Loading...
APPLICATION APPLICATION TRACKING LOG PROJECT TITLE: Ridllewav Plumbinll_ Inc. FILE #: MSPM 98-003 PROJECT LOCATION: 640 East Industrial Avenue TYPE OF APPLICATION: Maior Site Plan Modification PUBLIC NOTICE REOUIRED: (YIN) 0 REVIEWER'S NAME AGENT: Robert E. Fetrow ADDRESS:7289 Garden Road, Ste 104. WPB, FL AGENT PHONE: 561-841-9990 FAX: 561-841-9991 DATE REC'D: AMOUNT: 7/28/98 RECEIPT NO.: 12 SETS OF PRE-ASSEMBLED PLANS SUBMITTED FOR REVIEW: 2 OF 12 SETS SIGNED AND SEALED 0 SURVEY 0 LANDSCAPE PLAN 0 FLOOR PLAN 0 SITE PLAN WITH SITE DATA 0 APPLICATION/SUBMITTAL: DATE ACCEPTED: DRAINAGE PLAN ELEVATION VIEW DRAWINGS COLORED ELEVATIONS RECEIVED MATERIAL SAMPLES RECEIVED PHOTOGRAPHS RECEIVED o o o o o DATE DENIED: DATE OF LETTER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES: DATE OF SUBMITTAL ACCEPTANCE LETTER: I INITIAL 1ST REVIEW MEMO: DATE SENT: I MEMO NO. 98-224 I RETURN DATE: 8/12/98 1 ST REVIEW COMMENTS RECEIVED UTIL. P.W. PARKS FIRE POLICE PLANNING BLDGlENGR FORESTER c PLANS MEMO# o o o DATE I- II DATE OF LETTER SENT TO SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENTS: 90 DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID: DATE 12 COMPLETE (ASSEMBLED) SETS OF AMENDED PLANS SUBMITTED FOR 2ND REVIEW: PRE-ASSEMBLED PLANS SUBMITTED FOR REVIEW: AMENDED APPLICATION 0 2 OF12 SETS SIGNED AND SEALED 0 SURVEY 0 LANDSCAPE PLAN 0 FLOOR PLAN 0 SITE PLAN WITH SITE DATA 0 2ND REVIEW MEMO: DATE SENT: DRAINAGE PLAN ELEVATION VIEW DRAWINGS COLORED ELEVATIONS RECEIVED MATERIAL SAMPLES RECEIVED TRANSPARENCY RECEIVED PHOTOGRAPHS RECEIVED o o o o o o MEMO NO. RETURN DATE: 2nd REVIEW COMMENTS RECEIVED PLANS MEMO# DATE PLANS MEMO# DATE UTIL. 0 POLICE 0 P.W. I I PLANNING n PARKS 0 BLDGlENGR 0 .tl!.~ ( "'"If- FIRE 0 FORESTER 0 BOARD MEETING DATE: LAND DEVELOPMENT SIGNS PLACED AT THE PROPERTY. DATE SENT / SIGNS INSTALLED: DATE: BOARD: CITY COMMISSION: DATE: DEVELOPMENT ORDER RECEIVED FROM CITY CLERK: 0 DATE: DEVELOPMENT ORDER SENT TO APPLICANT: 0 DATE: S:\FORMS\TRACKING LOG FORM revised 4/25/97 . .:. " r- ,;. ,.~.,... " "1 '\. ,~,." < .., '.'." _.,{.-,;. , .t" . l ,~ PROJECT NAME: RIDGEWAY PLUMBING, INC. LOCATION: 640 EAST INDUSTRIAL AVE COMPUTER ID: RIDGEWAY PLUMBING\MSPM I FILE NO.: MSPM 98-003 I TYPE OF APPLICATION: MAJOR SITE PLAN MODIFICATION AGENT/CONTACT PERSON: OWNER/APPLICANT: ROBERT E. FETROW, P.E. Gregory & Garry Kozan GATOR ENGINEERING SERVICES, INC PHONE: 561-732-3176 PHONE: (561) 841-9990 FAX: 561-369-0118 FAX: (561) 841-9991 ADDRESS: ADDRESS: 7289 GARDEN RD., STE 104 640 East Industrial Ave. WPB, FL 33404 Date of submittal/Projected meetine: dates: SUBMITTAL / RESUBMITTAL 7/28/98 1ST REVIEW COMMENTS DUE: 8/12/98 PUBLIC NOTICE: TRC MEETING: 9/8/98 PROJECTED RESUBMITTAL DATE: 9/8/98 ACTUAL RESUBMITTAL DATE: 2ND REVIEW COMMENTS DUE: LAND DEVELOPMENT SIGNS POSTED (SITE PLANS): PLANNING & DEVELOPMENT BOARD 9/23/98 MEETING: CITY COMMISSION MEETING: 10/6/98 COMMENTS: S:\FORMSIPROJECT TRACKING INFO ( ! OF BOYNTON BEACH, FLORIDA PLANNING & ZONING DIVISION SITE PLAN REVIEW APPLICATION FOR NEW SITE PLANS & MAJOR MODIFICATIONS TO EXISTING SITE Application Acceptance Date: Fee Paid: Receipt Number: This application must be filled out completely, accurately and submitted as an original to the Planning and Zoning Department TWELVE COMPLETE. sequentially numbered, ASSEMBLED AND STAPLED sets of plans including a recent survey and appropriate fee shall be submitted with the application for the initial process of the Site Plan Review procedure, AN INCOMPLETE SUBMITTAL WILL NOT BE PROCESSED, Please print legibly (in ink) or type all information. I. GENERAL INFORMATION 1. Project Name: New warehouse and site monifi""t-inn" fnr Rir'lgo",,,"y Plumbina. Tn" 2, Applicant's name (person or business entity in whose name this application is made): Ridgeway Plumbing, Inc. Address: 640 East Industrial Avenue, Boynton Beacb FL Phone:(561) 732-3176 Fax: (561) 369-0118 33426 (Zip Code) 3. Agent's Name (person, if any, representing applicant): Robert E. Fetrow, P. E. c/o Gator Enqineerinq Services. Tnc. Address: 7289 Garden Road, Suite 104 WA~t- P~lm J:l:;::1;;l;.....h H'T , 314Q4 Fax: (561) 841-9991 (Zip Code) Phone: (561) 841-9990 4, Property Owner's (or Trus'ee's) Name: Gregory J. & Garry W. Kozan Address: 640 East Industrial Avenue Rnynt-nn Ro~~h. ~T 11426 Ph (561) 732-3176 one: Fax: (561) 369-0118 (Zip Code) 5, Correspondence to be mailed to agent only; if no agent, then to applicant unless a substitute is specified below:' Gator Engineering Services. Inc. 7?RQ r.;~rnon ROAn !=;nit-Q 1().d. West P~lm 'R~;:a,...h It'l 11404 'This is the one address to which all agendas, letters and other materials will be mailed. 6. What is applicant's interest in the premises affected? (owner. buyer. lessee. builder, developer, contract purchaser. etc.) Qwner 7 8. 9. 10. 11. 12. 13. 14, 15. 16. 17, Street address or location of site: h40 F'l.lit Innll"tri '" 1 "'VP Boynton 'Ro",..h. 'T. 3342(; Ou 43 45 2002 002 0010 and PropertyControl#: OR 41 4') 7.007 OO? 01<0 Legal description of site: see attached "hppt" Intended use(s) of s.te: Warehouse/Off ice Developer or Builder: Architect: Landscape Architect: Site Planner: Gator Enqineerina Servi r.p" Tn,.. , Engineer: Gator Enqineerin9 Sprvi r.p" Tn,.. Surveyor: Richard L. Shpp",rn JI. "'''''0'''' I Tn,.. Traffic Engineer: Simmons & Whit.,. Tnr. Has a site plan been previously approved by the City Commission for this property? NO 18. Estimated construction costs of proposed improvements shown on this site plan:$500. 000 II, SITE DATA The fOllowing information must be filled out below and must appear. where applicable, on all copies of the site plan. 1. Land Use Cateaorv shown in the Comprehensive Plan 2, Zonina District M-1 3, Area of Site 3.12 acres 136,023 sq, ft. 4. Land Use - Acreaae Breakdown a. Residential, including acres % of site surrounding lot area of grounds b. Recreation Areas' acres % of site (excluding water area) c, Water Area acres % of site d. Commercial acres % of site e. Industrial 3.12 acres 100 % of site f. Public/Institutional acres % of site g, Public, Private and Canal rights-of-way acres % of site h. Other (specify) acres % of site Planning and Zoning Department - Rev. 3/18/97 IICHIMAINISHRDA TAIPLANNINGISHAREDIWPIFORMSIAPPSINWSP\SITEPLAN.WPD I.' Other (specify) acres % of site j. Total area of site 3 . 1 2 acres '1 00 % of site . including open space suitable for outdoor recreation, and having a minimum dimension of 50 ft. by 50 ft, 5. Surface Cover a, Ground floor building 0 _ 760acres 24.4 % ofsite area ("building footprint") b, Water area acres % of site c, Other impervious areas, including paved area of public & private streets, paved area of parking lots & driveways (excluding landscaped areas), and sidewalks, patios, decks, and athletic courts. 1.92 acres 61.5 %ofsite d, Total impervious area .2......6..8.Alcres 85.8 % of site e, Landscaped area 02. acres .01 %ofsite inside of parking lots (20 sq.ft. per interior parking space required - see Sec. 7.5-35(g) of Landscape Code), f, Other landscaped areas,_ acres % of site g, Other pervious areas, including golf course, natural areas, yards. and swales, but excluding water areas 42 acres 1 3 . 5 % of site h, Total pervious areas ~ acres 14 , % of site i. Total area of site 3.12 acres 100 % of site 6, Floor Area a. Residential ~'.ft. b, CommerciaVOffice 6,000 sq. ft. c, IndustriallWarehouse 27,125 sq. ft, d, Recreational sq, ft. e, Public/Institutional sq, ft, f. Other (specify) sq, ft, g. Other (specify) sq. ft. h. Total floor area B'.07~ sq ft. Planning and Zoning Department - Rev 3/18/97 \\CHlMA1N\SHRDA T A \PLANNINGISHAREDlWPIFORMSIAPPSINWSPISITEPLAN .WPD B. 9. 10. Number of Residential Dwelli'- Units a. Single-family detached b. Duplex sq. ft. sq. ft. c. Multi-Family (3 + attached dwelling units) (1) Efficiency dwelling units (2) " Bedroom dwelling units (3) 2 Bedroom dwelling units (4) 3+ Bedroom dwelling units d. Total multi-family e, Total number of dwelling units Gross Densitv dwelling units dwelling units per acre feet ",1 Maximum heiaht of structures on site 25 . 0 Reauired off-street oarkina a. Calculation of required number of off-street parking spaces 1 parking space/BOO sq. ft. 33, .075 sq. ft./BOO= 41.~ spaces required stories b, Off-street parking spaces provided on site plan 62 4 Ii Planning and Zoning Department - Rev. 3/18/97 IICHIMAINISHRDA T A IPLANNINGISHAREOIWPIFORMSIAPPSINWSPISITEPLAN .WPD III CERTIFiCATION (I) (We) understand that this application and all papers and plans submitted herewith become a part of the permanent records of the Planning and Zoning Department (I) (We) hereby certify that the above statements and any statements or showings in any papers or plans submitted herewith are true to the best of (my) (our) knowledge and belief. This application will not be accepted unless signed according to the instructions below. "7/Pr-Ar Date Signature of Own or Trustee, of Authorized Principal if property is owned by a corporation or other business entity. IV AUTHORIZATIO~~ Signature of Authorized Agent ;?Pp~ , Date (I) (We) hereby designate the above signed person as (my) (our) authorized agent in regard to this application. S!,,,,,,,, of d Tru"~', or Authorized Pnncipal if property is owned by a corporation or other business entity, 7/-o/Ar Date SPACE BELOW THIS LINE FOR OFFICE USE ONLY Review Schedule: Date Received Technical Review Committee Planning & Development Board Community Appearance Board City Commission Date Date Date Date Stipulations of Final Approval: Other Government Agencies/Persons to be contacted: Additional Remarks: Planning and Zoning Department - Rev 3/18/97 IICHIMAI NISH RDA T A IPLANN INGISHAREDlWPIFORMS'APPSINWSPIS ITEPLAN.WPD ~.IDER TO SITE PLAN APPLICATION THe undersigned as applicant for Final Site Plan Approval does hereby acknowledge, represent and agree that all plans, specifications, drawings, engineering, and other data submitted with this applic~tion for review by the City of Boynton Beach shall be reviewed by the various boards, commissions, staff personnel and other parties designated, appointed or employed by the City of Boynton Beach, and any such party reviewing the same shall rely upon the accuracy thereof, and any change in any item submitted shall be deemed material and substantial. The undersigned hereby agrees that all plan:;, specifications, drawings, engineering and other data which may be approved by the City of Boynton Beach, or its boards, commissions, staff or designees shall be constructed in strict compliance with the form in which they are approved, and any change to the same shall be deemed material and shall place the applicant in violation of this application and all approvals and permits which may be granted. The applicant agrees to allow the City of Boynton Beach all rights and remedies as provided for by the applicable codes and ordinances of the City of Boynton Beach to bring any violation into compliance, and the applicant shall indemnify, reimburse and save the City of Boynton Beach harmless from any cost, expense, claim, liability or any action which may arise due to their enforcement of the same, EED TO this ..77 day of ./v,vo/ APPlicant& -- ,19.f'r Wi Planning and Zoning Department - Rev. 3/18/97 IICHIMAINISHRDA T A IPLANN I NGISHAREDlWPIFORMSIAPPSINWSPISITEPLAN .WPO SlhMONS & WHITE, INC. Engineers. Planners. Consultants April 5. 1994 Job No. 94-32 TRAFFIC GENERATION STATEMENT Ridgeway Plumbing Expansion Boynton Beach, Florida SITE DATA The sUbject parcel is located on the east side of Industrial Avenue approximately 1600 feet north of Boynton Beach Blvd. Existing site improvements on the currently developed site consist of a 3000 S.F. office and 7750 S.F. warehouse facility for Ridgeway Plumbing. Proposed development consists of expanding the existing facility with 3000 S.F. of additional office space and 11,625 S.F. of additional warehouse space. For additional information concerning site location and layout, please refer to the site plan prepared by Gator Engineering Services. Inc. TRAFFIC GENERATION The Palm Beach County Unified Land Development Code Article 7, Section 7.9 (I) C - Traffic Performance Standards. APPLICABILITY. Subsection 2 (B) requires that for any application for a site specific development order on property on which there is an existing use shall be subject to the Palm Beach County Traffic Performance Standards to the extent the traffic generation projected for the site specific development order exceeds the traffic generation of the existing use. The generation rates and capture rates of the existing use shall be updated to current pro forma traffic generation and pass-by rates and shall be used to calculate previous approval traffic. The previous approval traffic currently being generated by the existing Ridgeway Plumbing facility may be calculated as follows in accordance with the rates provided in Table 10.8-1 Fair Share Road Impact Fee Schedule: WAREHOUSE (7750 S.F.) 7750 S.F. x 4.88 tod 1000 S.F. = 38 tpd 4623 Forest Hill Boulevard, Suite 112, West Palm Beach, Florida 33415 Telephone (407) 965-9144 , Traffic Generation Statement Job No. 94-32 April 5, 1994 - Page Two TRAFFIC GENERATION (CONTINUED) OFFICE (3000 S.F.) Utilize generation rate of 24.6 tpd per 1000 S.F. for facilities less than 10,000 S.F. in size: 3000 S.F. x 24.6 tod 1000 S.F. = 74 tpd TOTAL: 112 tpd The traffic to be generated by the total facility following the 3000 S.F. office addition (and the 11,625 S.F. warehouse addition to be completed in 1994) may be calculated as follows: WAREHOUSE (19.375 S.F.) 19,375 S.F. x 4.88 tod 1000 S.F. = 95 tpd OFFICE (6000 S.F.) 6000 S.F. x 24.6 tod 1000 S.F. = 148 tpd TOTAL: 243 tpd The proposed expansion will therefore result in a net increase of 131 trips per day over the existing uses: 243 tpd - 112 tpd = 131 tpd Tr~ffic Generation Statement Job No. 94-32 April 5, 1994 - Page Three TRAFFIC GENERATION (CONTINUED) The Palm Beach County Land Development Code Article 7, Section 7.9 (I) G Procedure, Subsection 1 (C) (2) provides that amendments to non-residential projects generating fewer than 200 gross trips shall not be required to submit a Traffic Impact Statement. A brief review of the directly accessed link (Boynton Beach Blvd. between Old Boynton Road and Interstate 95), however, reveals that adequate capacity is available to support the proposed expansion and the project appears to meet the requirements of the Traffic Performance Standards. The low A.M. and P.M. peak hour turning movement volumes at the project entrance with Industrial Way do not warrant the construction of exclusive turn lanes based on the Palm Beach County engineering guidelines used in determining the need for turn lanes of 30 left turns or 75 right turns in the peak hour No site related improvements on Industrial Way are ther or ecommended.