REVIEW COMMENTS
;4~~
@
M E M 0 R A'N DUM
November 18, 1987
RECEIVBD
TO:
Mr. Pe~er Cheney
City Manager
l.2,'/ :-< 19~n
PLAI";~'oI.!
1:;C:;:;T~
FROM: Tom Clark
City Engineer
RE: Bond Reductions and/or Releases, Chalet IV, Plats 1 thru IV,
including the Loop Road (Sandalwood Drive) and Miner Road
This memo includes the analysis and recommendations for reducing
and/or rele~sing current performance bonds being held by the City
for the Chalet IV project, also known as Sandalwood, and is in
accordance with the recommendations of T.R.B. members that met on
November 17, 1987 to discuss the disposition of said bonds.
Please note that the landscaping and irrigation for sandalwood Drive
is not complete, but is not included in the analysis because these
items were not bonded improvements (estimated cost for completion
is $65,000).
Restoration Bond for Excavation and Fill 'Permit
This bond was reduced to $15,000 by Resolution No. 86-0000.
The work under this bond has been completed and suitable restoration
has been made.
A proposed resolution to release this bond is included here.
Performance Bond for Plat No. 4
This bond has been reduced to $20,000 by Resolution No. 87-JJ.
The work under this bond is complete.
A certification letter has been received from the Design Engineer,
dated July 1, 1987 , and a one year guarantee letter has been
receiv~d from the Developer, dated Nov. 12, 1986, copies of which
are included here.
A proposed resolution releasing the bond is included here.
Performance Bond for Private Recreation Area and Facilities
This bond was reduced to $3,000 by Resolution No. 87-11.
The work is complete and a certification letter, dated July 7, 1987
from the Design Engineer, and a guarantee letter, dated July 7, 1987
from the Developer have been received and copies are included here.
A proposed resolution to release the bond is also included.
Page #2
Performance bond for Plat No. 3 and north portions of Sandalwood Dr.
This bond was reduced to $16,800 by Resolution No. 87-HH.
A certification letter has been received requesting a reduction to
$1,000, dated July 7, 1987, and a copy is included here.
This bond should have included the cost for 1600 linear feet of five
ft. sidewalk, but was not included as a line item in the cost
estimate for the bond. The uncompleted work includes the 1600 ft.
of sidewalk, some grading on the west side of Sandalwood Drive,
cleaning storm inlets and adjusting utilities. The value of
uncompleted work approximates $16,800, which is the value required
by Resolution No. 87-HH.
.
No further reduction is recommended.
Performance Bond for 1744 ft of Sandalwood Drive, west of Congress
This bond has been reduced to $29,000 by Resolution No. 86-NNNN.
A copy of a certification letter from the Design Engineer, dated
July 7, 1987 requesting a reduction of the bond amount to $2,900 is
included here, Said certification did not include the value of 1744
ft.of five foot sidewalk included in the ,cost estimate for the
original bond as a line item.
The work under this bond has been substantially completed, except
for the sidewalks, some grading work on the south and west sides
and cleaning out storm sewer inlets. Value of uncompleted work is
estimated to be $21,000.
A proposed resolution to reduce the value of the bond to $21,000 is
included here,
Performance Bonds for Miner Road
The bond for the portion of Miner Road, east of Sandalwood Drive, was
for the amount of $89,773.30. The work remaining under this bond
includes the requirement for payment for street lights to be installed
by Florida Power & Light Company in the amount of $13,953.
There is concern that the plans were not followed with respect to
the stabilized shoulders as called for on the typical road section.
Said section called for stabilization to 75 p.s.i., Florida Bearing
Value, for a depth of 20 inches. I have discussed this with the
Contractor, County Engineers, Developers and Design Engineer and am
waiting for their conclusion and recommendations, The value of this
work would be at least $18,000, unless an alternate for future
construction with credits going into a County escrow account i7
accepted, Other work here includes possible adjustment of.a~ lnlet
structure built six inches lower than planned and some addltlonal
seeding and sodding and striping, Incomplete work on water valves
and damage to a fire hydrant is estimated by the Utility Departm~nt
at $4,000. The total value of uncompleted work under thi~ bond lS
estimated at $40,000 and includes the charge for street llghts,
Page #3
The bond for the portion of Miner Road, west of Sandalwood Drive
was for the amount of $54,123,78, No work has been done and the
plans for this improvement have not yet been submitted for approval
by the City or the County. According to the time allowed by the
subdivision regulations, completion of Miner Road was to be Oct~ber
9, 1987 and was extended by Commission action to December 8, 1987,
The value of the work under this bond is estimated to be approximately
$100,000 and exceeds the amount of the bond.
The estimated value of the uncompleted work for both parts of Miner
Road is $100,000 plus $40,000, ie., $140,000. Since the total amount
of the two bonds is only $143,897.08, I do not intend to recommend
a reduction to the bond for the first part of Miner Road until the
shoulder st~bilization is satisfactory or has otherwise been resolved
with all concerned.
~
Vp.--
-
-d~
Tom Clark
TAC:ck
attachments
cc: Carmen Annunziato
Don Jaeger
Kevin Hallahan
Ann Toney
Pete Mazzella
Raymond Rea
John Wildner
5
MEMORANDUM
3 August 1987
TO:
Tom Clark. City Engineer
FROM:
Carmen S. Annunziato, Planning Director
RE:
Bond Reduction and/or Release Requests, Chalet IV
(Sandalwood)
In response to your memo of July 21, 1987 concerning bonds at the
Chalet IV development, I concur that no bonds should be released
or reduced until such time as all improvements are complete or
near completion or new bonds are submitted consistent with your
projection of costs.
.
c ,.,~_. .J. ,..=:(~
CARMEN S. ANNUNZ~ATO
/bks
bonds,bks
MEMORANDUM
30 July 1987
TO:
Peter L, Cheney, City Manager
FROM:
Carmen S. Annunziato, Planning Director
RE:
Chalet IV - Sandalwood
On Tuesday, July 21, 1987 I met with the City Engineer, Chief
Plans Inspector, Don Jaeger, Consulting Engineer, Joel Wantman
and Jack Armarnik concerning the Chalet IV development and
outstanding items to be completed.
Among the items discussed were the status of landscaping and
sidewalks to be constructed on the south and west sides of
sandalwood Boulevard, and the status of Miner Road construction
through the Melear PUD. Concerning the installation of
landscaping and sidewalks on the south and west sides of
Sandalwood Drive, it was Mr. Armarnik's position that the City
could not hold bonds for other required improvements in lieu of
the installation of the previously mentioned landscaping and
sidewalks. Litigation was suggested as a means to compel the
City to release outstanding bonds,
Mr. Armarnik was questioned at gr~at length concerning Miner
Road. It was reported by Mr. Armarnik that Miner Road east of
Sandalwood Drive was under construction at this time. He also
reported that in his opinion, the remaining construction of Miner
Road through the Melear PUD would be accomplished by October 10,
1987 which is the date that all public improvements must be
completed. This position was qualified to the extent that the
permitting of the road could prevent completion by October 10,
1987.
Also discussed at great length was the value of the bond relative
to the projected cost of improvements of the second phase of
Miner Road.
In this regard, Mr. Wantman reported that his estimate of
$54,000+ was based on a different level of construction than what
will be-permitted. However, the impression given by Mr. Armarnik
is that he is committed to the improvement, regardless of the
bond value. Mr. Wantman reported that the plans for Phase 2 of
the Miner Road construction project were 30% complete and that
plans should be substantially complete in three weeks.
In conclusion, I suggested to Messrs. Armarnik and Wantman that
it was unlikely that the City would release or reduce bonds which
remain until such time as the landscaping, sidewalks, and Miner
Road issues have been resolved,
/'f5~
CARMEN S. UNZIATO
jack.bks
cc: Tom Clark
Don Jaeger
M E M 0 RAN DUM
July 21, 1987
TO: TECHNICAL REVIEW BOARD
John Guidry, Utilities Director
Bob Eichorst, Public Works
Charles Frederick, Recreation & Parks Director
Bud Howell, Building Official
Carmen Annunziato, Planning Director
Dale Hammack, Police Department
James Rhoden, Fire Chief
Kevin Hallahan, Forester/Horticulturist
Ann Toney, Assistant to the City Manager
FROM: Torn Clark, City Engineer
RE: Bond Reduction and/or Release Requests, Chalet IV, a.k.a.
Sandalwood
Recent requests have been made for reductions and/or releases of
the several bonds being held by the City for the subject project.
You have received copies of those letters.
The developer has requested that I advise him of the City response
to said requests and a copy of his letter of July 15, 1987, with a
list by date of his requests, is included herewith.
I have determined that the approximate value of the uncompleted
improvements is as listed below:
1. Miner Road from Congress Ave. to:Sandalwood Dr.------$136,000
2. Miner Road from Sandalwood Dr, to the west limits
of the Melear Property.------------------------------$ 93,000
3. Five foot sidewalk on south and west side of
Sandalwood Dr.---------------------------------------$ 30,000
4. Irrigation System for the median and for the
south and west sides of Sandalwood Dr.---------------$ 17,000
5. Landscaping including trees for south and west
side of Sanda,lwood Dr. -------------------------------$ 25,000
6. Plat 3 improvements----------------------------------$ 2,000
TOTAL COST
$303,000
con't.... .
To: TRB MEMBERS
July 21, 1987
Re: Bond Reduction and/or Release
Chalet IV, a,k.a. Sandalwood
Page 2
The total value of all the bonds currently being held by the City
are as follows:
l. Restoration bond for excavation & fill $ 15,000
2. Plat 4 Performance bond $ 20,000
3, Recreation bond $ 3,000
4. Plat 3 Performance bond $ 16,800
5. Loop Road (Sandalwood Drive) $ 29,000
6, Miner Rd, Performance bond (east part) $ 89,773
7. Miner Rd, Performance bond (west part) $ 54,123
TOTAL $227,696
Based on the above, the value of the uncompleted improvements exceeds
the value of the current bonds held by the City by the amount of
$75,304.
In consideration of the above, until east and west parts of Miner
Road are almost completed, I do not believe the reduction or
release of any of the bonds currently held by the City for this
project should be recommended,
Comments are requested as soon as possible so I can further advise
the developer concerning the status of his requests.
--v r - ef!J
Tom Clark
TAC/ck
attachment
CCl peter Cheney, City Manager
Don Jaeger, Bldg, Dept.
Pete Mazzella, utility Dept.
William Cavanaugh, Fire Dept.
p,S,
The cost for
for all four
Lighting has
parking
plats,
not yet
lot lighting is estimated to be $60,000
This was not a bonded improvement,
been installed for the parking lots.
~0cJ/,id)
~A A~~
Chalet IV
CORPORATION
July 15, 1987
Mr. Tom Clark
City of Boynton Beach
Engineering Dept.
120 Northeast 2nd Avenue
Boynton Beach, Florida 33435
Dear Mr. Clark:
You have received from Stanley/Wantman the following certificate
of works completed or reduced:
July 1 Restoration Bond - completed $15,000
July 1 Plat 4 - completed 20,000
July 7 Recreation Bond- completed 3,000
July 7 Plat 3 from $16,800 to $1,000
July 7 Loop Road from $29,000 to $2,900
It would be appreciated if the above Bonds would be cancelled
and/cr redolced.
Sineerely yours,
CHALET IV CORPORATION '
J. A
ik, Executive Vice President'
JA/bgm
.
Chalet IV Corporation. 7100 Biscayne Boulevard. Miami, Florida 33138. (305) 759-2441
.
~/I/
MEMORANDUM
May 21, 1987
TO:
Thomas A, Clark,
City Engineer
FROM:
Carmen S, Annunziato,
Planning Director
RE:
Bond Reduction
,'''-,.
(
Release of these bonds should be evaluated in connection with the
value of the bond for Minor Road, It is my understanding that
the Minor Road bond is for substantially less than the cost of
construction,
c.,. JL zij(- fi:
CARMEN S. ANNUN TO
flat
cc: City Manager
Central File
M E M 0 RAN DUM
MaYREcrNED
TO:
TECHNICAL REVIEW BOARD
..!IAY 15 J9Bl
PLANNING DEPT.
John Guidry, Utilities Director
Bob Eichorst, Public Works
Charles Frederick, Recreation & Park Director
Bud Howell, Building Official
Carmen Annunziato, Planning Director
Dale Hammack, Police Department
James Rhoden, Fire Chief
Kevin Hallahan, Forester/Horticulturist
Ann Toney, Assistant to the City Manager
FROM:
Tom Clark, City Engineer
RE:
Bond Reductions and Bond Releases, Chalet IV (Sandlewood)
Plats 1,2,3 & 4
Forwarded herewith are letters from Stanley/Wantman & Associates
requesting bond reductions and/or releases for the subject
project as follows:-
1. Letter dated April 28, 1987 regarding Plat #3 Performance
Bond reduction from $72,000 to $16,800.
2. Letter dated April 28, 1987 requesting release of the
Restoration Bond for the Excavation & Fill permits for
$15,000.
3. Letter dated April 24, 1987 requesting a bond reduction
for the Loop Road from $29,000 to $19,850.
4. Letter dated April 24, 1987 requesting a bond reduction
for recreation facilities from #45,000 to $3,000.
5. Letter dated April 30, 1987 requesting a release of the
bond for Plat #4 (previously reduced to $30,000).
Please advise as soon as possible if you have any objections to
the subject bond reductions and releases.
c---.. / _ d/ p?
V~ -~-
Tom Clark
TAC/ck
attachments
t; 1/ I,;' L Y / \','! [ ! I r ~!, [,~ f'. /,~': I" l.; ! i , I I' r~, 1[' G.
April 28, 1987
, I ( / . V:
1-, '/) \\\
Ai,'
~ \ '
,\' ,(
I ,~'
'. iF
\'
,
,
I
j
1
Boynton Beach Engineering
120 North East 2nd Avenue
Boynton Beach, Florida 33435
Attention:
Tom Clark
RE:
Chalet IV of Boynton Beach Plat 3
Performance Bond Reduction
(85110-0 )
Dear Mr. Clark:
The majority of the Required Improvements for the subject plat have
been completed to date.'
Our client, the Chalet IV Corporation, has posted a reduced
Performance Bond for Chalet IV of Boynton Beach Plat 3, in the
amount of $72,000.00.
At this time the developer respectfully requests to further reduce
this bond amount to $16,800.00, This amount represents the Cost of
Work Remaining to complete the Required Improvements in the plat.
Enclosed is a Certified Engineer's Opinion of Work Remaining. This
certification is based on record data review and field observations
conducted by this office.
We would appreciate your expeditious review and approval of this
request to reduce the Referenced Performance Bond to $16,500.00,
Very ly Y~ours~;J
~ /"I 7, ~ , ///4
~-:7-;"?<-~~~~~-
Thomas D. Alexcnder, P.E.
Project Manager
enc
c.c. Jack Armarnik - Chalet IV Corporation
Bill Blazak - Burg & DiVosta
Mary Arnold - Stanley/Wantman & Associates, Inc,
TDA/as
LOMBARD CENTER. 2000 LOMBARD STREET. WEST PALM BEACH, FLORIDA 33407 . (305) 842,7444
MEMBER OF THE STANLEY CONSULTANTS GROUP
INTERNATIONAL CONSULTANTS IN ENGINEERING, ARCHITECTURE PLANNING. AND MANAGEMENT
blf~r fl !;Y/\W~h! Ir,~f'[~ t, f\f;'.:!)! ;'/.'1 ~ S, !;~C.
,
l
I
1
, "
April 28, 1987
i ( / /
. '( ()
/' ~ .-
.~ \ \- .
'/
"
, v'
\,0
c'
City of Boynton Beach Engineering
120 North East 2nd Avenue
Bounton Beach, Florida 33435
,
vN
/
Attention:
Tom Clark
RE: Chalet IV of Boynton P.U.D.
Stanley/Wantman Job Number 84056-0
Request for Restoration Bond Release
Dear Mr. ClarK:
Our Client, Chalet IV Corporation, has posted a reduced Restoration
Bond for Chalet IV of Boynt?n in the amount of $15,000,00.
This is to inform you that all earthwork and the majority of the
Required Improvements have been completed at the referenced
project.
At this time, the developer respectfully requests a full release of
the Restoration Bond amount of $15,000.00.
This request for release is based on the referenced project's current
construction and restoration status; and also conditions related to
ongoing construction methodology being mointored by this office.
Furthermore, a sodded landscape berm has been constructed along the
eastern project boundary which will prevent any blowing dust or sand
from drifting onto Congress Avenue.
If you should have any questions or need any additional information,
please do not hesitate to call.
Very y yo~rs, ~/~
~--Vo4V".--Q /~~~~~<r7
omas D. Alex~nder, P.E. ?'~< ( ~r
Project Man.:;ger
c.c..
Jack Armarnik - Chalet IV Corporation
Bill Blazak - Burg & DiVosta
Mary Arnold - Stanley/Wantman & Associates, Inc.
TDA/as
LOMBARD CENTER. 2000 LOMBARD STREET. WEST PALM BEACH, FLORIDA 33407 . (305) 842-7444
MEMBER OF THE STANLEY CONSULTANTS GFiOUP
INTERNATIONAL CONSULTANTS IN ENGINEERING. ARCHITECTURE. PL.A,NNING. AND MANAGEMENT
I, i 'I 1:..../".,' i '
,. r ~ f,,' \. \) t : i / '. t ~ ;':, ~: '."~.
"
April 24, 1987
I
"
Boynton Beach Engineering
120 North East 2nd Avenue
Boynton Beach, Florida 33435
\' Ii,'
"
I
Attention:
Tom Clark
RE:
Chalet IV of Boynton Loop Road
Performance Bond Reduction
(84056-0)
Dear Mr. Clark:
The majurity of the Req~ired Improvements for Loop Road have been
completed. Because of the amount of construction traffic entering
the project, the developer has only had the first lift of asphalt
installed on Loop Road.
Enclosed is a Certified Engineer's Opinion of Cost of the Work
Remaining to complete the Required Improvements.
At this time the developer respectfully requests to reduce the
remaining Surety bond of $29,000.00 to $19,850.00.
If you should have any questions or require any additional
information, please do not hesitate to call.
Very t 1 yours,) ~~
-:SZ;;~N.C'4- O~~~'l"//1h-
Thomas D. .^,le"ander, P.E. ~/?c!/:T7
Project Manager
c.c.
Jack Armarnik - Chalet IV Corporation
Bill Blazak - Burg & DiVosta
Mary Arnold - Stanley/Wantman & Associates, Inc,
enc
TDA/as
----.-,.---.--.---------.-- ---~,._------~--~_..,-
LO~1BARD CENTER' 2000 LOMBARD STREET' WEST PALM BEACH, FLORIDA 33407 . (305) 842,7444
MEMBER OF THE STANLEY CONSULTANTS GROUP
INTERNtl,TIONAl CONSULTANTS IN ENGINEERING. ARCHITECTURE. PLANNING. AND III.ANAGEMENT
: l i ,;" I: Y 1\',',,; n i,~": " g f~; ';., 0(:1,\( . B, II,!C, '
.
I
April 24, 1987
.'
'.
,;\
I
Boynton Beach Bn~ineering
120 North East 2nd Avenue
Boynton Beach, Florida 33435
/ ,
<"< I (
.\ c/
\J'V'"
Attention:
Tom Clark
RE: Chalet IV of Boynton Recreation Area (85110-0)
Performance Bond Reduction
Dear Mr. C la,rk:
The majority of the Re~uired Improvements for the Recreation Area
have been completed to date.
Our client, The Chalet IV Corporation, has posted a reduced
performance bond for these amenities in the amount of $45,000.00.
At this time the developer respectfully requests to further reduce
the bond amount to $3,000.00. This amount represents the Cost
of Work Remaining to complete the Required Improvements.
Enclosed is a Certified Engineer's Opinion of the Work Remaining.
This certification is based on field observations conducted by
this office.
We would appreciate your expeditious review and approval of this
request to reduce the Referenced Performance bond to $3,000.00.
Very Y\;lY YOUCS~
.~~~/'q~~4A-~ A./-p!, /y 7
homas D. A~~x~nder, P.E.~; /.
Project Manager
c.e.
Jack Armarnik - Chalet IV Corporation
Bill Blazak - Burg & DiVosta
Mary Arnold - StanleyjWantman & Associates, Inc.
ene
TDAjas
._-_..._--_._-_._--_.__._~-~"
~- --- ---------.__. ~ ___~__._. .0
LOMBARD CENTER. 2000 LOMBARD STREET. WEST PALM BEACH, FLORIDA 33407 . (305) 842,7444
MEMBER OF THE snNLEY cnN.<;i !LTANTS GROUP
INTERr-J.A.T!ONAL CONSULTAf\lTS IN ENG!!':("ERI"JG ARCHIT~CTlIRE, Pl.'V>JNING; AN[) f/t~JA(;F.MENT
~ "r/..i i' I", J/\:'~!~r r.!', !.r;i .I~ r. /
, ! . "~ 'j . I ~. ~\ I; \,: (~I
,,~ (,-,
April 30, 1987
i\
/ \
(
~-
8oynton Beach Engineering
120 North East 2nd Avenue
8oynton Beach, Florida 33435
"
\
Attention:
Tom Clark
RE: Chalet IV of Boynton Plat 4
Stanley/Wantman Job Number 85110-0
Performance Bond Release
Dear Mr. Clark:
This is to confirm that the Required Bonded Improvements for the
subject plat have been completed in substantial accordance with the
plans and specifications prepared by this office and approved by
the City of Boynton Beach.
At this time the developer, The Chalet IV Corporation, respectfully
requests a full release of the reduced bond amount of $30,000.00.
Please find attached a copy of the developers guarantee for the
improvements of the subject plat which was previously suhmitted to
you.
If you should have any questions or required any additional infor-
mation, please do not hesitate to call.
Very uly Yours,~
~;;:z-c'w-Q -;y~~A~
homas D. Alexdn er, P.E.
Project !,'ia!l3.ger
c.c.
Jack Armarnik - Chalet IV Corporation
Bill Blazak - Burg & DiVosta
Mary Arnold - Stanley/Wantman & Associates, Inc,
TDA/as
~-_._~_.__._~~-~ -~---
--- --"---".._-,~--~ - .~---_..~- -"-"._- ~ -
LOMBARD CENTER. 2000 LOMBARD STREET. WEST PALM BEACH, FLORIDA 33407 . (305) 842,7444
MEMBEFl OF THE STANLEY CONSULTANTS GFlOUP
!NTER~ATIONAL CONSULTANTS IN ENGINEERING, AACHlTECTlIRE. PLANNING. A~D M4NAGEMENT
MEMORANDUM
5 ,Tune 1985
TO:
Carmen S. Annunziato, Planning Director
FROM:
Kevin Hallahan, Forester/Horticulturist
RE:
Chalet IV at Boynton Lakes - site Plan
This memo is in reference to the above-mentioned landscape
plan. The plans do not clearly identify the species of trees
and vegetation to be used for the entranceway road median.
In keeping with the intent of Section 7A-352, pgs. 6-7 of
Ordinance No. 81-22, no species of Ficus tree should be
planted in this area.
~ 4/~/J~
evin Hallahan
/bks
-n"1?Cji!~l:?D
M E M 0 RAN DUM
~ 1985
Plf.\i';I,,,,(j iJEPT~
'\
May 31, .l~tl:>
""
-,
TO: Mr. Carmen S. Annunziato,
Director of Planning
FROM: Tom Clark,
City Engineer
Re: Chalet IV site Plan, Plats 3 and 4
Comments:
1. The legend for street lights on private streets
should be added and also shown on the paving
and drainage plans.
2, Traffic control devices and street marking
details should be shown on paving and drainage
plans,
3. The outfall storm sewer into L-20 canal should
be shown. This was not shown for plats 1
and 2 either.
4. Gate house construction is not acceptable in a
public right of way.
5. proposed street names should be shown,
<;;. T'jp/~(d F: P~L, .freef-I/,~f'f $/c,,-,-I,'Ie.tJr~,1k,~,,;1"e.J
qrL ....""'IJ)r<lt//~ I~ct roerq.N&1'cs/"IJ1d ~e e.v-I,fe"'/ rf-~ $~
P- F,+J..., dB.!"I',,,, sv'{,J. -f~,-~:.:r..~q ~
Tom C ark
TAC:mb
M E M 0 ~ AND U M
May 8, 1985
TO: Mr. Carmen S. Annunziato,
Director of Planning
FROM: Tom Clark,
City Engineer
Re: Plat I and Plat II, Preliminary Plat, Chalet IV
Forwarded herewith are two sets of development plans and six
copies of the plats for the subject project including the set
with the T.R.B. review stamp.
Also forwarded is a copy of the cost estimate for the recreation
facilities.
Comments are as follows:
1. Cost estimates should be submitted for the following:
(a) Plat I and Plat II water, sewer and street improve-
ments including the "loop" road and street lights
on the "loop" road.
(b) A breakdown of the costs for Miner Road split as
per planned ownership for posting of bonds.
2. The dedication should be changed to provide for the loop
to be a public right of way.
3. The loop road will have to be extended to the recreation
area with the first plat improvements.
4. The recreation area will have to be granted by deed to
the Homeowner's Association for approval of the first
plat.
5. Roadway construction to have stabilized subgrade equal
to 50 p.s.i., Florida Bearing Value.
6. Other comments as per Carmen Annunziato's memo of May 7,
1985.
y; ~ tP~
Tom Clark
TAC:mb
Attach.
MEMORANDUM
7 May 1985
TO:
Tom Clark, City Engineer
FROM:
Carmen S. Annunziato, Planning Director
RE:
Chalet IV Plat I and Chalet IV Plat II
Preliminary Plats
Approval of these two preliminary plats is recommended subject to
the following:
1. All of Miner Road is to be bonded and dedicated in
connection with the approval of Plat I.
"
2. For those portions of Miner Road outside of the
limits of Plats I and II, the right-of-way should
be dedicated by separate instrument within 120
days of preliminary plat approva;.
3, That part of the 80' collector road lying west of
the part which appears on Plat I should be dedicated
to the public by instrument through the limits of
the recreation are a prior to filing a final plat.
4. The recreation area shown on the master plan for the
Melear PUD lying north of the collector road should
be dedicated by easement to the homeowners prior to
filing for final plat approval,
5. The location of off-site utilities will require the
dedication of easements by instrument which should
be recorded prior to filing the final plat for
Plat I.
6. Miner Road must be constructed through the limits of
the public land located at Congress Avenue and Miner
Road in a timely manner. The reason for this is that
the recently approved bond issues provide for the
construction of a multi-purpose public building to be
located on-site, thus, Miner Road must be in place to
serve this improvement at the time of occupancy.
7. The collector road should be dedicated to the public
in order to provide for enhanced municipal circulation
consistent with current City policy,
8. It is recommended that the Planning and Zoning Board
set $31,815/acre as the land value for Recreation and
Parks dedication purposes based on the contract for
purchase submitted by the ,applicant.
-
~r-
/bks
MEMORANDUM
AprilS, 1985
TO: Mr. Carmen S. Annunziato, Director of Planning
RE: Chalet IV
We have reviewed the water and sewer plans for this development and
have the following comments:
1. The pump station should be lowered in bottom elevation and
the gravity line on the main boulevard should be at least
10" VCP in such a manner that the entire subdivision (150
acres + or -lcan be served by one pumping station.
2. The plans as submitted show phase I being developed in two
sections. The water and sewer lines should be completed
throughout both sections when the first section develops
thereby looping the water lines and providing gravity
sewer for the out parcel owned by the city,
3. The water and sewer lines running through parking areas
from south to north shall have a 30' easement, the water
pipe shall be so located that it is 5' from one side of
the easement, the sewer line shall be 10' from the water
pipe and the balance of the easement on the sewer line
side of the easement.
This easement shall be designated as free of any tree
plantings whatsoever. Shrubs and hedges may be planted.
4. There should be coordination between the landscaping plan
and the utility plan in such a manner that the multiple
meters are not in back of or covered by shrubs or other
plantings. This should be made very clear so that when
C.A.B. review these plans, the Board understands and does
not attempt to change this portion.
5. If recreational facilities are planned west of the pro-
posed lake then water and sewer must be extended to them
in order to meet that requirement as imposed by Planning
and zoning and the Parks Department.
6. All gravity sewers shall be VCP not PVC as inciated on the
plans.
7. Review the detailed
to the standards of
sheets to be certain that they conform
the city of Boynton Beach.
(]~ti~lf
Perry A.Cessna,
Director of utilities
apt
Attachment:
Drawings for above
MEMORANDUM
'0
Carmen Annunziato
City Planner
DATE:
2 April '85
FILl!:
FIfOM
John Wildner
Park Superintendent
!!IUIIJI!:CT
Chalets IV At Boynton
I have reviewed the site plans for Chalets IV at Boynton.
the Melear P,U.D" this development was previously granted
the inlpact fee for the following recreation facilities:
As Phase One of
1/2 credit towards
Meeting Hall/Recreation Center
Tennis Courts
Pool
Childrens Play Area
Play Field
Picnic Area
In order to insure that recreation facilities are completed in a timely fashion,
it is suggested that:
1) Site planning and construction of recreation facilities be bonded
as part of Phase I. This should include utilities and access
roads from Phase I.
2) A submittal of site plans and construction of recreation facilities
should commence prior to 1/2 of construction on Phase I, or twenty-
one months from the beginning of construction~
3) Construction of recreation facilities should be completed prior
to the end of Phase I.
~ -;;; ?v'~,-~
rhn Wildner
CC: Charles Frederick
JW/ad
I
TO
J
FROM
Carmen S. Annunziato
Planning Director
Bob Donovan
Plans Review Inspector
SUBJEcr:,_,_,_,_~~ALE,~~~__,_,___,_,_,__,_,____________,____'____________,__,_,_ DATE:___~,- ~.:::.~__
FOLO ~
Be advised of the following comments as a result of site plan
review.
1. Water management required.
2, Future buildable areas should be shown, screened room
porches, etc.
3. Setbacks to buildings must be shown,
4. Must meet standard building code, state health code,
energy codes and all other applicable codes and ordinances.
PLEASE fiE,':, "/ TO --,_..", SIGNED ~.6 ~';;r~--;;L'l '--
."""""'....'"~.""",.~,..,..~,,,..,,..,,,..""'''''''"',,",,.,, '." ....~_ ,.,.,.". "..,,,,,,......,,,,"',,, .. "'.~.~"..."~.""'....-.:""" ". 'u., .,." .."....., ....,...,,,....-~""""'",' . """"""",..,""""".
" ...... ,........"',~..._,.~~'., ''''''~' .""....~~:."""'....,.c.....,.,.,"""',
REPLY
r/)
~~e/C! ( ,/,
!;/
,~-~..ft.- )L-
~
I
DATE: 0- ~6'5-
/
,
Z /:
.. 1/
~' I ~J.{/Y
SIGNED
ITEM /It F269 C WHEELER GROUP INC.
"
THIS COpy FOR PERSON ADDRESSED
I
I
FROM
TO
Carmen Annunziato
City Planner
Bob Donovan
Chf, Plans Review Inspector
SUBJECT:
CHALETS IV AT BOYNTON
DATE: 4-3-85
~OLD ..
Upon review of the above noted site-plan, be advised of the following
information,
1. Need Water Management approval.
2, Need setbacks shown. Also required is all future screen rooms,
porches, etc.
3. Need details on lighting,
PLEASE REPLY TO
SIGNED
~jJ~
Bob Donovan
REPLY ~
~.~r
DATE: /-,3- i'S:-
SIGNED