Loading...
REVIEW COMMENTS Parks Division Memorandum- TRC To: Mike Rumpf, Director of Planning and Zoning K~Y From: Kevin J Hallahan, Forester! Environmentalist Subj ect Borgata- Melear PUD New Site Plan -1" Review Date: October 11, 1999 The landscape plan for the three (3) lakes on the site indicate littoral! upland plantings for only two of the three lakes. Lake No 3 does not indicate any plantings. The applicant should show plantings for this lake or provide a written reason why this particular lake will not be landscaped with proper vegetation. The project should continue in the normal review process. CITY OF BOYNTON BEACH, FLORIDA INTER-OFFICE MEMORANDUM FROM: Sgt Thompson DATE: 10-11-99 FILE: SUBJECT: Melear P.U.D. Site Plans REFERENCES: ENCLOSURES: TO: Michael Rumpf Mr. Rumpf, these site plans are insufficient and not complete for me to evaluate the traffic data required by city code. When reviewing these plans, I check the following Chapters as outlined in the City Ordinances Manual to see that they comply with standards. Chapter 6 (Required Improvements) Chapter 21 (Signs) Chapter 22 (Streets and Sidewalks) Chapter 23 (Parking Lots) lfA.(t.c. Fl..ov-l ~ 3.tof S '''1>-r'S ,AM'.....)) pL.....~ "'\0 !fL)-'<>,c",,\\, pA'HC_.., ~\-\U..... There are no drawings attached to these plans to properly evaluate. MM.\(') !:. ~Tc... . FIRE & LIFE SAFETY DIVISION Memorandum No. 99-345 0',' '. ." " - ~' NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire Protection Association codes, and the City Fire code shall be adhered to. TO: Mike Rumpf, Director Planning & Zoning Division FROM: Steve Gale, Fire Marshal '/ C--/ Deputy Chief - Fire Rescue De~ment DATE: October 11, 1999 SUBJECT: Melear PUD/Borgata Phase 3a & 3c NWSP 99-019 We received only landscape plans of which we have no comment. We have not received or approved a new site plan. This project is not ready to go forward until all site plan information is provided. CC: File Rumpf, Michael From: Sent: To: Cc: Subject: Gale, Steven Monday, October 11, 19994:20 PM Rumpf, Michael Borden, Bob NWSP 99-019 FIRE & LIFE SAFETY DIVISION ~.' V Memorandum No. 99-345 NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire Protection Association codes, and the City Fire code shall be adhered to. TO: Mike Rumpf, Director Planning & Zoning Division FROM: Steve Gale, Fire Marshal Deputy Chief - Fire Rescue Department DATE: SUBJECT: October 11, 1999 Melear PUD/Borgata Phase 3a & 3c NWSP 99-019 We received only landscape plans of which we have no comment. We have not received or approved a new site plan. This project is not ready to go forward until all site plan information is provided. 1 DEPARTMENT OF DEVELOPMENT BUILDING DIVISION MEMORANDUM NO. 99-229 TO: Michael Rumpf, Planning and Zoning Director C' ~. Michael E. Haag, Deputy Building Officia~' ~ October 12,1999 /(J nrr , 1 lOCK; FROM: DATE: RE: Melear P.U.D. Phases 3A and 3C - New Site Plan (NWSP 99-019) Ist review comments We have reviewed the subject plans and offer the following comments that shall be addressed prior to the project being forwarded for Board review: Buildine: Division (Permit & Site Soecific Comments) Michael E. Haae: (561) 742-6352 1. Submit a site plan drawing of the recreation site. The plan shall show the required parking area and the proposed accessible sidewalk system. Identify the setback dimensions that identify the distance the recreation building is located from each property line. Please note that the dimensions of the overhang, covered walkways, canopies or awnings shall be included when identifying building setbacks. Show on the plan dimensions that identify the location of the swimming pool, tot lot and volley ball court. 2. Add to the building that is shown on the site plan drawing a labeled symbol that represents the location of the handicap accessible entrance door to the building. Also, label the location of the handicap accessible door on the floor plan drawing. 3. Identify on the site plan the location of the handicap accessible parking space(s). The quantity of the spaces shall be consistent with the regulations specified in the Florida Accessibility Code for Building Construction. The accessible parking space(s) that serve a use shall be located on the shortest safely accessible route of travel from adjacent parking to an accessible entrance. 4. Add to the site plan drawing a labeled symbol that represents the path oftravel ofthe accessible route that is required between the accessible parking space(s) and the accessible entrance door to the building. Use the symbol to delineate the location of the accessible route that is required from the accessible parking space(s) to each of the recreational amenities (swimming pool, tot lot and volleyball court). Add text that would indicate the labeled symbol represents the accessible route and the route is in compliance with Section 4.3 (Accessible Route) and 4.6 (Parking and Passenger Loading Zones) ofthe Florida Accessibility Code for Building Construction. Please note that at time of permit review, the applicant shall provide detailed documentation on the plans that will verify that the accessible route is in compliance with the regulations of the Florida Accessibility Code for Building Construction. Building Division Memo No. 99-229 to Michael Rumpf RE: Melear P.U.D. Phases 3A & 3C - New Site Plan -1 st review comments October 12, 1999 Page Two 5. Within the site data, identify the proposed finish floor elevation of the building (lowest floor elevation). Verify that the proposed elevation is in compliance with regulations of the code by adding specifications and notes to the site data that address the following issues: a) From the FEMA map, identify the title of the flood zone that the building is located within. Where applicable, specify the base flood elevation. Ifthere is no base flood elevation, indicate that on the plans. b) As the design professional-of-record for the project, state that the proposed floor elevation is above the highest 100-year base flood elevation applicable to the building site, as determined by the South Florida Water Management District's surface water management construction development regulations. [Section 3107.1.2, Chapter 31 of the Boynton Beach amendments to the 1997 edition of the Standard Building Code] c) Identify the floor elevation that the design professional has established for the building within the footprint of the building that is shown on the site plan, floor plan and civil plan. 6. Add to the site plan of the recreation area detailed and dimensioned elevation view drawings of the site signage, including dimensioning the width and height of the sign and the overall height of the sign structure. Add computations to the drawing that verify the total sign area is in compliance with the regulations specified in the Sign Code. Also, show and dimension on the site plan drawing the location ofthe sign and the distance the site sign is located from the adjacent property lines (note: ten feet is minimum setback dimension from adjacent property lines). If a site sign is shown, delineate on the landscape plan the location of the landscaping that is required for site signage. Drawings of the signage shall comply with the applicable regulations specified in the Sign Code (Chapter 21 of the Land Development Regulations) Or Place the following note on the site plan: "Site signage is not approved for this project Separate site plan review and approval is required for site signage." 7. Add to the submittal detailed and dimensioned elevation view drawings ofthe building signage. On the elevation view drawings of the building, identify the location of the wall signage and dimension the length and height of the signage. Also, identify the total sign area and provide computations that verify the sign area(s) is in compliance with the Sign Code. Drawings of the signage shall comply with the applicable regulations specified in the Sign Code (Chapter 21 of the Land Development Regulations). Or Place the following note on the site plan and building elevation view drawing(s): "Building signage is not approved for this project Separate site plan review and approval is required for building signage." Building Division Memo No. 99-229 to Michael Rumpf RE: Melear P.D.D. Phases 3A & 3C - New Site Plan _1st review comments October 12, 1999 Page Three 8. Add to sheet L8 of 12 the distance the site sign is located from the adjacent property lines (note: ten feet is minimum setback dimension from adjacent property lines). [Sigo Code (Chapter 21 of the Land Development Regulations)] 9. Add to the site plan drawing of the recreation area a labeled symbol that represents the location of the site lighting poles. Add a note to the site plan indicating that the locations of the site lighting poles are conceptuaL Also, note that the site lighting fixtures will illuminate the site consistent with the specifications identified in the Parking Lot Code/Landscape Code. Include, within the note, the overall height dimension of the site lighting pole and fixture. The overall height ofthe pole/fixture shall not exceed the height limitations of the Zoning Code. 10. On the site plan drawing of the recreation area, identifY the symbol that represents the property line. II. At time of 2nd review, submit a current surveyor plat drawings ofthe subject project. 12. Add to the site plan ofthe recreation area all easements that are shown on the survey/plat. The location, type and size of the easement(s) shall be shown and identified on the site plan. Where applicable, amend the plans so that structures do not encroach into an easement. 13. Add to the site data the number of stories in the recreation building. Also indicate the overall height of the building (finish grade to the highest point of the roof). The overall height of the buildings shall not exceed the height limitations of the master plan. Dimension the overall height of the building on the elevation view drawings of the building. 14. Below the floor plan drawing of the recreation building, add text that would indicate that the room layout of the floor plan is conceptuaL 15. Indicate on the site plan, within the floor area of the building, the total floor area ofthe building. 16. At time of permit review, submit signed and sealed working drawings ofthe proposed construction. Building Division Memo No. 99-229 to Michael Rumpf RE: Melear P.U.D. Phases 3A & 3C - New Site Plan -1 st review comments October 12, 1999 Page Four 17. To properly determine the impact fees that will be assessed for the proj ect, provide the following information: Submit a notarized affidavit on the letterhead of the owner, company or association. The letter must contain an answer to the following questions. (a) Will the ClubhouselRecreation building be restricted to the residents ofthe entire Melear P.D.D. only? (b) Will the residents have to cross any major roads or thoroughfare to get to the ClubhouselRecreation building? (c) Will there be any additional delivery to the site? (d) Will there be any additional employees to maintain and provide service to the site? Once this information is complete, the City will submit it to the Palm Beach County Impact Fee Office for impact fee determination. 18. Place a note on each sheet of the landscape plans indicating that a landscape permit and irrigation permit is required. The permits will be required for all landscaping that is located on common ground, landscape buffers or any parcel that is dedicated to the homeowners association. Note the following exceptions to the permit requirement: recreation site and parcels where the landscaping is covered by the plat documents. The landscaping and irrigation for the recreation site shall be included with the permit for the recreation building. 19. Add a symbol to the landscape plans that identifies the location of the landscaping material that is described in the plat documents. 20. Remove the word conceptual from all landscape drawings. 21. Add to each of the landscape drawings the title of the common area designations that match those that are identified on the plat documents. The designations shall be placed within the appropriate areas. 22. Submit for review a sample of the Cumulative Total Square Footage document that is required per note 10 of the master plan. This document shall include the square footages for the townhouse buildings that are located in Phase 3B. MEH:bg \\CH\MAIN\SHRDA T A \Development\Building~6870\Documents\TRC\NWSP 99-019 1st review Melear PUD Phase 3A and 3C.doc LEISURE SERVICES: PARKS MEMORANDUM #99-119 FROM: Michael Rumpf, Planning & Zoning Director John Wildner, Parks Director kJ Melear PUD - New Site PI~9-0/9 TO: RE: DATE: November 2, 1999 The Parks Division has reviewed the new site plan for phase 3 ofthe Melear PUD. The following comments are submitted: I. A previous developer was granted one-half credit and paid the remaining half recreation dedication fee based on the continued provision of the required private recreation (According to Chapter I, Article V, Section 3 ofthe Land Development Regulations). 2. Phases 3A and 3C show the following private recreation: 1. Children's play apparatus area 2. Landscape park like and quiet areas 3. Family picnic areas 4. Game court area 5. Swimming pool 6. Recreation center (meeting hall) One-half credit for private recreation continues to be recommended for phases 3A and 3C. 3. The developer made a marketing decision to consider the town house section (phase 3B) separately in regards to recreation. In order to qualify for one-half credit for private recreation, the developer agreed to make the following separate private recreation facilities available to town house residents: 1. Children's play apparatus area 2. Landscape park like quiet area 3 Family picnic area 4. Sand volleyball court 5. Swimming pool In addition, the developer agreed to include a provision in the Home Owner's Association documents allowing town house residents to hold their association meetings in the recreation center/meeting hall located single family home sections (phases 3A and 3C). 4. Based on the developer making the above-listed changes, one half credit is also recommended for the town house section (phase 3B) of the Melear PUD. JW:ad xc: Ken Hall Alea, Joann From: Sent: To: Subject: f' ' Wildner, John ~"'< Thursday, October 21, 1999 1 :07 PM Alea, Joann RE: Need comments for Melear PUD (NWSP 99-019) I met with Julian Bryan, rep for the developer, this morning; he is revising the Townhouse Section of the P.U.D. to show 5 separate recreation elements necessary to qualify for Y, credit already granted towards the recreation fee. A previous developer has already paid the initial half of the fee in lieu of land. Julian expects to have plans revised within a few days which include additional private recreation. Assuming he meets requirements of The Land Development Regulations, Chapter 1, Article V, Section 3, Boynton Beach fees/dedications, I will be able to sign off on the revised plans. -----Original Message----- From: Alea, Joann Sent: Thursday, October 21, 19999:30 AM To: Mazzella, Pete; Wildner, John Subject: Need comments for Melear PUD (NWSP 99-019) 1 Alea, Joann From: Sent: To: Subject: Wildner, John Tuesday, October 19, 1999 1 :23 PM Alea, Joann RE: There is an outstanding issue concerning Yo credit for private recreation provided which needs to be resolved. I am working with Chip Bryan of Melear, and hope to sign off on this project in the next few days. -----Original Message----- From: Alea, Joann Sent: Monday, October 18,19994:10 PM To: Mazzella, Pete; Wildner, John Cc: Kribs, Carol Subject: Need your comments for Melear PUD New Site Plan 99-019. Thank you. 1 Alea, Joann From: Sent: To: Cc: Subject: U.' , Mazzella, Pete "'V-1. l~.C , Thursday, October 21, 199911:52AM Alea, Joann Guidry, John RE: Need comments for Melear PUD (NWSP 99-019) Joann After reviewing the landscaping plans on this project, we do not have any additional comments. All of the water and sewer issues have been satisfactorily addressed in conjunction with the other phases, or will be addressed in the plat document. Thank you for your cooperation in this matter. A hard copy memo will not follow this e-mail. Peter Mazzella ---Original Message--- From: Alea, Joann Sent: Thursday, October 21,19999:30 AM To: Mazzella, Pete; Wildner, John Subject: Need comments for Melear PUD (NWSP 99-019) 1 DEPARTMENT OF DEVELOPMENT MEMORANDUM ENG 99-132 TO: Michael W. Rumpf, Director of Planning & Zoning FROM: Jack Casler, P.E., P.L.S., Acting City Engineer DATE: October 20, 1999 RE: MELEAR P.D.D. - NEW SITE PLAN (NWSP 99-019) 1 ST REVIEW COMMENTS 1. Correct spelling of "Minor" Road to "Miner" Road. 2. The "street trees" are in utility easements and Utility Dept will only allow palms. 3. Correct the plans to reflect the cut corners depicted on the plat and construction drawings. 4. Incorporate a key map on each page for easy reference to the twelve-sheet submittal. JHC/ck C:\My Documents\Melear PUD New Site Plan 1st Review.doc DEPARTMENT OF DEVELOPMENT MEMORANDUM ENG 99-132 TO: Michael W. Rumpf, Director of Planning & zonin~!\ fl Jack Casler, P.E., P.L.S., Acting City Engineer (~/ October 20, 1999 / FROM: DATE: RE: MELEAR P.U.D. - NEW SITE PLAN (NWSP 99-019) 1sT REVIEW COMMENTS I. Correct spelling of "Minor" Road to "Miner" Road. 2. The "street trees" are in utility easements and Utility Dept. will only allow palms. 3. Correct the plans to reflect the cut corners depicted on the plat and construction drawings. 4. Incorporate a key map on each page for easy reference to the twelve-sheet submittal. JHC/ck C:\My Documents\Melear pun New Site Plan 1st Review.doc .JEPARTMENT OF DEVELOPMENT MEMORANDUM NO. PZ 99-239 TO: TRC MEMBERS Bob Borden, Assistant Fire Marshal Kevin Hallahan, Forester/Environmentalist Lee Thompson, Police Department Pete Mazzella, Utilities Department Michael Haag, Building Division Ken Hall, Engineering Division Larry Quinn, Public Works Department John Wildner, Parks Division Jack Casler, Acting City Engineer FROM: (IY1!;JrL Michael W. Rumpf Director of Planning and Zoning DATE: October 5, 1999 RE: SITE PLAN REVIEW PROCEDURES 1 ST Review - New Site Plan Project - Melear P.U.D. Location - Southwest corner of Miner Road and Sandalwood Drive Agent Julian Bryan - Julian Bryan & Associates File No. NWSP 99-019 Find attached for your review the plans and exhibits for the above-referenced project. Please review the plans and exhibits and transmit formal written comments or e-mail to JoAnn Alea and I no later than 5:00 P.M. on October 12. 1999. When preparing your comments, please separate them into two categories; code deficiencies with code sections referenced and recommendations that you believe will enhance the project. Adhering to the following review guidelines will promote a comprehensive review and enable the applicant to efficiently obtain Technical Review Committee approval: 1. Use the review standards specified in Part IV, Land Development Regulations, Site Plan Review and the applicable code sections of the Code of Ordinances to review and formulate comments. 2. The documents submitted for the project were determined to be substantially complete with the exception of traffic data, however, if the data provided to meet the submittal requirements is insufficient to properly evaluate and process the project based on the review standards or the documents show code deficiencies, additional data and/or corrections should be requested by the reviewer by contacting Scott Barber, or myself 3. Each comment shall reference the section of the code that is incorrectly depicted on the documents. Page 2 4. Technical Review Committee member(s) shall identify in their comments when the plans depict or when the location and installation of their departmental required improvements may conflict with other departmental improvements. 5. When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the comment and the specific code section may be included in their review comments with the name of the appropriate TRC Member that is responsible for the review specified. 6. If a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time frame stated above, to me. The memorandum shall state that the plans are approved and that they do not have any comments on the plans submitted for review and that they recommend the project be forwarded through the approval process. All comments shall be typed, addressed and transmitted or e-mailed to JoAnn Alea and I for distribution to the applicant. Please include the name and phone number of the reviewer on this memorandum or e- mail. Scott Barber will be the Planning and Zoning staff member coordinating the review of the project. First review comments will be transmitted to the applicant along with a list of Technical Review Committee (TRC) members. MWRjma J:\SHRDATA\PLANNING\SHARED\VVP\PROJECTS\MELEAR PUD - NWSP 10-4-99\LETTER 1ST REVIEW TO TRC.DOC DEPARTMENT OF DEVELOPMENT' 0') ~~ rt; BUILDING DIVISION iJ) ;-'---'" MEMORANDUM NO. 00-155 If i' \~r l~' Ii '-,', 'r~~ 'iii, ; ~ \ ii, M/W 26 ~ .~ TO: Michael Rumpf, Planning and Zoning Director ~!... , . ,~.... ......,. .. '. .. ;0.....' I , \l;Yf. l ._-~-_."",--> FROM: Michael E. Haag, Building code Administrator DATE: May 26, 2000 RE' Melear P.U.D. Phases 3A and 3C - New Site PI 2nd review comments We have reviewed the subject plans and recommend that the request be forwarded for Board review with the understanding that all remaining comments will be shown in compliance on the working drawings submitted for permits. Buildinl! Division (Site Soecific and Permit Comments) - Michael E. Haal! (561) 742-6352 L Clarify the name of the project by identifYing within title block Melear PUD Phase 3A and 3C 2. Verify that the sun deck and clubhouse comply with the required setbacks by identifYing the setback dimension from the property line to the edge of the sun deck and the leading edge of the clubhouse building. Please note that the dimensions of the overhang, covered walkways, canopies or awnings shall be included when identifying building setbacks. 3. At time of permit review, submit signed and sealed working drawings of the proposed construction. 4 IdentifY the finish floor elevation that the design professional has established for the building within the footprint of the floor plan of the building. 5. At time of 2nd review, submit a current survey or plat drawings of the subject project 6. Add to the site plan ofthe recreation area all easements that are shown on the survey/plat The location, type and size ofthe easement( s) shall be shown and identified on the site plan. The easements shall match the easements that are shown on the surveyor plat Where applicable, amend the plans so that structures do not encroach into an easement 7. Add to the site data the number of stories that are in the recreation building. Building Division Memo No. 00-155 to Michael Rumpf RE: Melear P.D.D. Phases 3A & 3C - New Site Plan - 2nd review comments May 26, 2000 Page Two 8. To properly determine the impact fees that will be assessed for the project, provide the following information: Submit a notarized affidavit on the letterhead of the owner, company or association. The letter must list and contain an answer to the following questions. (a) Will the ClubhouselRecreation building be restricted to the residents of the entire Melear P.U.D. only? (b) Will the residents have to cross any major roads or thoroughfare to get to the ClubhouselRecreation building? (c) Will there be any additional deliveries to the site? (d) Will there be any additional employees to maintain and provide service to the site? Once this information is complete, the City will submit it to the Palm Beach County Impact Fee Office for impact fee determination. 9. To verify compliance with the maximum floor area ratio allowed for the project, submit for review a sample of the "Cumulative Total Square Footage" document that is required per note 10 of the master plan. This document shall be submitted with each permit for a house or townhouse. The document shall maintain a running total of the square footages for all detached single-family units and all townhouse units that are located in all three phases of the project. The total ofthe floor area ratio square footage of the units shall not exceed the total floor area ratio square footage that is allowed for the project's 4.0 Land Use Intensity. Show on the document the floor area ratio computations for the project. 10. Compliance with the Building Codes will be evaluated at time of permit review. The permit fee, water and sewer facility fees, Fire and Life Safety fees, County fees and State fees will be determined at time of permit review. 1 L Permits are required to construct the improvements that are shown on the approved site plan/conditional use documents. Permit application forms are available in the Building Division of the Development Department. A permit submittal checklist is available in the Building Division. The list identifies the basic documents that the Plans Analyst checks for when an applicant submits for permit review. MEH:bg \\CH\MAIN\SHRDA T A\Development\Building-6870\Documents\TRC\NWSP 99-019 2nd review melear PUD Phase 3A and 3C.doc LEISURE SERVICES: PARKS MEMORANDUM #00-72 RE: Michael Rumpf, Director of Planning & Zoning John Wildner, Parks Director ./ttJ Barbara J. Meacham, Lands~e Planner~~ Melear PUD, Phases 3A & 3C Recreation Area Site Plan TO: THRU: FROM: Date May 26, 2000 The Parks Division has reviewed the site plan for the Melear P .U.D and has no comments. oo~~v l' j~:~ \\i'~'~Di;i;'"f:J . r~ !J) .' JULIAN BRYAN & ASSOCIATES May 10, 2000 Ms. Lusia Galav, AICP Senior Planner Planning & Zoning Division City of Boynton Beach 100 E. Boynton Beach Boulevard Boynton Beach, Florida 33425 Re: MELEAR PUD, Phases 3A & 3C Recreation Area Site Plan - Continental Homes of Florida Dear Ms. Galav, I am pleased to submit twelve sets of revised plans for final review as our Rectified Final Site Plan for the above referenced. This submittal includes the site plan revised to reflect various staff comments as well as revisions necessary as a result of plat and engineering issues. Also included are revised landscape plans, site engineering and architectural floor plans and elevations for the clubhouse. Written responses to various department comments are enclosed to assist you in your final review. Your assistance in this matter is very much appreciated. Please feel free to call should you have any questions. cc: Continental Homes LAND DEVELOPMENT CONSULTANTS - 756 SI. Albans Dr. - Boca Raton, Fla. 33466 - 561/338/0395 MELEAR PUO Phases 3A & 3C, RECREATION AREA FINAL SITE PLAN RESPONSE TO ORC COMMENTS File Number NWSP 99-019 FIRE 1 . The final site plan has been revised and is included in this resubmittal. POLICE 2 - The revised final site plan shows all parl<ing, stop signs and handicap parking spaces. ENGINEERING 3 . The landscape plans have been revised to correct the spelling of Miner Road. 4 - The landscape plans have been revised to only show palm trees shown in utility easements. 5 - The landscape plans have been revised to show cut corners at all intersections. 6 - A key sheet has been added to the landscape plans. BUILDING DIVISION 7 - The site plan is included along with engineering, anchitectural and landscape plans. Dimensions have been added to the plan that tie down the location of the building, swimming pool, volleyball coun and tot lot. 8 - A general note has been added to the site plan reflecting the fact that a symbol "HA. for handicap access has been added to the site plan (along the route over the 5' sidewalk). This sidewalk connects the building access points to the required handicap parking space which is shown on the site plan. The handicap access locations into the building have been noted on the site plan. A note has also been added to the architectural floor plans stating that all entrances into the building are handicap accessible. 9 - Please see response #8 above. 10 - Please see response #8 above. 11 - The minimum finish floor elevation of the recreation building has been added to the site plan. The accompanying engineer plan has a note regarding the applicable flood zone and minimum South Florida Watf!r Management District criteria. 12 - A noter has been added to the site plan regarding signage. The entry monument signs shown on sheet L-10 of the landscape plans constitute the "signage program" and are the only signs (other than speed limit, street name and stop signs) located within Phases 3A and 3C of the Melear PUD. 13 - Please see response #12 above. 14 . Dimensions, locating the monument sign, have been added to sheet L.8 of the landscape plans. 15 - Interior lighting pole locations have been added to the site plan along with a general note regarding levels of illumination. The architectural plans, to be submitted for permits, also include lighting photometries verifying that minimum City Code standards have been met. It is also noted that these poles will be a maximum of 25' in height which is under the 30' maximum allowed in this community. (1) 16 - A symbol "PIL" has been added to interior property lines on the site plan. A road right of way symbol (R/W) shows the adjacent roadway. In addition perimeter distances and bearings are shown on the site plan. 17 - The final plat for this community has been recorded. The site plan provided the legal description and recording information for this plat. 18 . All easements of record shown on the recorded plat are properly reflected on the site plan. 19 - The recreation building is one story. This is reflected in the accompanying architectural floor plans. The maximum building height of 23' - 6" is noted on the site plan and on the architectural elevations. 20. The floor plan is not conceptual therefore a note stating that it is conceptual has not been added. The architectural floor plan and elevations included in this review package are taken from finished working drawings. 21 - The total floor area of the building has been added to the site plan. 22 - No response required. PARKS & RECREATION 23 . No response required, statement is correct. 24 - No response required, statement is correct. 25 - No response required, statement is correct. 26 - No response required, statement is correct. FORESTER/ENVIRONM ENT ALIST 27 - The littoral plantings for two of the three lakes were approved based on additional mitigation previously agreed to. The landscape plans note on sheet L-12, the required square footage of littoral area. This has been accomodated in the two lakes by consolidating the required area. PLANNING & ZONING 28 - The site plan reflects in general notes, callouls, etc. each requested item. In addition, the accompanying landscape plans and architectural plans properly reflect the remaining items. 29 . All trees exceed the minimum 8' height at the time of planting. 30 - The developer is sensitive to the unnecessary destruction of cypress trees and therefore will not use Cypress mulch. The landscape plans standard note reflect cypress mulch or equal material. As requested we will therefore use other types of mulch. 31 - The spelling of Miner Road has been corrected on the landscape plans. JULIAN BRYAN & ASSOCIATES revised and resubmitted on 5-5-00 (2)