Loading...
CORRESPONDENCE Th.e Satter Jmpanies July 1, 1981 Ted Satter Enterpnn.. Inc. Satter Custom Home.. IDe. Mr. Tom Clark, City Engineer City of Boynton Beach 120 N. E. Second Avenue Boynton Beach, FL 33435 Satter Cow:truCtiOD Company. Inc. SaUer Properties. IDe. Satter Manaaement Corporation SUBJECT: DOS LAGOS, P.U.D. J II: R Mortpa:f1 Company, Ine. Dear Tom: Satter Architectural &:: Enlineerlnl Group, IDe.. As per our recent telephone conversation concerning the subject Project, I have enclosed the following: Satter Markllltina: Services., Inc. 1. Two copies of the proposed street lighting plan including the specifications for the type of fixtures proposed. Satter Land Development, Inc. Satter &: Ray Real Enate Consultants, Ine. 2. Two copies of the revised master plan for the subject Project showing the adjusted berm width along Miner Road and the revised Miner Road right-of-way width. Conerea Park Title Insurance Company, Inc. Investment A.oclat.e. Unlimited, IDe. 3. One copy of the revised legal description for the Miner Road right-of-way. 4. One copy of the mortgage deed for the subject project indicating that the total purchase price for this parcel was $2,500,000.00. 5. One copy of the revised construction cost estimates for the site construction showing an estimated cost of $1,783,000.00. It has been estimated that the proposed recreation facili- ties that will be built with this project will be an addi- tional cost of approximately $150,000.00 each; therefore, the total estimated costs for bonding purposes will be $2,083,000.00. I have been in contact with the surveyor for this project, weimer and Company, concerning the plat revisions you have requested. He has indicated that all revisions have been '~LL YOU NEED TO KNOW IN REAL ESTATE" 2328 South Congress Avenue West Palm Beach, Florida 33406 305-968-0750 Mr. Tom Clark, City Engineer Page 2 July 1, 1981 made. They are currently putting the final Florida Power & Light easements on the plat and will have it complete and re- submitted to your office by Monday, July 6, 1981. We would like to change the names of the street within the project to better reflect the type of units that we intend to construct. I have enclosed one copy of the master plan on which the revised names are shown. Please review these and let me know if this change is acceptable to the City. As you know we are planning on having this plat approved for filing by the City Commission at their meeting on July 21, 1981. Provided that all information previously submitted to your office and the items submitted herewith meet with your requirements, I will proceed with obtaining the required bond (for $2,083,000.00) and a check for $20,980.00 (l% of the cost of the required improve- ments plus $150.00) as required by your subdivision's regulations pursuant to obtaining a land development permit. Please review this information and contact me if you have any questions or comments concerning the subject Project. Very truly yours, SATTER ARCHITECTURAL & ENGINEERING G~7 INC. -A ~ ederick Roth, Jr., P.E. Vice President FR/rwg Enclosures cc: Joe Bova Robert A. Satter - --:\ . 'A" d~.~~~~'..jG.jt,; C' .",- (}v-..4- The Sa{-fu:C~panies .,. (J~Jfh June 9, 1981 ~ X \' \\~1' (. ~ [) 'X 11It, cS ~ Satter ConstruCtiOD Company, Ine. City of Boynton Boynton Beach Beach, Fla. Receive Ted Satter Enterprises, Inc. Sattel' Custom Homes,. IDe. Satter Properties., Inc. Satter Manaa:ernent Corporation ATTENTION: Mr. Tom Clark, P.E. City Engineer J II: R Mortlale Company. Inc. Re: Dos Lagos, P.D.D. for The Satter Companies Satter Architectural &: Engineering Group, Inc. Dear Mr. Clark, Satter Marketing Services. Inc. Satter Land Development. Inc. As per the Boynton Beach subdivision and platting regulations we are enclosing herewith: Satter At Ray Real Estate ConsuJtants, Inc. 1. Two (2) sets of the paving and for the subject project, Olsak Inc., drawing 381-M and eleven dated April, 1981. drainage plans and Associates, (11) sheets Concress Park Title Insurance Company, Inc. lnvestment Associates Unlimited, Inc. 2. Two (2) sets of the water and sewer plans for the subject project, Olsak and Associates, Inc., drawing 381-M and ten (10) sheets dated April, 1981. 3. Three (3) sets of the master plan for the subject project. 4. Construction cost estimates for the subject project. 5. Construction specifications for the subject project. 6 . Six (6) sets of the preliminary plat by Weimer and Associates in five (5) (prepared sheets). '~LL YOU NEED TO KNOW IN REAL ESTATE" 2328 South Congress Avenue West Palm Beach, Florida 33406 305.968-0750 7. A check for $50.00 to cover the processing fees. 8. Copies of the original DER and Health Department, Water and Sewer permit approvals. You will note that all roads within the development will be privately owned and maintained. The water and sewer system will be dedicated to the city and this has been coordinated with Mr. Perry Cessna, Utilities Director for Boynton Beach. The cost of the left turn lane at the project entrance off of Congress Avenue has been included in the construction cost estimate. The permit request for this construction has been sent to the Palm Beach County Engineering Department (a copy of the letter Olsak and Associates, Inc., dated May 8, 1981 enclosed herewith). The cost of the bicycle pedestrian path along Congress Avenue and Minor Road as required by the PUD approval is also included in the construction cost estimate. We are requesting that you review this information and provided that it meets with your requirements, forward this project to the city council for final plat approval. Please contact me if you have any questions or comments concerning this information. Fredrick Roth, Jr., P.E. Vice President Engineering Satter Architectural and Engineering Group cc: Olsak and Associates, Inc. Weimer and Associates MEMBER :,' ,:.,... \rEL\lEH A\U CO\JI l\ \ r INCORPORATED planners . land surveyors . engineers land development consultants P. O. BOX 15786 2586 FOREST HILL BOULEVARD wEST PALM BEACH, FLORIDA 33406 PHONE 305 965.8900 Dos La gos W.O. #80-110 May 26, 1 981 Revi sed June 11, 1981 LEGAL DESCRIPTION FOR DEDICATION OF MINER ROAD RIGHT OF WAY A parcel of land in the Northwest one-quarter of Section 17, Township 45 South, Range 43 East, Palm Beach County, Florida; said parcel being specifically described as follows: From the North'west corner of said Section 17, bear North 890-16'-39" East, along the North line of said Section 17, a distance of 60.06 feet; Thence, South 010-44'-39" West, along a line 60.00 feet East of, as measured at right angles to and parallel to the West line of said Section 17, a distance of 50.05 feet to the POINT OF BEGINNING. Thence, North 890-16'-39" East, along a line 50.00 feet South of, as measured at ri9ht angles to and parallel to the North line of said Section 17, a distance of 1643.57 feet; Thence, South 090-06'-30" West, a distance of 109.61 feet; Thence, South 890-16'-39" West, along a line 158.00 feet South of, as measured at right angles to and parallel to the North line of said Section 17, a distance of 1605.56 feet; Thence, South 450-30'-39" West, a distance of 34.59 feet; Thence, North 010-44'-39" East, along a line 60.00 feet East of, as measured at right angles to and parallel to the West line of said Section 17, a distance of 132.05 feet to the POINT OF BEGINNING. ~u. ., & 1\SSllriatts, 11m,. Consulting Engineers & Land Planners 300 GREYMON DRIVE V,EST PALM BEACH. FLORIDA 33.405 OFFICE (305) 833.4 . ~<:l ~ @ 1(5).\7 I ' t u .-- Palm Beach County, }~gineering & Public Works P.D.Box 2429 ~est Palm Beach,Florida 33402. Hay 8,;981. Att: Mr.Charles R.Walker,F.E., Director Traffic Division. RE:"DoB Lagos F.U.D." Modification of South Congress Avenue-Left turn . Gentlemen; This is an app~ication for permit to construct the left turn lane on South Congress Avenue ( Boynton Beach.) ,as shown on the Dwg's. Enclosed please find 4 sets of Dwg's for the proposed construction. If you have any, questions in this matter,please do not hesitate to contact this office. Sincerely yours, OLSAK & ASSOCIATES, / h ~~ 'c/'?.,d?-.rt:t ':'j.(f:j/ Ivan K.Olsak.P.E. ---.--- .-.--'- cc:IKO Satter Companies,Inc. I - ,j- STATE OF FLORIDA DEPARTMENT OF Bob 'Jccnam, Governor Health & Rehabilitative Serv[ces District Nine P. O. Box 29 Palm Beach County Health Dept. West Palm Btach, Florida 33402 Please Address Reply to: ESE-WPB May 1, 1981 Mr. Max Ambach Ambach Associates, Inc. 8150 So. Federal Highway Hypoluxo, FL 33462 Re: MW - Permit fJ: Utility: Project: 5081-4946 FH Rei. Boynton Beach Dos Lagos P.U.D. Dear Mr. Ambach: Thia will acknowledge receipt of your request for renewal of the referenced permit. The permit is hereby being extended to 5/1/82. Please be advised that all the conditions of the original approval still remnin in effect. Upon completion of the project, but prior to use, the engineer-of- record shall submit a certificate of completion together with results of the pressure test and bacteriological analyses, and a set of record drawings. The water distribution shall not be put into use without obtaining a release for service from this agency. Very truly yours, For the Division Director Environmental Sciences & Engineering ~L~.....~ Umesh Asrani, P. E. I Supervising Engineer Plan Review & Permits FJG/UA/fm cc: Dept. of Env. Regulation Ivan K. Olsak, P.E. Perry A. Cessna ESE 209-A Rev. April 1981 " (ATE OF FLORIDA QEPARTMENT OF ENVIRONMENTAL REGULATION May 1, 1981 ,-t't"IRON~......... :'-o/~~, t~,c~.. ~--'\ 'II I 9 " ~ . .I'f"'rEO'f\.o'-~ BOB GRAHAM GOVrnNOR TH FLOR Ill;. DISTR leT JACOB D VARN SECnETARY :>UN CLUB Ru:," OX 3856 PALM OEACH r _ :Jf-lIDA 33402 WARRF.N G. STRAHM SURDISTRICT MANAGE:.R Mr. Max .~mbach Ambach Associates, Inc. 8150 So. Federal Highway Hypoluxo, FL 33462 Dear Mr. Amb2ch: Re: Project: Dos Lagos Utility: Boynton Beach This office has completed the review of your request to extend the expiration date of the referenced permit which was originally issued on August 12, 1980. Your request for an extension of the expiration date is approved. Your new permit number is CS 50-42179 and the new expiration date is May 1, 1982 All the conditions of the original permit shall remain in effect for the duration of this time extension and this letter of approval must be 'attached to the original permit. Should you have any questions please contact this office, telephone 305/689-5800. Local Program Approval Date: 5/1/81 , -~ ~ Palm Beach County Rea). th :"epartr;;ent Environmental Sciences & Engineering 1st day of May , 19 81 Issued this ~~_~\)L Harren G. Strahm Subdistrict Manager :c: Ivan K. Olsak, P. E. Perry A. Cessna _2cn.t_E'r.tir::lt1-.I;1.or..i.cb--~.L-.JL- --- ~- -~. _.~-~ ~-_._-~ '. ,.---/ THE EDWARD J. DEBARTOLO CDFlPOAATION P.O. BOX 3287' 7620 MARKET STREET' YOU'lGSTOWN. OHIO 44512 PHONE. (216) 758.7292 . TELEX. 98-2408 OIl,cC' of tho President September 24, 1979 rlr. ~'ax Ambach P.O. Box 1048 Boynton Beach, Florida 33435 Dear Mr. Ambach: The undersigned as the fee owner of 87.42 acres located in the City of Boynton Beach, Florida and described in Exhibit "A" attached hereto and made a part hereof authorizes you as a purchaser of the property to file an application either on my behalf, or as purchaser of the property with the City of Boynton Beach, for the rezoning of such property to permit 4.5 residential density. EJfJ:amr Attach .. .. ~..', \ - ~ , ~ .....~, .,' A p~rcel of lalld ill tl1" r,orll)\V.",.t QUJrler (rJl'1 1/4) uf Section 17 I TO\','ll~llip LIS South, f<Dn[jl; 43 [ast, be: ng more pur-ticulill'ly dcscr"ibed uS follows: C' '::'ilC'flce ,]t the iJorlhwcst CC;I~ller' of said Section 17; :;I~-:l::::e E~]sterly along the r\lorth line of sdid S~"ction 17, a dist3nce of 50.04 fect to the point of beginning of the p"r"cel to be h"rein described; thence continue [2sterly cdor-.g the sdicJ r';cwth line of said Section 17, a distunce of 1748.90 j"et to the centerlille of the Lake Worth Drainage Di~trict Equalizer Canal E-4; thence Southerly along the said cellterline of the Lake Wor-th Drelillage Oistr"ict Celn,,1 E-4, a distance of 1979.10 feet to a point of CUI"vature of a curve concave to the Northwest, said curve having a I"udius of 6500.0 feet and a central an~le of 30 28' 30"; thence Soutllerly "lo<1g the arc of the "for"esaid curve a di5tnnce of 39.~.23 feet to a point; thc:nce Scutherly 120 35' 00" West alollg a line tullgent 10 the zf:orescid curVe a distance' of 302.42 feet to u point in the East-West Quar_ter Section lille of suid Section 17; thence South 890 cis' 49" West ,lIong said East-West Quarter Section lille a distance of 1375.SI feet; thence North 10 44' 39" Edst a distelnce of 2636.07 feet to the point of beginfling. .. EXHIBIT "A" ----- ~:.I Rhett Roy Landscape Architecture/Planning, PA TO JOB NO:ll9b5"C JOB: ~c, tta.J6to ATTN:~ DATE: ......_~~ RE: r;,. Ii- . f) ~ $Ct\J r- ~ ,... .... ~ ... ( GENTLEMEN: We are sending you ~ dated 1-. Prints Cost Estimate Report Original Drawings Contract Copy of Letter Specifications Bid Package Change Order For Your Review As Requested With Our Review Via i-1ail Messeng,er Hand Delivery tlo.:"es :.. . . II \ " ~-~ I'~~~\f COpy TO: SIGN 412 N. Andrews Avenue. Fort Lauderdale. Ronda 33301 . Telephone (305) 462-0704