Loading...
CORRESPONDENCE . 'The City of t;Boynton t;Beac/i 100 'E. 'Boyntott 'Beam 'Boukvartf P.o. 'Bo't310 'Boynton 'BuuFr., :r{oritUz 33425-0310 City:Jfall: (407) 375-6()()() rJVC: (407) 375-6090 October 11, 1995 VIA: Facsimile 434-8187 Agustin Hernandez, Planning Department School Board of Palm Beach County 3384 Forest Hill Boulevard West Palm Beach, Florida 33406-5871 Dear Mr. Hernandez: In order to assist the School Board in obtaining necessary approvals from the South Florida Water Management District, the City of Boynton Beach is presenting this letter as a preliminary step toward a final agreement. To meet the drainage requirements there is a need for additional land. The City has offered and will give the School Board permission to utilize City owned land along the C-16 Canal, west of the school site. This is approximately a 50 x 1300-foot strip located off NW. 13th Avenue. The School Board will be responsible for the development and maintenance of this land. Secondly, the City will give the School Board permission to do the needed street construction to accomplish the drainage project. An Interlocal Agreement is currently in effect between the City and the School Board regarding the Poinciana Elementary School construction project. The Interlocal Agreement will be amended to address the use of the City property for drainage and subsequent maintenance along with other issues that need to be addressed. !llmem.a's (jateway to tlU (julfstream Letter to Agustin Hernandez October 11, 1995 Page Two The City of Boynton Beach has worked very close with the School Board on this school project and wish to see it completed in the time originally planned. You can rely on our continued cooperation and support. Sincerely, CITY OF BOYNTON BEACH ---W+-'-~ B Wilfred Hawkins Assistant to the City Manager WH:smb c: Carrie Parker, City Manager Jim Cherof, City Attorney Charlie Frederick, Recreation & Park Director William Hukill, P.E., Director of Development Tambri Heyden, Planning Department Director Larry Zabik, Assistant Superintendent Michael Mergio, Support Services 2 ...... '-I'Lf,i::~ii,;JG AirD-~rjf-I'~ ,-._,.__,~-...l.QHillG OEPT. -, 9:\CM\WILFRED\HERNANDE.WPD tJ:Fu City of t;Boynton t;Beac/i 100 'E.. 'Boyntott 'Beam 'Boukvartf P.O. 'Bo<t310 'Boynton 'BuuFr., :r{oritUz 33425-0310 City:Jfall: (407) 375-6()()() rJVC: (407) 375-6090 October 11, 1995 VIA: Facsimile 434-8187 Agustin Hernandez, Planning Department School Board of Palm Beach County 3384 Forest Hill Boulevard West Palm Beach, Florida 33406-5871 Dear Mr. Hernandez: In order to assist the School Board in obtaining necessary approvals from the South Florida Water Management District, the City of Boynton Beach is presenting this letter as a preliminary step toward a final agreement. To meet the drainage requirements there is a need for additional land. The City has offered and will give the School Board permission to utilize City owned land along the C-16 Canal, west of the school site. This is approximately a 50 x 1300-foot strip located off N. W. 13th Avenue. The School Board will be responsible for the development and maintenance of this land. Secondly, the City will give the School Board permission to do the needed street construction to accomplish the drainage project. An Interlocal Agreem!'lm is currently in effect b..etwAFln .the City and the School Board regarding the Poinciana ~JemenfaiYSctioorconstruction project. The Interlocal Agreement will be amended to address the use of the City property for drainage and subsequent maintenance along with other issues that need to be addressed. !llmem.a's (jateway to tlU (julfstream Letter to Agustin Hernandez October 11, 1995 Page Two The City of Boynton Beach has worked very close with the School Board on this school project and wish to see it completed in the time originally planned. You can rely on our continued cooperation and support. Sincerely, CITY OF BOYNTON BEACH ---W+-'-~ B Wilfred Hawkins Assistant to the City Manager WH:smb c: Carrie Parker, City Manager Jim Cherof, City Attorney Charlie Frederick, Recreation & Park Director William Hukill, P.E., Director of Development Tambri Heyden, Planning Department Director Larry Zabik, Assistant Superintendent Michael Mergio, Support Services ~.._'_.-'-.__e_, ~ " "" ',', '.~';;;'~__~:2...,; -.iL.j 2 . d; 'l.~j; PLANNING AND ZONING DEPT. rP-; I " S~M\WILFRED\HERNANDE.WPD .h..'__'_.... ," I', [. >..! " t:} - ~''--'JU . , 'I1ie City of t;Boynton t;Beac/i 100 'E. 'Boynton 'Btacr. 'Boukvartf P.O. 'Bo't31O 'Boynton 'B=r., rforitia 33425-0310 City 9fa[[: (407) 375-6()()() rJVC: (407) 375-6090 September 27, 1995 The IPARC Clearinghouse c/o TOIm Of Lantana 500 Greynolds Circle Lantana, FL 33462 RE: AMENDMENT TO COMPREHENSIVE PLAN - REF. #95-S2 POINCIANA ELEMENTARY SCHOOL (WAR 95-004) The City of Boynton Beach is processing an amendment to its comprehensive plan in connection with the plans of The School District of Palm Beac.h County to expand the Poinciana Elementary School's campus. The entire project site is approximat.ely 10 acres j however, only 1.52 acres are being added to the existing site, and therefore changed from Medium Density Residential to the Public & Privat,e Governmental/Institutional classification. Public hearings on this proposed amendment will be held before the Planning and Development Board on November 14, 1995 and before the City Commission on November 21, 1995, both at 7~00 P.M. in the Commission Chambers at City Hall, 100 E. Boynton Beach Boulevard, Boynton Beach, Florida. Should you have any questions or need additional information, contac.t Mic.hael Rumpf, Senior Planner at 375-6260. Sincerely, ~~\9~k 1 arabl' i Heyden Planning and Zoning Director T.JH:mr Enclosures MISCX:POINIPRC.LET !llmerka's (jateway to tlU (julfstream Page I of2 EXECUTIVE SUMMARY FOR COMPREHENSIVE PLAN AMENDMENTS DATE: SEPTEMBER 11, 1995 Reference #: LUAR 95-004 DCA REF. 95-S2 General Information Initiating Local Government: CITY OF BOYNTON BEACH Contact Person: MTr.HART. RUMPF. ~RNTOR PTANNRR Address: 100 E. BOYNTON BEACH BOULEVARD, BOYNTON BEACH, FLORIDA 33425 TelephoneJFax: 375 6260 /375-6090 Applicant! Agent: THE SCHOOL BOARD OF PALM BEACH COUNTY/JAN HANSEN TelephoneJFax: 434-8020 Proposed Comprehensive Plan Textual Amendments General Summary of Amendments: - amendments relating to traffic circulation or the roadway networks - amendments relating to affordable housing Amendments related to the following elements: X land use , - - traffic circulation - mass transit - ports and aviation - housing - infrastructure sub-elements - coastal management - conservation - recreation and open space - intergovernmental coordination - capital improvements - other Summary of addition (s) to adopted comprehensive plan: N/A Page 2 of2 Summary of proposed change (s) to adopted comprehensive plan: N/A Proposed Amendments to the Future Land Use Map Location of proposed map amendment (include a location map) West of Seacrest Boulevard, between NW 13th Avenue and NW 11th Avenue Size of Area Proposed for Change (acres) 1.52 ACRES OF THE ENTIRE 10.2 ACRE SITE Present Future Land Use Plan Designation (include a density/intensity definition) MEDIUM DENSITY RESIDENTIAL WITH A MAXIMUM DENSITY OF (9.68 DU/ACRE). Proposed Future Land Use Designation (include a density/intensity definition) PUBLIC & PRIVATE GOVERNMENTAL/INSTITUTIONAL Present Zoning of Site (include a density/intensity definition) R-lA (SINGLE FAMILY) AND R-2 (DUPLEX) , Proposed Zoning of Site (include a density/intensity definition) PUBLIC USAGE Present Development of Site SINGLE FAMILY HOMES AND VACANT Proposed Development of the Site, ifknown (Number of Dwelling Units; Commercial Square Footage; Industrial Square Footage; Other Proposed usage and intensity): EXPANSION OF EXISTING 'POINCIANA ELEMENTARY SCHOOL PROPERTY INCLUDING RELOCATION OF STRUCTURE Is proposed change a Development of Regional Impact? NO Comprehensive Plan Change Processing DatelTimeILocation Scheduled for Local Planni~Afben~ Public Heari~ H6VKMB8R 14 , 1995/7:00 P.M./CITY COMM S N HAMBERS, 10 E. BOYNTON BEACH BLVD. . DatelTimeILocation Scheduled for Governing Body Public Hearing NOVEMBER 21, 1995/TIME AND LOCATION AS ABOVE Scheduled Date for Transmittal to DCA NOT APPLICABLE-SMALL SCALE AMENDMENT NOTICE OF LAND USE CHANGE NOTICE OF ZONING CHANGE CITY OF BOYNTON BEACH PUBLIC HEARINGS The City of BO~lton Beach proposes to change the land use and zoning on the darkened areas shown on the map below. Public hearings on these proposals will be held before the Planning and Development Board on November 14, 1995 and before the City Commission on November 21, 1995, both at 7:00 P.M. or as soon thereafter aa the saende permits, at City Hall in the Commission Chambers, 100 East Boynton Beach Boulevard, Boynton Beach, Florida. T .. .------ r{~toN CANAL IF'16 --- --- _m__ - ------ ----------.---- I --- __ _2"______ -- ------- R1A1MeDR 10 PU/PPGI"", , \ ~ <D - - f-- - PlANNING ._ f1.......... .. no POINCIANA ELEMENTARY SCHOOL LEGAL: . The School District of Palm Beach County Jan C. Hansen Redevelopment/expansion of existing elementary school Portions of the entire 10. 2-acre site located between N. W. 11 th Avenue and N.W. 13th Avenue, immediately west of Seacrest Boulevard. Complete legal descriptions on file in the Planning De.pat'tment, 100' East BO>~lton Beach Boulevard, Boynton Beach, Florida. PETITIONER: AGENT: INTENDED USE: LOCATION: REQUEST: LAND USE AMENDMENT: From - MeDR Medium Density Residential (all parcels) To - PPGI Public & Private Governmental/Institution (all parcels) REQUEST: REZONE: From - R-lA Single Family and R-2 Duplex (see map for selected parcels) To - PU h,blic Usage (all parcels) A COPY OF THESE APPLICATIONS AND CORRESPONDING LEGAL DESCRIPTION ARE AVAILABLE FOR REVIEW BY THE PUBLIC IN THE PLANNING AND ZONING DEPARTMENT AND IN THE OFFICE OF THE CITY CLERK. ALL INTERESTED PARTIES ARE NOTIFIED TO APPEAR AT SAID HEARINGS IN PERSON OR BY ATTORNEY AND BE HEARD. ANY PERSON WHO DECIDES TO APPEAL ANY DECISION OF THE PLANNING AND ZONING BOARD OR CITY COMMISSION WITH RESPECT TO ANY MATTER CONSIDERED AT THESE MEETINGS WILL NEED TO ENSURE THAT A VERBATIM RECORD OF THE PROCEEDINGS IS MADE, WHICH RECORD INCLUDES THE TESTIMONY AND EVIDENCE UPON WHICH THE APPEAL IS BASED. PLEASE CALL (407) 375-6260 FOR ANY QUESTIONS REGARDING THE ABOVE MATTERS. MISCX:POINC400.AD SUZANNE M. KRUSE CITY CLERK To: Fax: From: Date: Pages: From the desk of... Wilfred Hawkins Assistant to the City Manager City of Boynton Beach P.O. Box 310 Boynton Beach. FL 33425 (407)375-60 I 0 Fax: (407)375-60 I I Larry Zabik, Asst. Supt. 434-8900 Wilfred Hawkins, Asst. to the City Manager September l, 1 995 1 pages, including cover sheet. Below are a list of issuses that need to be discussed at the meeting that should be held next week. All the school districts cast of characters involved with the Poinciana construction project should attend this meeting. Discussion Issues: 1. Drainage- where will the drainage be placed? Needs to be finalized. 2. Interlocal agreement - References made that interlocal agreement would negate certain permitting and fee requirements. 3. Property Lisitng- Rezoning Application requires 400 ft. property listing and tax maps with 400ft. property bounderies shown. 4. Traffic Study - City zoning code requires traffic study be done for rezoning application. 5. No Utility Data- Data needed on comparing existing to proposed new utilities. 6. Rezonging Application not signed by proper authority. 7 . Verify Legal descriptions on the properties involved in the construction project. 8. N.W. 13th Ave. should only be a right-of-way abandonedment; not the entire street. Please notify this office of two dates and times for the meeting. Thank you. cc: /0'''v\1:( ~ ~ley(.ipv1 , ~(Ir!<e k::'u1"Yif \... bill ~ltY--lli THE SCHC 30ARD OF PALM BEACH COUNTY, FLORIDA Dr -Bernard Shulman I. SUPERINTENDENT OF SCHOOlS PLANNING, CONSTRUCTION & REAL ESTATE 3320 FOREST HILL BOULEVARD. SUITE C-331 WEST PALM BEACH, FL 33406-5813 (407) 434-8020 FAX (407) 434-8187 August 21, 1995 Ms. Tambri Heyden Planning Director 100 East Boynton Beach Boulevard Boynton Beach, FL 33425-0310 Re: Poinciana Elementary School Land Use/ZDning Application Dear Ms. Hayden: In accordance with your informal DRC review, the attached Land Use and Zoning applications are submitted for processing. The proposed Land Use and Zoning changes are nominal and conforming in nature in so far as the existing school campus is being expanded to accommodate the new school while currently maintaining existing school enrollment. Therefore, this change merely conforms the expansion area to the existing Land Use and Zoning designations. Although the existing school capacity will be increased with the new building, the resulting impact on infrastructure and services are manageable and can be accommodated by existing facilities. The proposed 1.61 acre offsite drainage parcel is designed to accommodate the revised drainage requirements; all other impacts on infrastructure are incremental. Thank you for your consideration. J n C. Hansen, AICP Planning Specialist 1m Attachment H: Idala I wp51 Idoc les. poi . Bernard Shulman @:}OOL D/,y Q~ ~~ '~q '"<l 'YC'.'. i. ,., ..~I'OREXCI!.'r" 'i'"< ~L ,.{:', ''7 BEACH CO\.). THE SChuOL BOARD OF PALM BEACH COUNTY, FLORIDA SUPERINTENDENT OF SCHOOLS PLANNING, CONSTRUCTION & REAL ESTATE 3320 FOREST HILL BOULEVARD, SUITE C-331 WEST PALM BEACH, FL 33406-5813 r August 21, 1995 co (407) 434-8020 FAX (407) 434-8187 Ms. Tambri Heyden Planning Director 100 East Boynton Beach Boulevard Boynton Beach, FL 33425-0310 RE: AGENT AUTHORIZATION Dear Ms. Heyden: This letter is to serve as permission for Jan C. Hansen to act as the agent, to prepare and submit all documentation, and attend all meetings pertaining to the Poinciana Elementary School property as it relates to any Land Use Zoning and related development approval. Furthermore, I/we Lawrence Zabik. Assistant Suoerintendent do hereby authorize Jan C. Hansen to represent me and to acknowledge the terms and conditions which may arise as part of the approval of this application for the proposed use of Poinciana Elementarv School site . Applicant is: Owner: Agent: x STATE OF Florida COUNTY OF Palm Beach County Very truly yours, L ,6Z,fl ~nce G. Zabik,~stant Superintendent Palm Beach County School Board ~JJ, / Applicant's Signature 3320 Forest Hill Blvd.. West Palm Beach. FL 33406 Street Address, City, State, Zip Code Jan C, Hansen Applicat's Name 407/434-8800 H:ldatalwp5l Idocles. poi 'I1ie City of t;Boynton 1Jeacli July 27, 1995 Mr. August Hernandez Government Liaison School Board of Palm Beach County 3300 Forest Hill Boulevard C-3 West Palm Beach, FL 33406 Dear Mr. Hernandez: roJ~@~~\I7~rnI ~~" 17 19'151~ PLANNING AND " C" I ZONING DEPT ~ J{k,,; fJo;~(!;,4~ I have attached the applications that need to be filled out and initiated by you regarding Poinciana School. If you have any questions, please contact Tambri Heyden at 375-6260. Sincerely, CITY OF BOYNTON BEACH ~:UJ flutvlij)'d Wilf d Hawkins A stant to the City Manager WH:jc Attachment cc: Tambri Heyden, Planning Director !llmem.a's (jateway to tlU (julfstream .~ 6'y 1/..-", < ~> Ii THE SCHO 'ARD OF PALM BL.. ., COUNTY. FLORIDA r MONICA UHLHORN So,. ,A1'ENDENT OF SCHOOLS PLANNING. CONSTRUCTION & REAL ESTATE 3320 FOREST HILL BOULEVARD, SUITE C-331 WEST PALM BEACH, FL 33406-5813 (407) 434-8020 FAX (407) 434-8187 July 11, 1995 MEMORANDUM TO: City of Boynton Beach Technical Review Committee Members (TRC) Bill Hukill, Building Division of Development Department _ Floyd Jordan, Fire Departtnent . (1. Thomas Dettman, Police Department ~f, r<~ John Guidry, Utilities Bob Eichorst, Public Works { Charlie Frederick, Parks & Recreation V'i;/ P. Tambri Heyden, Planning & Zoning 'I r . L/( Mike Haag, Planning & Zoning \ /i/j B. P iJ' ': ' )~,~ ~ /. C7f'J //",' "., , . . . .)-, Agustin A. Hernandez ; . ~S " Planning Specialist (Educational) ~ "- Planning and Real Estate FROM: RE: Poinciana Elementary - Response to Comments The Palm Beach County School District Planning and Real Estate Departtnent staff would like to thank the City TRC members for their input and comments on the Poinciana Elementary campus. District staff has met with the City Manager and City staff representatives. Pursuant to our meeting the following understanding on the Poinciana TRC comments is provided: 1) Police Departtnent - OK 2) Recreation & Parks Department - OK 3) Forester/Environmentalist - OK 4) Public Works - OK 5) Building Division - OK 6) Fire Departtnent - OK 7) Utilities: A. Palm Beach Health Departtnent Pennits for water main will be acquired by School District Design Build Team. B. Inspection on removal or abandomnent of existing water and sewer utilities will be coordinated between the City of Boynton Beach Utility Departtnent and the Design Build Utility Contractor and Job Superintendent. H:ldatalwp51Idocles.poe . Technical Review Committee July 11, 1995 Page 2 \ C. Utility easements will be shown on the platted site plan. D. Dual (parallel) backflow preventors will be installed on proposed domestic water meter. E. A 6" sanitary sewer clean out approximately one foot inside property per Utility Department Standards will be provided. F. All utilities construction shall be in accordance with City of Boynton Beach approved criteria. 8. Site and Zoning Development responses and comments: . ~ A. The property shall be rezoned to Public Usage (P~~~ith School District cooperation. Height variances if required for the sch.ool'shm1 be applied for by the City. .--'" -- B. Right-of-way and easement abandonments will be initiated by the City. C. The school property will be platted by the School District. D. A courtesy site plan review has been provided to the City. E. A sidewalk along Seacrest Avenue will be constructed. No standard cul-de-sac at the west dead-end of N.W. 11th Avenue will be required. No sidewalks along 11th and 13th Streets. A sidewalk access from the west will be on the site plan and constructed. F. Parking as shown on the submitted site plan shall be provided. H:ldatalwp51Idocles.poe