CORRESPONDENCE , I ~ DEVELOPMENT DEPARTMENT ENGINEERING DIVISION MEMORANDUM NO. TO: Tambri J. Heyden, Planning & zoning ~iam Hukill, P.E., City Engineer May 31, 1995 FROM: DATE: RE: KNUTH ROAD - FUNDING My understanding of the recent time extensions granted for the Tara Oaks PUD and Knuth Road PCD is that the Commission conditioned approvals on construction (by the applicants) of Knuth Road in it's entirety from Woolbright Road to Boynton Beach Boulevard. Further, that without Knuth Road completion commitments the extensions could have failed. The draft resolution you showed me today in effect funds the Knuth Road construction out of public funds (impact fee credits) which I do not believe was the intention of the Commission. My feeling about it is that the PUD and PCD should not be built without meeting concurrency (in this case construction of Knuth Road) first. To the best of my knowledge Knuth Road is not on the County Road Schedule and unless the developers build it, the PUD and PCD do not meet concurrency. They should build the road, just as they agreed to do in order to receive an extension. If they can work out an arrangement with Palm Beach County to front the cost now and recover later when the County would have normally scheduled construction anyway, more power to them. But using impact fee credits to "buy" time extensions is not good public policy. The bottom line is that I am opposed to the resolution. At a minimum, the sixth "whereas" should be removed or the word "not" deleted, and "either" changed to "both", and "or" changed to "and". WVH/ck C:KNUTHRD xc: Carrie Parker, City Manager James Cherof, City Attorney KllcI8y & AaocIM_ Landscape Architectsl Planners 1561 Forum Place Suite 100A West Palm Beach, Florida 33401 (407) 689-5522 · Fax: (407) 689-2592 January 24, 1995 Ms. Tambri Heyden, Planning Director City of Boynton Beach Planning & Zoning Department 100 East Boynton Beach Blvd. Boynton Beach, FL 33425 Re: Impact Fee Credits for the Construction of Knuth Road Our Project No.: 799.16 Dear Ms. Heyden, As you are aware, my client, Mr. Bill Winchester, is responsible for the construction of Knuth Road as part of the Conditions of Approval for the two Planned Commercial Developments and one Planned Unit Development which are currently being considered for Time Extensions. Since the projects have been approved, there has been an assumption that the costs incurred with regard to the construction of this road would be credited against Palm Beach County Traffic Impact Fees. Because Knuth Road is a collector road designated on the City's Comprehensive Plan, the value of the construction of Knuth Road is more resident serving than project serving. In reviewing our files, it appears that the issue of impact fee credit has never been finally coordinated with Palm Beach County. I am attaching a letter written by Mr. Chris Cutro on May 28, 1992 to Mr. Haney Frakes. It is my understanding that our County staff is prepared to recommend approval of the impact fee credits, but a resolution requesting such credits needs to be adopted by the City Council. Attached you will find a draft resolution which was prepared by my office to assist Mr. Cutro at the time he was pursuing this matter. As you are aware, Mr. Cutro left the City without this matter being finally resolved. As far as I know, this resolution has not been reviewed by your City Attorney or presented to the City Council for their approval. At this time, assuming that the City Council approves the extensions for these projects, it seems appropriate to also resolve this issue. By getting this issue resolved now, there should be no additional delays in moving these projects forward within the time period allowed by the extension. If I can be of any assistance in this matter, please do not hesitate to contact me. ~m ffi :: ~ 1:95 ffi lill\ Kieran J. Kilday Kilday & Associates, Inc. PLANNING AND ZONING OEPT. QClie City of 'Boyn1;on ~eac.1i ~ @ zoo ~ ~"!fOI'-~<:lIau&.~ .. ~ !P.o. !2r~.!1Z0 .' - '<~'- ."1 ~oyn-~~ .s'",z.S-o.J1Z0 " '. .. o.,!HaIL (407) ~7S-6000 '!FJ'UC: (407)- ~7.s..-o FAcsrMX~S TRANSMISSION FAX NO. ~ C~c=>o _..~ &t.l J -.::;- ~ / .A--..os. Z ~~ ~.....-.J , 3CJ.S" - ?? / - Y"9'd2--.3 TO, FROM: DATS: C: E'A.X.TR.AHS. r:rb ~........:) '''--H-i'''.!Sa I ~ A ~ii?~cc>L-_(.A.. 'f7 &>^--' ,-~-.,-- t-+A--=- .-e:.~ ~ ~ i I :e::c::::> By JLt ~y 4' ~-""Sc!?'c., a;Z......-.~LL--= ~--'--l "'-.J ~ r:~~ ~ ~L." ~+-?~~-=:r- ~~ ~ 1l'..4 P'~-r- ~ ~oe-~ 1...,- ~ IS-- ~"-' L.A- ~ i=2-.o ~t:::::o FT:?~ bJ fi&1b..c ~ -r7'........ <<:;.~~ r.-. --.... .- I ~..s-" ,e::TlA.. J )..A -~ A. J c:::;;,. - ~Aocs'l!!!. ~1 E"!:t--.J Cc9'"-'.......-e:.~ ~r::> ~c:..,2_-c>' "-' ~ lA.!lrT+-f- ~_ ....c::::> 'P,-,--r- t-r- I "'-i-r-.c:> o~ lC?:e~o Fib~.A-r::. OF p......aES :t:NCLt.1D:I:NO THXS COVER SHJll."X' 2- ~~~ ,,- ~enLl JllJ!: : NUMBER .:zL~ri.c.A 's q~",-r.va.!I ~c t:.fU. t;;;u.lfst:reo:uro TRANSMISSION REPORT THIS DOCUMENT WAS SENT (REDUCED SAMPLE ABOVE) ** COUNT ** # 2 *** SEND *** IN r-;r L-.L..... 01 REMOTE STATION r. D. START TIME DURATION #PAGES COMMENT I 1 ! JOSIAS & GOREN. P. A. 5-30-95 3:52PM 1 ' 15" 2 I --- TOTAL 0:01 '15" 2 XEROX TELECOPIER 7020 l' lilel~ie.* I I I JRN-10- ''35 TUE 09: (B ID: V I U)fl'r' 0' RS~;(( TEL t~:407-6a9-2592 l:i288 P02 r '--" v IIDm&~'ii'i PROPOSED RESOLUTION WBBRBAS the Boyncon Bea.ch Comprehensive Plan, Ordinanoe 89-39, iden~ific8 Knu~h Road ae a City Colleotor (Exhibi~ A), and WHDREAS the City of BOfnton Beaeh haa obtained and proe.c~.d ~h. Right-of.'WClY for Knuth Road b.1.'J part of it!! ~dopted ThorQughfare plan, and WHEREAS Rnuth Ro~d p~ovidee a critical North/South alternative to Congrel.'Js Avenue between Woolb~ight Road and Old Boynton Ro.~, and Wfi:f;REAS the City of Boynton :5cCl~h hd~ approved Knuth !\oa.d FeD (Ordinance 090-70) and TaT.Cl Oake FUD (Ordinance 090-75) which both front on Knuth Road, ana WHEREAS the C1t~ of Boynton Beach has required the petitioners of Knuth Road peD and Tara Oaks PCD to construct the missing link ot Knuth Road between Boynton B8&oh Boulevard and woolDrlght Road, and WHEREAS :.he construction of Knuth Road is not a 8i te related requirement of either Knuth Road peD or Tara Oaks PUD, and WHE~EAS the construction of :Knuth Road is considered part of comple.tion of the major road network of the City of Boynton Beach, and WHERBAS the citizens of Boynton Beach a.nd unincorporated Palm Beach County will benefit from the completed link of Knuth Road between Woolbright Roa.d and Old Boynton Road, and WHBRBAS Article 10.1 K.l.g. of the Palm Beach County Unified Land Development Code provides impact fee credits where construction of a portion of a major l'oad network is proposed, and WHEReAS the City of Boynton Bea.ch has determined that the construction of Knuth Road meets the standards for oredit of road imp~ct fee~, be it therefore RESOLVED that, THE City of Boynton Beach request that Palm Beach County make & findinq that credit for the preparation of plans and construction ~t Knuth Ro&d a8 approved by the City of Boynton Beach and Palm Be~ch County be granted again8t th~ Road Impact Pe~8 due from Knuth Road pen and Tara Oak. PUD. - - ,I HI'l-lU-' ~ I U::. U':;:I: ~ i iJ; r:. J LiJH'f (~ '-1~~u.... I t:.~ )'~U: YU. (-bl::i'::h::::=~,?'::: j:;.o:;W r'U::J t~ City of ;r~~ton iBeacn ~"6 ~ Zoni"l'Dtp4Ttmeftt 1 00 $. ~to" 'IeWi '!cuUfIlIrri :P.O. ~~.HO 1Joynum 'Buuh. jf.,rl.da JJ42S-0.J10 {4Q7) 7J8,7450, 1~'U: (407) iJ8.74SfJ May ZS, 1992 Kaney FrakeS AsS1.tant county Enq1neer palm B85Ch county Bng1neer1nq & Public Works 160 S. AUstral1an Avenue, Airport Hilton Centre wast PaJ.m Beach, FL 3.3407 RE: Credit for Road Construction in Lieu of Payment of Impact Fees for Knuth Road (Link between Woolbr1qht Road and Bounton aeach Boulevard) Dear Hr. Frakes: Pursuant to Section 22-25 Exemption and credits seot1on of the PAI~ SHARt CONrRISUTION FOR ROAD IMPROVEMENTS ORDINANCE, I am writing to clarify that Knuth Rood, a major collector shown on the City's Thorouqh!Are Protection Map will be entitled to r.c.iv~ the creQ1t for Imp~et Feez provided for in the Or~inance. Att.~hed you will find a copy 0: the a~opted Tho.oughfare Plan Map for cbc City of ~oynton ~c~ch. Knuth Ro.~ is shown on thlS map ~~ A oolloctor f~c~lity t.om Woolbright Roa~ northerly to the Boynton eeach Hall. Add1t1onally, ~otb the City and the county approved new alignments tor the north end of Knuth Road several years ago to allow tor better utilization of this road as an alt~rnat1ve nortl1/soutn collector serving the Mall. (The new a:1Qnment prov1de~ for the north terminus of Knuth Road to align d~rectly with the westerly entrance to the Mall.) The roac1 has always been envisioned as an alternative to Conqress Avenue which is at th18 time the only north/south arter1al in the area. Current~yp a portlon of Knuth Road is constructed south of !o~~ton Beach Boulevard. In the Past, because Woolbriqht Road did not ex1st between Conqress Avenue and Military Trail, the remaining construction of this link was not a prior1ty. However, now with Woolbri~ht Road open and o~Qra~inq with s1gn1f1oant traff1ei tbe construction of Knuth Road would olearly be desirable an~ warranted. .I:fmerit::a J gate.wa.y to th.e. quIfstream _nJHrH.0-' 95 TIJE 09; ffi IDac.ILDRY ex RS~:,oC . . TJ::I...HO: 40'(-b:3'3-~'592 ~288 P06 l .... . .. Haney rrakas -z- MClY Z8, 1992 CUrrently, there are two projects whioh bave received approval from the City which in addition to having frontaiee on either Woolbright Ro~d or Boynton Beach Boulevaral also have frontaqes on Knuth Road, As part of the development approval procQss, the city wishes to hav~ either one or both of these projects domplete the missing llnk of Knuth Road. The developers of these parcels have requested clarification as to whether impact fee credit can be obtained ~or ~he ~oft~tru~tlon of Knuth Road which is not dir@ctly rp-l~t.d to the need of the proj~ct purauant to sMct10n 22-25 of ~hQ ~oad Impact rGe ordinan~o. Based upon my reading of th$ orr:11:n.anc$ and th~ defiuit10n of Ira major road. natwork Gystem", I Deli_va ~hat Knuth Road should ~lal1fy a5 the major eol1.~eor road which i8 8nvi~ion.d in this ordinance. Additionally, bac~us. Knuth Road will provide the f~rst westerly north/south alterna~ive to conqress Avenue, it should provide relief afid therefore additional capacity for Congree8 Avenue AG wall. I would apprec1ate your ~esponse to this letter. Needless to say, we expect th~t we woulQ need to meet all of the requ1rements of :be ordinance With respect to proceaures, cost est1mates, and scope of constructlon activity. Thank you tor your eon.1c1.rat1on. Sincerely, ~~ Chriatopher Cutro, AICP Plann1no and zon1n; Director cc:cp Ene. A:K11clay .,t'.....,.",...~. ---r;;;;:'1' \ '. / . ),'J/ Jlt,. lflt /(/) QVU;T, lk:J.{i.f~ IE Klldey II' Aaoclet.. Landscape Architectsl Planners 1551 Forum Place Suite 100A JWest Palm Beach, Florida 33401 (407) 689-5522 . Fax: (407) 689-2592 April 12, 1995 Ms. Tambri Heyden, Planning Director City of Boynton Beach Planning & Zoning Department 100 East Boynton Beach Blvd. Boynton Beach, FL 33425 Re: Knuth Road P.C.D. Extension Request, Boynton Beach P.C.D. Extension Request and Tara Oaks P.U.D. Extension Request Our Project No.: 799.16 Dear Ms. Heyden, This letter will serve as several requests. Firstly, on behalf of my clients, I have been authorized to request an additional thirty (30) day postponement of both the Knuth Road P.C.D. and the Boynton Beach P.C.D. As indicated in my previous correspondence of March 16, 1995, my clients have been trying to firm up development time tables to address the concerns which were raised by the Planning Commission. They are still in this process and would prefer the additional thirty (30) days to be in a better position to address these issues before the City Council. In the case of the Tara Oaks P.U.D., we do intend to present the matter to the city Council on Tuesday, April 18, 1995. In this particular case, my clients have entered into a contract with Pulte Homes who will develop the project. We are requesting that representatives of Pulte Homes accompany us to the meeting to better explain their proposal to the Council. In all likelihood, because their housing type will require modification of the master plan, a master plan modification request would shortly follow approval of the extension. On Tuesday night, we can provide the Council with more details regarding their sales program. However, given the fact that we are anxious to move ahead with the Pulte Homes I Tara Oaks proposals, I do need to get the impact fee credits issue resolved for the construction of Knuth Road. You will recall, that I addressed this matter to you in a separate letter of January 24, 1995, (attached). Sometime ago, both the County Representatives and City Staff recommended approval of these impact fee credits. However, in order to facilitate that approval, a resolution must be passed by the City Council to be submitted to Palm Beach County. Attached you will Ms. Tambri Heyden April 12, 1995 Page 2 of 2 find a draft of a resolution that contains the necessary information according to the County Ordinance. I would request that this matter be on the agenda for action on Tuesday nights meeting as well as the Tara Oak extension. Resolution of this issue is a requirement of our contract with Pulte Homes. Please call me if you have any questions regarding any of these matters. Sincerely, -k\'W~ -kcld~ Kieran J. Kilday Kilday & Associates, Inc. KJKlcdd\cheyden.412 Attachments cc: Mike Schroeder; Schroeder & Larche Carrie Parker, City of Boynton Beach, City Manager . : i\ APR J 4 . I," L~~_,.._,~ HM.JfJJh!G N~D ZON!NG DEPT. . ---"-_.._-~-----~._-----~....._--_.._-------~ .. .......... '" ~ .<; Kilday & .a..o<'l.tu Landscape Architects/ Planners 1551 Forum Place Suite 100A West Palm Beach. Florida 33401 (407) 689-5522 · Fax: (407) 689-2592 January 24, 1995 Ms. Tambri Heyden, Planning Director City of Boynton Beach Planning & Zoning Department 100 East Boynton Beach Blvd. Boynton Beach, FL 33425 Re: Impact Fee Credits for the Construction of Knuth Road Our Project No.: 799.16 Dear Ms. Heyden, As you are aware, my client, Mr. Bill Winchester, is responsible for the construction of Knuth Road as part of the Conditions of Approval for the two Planned Commercial Developments and one Planned Unit Development which are currently being considered for Time Extensions. Since the projects have been approved, there has been an assumption that the costs incurred with regard to the construction of this road would be credited against Palm Beach County Traffic Impact Fees. Because Knuth Road is a collector road designated on the City's Comprehensive Plan, the value of the construction of Knuth Road is more resident serving than project serving. In reviewing our files, it appears that the issue of impact fee credit has never been finally coordinated with Palm Beach County. I am attaching a letter written by Mr. Chris Cutro on May 28, 1992 to Mr. Haney Frakes. It is my understanding that our County staff is prepared to recommend approval of the impact fee credits, but a resolution requesting such credits needs to be adopted by the City Council. Attached you will find a draft resolution which was prepared by my office to assist Mr. Cutro at the time he was pursuing this matter. As you are aware, Mr. Cutro left the City without this matter being finally resolved. As far as I know, this resolution has not been reviewed by your City Attorney or presented to the City Council for their approval. At this time, assuming that the City Council approves the extensions for these projects, it seems appropriate to also resolve this issue. By getting this issue resolved now, there should be no additional delays in moving these projects forward within the time period allowed by the extension. If I can be of any assistance in this matter, please do not hesitate to contact me. Sincerely, Kieran J. Kilday Kilday & Associates, Inc. - , ,IH"-lU-. ~~ I Lc U~: U:=,' ,<lLLJH.I 0 H~:::,U~ - '-' ! I::!.,- ..NU: 4l:J(-bl::i~-'-:='~':: l=IC:i::ll::i t-'U:::' . .~Cityof ,Y ~ton 1Jeacli tr ~'\:1 e!r Zoni"'8 '1Jtp4Tt~ftt 100 $. ,."'" 'Iuu/I. t!cukvan( ~.o. ~Jl(l 1J41ynwn 'BUJ&.1tcritla )J-425-0J10 (407) 7J8.7450, 1M: (407) 7J8.7459 May 2S, 1992 Kaney Frakes ASS1.tan~ county En91neer palm Beach county Bnq1neer1nq & Public Works 160 S, AUstralian Avenue, Airport H~lton Centre Wast PaJ.Jll Sea:::h, FL 33407 RE: Credit for Road Construction in Lieu of Payment of Impact Fees for Knuth Road (Link between Woolbr1qht Road and Bounton Beach Boulevard) Dear Hr. Frakes: Pursuant to Sectlon 22-25 Exemption and credits sect10n ot the PAI~ SHARt CONTRI5UTION FOR ROAD IMPROVEMENTS ORnXNANCE, I am writ1ng to clarify that Knuth Road, a major collector shown on the CitY'e Thorouqhrare Protection Map will be ent~tled to receiv$ th~ creQ1t for Imp~ct Feez provided for in the Ordinance. Att.ohed you will find a copy o~ the .~opted Thoroughfare Plan MaF for ehe City of aoynton ~c~ch. Knuth Roa~ 18 Inown on thiS map am a col16ctor fAcility !.orn Woolbright Road northerly to the Boynton Beach Hall, Add1t1onally, ~otn the City anc the county approved new allqnments tor the north end of Knuth Road several yaars ago to allow tor better utilization of this road as an alternative north/souto collector serving the Mall. (The new allqnment provided for the north terminus of Knuth Road to align d~rectly with the westerly entrance to the Mall.) The roa~ has always been envisioned as an alternative to Conqress Avenue which is at th18 time the only north/south arter1al in the area. Currently, a portion of Knuth Road is constructed south of !o}~ton Beach Boulevard. In the past, because Woolbright Road did not ex1st between Congress Avenue and Military Trail, the r~m~ininq construction ot th1s link was not a prior1ty. However, now with Woolbri~ht Road open and oD@ra~inq with significant trafti~1 the construction of Knuth Road would clearly ~Q desirable and warranted. rqmeric.a $ t]ate'i.Vay to tfte. fJu.ifstream --.,,- _..JHr~-J.0-'95 TUE 09:05 ' T,ILDRY t~ R:=8JC '-'" . . T.I=:b..J~: 407-83'3-::592 ;;288 P05 I - ... '. HanlY Frakas -z- KelY ZS, 1992 CUrrently, there are two projects which have rec.ived approval from the city which in addition to h4v1ng frontaqes on either Woolbriqht Road or Boynton Beach Boul~var4, also have fronta;es on Knuth Road. A~ part of the development approval process, the city w1sh~e to have either one or both of these projects eomplete the missing 11nk cf Knuth Road. The developers of these parcels have requested clarification as to whether impact fee credit can be obtained ~or ~he ~onatru~tion of Knuth Road which is not dir@ctly rp-lat.d to the np-ed of th~ proj~ct purauant to s~ct1on 2~-2S of ~hQ ~oad Impact tee ord1nanco. Based upon my reading of thlil crd1nancIilI and thy d9finit~on of "a major road network ~Y8tQm", ~ believe :hat Knuth Road should qualify as the major eoll.e~or road which is ~nvi~ion.d in this Ordinance. Additionally, bec~uB. Knuth Road will provid. th. f~r&t westerly north/south alterna~1ve to conqress Avenue, it should provide relief and therefore edditional capacity for Conqreeg Avenue eu wall. I would apprec1ate your response to this letter. Needless to Say, we expect th~t we woul~ need to meet all of the requ1rements of :he ordinance Wl~h respect to proce~ure8, cost est1rnates, and scope of constructlon activity. Thank you for your con.1c1.rat1on. Sincerely, ~~ Christopher Cutro, AICP Planninq and Zoning Director cc:cp Ene. A:K:11di:lY .,t'~.. ,- JAN-10-' 55 TUE 09: 03 I'" f<I Lmy &~ ASSCiC TEL hlO: 407-639-2592 *t288 P02 l' r '-. '-' u rnIil!~1r1 PROPOSBD RESOLUT10N WHBRBAS the Boyn'ton Bea.oh Comprehensive planl Ordinanoe 99-39, idontifieD Knuth Road ao a City C~llootor (Exhibit A), ~nd WHDRaAS the City of Boynton Beaeh haa obtained and pro~ec~.d ~h. R1sht-of.'Way fOJ:" :Knuth RQad as part of its adopt",c;1 Thoroughfare Plan, and WHEREAS Rnuth Road p~ovideG a critical North/South alternative to Congrece Avenue between Woolbright Road and Old Boynton ROA~, And Wfil;REAS tha City of Boynton :Beach hal:t a.pPJ:"oved Knuth :fI.olad PCD (OJ:"dinallce 090-70) and TaT-a Oake PUD (Ordinance 090-75) which both front on Knuth Road, and WHEREAS the City or Boynton Beach has re~ulred the petitioners of Knuth Road peD and Tara Oaks PCD to construct the missing link ot Knuth Road between Eoynton Beaeh BOUlevard and woolbright Road, and WHEREAS ':.he construction of Knuth Road is not a site related requirement of either Knuth Road peD or Tara Oaks PUD, and WHEREAS the construction of Knuth Road is considered part of completion of the major read network of the City of Boynton Beach, and WHEREAS the citizens of Boynton Bea.ch and unincorporated Palm Beach County will benefit fram the completed link of Knuth Road between Woolbright Road and Old Boynton Road, and WHBRBAS Article 10.1 K~l.g. of the Palm Beach County Unified Land Development Code provides impact fee credits where constructIon of a portion of a major road network is propoeed, and WHERBAS the City of Boynton Beach has determined that the construction of Knuth Road meets the standards for oredit of road imp~ct fees, be it therefore RESOLVED that, THB City of Boynton Beach request that Palm Beach County make a findinq that credit for the preparation of plans and construction ~t Knuth Road as approved by the City of Boynton Beach and Palm Be~ch County be gr~nt8d again8t the RQad Impact ~ee8 due from Xnuth Road pen and Tara Oake PUDa ~ ,.' \L /' CtP f ~ Klldey & Auoclet.. Landscape Architects/ Planners 1551 Forum Place Suite 100A West Palm Beach, Florida 33401 (4071 689-5522 · Fax: (4071 689-2592 March 16, 1995 Ms. Tambri Heyden, Director City of Boynton Beach Planning & Zoning Department 100 East Boynton Beach Blvd. Boynton Beach, FL 33425 RE: Tara Oaks P,U.D., Knuth Road P.C.D., Boynton Beach Boulevard P.C.D. OUR PROJECT NO.: 799,16 Dear Ms. Heyden, This letter will serve as a request to postpone consideration of the above three (3) extension requests for a period of thirty (30) days until the City Commission Meeting of April 18, 1995. We are requesting this postponement in order to properly assess the effects of the Zoning Commissions recommendations regarding these projects assuming they are adopted by the City Council. At the Zoning Commission Meeting, it seemed apparent that the Commissioners wished to have better reassurance that these projects will in fact move forward to develop if time extensions are granted, As there are ongoing discussions regarding the development of all of the properties at this time, we feel that during the additional thirty (30) days we can try to solidify time tables for development so we can better address this issue at the City Council Meeting. Additionally, we will use this time to assess the effect of a denial of these petitions including such issues as the status of previous dedications of right-of-way which resulted from the previous approvals. With regard to these issues, our attorney wishes adequate time to meet with the City Attorney and discuss the ramifications which would result from the City Council's adopting the recommendations of the Zoning Commission. Thank you for your consideration in this matter. Sincerely, ...../'" cc: Mike Schroeder KJKlcdd\cheyden.316 _ Board-of County Commissioners Ken L. 'Foster, Chairman Burt Aaronson, Vice Chairman Karen T. Marcus Carol A. Roberts Warren H. Newell Mary McCarty Maude Ford Lee County Administrator Robert Weisman Department of Engineering and Public Works March 7, 1995 Mr. Mike Haag City of Boynton Beach 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, FL 33425-0310 RE: BOYNTON BEACH BOULEVARD P.C.D. KNUTH ROAD p.e.D. TARA OAKS P.U.D. Dear Mr. Haag: The Palm Beach County Traffic Division has traffic reviewed the three traffic analyses prepared by Simmons & White for these three proposed developments. The three studies are updates to the K. S. Rogers traffic studies prepared in 1990. They use the trip generation and trip distribution from the K. S. Rogers studies and update the existing traffic volumes (1994) and the future traffic (1997) volumes. These traffic studies do not address traffic on Gateway Boulevard for the two P. C. D. s, as woul d be requi red by the exi st i ng Traffi c Performance Standards (TPS). A letter received yesterday from Simmons & White provides some of the requested additional information for Gateway Boulevard. Bovnton Beach Boulevard P.C.D. The updated traffic study addresses 120,000 square feet of general retail. The traffic study states that it address 110,375 square feet of general retail, and outparcels consisting of a 5,625 square foot bank with drive-through, and a 4,000 square foot high-turnov.er restaurant. The outparcels are high traffic generators and the traffic study does not properly address the outparcel uses. The 120,000 square feet of retail will generate 4,818 net daily trips with a build-out of 1997. The study shows that the project will meet the requirements of TPS on all roadways except Gateway Boulevard. Gateway Boulevard restricts the development to 75,700 square feet of general retail (3,361 daily trips) until it is widened to six-lanes in FY 96/97. Knuth Road P.C.D. The updated traffic study addresses a 120,000 square foot shopping center which includes 110,375 square feet of general retail and outparcels consisting a 4,500 square foot bank with drive-through, and service station with a 2,000 square foot convenience store, and a car wash. The project will generate 6,221 net daily trips with a build-out of 1997. The study shows that the project will meet the requirements of TPS on all roadways except Gateway Boulevard. Gateway Boulevard "An Equal Opportunity - Affirmative Action EmploYl'rq @ printed on recycled paper Box 21229 West Palm Beach, Florida 33416-1229 (407) 684-4000 March 7, 1995 Mr. Mike Haag BOYNTON BEACH BOULEVARD P.C.D. KNUTH ROAD P.C.D. TARA OAKS P.U.D. page two restricts the development to 75,700 square feet of general retail (3,361 daily trips) until it is widened to six-lanes in FY 96/97. Tara Oaks P.U.D. The updated traffic study discusses a project consisting of 192 multi-family dwell;ng '.mits and a 20,000 square foot church. This project would generate 1,498 daily trips. The study mentions an unidentified previous petition which accounts for 770 of the projects daily trips. Like the K. S. Rogers study, the updated study does not address these trips. Rather, it addresses 728 daily trips from an undefined project. The updated study shows that this undefined project meets TPS on all roadways, based on a build-out of 1997. In your letter dated January 20, 1995, you requested verification that the roadway improvements listed in the Simmons & White reports are still applicable. There is no information in these reports that allows me to verify the need for those roadway improvements. I am sorry for the delay in responding to your request. The form of the updated traffic studies and missing information did not allow a timely review. If you have any questions regarding this determination, please contact me at 684-4030. Sincerely, OFFICE OF THE COUNTY ENGINEER 30-- ')v~ Dan Weisberg, P.E. Senior Registp.red C;vil Engineer cc. Rob Rennebaum, P.E., Simmons & White File: TPS - Mun. - Traffic Study Review h:\traffic\diw\boyn37 ....._ M _, ~_.............,..=_,,,'U'<_ ~ ,..,~ ....<-~- r r-"'~-'~ f', ~ ! i') ~ I f" 1 Fi : P II ~.JU ~ I MAR 10 PlANirfNc;7,1:D.. -Qh ZQ,I'!,I,NQ. DEP,L_", .,\y Kilday & AaocIetea Landscape Architectsl Planners 1551 Forum Place Suite 100A West Palm Beach. Florida 33401 (407) 689-5522 · Fax: (407) 689-2592 U\VJ~f; -~~ IL 8 /995 IlJ March 6, 1995 Ms. Tambri Heyden, Planning Director City of Boynton Beach Planning & Zoning Department 100 East Boynton Beach Blvd. Boynton Beach, FL 33425 PLANNING AND ZONING DEPI Re: Knuth Road P.C.D. and Boynton Beach P,C.D. Time Extensions Our Project No.: 799.16 Dear Ms. Heyden, Thank you for meeting with Bill Winchester and myself last week to discuss the Time Extensions for Boynton Beach P.C.D. and Knuth Road P.C.D. As of this date, I am still waiting for verification from the County Engineer that phasing for each of the above projects would only occur after the trips generated by each project exceeds 3,361 trips per day. This number is the number that was calculated by our traffic engineer, Mr. Robert Rennebaum, in assigning the 1 % that is allowed to utilize Gateway Boulevard and working the trips backwards to the site based upon the assignments contained in the original traffic study. As you are aware, Mr. Winchester is concerned that this project is being required to retroactively meet phasing requirements when there are many other projects in the City of Boynton Beach which have received extensions without any phasing requirement. For that reason, we are requesting an agreement with the City that either project be allowed to utilize all or part of the 6,722 total trips that the projects would be allowed before the requirement of phasing. In other words, since each project would be permitted to generate 3,361 trips it makes sense that we be allowed to assign either all or part of the trips to one project as it is likely that one project will move ahead quicker than the other project. One additional issue which we discussed at our meeting which we would like to have resolved at the time of the consideration of the extension request is the fact that the Knuth Road P.C.D, has an approval on it's Master Plan including a service station. While we are aware that the service station criteria which was adopted after this approval would not allow this use at this corner, our ability to proceed Ms, Tambri Heyden March 6, 1995 Page 2 using our approved master plan is very important. In all probability, based on some very recent discussions with users of the Knuth Road P.C.D., we believe that the service station use will in fact be the first phase of the development of this center. Additionally, with the construction of the service station, we hope to be in a position to construct Knuth Road from its current terminus and is southerly to the canal crossing. (Tara Oaks P.U.D. will continue this construction southerly to Woolbright Road.) At this time, we expect the petition to be heard by the Planning Commission on March 14, 1995. I will make myself available at any time should you wish to discuss these matters further. I will continue to seek written confirmation from the County Engineer that the phasing requirement referenced in this letter is in fact correct. Kieran J. Kilday Kilday & Associates, Inc. CC: Mike Schroeder Bill Winchester t1RR-06-'95 MeN 16:04 ID:KIL~Y & ASSOC. TEL NO:407-589-2592 1:*340 P01 Maroh 6, 198a -........... .. - ' ,,-' ", " .. ,; c- '-.1-<" " . . lanning Olrector City of Boynton Beech Planning & Zoning Department 100 Eut Boynton Be80h Blvd. Boynton BMoh, FL ~6 ~[U~~fiX:ml - 6 /995 IJJ} ~~~~WgE~~D Re: Knuth Road P.C.D. and Boynton Beach P.C.D, Time Extensions Our PI'OJeet No.: 799.16 D_r Ms. Heyden. Thank you for meeting with Bill Winchester and mvsatf last week to dlsQuss the Time Extenalona for Boynton Beach P,C.D. and Knuttl Road P.C.D. M of thl8 date, I am stili waiting for verification from the County Engineer that phasing for BBClh of the above projects would only occur after the trips generated by eacn project exceeds 31381 trips per day, Thla number Is the number ht was calculated by our traffic engineer. Mr. Robert Rennebaum, In assigning 1he 1% that Is allowed to utilize Gateway Boulevard and WOrl<lng the tr1pa backwards to the site baNd upon the ucignmenta contained In the original trafflo study. As you are aware, Mr. Winchester Is conoemed that this project Is b~ng requlreca to retroactively meet phasing requirements when there are many other projects In the City of Boynton BBBCh which have received extensions wtthout any phasing requirement. For that raaoon, wo are requesting an agreement with the City that either project be allowed to utilize all or part of the 6,722 total trips that the projects would be allowed betore the requirement of phasing. In other' WOrds, since each project would be permitted to generate 3.361 tr1ps It makes sense that we be a!rowed to assign either all or part of the trips to one project as It I. likely that on. project will move ahead quicker than the other project. One additlonalluue which we discussed at our meeting which we would like to have resolvecl at tl'l8 time of the oonslderation of the extension request II the fact that the Knuth Road P.C,D. has an approval on It'8 Master Plan Including . service station. While we are aware that the slI'Vlce statton cr1terla which was adopted after this approval would not allow this use at this comer, our ability to proceed ~- ~^:i~h~ r-g., .~ / _ //., hre.~, "Jf1 . ... ! ~L~. t7;~~\~1 /.,'_. ..-jIJ;~ L 1/1'\/ " ,P-'W~ )1L-I/t. :---. '.. -o-'~. ~.if~ 1 t/ ." , /'<<._iltA.,' I'- .a,1-~~~c ~::1;'Iz~-~ '. /r./ " 'fC.j)" ~?--17 L ,:;. ~:1"JL , CVJt. ~ ,. .J~~ /v I.. '-"(.1 ~ ~/~~ ~I A.' i:J " LXV ~ cvtfdL~ 5iA r; / ". {/LC ~' . L7,?,-c-z-:7) ~,~ " f1~ ?,.k_~_ t4~~~.~ f1tD. _ ~ l'lAR-OS-' ':6 tlC1H 16: 85 ID: 1< I Lffi'y' (~ ASSOC. TEL tU: 487-589-2592 1:*340 P02 MI. rambrl Heyden March e. 1 eee; Page .2 using our approved master plan Is very Important. In all probability, buecl en some very recent discussions with users of the Knuth Road P.C.O., WIt believe that the servIce !d:atlon use will In fact be the first phase of the development of this oenter. Addttlonally I with the construction of the aervlce station, we hope to be In a position \0 construct Knuth Road from Its current terminus and Is lOutherly to tt18 canal crossing. (Tara Oaks P,U.D. will comlnue this construction southerly to WOOlbright Road.) At this time, we expect the petition to be heard by the Planning Commlulon on Maroh 14, 1995. I will make mysetf available at any time should you wleh to discuss these matters further. I will continue to seek wrinen conftrmatlon frgm the COunty Engineer that 'lhe phaalng rGq ulrement referenced In this letter II In fact oorreot. KIeran J. Kilday Kllday & Aesooiates, Ino. cc: Mike Schroeder Bill Wlnaheeter MAR-07-199S 09:25 " . ~. .. ...---- 22~~222222222222 407 478 5770 P.01/03 - County Administrator Rober! Welsmnn Ken L Poster, Chairman Burt Atlronson, Vice Chairman , I<~fen T. Marcus Carol A. Roberts Warren H. Newell Mary McCOlrty Maudt~ Ford lee Deputment of Bnsin'terir\8 .ltnd Pl.lblic: Work. . -119!1i m TELECOPIER TRANSMITTAL COVER SKEET TRAffIC DIVISION FAX NUMBER: (407) 478-5770 \'''-' PLAZO NNING AND . . NING OEPT. TRANSMITTAL DATE: 1> l., ,~ ~ PLEASE DELIVER THE fOLLOWING TELECOPlfO MATERIAL TO: RECEIVER'S ~AME: OFfICE NAME: r1 (> '"z::..."...Tu <.A..- /4J t:.~ (;-( . OFFICE TELEPHONE NUMBER: ( J OFFICE FAX NUMBER: ( ) S U BJE C1 : r6 t) ~...-c- r '-'.....-.- kL~~ IIi (-\1) 3/)~_D09o f? <::--4'- <... H p, ~ c...- c) ('J <- l) ,r PC D I 1/tf\.6 dA- ~ c ****~****..*********.****************.****************~************************ SENDER'S NAME: ~.,A./ OFFICE TELEPHONE NUMBER: I \ \A/ ~ {~ P:J e /{J2.. 6~Y ~(j=S <J ******************************************************************************* TOTAL NUMBER OF PAGES (including this transmittal ~over sneet): ~ YES ( ) . . NO ( 'lr). PLEASE CALL TO VERIFY RECEIPT ~ATERIAL: NAME OF FAX OPERATOR: ~ "An Equ<ll OppmIU"il)' - A ffirmilliv.: .-\r:Lit>n Empl"yt'r" @P;~I#/JM f~"d_( Box 21229 West P:Jlm BQach, Flori,la 3:!41(j.-1129 1"07) "SJ,-~()OO ?11\~~ uJ- fJlt" S)f'~ Q " ~~... ?~ tP~. \ /" 0 Il-,..b~ vfA~ \2.- 1 ,I'< qJ'\' /p..,(Y' \) .. {.,~~< ~~~ ~\y... # /\ I tJfP f>'O~ b So ~rtl I ~,)-<<' bP-l1 ~W ~ Rll 11 r.\ b-<- 7 n rP~ ?i ....1.. V':F' - '" \.Y t..-J:" i" 1 'WG~ ~.....u .j,(\. ~ vJ ~Q' rJ<'\U' tpf::> ()~H ... ~D ()\l:> tv ~ fit!> ~\l)~ '> ~D'1 ~ ~,.~ ~ cJ:;ft t(.,'v <,fi'. ~ \ b~ -~y .....S-<t' {t-~' -110"'"1> ~' "'\'P rpJ,VJ \.. ~~ '{.rJ ~ ?A',t; Sf; t ~'\'Jt>\t" tl." V s tJo< ~,'(poI ~ \V jr. ~~\ l/ tfJ>'-\ ~,6 vrl",t~ . ~{LJ ~ Dt.r> lIP ,,$ 6" ~ ~ ~o ~~ ~ 'CP ~()\) ~\t5' ~1 ~ ~~ vi ~,~ 'tp (.. \L' ~ ~D-{ S t1AR-07-1 99S 09: 27 22.~2222222222222 407 478 5770 P_02/03 county AdminIstrator Robert Weisman B<tard of County Commissioners - Ken L Fost,,!', Chairman l:lurt Aaronson.. Vice Chail'man Karen T. Mal'c'lc; Cilrol A. Roberts Warren H. Ne'Well Mal)' McCnrty .Maude Ford Lec: Department of Engineering and Public Works March 7, 1995 Mr. Mike Haag C1ty of Boynton Bea~h 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, FL 33425~0310 RE: BOYNTON BEACH BOULEVARD P.C.D. KNUTH ROAD P.C.D. TARA OAKS P.U.D. Dear Mr. Haag; The Palm Beach County Traffic D1v1sion has traffic reviewed the three traffic ana.lyses prepared by Simmons &. White for these three proposed developments. The three studies are updates to the K. S. Rogers traffic studies prepared in 1990. They use the trip generation and trip distr1but1on from the K. S. Rogers studies. and update the existing traffic volumes (1994) and the future traffic (1997) volumes. These traffic studies do not address traffic on Gateway Boulevard for the two P.C.D.s, as would be required by the exist1ng Traffic Performance Standards (TPS). A letter receivedyesterctay from Simmons & White prov1des some of the requested additional information for Gateway Boulevard. ~on Beach Boulevard P.C.DL The updaled L~~rric study addresses 120,000 square fect of general retail. The traffic study states that the it address 110,375 square feet of general retail and outparcels consisting of a 5,625 square foot bank with drive-through and a 4.000 square foot high-turnover restaurant. The Qutparcels are high traffiC generators and the traffic study does not properly address the outparcel uses. The 120,000 square feet of retail will generate 4,818 net daily trips with a build-cut of 1997. The study shows that the project will meet the requirements of TPS on all roadways except Gateway Boulevard. Gateway Boulevard restricts the d~v~lapment to 75.700 square feet of general retail (3,361 daily trips) until it is widen~d t.o six-lanes in FY 96/97. K!!,uth Roa~jl~ The updatQd traffic study addresses a 120,000 square foot shopping center which includes 110,~75 square feet of general retail and outparcels consisting a 4,500 square foot bank with drive-through and service station with a 2,000 square foot convQ~iQncQ stor~ and a car wash. The project will generate 6,221 net daily trips with a build-out of 1997. The study shows that the project will meet the ~Qquir'ilmenh of TPS on all roadways except Gateway Boulevard. Gateway Boulevard "An Eqll:ll Oppml\m' l}' - A ffirn):\th '" Action r::r~1 p loyel'" ~'l. IO~ pm,tftD Qn 1'IX)'t'.~.t).; t:<QF1W 1l0:\; 21229 West Palm Be<l(h, Florida 33416.12l9 (407) 6114-40UO t'IAR-07-1995 09: 27 2?~~2222222222222 407 478 5770 P.~3/03 March 7, 1995 Mr. Mike Haag BOYNTON BEACH BOULEVARDP.C.D. KNUTH ROAD P.C.D. TARA OAKS P.U.D. page two restricts the development to 75,700 square feet of general reta11 (3,3el da1ly trips) until it is widened to six-lanes in FY 96/97. Tara OaKs P. U.....D. The updated traffic study discusses a project consist1ng of 192 mult1-fam11y dWelling units and a 20,000 square foot church. Th1s project would generate 1,498 daily trips. The study mentions an unidentified previous petition which accounts for 770 of the projects daily trips. Like the K. S. Rogers study, the updated study does not address these trips. Rather, it addresses 728 daily trips from an undafined project. The updated study shows that this undefined project meets TPS on all roadways, based on a build-out of 1997. In your letter dated January 20t 1995~ yaup requested verification that the roadway irnp:rovements listed in the Simmons! White reports are still applicable. There is no information in these reports that allows me to verify the need for those roadway improvements. I am sorry for the delay in respondin~ to your request. The form of the updated traffic studies and missing informatlon did not allow a timely review. If you have any questions regarding this determination, please contact me at 684-4030. Sincerely, / OFFICE OF THE COUNTY ENGINEER ~~~ Dan Weisberg. P.E. Senior Registered Civil Engineer ce. Rob Rennebaum. P.E., Simmons & White FilQ: TPS - Mun. - Traffic Study Review h:\traffic\diw\boyn37 TOTAL P.03 7.D.l ~ TARA OAKS PUD 7.D.2 KNUTH ROAD PCD 7.D.3 BOYNTON BEACH BOULEVARD PCD TIME EXTENSION HANDOUT Klldey It ANOC.... Landscape Architects/ Planners 1551 Forum Place Suite 100A West Palm Beach, Florida 33401 (407) 689-5522 · Fax: (407) 689-2592 ~ C~ f 1Z> ~4:'::. : IAQII 0A ~& j>vD FIe; #. tHf'rt: q'l-cY:> 3 $ C /1lf(!;- 9 '-1- 00 (" J) Krv..mJ ~y Pc!) ,:.I.C -JJ M fib q'l-DO(; -1 C/J~ 9~_o")i 3) 8<>'1"'it>oJ &l.JaJ &.10. PCD 1=/4.- /I t'1P(E. 71--t)DI '1 ep Fe. q '1- on3 February 14, 1995 Mr. Mike Haag, Zoning and Site Development Administrator City of Boynton Beach Planning & Zoning Department 100 East Boynton Beach Blvd. Boynton Beach, FL 33425 Ae: Tara Oaks PUD, Knuth Road PCD, and Boynton Beach Boulevard PCD Our Project No.: 799.16 Dear Mr. Haag, This letter serves as a request for a postponement to the March 14, 1995 Planning and Development Board Meeting of the aforementioned projects currently being reviewed for a Time Extension and Concurrency Exemption Certification. These items are scheduled on tonights February 14, 1995 Planning and Development Board Meeting, however, the petitioner is requesting this postponement to allow additional time for their Traffic Engineer to address concerns raised by the Palm Beach County Traffic Division for these projects. Thank you for your continued cooperation with this matter. Should you have any questions regarding this postponement, please feel free to contact this office. Sincerely, .~Q . cJcJZ;;o Lindsey A. ~alter Kilday & Associates, Inc. cc: Bill Winchester Mike Schroeder Klldey & Aaocletes Landscape Architectsl Planners 1551 Forum Place Suite 100A West Palm Beach, Florida 33401 (407) 689-5522 · Fax: (407) 689-2592 December 28, 1994 Mr. Mike Haag, Site and Zoning Administrator City of Boynton Beach Planning & Zoning Department 100 East Boynton Beach Boulevard Boynton Beach, FL 33425 Request for Time Extensions Tara Oaks P.U.D. Knuth Road P.C.D. Boynton Beach Blvd. P.C.D. Our Project No.: 799.16 Re: Projects: Dear Mr. Haag, Pursuant to our telephone conversation, please find attached three(3) checks each in the amount of $125.00 payable to the City of Boynton Beach. As discussed, these checks represent filing fees for requests for time extensions for commencement of development of the above referenced projects. It is my understanding that these items are scheduled for the January 10,1995 Technical Review Committee meeting at 9:00 a.m. It is also my understanding from our conversation, that these requests will be heard by the City's Planning and Development Board on February 14,1995 and the City Commission on February 21,1995. If any of this information is incorrect, please contact me at your earliest convenience. I will be contacting you next week with regard to the TRC meeting, however, please feel free to contact me if you have any questions or require further information. Sincerely, c:e:~~ ~ Lindsey A. Walter cc: Michael Schroeder Bill Winchester ".... ....,. .., .. ... . ...,-" ..:...;.... ;.,,;.,. .,T. Kilday & Auocle.. Landscape Architectsl Planners 1551 Forum Place Suite 100A West Palm Beach, Florida 33401 (407) 689-5522 · Fax: (407) 689-2592 November 23, 1994 Ms. Tambri Heyden, Director City of Boynton Beach Planning & Zoning Department 100 East Boynton Beach Blvd. Boynton Beach, FL 33425 RE: Request for Time Extensions PROJECTS: Tara Oaks P.U.D. (Ordinance 90-75) Knuth P.C.D. (Ordinance 90-70) Boynton Beach Boulevard P.C.D. (Ordinance 90-73) Dear Ms. Heyden, This letter will serve as a formal request to have the City Commission of Boynton Beach review the status of the above three (3) Planned Developments and to grant further time extensions for their commencement of development. I have reviewed your Zoning Code in an effort to determine the proper procedure for extending these project approvals. It appears that the only process available at this time is contained in Section 9, Article 13, Time Limitation for Development of Property. In fact, this section was the basis for a similar review of the Capitol Professional Center PCD (located at the southeast comer of Knuth Road and Old Boynton Road). In that case, the Commission, after determining that the existing Planned Commercial Development zoning was the most appropriate zoning for the property, granted an indefinite time extension. I have attached the staff report and time extension letter for your review. ./ All three (3) of the above referenced Planned Developments were approved on December 18, 1990. . Since that time, while there has been some activity concerning each of the projects, there has not been formal final development plan approval and/or construction. The original eighteen (18) month time limit of the approvals would have expired on June 18, 1992. However, on June 16, 1992, the City Commission approved our request to extend the expiration dates of the three (3) planned developments for one (1) year until June 17, 1993 (see attached letter from Chris Cutro dated June 29, 1992). No action or review has taken place since that time. Due to the down swing in the economy, the property owners have been unable to successfully commence development which, in this case, is recording of a plat of record for the first phase of development. However, the property owners have worked continuously on all three projects since the last extension in an effort to commence development. m rn D \VI rn rn NU/ 2 3 ,. Ms. Tambri Heyden November 23, 1994 Page 2 Since the expiration of the time extension on June 18, 1993, the properties have been in a sort of limbo. If you recall, the two commercial properties were annexed into the City of Boynton Beach at the same time that they were rezoned. Therefore, the Planned Commercial Development Zoning District is the only zoning district that has ever been assigned to them within the City of Boynton Beach. With regard to the Tara Oaks property, the project was already an existing Planned Unit Development when it was modified to its current master plan status. Therefore, assuming that the Planned Development approvals have expired for all three projects, I have no idea what the actual underlying zoning would be. I believe that is why the provisions of Section 9, Article 13 were provided in the Code. As in the case of the Capitol Professional Center PCD, the projects clearly need to be revisited by the City Commission to determine whether the existing zoning is the most appropriate zoning and, assuming that it is, formal action should be taken regarding the extension of these approvals. Needless to say, my clients are actively seeking extensions of these approvals. Despite the economic problems which prevented these projects from moving to the next step in the development process, there has been activities undertaken throughout the entire timeframe of the approvals to ready these projects for development. For the purpose of your analysis regarding the status of these projects, I have prepared a summary of activities for each project below. Additionally, I will be calling your office to set up a meeting to review these projects with you and I will be prepared to be present at the time of their consideration by the City Commission. At this time, I am not aware of any formal application procedure. However, if there is an application document, we will be ready to submit it to you promptly. I. Tara Oaks Planned Unit Development. This project received a rezoning approval from P.U.D. - Planned Unit Development with a land use intensity of 4.0 to a P.U.D. - Planned Unit Development with a land use intensity of 5.0, This project also received a land use amendment approval from Low Density Residential to Medium Density Residential. Both of these ordinances were passed on final reading by the City Commission on December 18, 1990. As part of the rezoning and land use approval, the applicant entered into an agreement with the Stonehaven Homeowner's Association which required the applicant to commit to numerous conditions of approval including providing a buffer wall on the project's north property line along with a twenty-five foot wide landscape buffer and a 40' setback for all buildings from the north property line of Tara Oaks P.U.D. (copy attached.) This agreement is still active and binding. Since the approval of the project the applicant has done the following: 1. Pursuant to the approved master plan, the south portion of the property was designated for utilization by a church. In fact, this property was sold Ms. Tambri Heyden November 23, 1994 Page 3 to the Church of Jesus Christ of Latter Day Saints on June 26, 1992 (see attached warranty deed). Therefore, the Planned Unit Development now has two separate owners, the applicant and the church. 2. In order to develop this first phase for the church parcel, the applicant requested an approval for road improvements for the Tara Oaks P.U.D. This request was made by Rick Rossi of Rossi & Malavasi Engineers, Inc. to construct a portion of Knuth Road at the south end of the Tara Oaks P.U.D. to accommodate the pending purchase of the church parcel. Subsequently, on June 2, 1992 the City Commission granted approval of the partial Knuth Road improvements required by the Tara Oaks P.U.D. (see attached letter dated June 12, 1992 from Chris Cutro). Also attached is a letter from the Boynton City Engineer dated June 19, 1992 indicating what additional work was required to obtain a land development permit for the road construction. The applicant expended over $4,000.00 in conjunction with obtaining approval of these preliminary plans. Additionally, the applicant has obtained the previous construction plans from the previous owner which will be modified in order to obtain final permits. (It should also be noted that over $100,000.00 has been set aside in an escrow account to guarantee construction of this portion of Knuth Road at such time as the church is ready to pull building permits for the development of the site,) 3. The applicant has complied with the zoning condition of approval to dedicate to the City of Boynton Beach twenty-five (25) feet for Knuth Road pursuant to the attached right-of-way deed (ORB 7324, Pg. 1159, dated June 26, 1992). 4. The applicant has expended over $28,000.00 for the construction of the canal crossing at the intersection of Woolbright Road and Knuth Road. Attached is correspondence concerning the canal crossing including: a. A letter dated April 24, 1992 from the Department of Environmental Resource Management indicating that no permit would be required pursuant to the Palm Beach County Wetlands Protection Ordinance. b. A letter from South Florida Water Management District granting a permit exemption dated April 29, 1992. This letter indicates that the South Florida Water Management District will not be analyzing the surface water management system. Ms. Tambri Heyden November 23, 1994 Page 4 c. A letter dated May 8, 1992 issuing a permit for the culverting of Knuth Road from the Florida Department of Environmental Regulation. d. A letter dated June 11, 1992 from the Lake Worth Drainage District approving the permit for the Knuth Road/Woolbright Road intersection and culvert at the L-26 canal. e. A letter from the Lake Worth Drainage District dated April 14, 1993 indicating final acceptance and final inspection of the Knuth Road culvert crossing. 1. A permit from the Palm Beach County Land Development Division dated June 18, 1992 for Right-of-Way Construction indicating approval to connect Knuth Road into the north right-of-way of Woolbright Road. g. Three (3) letters from the City consultant, Gee & Jenson, dated January 18, 1993, April 9, 1993 and May 4, 1993. These letters reference City Commission approval for the extension of Knuth Road to the Tara Oaks church site and correspondence regarding construction plans that were prepared and submitted by Rossi & Malavasi to the City for approval. 5. Received approval for an excavation and fill permit by the City Commission on April 8, 1993 for the construction of Knuth Road (see attached minutes). 6. Cleared Knuth Road right-of-way pursuant to a clearing and grubbing permit for $6,000.00. 7. Requested a minor amendment to the master plan to amend a condition of approval regarding construction of Knuth Road from the Stonehaven P.U.D. on the north to Woolbright Road. This request was made on June 15, 1992 and the petitioner paid a fee of $500.00 (see attached cash receipt) . II. Knuth Road P.C.D. This project received annexation, future land use amendment approval, from County Commercial High to Local Retail, rezoning from County AR - Agricultural Residential to City P.C.D. - Planned Commercial Development and an approval for a text amendment to the City Land Use Element pertaining to Ms. Tambri Heyden November 23, 1994 Page 5 planning area 7, 7.J. As part of the rezoning and land use amendment approval, this project was also the subject of an agreement with the Stonehaven P.U.D. Homeowner's Association. This document is also attached for your reference. Since the time extension granted by the City Commission on June 16, 1992, the property owner has done the following: 1 . Received a master plan modification and site plan approval from the Boynton Bea,::h City Commission on June 2, 1992. This modification was to allow the replacement of a restaurant on a comer of this P.C.D. to allow a convenience store with gasoline sales. 2. Obtained a minor amendment to the master plan to split the construction costs of the extension of Knuth Road from the Stonehaven P.U.D. entry south to Woolbright Road. The applicant paid $500.00 for the request of this modification. III. Boynton Beach Boulevard P.C.D. This project received annexation approval, rezoning approval from County AR - Agricultural Residential to City P.C.D. - Planned Commercial Development, a Comprehensive Land Use Plan amendment from County Commercial High to City Commercial Local Retail, and a text amendment to the City's Land Use Element deleting language indicating that this property should be placed in a High Residential land use category. This project also was the subject of an agreement with the residents of the Stonehaven P.U.D. which abut the property to the west. Since the approval of the project, the applicant has done the following: 1. As part of the original approval, the property owner agreed to comply with a specific request from the Stonehaven P.U.D. Specifically, the removal of several large Australian Pines along the portion of the property which the neighbors considered to be a danger to adjacent property. Immediately upon approval of this project, the property owner contracted with Arbor Tree Services, Inc., who removed said trees. 2. This project also was the subject of a request for a minor master plan modification in an effort to split the construction costs of the proposed Knuth Road extension. As previously stated, the City Commission approved a request for minor master plan modification for this project on April 8, 1993 to allow all three (3) Planned Developments to split the Knuth Road link construction costs. Ms. Tambri Heyden November 23, 1994 Page 6 3. Received approval for an excavation and fill permit from the City Commission on November 16, 1993 (see attached letter dated November 23, 1993). We have appreciated your working with us in the past. Recently, with the economy improving, the applicant has received significant interest in the development of all three parcels. We are, therefore, optimistic that with the proper extensions, we can move ahead in their development. In that regard, I am forwarding to you under separate cover a request to finalize the impact fee credit agreement for the construction of Knuth Road. Please feel free to contact me if you have any questions. cc: Bill Winchester Michael Schroeder AKJKljb/heyden.n16 '~~,r 'E .A; 3":'i ,:.: I: : L.In:,'; ,:' i-i'::~:::'CC_ -~;:::L :.,~C,(; ~.~c:rl'-~~~:::9--;?:..~9;: ~58? F.l31. ',. ... ~ L ;\. 1 (1 7 - 4 S:; .. '3 eH, .:4 r'~;:!.r' .2 S '1 0 : 1 9 ~ 0 . CO 3 P. 02 lune 1Stt 199.3 .,..~ Q! h".r~Kt<1 0, ....1... \V'b*-' 1(..~I\ OM ,.fOhn L 'ilfl1~tt.'~"'tf' ~1~' rr.IVMlIlII\$'t.: ~ IMII,i,'l\ 11. ,W~'\M ((-~ AulilltJlll;I~i ~~' J!,~*, wr:~:; "II';' Il tkl~.......... ~, ~.. j ! ~ "AKe W.;')f1TH O~A:IN^\f.a Dit$""AIO" , _.,.J...,......I\......,'\.,....I\.~Pt_~."......,J/~ t...""..lt"'iY":/'"",._~/'<.u_..I,.",~1........... ,J:j4i ~;,;.I~'J',~i'nljAlk, .)~t."A't b~II.r.;.r-l. r::V;;,Ii.IO.. .$;\.$&1 .",,,", ;!O...d~.. !:..'\~"i I;) r p. ,'.. ,I...d~ hlUt~ '1a'W1~"l{ ~ of:f;~ koj;.l/.; .{I", Mi::1avni/ lnt. $J.W VP!~.fjI'!i e,ivd'l ~:Jkt.: 4tJ V\i \;;:!It, P.~lrn "~!ii,rj. fl ~ J'~f)9~ 1 ';HJ4 ::)e<ca~ !~~/\r Rf;i$h ~h.tblet;;tl Fill:.! ,.l.r,("~lhrH:;'EJ LaH~r '(ll'!' nNDD Ptrm1t# 93..2C\30RlC.O'J. K.nuth f>'r;f~.i:l C;,;"v~rt (,t~fl$!r-I~ oJ. l,.2' U,~\t~ '{.,':'J(t,i; Ch"~~n:a~~ Dl$ukt bas (>~>mple.t~d iI fifi?t! ln~pe';.th:)J', c,' tllt) abo,;,'!! tH}!"i'ie:d f:)~'o.l~:C ;1"tJ d{)€~ hv.!reby .~1:jpW\'e the. ir,;~ta; ~thjp Lake Ii\'( :'th Drainage D1sti'iCi also ':~e"tlfi~s H\:Jf thQ p>irm:{ ctit,~:rt;(IlH. h~",~ D~pn met COf;c~;mj"ig CiYlstructLonand rigllh. 1..$1.... JO,lll:" "~(' \\ ...) . .,.~;\~.V,/tllt.', C:rainas'~ :)l~trlcll1i 1"t:,( o1>n"!y;hgas"0 .::on~uu\.:1.IOl"'1 method:; Of iJ'Ihterl~;fl '''';\l.!Sdi ,t,1i t"'.i!' "MtJOMrbidtji of ~["\g;r'lH::r l:1.tlJ devek)per, Sll'!I;~i.1Yf LAKl: W'ORTr-i D~AINACr DlSTt<lCT P~WICk h. Martin, fI.E. CH~tf\ei Erlg.ingei " /.,I,A:r: :(~t Cl~'v ;;;1 "ol'M~m ~e~!..:;h r;n81M"r~..;~ :;*pA~i'I"!"~"Ii ~-\<'~" <~t~ fQ'i "fJlV"!r-!t~!t'i. Mifl~3f.H~ ~:~\;~rO~" ;: ;'1 ".. ,.,;'",' ) fl'__!-." ""'l"'f "",f.'R-,''''hr ,''''I')li 1""A."l:;'~..tj~ tVti.w!;,.,J1 ~..~~.Hi;, ',I.;)1Ptr\..l"""1 l\."'.rlifo" ~r-... ....0 (\v ;; L~ "f__.' 1~Hi::t~'t, ~. J>;~'" 'M~~A1 C;;~~-'- r--_.22ZdL... flt>st"i~.. I'M brs.nd ta:< '..mn~.mif!afi~)ar'lo. Th7', : *~t ;:l.GliI~ ~.' ; l'M""~~'~-_.~--"---r;'-7"-' -- ,'~;, .~. ." ,I'MI , . : /"7.." '.. """;.r~ 0..'",. ,'-:""!".:.? /' /"~e ' 1';':;'''.'-' .L.:.!.!...' ...~ ' .., ;'(';.~..:_~""~--.. l~'~" .pO'-? " , ("~, lilt" ~"t '. ,off , ~"~~~~:~_'~~J.':f/J(:1... " p /fi'~~:..,____; ,r:;;~~. ......:;t/.." ,~1iO,~~~ t'j .~..~. - I . r- .t2!J. v: . ,...1 " ..........! 11"'........... i('.~;:aJL..._--....-L....-... .~,~~~ ; '.'. . ~>l: oil . ,.", 11=1l<" , : v" .......~."____~"'...,,_g,,........-.-._........---..\-. ___.'_~"___. .___._.~,..--''''''R, ......-...1. r . ! ( I. " :,\ -- (',.\ () .,........... ..-.,,"'-"'-'---~ \.~w... R f\~ ~-1--~ \~ F.~\\; f"". \!; ,',~1,p,,,~~!,,,c,,-,"~.;,'..-r<-,,_:""'.~""-"'''''.,v<~-''''''''''~ ~ \ i, '~ 11tl ~"-.,.....~,. \:':,. , . .<. I \~ p\'. \.I!\C)? 8 ' :',11 tf 1,\"'/'."" -.- 'l, I' ~t> .'~~::! ~ J. ~'I ~ ~:. f L.f):'l\' ;~< t~~:)~=';~:( TEL. t ..j(J: .:::.;,c-t~"_':~':,Ef'3'-'::~':~9~'1 ,=t7}".:f? P02 1E~ N 2C7-49~-ge~4 I,~t~f' 2:3 --: 10 ~ 1'~ ~~o. CU~ ~. C!. ~~\'"" l(~! '{ l::'1 ~~ _ J:l ;~.~"ti Qr t ;;,,~!.j SI'\,", 'j 1 ')tN/, F<J';J. :K!'!,YPha ,; & N';'.i:ill'\, ! n( . ~2J1 8s'~aj~~~ '~~G4d W~~.: ~B1r B?~~~~ r~_ 3~t)~ ~".~VIII r"'::::-. c. ,...,,).., w..~..r U,'\\ ~;; D1IlI ~ . \))rJM l. W!lI1Nl)rih ~il ~rfIi"'II\~~ t. ' ..'~~.'~' Wll\~lil! ~' "1Il11~"1I' ~~." ."'.. ..~. ll~.." , . l' ,.' "'~ ..'" I /lM"""'i' r\ 17.D'-'~~' /1 ~r::~;;;' r 1)\, r'l j II r~ @~ n; r"l19>4~\i'J ~ Mil I j'! l;;.:!",. li2I' 1/, U .... .... l..:';J ...:;;l iJ I i......l ,<~\Id l,Jjr:'lfll'i')... ~:!~*,niAOHi' ~!~"r~!t~'r .'!s.;;.;"'l, _iff' 'r.... .......~~....~;\. 'l=...~..'I....ir\_,,,....~...,...,',; """J,I'~_,,I'".__~-~ '-''Iow--''~ti.." -,,-< ,.Jo".tl 'l4lt,.i'(,dh'riO.,,.,!. :[,.111;"( P~:!iAC", ~l..iJF;i!)A !l;;.ill>.i ';v(ii) ; j, 1 gg~ :)~" r ;"k t, J a:. i.. :'. ,. r' ; '~'..lt "e~ t , ~~DG ,;'e(i~'t #92-2C3DCj'R~Olf Kn~th Ro~d.!Woo~b~~~ght Rnad :nterse~tinn 8~d C~l~~ 1, Cmr~l ~-261 SMA Jub #920~7 ~~~. r:~'i_.;~ .t{~?"~~';i'E;i.: tne cn/f~~ ~1{.ti,;rl i)~sr~~ fer the tibOYt~; tatQ~"f',rIC~'-' pYI;),jett ltld dc ;F,~l t: l',e"'.!:.I,)' :!<;,';n)'.[~ ni' tni"'ti, of:J\" ~>JI'~it:.!.1C':'U' .:" OJ,' :li~....'dcj.' ~'tea ~'Je.j&ct t~ the (:~low~nQ (o~a1l1o~!- < / .'" ;~" tr'It' ~1iM "1' iq.;;""it'J1t.jo';{l1 ~ b""PGf'lrrl;t.~~ \,"~' ;-,e r~::j.ih~<lo~ on ~hl!1 top cf H.e h: ..~'r: ',.~" ~ ;,,, ~ ~ 1"~;;'" 'J t.~;.. )' .d trf-~=t;;-'~;'~" ~ ~ ~.~" '- ,: 1 '";~ "'1 ~=>'F.I ,- ,(,';' , '''fJ-\,l,-, \..I"!of-,l-j'\'f 1'~1.....~l~'N_'.I')" ~" f C", '1..,1 ....' ~,,,.....~. ~;~_:", ~~..~::=-~ f!,tl ~,/~{I'I,..l t'l :" ~o. ~".j" ""~ ~lC'J<n .~ ;,,":.11i';~j ~.}. ,4ot" i....... -: "'f ',>:"~ t' ~. ~'r, .~ t," 110 n \'''~ r!'i 1 (~~ 1 ('\:,... I ..". ~ j!.' ~.~ irt::...; (",'r t ~ ~),..;~ 1I '-iI' ~ 1ri ';; I "'j. '..... .,,},~... t~. ~ J t'v ! \, ~ ..; 't? ~,o, ..I : j:;~;rl{i~1~~~~!'~ ~n',here dis'curlJtid ~.'i 1:"tJrH~tr!,.ict1Cq<~ act~~'J11.Y, t)e t tn hU'r:1Ht{;;' \1' " i ~er:;::rn~'lJct ;.;.\~ndl :~) to iwprOV.S\1 cftS'lg:; sect1cri o1cmg r"\J:W;: t: ~ ,'[ mn;:' l~ n.,; 'lILH ng :~ 1 el.! 't i rg 5 nd ;)r:)i;iS v ~ ~ ~!p t 'ie 01' tM m~ 1 nter.an Cf~ :;I!I";'l~., .ht: [:hiffN:f\.1:arnl .~eri11S .:H\d S'r}~ S;:X~5 Srlf,.n be sta~iUted. TYPE: I':'; ~':(<,i:,!' !n~1t}n 'f';!:::l}1 bE) "'r.,~,tOlM by i.~,~1C;. lr.ls e:enstr'\,u:tIcr'! g.han be r:.~~;':~p 'h1~,,1 ,r; pr '( V" 'to <J r / 0~ n dl i".iJ de t 1'; " tl ') oj ldi" t t(l L WDO r 1I1r.ts. of 'I>~Y/ !J,!~~tH'i~Il'~f, v i i. ;"C(!.1i.n,;:;.~ \-;n~ ()!'l'U:'\', al',{ .Hi:; an ~;H'(nH,(;. nl"".h'~;j b:'1 f:lERjt\n!'lj' eN'po;. ,,:f ~'I'~I'I'r.'it':L'" fC.':": 'i". ii~1"', r;'~;ljf'''. :"""':".' \i",'jf~(."'''y. 'l.'nJ"~CJ"'I.i-\f ti-,.t ""." I,'" '~"".'''~ :'1 J., ~1I!'lf ~.""'...~. ...~ ,II" l..,:T'".-","--t' 'W"."....'I.....J ~.;~""., ,..J ~ft ,\.Ji 1""'.,-'9'1 '-.;- fIg. 13lrJ-.)" f:..fi i11VC'~\ ,~*d p'''"~:;r~ 't~~ t'!!{;: c1j'~'mne~.c:ir\~i cr an)-- ";;o;~~t,J'.~,~j:tion:o ',~'i'rr,')t~~;,~ ',d; I t(tk,~ ~l'i fNSr.I:-,(j!tfl;:,j ':i,t,H~a:.,;t1];;:;'i$: l1li't&!:.H.t'y to pl"e\l~nt "("'b".;".", F;~. "'..~t~\.(, lJi'p'("'':.'''~'l '''11' d.:,y,:I;<::..~-t1'l" Ciu"'n'i ~O"'r'I+~"'t'tfon iO~' '; ~a. ".,' .t,' " ,.'" r '. 'f:;I r JJ'i I, 'lJl'......~. \-,. -P ''!: ...< , "t, .. \ '- ......,,1_1 ,\, ~1 \..-" .~..c.., .-l . ." ~ < :'\ ;'jfH'7';'';,',~'.,:' 0" "~pn;;'~F,tHiv$j ,,1111 ~;(/'U;.Cl: t!1.Q U~C[ tn~p~r.::tHm Deplrt~i~l'It to 5:ke3J:e 1~irec:iGGa at lQlit t~ h~u~' i~ ~d~3"CI FBt1ure to do [0 may '"'i:$i.\Jt ~;'\ ['rdw.:tlnr e'f -c!",,, ,!,!Qt".{ ",nt"1;ls'Jdi ifl'fr,Ht~Oft c:~n bel ~'ifld~ whfH'e ti.:')::H,:;r,\;...., 'j:',C!I!,:,,:}rC1..i',d 1:*lstal1i.it'lc!:;, (I!:J~'t be> lJrco\lel'~d tor insr.ll!!r.t';on. . ~1I~~_._._._,..-__._,_...<;~.t.,,,~,_,,,,,,,,,~,,,,,._-,,,,,,_,,,"'~4 ...vJ~""""'--._"""""'-~"'~'- <~I , ! y.'~iY..; ,q, ", >.;- I'.'; 1 'I, I' ."., ",',~" .' .....!. ..'. > {i". ..... t I::O'i .. tit! .' .~i1!:. ,1.\.0. 3"r:rr. ~ T.a,..~.. Li ,.,; e,\'" H,g:., W l,r1 H' S. K~,Y .,Y , \ll!\)'ll d ;"~tr.~ t'>: i ns f I n~ 1 :~ l~,pr;; if,~ I. J, Tr.s !,.'l~.j~ \{o':;.n tF~:i-,e:;i'S ~d~'.;rh;:t r{il1 ,';('it aec:ept. any 'f/~tf:r- f~~Clm dew;lttll"ll'l9 flHt':;~. C;,', .;;:; Gfrsit,:,},';t.n \<'\:l'"Ht~"l ,,,'~H'i{;Jt1orl ~'if app\"tJl./&": 'f-'t'Ofl; s.r.,W.M,l:>" ~~.,~~ LH:,~r, i~}~~r"'r t.'t~d t;~- 't~!'i ~~ ;:1ffftf,:, '~ .' (~! (J ( 1 ' ", i)i~aw ~i.~~? f"l~~1 r~:..I-,.t'Ir. ;.~~~ ~~.l~~'" . ~1\tI!-'ie" ~~i! ~~~*, Fj_~Hr~ a.;l~:n 7:1i~;J.3~\~ f Uil;l. tJ':''') .flio-fiiJ1'J:. '~~{',l_..;..:'....' ;..'/-'-1 .. t,... ~.i.i' _::7 .II,: '..l~,~:~::',.; :;.~; t:t;"_/:-L"_. n:'.. I ".jC ~ ...,~C(;.'-\:-,el;!~~,;!::l'~~:: t:r.::icJ7 P(;3:~ TEL t. ( 7'." !,;?, ~} " 96 9 4 ~!~ 2P -; 10:19 No.aO! P.O' ~^I\.!.' ^,,'ll"";'" lI!'.iI ~i\':'\~ "!il:i'n;t,~'1 ';~I'(,Hhe has Pfo\,~<1';:d ~ b~M :12~~ of :he (~ost Of ~h~ ;lipa a i'~A'~d unon 15S~.nce of fjns ~ V t-d'r'r~ ~; ~.~,~ ~ 0 f I:" ee C:q'.~) J~ r!. \'1 i r,:s S J! n favvr Df LWCO in thB emou~t C! d Hs instfll1HiDr;, BOI'lC ....nl I)~ ~IH;;e:;t1(';.!'! by LWei) UC d8\1e:opc'r t\) ;.. !~DD II ;: I ;"m'~t,g &g~'e1 t~a: !ion1f!c~n: CQ~str~ct1on Qust Start w~th!n "t' ",,,..' (of 'I''''a .";"Yt.,.( -)""'.....,'''i ...:~j~"r'" "r' ~~l ~r'mi+ \'f"l~1 ~)'H'O':' ,\,. \1~Ci .'~ ~~......4- v-' l ~J.iJ ill ~,,~...,-,,""l'...Q... (,' ">01" to<' r'" J lla" cid a~d ! ~I~ .,p!!c!t1)n ~uSt ts aD~1~ec r or to b~y ~1~~!tru~t10r ~:1.i\~tj or ~11'. . ::~ :;~"I\"Hl;:'~1 :US1~":'; ':j' ;;'\i(ccHQrs iF] tH:a ~\~\~ ':'lpei'a~,; ,; .'.~~. ''1'': ~ rta '; (. ~ ",e :1';' ~ n~~.;: 11; 5ten. .; r- ':;e>pc': (..1 i;,y, ~~., "\~ \. " " '~ " r.:c/..." ",.I.,. d-I,..,,., ..'f "1'..1 h, 'H"\{;.:;''''.~rl''''~ ,.,.f <''-''i, fl.f''''l'l''t. i....J...i ....,. tl.<,,,, ,'..)r\!'l ..., .....~. Y..~ ~,.. oil IY~ I,"" ,I -!o1;1n "'I ....',!\.o.J( '''t:"I...,,. ~, ..! '.. r'~' ~ t . f.....:Ji .!.J ".l"lt".;' Lon\J"" ~ \1,,:~: "i'\d!~r~ ';:'\11:.:' ;!!gre\:'~ t(; p;:!, ftH""" :::;e ,;,blJ\1f' H.t) T.,n.t.Mt !~"'UE. ~o "'bid :: \',,~. .. ;,)~.'~ j ts ~ r:J' ," t} cl rj 1;\",10 11~ i ee!' \oj r~ t'l\'1't ~e S;I) f' I) nt da'I'6 9<1' W)"al'~ t i l) g 0\ !,.,: ('J ~.,-:O~ 1"~1"I~ ".r.'"., ti'\\~ (j~:",,1"'"~" !".,(....jCI """p;'.,,\) ..~ I,' .", g \l'I "I, j ':;j 1 \I;' I ..; I.. rr'" i -'.. ~.. ..~.. . ~,~. -' ... , I; ,'" :..ir',.J'\"i,.f J-'C'.lI ! k t. ""t Ill, rJ f I~-r 'tt'~ ,".l r, ~ 1'\ ~ I ' f\)lf." 1~;Jt!.\..h_, <C' ". * r\ li. w- \' ~",. ,/ pT. ... y/ // ...~ ,~~.,~ I ./'~~ '.: ." ,~~ "tJ~.-" ..1.... . ~- . ,..........~~:=t;"'"-_.,~,.L~~~_. !tt,/' ..~:t."r f..' I ... .(". .r,~~~... I ' ~\ I,~ ; ! , it ~ l~l ~? t; t e t S ,.r~;i!~'rr~-~"----~~~'-'--'~_.'-'-' .~~di.- A u.! ~ .. !'i(~1,- ~~. .~ ''.!:;/.fl_ 'l'!dtfi')~ :; I. i l\liNt R i~M""f ,'. ~ ~'1I.t. 1 '.Ai: 1..1 .lto:, tit ~, I'k',' 1 J ,-. ..... ' ~ . '". t.. (Please )~1nt or t)pe.rarnQ !i1'c"g '~.:ith $1S!'\Huf'Gi '~jJ ;.hP'i1;<t is. lHui':d 'r ,~"pH:,n~, r:f:a.~;: ;;'19'-' \:loth c;opHrs tinct retI.H"! ~o~h ~.~'ii CQ L~)D fsr !lg~5t~~~. '~e perm1! ~& v4'~d on'y ftfte. beti ~. ~t ~ :) \? ;:"1'11 tr ~ ~ ~ ~ r; ,;, ~l~; ~~1l11 t \ E r:. :f l ~ 'I (: s. i ~:i e 1 . .'.1" . .......' . K.n S. Rcuijrs. ~.t.. Olr~ct~r r I. t:. . Pb~ LanG ~t\flnpment ~6 i'l~;(.it'HItC ,.,... .l~~!" ~ )1" i'\. ; ., ~ ; r ~~'J if. / i.j\ \~ (t. l ~;,L n GEE Be JENSON Engineers-Architects-Planners. Inc. One Harvard Circle West Palm Beach. FL 33409 Telephone (407) 683-3301 Fax (407) 686-7446 May 4, 1993 Erico Rossi, PE Rossi & Malavasi Engineers 580 Village Boulevard Suite 140 West Palm Beach, FL 33409 Re: Knuth Road Tara Oaks P.U.D. Church Access Portion Dear Ric: Of the three (3) sects of Construction Plans you recently sent to my office, two (2) were of the previous layout with the retention pond still located in the Knuth Road right-of-way. I I have r~turned both sets to you with this letter. Please forward two (2) up-to-date, signed and sealed sets of the Construction Plans to my attention, along with a copy of the executed Water Management Tract documents for this project. All of the other comments from my April 9th letter have been satisfied. , IC;~~~ W. Rich rd Staudinger, P.E. City Engineer -.'~ RECElVED~ .. WRSfJer cc: Vincent Finizio Chris Cutro Mike Sewell J. Scott Miller MAY 5 PLANNING DEPT. ... 92025/207 11111 Mf"'~M 0, hI\Ie, W.~ K.rlWl 0.11 Jvhf'l l.~ In ....""""...... WIIIn ca. WImM 0& -~.. AilIfWt L ~ AItttNf p.", I tchoM. , A. iAKI WOATH ORAINAOI D,.'tFUCT Uo.i MI&.ITAftY "~^'l. OILMV .'''OM, n.OPlIDA IO~M April 14, 1993 Mr, Enrt<::o ROlli, P. E. Ro"i Be Matavasl, lnc. 580 VlUlge Blvd., SuIte 140 West Palm BtlCh, FL 33409.'904 Oear ;Mr. ROllI: SubJeth ~ eeeptance Letter for L W~rmlt N93'2030IllC.01. Knuth f1t;:d.2...lvert Cl'~ning of l-26 LaKe Worth Orainage District has completed a final inspection of the above named facility and does hereby approve the installation, Lake Wortn Drainage DIstrict also certlnes that th~ permit conditions have been met concerning construction and rlghts- of-way. lake Worth Drainage DIstrict Is not certifying as to cOI"1$tructlo1"l metnod, or mat.r1AI~ used, thl5 is the reSpOn&ibillty of engineer and permi\t.... Sincerely, LAKE WORTH DRA'NAGE DISTRICT' Patrick A. M.rtln, P.E. DIstrict Engin.~r PAM:mm t~: City of Boynton Seaeh Engln.c'/dt~g Department William a. Winters, Manlier, LWDD Shaughn J. Webb, Chl,f Inspector, l woo ~p.I" " Oc-~.Y D.~ . eoo. ~oton .OH~ · Stl)'l'ItOn fMctlt WOtl ,.I./m B..~1l 7~,.)t!G . ,^X ("01> .".'11'4 \: J ",' . L ,...,L\... ~~ i- C"'" ,i t~,-. ',. n GEE & JENSON Engineers.ArcI11Iecls.Planners. Inc . April 9, 1993 One Harvard Circle West Palrn Beach, FL 33409 Telephone (407) 683.3301 Fax (407)686.7446 Mr Enrico Rossi Rossi & Malavasi Engineers 580 Village Boulevard Suite 140 West Palm Beach, FL 33409 Re: Knuth Road - Tara Oaks P.U.D. Construction Plans Dear Mr. Rossi: Gee & Jenson has reviewed the revised construction plans submitted by Rossi & Malavasi for the extension of Knuth Road adjacent to the Tara Oaks P.U.D. This portion of the roadway construction is covered by a prior-to-platting agreement with the City. Our comments are noted below: 1. The plans call for FOOT Index 232 Type C & E inlets without sumps. The inlet detail on the plan must include sumps. 2. Add a weep hole to the proposed sump in the control structure (S-3). 3. Eight foot bike path is approved on one side of the road to match existing alignment north of Tara Oaks (Stone Haven). 4. Driveway concrete must be 6- thick with 10 gauge 6- x 6- wire mesh. Add to detail. 5. Transition curb & gutter to 0- high curb so as to prevent traffic hazard. 6. Water management tract must be dedicated by separate instrument or platted to provide legal access from the roadway for maintenance. RO" "t'" ...." , .oCt.., Fr::,. ,', ----.." r' n_:'. AFR 1.1 PU.NNli~G C<:.~ 1-, - ---- . fI n Rossi & Malavasi Attn: Mr. Enrico Rossi April 9, 1993 - Page 2 7. Drainage calculations were not submitted with these plans. We have assumed that nothing associated with the drainage system was modified by the revisions to these plans. The excavation & fill permit for this construction was approved by the City Commission on 4/8/93. Please coordinate a preconstruction meeting with the Engineering Department prior to initiating any construction beyond the clearing presently underway north of the canal. Very truly yours, WRS/lg 92025/207 cc: Mike Sewell Vince Finizio J. Scott Miller Chris Cutro / GEE & JENSON Ei,lgineers- Archilects- PlannerS. Inc January 18, 1993 Mr. Ric Rossi Rossi & Malavasi Engineers 580 Village Boulevard Suite 140 West Palm Beach, FL 33409 Re: Knuth Road to Tara Oaks Church Dear Ric: Enclosed please find one executed original each, of the Prior to Platting contracts for the extension of Knuth Road to the Tara Oaks Church site. As noted in the cover letter, the City Commission approved these contracts by Resolutions #R93-04 and R93-05 at the January 5, 1993 Commission meeting. In accordance with Appendix C of the Code of Ordinances, you are to report in writing monthly on the status of these projects. All construction is to meet City requirements, including completion and certification of construction. Please call if you have any questions on this matter. Ve.ry truly Yours, Gee & Jenson Engineers-Arc' ts-Planners, Inc. . i ar tfu~A City Engineer ...... . ~ WRS/bf ..- EncL 92-025/207 cc: Vince Finizio w / encL J. Scott Miller Chris Cutro Don Jaeger James Cherof n -or r-':: :~~ ~ -~ \ l'-..J: '.,-,,~.:__.. t .......- JM{ i 9 FL\NNH'iG. :-:-:::. ----- .., One Harvard Circle. West Palm Beach, Florida 33409-1923.407/683-3301 . FAX 407/686-7446 %e City of r.Boynton r.Beacli /~ /201. .PCi ..J Pfa.nning &' Zening 'Department 100 'E. '.Boynton 'Beadi 'Boulevard P.O. '.Bo{.31O 'Boynton 'BelU.h, 'Jforida 33425.0310 (407) 738.7490, :T.'<<: (407) 738.7459 June 29, 1992 Mr. Kieran J. Kilday Kilday & Associates 1551 Forum Place, Bldg. 100A West Palm Beach, FL 33401 Dear Kieran: This is to inform you that on June 16, 1992 the City Commission approved your request to extend expiration dates of the Knuth Road PCD, Boynton Beach PCD and Tara Oaks PUD for one year. This means that the plats for these developments must be approved by June 17, 1993. If you are in need of further extensions, your request should be addressed to this office no later than May 17, 1993. I hope this letter is of some help to you. If you should have any questions regarding this matter, please feel free to call me. Yours truly, ~~ Christopher Cutro Planning & Zoning Director CC/jm 5Imerica's qateway to tfie qulfstream - -t .rzTU City of . r.Boynton 13eac/i 100 'E. 'Boynton 'Becu/i 'Bou1e.vara P.O. 'Bo;(310 'Boynton 'Beadi, '.fforitia 33435-0310 City:Jfo.{[: (407) 734-8111 '.f5tX: (407) 738-7459 THE CITY ENGINEER June 19, 1992 Rossi & Malavasi Engineers, Inc. 580 Village Boulevard, Suite 140 West Palm Beach, Fl 33425 Attention: Enrico Rossi, P.E. Re: Knuth Road Improvement Tara Oaks, P.U.O. Land Development Permit Application RECEIVED JUN 1 9 1992 Dear Mrl' Rossi: Approval of the partial Knuth Road improvements, required by the Tara Oaks P.U.D., was given by City Commission at their June 2, 1992 City Commission meeting. Prior to beginning work, a land development permit must be issued by this department. To this effect, please submit the following information. 1) Six sets of construction plans, rectified according to staff comments and signed and sealed by the Engineer of Record. 2) All permits, including but not limited to: SFWMD, LWDD and Palm Beach County Roadway. 3) Non-refundable administrative fee in the amount of $2,219.24 (.02 x $110,962). 4) Florida Power & Light cost estimate for the installation of street lighting, along with a non-refundable street lighting fee in the amount of 125% of the street lighting cost. 5) Performance Bond in the amount of $122,058.20 (1.1 x $110,962) . 6) If the present applicant plans to sell the property or assign the rights of this approval in any way, the City will need a letter of assignment transferring all rights and accepting all conditions of the original approval. . 7) A statement from the owner agreeing to the dedication of the right-of-way, including time and method of such dedication. Jlmenca's gateway to tfie (ju[fttream .. ~. Rossi & Ma1avasi Engineers, Inc. June 19, 1992 Page #2 If we can be of any further assistance please contact this office at 738-7487. Very truly yours, CITY. OF BOYNTON BEACH, FLORIDA /'~)?- " Michae1~azunas, P.E. City Engineer MEK/ck cc: J. Scott Miller, City Manager Chris Cutro, Planning & Zoning Director I,IIIMJ.II '-- JCM I. WtlI!WOrfl In .....,."..,.. W1111n ca. WIn"" ........ ...,..., AIftrG .. ~IWI M1mIY Ptfft & 1ef'tCnt. P)I, LAKE WORTH CAAINAClE DISTRICT 1301' MILITAAY rAAlL l)1~AV llACH, ~I.ORlgA >>4104 June 11 t 1992 Mr. Keith B. Jackson, P.E. Sha11oway, Fay, Rayman & Newel', Inc. 1201 Belvedere Road W8S~ Palm Beach, F~ 3~405 . Dear Mr. Jackson: LWDD Permit #92-2030C/R.Ol, Knuth Road/Woo1br1ght Road Intersection and Culvert, Canal L-26, SHA Job *92037 We have reviewed the construction plans for the above referenced proj!ct and do and do Mereby approve of them for construction in our service area subject to the following conditions: ( X) At the time of insta'1at1on a benchmark will be required on the top of the water control structure(s) with tn. elevation clearly daf1ned. Subject: ( X ) ( X ) ( X ) ( X ) ( X ) x x ) Permittee wi" restore r1ght-of.way to its original or better condition where disturbed by construction activity. Permittee will reconstruct canal(s) to approveddes1gn section along projects 'i~its, including clearing and proper Sloping of the maintenance berms. The cle~red canal berms and side slopes shall be stabilized. Type of stabilization shall be approved by LWDD. This construct1on shall be completed prior to any bu1ld1ng activity adjacent to ~WDO rights of way/easements. Perm,ttee will obtain any and a" permits required by OER/Army Corps of Eng1neers, S.F.W.M.D.. Palm Beach County and/or any municipality that may be involved prior to the ~nmmenc1ng of any construction. Permittee will take al' reasonable precautions necessary to prevent turbidity or si1tfng upstream and downstream during construction. Permittee or representative wil' contact the lWDO Insp~ct1on Department to Schedu1e inspections at least 48 nours in advance. Failure to do so may result in rejection of the work until visual inspection can be mads where applicabla, Underground installations must be uncovered for insgection. Permittee must subm1t "record drawings" witMn sixty (50") days of receiving final approval. The Lake Worth Drainage District w1il not acc!pt any water from dewatering either on or offs1te unti1 written notification of approval from S.F.W.M.D. has been submitted to this office. (1) O~rIY aM'" . Doc. Fu.1Ot'l 'IM-S3a . eoyn~n fJtlct11 Will PJ/m It. TU.NU · flAK {~1l "'K-fH.4 gOd:. 0 N JI Z. y ^ Y "1 V H "Y :z S 1!I 0 H >I< MV L. E:: : l. 0 ~ e . Ii: e . 9 0 -- ,._---_.._----_._-~--._._,._-...- ----..--------------...---.--- .~ .. ( ) Perm~ae hu-'ovidod a bond in favOF of LWOO in tha amount. 110% . the co"" of the pip, and its 'sta"~~')n. Bond wi1i '.'; re1eosed upon ;S1uance of fino' inspection by ~wDO and davelop~r submittal of IIrtCord draw1ngsll to loWDD. P8rmittee ogrees that si~n1ficant construction must start withir onl year of the. date of permit 1uu~nc! or tnis pllrmit w11' b"ccl/ void and I new application must be applied for prior to any construction activity on lite. The Permittee, assigns. ~r 5~cceS50rs in title agree to opar8t~ and maintain the arainage system in perpetuity. ( X ) x ( ) In r.ons1dp.r~t1on of an~ hj ar.c~ptante or thp permit i~~u~d by the LWDC. thl! undersigned agree5 to f'!p.r'Orll\ the iibOVl! (.r,d further agrees to hoh tl1e ~WOD, its sgen ts ~nd ~mp 1 oyee! ha rm1 e!S ;0.,. any damage emana t 1 n~ '; t of. ~r resulting from th~ perm1~ her~,n 9ran~td. LAKE WORTH DRAINAGE DISTRICT William Go Winters 'PERMITtER v W R (Please print or type name .along with signature) By: , . ThiS permit is 1ssued in dllplicate, Please sign both cop1es 4nd l'etli,': both Gopies to LWDO for signature. ihe permit 1$ vAlid on'} ~fter ~O.: the permitt,r and p~rm1ttee hove signed, cc: Ken S. Rogers. P.E.. Director PBe Lan~ Oevtlopment Ed Mac.:1ejko ~FWMD, ( 2) " Sad ON. :t1!ll'Y^V'"1VW .., z..OY*, ~v"-c I,LO ze 'I!::Z '90 iJJie City oj'. r.Boynton r.Beacli 'l!ftuming c!J' Zonine q;tp~nt 100 ~ t.Boynton t.Btadt tJ30uUvarrf P.O. tJ3~31O t.Boynttm t.Bta&, '}1orilfa 33425.0310 (407) 7.38-7490, 7JU; (407) 738.7459 June 12, 1992 Mr. Rick Rossi Rossi & Malvasi 1675 Palm Beach Lakes Boulevard Suite 408 West Palm Beach, FL 33401 Re: Tara Oaks Infrastructure Improvements Dear Mr. Rossi: Please be advised that at the June 2, 1992, meeting of the City Commission your request to construct a portion of Knuth Road at the south end of the Tara Oaks P.U.D. was approved. A land development permit is required prior to commencement of construction. Contact the City Engineer at (407) 738-7487 for detalls related to this permit. We hope that this letter is of some help to you. If you should have any questions regardlng this request, please feel free to call me. Yours truly, ~~ Chrlstopher Cutro Plannlng and Zoning Director CC:ald xc: ,Michael Schroeder C:TARAOAK.ALD _~__"__.."____..__~"____~tJ_~.c,...Cl....~_..__-,-~~ .J .=......1.,"-.... ~.._ '" ..~.. ....L~.._,._~._ ,'," titu City of - $oynton $eatfi u - 33$.4 100 'E. 'Boynton '&tuft. 'Boufevara P. O. 'lJo{.31O 'Boynton 'Beadt., '7forida 33425-0310 {407} 738.7490 , :FJtX: (407) 738.7459 Pf.anning'Department, City:Jfa[[ CompU{. 'West 'J1/ing June 5, 1991 Mr. Chuck Yannette Kilday & Associates 1551 Forum Place, Suite lOOA West Palm Beach, Florida 33401 RE: Capitol Professional Center PCD Dear Mr. Yannette: Please be advised that on Tuesday, June 4, 1991, the City Commission extended the PCD zoning and master plan approval of the Capitol professional Center peD indefinitely. The Capitol Professional Center peD is located at the southeast corner of Old Boynton Road and Knuth Road and consists of two 33,000 square foot general office buildings for a total of 66,000 square feet. It should be noted that pursuant to the City's Concurrency Management Ordinance (Ord. No. 90-18), the Capitol Professional Center PCD is not exempt from the concurrency requirements. Thus, the project will be reviewed for compliance with the drainage and traffic level of service standards when a site plan and/or plat approval is applied for. You-are being notified because Kilday & Associates is the last agent of record for the abbve-mentioned project. If you have any questions please do not hesitate to contact our office at 738-7490. Very Truly Yours, ,.)u--~. (' \. f, /-....-, ,-- ..."'~ ----- ......... ""~ CHRISTOPHER CUTRO, AICP Planning Director Attachment cc: subject file chron. file central file a: capitol.3jcurrent 5hnema's gateway tc ~8R.,IJ W~J 1iI~ 4trAC{/#> r. ~Ll>i'Y j,Vrm 11. <. J!3 fY'I j ,"(!:u f) t:t?t/~s. .-X/ S 10.,.) ,.. ..LA '(" bi- reAl p~--;c.r' rrtA.. -f;1rl. ' (l..(1lf .J1~ l~ r. , t. All'-':.,h. ,.),' /" JPV' I d7/" - v t,,,sft.l('ltD I. ~ W,< 1"'- ./ fL:. Jl ~ /j Y \JJV~tiJJ-r1lV , I .. '-'" KNUTH ROAD . . '\ - i ;a S .. '00 I U I 10 I =1 .b :z: ~,. 3:' fa I~ .. III. .. !O I :s i ,.'" g-4 r: zi -. ' g-C i t I : . i .. " : ~ C/) i 0 , > . I"" I m - .. I . i Co> ~ ~9. :D . ~ . !~i!! ;~ J ~ .. :-:. i .J~I '.1~ J-i I:~ -. mm i:,- !fi .' -z J ~~ . , 11 i (t f r:..J; ~~.~ ~~B t.' w m ~H I- . , ! , f o if fH 'l =l H hi l! !! ~. &:1 r: r_ ~I fil; i! H , p. h ti .. 1 -;: j'r 'r1 , o . -.- 1 . l ill; I. l! '''It;l'' ! ~i Ei it 5 J ; i i ~ .1 I J Et f i i; ! ~ : I' i ~; l; I r ! ~r ; t t. f r ~f i I f :j ~ ~ i~ j I i I ..,...,ou.. ".,..1,' "~.u' .t Jr'I'.. II ~" !I If :s ... i - 1:1 N 1:1 1:1 '7101 =.. ;c m 0 > > I""C :l.!:. 1:1 :D Z ::D I: C) ::DO- q~ g] < ;:0; ~ ;:0;01"" Z 0 III III -::DO ;; Ii < <5 Z g z Z Z c:> ~ n .. i; t - <5 C c:> > :II c:>>c:> C/) ~ ~ ~: Ii 5i 1:1 I"" ,. ,. ::D ::D '" >. ::D I m m I"" -. II - 0 ~i 5 i > ::D 0 .. ... 0>8 m < 0 ... CI"" ..;' n ::u > 6 0 n j;O::D !i I ~ 0 .. m ... I a~> 0 '" u ;.. . > ::D :' 0 ::Dm 0 ':!> i 0 i .. ::D ;.. > j :f '0 CD CD I\J ~ b ~ ~ - 0 0 0 .. . -0 CD Co> 1:1 0 0 PC/) co- O (I) (I) In ... .. ~~ 0 :v :v ;W ;W ~=" ". I . . ". . . ii . . _w ':; '0 I"" o 01 o -< z ~ o Z ::D o > o -f o -f > I"" ,... o -f > ::D m > 1I~!! I ,:'l~ i jHh' iim' .;5 - . ~ii~ 1~!5 ,.111 i;~l _:i~ "1'1 . . - I "- II ! , . ~ 1:- ~c ~~ . II >> t' 1I w Q . > o . . CJ) =i m c > -4 > :;: j; ., s.c.... ,." ~n' 0.... b 1" ""~ c..- a,._ --.OA"'" '-1liiie, ",.... 0.--..... A.I.-.t... it~:.:>~ CAPITOL PROFESSIONAL CENTER BOYNTON BEACH, ROAlD" MASTER PLAN KllNy . Auoc",,, lAnd6C"" AtcMKtS I ~ '""~""-c:e ..... :I0OI _,_ -. _ J3401 13061 .. un PLANNING DEPARTMENT MEMORANDUM NO.~ 91-094 FROM: J. Scott Miller, city Manager J~a.2k-,.~ dt.~4 Christoj;fhe"'fGCuti-'o, Planning If'il:'ector TO: DATE: May 22, 1991 RE: Status of 'capitol Professional Center PCD - City Commission Recommendation . . Pursuant to section 9.C.13 of Appendix A-Zoning, the City Commission shall review any rezoning approval to a planned zoning district (PUD, PID, PCD) that has expired and take action in accordance with paragraphs a. of b. below: "a. The city commission may extend the zoning of the property for a period of one (1) year or more, or may extend the zoning of the property indefinitely. If development of the property' in manner specified above does not occur by the end of said time extension, the city commission may grant additional time extensions or may take action in accordance with paragraph b. below: b. The city commission may instruct the city manager to file an application to a more restrictive zoning district and/or future land use category. The zoning of the property shall be considered to be extended until final adoption of the more restrictive zoning district and/or future land use map use category. 11 The Capitol Professional Center (a.k.a. Knuth Road Associates) Planned Commercial Development (PCD), located at the southwest intersection of Old Boynton Road and Knuth Road originally received a rezoning/master plan approval on September 3, 1986, which subsequently expired on March 3, 1988 (eighteen months). The project received a one-year retroactive time extension from the City Commission on August 16, 1988, which subsequently expired on August 16, 1989. The project consists of two '33,000 square feet office buildings for a total of 66,000 square feet. Pursuant to Section 9.C.13 of Appendix A-Zoning, the Planning Department requests that the Capitol Professional Center PCD be placed on the June 4th, City Commission ag~nda for a . recommendation on the status of the approval. If the approval is r.ot retroactively extended, the City Commission may wish to instruct staff to file a rezoning and/or land use amendment application to a more restrictive zoning category. If the approval is retroactively extended, the City Commission should specify whether the approval is extended indefinitely or for a set period of time. It should be noted that pursuant to the City's Concurrency Eanagement Ordinance (Ord. 90-18), the project is not exempt from the concurrency requirements, regardless of the status of the rezoning/master plan approval. Thus, the project will be reviewed for compliance with the traffic and drainage level of service requirements when a site plan and/or plat approval is applied for. Since the City'S future land use map shows an office commercial land use category for the subject parcel of land, it is recommended that the current rezoning/master plan approval for an office complex remain valid for an indefinite period of time. As previously stated, the impacts generated by the project will be assessed at the site plan and/or platting stage, If you have any questions please contact our office. Ene. cc: subject file chron. file a:capitol.docjcurrent (-- (/ "-'! ~ Soul.n Florida Water Mdnagt.d\ent District ... MllI (JUII CI\l11 AOl\d . P.O. 3l>:\ l!4Ml . Wlttt {'l"lm UVi1c:n, PL. ,"',HfS..t08O · Wl7l n!f'.~f'K) · FL W" T! I ~~.~3i.tt CON 24-05 ,.;i" ..~ ~ ,ft." ~....- \" , ~, ~.:: ....l '; ~ -(' FINAL APPROVED APR 2 9 1992 Rt8ulat1on Oepartment App1ieat1on No. 820417-4 Apr11 29, ~;92 WPS . Boynton Stach City Engineer P.O. Box 310 Boynton B.a~h, FL 33435 Dear S1ra: Subjtct: ~ 50.02876-5 ~111am Winchest.r Project: Knuth Read/Woolbright Road Intersection Location: Palm B.ach County, S30/T45S/R43E A r.~uost for Permit Exemption pursuant to Rul. 40E-4.053, Flor1da Aam1n1.trat1vt Code (F.A.C.) his been ree.~v.d for tht Ibova rtferenced project. The owner has eert1fied that .1' the conditions for the Ixemption have bien or wil' be met upon construction: conseQuently thl Oistr1ct wi" not b! analyzing th. surface water m.nlg.mtnt system. It is th.r.for~ nlcessary that you consider th~s in your rtv1tw of the project. .' .Sincerlly, ~~~~. Kenneth S. Todd, Jr., P.E. $uperv1.ing Prof...1ona' Surface Wattr Management Division KST/ld c: OER W1111am Winch..ter Sha'loway, Foy, Rayman' Newt1', Inc. .,,,,,.'11111/ ''''10,",. 'I.... .\'111,"":" IIMJrl1',11I \\1.11111 .1.IIIWc II "".,11 I "fri..lIt1II'rd.,". 1....lh 'i "",,'h,II' , \\',...., 1'.111" 1\,',1111 rrtl"fI'" ,'".,., f".'\'UII\..lllf\'/""f ,1...",..,.1\, ',.'tf;;!'" \1...1,,, o\N'.''''~'*''''''X'.''YH''''~''''''% tal$6~"* . XVL,'S : L tl :c. 6 '8 Z 'S 0 - - _u .. ... _.. _.. ." _.. _... KatL!H '1'. MHCUIl. ChJlr- Y <':llrulc: Phllllplil, Vl\:c U .f Calrnl ..\. It(,h~rl" (..'61wl J. t:lll\qlll~t ;"I~r\' J\k( 'Ml\' "~'II' rUllh,'l' . .\\.1I1d,' I'llrd I.\'~' " tOo'.l' ,-/.."11 V ''''Q. COLln'l Adm'n'larl -. , r , 119~ April .24, 1992 Robert Wolsmall D..,artm,nt oC Enylronmental Rd5~ Man.Bement Lak, Vorth Dr.in~;. Distriet c/o Mt. Keith Jlck.on Sh.llo~.y, roy, R.yman and Ne~ell, Inc. l~Ol aelv'dtr. Road WeMt Palm B..ch, rL 33405 Dear Mr. Jackson: SUBJECT: EXEMPTION fOR ~AKi WORtH DRAINAGE DISTRICT; nr-218.92 This is cu aCKllowlld;t r.ceipt ot yo~r application to culvert approximately 96 lint~l f'tt of the ~ak, Worth Draiu.ge Di$tridt L-2' oln.l for the ero..ing of Knuth R.oad. At tlli~ ti~G, hO permit i. required pursuant to tho Palm Beach County Wetlands Prct.ctiou Ordinance, Sttctioll 11.01 (u). This d..terlllinatiol\ is basl!d solely upon tht infurrult1~n on thl .ncl~~~d faur (4) sh~et~ provid.~ to thij Department by the applicallt and l'llay not bt valid in Lh. event of subsequent rule ahln;e.. Our exemption does not relieve you ot the need to obtain any other lO~ll, .tlte or federal ptrmit. which may be rtquir.d. Ba; lIu!vi..,d that turbidity .creens (or CoIther.-m..n. of--t-urbidity control) muatbe utiliud .. neca.llry during construction such that turbidity ltlyels ill the projElct art I. do nClt Etxc.:..cl 29 N.'l'.U.'1 ~bov~ natural background., AlIo, b. advised that any alteration of ~angrov.., or dredging or filling attivit1e. not covered by thig latter may require a p.rmit. It you have any question., pl..at eantaet Ms. Denise Cromp It (401) 355-4011. Sincerely, ~~~. (lA~_ . Barbara Con~Yt s.nio~n~nt.l Analy.t Coa.tal a04 Wetland.. Divi.ion BC:I>EC:fb Inclolur.. :> "1; III.II(et.! vII It!L')'\'~1I ""p.' gOd 1111 ~t)UTH DIXIli IIWr'l SUITl! HtI "'EST rALM m~ACII, fLl)ItU).~ 1 H~'S (407) }~~.40J I SVNCOM In.~l1' I · - - 0.... "" TAT.... J .... : J... 0 e e 'e:: e 'e c ONa % . V^':l''''1VN "I' ... - - - ..... ~ ~