CORRESPONDENCE
@ne~(~i9k
COMPANY, INC.
8330 WOODFIelD CROSSING BLVD.
P.O. BOX <40177 (317) 253.3606
INDIANAPOLIS. INDIANA 46240
Mr. Tom Clark
City Engineer
Boynton Beach, Florida
211 S. Federal Highway
P.O. Box 310
Boynton Beach, FL 33425-0310
Dear Mr. Clark:
EXPRESS MAIL
January 6, 1989
Re: Melear PUD
Enclosed is the bond for the cost of signalization of the
intersection of Congress Avenue and Sandalwood Drive. The
. posting of this bond was a condition of the November 8, 1988
approval of the amended Master Plan for the Mealear PUD.
JTB/dc
encl.
cc: Mr. Carmen ~~unziato
(w/copy of bond)
\
"""
A. .:((.
~,'"
c' """......
. . 'W
Sincerely,
GENE B. GLICK COMPANY, INC.
...--wh.
( ~ames T. Bisesi
~/
ltECEIVED
JAM 9 1900
FLANN1NG DE.pr~'
to"
-,
.~
&
ri","
,
j./
:?
-<<
~
:,;
'J
"
'i
"
:6
J
X
i'
e
l-
I
,~- -
s
~.
CITY of _mt,__
c ----,......l:::j""~:;ijrt-~NI..
. ~~-"'"'IoI~R!~-~~"".t::I1 j '~C.ll
" ..~.~... P. Q. Box 310 -- ! . - __
r.~" Boynton Beach, Florida 33425-0310 .~-- -
, __ __ . (407.) 738-7490
OFFICE OF THE PLANNING DIRECTOR
30 November 1988
Mr. Javier Lopez
Palm Beach County
Engineering Department
PO Box 2429
West Palm Beach, FL 33402
Dear Javier:
Accompanying this letter you will find correspondence related
to the issuance of permits at the Melear Planned Unit Development
located in Boynton Beach.
As a condition of the approval of the PUD, development of the
final 50% of the project was conditioned upon the letting of
contracts to construct Hypoluxo Road as a four-lane divided
highway from Congress Avenue to 1-95. Ms. Rezzonico advises in
her letter that contracts have now been let. Will you please
confirm her findings.
Thank you for your attention to this matter.
Very truly yours,
CITY OF BOYNTON BEACH
/bks
cc:
Carmen S. Annunziato, AICP
Planning Director
City Manager
Ann Marie Rezzonico
Central File
.JONES, FOSTER, .JOHNSTON & STUBBS, P.A.
COUNSEL
WilLIAM A FOSTER
ATTORNEYS AND COUNSELORS
FLAGLER CENTER TOWER
505 SOUTH FLAGLER DRIVE
ELEVENTH FLOOR
P. Q. DRAWER E
WEST PALM BEACH, FLORIDA 33402.3475
(407) 659.3000
FAX: (407) 832-1454
OTHER LOCATION
Sli1 s, e. 8th STREET, SUITE 101
PEtRA'" BEACH. FLORIDA ~
LARRY e ALEXANDER
GEORGE H. BAILEY
KEVIN C BEUTTENMULLER
MICHAEL 0 BROWN
MARGARET L. COOPER
REBECCA G. DOANE
RANDY 0 ELUSON
L MARTIN FLANAGAN
SCOTT G HAWKINS
THORNTON M. HENRY
PETER S, HOLTON
HARRY A. JOHNSTON, II
J A. JURGENS
MARK e. KLEINFELD
CHARLES e. KOVAL
MICHAEL T. KRANZ
JOHN l,RQUX
JOHN BLAIR McCRACKEN
TIMOTHY E. MONAGHAN
JOHN C. RANDOLPH
ANN MARIE G, REZZONlCO
ANDREW R ROSS
STEVEN J. ROTHMAN
PETER A. SACHS
JOEL T. STRAWN
SIDNEY A. STUBBS. JR
AlLEN Fl. TOMLINSON
JOHN S. TFl,MPER
MICHAEL p, WALSH
H. ADAMS WEAVER
PAUL C. WOLFE
November 21, 1988
Mr. Carmen P. Annunziato
Planning Director
City of Boynton Beach
200 North Seacrest Boulevard
Boynton Beach, Florida 33425
RE: Melear PUD - Master Plan Modification
Dear Mr. Annunziato:
For your records I am enclosing a photocopy of your
letter to me of May 11, 1988 regarding the release of the
final 50% of the residential units and all of the commercial
property in the captioned PUD. It is my understanding
that the contracts have now been let to Hardrive, and that
construction will begin i,n January. Therefore, I request
that you confirm this in writing and also confirm to me
that the units are now able to be released.
I look forward to hearing from you as soon as possible.
Sincerely,
~ri"
AMR:pr
Enclosure
RECEIVED
JV 27 1988
PLlc: ;~ING DEPT.
CITY of
BOYNTON BEACH
.
~~
..
.
200 N. Seacrest Blvd.
Post Office Box 310
Boynton Bea~h, FL 33435
(305) ,738-7490
-- ~ -:---- . ....
.-.. - - ~'I.""''': .
:~c:;___'__~'::'-::'~=. ' ~~J' . ..,; I
":"~.;::~~~;;~~;~:_~ TI~::~~' :'f?
-r"':"'~ ~,-i-~ ":-., ~"~'ki;,~1 ~"r.>...~
- 'I . -- ~ J..C1........ .".. \i;
..---. _ -.......... . . :--:-..'1!'~~........ ...~.
~ .... ~~
-.i- '~-??~~~ir'
,!
OFFICE OF THE PLANNING DIRECTOR
May 11, 1988
Ann Marie Rezzonico, Esq.
Johnston, Sasser, Randolph & Weaver, P.A.
310 Okeechobee Boulevard
West Palm Beach, FL 33402
Re: Melear PUD-Master Plan Modification
Dear Ms. Rezzonico:
In response to your letter dated May 4, 1988, requesting
clarification of the release of the final 50% of the units and
the commercial property within the Melear Planned Unit
Development, please be advised that building permits for the
final 50% of the residential units and all of the commercial
property cannot be issued until such time that Palm Beach County
'. lets the contract for the construction of Hypoluxo Road as a
four-lane section from Congress Avenue to 1-95.
If you have any questions, please do not hesitate to call.
Yours very truly,
CITY OF BOYNTON BEACH
C~ . fL r ;~
CARMEN S. ANNUNZIATO, AICP
PLANNING DIRECTOR
CSA:ro
cc Central File
,
-,
~(ECEIVED
DEe ;?, 1983
PLANNING Depf,
M E M 0 RAN D U ~
..=~
December 1, 1983
To: Carmen Annunziato, City Planner
Re: City Resolution No. 83-JJJJ - 0000
As you can see from the attached letter from John Sansbury, County
Administrator, the Resolution concerning annexation and rezoning has
been received by the Board of County Commissioners.
~L ;; c;4
<<;'ei L. Cheney
City Manager
PLC:mh
Att.
Board of County Commissioners
Peggy B, Evatt, Chairman
Ken Spillias
Dennis P. Koehler
Dorothy Wilken
Bill Bailey
County Administrator
John C, Sansbury
November 29, 1983
Mr. Peter L. Cheney, City Manager
City of Boynton Beach
P. O. Box 310
Boynton Beach, Florida 33435-0310
Dear Mr. Cheney:
This letter acknowledges receipt of Resolution No. 83-JJJJ expressing the
Council's desire to participate in the early design discussions for North Seacrest
Boulevard and notifying the Board of County Commissioners of its concerns
concerning the design of North Seacrest Boulevard.
Please be advised that the Palm Beach County Board of County Commissioners
officially received and filed the resolution in their meeting of November 29, 1983.
Copies of the resolution were forwarded to the County Engineer for review and
recommendations.
This letter also acknowledges receipt of Resolution No. 83-0000 requesting
permission to rezone a certain parcel of land being annexed to the City of Boynton
Beach from Palm Beach County Zoning Classification AG to the City of Boynton
Beach Zoning Classification of Planned Unit Development with a land use intensity
of 4.0 and from County land use of Medium-Medium High Density to City land use
classification of Moderate Density Residential.
Please be advised that the Palm Beach County Board of County Commissioners
officially received and filed the resolution in their meeting of November 29, 1983.
Copies of the resolution were forwarded to the Planning, Zoning and Building
Department for their review and recommendations.
Very truly yours,
~e'~/h-
John C. Sansbury
County Administrator
:'
f~'}~
JCS/lmg
NOV 1983
'~'~CEtVr ',,1
. '" r,,?:u,r"'.r
, ~~rl
CC Herb Kahlert, County Engineer
Robert Basehart, PZ&B
,
BOX 1989 . WEST PALM BEACH, FLORIDA 33401
/' ,'.
-- i ~
./ /?? ~
CITY of
BOYNTON BEACH
~
Q,..
. (..' :'
' ..' eceive
pate
lfime _
120 N.E. 2nd AVENUE
P.O. BOX 310
OYNTON BEACH, FLORIDA 33435-0310
(305) 734-811 1
February 28, 1983
Mr. Alan Ciklin
Boose Ciklin & Martens Law Offices
The Concourse
2000 palm Beach Lakes Blvd.
West Palm Beach, Florida 33409
"
RE: Melear P.U.D.
Dear Mro Ciklin:
I am responding to your letter of February 8, 1983, and your
comments concerning recent attempts to resolve development
problems for the Melear tract.
As I understand your letter, the current major concern with
which you are now faced has to do with a "Neighborhood Commercial
Pod" within the P.U.D. and you indicate that you have been in-
formed that any commercial within the P.U.D. is not acceptable
and will be opposed. I believe that you may have misunderstood
comments that have been made concerning your commercial podo The
City's Code concerning P.U.D. provides that a maximum of five to
ten percent of the total land of the P.U.D. can be considered for
commercial activities and, therefore, commercial activities are
accepted in the City's P.U.D. 1
I.
I believe the issues surrounding the proposed commercial activity
in the Melear P.U.D. may have more to do with location and access
than with whether or not the use is permitted. The City code
indicates that commercial uses should serve the needs of the
P.U.D. and not the general needs of the surrounding area, that
the commercially located land should not generally front on the
perimeter streets and that. preferrably, the commercial should be
centrally located in the P.U.D. This is similar to the County
regulations which require that "access to commercial facilities
-
Mr. Alan Ciklin
Re: Melear P.U.D.
February 28. 1983
-
,. -,
:tf
-2-
shall be from an arterial or collector which is part of the
interior circulation system within the planned unit development.
No commercial facility shall maintain frontage or direct physical
access on any arterial or collector bordering or traversing the
planned Unit Development tract."
I do not understand the basis for the Melear family's "collective
decision" that they can no longer afford to continue to give and
expend funds without some sort of reasonable positive assurance
from the City that the project can move ahead as planned since I
believe there has been an indication of a resolution of the den-
sity questions and this letter confirms that commercial develop-
ment is indeed a permitted part of the P.U.D. However, I respect
the Melear's decision to hold in abeyance further discussions on
this P.U.D. for a period of time that satisfies their needs.
Even though the Melear family has decided that they do not cur-
rently have a need for water and sewer connections to the Boynton
Beach utility system, it is obvious that these connections will
be needed at some time in the future for the eventual development
of this tract. I believe it is proper that the utility connection
agreement remain in effect as a part of the public records of the
City of Boynton Beach.
Obviously. the Melear family should make its own decisions con-
cerning the proper time to proceed with the development of their
land and the City respects their decision process. I hope this
responds to your letter and will provide a correct understanding
of the factors surrounding development of this tract in Boynton
Beach i.e., density levels, commercial activity and utility
service.
please let me know if I can be of further assistance in this
matter.
Sincerely,
CITY OF BOYNTON BEACH
<
Ovt ~/ C'0
{(et~r L. Cheney
city Manager
PLC : j c
..JAMES W. VANCE
WILLIAM P. DONEY
Received
L....W OF"F'"ICES
JAMES W. VANOE, P.A.Date
SUITE 200, BARRISTERS BUILDING
1615 FORUM PLACE lime
WEST PALM BEAOH, FLORIDA 33401
~;4I~
~
TELEPHONE:
(305) 68,4-55044
August 24, 1983
Alan J. Cik1in, Esquire
Boose, Cik1in & Martens
Eighth Floor, Concourse
2000 Palm Beach Lakes Boulevard
West Palm Beach, Florida 33409
Re: Melear PUD
Dear Alan:
This letter is in response to your letter to Jim
Vance of August 1, 1983. I have reviewed the form documents
that you have submitted to us and the same would appear
adequate to satisfy the City's requirements as to unified
control, so long as the property subject to the declaration
constitutes the entire PUD and, as set forth, the restrictions
run with the land.
'7jf;L"
WILLIAM P. DONEY,
WPD/sjw /
cc: Carmen Annunziato '
G>>
120N.E. 2nd AVENUE
P.O. BOX 310
BOYNTON BEACH, FlORtDA334J5.0310
(305)734-8111
~
. -, - -r;
c -. . ',;..)"f,t/",J, .
~e.r::P.~~"'~"~IoolI....t:-!~= ~ .~otil .
.:,~. '~,II~I
--..., ~ - -j--~~~'
, .-'. , - r '.::---
- . !:::. .
_ '/.J-'-
;.---
CITY of
BOYNTON BEACH
OFFICE OF THE CITY PLANNER
23 August 1983
Allen Ciklin, Esq.
2000 Palm Beach Lakes Blvd.
West Palm Beach, FL 33409
Dear Allen:
In reference to the Melear Annexation, please be advised that
a pre-hearing conference involving the City Technical Review
Board and your technical staff has been set for 9:00 A.M. on
September 6, 1983. This conference will be held in the
Planning Department Conference Room.
Yours very truly,
CITY OF BOYNTON BEACH
/'
C ~_~ '-' c~~:z:..
,
Carmen S. Annunziato
City Planner
/bks
cc:
City Manager
Technical Review Board
Central File
l;,'l.lrd of (-OIlIlI~ Con1Jlli,,,i(_~IH'r...
Coun1\ Admini"tr;tlllr
l\'~'~~', 1-: [\all. Cll.lirm:m
}d'll SpiJlj;l.... "in: Chairman
Ih'illli, 1'. Koehler
Dl1ruthy '....ilkl.n
Hill lLoile,
.I. '!l;j (' S:,!.. '!'\
September I, 1983
Dcpartmrnt of Engj;lur"IQ
,If!;l Public ~.,'(J.~ '.
H. F. Ka1,lcn
Coun'iY E,-:gine>ef
Mr. Carmen S. Annunziato
City Planner .
City of Boynton Beach
120 N. E. 2nd Avenue
Boynton Beach, FL 33435
,
.
i
i
f
I
,
.
SUBJECT: Proposed Melear, P.D.D.
Dear Mr. Annunziato:
This is to confirm our meeting of August 30 with yourself and the developer
of Melear, P.D.D., in which the developer agreed to certain conditions which
would allow his project to meet the requirements of the traffic performance
standard. The proposed development is a category A project, i.e., one having
a significant impact on a road or roads which are already operating at or
above level of service D. As this is the case, the project must limit it's
traffic to less than a significant impact on two category A road links, those
being Lantana Road and Hypoluxo Road between Congress Avenue and 1-95. Our
calculations indicate that project development should be limited to 50% of
the residential units, with the balance of the residential units and all of
the commercial not being allowed to develop until Lantana Road and Hypoluxo
Road are constructed as four lane facilities. Additionally, this project
should be required to:
1) Dedicate 108 feet of right of way for and construct Miner Road across
the project's north property frontage.
2)a) Reimburse the County for the cost of constructing left turn lanes at
the project's entrance on Congress Avenue and at Miner Road. These
turn lanes will be included in the Congress Avenue four laning project
currently under contract. The County will bill the developer for this
work based on unit prices at the time of Congress Avenue construction.
b) Construct right turn lanes on Congress Avenue at the project's entrance
and at Miner Road. These turn lanes should be constructed at the time
the project's entrance road and Miner Road are built.
3) Pay the cost of signalization at the following intersections, when war-
ranted, as determined by the County Engineer:
a) Congress Avenue and Miner Road.
b) Entrance Road and Miner Road.
c) Entrance Road and Congress Avenue.
4) Pay "Fair Share Impact Fee" upon issuance of building permits.
BOX 2429
WEST PALi\1 BEACH, FLORIOA 33402
(305) GS44000
--~------
------- ---~- -.----..----
Page Two
As we discussed, it is anticipated that the City will enter into a formal
agreement with the developer to ensure that all of these conditions are
complied with in order that this project would meet the requirements of the
traffic performance standard.
The opportunity to cOIT@ent is, sincerely appreciated.
If you have any questions or require additional information, please do not
hesitate to contact this office.
Sincerely,
OFFICE OF THE COUNTY ENGINEER
Charles R. Walker, Jr., P.E.
Director, Traffic Division
CRWect
cc: Stan Redick
~
~'eiv.....
Pate
rune
MEMORANDUM
TO: Mr. Carmen Annunziato
City Planner
DATE: August 26, 1983
RE: Melear Annexation - Departmental Review
The overall growth projections of the N.W. Congress Avenue corridor will
have significant impact upon park and recreation services and facilities.
The annexation of this property will strengthen this impact, as 1,005
additional units will translate into over 2,000 people.
While this development and others already approved for development do
include some private recreation facilities, they generally do not include
facilities such as lighted athletic fields, auditoriums, public beaches,
boat ramps, major recreation centers, or programs such as youth and adult
athletic leagues, day camps, playgrounds, and a multitude of other
instructional and social programs offered by this department.
The development of Motorola and the Boynton Mall will create a family-
oriented population increase which will place greater demands on the
above mentioned facilities.
The nature of the overall N.W. section expansion will require the continual
provision of capital outlay funds, along with operational funds to provide
for personnel, materials, and maintenance.
~-,,'%..r;2k
Charles C. Frederick '-,
Recreation & Park Director
CCF:as
Attachment
CC:
John Wildner, Park Supt.
./
iBC:X::a:
ClllKUn &
mARfeITS
LAW OFFICES
WILLIAM R. BOOSE. III
ALAN J. CIKLlN. P.A.
ANN I W. COLLETTE
STEPHEN FRY
RICHARD L. MARTENS. P.A.
KERRY R. SCHWENCKE
R February 1983
/
Mr. Peter L. Cheney
City Manager
City of Boynton Beach
120 N.E. 2nd Avenue
Post Office Box 310
Boynton Beach, FL 33435
i,
'i't.\\ '&O~"^
._,.._...........i~ r1'-:'
"
."
.-~.! ~:-~:~~~>.'
Re: Melear P.U.D.
Dear Peter:
As you know, we have been attempting to resolve our
development problems with the City of Boynton Beach for
several months. We have met, rethought and revised our
site plan and development several times based on the input
of staff and the City Planning Board. In fact, based on
their input and our desire to cooperate, we reduced the
density on the subject location from a County recommended
8 to 12 units per acre to 6.5 units per acre. Despite
our efforts to cooperate and reach an accord with the City,
it appears to the Melear family that each time we ~ive,
something else is then required. Each of the site plans
that have been submitted to the City reflected a neighborhood
commercial pod within the P.U.D. We are now informed that
any commercial within the P.U.D. is not acceptable and
will be opposed. We now believe that despite our efforts
to compromise and cooperate, each time we do so something
more is requested. The Melear family has made the collective
decision that they can no longer afford to continue to
give and expend funds without some sort of reasonable,
positive assurance from the City that the project can move
ahead as planned.
Therefore, based on these factors, the Melear family
has decided not to proceed with annexation of the property
into Boynton Beach, nor for the use of the water and sewer
connections set forth in the Annexation Agreement. I should
also remind you that the proposed development which was
submittetl to the City Commission <l.t the time we entered
into the Annexation Agreement was at 8 to 12 units per
acre, and not 6.5. Based on the fact that we will not
I
I
IL ~IGHTH fL()()R'.1 HE ConcOURSE' 2000 PAlM B€'1CH ~ Si.VO. !.lIEST PALM GEflCi. FLORIDA, 33409 ' [305] 6-39' 9595
":'J.k! 510.%2'~-:-
Mr. Peter L. Cheney
8 February 1983
Page Two
be using water and sewer connections in the City of Boynton
Beach, I would request that the City take appropriate action
to remove the Annexation Agreement from the public records.
In any event, the Melear family is disappointed that
this was the result of their concerted efforts. Hopefully,
sometime in the future, the City will reanalyze their position
and be able to rechannel the project on a more positive
basis. Thank you for your cooperation and if you have
any questions or comments, please don't hesitate to call
me.
AJC/lab
cc: Mr. Larry Melear
Mr. Carmen Annunziato
Harry Johnston, Esquire
.i
"
R'rei"d~ic:
Date / ~h/YI
Time ()
-
MEMORANDUM
February 14, 1983
To:
Carmen Annunziato, City Planner
Re:
Alan J. Ciklin Letter of February 8, 1983
Melear P.U.D.
Please review the attached letter and provide me with a written
response to the items raised in the letter.
After I receive your comments, I will review it, prepare a draft
response to Mr. Ciklin and then review it with the City Attorney.
It is my current feeling, pending further discussion with the
city Attorney and then with the City council, that the annexation
agreement that has been signed is binding and cannot be removed
from the public records. Furthermore, the only way this piece of
property can be developed is with the city's water and sewer. In
the meantime of course, if the Melear family wishes to hold the
property as vacant land there are no steps that the City would
take to prevent this.
/Zc/ l c4
f!et~r L. Cheney
City Manager
PLC:mh
.
MEMORANDUM
February 16, 1983
TO:
Peter L. Cheney, City Manager
FROM:
Carmen S. Annunziato, City Planner
RE:
Alan J. Ciklin letter of February 8, 1983/Melear Property
consistent with your request, I have reviewed Alan Ciklin's
letter of February 8, 1983 regarding the Melear family property .
which is located on the west side of Congress Avenue between L.W.D.D.
Canals #20 and 21.
As noted in Mr. Ciklin's letter, Mr. Melear appeared before
the Planning and Zoning Board to discuss the issues related to gross
and net density. Following the presentation of plan materials and
graphics, it was generally agreed upon that an appropriate gross
density for the Melear property would be approximately six units per
acre. In response to the Planning and Zoning Board comments, M~.
Melear revised his concept plan to reflect density in the gross and
_ net which were consistent with the issues raised at the Planning and
Zoning Board. The gross density reflected on the revised plan was
6.5 dwelling units per acre.
Concerning commercial uses in PUD'S, our
a maximum of from 5 to 10% of the total land area
zoning depending upon the intensity of land use.
qualifications as follows:
code provides for
proposed for re-
There are, however,
l.
the needs of
area.
That the land proposed for commercial uses should serve
the PUD, and not the general needs of the surrounding
2. The commercially located lands should not generally
front on the perimeter streets.
--
3. The commercially used lands should preferably be
· centrally located in the PUD.
The proposed location for commercial use in the Melear concept plan
is on the south side of the entrance road at Congress Avenue, directly
across from the Dos Logos PUD. Although the total acreage proposed
for commercial uses (3.1 acres) is consistent with ordinance require-
ments, the location proposed, in my opinion, violates three of the
four standards listed above.
CSA:bks
cc: Central File
Hr. Alan ciklin
Re: Melear P.U.D.
February 25, 1983
-3-
cc: Mayor and city council
Planning and zoning Board
Larry Melear
Harry Johnston, Esquire
James vance, city Attorney
carmen Annunziato, city planner
perry Cessna, utilities Director
I
CITY of
BOYNTON BEACH
P.Q BOX 310
120 N.E 2ND AVENUE
BOYNTO.... BEACH. fLORIDA 33435
13051734-8111
Mr. Alan J. ~klin
Boose, Ciklin\& Martens
8th. FIr., The Concourse
2000 Palm Beach Lakes Blvd.
W. Palm Beach, Fl. 33409
Dear Mr. Ciklin:
J
~
t... -- ~~':;)('rJ'~
- tt..Ul:.ttE..:::::...::;.Er-j;;;;iJ:~J::.t:c I .~_:j~J'! ....--
''jL ~ J= I
j~r:'~~::F~~r:~ ~H - , ,
- ~~~ ~~~~3ljlif/?
_ - ,17'::;.;"0-
:::--'/->~-
December 6, 1982
Please be advised that a discussion of densities
in the North Congress area of Boynton Beach has been set for
Dec. 14, 1982 at 7: 30 P.M. with the Planning and Zoning Board.
In particular, the issues associated with the Melear tract
will be addressed.
appreciated.
Your attendance at this meeting would be greatly
CSA:mpc
CC: City Manager
Utilities Director
Central File
Yours very truly,
~ OF BOYNTON BEACH
Ltt171~?f/rd. 0z-n-u<?1~d;,
Carmen S. Annunziato GI
City Planner
/,?,,~
"
MEMORANDUM
November 30, 1982
To: Honorable Mayor and City Council
Re: Melear P.U.D.
The last piece of land to be reviewed for development on the
west side of Congress Avenue, north of Old Boynton Road, is
the Melear Tract. As you know, the owner of this tract executed
an agreement for water service outside the City Limits (see
attached). with this agreement, they agreed ..."in consideration
of the privilege of receiving water service from said CITY, that the
execution of this Agreement is considered a voluntary petition for
annexation."
For your information, I have attached correspondence and memorandum
relative to the Melear P.U.D. approval process, which I am forward-
ing to you. I don't feel that the matter should be coming before
the City Council for consideration until after it has been reviewed
by the Planning & Zoning Board and appropriate Staff and Planning &
Zoning Board recommendations have been prepared for City Council
consideration.
You can see from the attached correspondence and a memo to Carmen
Annunziato that it is being suggested that this matter be placed
on the next Planning & Zoning Board Agenda for consideration by
that Body, if the Chairman of the Planning & Zoning Board agrees
to including it on the Agenda.
(~L ,_/ 04/
Ut:ei>L. Cheney
city Manager
PLC :mh
''',.~ r:;
~~te~ ' Lo//?:;:?4-~/
TJme - ,/:' <I7J ---
--
Atts.
cc: City Planner
Central Files
M EM 0 RAN DUM
November 30, 1982
To: Carmen Annunziato, City Planner
Re: Melear P.U.D.
You have received a copy of a letter from Alan ciklin dated
November 23, 1982. Please arrange to prepare a planning Staff
recommendation on this matter and place the issue on the next
Planning & zoning Board Agenda if the Chairman of the Board
so approves. It seems to me that this is the best way to get
a policy determination on the possible density of the develop-
ment of the Melear P.U.D.
rE<A. ~h~
city Manager
PLC:mh
Att.
cc: city Attorney
Central Files
. .
iBtXEE
(1IHUn &.
mARfens
LAW OFFICES
WILLIAM R. BOOSE. III
ALAN J. CIKLlN. P.A.
ANNI W. COLLETTE
STEPHEN FRY
RICHARD L. MARTENS, P.R.
KERRY R. SCHWENCKE
23 November 1982
,I
Mr. Peter L. Cheney
City Manager
City of Boynton Beach
120 N.E. 2nd Avenue
Post Office Box 310
Boynton Beach, FL 33435
Re: Melear P.U.D.
~i''].$2 3031"
/.~ 'k. 7.
/.{? ,.' c.
i!? \lOll 19a1 1
!~ ~U, ~
1 ('f '.',r::~t:~'dr~:
\ N 1."....~~,.1:~ -
\~~\ f"'O<t:<i t..~nnG;:.-.
\.. ~ ,~.,.~ OHler-
\~-
'-.(?
'. /;'/ J>
'-:~.L~~_nl qt ~_l
Dear Peter:
Thank you for your letter of November 17,1982. We
are ready to appear before the ~lanning and Zoning Board
for an informal discussion of the appropriate development
of densities for the subject parcel of property. At your
earliest convenience, please schedule me for such an appearance
so that we make make a presentation to them in an informal
setting and to discuss the relative merits of the the Melear
proposal and densities.
Regarding the other issues as you see them, I offer
the following comments:
1. My client has entered into a voluntary agreement
to annex the property into the City of Boynton and is ready,
willing and able to comply with the terms of that agreement.
We certainly agree that the City of Boynton Beach is the
appropriate means of supply as it relates to utilities.
The only question that continues to arise, is that there
is nothing included in the agreement that requires the
Melears to proceed through governmental approvals in the
City. However, we may not have a problem with proceeding
in the City for governmental approval once we have a feel
for what the Planning and Zoning Board determines to be
an appropriate density for the site.
2. I have reviewed Carmen Annunziato's comparison
of gross density and have no argument with it but for the
caveat that the densities reflect over-all project densities
and not necessarily effective densities immediately adjacent
EIGHTH FlOOR, THE concOURSE, 2000 PALM BEACH lRHES BlVD. WEST PALM BEACH. FlO!<IllA . 33409 . 1305] 6W' 9595
TUJi 51O'952'J64.~
c.
Mr. Peter Cheney
23 November 1982
Page Two
to the project. This can certainly be discussed in detail
before the Planning and Zoning Board.
3. I do not necessarily agree that the appropriate
density for the the Melear P.U.D. is entirely dictated
by the utilities the City is willing to provide. If the
City lacks sufficient capacity to serve the Melear P.U.D. at
the density recommended by the County's Comprehensive Plan
(8 to 12 units per acre) then one of the alternatives my
clients would have, would be to wait until further capacity
is available. Additionally, when we requested service
to the City, we indicated at that time that the density
allocated to the property was 8 to 12 units per acre and
there was no attempt to suggest anything but that density
to the City. Based on that representation, the City approved
the Agreement for Water and Sewer Service. Additionally,
the Congress Lakes P.U.D. approved at 11.20 units per acre
is recommended on the previous County Comprehensive Plan
at the same density as the Melear P.U.D., i.e., 3 to 5
units per acre. It appears, therefore, that the City did
not base its density for the Congress Lakes P.U.D. merely
on the availability of utilities or the willingness of
the City to grant utilities, but also other factors as
well as such as surrounding land use and intensity.
Again, thank you for your continued cooperation in
this matter. I am still optimistic that once we are to
meet with the Planning and &oning Board for an informal
discussion, we will be able to come to a meeting of the
minds and then proceed to annex the property and obtain
our governmental approvals in the City of Boynton Beach.
If you have any further questions or comments, please don't
hesitate to call me. I shall await your notice of our
appearance before the Planning and oning Board.
A.JC/1ab
cc: Mr. Larry Melear
Harry Johnston, Esquire
Mr. Carmen Annunziato
Mr. Perry Cessna
Mr. Ron Hoggard
CITY of
BOYNTON BEACH
~,' . Office
~
~
of the City Manager
120 N.E. 2nd AVENUE
P.O. BOX 310
BOYNTON BEACH, FLORIDA 33435-0310
(305) 734-8111
November 16, 1982
Alan J. Ciklin, P.A.
Boose, Ciklin & Martens Law Offices
Eigth Floor - The Concourse
2000 Palm Beach Lakes Blvd.
West Palm Beach, Florida 33409
Re: Melear P.U.D.
Dear Mr. Ciklin:
In further response to your letter of November 2, 1982 relative
to Melear P.U.D., it appears to me that the issues currently
before your client and the City are as follows:
1. Your client has entered into an Agreement to
annex1his property into the cit y of Boynton
Beach as zoned, and as is feasible. This
Agreement was made in connection with a desire
to receive water and sewer services from the
city of Boynton Beach for the purpose of
developing his property, and was made in recogni-
tion of the fact that there had been previous
provisions made relative to the fact that the
subject property is within the City of Boynton
Beach utility Service Area.
2. Because your client's property is within the
City's utility Service Area, it is appropriate
that utilities be provided by the City of Boynton
Beach and it is further appropriate that the
utilities be provided in accordance with reason-
able conditions established by the city of Boynton
Beach.
Alan J. ciklin, P.A.
November 16, 1982
Page 3
Re: Melear P.U.D.
8. I believe it is fair to suggest that annexation
is currently possible and appropriate and that
you should arrange to appear before the planning
and Zoning Board for an informal discussion of
appropriate development of densities for the
subject parcel of property, because I am sure
that it would be the position of the City Council
that they would expect to receive recommendations
from the Planning and Zoning Board prior to taking
a position on the proper density for this piece of
proper t y.
Alan J. ciklin, P.A.
November 16, 1982
Page 2
Re: Melear P.U.D.
3. It is recognized that it is appropriate for
your client's property to become a part of the
City of Boynton Beach in order to provide a
reasonable basis for the provision of public
services to your client's property.
4. In a schematic map form, you have provided a
schedule entitled, "Melear P.U.D. adjacent
density comparison", which shows some density
comparisons related to the Melear property.
Carmen Annunziato, City Planner, has prepared
a similar map entitled, "Comparison of Gross
Densities Melear properties", which shows further
identification of densities in the area of the
Melear property. Your analysis of densities is
presented in the first paragraph of page two of
your letter. Carmen Annunziato's analysis of
densities show that the accumulative average of
gross densities for the projects shown on his
map is 5.62 units per acre.
5. It appears that the County Administrator's Staff
will certify an appropriate density that is con-
sistent with the City's willingness to provide
utilities.
6. I believe it is appropriate to interpret the city's
position on this matter as one that relates to
the rpovision of utilities to a reasonable and
supportable density pattern.
7. I believe it would be current City policy to
indicate to the county that a letter confirming
the availability of utilities from the city for
this particular piece of land would be supplied
only in connection with the completion of the
terms of the Agreement that was signed on August
18, 1982which indicates that your client agreed
to voluntarily annex to the city of Boynton Beach
as soon as annexation is possible.
p
;n cL.-1
11/16/82
Letter to Alan J. Ciklin to be reviewed
by Carmen and Perry.
( )J/--L!
Z-
fA #*1~
~,. .. ."",0"", ffice
'.t~'
~~,
of the City Manager
120 N.E. 2nd AVENUE
P.O. BOX 310
BOYNTON BEACH, FLORIDA 33435-0310
(305)734-8111
CITY of
BOYNTON BEACH
November 17. 1982
Alan J. Ciklin, P.A.
Boose, Ciklin & Martens Law Offices
Eighth Floor - The Concourse
2000 Palm Beach Lakes Blvd.
West Palm Beach, Florida 33409
Re: Melear P.U.D.
Dear Mr. Ciklin:
In further response to your letter of November 2, 1982 relative
to Melear P.U.D., it appears to me that the issues currently
before your client and the City are as follows:
1. Your client has entered into a voluntary agreement
to annex this property into the City of Boynton
Beach as soon as it is feasible. This Agreement
was made in connection with a desire to receive
water services from the City of Boynton Beach for
the purpose of developing this property and was
made in recognition of the fact that the subject
property is within the City of Boynton Beach
Utility Service Area.
2. Because your client's property is within the City's
Utility service Area, it is appropriate that
utilities be provided by the City of Boynton Beach
and it is further appropriate that the utilities
be provided in accordance with reasonable conditions
established by the City of Boynton Bea
, ~ ('>>1~~!
~~:,- iifiif!- .-=
Alan J. Ciklin, P.A.
November 17, 1982
Page 2
Re: Melear P.U.D.
3. It is recognized that it is appropriate for
your client's property to become a part of
the City of Boynton Beach in order to provide
a reasonable basis for the provision of public
services to your client's property.
4. In a schematic map form, you have provided a
schedule entitled, "Melear P.U.D. Adjacent
Density Comparison", which shows some density
comparisons related to the Melear property.
Carmen Annunziato, city Planner, has prepared
a similar map entitled, "Comparison of Gross
Densities, Melear properties", which shows
further identification of densities in the
area of the Melear property. Your analysis
of densities is presented in the first paragraph
of page two of your letter. Carmen Annunziato's
analysis of densities show that the accumulative
average of gross densities for the projects shown
on his map is 5.62 units per acre.
5. It appears that the County Administrator's Staff
will certify an appropriate density that is con-
sistent with the City's willingness to provide
utilities.
6. I believe it is appropriate to interpret the city's
position on this matter as one that relates to the
provision of utilities to a reasonable and support-
able density pattern.
7. I believe it would be current City policy to
indicate to the county that a letter confirming
the availability of utilities from the city for
this particular piece of land would be supplied
only in connection with the completion of the
terms of the Agreement that was signed on August
18, 1982 which indicates that your client agreed
to voluntarily annex to the city of Boynton Beach
as soon as annexation is possible.
CITY of
BOYNTON BEACH
~.. . Offico
vJJ
of the City Manager
120 N.E. 2nd AVENUE
P.O. BOX 310
BOYNTON BEACH, FLORIDA 33435-0310
(305)734--8111
November 17, 1982
Alan J. Ciklin, P.A.
Boose, Ciklin & Martens Law Offices
Eighth Floor - The Concourse
2000 Palm Beach Lakes Blvd.
West Palm BeachJ Florida 33409
Re: Melear P.U.D.
Dear Mr. Ciklin:
In further response to your letter of November 2, 1982 relative
to Melear P.U.D." it appears to me that the issues currently
before your client and the City are as follows:
1. Your client has entered into a voluntary agreement
to annex this property into the City of Boynton
Beach as soon as it is feasible. This Agreement
was made in connection with a desire to receive
water services from the City of Boynton Beach for
the purpose of developing this property and was
made in recognition of the fact that the subject
property is within the city of Boynton Beach
Utility service Area.
2. Because your client's property is within the City's
Utility service Area. it is appropriate that
utilities be provided by the city of Boynton Beach
and it is further appropriate that the utilities
be provided in accordance with reasonable conditions
established by the City of Boynton Beach.
.
Alan J. Ciklin, P.A.
November 11, 1982
Page 2
Re: Melear P.U.D.
3. It is recognized that it is appropriate for
your client's property to become a part of
the City of Boynton Beach in order to provide
a reasonable basis for the provision of public
services to your client's property.
4. In a schematic map form, you have provided a
schedule entitled, "Melear P.U.D. Adjacent
Density Comparison", which shows some density
comparisons related to the Melear property.
Carmen Annunziato, city Planner, has prepared
a similar map entitled, "Comparison of Gross
Densities, Melear properties", which shows
further identification of densities in the
area of the Melear property. Your analysis
of densities is presented in" the first paragraph
of page two of your letter. Carmen Annunziato's
analysis of densities show that the accumulative
average of gross densities for the projects shown
on his map is 5.62 units per acre.
5. It appears that the County Administrator's Staff
will certify an appropriate density that is con-
sistent with the city's willingness to provide
utilities.
6. I believe it is appropriate to interpret the city's
position on this matter as one that relates to the
provision of utilities to a reasonable and support-
able density pattern.
7. I believe it would be current city policy to
indicate to the county that a letter confirming
the availability of utilities from the city for
this particular piece of land would be supplied
only in connection with the completion of the
terms of the Agreement that was signed on August
18. 1982 which indicates that your client agreed
to voluntarily annex to the City of Boynton Beach
as soon as annexation is possible.
Alan J. Ciklin, P.A.
November 17, 1982
Page 3
Re: Melear P.U.D.
8. I believe it is fair to suggest that annexation
is currently possible and appropriate and that
you should arrange to appear before the Planning
and Zoning Board for an informal discussion of
appropriate development of densities for the
subject parcel of property, because I am sure
that it would be the position of the City Council
that they would expect to receive recommendations
from the planning and Zoning Board prior to taking
a position on the proper density for this piece of
property.
If you have any further questions regarding this matter, please
let me know.
Sincerely,
CITY OF BOYNTON BEACH
!~L JottY
V:te~ L. Cheney
city Manager
PLC:mh
Enclosures
cc: Carmen Annunziato, City Planner
Perry Cessna, Director of utilities
Central Files
GUMl-"AHI~UI\I
Ur
l:itiU~0
U t: I\J 01 I II -..,
I
MELEAR
PROr-'ERTIES
___ _. _-----1 __ _
-----' ~~~--------
<: .:.-",,,&1
1
t
.. - - .... c== p==:
" fI
"
_C I
,
I'
I ':
f. ; "
'-
i :;
,
~: "
I
B 9
_____u --- .----
~, -- ---
(
I,
r
r
"
,
;
,
I
,
~, ~
{' ~f1~ I
~
.. " r- !
8 ,--' S
,- '-ILJ;; ".' , '
~,~TDff -- !,
, ~iI!8 flta ~ !
,,' lLc
;:'~'1]'j ~e-; I
.
~ ,,~, "J ~ f- I
-, :J;L-f:f
='1 _or , ~ .] -'
._., I. ),.,::
'- \ --,...-.
~ . ""'~ . t----c-~;ri
,
"
"
C ,
1\
I
Ii
1\
I ~.) ~ 6
" ~ ,'.- -,
,
.
i
t P I 0
" -.
, -,
.
1 I~
'-:..:...::.:r'-"-~--'-~-:
1. ......ll_O'...~.C;cov...UO
'.QQ
!.,',' c
I
!
i.,
.'~
-~
~aQI"lIn
1. "'&4__1001'\11>
I,U
J. S"""l :o.>"Uh...uu
'.05
.. S4J>dA.h<lS...
1.61
,. c.:....,....t.o....UD
B.lll
.. hnoUl11
1.10
J. c.:..L.t.ooo""
LH
.. ...yntont.o.....up
L51
.. IiOlll.J.dO.eo....tryClull
1."
UD ""'tQ""'''
...1.....
"---=--:--- :f==-=-===,
JI r
-' -,I ,
I! ~
.~
I I~C-~I .
U_____,j =~ ' (
i rT,~~"l f
I ' .-~ I~~"
I'{II C "-"';.
"j
,_1-- ,___',-' -11 r,'
~',--r'-!I- i~
.
I-
I rJ
2
,
t
t
, _M i
I t
. !
,
~ t
,
J ^
~ [
_._u. . ,: ,'"- ~-. ~ i'
--.. )i
" I
s " , ,
1 r
,
,
--:-=-~==-:::3..:.-..-=_~ l ,
- ~-~.. ..- A .
- .. - I . vrr;".
i "4) 5
~ ,
, I
i
t
" ; SE.: , ,
I
---- h___"-'-_........._ " I
--, ...__..u.___ -, -' ------ !
"-
,- ,
I f,
!
~
- cA/l{.-t~ ~
-,
g
'\
;r.
lIJ
'>/
.!)!
~
\J
"
,Ii
~
~
=======1
I
I
I
I
I
I
_______..J
--;---,----,
, , I
~-',', I
\",' I
I
I
________ _J
_~'(fyD.l!=' _-,
,
I
. -'.. '
". -" .-
/j
:/
'..'~-J~-
..,
n
')
("
('I
pO
r,
"
REPLY MESSAGE
FROM
r
--,
Carmen S. Annunziato
City Planner
Peter Cheney
City Manager
TO
Nov.16,1982
DATE: -
Melear Property
SUBJECf:
P'OLD +
I concur with the statements listed in your letter
to Alan Ciklin dated November 16, 1982.
CSA:mpc
'f.,
, .
CC: Perry Cessna
SIGNED
PLEASE REPLY, TO
REPLY
DATE:
SIGNED
FORM F269 Available from GRAYARC COo. INC.. New Hanford, Conn. 06057
THIS COpy FOR PERSON ADDRESSED
.
-------- ------....--- ---.- -.- -- -- . ----.--..,- ~-----'--"~._~---- .
J
r
t'.:..
.....-
./
j
REPL V MESSAGE
FROM
I
-"1
Carmen S. Annunziato
City Planner
TO
Peter Cheney
City Manager
SUBJECT:
Melear _PEopeE:t:~~s/Del1~i_t::Y _~
j)A TE: N()V--"_~2.-!l9 82
,.OLD..
Accompanying this memo you will find a comparison
of your densities of projects adjacent or in the area of
the Melear property. The cumulative average of gross
densities for the projects shown is 5.62 units per acre.
CSA:mpc
Attach.
"~"'''''=''_","'~ _........,,~,_""-_~_... _.__" _..~.=_~".",.,....--.__.,,,,~,,,___--=-,._.,_, ~ .....__..-..'_. _-.-._.,,___.___._.~____,_~_._' ~ _ .,~.._", ."''"'''''''c...,....' ,'-'_'" "'.- . ~._~>i:!
PLEAS. REPl Y TO
SlGNED~ yf
.-
REPLY
SIGNED
~
--~---......,._~----
FORM F269 Avadable from GRAYARC CO., INC.. New Hartford. Conn 06057
THIS COpy FOR PERSON ADDRESSED
MEMORANDL
. .
TO
Peter Cheney
City Manager
DAU November 10, 1982
!".
.J!
FILE
FROM
Carmen S." Annunziato
City Planner
5U8JECT
Ciklin Letter/Melear Property
This memorandum is in response to your request for
comment concerning Mr. Ciklin's letter of November 2,1982 and
specifically the discussion which occurred at a meeting held
in the County Zoning Director's office on October 27,1982.
The parties present at the October 27th meeting were Mr.Ciklin,
Mr. Hoggard of Gee and Jensen, Mr. Melear, Mr. Morley of the
County Planning Office, Mr. Lunney, the County Zoning Director,
Perry Cessna and me.
The discussions held at the meeting centered on Mr.
Ciklin's inability to secure a letter confirming the avail-
ability of utilities from the City. The reasons put forth in
this regard were Boynton Beach's immediate desire to process
the development applications and an unwillingness to enter
into a development approval process without a prior understand-
ing of an acceptable level of density.
Mr. Ciklin reduced the scope of discussion to two
principle concerns, one being attempting to secure the utility
letter without the benefit of immediate annexation and the
other being an attempt to secure from the City an understanding
of what level of density the City would offer in return for
annexation. With respect to the former, Mr. Ciklin was advised
that he could always request the City Council to authorize a
utility letter if the administrative staff was unwilling to
do so and, with respect to the latter, Mr. Ciklin was advised
to send a letter to the City Manager requesting an answer
concerning dens,i ty. Beyond this, nothing else was decided;
however, the County advised Mr. Ciklin that they would only
certify for public hearing purposes, the density which the
City would be willing to serve utility wise.
The additional information requested will follow in
short order.
CSA:mpc
.
GA~~'~_< (r ~u::::t.
Carmen S: Annunzi 0
City Planner
CC: Utility Director
Central File
?h"'d-.
CITY of
BOYNTON BEACH
~
..,.
.
~
~
120N.E. 2nd AVENUE
P.O. BOX 310
BOYNTON BEACH, FLORIDA 33435-0310
(305) 734-8111
November 8, 1982
Alan Ciklin
Boose Ciklin & Martens Law Offices
2000 Palm Beach Lakes Blvd.
West palm Beach, Florida 33409
HcJ::,~ (ltt"C'"J
OatL--JLfJ / r------=__
Time 'II! V s-
Re: Melear P.U.D.
Dear Alan:
I have reviewed your letter of November 2, 1982, and have
asked Carmen Annunziato to provide me with a report on the
October 27, 1982, meeting.
In addition, I have asked Carmen to provide me with a map
that shows the densities for all of the property adjacent to
the Melear tract including that property on the east side of
Congress Avenue, which was left off of your sketch.
After I have received this information from Carmen, I
will be in touch with you with a further response to your
letter.
'Sincerely,
CITY OF BOYNTON BEACH
~/~,: &:? c~4
Peter Lo Cheney
City Manager
PLC : j C
cc: carmen Annunziato
central File
Mayor and City Council
~,M~
MEMORANDUM
November 8, 1982
TO: carmen Annunziato
City planner
RE: Alan Ciklin's Letter of November 2, 1982
Melear P.U.D.
please review the attached letter and provide me with J 4.. ".- . p
written report concerning the discussion that took place at ")'0
the meeting on October 27th relative to densities.
would you also review the attachment to Alan ciklin's j
letter and provide me with a similar attachment that addresses ",-~",,-.......J
densities of development on all land adjacent and in the area I ,It<
of the Melear tract including the east side of congress Ave.
/)
(l(L d~4
Peter L. Cheney
city Manager
PLC : j c
Attachment
cc: Central File
Rec
Date
--
Time _ ./~
iac:x:a:
ClllKUn &
mARrEn~S
LAW OFFICES
':;1
,
:~
;',
,
1,:,)
WILLIAM R. BOOSE. III
ALAN J, CIKLlN, PA.
ANNI W, COLLETTE
STEPHEN FRY
RICHARD L. MARTENS, P.A,
KERRY R, SCHWENCKE
2 November 1982
. NOV 1982
. '~..~r;~::*,~
. ,~:o' ~ ..''''":\
::~~,'? /;t{-:~'~~.~~
Mr. Peter Cheney
City Manager
City of Boynton Beach
Post Office Box 310
Boynton Beach, FL 33435
Re: Melear P.U.D.
Dear Peter:
On Wednesday, October 27, 1982, Carmen Annunziato and the
County Planning & Zoning representatives met with Larry Melear,
Ron Hoggard of Gee & Jensen and myself to discuss a method of
resolving the apparent log-jam with the Melear P.U.D. The
problem, from our standpoint, arises due to the fact that Palm
Beach County has a Comprehensive Plan designation for this
property in the 8 to 12 unit per acre category with up to 16
units per acre with a transfer of development rights. The City
does not have a Comprehensive Plan recommendation for the site
and apparently is using the County's previous Comprehensive Plan
designation of 3 to 5 units per acre. We have, of course,
agreed to annex into Boynton Beach in exchange for water and
sewer service and continue to stand by that commitment.
However, the City desires us to go through all governmental
approvals in Boynton Beach rather than proceed through
governmental approvals in Palm Beach County and then annex. The
comprehensive planning progress, as we see it, provides
guidelines to City and County Commissions for future development
as well as providing property oWners a guideline as to what they
can expect to be approved for their property. In the case of
the Melear P.U.D., we have that guideline in the unincorporated
area, but do not have such a guideline in the incorporated area
of Boynton Beach.
.
Based on the foregoing quandary, Carmen suggested that I
request to have the Melear P.U.D. brought before either the
Boynton Planning Commission and/or Boynton City Commission to
discuss, probably in a workshop session, what they envision to
be a reasonable density for the Melear P.U.D. By doing this, we
will have a better picture of what to expect should we elect to
go to the City of Boynton for our governmental approvals and the
workshop review of the site will give us the same benefit most
developers have, that is, a Comprehensive Plan rec~nmendation
for future development~
L EIGHTH FLOOR, THE ConcOURSE' 2000 PALM BEACH LAKES BLVD, WEST PALM BEACH, FLORIDA, 33409 ' I30SI 689, 9595
T~ 510'952'7646
-
I
I I
I \ I
. I
I I 3.6 DUlAC I
L_- L-- __....1--- _
---3-- - MINER.:BQ_-...---
- ----"1 ( I
I I I
KNOLLWOOD I 3.5 DUlAC I \ I
9.3 DUlAC L _ I'.
I -1 \,\9.0 DUlAC \ 9.3 DUlAC J w
I 'l >
I l-----~ I MELEAR ~.U.D. ~- :
_------4 I 9\~U/AC OV~~::/--1 en
15.5 DUlAC I \. .. ~ / IW
I I "-..'--_____, a:
I \ --r ~
J I .0
1------1 I 9.5 DUlAC I 18.4 DUlAC 10
I I
I I
.
MEADOWS 300 P.U.D.
\
\ 7.7' I
4.7 DUlAC \ DUlAC t
I, :: 7 DU/:C
I 7.0 DUlAC .
(MOBILE HOMES)
I SAND AND SEA ,
I (MOBILE HOMES) I
I I
~- -~-E
- N.W. 22 NO. AV .
--
CONGRESS
LAKES
I
I
I
.
.
_J
,
.
-.--J
MELEAR P.U.D.
ADJACENT DENSITY COMPARISON
s:
..
..
o
<:
1" = 600'
(J?l,e /
*~
:> r:ove.r~Lp J; 1 ('''';:':2
~,,1r. Pe-tel: C1-:CDf1V
C1.. t'\J r:'an?;q0r
ri t ~/ ,"')f ?oynt.0n ft~;'H~~
f"CF.t OffiJ~€ lI"(')y ~1f:
!?o'l\,mt~n t',el\~1:, 1"1, :3:~4.1~:
Rn: "/("1f1:'&\!' 'f.\.lj..f".
r'e(~r f'~t ~r t
:,"r, 'i",~~d~~$dav, 0cto't'~r '-7. ].('102, C?'trrnen p.."nnr:n~,,:i.~t.n cn(1 tht'!-
('.ounty rl~nl1inc ~ Zonina r(:1r:rp9Hntatlv~s me-t "':i.th L~rr"V r.i~lp;a,Y,
non l-:Qorl"l\.rr'J cf ;;~t? (.. .:ren$~n. arH~ nye&lf to ~'i..scup.;g. -?, 'v"+:h~'''(~ {,',
r~e~;.lvin('J' tht"": (l~'np',rpnt lor"-i~rr( ';:dt'h t.}He ,:,1ele:ar p.r'. f). :r"'l>]~
"'ro'\.-lc;p,~ror;,: nnr 5tanr1rotnt.. arifie$ !.~lU!! to t.11e .fi;lCt t:--iat pfiJr,
p(I"~,C'l', ("(,\l1!"it? ..),S~ ~ CCH~rreri?n~d.""'~ 'Pl~~ ~~~~lqn1!:,t-ir:'r1 :for t"b.i.s
::---r~':"";(,lrtv.lr tl':e:: i:o I? nt:it l''.':'r acre cat~('!('!r~1 Nit1.., un t.O It;
Dnits Pf'r acrl?~'Jit~ ~ t~rnnsff..'c'r of f!pvel(':.'r.~.,nt ri,('!'ht_D. "rhf~ f"it.'/
(~Cte""'~~ 7'}C't l~(.,'V.o ~ r0~rrr€''te;''1$1'O'J~ rl~,tl :r~r."..,mr:ie:r1'1Piti()'r1 ~rt'()r t"l'p t1:itc
tn""l 7~r"n"",r~~tl V ; -'. n~f.!"ir.7 t,1-;(? r("'n~ntv' ~ pr€vi.ov~ ("(')n_r-r"~~',~:'-n$jvp. TIHr-,
f~~$iN:r:"iti{')t" 0f ?, '-_n 17; ti:nitp: ;'H~r ,'$IoC!"'i-"<t. ~,ff!l hnv~, r, I':" C(H~r.".I:i{~,
{h.~r-r'-ed t~~ .,,\PTte'( IT':t.0 f'l.()vntnr, Pt:*~("l"' fr, e""eh~);r-y,,? :~r t,.TBtp_'r" ~r;t"
f'{/?-t..'f~r ,,~PT'vlcp ~nt~t contjr!:1~.p, to ,S?',tanr1 t.~1at C"c'r'''r~'it,r''~nt.
..ji':I.....t::"':v~r, t_l',<?J' rit:."/ d~r~~.r("s t1'P to r:C" tt'ir()t~f11~ p:ll (;()"7~~rf1..ri("nt,~}
;,~t-,""'::r{')'\r;r~l r-: In r'()\"'!1t.on rl:~:~c1-,; re,t.':c): t."h?1n t'ro(:~e~("O: t_'i1r("-!}:~1<"
"',;(y\-"-pr""--I."':1'-;tt"!1 ,,,,'c"nrc,v<-;l!'!: -in T)a.J\., ';'Pi"C"'; '---(HJnt'r err' t'hP!:i Dr;nf";X. ':Y:I';~
c(>";r'-r~,":lh,(?nsivr.< .2:.nr;i.r'j(~ rt"'oc;"r0:~r~, r~ \'It'i> r,(.~!i.:: it, r'rc,vidc~
,~n i ,~''?''l J IV':.... tD ('; t-:~' ""r:.t:@ C()ur~tv r~;-,;!>-j, ?;.;:;;j,r:-:n!7' -t:or C1..'3t ~}rf; t'~f"'Yol():r"ti?nt
;rH:; \''';'-:-11 ,,":.":1, 'i",rov,;_,"1n"'^' r:!"(.Jr~~'rt:y (J\r::,;"T'!l., ~ ;;',n:i~r.'1.hH'~ 'H', tc \fft'iS,t t'Ht'"",.
.;'~qn /T'x,'.ect tc ~"'(' ,n;r-':~r()..;!(''''-<: ~(>r' 't~',~,j!, ""-'r0',;';c!"'t:,~. 1::-;: tl-1? C,~Be of
ti1~ ~'01er";j n.,!. ., '.<;e- ""~VP th.~.t. Gui::~p:1 iriP i:'1 t~'\f' Hn:!nc.',~r.p()Tat(',!"l
~;X;~-'.J., h"t. i,~_D ;;-:"';.1: 'j it'r~";\ ~b(';"' ,. f:~'tdd('l1 irJ:' :in t).~:'!'lir>("'(:,r"'(~"rnt~i1 ?_r~E':.
(' f. \:~("'Y-r; L~n f'E'-.-).C';
;'~? ~p-t; ()r: t -S'e r'-:-'rc-::I,..~.n': "ualj..-1 f::J,"V, r.::1r~"1f':'ri !;'U;>':,;('!.~tl?:~l t.ha t. 1
rr:'''ftH:~:Q:t f:{,! :~l'Vf' tJ"C'. :"-;f,~lc?r I":'.~f.r. rrnuc!l"t l~~(_'fcr(~ ,:::'ftl~er t1;:of)
r-'r:vnt01i -r'J7-!!lH"'l],n.-: ::'on:f'~is.~i{jn en~~/("r POV-nt.f)Yi ~it..:.".r ():H -:,~l~1;.i0n t,o
"-;1 }";Ct1S:--::, ~-'r(')l.~::-,lv :in ..n ',.-;'or"~51',or' BF'f:",j,.:::,n, .......hG.t t'h:)v 4?:r:vl~~jon t<:'
~',c ti r t~i:; 9C'YlP:l-', l t:' .1r.p ~~" tv ,ror t:;-;r<: ~.;,;:.) 1,:;:.;:'\.r '7", i'.. 1".. '....'] r:; it'::::" f;"hi p, ';"'fl>'.
.,,;;11 r"i"';VO~ ;t: -;",:'ttf'r ~~';'Ct.l.H.l'" cf ~"h;..'" to t?':Yn~('t. s)".,;p}:i >-'€) (,'lect b:)
,.~(' tn t},-;,: .-,.~t~,~ ,O)J;' I"'c,':~"-)"'~_.,,: .(.'01:- ':""u'x ,.er:v~r':"'r'{-H't''i.J ?j""'r"L.t......,.r21 q .t'j 't1 ("1 t::'.::~
~.,";rv~......,~~.... s.r"_1'j0'c., r:'" -t:~..~~ :"":!tF- "i,.d.l] i,iv"'" 1Jf'; t'\.", ~n1"'?' ~-';i,l1E+-it .~(.~~t.
'1J1',U-f~1: n-:C",;."'r :-~, ~-'VL', ~.1.;~t, ;';;:', ,.. (''''')~'''r'''!,~~..'r't'';'l~.~:i'\,N'' ~l,~~!~; ~~'),C'I,');'''''':''''!'?r...,!:'~rti(';n
7C:ir f'l't_lJr~' ~C"!"'l,"'j: "'i:'>1~t..
t.';r. r.~t~r ("T.Ch'i":'V
? :':"over~~':',~)t" 1 !"~:::'
;13..":1(' '1'\'.'0
I ~'R".rG" t.al~~n t)-.~ 1 f~c:rtv of ~l""clo~ic.~f 3r H('~j~cent i1~l"Js:it../
(~('H\1i.~E*:rit1Qn rr~f'f:\rpc:~by' ~Jr. ~:";rJ(F'H~rf'.. 'There-n.s! tt~1:;; ft~("')'.m en'" t:.h~
1i,"ctr.~"' "r~ not n""ce~""'rilv o"''1:rnl1 ,l...n~i ti~" of "rl <!<ntir<'!>
~r("'>1"'!'ct, :_~ut, !:xe ~~ffectiv~ n~t. dff'!H~:ftJ(-~~ o-f: t,,!..,(-;,, Z'q.....r:-.t.(">~.iy.~tt'~
l~.cr.tlGf'l' l'th'",,,;"r'I. !.~or .t:"4IltC\.l""T'.l,.." C'c,r':f"'Irt"':'J<.'t l.al!2'F "1~. ~ ~n (l'v'(";rr,ll
!J('~n~it.'t/ ':)r 11.' l.:H1:ltF~'~r c.C"rc y,t1:+_ ,,{'1jaelt~p.t. t;to, t'--:e t';,e-l"'!a:r
nr('~r',(')rtv t!'"-4" e-.ctnA:l (~~~r:~lt_'v i p , 1":.7 ~'Jr.~,t~ i;:f'r :"!tcre. corvrr!J;{' 1":',
t}--~,'8 T';~.lf."::i.r l'.~'.!i.. };("\'j. l'ln C"'Jrr?11 A(t'n:e-it:.',/ ,...,.. .') l.'lt'''f{t,s !.+~r l'C!""1'!'
\...oit1. ;'0 effe:ct_i\l'f) ~'1~n~itv \:'o~t"'der;.n(')' Cl')n"~refi"~ 1,",\Jo:~~ (~~ 1 p. A ~!"l~1
:-1e-pf:itv ~"'Ic,;'\r.4eri~~ ~J-1'1nllt0'c-~~"'r~, of 3.tt. Ir ~1ey..tn~lr~"f' t:~'!p 'p;tt<:€("t';,
tJ:~ int.~lIr'f~cin1'! ~~,:,1 c~''Pat,ihi' 1t~...!, "",.I::. .4(:\"1!;f t,i.~t:l: ~,'?'t9' ~'r \iri"'\lIi'!r~/
~t"')rj4,":'~r'i'~ ?1~r1 \.....{~ t"~1 j (?VP ~,~;) ~'(l";VC .t;,ccn!';;~~l i ~1'e'-"! t:}-,~ t . Tr- ~..en.\. t: i 01" I
tl,Al'f.' :'Ire',! -f-'ActJ'::"rs f;\,;t;;~i a~ t"'1':~ r>'J)l:1:.Et€'rlCt' (".f: f:ru1nv 2:.....,llt~1~ F:H;,....,d."'f~s
f"t,,; t1.,t~ ;o"~r~ f~r:(' ~'ei!1" ~...,,~td_l.p ~~"""f'- t"'~r"'lf1 rq,,.,tl~ ,.."fw~:ll":1-','hav~'; v~r'/
i~tf'nf~~' -if"'velt:""r'r~~r,i:.r, ,.,,.It.''O\H'~r tl'7.:'1.r ,'~pn$,i.,t'.!' .trr r~lati,=:!~l'.~ le.......
Pl @>1'\i7,('> ("cnf~:Ll~r t}-j s- nut' l~t;};;":tle$.t t(", f"BVl' th+?' x;~~.".tt€;r c:~ t't-.$.;'
v,~l~(\r -:;'.r:. f.'-. hr(tl):t1'I~t. l',€:,-fc-r~ th(1'- ~t"'r;r"'r'ri.€"t.e!:""e{.:i~e t.o ('7tfJ,f':VqE1:
t?~f." rp.co!'('!,~erH'l~.1 denti5:tty if' t.1~,f:': City 0F T":nynt.cn t"f.'i.t\':'''-.. ~,~"(', c,r-
("'()\~rff1?, uenl"'! li"'l? to ~"~' ~':ref'Jr~nt. \',':}~.r:rn t~l'd,f1: nBttr>>!" ~.~. ';;i!!-1lCllC,~C;'.;\
1$0 tl,:(:\t ",.j4~ r'~a.y n-l'c;-vi(~".." 1,>Jl"el,t '",'"r:: lc'f'l i~v~ is "'!~ll,'lahl4'f.) lnrl..d:-.. "~,B
P':l":la""~~, t1'~n1:~ :-/(.u fc,t" 'VGnT ......~.r::r~.:rn+:;..~T\ il':; trts rroi1",tt_~r.. I st-,;"lll
a\..,.r~Jt, ~,"-r;;Hr rp-;:"lv.
::~i nc~r~ly,
;~l~HT ,J. r!l'l.in
~,1C /} ..r,
~(':t ~"~r. !,;:tr't"\)" ?'!.elp.~,r
Pt':t"ry ,Jo'h"stcn, r-~...,ujrp;
~'!r. ?o~ t,~ory,.".~r'l
~!r. Car-rt0n An.nU'07iato
~Jr. r'f!'rry r:~ ftSD1'\
'~r. ~;h"7:'"r;;t,11Y Lur.r>i"Y
"
t
'fI
MEMORANDL'A
DATI[
Sept. 29, 1982
TO
Peter Cheney
City Manager
FILE
"'''OM
Carmen S. Annunziato
City Planner
5UIIIJI!CT
Development/Melear Tract
On Tuesday, September 28, 1982, I met with Tim Lunny, Zoning
Director and Richard Morley, Principal Planner for Palm Beach county
concerning the Melear tract. Specifically, we discussed the po-
tential for development of this tract and the associated density.
The Melear tract is designated Medium-Medium High in the
Palm Beach County Comprehensive Plan which correlates with a
base density of 8 units per acre. Up to 4 units per acre density
bonus may be awarded for developing a Planned Unit Development and
an additional 4 units per acre may be transferred to this property
from reserved property. This, of course, provides for a range
of densities of from 8 to 16 units per acre which may be awarded
subject to compliance with the Comprehensive Plan performance
standards.
Based on these preliminary discussions with the County staff,
it is apparent that the owners of the Melear tract would likely
receive approval from the Board of County Commissioners for a
Planned Unit Development with a density of 9 1 ~its per acre if they
can meet the performance standards. Owing to the fact that Congress
Avenue is to be reconstructed northward from NW 22nd Avenue to
Hypoluxo Road, the critical factor for density becomes availability
of sewers and water facilities. Sewer and water facilities may, in
fact become the only limiting factor as the County staff would like-
ly certify an application for rezoning in the unincorporated county
at whatever density the City is willing to serve within the limits
of the Comprehensive Plan Land Use Classification.
I will continue to advise as more information become
available.
c:::::~ Sf ~..r.:-
Carmen S. Annunz'ato
City Planner
CSA:mpc
CC: Perry Cessna
Central File