Modiifed Site Plan COUS 98-004.doc DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. PZ 99-062 TO: Bob Borden, Assistant Fire Marshal AI Kim, Public Works Mike Haag, Building Division Ken Hall, Engineering Division Kevin Hallahan, Forester/Environmentalist Pete Mazzella, Utilities Department Ofc. Robert Riggle, Police Department John Wildner, Parks Division Bob Donovan, Permit Application Group (ilt.-!Z Michael W. Rumpf Acting Planning and Zoning Manager FROM: DA TE: March 3, 1999 SUBJECT: Lake Worth Christian School- MODIFIED (sign-off) File # COUS 98-004 The amended site plan for Lake Worth Christian School has been submitted for final sign-off by the Technical Review Committee. Three (3) sets of plans, each requiring your unconditional signature, are available for review in Planning and Zoning. A copy of the originally reviewed plans, staff comments and City Commission approval of the Site Plan Modification will be available for your use to perform the review. Please review and sign-off each of the three (3) sets of plans, NO LATER THAN 5:00 P.M., March 12, 1999. If the plans are not in compliance with your staff comments or City regulations, sign the plans "subject to memo". To facilitate the sign-off process, please resubmit written comments addressed to the Planning and Zoning Manager, NO LATER THAN 5:00 P.M., March 12, 1999. Thank you for your prompt response to this request. N\J(e', s(g(Cf9 MWRbme ~\J \-\y~\.....,- ~Ms-- --). R't:) r i~-\/h.' ~_ v-- ---I' 0 0- ~~l~~G\) t> L.\~\~ .... ~0\ SlV --..... r" it\ ,'-J \ "__ cc: William Bingham, Fire Chief Marshall Gage, Police Chief John Guidry, Utilities Director Sebastian Puda, Engineering Division Central File J:ISHRDATAIPlANNINGISHAREOIWPIPROJECTS\LAKEWORTHCHRISTIAN SCHOOLICOUSlRECTlFIED - NWSP 98-<Xl6,DOC Department of Engineering and Public Works PO, Box 21229 West Palm Beach. FL 33416-1229 (561) 684-4000 http://www.co.palm-beach.f1.us . Palm Beach County Board of County Commissioners Burt Aaronson. Chairman Maude Ford Lee. Vice Chair Karen T. Marcus Carol A, Roberts Warren H, Newell Mary McCarty Ken L. Foster County Administrator Robert Weisman. P.E, "An Equal Opportunity Affirmative Action Employer" @ printed on recycled paper December 1, 1998 1~1.r~j]j ~f~rnl,nll IIJLI DEe 71998 HJ!JI I t~_"._,._,~....., .. ....._--J I' , L...___....,..... "_"~''''_ , Mr. Michael Rumpf City of Boynton Beach Planning and Zoning Department 100 East Boynton Beach P.O. Box 310 Boynton Beach, FL 33425-0310 RE: LAKE WORTH CHRISTIAN SCHOOL TRAFFIC PERFORMANCE STANDARDS REVIEW Mr. Rumpf: The Palm Beach County Traffic Division has reviewed the traffic study for the project entitled Lake Worth Christian School pursuant to the Traffic Performance Standards in Article 15 of the Palm Beach County Land Development Code. The project is summarized as follows: Location: High Ridge Road, south of Hypoluxo Road Municipality: Boynton Beach Proposed Use: Private School (Elementary) Trip Rate: 3.38 trips per student New Trips: 389 trips per day Buildout: 1999 " This rate was derived by applying the ''K'' factor for Elementary &hools (520) to the AM Peak Hour of Generator rat<l for Private &hools (521) (135 students) (ITE 5th Edition*) Based on our review the Traffic Division has determined that the project meets the Traffic Performance Standards of Palm Beach County, providing that: . Site access to be one"way enter (south access) and one-way exit, right-turn only (north access). Failure to implement this condition would result in the project not meeting the Traffic Performance Standards. If you have any questions regarding this review, please contact me at 684-4030. Sincerely, OFF~F THE COUN: ENGINEER ~~ Senior Traffic Engineer cc: Ger!lld R. Church, P.E. - Consulting Civil Engineer File: Gene~al- TPS - MUll - TraffIc Study Review h: '\traffIc \apf\tps '\98038app. wpd - T AZ 418 DEPARTMENT OF DEVELOPMENT Division of Planning and Zoning Bulent I. Kastarlak, NCARB Director Building Planning & Zoning Engineering Occupational License COmmllnity Redevelopment November 25, 1998 Mr. AI Federico, Senior Traffic Engineer Palm Beach County Traffic Division Department of Engineering and Public Works P.O. Box 21229 West Palm Beach, Florida 33416 Re: Traffic Study: Lake Worth Christian School East side of High Ridge Road between Gateway Boulevard to the south and Hypoluxo Road to the north. File # COUS 98-004 Dear Mr. Federico: The enclosed revised traffic impact study on the Lake Worth Christian School site dated February 24, 1998 and revised November 23, 1998, prepared by Gerald B. Church, P.E. Consulting Civil Engineer was received by Planning and Zoning recently for the above- referenced application. Please review the enclosed information for conformance with the County's Traffic Performance Standard Ordinance. If you have questions regarding this matter, please call me at (561) 742-6260, otherwise please send me your written comments/approval to the above address and copy Michael Haag, Building Code Permit Administrator Sincerely, ~ L_ -l--::'-~ t Michael W. Rumpf Acting Planning and Zoning Manager MWR:bme cc: Central File s:\projects\Lake Worth Christian School\traffic memo America's Gateway to the Gulfstream 100 East Boynton Beach Blvd., P.O. Box 310 Boynton Beach, Florida 3342~310 Phone: (561) 375-6260 FAX: (561) 375-6259 GERALD B. CHURCH, P.E. CONSULTING CIVIL ENGINEER 2575 S. Ocean Blvd., Apartment 310 Highland Beach, Florida 33487 DOCUMENT TRANSMITTAL FORM DATE: 11/24/98 TO: Mr. Mike Rumph Administrator, Planning & Zoning City of Boynton Beach 100 E. Boynton Beach Blvd Boynton Beach, Fl 33425 FROM: Gerald B. Church, P.E. THE FOLLOWING DOCUMENT(S)/MATERIAL(S): 3 Sets of Revised Traffic Study for Lake Worth Christian School. ARE ENCLOSED FOR YOUR: Review_X Request Approval_X_ Info Records Comments COMMENTS: IF YOU HAVE ANY QUESTION CONCERNING THIS TRANSMITTAL, KINDLY CONTACT ME BY TELEPHONE AT (407) 278-7401. THANK YOU. ~~/d /f. ~ GERALD B. CHURCH, P.E. DEPARTMENT OF DEVELOPMENT Division of Planning and Zoning Bulent I. Kastarlak, NCARB Director Building Planning & Zoning Engineering Occupational license Community Redevelopment October 2, 1998 Mr. AI Federico, Senior Traffic Engineer Palm Beach County Traffic Division Department of Engineering and Public Works P.O. Box 21229 West Palm Beach, Florida 33416 Re: Traffic Study: Lake Worth Christian School East side of High Ridge Road between Gateway Boulevard (to the south and Hypoluxo Road (to the north). File # COUS 98-004 Dear Mr. Federico: The attached traffic study for the Lake Worth Christian School elementary school site, dated May 10, 1998, prepared by Gerald B. Church, P.E. Consulting Civil Engineer was received by Planning and Zoning recently for the above-referenced application. Please review the enclosed information for conformance with the County's Traffic Performance Standard Ordinance. If you have questions regarding this matter, please call me at (561) 742-6260, otherwise please send me your written comments/approval to the above address and copy Michael Haag, Building Code Permit Administrator. Sincerely, -(G_G~ Michael W. Rumpf Acting Director of Planning and Zoning MWR:bme cc: Michael E. Haag, Building Code Permit Administrator Central File s:\projects\Lake Worth Christian School\COUS\traffic America's Gateway to the Gulfstream 100 East Boynton Beach Blvd., P.O. Box 310 Boynton Beach, Florida 33425-0310 Phone: (561) 742-6260 FAX: (561) 742-6259