REVIEW COMMENTS ;4~~ @ M E M 0 R A'N DUM November 18, 1987 RECEIVBD TO: Mr. Pe~er Cheney City Manager l.2,'/ :-< 19~n PLAI";~'oI.! 1:;C:;:;T~ FROM: Tom Clark City Engineer RE: Bond Reductions and/or Releases, Chalet IV, Plats 1 thru IV, including the Loop Road (Sandalwood Drive) and Miner Road This memo includes the analysis and recommendations for reducing and/or rele~sing current performance bonds being held by the City for the Chalet IV project, also known as Sandalwood, and is in accordance with the recommendations of T.R.B. members that met on November 17, 1987 to discuss the disposition of said bonds. Please note that the landscaping and irrigation for sandalwood Drive is not complete, but is not included in the analysis because these items were not bonded improvements (estimated cost for completion is $65,000). Restoration Bond for Excavation and Fill 'Permit This bond was reduced to $15,000 by Resolution No. 86-0000. The work under this bond has been completed and suitable restoration has been made. A proposed resolution to release this bond is included here. Performance Bond for Plat No. 4 This bond has been reduced to $20,000 by Resolution No. 87-JJ. The work under this bond is complete. A certification letter has been received from the Design Engineer, dated July 1, 1987 , and a one year guarantee letter has been receiv~d from the Developer, dated Nov. 12, 1986, copies of which are included here. A proposed resolution releasing the bond is included here. Performance Bond for Private Recreation Area and Facilities This bond was reduced to $3,000 by Resolution No. 87-11. The work is complete and a certification letter, dated July 7, 1987 from the Design Engineer, and a guarantee letter, dated July 7, 1987 from the Developer have been received and copies are included here. A proposed resolution to release the bond is also included. Page #2 Performance bond for Plat No. 3 and north portions of Sandalwood Dr. This bond was reduced to $16,800 by Resolution No. 87-HH. A certification letter has been received requesting a reduction to $1,000, dated July 7, 1987, and a copy is included here. This bond should have included the cost for 1600 linear feet of five ft. sidewalk, but was not included as a line item in the cost estimate for the bond. The uncompleted work includes the 1600 ft. of sidewalk, some grading on the west side of Sandalwood Drive, cleaning storm inlets and adjusting utilities. The value of uncompleted work approximates $16,800, which is the value required by Resolution No. 87-HH. . No further reduction is recommended. Performance Bond for 1744 ft of Sandalwood Drive, west of Congress This bond has been reduced to $29,000 by Resolution No. 86-NNNN. A copy of a certification letter from the Design Engineer, dated July 7, 1987 requesting a reduction of the bond amount to $2,900 is included here, Said certification did not include the value of 1744 ft.of five foot sidewalk included in the ,cost estimate for the original bond as a line item. The work under this bond has been substantially completed, except for the sidewalks, some grading work on the south and west sides and cleaning out storm sewer inlets. Value of uncompleted work is estimated to be $21,000. A proposed resolution to reduce the value of the bond to $21,000 is included here, Performance Bonds for Miner Road The bond for the portion of Miner Road, east of Sandalwood Drive, was for the amount of $89,773.30. The work remaining under this bond includes the requirement for payment for street lights to be installed by Florida Power & Light Company in the amount of $13,953. There is concern that the plans were not followed with respect to the stabilized shoulders as called for on the typical road section. Said section called for stabilization to 75 p.s.i., Florida Bearing Value, for a depth of 20 inches. I have discussed this with the Contractor, County Engineers, Developers and Design Engineer and am waiting for their conclusion and recommendations, The value of this work would be at least $18,000, unless an alternate for future construction with credits going into a County escrow account i7 accepted, Other work here includes possible adjustment of.a~ lnlet structure built six inches lower than planned and some addltlonal seeding and sodding and striping, Incomplete work on water valves and damage to a fire hydrant is estimated by the Utility Departm~nt at $4,000. The total value of uncompleted work under thi~ bond lS estimated at $40,000 and includes the charge for street llghts, Page #3 The bond for the portion of Miner Road, west of Sandalwood Drive was for the amount of $54,123,78, No work has been done and the plans for this improvement have not yet been submitted for approval by the City or the County. According to the time allowed by the subdivision regulations, completion of Miner Road was to be Oct~ber 9, 1987 and was extended by Commission action to December 8, 1987, The value of the work under this bond is estimated to be approximately $100,000 and exceeds the amount of the bond. The estimated value of the uncompleted work for both parts of Miner Road is $100,000 plus $40,000, ie., $140,000. Since the total amount of the two bonds is only $143,897.08, I do not intend to recommend a reduction to the bond for the first part of Miner Road until the shoulder st~bilization is satisfactory or has otherwise been resolved with all concerned. ~ Vp.-- - -d~ Tom Clark TAC:ck attachments cc: Carmen Annunziato Don Jaeger Kevin Hallahan Ann Toney Pete Mazzella Raymond Rea John Wildner 5 MEMORANDUM 3 August 1987 TO: Tom Clark. City Engineer FROM: Carmen S. Annunziato, Planning Director RE: Bond Reduction and/or Release Requests, Chalet IV (Sandalwood) In response to your memo of July 21, 1987 concerning bonds at the Chalet IV development, I concur that no bonds should be released or reduced until such time as all improvements are complete or near completion or new bonds are submitted consistent with your projection of costs. . c ,.,~_. .J. ,..=:(~ CARMEN S. ANNUNZ~ATO /bks bonds,bks MEMORANDUM 30 July 1987 TO: Peter L, Cheney, City Manager FROM: Carmen S. Annunziato, Planning Director RE: Chalet IV - Sandalwood On Tuesday, July 21, 1987 I met with the City Engineer, Chief Plans Inspector, Don Jaeger, Consulting Engineer, Joel Wantman and Jack Armarnik concerning the Chalet IV development and outstanding items to be completed. Among the items discussed were the status of landscaping and sidewalks to be constructed on the south and west sides of sandalwood Boulevard, and the status of Miner Road construction through the Melear PUD. Concerning the installation of landscaping and sidewalks on the south and west sides of Sandalwood Drive, it was Mr. Armarnik's position that the City could not hold bonds for other required improvements in lieu of the installation of the previously mentioned landscaping and sidewalks. Litigation was suggested as a means to compel the City to release outstanding bonds, Mr. Armarnik was questioned at gr~at length concerning Miner Road. It was reported by Mr. Armarnik that Miner Road east of Sandalwood Drive was under construction at this time. He also reported that in his opinion, the remaining construction of Miner Road through the Melear PUD would be accomplished by October 10, 1987 which is the date that all public improvements must be completed. This position was qualified to the extent that the permitting of the road could prevent completion by October 10, 1987. Also discussed at great length was the value of the bond relative to the projected cost of improvements of the second phase of Miner Road. In this regard, Mr. Wantman reported that his estimate of $54,000+ was based on a different level of construction than what will be-permitted. However, the impression given by Mr. Armarnik is that he is committed to the improvement, regardless of the bond value. Mr. Wantman reported that the plans for Phase 2 of the Miner Road construction project were 30% complete and that plans should be substantially complete in three weeks. In conclusion, I suggested to Messrs. Armarnik and Wantman that it was unlikely that the City would release or reduce bonds which remain until such time as the landscaping, sidewalks, and Miner Road issues have been resolved, /'f5~ CARMEN S. UNZIATO jack.bks cc: Tom Clark Don Jaeger M E M 0 RAN DUM July 21, 1987 TO: TECHNICAL REVIEW BOARD John Guidry, Utilities Director Bob Eichorst, Public Works Charles Frederick, Recreation & Parks Director Bud Howell, Building Official Carmen Annunziato, Planning Director Dale Hammack, Police Department James Rhoden, Fire Chief Kevin Hallahan, Forester/Horticulturist Ann Toney, Assistant to the City Manager FROM: Torn Clark, City Engineer RE: Bond Reduction and/or Release Requests, Chalet IV, a.k.a. Sandalwood Recent requests have been made for reductions and/or releases of the several bonds being held by the City for the subject project. You have received copies of those letters. The developer has requested that I advise him of the City response to said requests and a copy of his letter of July 15, 1987, with a list by date of his requests, is included herewith. I have determined that the approximate value of the uncompleted improvements is as listed below: 1. Miner Road from Congress Ave. to:Sandalwood Dr.------$136,000 2. Miner Road from Sandalwood Dr, to the west limits of the Melear Property.------------------------------$ 93,000 3. Five foot sidewalk on south and west side of Sandalwood Dr.---------------------------------------$ 30,000 4. Irrigation System for the median and for the south and west sides of Sandalwood Dr.---------------$ 17,000 5. Landscaping including trees for south and west side of Sanda,lwood Dr. -------------------------------$ 25,000 6. Plat 3 improvements----------------------------------$ 2,000 TOTAL COST $303,000 con't.... . To: TRB MEMBERS July 21, 1987 Re: Bond Reduction and/or Release Chalet IV, a,k.a. Sandalwood Page 2 The total value of all the bonds currently being held by the City are as follows: l. Restoration bond for excavation & fill $ 15,000 2. Plat 4 Performance bond $ 20,000 3, Recreation bond $ 3,000 4. Plat 3 Performance bond $ 16,800 5. Loop Road (Sandalwood Drive) $ 29,000 6, Miner Rd, Performance bond (east part) $ 89,773 7. Miner Rd, Performance bond (west part) $ 54,123 TOTAL $227,696 Based on the above, the value of the uncompleted improvements exceeds the value of the current bonds held by the City by the amount of $75,304. In consideration of the above, until east and west parts of Miner Road are almost completed, I do not believe the reduction or release of any of the bonds currently held by the City for this project should be recommended, Comments are requested as soon as possible so I can further advise the developer concerning the status of his requests. --v r - ef!J Tom Clark TAC/ck attachment CCl peter Cheney, City Manager Don Jaeger, Bldg, Dept. Pete Mazzella, utility Dept. William Cavanaugh, Fire Dept. p,S, The cost for for all four Lighting has parking plats, not yet lot lighting is estimated to be $60,000 This was not a bonded improvement, been installed for the parking lots. ~0cJ/,id) ~A A~~ Chalet IV CORPORATION July 15, 1987 Mr. Tom Clark City of Boynton Beach Engineering Dept. 120 Northeast 2nd Avenue Boynton Beach, Florida 33435 Dear Mr. Clark: You have received from Stanley/Wantman the following certificate of works completed or reduced: July 1 Restoration Bond - completed $15,000 July 1 Plat 4 - completed 20,000 July 7 Recreation Bond- completed 3,000 July 7 Plat 3 from $16,800 to $1,000 July 7 Loop Road from $29,000 to $2,900 It would be appreciated if the above Bonds would be cancelled and/cr redolced. Sineerely yours, CHALET IV CORPORATION ' J. A ik, Executive Vice President' JA/bgm . Chalet IV Corporation. 7100 Biscayne Boulevard. Miami, Florida 33138. (305) 759-2441 . ~/I/ MEMORANDUM May 21, 1987 TO: Thomas A, Clark, City Engineer FROM: Carmen S, Annunziato, Planning Director RE: Bond Reduction ,'''-,. ( Release of these bonds should be evaluated in connection with the value of the bond for Minor Road, It is my understanding that the Minor Road bond is for substantially less than the cost of construction, c.,. JL zij(- fi: CARMEN S. ANNUN TO flat cc: City Manager Central File M E M 0 RAN DUM MaYREcrNED TO: TECHNICAL REVIEW BOARD ..!IAY 15 J9Bl PLANNING DEPT. John Guidry, Utilities Director Bob Eichorst, Public Works Charles Frederick, Recreation & Park Director Bud Howell, Building Official Carmen Annunziato, Planning Director Dale Hammack, Police Department James Rhoden, Fire Chief Kevin Hallahan, Forester/Horticulturist Ann Toney, Assistant to the City Manager FROM: Tom Clark, City Engineer RE: Bond Reductions and Bond Releases, Chalet IV (Sandlewood) Plats 1,2,3 & 4 Forwarded herewith are letters from Stanley/Wantman & Associates requesting bond reductions and/or releases for the subject project as follows:- 1. Letter dated April 28, 1987 regarding Plat #3 Performance Bond reduction from $72,000 to $16,800. 2. Letter dated April 28, 1987 requesting release of the Restoration Bond for the Excavation & Fill permits for $15,000. 3. Letter dated April 24, 1987 requesting a bond reduction for the Loop Road from $29,000 to $19,850. 4. Letter dated April 24, 1987 requesting a bond reduction for recreation facilities from #45,000 to $3,000. 5. Letter dated April 30, 1987 requesting a release of the bond for Plat #4 (previously reduced to $30,000). Please advise as soon as possible if you have any objections to the subject bond reductions and releases. c---.. / _ d/ p? V~ -~- Tom Clark TAC/ck attachments t; 1/ I,;' L Y / \','! [ ! I r ~!, [,~ f'. /,~': I" l.; ! i , I I' r~, 1[' G. April 28, 1987 , I ( / . V: 1-, '/) \\\ Ai,' ~ \ ' ,\' ,( I ,~' '. iF \' , , I j 1 Boynton Beach Engineering 120 North East 2nd Avenue Boynton Beach, Florida 33435 Attention: Tom Clark RE: Chalet IV of Boynton Beach Plat 3 Performance Bond Reduction (85110-0 ) Dear Mr. Clark: The majority of the Required Improvements for the subject plat have been completed to date.' Our client, the Chalet IV Corporation, has posted a reduced Performance Bond for Chalet IV of Boynton Beach Plat 3, in the amount of $72,000.00. At this time the developer respectfully requests to further reduce this bond amount to $16,800.00, This amount represents the Cost of Work Remaining to complete the Required Improvements in the plat. Enclosed is a Certified Engineer's Opinion of Work Remaining. This certification is based on record data review and field observations conducted by this office. We would appreciate your expeditious review and approval of this request to reduce the Referenced Performance Bond to $16,500.00, Very ly Y~ours~;J ~ /"I 7, ~ , ///4 ~-:7-;"?<-~~~~~- Thomas D. Alexcnder, P.E. Project Manager enc c.c. Jack Armarnik - Chalet IV Corporation Bill Blazak - Burg & DiVosta Mary Arnold - Stanley/Wantman & Associates, Inc, TDA/as LOMBARD CENTER. 2000 LOMBARD STREET. WEST PALM BEACH, FLORIDA 33407 . (305) 842,7444 MEMBER OF THE STANLEY CONSULTANTS GROUP INTERNATIONAL CONSULTANTS IN ENGINEERING, ARCHITECTURE PLANNING. AND MANAGEMENT blf~r fl !;Y/\W~h! Ir,~f'[~ t, f\f;'.:!)! ;'/.'1 ~ S, !;~C. , l I 1 , " April 28, 1987 i ( / / . '( () /' ~ .- .~ \ \- . '/ " , v' \,0 c' City of Boynton Beach Engineering 120 North East 2nd Avenue Bounton Beach, Florida 33435 , vN / Attention: Tom Clark RE: Chalet IV of Boynton P.U.D. Stanley/Wantman Job Number 84056-0 Request for Restoration Bond Release Dear Mr. ClarK: Our Client, Chalet IV Corporation, has posted a reduced Restoration Bond for Chalet IV of Boynt?n in the amount of $15,000,00. This is to inform you that all earthwork and the majority of the Required Improvements have been completed at the referenced project. At this time, the developer respectfully requests a full release of the Restoration Bond amount of $15,000.00. This request for release is based on the referenced project's current construction and restoration status; and also conditions related to ongoing construction methodology being mointored by this office. Furthermore, a sodded landscape berm has been constructed along the eastern project boundary which will prevent any blowing dust or sand from drifting onto Congress Avenue. If you should have any questions or need any additional information, please do not hesitate to call. Very y yo~rs, ~/~ ~--Vo4V".--Q /~~~~~<r7 omas D. Alex~nder, P.E. ?'~< ( ~r Project Man.:;ger c.c.. Jack Armarnik - Chalet IV Corporation Bill Blazak - Burg & DiVosta Mary Arnold - Stanley/Wantman & Associates, Inc. TDA/as LOMBARD CENTER. 2000 LOMBARD STREET. WEST PALM BEACH, FLORIDA 33407 . (305) 842-7444 MEMBER OF THE STANLEY CONSULTANTS GFiOUP INTERNATIONAL CONSULTANTS IN ENGINEERING. ARCHITECTURE. PL.A,NNING. AND MANAGEMENT I, i 'I 1:..../".,' i ' ,. r ~ f,,' \. \) t : i / '. t ~ ;':, ~: '."~. " April 24, 1987 I " Boynton Beach Engineering 120 North East 2nd Avenue Boynton Beach, Florida 33435 \' Ii,' " I Attention: Tom Clark RE: Chalet IV of Boynton Loop Road Performance Bond Reduction (84056-0) Dear Mr. Clark: The majurity of the Req~ired Improvements for Loop Road have been completed. Because of the amount of construction traffic entering the project, the developer has only had the first lift of asphalt installed on Loop Road. Enclosed is a Certified Engineer's Opinion of Cost of the Work Remaining to complete the Required Improvements. At this time the developer respectfully requests to reduce the remaining Surety bond of $29,000.00 to $19,850.00. If you should have any questions or require any additional information, please do not hesitate to call. Very t 1 yours,) ~~ -:SZ;;~N.C'4- O~~~'l"//1h- Thomas D. .^,le"ander, P.E. ~/?c!/:T7 Project Manager c.c. Jack Armarnik - Chalet IV Corporation Bill Blazak - Burg & DiVosta Mary Arnold - Stanley/Wantman & Associates, Inc, enc TDA/as ----.-,.---.--.---------.-- ---~,._------~--~_..,- LO~1BARD CENTER' 2000 LOMBARD STREET' WEST PALM BEACH, FLORIDA 33407 . (305) 842,7444 MEMBER OF THE STANLEY CONSULTANTS GROUP INTERNtl,TIONAl CONSULTANTS IN ENGINEERING. ARCHITECTURE. PLANNING. AND III.ANAGEMENT : l i ,;" I: Y 1\',',,; n i,~": " g f~; ';., 0(:1,\( . B, II,!C, ' . I April 24, 1987 .' '. ,;\ I Boynton Beach Bn~ineering 120 North East 2nd Avenue Boynton Beach, Florida 33435 / , <"< I ( .\ c/ \J'V'" Attention: Tom Clark RE: Chalet IV of Boynton Recreation Area (85110-0) Performance Bond Reduction Dear Mr. C la,rk: The majority of the Re~uired Improvements for the Recreation Area have been completed to date. Our client, The Chalet IV Corporation, has posted a reduced performance bond for these amenities in the amount of $45,000.00. At this time the developer respectfully requests to further reduce the bond amount to $3,000.00. This amount represents the Cost of Work Remaining to complete the Required Improvements. Enclosed is a Certified Engineer's Opinion of the Work Remaining. This certification is based on field observations conducted by this office. We would appreciate your expeditious review and approval of this request to reduce the Referenced Performance bond to $3,000.00. Very Y\;lY YOUCS~ .~~~/'q~~4A-~ A./-p!, /y 7 homas D. A~~x~nder, P.E.~; /. Project Manager c.e. Jack Armarnik - Chalet IV Corporation Bill Blazak - Burg & DiVosta Mary Arnold - StanleyjWantman & Associates, Inc. ene TDAjas ._-_..._--_._-_._--_.__._~-~" ~- --- ---------.__. ~ ___~__._. .0 LOMBARD CENTER. 2000 LOMBARD STREET. WEST PALM BEACH, FLORIDA 33407 . (305) 842,7444 MEMBER OF THE snNLEY cnN.<;i !LTANTS GROUP INTERr-J.A.T!ONAL CONSULTAf\lTS IN ENG!!':("ERI"JG ARCHIT~CTlIRE, Pl.'V>JNING; AN[) f/t~JA(;F.MENT ~ "r/..i i' I", J/\:'~!~r r.!', !.r;i .I~ r. / , ! . "~ 'j . I ~. ~\ I; \,: (~I ,,~ (,-, April 30, 1987 i\ / \ ( ~- 8oynton Beach Engineering 120 North East 2nd Avenue 8oynton Beach, Florida 33435 " \ Attention: Tom Clark RE: Chalet IV of Boynton Plat 4 Stanley/Wantman Job Number 85110-0 Performance Bond Release Dear Mr. Clark: This is to confirm that the Required Bonded Improvements for the subject plat have been completed in substantial accordance with the plans and specifications prepared by this office and approved by the City of Boynton Beach. At this time the developer, The Chalet IV Corporation, respectfully requests a full release of the reduced bond amount of $30,000.00. Please find attached a copy of the developers guarantee for the improvements of the subject plat which was previously suhmitted to you. If you should have any questions or required any additional infor- mation, please do not hesitate to call. Very uly Yours,~ ~;;:z-c'w-Q -;y~~A~ homas D. Alexdn er, P.E. Project !,'ia!l3.ger c.c. Jack Armarnik - Chalet IV Corporation Bill Blazak - Burg & DiVosta Mary Arnold - Stanley/Wantman & Associates, Inc, TDA/as ~-_._~_.__._~~-~ -~--- --- --"---".._-,~--~ - .~---_..~- -"-"._- ~ - LOMBARD CENTER. 2000 LOMBARD STREET. WEST PALM BEACH, FLORIDA 33407 . (305) 842,7444 MEMBEFl OF THE STANLEY CONSULTANTS GFlOUP !NTER~ATIONAL CONSULTANTS IN ENGINEERING, AACHlTECTlIRE. PLANNING. A~D M4NAGEMENT MEMORANDUM 5 ,Tune 1985 TO: Carmen S. Annunziato, Planning Director FROM: Kevin Hallahan, Forester/Horticulturist RE: Chalet IV at Boynton Lakes - site Plan This memo is in reference to the above-mentioned landscape plan. The plans do not clearly identify the species of trees and vegetation to be used for the entranceway road median. In keeping with the intent of Section 7A-352, pgs. 6-7 of Ordinance No. 81-22, no species of Ficus tree should be planted in this area. ~ 4/~/J~ evin Hallahan /bks -n"1?Cji!~l:?D M E M 0 RAN DUM ~ 1985 Plf.\i';I,,,,(j iJEPT~ '\ May 31, .l~tl:> "" -, TO: Mr. Carmen S. Annunziato, Director of Planning FROM: Tom Clark, City Engineer Re: Chalet IV site Plan, Plats 3 and 4 Comments: 1. The legend for street lights on private streets should be added and also shown on the paving and drainage plans. 2, Traffic control devices and street marking details should be shown on paving and drainage plans, 3. The outfall storm sewer into L-20 canal should be shown. This was not shown for plats 1 and 2 either. 4. Gate house construction is not acceptable in a public right of way. 5. proposed street names should be shown, <;;. T'jp/~(d F: P~L, .freef-I/,~f'f $/c,,-,-I,'Ie.tJr~,1k,~,,;1"e.J qrL ....""'IJ)r<lt//~ I~ct roerq.N&1'cs/"IJ1d ~e e.v-I,fe"'/ rf-~ $~ P- F,+J..., dB.!"I',,,, sv'{,J. -f~,-~:.:r..~q ~ Tom C ark TAC:mb M E M 0 ~ AND U M May 8, 1985 TO: Mr. Carmen S. Annunziato, Director of Planning FROM: Tom Clark, City Engineer Re: Plat I and Plat II, Preliminary Plat, Chalet IV Forwarded herewith are two sets of development plans and six copies of the plats for the subject project including the set with the T.R.B. review stamp. Also forwarded is a copy of the cost estimate for the recreation facilities. Comments are as follows: 1. Cost estimates should be submitted for the following: (a) Plat I and Plat II water, sewer and street improve- ments including the "loop" road and street lights on the "loop" road. (b) A breakdown of the costs for Miner Road split as per planned ownership for posting of bonds. 2. The dedication should be changed to provide for the loop to be a public right of way. 3. The loop road will have to be extended to the recreation area with the first plat improvements. 4. The recreation area will have to be granted by deed to the Homeowner's Association for approval of the first plat. 5. Roadway construction to have stabilized subgrade equal to 50 p.s.i., Florida Bearing Value. 6. Other comments as per Carmen Annunziato's memo of May 7, 1985. y; ~ tP~ Tom Clark TAC:mb Attach. MEMORANDUM 7 May 1985 TO: Tom Clark, City Engineer FROM: Carmen S. Annunziato, Planning Director RE: Chalet IV Plat I and Chalet IV Plat II Preliminary Plats Approval of these two preliminary plats is recommended subject to the following: 1. All of Miner Road is to be bonded and dedicated in connection with the approval of Plat I. " 2. For those portions of Miner Road outside of the limits of Plats I and II, the right-of-way should be dedicated by separate instrument within 120 days of preliminary plat approva;. 3, That part of the 80' collector road lying west of the part which appears on Plat I should be dedicated to the public by instrument through the limits of the recreation are a prior to filing a final plat. 4. The recreation area shown on the master plan for the Melear PUD lying north of the collector road should be dedicated by easement to the homeowners prior to filing for final plat approval, 5. The location of off-site utilities will require the dedication of easements by instrument which should be recorded prior to filing the final plat for Plat I. 6. Miner Road must be constructed through the limits of the public land located at Congress Avenue and Miner Road in a timely manner. The reason for this is that the recently approved bond issues provide for the construction of a multi-purpose public building to be located on-site, thus, Miner Road must be in place to serve this improvement at the time of occupancy. 7. The collector road should be dedicated to the public in order to provide for enhanced municipal circulation consistent with current City policy, 8. It is recommended that the Planning and Zoning Board set $31,815/acre as the land value for Recreation and Parks dedication purposes based on the contract for purchase submitted by the ,applicant. - ~r- /bks MEMORANDUM AprilS, 1985 TO: Mr. Carmen S. Annunziato, Director of Planning RE: Chalet IV We have reviewed the water and sewer plans for this development and have the following comments: 1. The pump station should be lowered in bottom elevation and the gravity line on the main boulevard should be at least 10" VCP in such a manner that the entire subdivision (150 acres + or -lcan be served by one pumping station. 2. The plans as submitted show phase I being developed in two sections. The water and sewer lines should be completed throughout both sections when the first section develops thereby looping the water lines and providing gravity sewer for the out parcel owned by the city, 3. The water and sewer lines running through parking areas from south to north shall have a 30' easement, the water pipe shall be so located that it is 5' from one side of the easement, the sewer line shall be 10' from the water pipe and the balance of the easement on the sewer line side of the easement. This easement shall be designated as free of any tree plantings whatsoever. Shrubs and hedges may be planted. 4. There should be coordination between the landscaping plan and the utility plan in such a manner that the multiple meters are not in back of or covered by shrubs or other plantings. This should be made very clear so that when C.A.B. review these plans, the Board understands and does not attempt to change this portion. 5. If recreational facilities are planned west of the pro- posed lake then water and sewer must be extended to them in order to meet that requirement as imposed by Planning and zoning and the Parks Department. 6. All gravity sewers shall be VCP not PVC as inciated on the plans. 7. Review the detailed to the standards of sheets to be certain that they conform the city of Boynton Beach. (]~ti~lf Perry A.Cessna, Director of utilities apt Attachment: Drawings for above MEMORANDUM '0 Carmen Annunziato City Planner DATE: 2 April '85 FILl!: FIfOM John Wildner Park Superintendent !!IUIIJI!:CT Chalets IV At Boynton I have reviewed the site plans for Chalets IV at Boynton. the Melear P,U.D" this development was previously granted the inlpact fee for the following recreation facilities: As Phase One of 1/2 credit towards Meeting Hall/Recreation Center Tennis Courts Pool Childrens Play Area Play Field Picnic Area In order to insure that recreation facilities are completed in a timely fashion, it is suggested that: 1) Site planning and construction of recreation facilities be bonded as part of Phase I. This should include utilities and access roads from Phase I. 2) A submittal of site plans and construction of recreation facilities should commence prior to 1/2 of construction on Phase I, or twenty- one months from the beginning of construction~ 3) Construction of recreation facilities should be completed prior to the end of Phase I. ~ -;;; ?v'~,-~ rhn Wildner CC: Charles Frederick JW/ad I TO J FROM Carmen S. Annunziato Planning Director Bob Donovan Plans Review Inspector SUBJEcr:,_,_,_,_~~ALE,~~~__,_,___,_,_,__,_,____________,____'____________,__,_,_ DATE:___~,- ~.:::.~__ FOLO ~ Be advised of the following comments as a result of site plan review. 1. Water management required. 2, Future buildable areas should be shown, screened room porches, etc. 3. Setbacks to buildings must be shown, 4. Must meet standard building code, state health code, energy codes and all other applicable codes and ordinances. PLEASE fiE,':, "/ TO --,_..", SIGNED ~.6 ~';;r~--;;L'l '-- ."""""'....'"~.""",.~,..,..~,,,..,,..,,,..""'''''''"',,",,.,, '." ....~_ ,.,.,.". "..,,,,,,......,,,,"',,, .. "'.~.~"..."~.""'....-.:""" ". 'u., .,." .."....., ....,...,,,....-~""""'",' . """"""",..,""""". " ...... ,........"',~..._,.~~'., ''''''~' .""....~~:."""'....,.c.....,.,.,"""', REPLY r/) ~~e/C! ( ,/, !;/ ,~-~..ft.- )L- ~ I DATE: 0- ~6'5- / , Z /: .. 1/ ~' I ~J.{/Y SIGNED ITEM /It F269 C WHEELER GROUP INC. " THIS COpy FOR PERSON ADDRESSED I I FROM TO Carmen Annunziato City Planner Bob Donovan Chf, Plans Review Inspector SUBJECT: CHALETS IV AT BOYNTON DATE: 4-3-85 ~OLD .. Upon review of the above noted site-plan, be advised of the following information, 1. Need Water Management approval. 2, Need setbacks shown. Also required is all future screen rooms, porches, etc. 3. Need details on lighting, PLEASE REPLY TO SIGNED ~jJ~ Bob Donovan REPLY ~ ~.~r DATE: /-,3- i'S:- SIGNED ltem # F269 '9 Wheeler Group Inc. 1979 THIS COPY FOR PERSON ADDRESSED