REVIEW COMMENTS
APPLICATION TRACKING LOG
PR01ECT TITLE: Banana Boat Restaurant FILE #:MSPM 99-003
PROlECT LOCATION: 739 East Ocean Ave.
TYPE OF APPLICATION: MSPM
PUBLIC NOTICE REnUlRED: (Y/N) D REVIEWER'S NAME
AGENT: ADDRESS:
AGENT PHONE: FAX:
DATE REC'D: AMOUNT:
RECEIPT NO.:
12 SETS OF PRE-ASSEMBLED PLANS SUBMITTED FOR REVIEW:
2 OF 12 SETS SIGNED AND SEALED D
SURVEY D
LANDSCAPE PLAN D
FLOOR PLAN D
SITE PLAN WITH SITE DATA D
APPLICATION/SUBMITTAL: DATE ACCEPTED:
DRAINAGE PLAN
ELEVATION VIEW DRAWINGS
COLORED ELEVATIONS RECEIVED
MATERIAL SAMPLES RECEIVED
PHOTOGRAPHS RECEIVED
DATE DENIED:
D
D
D
D
D
DATE OF LETTER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES:
DATE OF SUBMITTAL ACCEPTANCE LETTER:
I MEMO NO. I RETURN DATE:
1 ST REVIEW COMMENTS RECEIVED l-
DATE PLA 0# DATE t- 0 L--
UTIL. PLANNING ""\ /\QQ ,
P W BLDG ~ (:>>
PARKS ENGR f1j
~~ICE FORESTER I, cO /
DATE OF LETTER SENT TO SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENTS: ~
90 DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID:
COMMENTS DUE 7/19/99
I INITIAL 1ST REVIEW MEMO: DATE SENT:
99
DATE 12 COMPLETE (ASSEMBLED) SETS OF AMENDED PLANS SUBMITTED FOR 2ND REVIEW:
PRE-ASSEMBLED PLANS SUBMITTED FOR REVIEW:
AMENDED APPLICATION D
2 OF12 SETS SIGNED AND SEALED D
SURVEY D
LANDSCAPE PLAN D
FLOOR PLAN D
SITE PLAN WITH SITE DATA D
2ND REVIEW MEMO: DATE SENT:
DRAINAGE PLAN
ELEVATION VIEW DRAWINGS
COLORED ELEVATIONS RECEIVED
MATERIAL SAMPLES RECEIVED
TRANSPARENCY RECEIVED
PHOTOGRAPHS RECEIVED
MEMO NO.
D
D
D
D
D
D
RETURN DATE:
2nd REVIEW COMMENTS RECEIVED
PLANS MEMO# DATE PLANS MEMO# DATE
UTIL. D PLANNING D
P.W. D BLDG D
PARKS D ENGR D
FIRE D FORESTER D
POLICE D
BOARD MEETING DATE:
LAND DEVELOPMENT SIGNS PLACED AT THE PROPERTY. DATE SENT / SIGNS INSTALLED:
DATE:
BOARD:
CITY COMMISSION: DATE:
DEVELOPMENT ORDER RECEIVED FROM CITY CLERK: D DATE:
DEVELOPMENT ORDER SENT TO APPLICANT: D DATE:
S:\FORMS\TRACKING LOG FORM
revised 4/25/97
1 st REVIEW COMMENTS
Project name: Banana Boat Restaurant
File number: MSPM 99-003
Reference: 1 st Review, Major Site Plan Modification, File # 99-003
Department date stamp marking.
O\\J
DEPARTMENTS -\ 0\ d
PUBLIC WORKS
Comments: ~c_ DuJ ~-
ua::tM..~ s --
I. The Public Works Department is not agreeable to dumpst' ~S p(Y\- 9q- 6'03
to bad turning radius, not enough room for backing. \
pick up from south side of enclosure, or stay with com pac ----- -.
-
UTILITIES
Comments:
2. All utility easements and off-site utility lines shall be shown on the
rectified landscaping drawings so that we may determine which trees
may interfere with utilities. In general, palm trees will be the only tree
species allowed within utility easements, or in the vicinity of water
mains. Canopy trees may be planted so that roots and branches will not
impact utilities in the foreseeable future. LDR Sec. 7.5-18.1 gives public
utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way.
3. Provide an engineer's written certification that drainage will conform to
all rules of the City and the South Florida Water Management District.
(LDR Chap. 4, sec. 7F)
4. Water and sewer lines to be owned and operated by the City shall be
included within utility easements. Please show all proposed easements
on engineering drawings, using a minimum width of 12 feet. The
easements shall be dedicated via separate instrument to the City as stated
in Sec. 26-33(a) of the Code.
5. LDR chap. 6, Article IV, Sec. 16 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant.
Please demonstrate that the plan meets this condition, by showing all
hydrants.
6. Appropriate backflow preventers will be required on the domestic water
service to the building, and the fire sprinkler line if there is one, in
accordance with Sec. 26-207.
7. A building permit for this project shall not be issued until this office has
approved the plans for the water and/or sewer improvements required to
serve the project. (Sec. 26-15)
8. A scaled drawing showing the site drainage plan shall be submitted.
(LDR Chap. 4, sec. 7F)
\
Page 2
File Name: Banana Boat Restaurant
File No.: MSPM 99-003
DEPARTMENTS INCLUDE REJECT
9. Provide drainage calculations showing the amount of rainfall to be
retained on-site, and the eventual discharge point. Please be advised that
if the on-site system is required to connect to the City's stormwater
system, there will be a fee for improvements the City is planning to make
for off-site stormwater treatment and conveyance, as part of the
Downtown Watershed Storm water Improvement Project.(Sec, 26-406)
10. Please show the routing of the proposed sanitary sewer service line that
is currently under review for pennit.
FIRE
Comments:
II. The fire hydrant location was not shown on the plan; LDR 6-16. A
hydrant location is required prior to Fire Department approval.
POLICE
Comments:
12. Have site plans show "stop signs" locations for entry and exit onto
property.
13. Directional arrows on plan to indicate direction of traffic and flow on
and off property.
ENGINEERING DIVISION
Comments:
14. Change the aisle widths from 24' to 27' for 900 stalls per City Standard
Drawing B-90013.
15. Add a note that all markings and signage shall conform to City Standard
Drawing B-98001 and show the markings on the Site Plan and Paving &
Drainage Plan.
16. Add a note that all plans submitted for specific permits shall meet the
City's code requirements at time of application. These permits include,
but are not limited to the following: site lighting, paving, drainage,
curbing, landscaping and irrigation. Penn its required from other
permitting agencies, such as FDOT, PBC, SFWMD, DERN, LWDD,
DEP and any others, shall be included with the pennit request.
17. Provide a Site Lighting Plan and Drainage Plan in conformance with
Chapter 4 and 23 of the Land Development Regulations.
18. Valet parking shall provide a passenger loading zone at the entrance
protected from the weather by canopy or roof overhang to comply with
Page 3
File Name: Banana Boat Restaurant
File No.: MSPM 99-003
DEPARTMENTS INCLUDE REJECT
Section 4.L2.(5)(e),4.144.6.6 and 6.2 of the Florida Accessibility Code.
19. To meet the 27' back-up requirement within the parking lot consider
placing the wheel stops along the north side next to the bulkhead to
provide a 16' stall and 2' overhang. Also, since the cars along the south
side will be buffered by the grade of the new bridge, remove the 3'
landscape buffer which is generally a requirement to screen vehicles
from the abutting right-of-way. Stripe two lanes at the front entrance,
one for valet parking and the other a pass-thru lane.
20. In the southwest comer reduce the 8' landscape area to 6' to provide a
27' back-up area.
2!. Cross hatch the "turn around" space with yellow stripes and show the
pavement words "No Parking". Also show a post mounted sign
designating the area as a "Tow-Away" zone with the appropriate
information. Consider paving the 5' landscape area abutting the space to
the west for better maneuverability.
22. Locate the dumpsters in the Northeast comer of the parking lot to
eliminate back-up maneuvers in the ingress/egress access road. This will
also make the entrance more esthetically pleasing by not having three
sets of dumpster doors facing your patrons.
23. The decorative light fixtures shall be the same being used for the bridge
lighting for continuity. Per Visions 20/20 Redevelopment Plan (see
attachment).
24. Consider a one-way traffic plan for ease of circulation.
25. Show an accessible route from the public sidewalk to the building. If
route cannot be constructed, obtain an exception by the Building
Official per 4.1.1 (5) of the Fla. Accessibility Code.
BUILDING DIVISION
Comments:
26. Add to the building that is depicted on the site plan drawing (sheet AI) a
labeled symbol that represents the location of the handicap accessible
entrance door to the building. Show and label the same door on the floor
plan drawing (A3).
27. Identil'y the location of the handicap accessible parking spaces. The
quantity of the spaces shall be consistent with the regulations specified in
the Florida Accessibility Code for Building Construction. The location
of the accessible parking spaces shall be located on the shortest safely
accessible route of travel to the accessible building entrance. [Section
4.6.2 of the Florida Accessibility Code for Building Construction]
Page 4
File Name: Banana Boat Restaurant
File No.: MSPM 99-003
28. Add to the site plan drawing a labeled symbol that represents and shows
the location and path of the accessible route that is required between the
accessible parking spaces and the accessible entrance door to the
building. Add text that would indicate the label represents the accessible
route and the route is in compliance with Section 4.3 (Accessible Route)
and 4.6 (Parking and Passenger Loading Zones) of the Florida
Accessibility Code for Building Construction. Please note that at time of
permit review the applicant shall provide detailed data on the plans that
will verify that the path of the accessible route is in compliance with the
regulations ofthe Florida Accessibility Code for Building Construction
including, but not limited to, width, slope and cross slope.
29. Identify the finish floor elevation within the footprint of the building that
is illustrated on the site plan drawing and the floor plan drawing. Add to
the site data, found on sheet A I, the flood zone that the building is
located within including, where applicable, base flood elevation. If there
is no base flood elevation, indicate that on the plans.
30. Provide detailed and dimensioned elevation view drawings of the site
signage including dimensioning the width and height of the sign and the
overall height of the sign structure. Add computations to the drawing
that verify the total sign area is in compliance with the regulations
specified in the Sign Code. Also, show and dimension on the site plan
drawing the location of the sign and the distance the site sign is located
from the adjacent property lines (note: ten feet is minimum setback
dimension from adjacent property lines). If a site sign is shown,
delineate on the landscape plan the location of the landscaping that is
required for site signage. Drawings of the signage shall comply with the
applicable regulations specified in the Sign Code (Chapter 21 of the
Land Development Regulations).
Or
Place the following note on the site plan: "Site signage is not approved
for this project. Separate site plan review and approval is required for
site signage."
31. Provide detailed and dimensioned elevation view drawings of the
building signage. On the elevation view drawings of the building,
identify the location of the wall signage and dimension the length and
height of the signage. Also, identify the total sign area and provide
computations that verify the sign area(s) are in compliance with the Sign
Code. Drawings of the signage shall comply with the applicable
regulations specified in the Sign Code (Chapter 21 of the Land
Development Regulations). Add to the submittal an elevation view
drawing of the east side of the building.
32. Add a note to the site plan indicating that the site lighting fixtures will
illuminate the site consistent with the specifications identified in the
Parking Lot Code and the Central Business District Landscape Code.
Include within the note the overall height dimension of the site lighting
Page 5
File Name: Banana Boat Restaurant
File No.: MSPM 99-003
pole and fixture.
33. Place a note on the elevation view drawings indicating that thewall
openings and wall construction comply with Table 600 of the 1997
edition of the Standard Building Code.
34. At time of penn it review, identify on the site plan the actual setback
dimension from the leading edge of the north and east face of the
structure to the north and east property lines. Please note that the size or
width of overhangs, covered walkways, canopies or awnings shall be
included and shown when identifying the setback dimension. The
building setbacks shall comply with Zoning Code regulations.
35.. At time of penn it review, submit signed and sealed working drawings of
the proposed construction.
36. At time of penn it review, indicate within the site data the use of the
facility, type of construction and the occupancy classification. The
design (building area, occupancy and type of construction) of the
building shall comply with the regulations specified in the 1997 edition
of the Standard Building Code and the Amendments to the Standard
Building Code that the City has adopted.
37. To properly detennine the impact fees that will be assessed for the
project, identify on the site if the restaurant is a Quality or High
Turnover Sit Down Restaurant. Also, identify on the site plan the
number of existing seats, number of new seats and the total number of
seats provided. On the floor plan, chronologically number all seats
including bar seats.
PARKS AND RECREATION
Comments: None
FORESTERlENVIRONMENTALIST
Comments:
38. The applicant should indicate on the landscape plans if any of the
existing native trees will be preserved relocated or removed and replaced
on the site.
PLANNING AND ZONING
Comments:
39. Sign and seal all drawings prior to building pennit submittal.
40. On the site plan provide the following infonnation: ChA, Sec.7, Par.B
- A color for the wall and gate of the dumpster enclosure.
- 5 foot landscape buffer adjacent to Ocean Ave.
- 4 handicapped parking spaces per ADA requirements. I
- Provide wheel stops to prevent vehicle encroachment into required
Page 6
File Name: Banana Boat Restaurant
File No.: MSPM 99-003
landscape areas and walkways. Ch.23 Art.1I Per.E
- Provide a landscape island in the void at the east end of the 10
parking spaces adjacent to the Boat Basin, in order to protect parked
cars in that row from west bound traffic.
- All parking lot landscape areas shall be protected by a curbing.
- 27 foot wide drive aisles adjacent to perpendicular parking spaces.
- Minimum 44 inch wide accessible walk, separate from the drive
aisle, connecting the handicapped parking spaces to the accessible
entry ramp.
- Setback dimensions at Ocean Avenue. Ch.2 Sec.6 Par.E
- Parking details including handicapped signage. Drawing # B-900 I 2
- Loading space or note stating that all deliveries will be made after
hours. Ch.2 Sec. I I Par.H.
. Accessible walk from the Ocean Ave. side walk to the building
entry. Ch.9 Sec. 10 Par.B
- Details for any proposed wall or monument signs.
41. In the site plan tabular data provide the following data: ChA, Sec.7,
Par.E
- Parking area landscape space requirement with calculations.
- Proposed Building height.
- Zoning district and Land Use designation.
. Building setback requirements.
- Number of loading spaces.
. Water bodies in acres and square foot.
42. On the architectural plans provide the following information. ChA,
Sec.7, Par.D.2
- Elevation drawings for all building elevations.
- Proposed exterior color schedule in tabular form.
- Overall building dimensions, including height to the entry tower
peak.
43. Submit colored elevation drawings of all elevations of the building.
ChA, Sec.7, Par.D.2
44. Provide a drainage plan. ChA Sec.7 Par.F
45. On the landscape plans provide the following information: Ch.7.5,
Art. II, Sec.5
- Label and dimension all required landscape buffers.
- Revise note #8 to state that mulch other than cypress shall be used.
- The source of the automatic irrigation system.
- Locate the trees along Ocean Ave. that are proposed as part of the
bridge project. Following the same theme, materials and
dimensions, provide trees in the 5' buffer along the portion of Ocean
Ave. not planted as part of that project.
Calculations for the requirements of required native trees and shrubs.
46. Site lighting must be consistent with the Visions 20/20
recommendations.
\\CH\MAIN\SHRDAT A\PLANNING\SHARED\WP\PROJECTS\BANANA BOAT REST, MSPM\iST REVIEW COMMENTS.DOC
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 99-163
TO:
Michael Rumpf, Planning and Zoning Director
FROM:
Michael E. Haag, Building Code Permit Administrator
DATE:
July 19, 1999
RE:
Banana Boat Restaurant - Major Site Plan Modification (MSPM 99-003)
1st review comments
We have reviewed the subject plans and offer the following comments that shall be addressed
prior to the project being forwarded for Board review:
BuildiDl!: Division (Permit & Site Suecific Comments) - Michael E. Haag (561) 742-6352
1. Add to the building that is depicted on the site plan drawing (sheet AI) a labeled symbol
that represents the location of the handicap accessible entrance door to the building. Show
and label the same door on the floor plan drawing (A3).
2. IdentifY the location of the handicap accessible parking spaces. The quantity of the spaces
shall be consistent with the regulations specified in the Florida Accessibility Code for
Building Construction. The location of the accessible parking spaces shall be located on
the shortest safely accessible route of travel to the accessible building entrance. [Section
4.6.2 of the Florida Accessibility Code for Building Construction]
3. Add to the site plan drawing a labeled symbol that represents and shows the location and
path of the accessible route that is required between the accessible parking spaces and the
accessible entrance door to the building. Add text that would indicate the label represents
the accessible route and the route is in compliance with Section 4.3 (Accessible Route) and
4.6 (Parking and Passenger Loading Zones) of the Florida Accessibility Code for Building
Construction. Please note that at time of permit review the applicant shall provide detailed
data on the plans that will verify that the path of the accessible route is in compliance with
the regulations of the Florida Accessibility Code for Building Construction including, but
not limited to, width, slope and cross slope.
4. Identify the finish floor elevation within the footprint of the building that is illustrated on
the site plan drawing and the floor plan drawing. Add to the site data, found on sheet AI,
the flood zone that the building is located within including, where applicable, base flood
elevation. If there is no base flood elevation, indicate that on the plans.
Building Division Memo No. 99-163 to Michael Rumpf
RE: Banana Boat Restaurant - Major Site Plan Modification
July 19, 1999
Page Three
II. At time of permit review, indicate within the site data the use of the facility, type of
construction and the occupancy classification. The design (building area, occupancy and
type of construction) of the building shall comply with the regulations specified in the 1997
edition of the Standard Building Code and the Amendments to the Standard Building Code
that the City has adopted.
12. To properly determine the impact fees that will be assessed for the project, identify on the
site if the restaurant is a Quality or High Turnover Sit Down Restaurant. Also, identify on
the site plan the number of existing seats, number of new seats and the total number of seats
provided. On the floor plan, chronologically number all seats including bar seats.
MEH:bg
J:\SHRDA T A\Development\Building-6870\Documents\TRC\MSPM 99.003 1st review Banana Boat Restaurant.doc
TO:
/lM sfM t:) 9 J ()B!:>
~::;:;;;;,:.~
MEMORANDUM @,'Th \j;J ~J..~i_
UTILITIES DEPT. NO, 99 - 208,& 'JI. 'lO sro
---"'
7JjN\I'';'\.J~' l .
\ ,
John A. Guidry, Utilities Director~ -
July 19, 1999
FROM:
DATE:
SUBJECT:
Banana Boat Restaurant - 1st Review
We offer the following comments on this project:
GENERAL COMMENTS
1) All utility easements and off-site utility lines shall be shown on the rectified landscaping drawings
so that we may determine which trees may interfere with utilities. In general, palm trees will be
the only tree species allowed within utility easements, or in the vicinity of water mains. Canopy
trees may be planted so that roots and branches will not impact utilities in the foreseeable future.
LDR Sec. 7.5-18.1 gives public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way.
2) Provide an engineer's written certification that drainage will conform to all rules of the City and the
South Florida Water Management District. (LDR Chap. 4, sec. 7F)
SPECIFIC CONDITIONS
I) Water and sewer lines to be owned and operated by the City shall be included within utility
easements. Please show all proposed easements on engineering drawings, using a minimum width
of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in Sec. 26-
33(a) of the Code.
2) LDR chap. 6, Article IV, Sec. 16 requires that all points on each building will be within 200 feet of
an existing or proposed fire hydrant. Please demonstrate that the plan meets this condition, by
showing all hydrants.
3) Appropriate backflow preventers will be required on the domestic water service to the building,
and the fire sprinkler line if there is one, in accordance with Sec. 26-207.
4) A building permit for this project shall not be issued until this office has approved the plans for the
water and/or sewer improvements required to serve the project. (Sec. 26-15)
5) A scaled drawing showing the site drainage plan shall be submitted. (LDR Chap. 4, sec. 7F)
6) Provide drainage calculations showing the amount of rainfall to be retained on-site, and the
eventual discharge point. Please be advised that if the on-site system is required to connect to the
City's stormwater system, there will be a fee for improvements the City is planning to make for
off-site stormwater treatment and conveyance. as part of the Downtown Watershed Stormwater
Improvement Project. (Sec. 26-406)
7) Please show the routing of the proposed sanitary sewer service line that is currently under review
for permit.
Please refer any questions on this matter to Peter Mazzella (742-6404) of this office.
JAG/PVM
Xc: Skip Milor
Peter Mazzella
File
DEPARTMENT OF DEVELOPMENT r
MEMORANDUM
ENG 99-100
11DJ1f!I r' -. -.._~_.- ..
WI '.. " I
.At 2 7/999
p;7;"'''~
L(:!h'J;-';(~.--
~ ~~~~~
TO:
Michael W. Rumpf, Director of Planning & Zoning
Jack H. Casler, P.E.,P.L.S., Acting City Engineer e
July 27, 1999
FROM:
DATE:
RE: BANANA BOAT RESTAURANT-~mspm 00-003)
MAJOR SITE PLAN MODIFICATION 1 st REVIEW COMMENTS
.
I. Change the aisle widths from 24' to 27' for 900 stalls per City Standard Drawing B-90013.
2. Add a note that all markings and signage shall conform to City Standard Drawing B-9800l and
show the markings on the Site Plan and Paving & Drainage Plan.
3. Add a note that all plans submitted for specific permits shall meet the City's code requirements
at time of application. These permits include, but are not limited to the following: site lighting,
paving, drainage, curbing, landscaping and irrigation. Permits required from other permitting
agencies, such as FDOT, PBC, SFWMD, DERN, L WDD, DEP and any others, shall be
included with the permit request.
4. Provide a Site Lighting Plan and Drainage Plan in conformance with Chapter 4 and 23 of the
Land Development Regulations.
5. Valet parking shall provide a passenger loading zone at the entrance protected from the weather
by canopy or roof overhang to comply with Section 4.1.2.(5)(e),4.l44.6.6 and 6.2 of the Florida
Accessibility Code.
6. To meet the 27' back-up requirement within the parking lot consider placing the wheel stops
along the north side next to the bulkhead to provide a 16' stall and 2' overhang. Also, since
the cars along the south side will be buffered by the grade of the new bridge, remove the 3'
landscape buffer which is generally a requirement to screen vehicles from the abutting right-of-
way. Stripe two lanes at the front entrance, one for valet parking and the other a pass-thru lane.
7. In the southwest comer reduce the 8' landscape area to 6' to provide a 27' back-up area.
8. Cross hatch the "turn around" space with yellow stripes and show the pavement words "No
Parking". Also show a post mounted sign designating the area as a "Tow-Away" zone with the
appropriate information. Consider paving the 5' landscape area abutting the space to the west
for better maneuverability,
/INI sf"" q 1- M3
LEISURE SERVICES PARKS MEMORANDUM
TO
Michael W Rumpf, Planning & Zoning Director
John Wildner, Parks Superintendent 9 IV /...J
Banana Boat Restaurant
FROM
RE:
DATE
July 20, 1999
I have no comments on the above-named project. The project should continue in the
normal review process.
JW:ad
/Y)t, S Prv.. / Q4' vP0
Parks Division Memorandum- TRC
To:
Mike Rumpf. Planning Director
r<~
From:
Kevin J Hallahan, Forester / Environmentalist
Subject:
Banana Boat Restaurant
Date:
July 21, 1999
The applicant should indicate on the landscape plans if any of the existing native trees will be
preserved relocated or removed and replaced on the site. The project should continue in the
normal review process. No outstanding issues.
TO:
THRU:
FROM:
SUBJ:
DATE:
PUBLIC WORKS DEPARTMENT
MEMORANDUM #99-136
Mike Rumpf, Director of Planning & Zoning
C. Larry Roberts, Public Works Director
Mark Lips, Sanitation Foreman
1 sl Review Major Site Plan-Modification of Banana Boat (MSPM 99-003)
July 20, 1999
The Public Works Department is not agreeable to Dumpster locations due to bad turning
radius, not enough room for backing. We recommend pick up from south side of
enclosure, or stay with compactor pickup.
Any questions please contact me at (561) 742-6200,
~d/f
/r-U,
FIRE & LIFE SAFETY DIVISION
Memorandum No. 99-322
....
. '~- ..
NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire
Protection Association codes, and the City Fire code shall be adhered to.
TO: Mike Rumpf, Director
Planning & Zoning Division
FROM: Steve Gale, Fire Marshal ~
Deputy Chief - Fire Rescue Dep~ent
DATE: July 19, 1999
SUBJECT: Banana Boat Restaurant
739 E. Ocean Ave.
MSPM 99-003
The fire hydrant location was not shown on the plan; LOR 6-16. A hydrant
location is required prior to Fire Department approval.
cc: File
~sPV'<.- l:tCt- Oo~
CITY OF BOYNTON BEACH
DEVELOPMENT DEPARTMENT
100 East Boynton Beach Blvd.
P. O. Box 310
Boynton Beach, Florida 33425-0310
PLAN REVIEW COMMENTS
PLEASE NOTE THAT THE EFFICIENCY BY WHICH YOU RECEIVE YOUR PERMIT
DEPENDS ON YOUR RESPONSE TO THE CONTENTS OF THIS DOCUMENT. IT IS
RECOMMENDED THAT YOU CAREFULLY READ AND CORRECTLY RESPOND TO
ALL ASPECTS OF THIS DOCUMENT.
COMMENTS:
For permit application number:
Project Name or Address:
REVIEWED BY:
J~"",~ \?oM ~le~\""U~AN\
Department and/or Division: Police Department
Name of Reviewer: 5(;."" 1\.\0 "" I'~o r-J
Trade: Police
Phone # (561) 742.6100 ext.
Fax # (561) 375.6185
Date Started Review: ,~ 1;.,-qCj
Type of Review: ON S,Tk. IR.A~'G.. 'i'LA"':> ~,JIE.u..J
fo~ It!AtF.<.. Co...;l~L A",t> "'\1);,/1<.0,\(.... <:'I'..l\t> AN~ l1\f.ouj'i SIT~
Which Review: ~ 1st o 2nd D3rd o 4th 0 Other
COMMENT DISTRIBUTION:
Person identified on the application to receive comments:
Name
Phone # (areacode:561) ex!.
Fax # (area code:561)
Date(s) reviewer called:
Person who received the call
THE FOLLOWING AREA SHALL BE FILLED-IN IN THE PRESENCE OF THE PLANS ANALYST
AND/OR PERMIT CLERK:
COMMENTS/PLANS PICKED UP:
Comment(s) reed. by print name and date:
OR
Plans/Comments recd. by print name and date:
L
~.. ,"~ ~...,~ ','" ...," -.
-
_.,.,....,<..
..
~ . ''''-.(
PROJECT NAME: Banana Boat Restaurant
LOCATION: 739 East Ocean Avenue
COMPUTER ID:
PERMIT #:
I FILE NO.: MSPM 99-003 II TYPE OF APPLICATION: MSPM I
A~~~TACT PERSON: , OWNER/APPLICANT:
Slattery & Ro';J Architects -f
..$ i)'t ~, "t).-.'> PHONE:
PHONE: 561-39~~ .
39A. - <6
FAX: 561-392-54013 8 '/ , FAX:
ADDRESS: ADDRESS:
2060 N. W. Boca Raton Blvd. Suite #2
Boca Raton, FL 33431
Date of submittallProiected meetinl: dates:
SUBMITTAL / RESUBMITT AL 7/9/99
1sT REVIEW COMMENTS DUE: 7/19/99
PUBLIC NOTICE:
TRC 8/24/99
PRO __
ACT /J..U) Mw.- ~ v..tvd.L...J
2ND.. vd.a. ~,,~~ r ~
LAN fu-
(SITI A---
~:~
PLAJ 9/14/99
MEE ~/ 31,\<6
CIT\ 9/21/99
COMMENTS:
S:\FORMSIPROJECT TRACKING INFO
":---.
> .
Page2of2 1st 2" 3"4'" Plan Re"ew Comments for Permit Application #
Your permit application and supporting documentation do not comply with the City of
Boynton Beach Code of Ordinances. Prior to receiving a permit to construct or install
the requested improvements the plans and documents shall be amended to show
compliance with the below listed comments. Prior to making the changes to the plans
and/or documents please read the attached Submittal of Corrected Plans form. This
form contains important information relative to amending documents and submitting
corrected plans and/or documents. Questions regarding the comments may be
directed to the reviewer named above. If a conference is necessary, please schedule
an appointment with the reviewer. Please note that additional comments may be
generated following staff review of the amended plans. Timely approval of your project
is dependent upon your prompt and correct response to the information provided in this
document. Find attached, a form titled Submittal of Corrected Plans. this document
shall be properly completed and stapled to the file copy of the corrected plans when
submitting them to the Plans Analyst.
I IZA?ri c. Co...... Te..oL c.. PAl2..~1 ""'\ Loi' TIU\-ffic. ?LAN)
C \-\A~Tt.e...... J.3 A lZ.T 1T~ SC c ~ \ "...,:,';::;, ;;J..
EAc.H PPl~K'''-'l LoT LOo..Jil.e.vL-;E,'D OfL ~E. c.o.....sl7tv(.le.S>
'2>l\ALL .\......cL."''i:>E. 'l"'\r~o"~MtN'"F,,:> AS folLol..,)''>-:
fAct\ fAe..i,,,--\ LOi'litAtl"IL \>I-.'\N SHAll- rR...')\)iD€ ro(t
Slop '==;, <\N::, A - E"- -
1 I \')<,\'\-.5, '\0\e&.C\\o.....AL l't/?.C.owc,. ir..:I\~t.NAl
Te.Atr.<:.. ':::.I\....,~ A.....~ I r.
...,- .-..J og.,""A'T\o..... S:11N"- L>..>\-\E.ltf AIP~\)fR'1/
I HE A. coL - c<€.- I'
I' I t U\N { I A I r-.:> ';)'T!i E- {).., , (} L .......
~S~SI'W1 111 ~OQ. THE plop
AND .E.ft;C.',E..J\ Iv\OVEMf"-'l of .~ fi'r
m~ S\l~ If.A ('Ie O'Vfc A......t\ Il4
-, t ~<.I'i
t<~c.oN\""E:-->t>,..,I;",....... \
I. H~\lC: c_
c;. ""I IE.
EN~7 Ih--'I:>
.:l.. D R,r-
1 "'c...l'o""'^L
\) F ~Al::'r
\l'-fc....
p~""'s. S,\-lOLo,J "SIC
E..~)T - P
0"-",, fRofEe.it_
A~L..:Js. 0,,-, .
pLAt-.,) Ie
A......~ FLo L..J
0,,-, A......1':!
'S.11"'->-::'"
Loe AT\",-.l ""
fo~
I IVt)Ic.A I .
F ':)1~fC.Tlo.v
of~ f
ROf'~~1'7 ..
2
Page 2 of 2 I" 2'd 3'd 4th Plan Renew Comments for Permit Application #
Your permit application and supporting documentation do not comply with the City of
Boynton Beach Code of Ordinances. Prior to receiving a permit to construct or install
the requested improvements the plans and documents shall be amended to show
compliance with the below listed comments. Prior to making the changes to the plans
and/or documents please read the attached Submittal of Corrected Plans form. This
form contains important information relative to amending documents and submitting
corrected plans and/or documents, Questions regarding the comments may be
directed to the reviewer named above. If a conference is necessary, please schedule
an appointment with the reviewer. Please note that additional comments may be
generated following staff review of the amended plans. Timely approval of your project
is dependent upon your prompt and correct response to the information provided in this
document. Find attached, a form titled Submittal of Corrected Plans, this document
shall be properly completed and stapled to the file copy of the corrected plans when
submitting them to the Plans Analyst.
TR.P.l1="l c. CO.......TlU>L C PA(Z..\('''-\ LQ\ TlU\-ffic.. fLA....::>)
C. \-\Af'--ne.e...... J.3 AiZ.T Tt S'C.- c:. ~ I ......:>~ ;J..
E~c.\-\ PPlRK\,,-,} LoT L<;).v<STt'!..vc:.7E.'D 6(L ((e. Lo......sliuc..\'E.Sl
S,I\ALL\NC.Lv\)E. 'lIqp~O..J~N\l:.N"'''::, AS folLol..,)'<":
fAc.r\ fAe..i.",-,\ LOi~fr(c... \\-.I\N s.1-\I'>,U- r~\.l,D2. t:'Q((..
<"Y 0 C A cv'\\-", '\0\!2."-2\o......AL ,0, R-C-o w",", ir..:tlE.t.tJAL
~ol :::>-\IN~ \' e^ -" I lO- ,
'\e.Atf".<:.. S\I~~ A.....<;;:::, :r:.....fot-""A-lIo.... '0;/1"''''' UJ\-\~/tE. Aff,-':'uffl.'II\Tt.._
II-IE. ftffL.U\,S( (2€.IAI,....:)~ Tt\E- ~sft""-lS'j~ILI11 ~oQ. THE. p~DpE~
AND f.ff;C.\E.....I MO\lfMfNI Ofle.Arr.e:.. 0"'10 "'......\) Tl-Itcl>V1l-l
II\(. S -ilL
((ECOMMl':--,t>~c:>f"-' ~
(I. S. 1\ L - (oL
I. 1-\f',.\lE.. SITE.- pLoA......S s.\\ov-..> STor' \~.......S OCA\\o,-..) S
E NT~7 (>.o-J't;:. E..X 'T 0 ,,-,Tv f(<.ofe.e..T't.
;l., ~IR~Clio",,"'L A.e...<-OGJ$. Ot'J pLAN \0 'IN~Ic.A\F ',)\~€c.T,o,..J
of I/Z.AIT,c-- A--~ A-ow 0"'-" .<\.....1) off fR.Of"-C<-'7"
2