CORRESPONDENCE
Board of County €:ommissioners
Carol A. Roberts, Chair
Carol J. Elmquist, Vice Chairman
Karen T. Marcus
Dorothy Wilken.
Jim Watt
County Administrat(]
Jan \\'inters
September 15, 1988
Department of engincerin
and Public Works
H. r. Kahlert
County engineer
Thomas A. Clark, P.E.
City Engi neer
City of Boynton Beach
120 Northeast 2nd Avenue
Boynton Beach, FL 33435
SUBJECT:
S.W. CONGRESS BOULEVARD AND CONGRESS AVENUE
Dear Mr. Clark:
The Traffic Division has received our copy of the correspondence, regarding the
subject intersection you sent to Mr. Michael F. Matchus of Coral Gables Federal.
In his letter, you requested the total cost of installation of the traffic signal
at the subject intersection. Please find attached a copy of Contract No. 87-
16, which list the equipment needed and a total cost for the proposed traffic
signal installation.
We are requesting that your office inform each of the three Developments of their
fair share cost for the traffic signal. In addition, we are requesting that the
Landing Apartments, Lakes of Tara, and Tara Oakes establ ish a joint escrow
account in the amount of $28,398.50, to be released dir.ectly to our signal
contractor upon completion of the installation. As soon as the County has been
notified that the escrow account exists, the signal inst~llation contract will
be released with a 90 day completion schedule.
Thank you for your cooperation in this matter of mutual interest. If you have
any questions, please contact me.
Sincerely,
OFFICE OF THE COUNTY ENGINEER
&~%C-~
Charles L. Cantrell
Signal Engineer - Traffic Division
J;4J-
CLC:GLH:jr
lUJC~%l)
Ocr 10
Pi...4tv 1988
I'vIIVG D
f:pr.
.
cc: Mr. Carmen Annunziato, City Planner w/enc.
Mr. Peter Cheney, City Manager w/enc.
File: Intersection "S.W. Congress Blvd. & Congress Ave."
clc\clark.con
".'\n Icgu:.d Opportunity - Arfjrnhlli~e Action Employer"
BOX 2429 WJ:ST PAI_M BEACH, FLORIDA 33402-2429 (407) 684-4000
..
S.W. CONGRESS BOULEVARD AND CONGRESS AVENUE
CONTRACT NO. 87-16A
ITEM NO. QIY UNII
DESCRIPTION
FI OR I PRICE
630-112 15 LF 2" PVC UNDERGROUND CONDUIT F & I
632-1-21 1 PI SIGNAL CABLE (SPAN LENGTH F & I
RANGE = 450' - 475')
632-1-99 1 PI PEDESTRIAN SIGNAL CABLE F & I
(SEVEN CONDUCTOR)
634-1-121 1
SPAN WIRE ASSEMBLY (SPAN F & I
LENGTH RANGE = 450' - 475')
PI
639-1-13 1
F & I
ELECTRICAL POWER SERVICE
(OVERHEAD)
641-15-41 4 EA 41' CLASS VI CONCRETE POLE F & I
AS
650-1-131 6 AS 3-SECTION ALUMINUM F & I
SIGNAL HEAD (12")
650-9-151 2 AS 5-SECTION ALUMINUM F & I
CLUSTER HEAD (12")
653-112 4 AS 12" PEDESTRIAN SIGNAL F & I
HEAD (2 WAY)
660-12A 2 EA DETECTOR AMPLIFIER WITH F & I
HARNESS (NORMAL FUNCTION)
660-12C 2 EA DETECTOR AMPLIFIER WITH F & I
HARNESS (SEQUENTIAL STRETCH
/ DELAY FUNTION)
660-13A 4 EA DETECTOR LOOP & LEAD-IN WIRE F & I
(26' QUADRIPOLE)
660-13B 2 EA DETECTOR LOOP & LEAD-IN WIRE F & I
(46' QUADRIPOLE)
660-13D 4 EA DETECTOR LOOP & LEAD-IN WIRE F & I
(ADVANCE LOOP)
665-11
EA PEDESTRIAN DETECTOR
(PUSHBUTTON)
F & I
8
671-13-80 1
8-PHASE CONTROLLER
(MICRO PROCESSOR)
EA BASE C^BINET HOUNTING
F & I
EA
677-11
1
F & I
715-92-14 1
PI
COMPLETE STREET LIGHT INST. F & I
(4 STREET LIGHTS)
Page 1
2.50
1,080.00
190.00
920.00
365.00
1,640.00
490.00
690.00
640.00
127.00
295.00
175.00
197.00
295.00
72.00
6,487.00
360.00
1,825.00
SUBTOTAL
37.50
1,080'.00
190.00
920.00
365.00
6,560.00
2,940.00
1,380.00
2,560.00
254.00
590.00
700.00
394.00
1,180.00
576.00
6,487.00
360.00
1,825.00
..
S.W. CONGRESS BOULEVARD AND CONGRESS AVENUE
CONTRACT NO. 87-16A
ITEM NO. Q.TY llNLT. _____DEliCR1P.Tl.c>lL___'______ __ Fl, .OR.l ..ERICE _. HSUBTQTAL _ _
Total:
28,398.50
Page 2
RF'. C~~, 7''r,lD
-, #. ~ ..c
, ( I (' ~
'i ~ (-jo\ (''''\ \
...-( /J""" \ " ! l\1
J I) C/'
C
:II: Shalloway, Foy, Schofield,
Rayman & Newell, Inc.
.
~, ;!
"'88 July 8, 1988
oJ c.PT~,
'\
-
!
'"
PL,~t ",
-
--
Tom Clark
City Engineer
City of Boynton Beach
P.O. Box 310 - ,
_ , _ BPyntona~a,qb~ F:~_.3~j:2?
...."':
. :.~'~.:- .;. " . ....
.... ." .... -
-....:.:. -. '"'-
Re: Tara Oaks
Project No.: 87087
Dear Mr. Clark:
.
As per your phone conversation with Jay G. Foy, of our
office, this letter is for the package that was submitted on
June 27, 1988 for the Technical Review Board meeting on July
5, 1988. The package submitted was for the City of Boynton
Beach approval of the preliminary plat, construction plans
and landscape plans. The engineering portion of the
submittal consisted of six (6) sets of the following items:
Boundary and tree survey, engineering plans, water
management calculations, lift station calculations, fire
flow calculations, cost estimates, and preliminary plat.
Should you have any questions, please call the
undersigned at 655-1151.
Sincerely,
~~
Alex Garcia
AG:at
tI1....~.*
RECEIVrf' '
"
"
Jut : <' 19Fj::
>:: '
, .
" - I:)t Jt.LlN1},."G f',to
'::' ~~1I.l!!l"1:a ~,{:l .
t - "
Enginee~ . Planners. Surveyors
1~1 Belvedere Road, West Palm Beach, Florida 33405 305/655-1151