REVIEW COMMENTS
APPLICATION TRACK'NG LOG
C~"I. C\\-ae,
PR01ECT TITLE: BAPS TEMPLE CHURCH FILE #: ......... II .,...1
PROJECT LOCATION: SE 18TH AVE US-l 8t SE 20TH AVE.
TYPE OF APPLICATION: New Site Plan
PUBLIC NOTICE REQUIRED: (YIN) REVIEWER'S NAME
AGENT: ADDRESS:
AGENT PHONE: FAX:
DATE REC'D: AMOUNT:
RECEIPT NO.:
12 SETS OF PRE.ASSEMBLED PLANS SUBM'lTED FOR REVIEW:
2 OF 12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
SITE PLAN W'TH SITE DATA 0
APPLlCATlON/SUBM'lTAL: DATE ACCEPTED:
DRAINAGE PLAN
ELEVATION V'EW DRAW'NGS
COLORED ELEVAT'ONS RECEIVED
MATERIAL SAMPLES RECEIVED
PHOTOGRAPHS RECEIVED
o
o
o
o
o
DATE DENIED:
DATE OF LElTER TO APPLICANT 'DENTlFYING SUBM'SSION DEFICIENC'ES:
\ \ \"2.1 C\,
1ST REVIEW COMMENTS DUE: ~/99
PLA S MEMO# DATE
1 ST REV'EW COMMENTS RECEIVED
UTIL.
P.W.
PARKS
FIRE
En .
POLICE
PLANNING
BLDG
FORESTER
PLANS MEMO#
\
';<:tx~ d
\ \ \0 \ 9-9
DATE
-
DATE OF LElTER SENT TO APPLICANT IDENTIFYING TRC REV'EW COMMENTS:
90-DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID:
DATE 12 COMPLETE (ASSEMBLED) SETS OF AMENDED PLANS SUBMllTED FOR 2ND REV'EW:
PRE-ASSEMBLED PLANS SUBM'lTED FOR REV'EW:
AMENDED APPLICATION 0
2 OF12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
S'TE PLAN WITH SITE DATA 0
2ND REVIEW MEMO: DATE SENT:
DRAINAGE PLAN
ELEVATION VIEW DRAWINGS
COLORED ELEVATIONS RECE'VED
MATER'AL SAMPLES RECEIVED
TRANSPARENCY RECE'VED
PHOTOGRAPHS RECEIVED
o
o
o
o
o
o
MEMO NO.
RETURN DATE:
2nd REVIEW COMMENTS RECE'VED
PLANS MEMO# DATE PLANS MEMO# DATE
UTIL. 0 POLICE 0
P.W. 0 PLANNING 0
PARKS n BLDG/ENGR 0
F'RE 0 FORESTER 0
BOARD MEETING DATE:
LAND DEVELOPMENT S'GNS PLACED AT THE PROPERTY. DATE SENT I SIGNS INSTALLED:
DATE:
BOARD:
C'TY COMM'SSION: DATE:
DEVELOPM~DER RECE'VED FROM CITY CLERK: 0 DATE:
DEVELOP.,kNT ORDER SENT TO APPLICANT: 0 DATE:
S:\FORMS\TRACKING LOG FORM
MEMORANDUM
UTILITIES DEPARTMENT NO. 00 - 45
TO:
Michael Rumpf, Planning and Zoning Director
FROM:
John A. Guidry, Director of Utilities
DATE:
February 15, 2000
SUBJECT: BAPS Development
Comments on Rectified Plans
We offer the following comments on the rectified plans for this project, based
upon the review conducted on Feb. 15, 2000:
1. The drainage plan and calculations are based upon a perimeter berm
surrounding the site with a top elevation of 13.40. Stage storage is based
upon that elevation. However, the elevation at the west driveway is only
12.60, and elevation at the east driveway is not specified but may be
approximately the same. Therefore, clarify the actual proposed condition, or
provide calculations showing that the 3 year, 72-hour storm event will be
retained on-site (i.e. have a stage level less than 12.60).
2. Live Oak trees conflict with the proposed water main in 2 locations. Please
show the utility easements on the landscaping plan, and eliminate the
suggested conflict. Recall that only palm species are allowed Ill, or
overhanging easements containing water or sewer mains.
3. Specify the source of irrigation water to be used. Note that City potable water
may not be used for irrigation in this location, due to the availability of fresh
groundwater.
Please refer any questions on this matter to Peter Mazzella (742-6404) of this
office.
PVM
Xc: Skip Milor
File
HI/,
P IJIr-:L
it)l..t- 121
"Sf-tG2
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 00-047
ill
"
~~G~\~RJGlI'
'II.
'11"1'
FEB?4 I J!.
. - ~,L:) i
TO:
Michael Rumpf, Planning and Zoning Director
Mioh,d E. H~g. B,ildllig Cod, Admi";''''{ ~
February 24,2000
Baps Temple Church - Rectified Conditional Use/Site Plan (COUS 99-008) 1st
Review Comments
PlMU,:i'JG MW
Z0~.':\'G D:Ti
FROM:
DATE:
RE:
Before the Building Division signs off on the rectified conditional use/site plan, the plans shall
be amended to comply with the following comments:
Buildinl! Division (Site SDecific and Permit Comments) - Michael E. Haag (561) 742-6352
I. Amend note #5 found on the sheet titled Site Plan (sheet SPl of2) to state that the finished
floor elevation is above the highest 100-year base flood elevation applicable to the building
site, as determined by the South Florida Water Management District's surface water
management construction development regulations. [Section 3107.1.2, Chapter 31 of the
Boynton Beach amendments to the 1997 edition of the Standard Building Code]
2. At time of permit submittal, provide an executed City unity of title form. The form shall
combine all lots or parcels within the subject site as one lot. Include with the completed
form a copy of the recorded deed of each property that is being united as one. The name of
the current property owner on each deed shall match. The processing of the form shall
follow the City's unity oftitle procedures.
3. At time of permit review, attach a current survey ofthe subject property to both sets of
permit documents.
S:\Development\Building-6870\Documents\TRC\COUS 99-008 Baps Temple Church rectificed site plan 1st review.doc
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. PZ 00-033
TO: Bob Borden, Assistant Fire Marshal
Larry Quinn, Public Works
Mike Haag, Building Division
Ken Hall, Engineering Division
Kevin Hallahan, Forester/Environmentalist
Pete Mazzella, Utilities Department
Mike Lane, Police Department
John Wildner, Parks Division
/'t'~
FROM: Michael W. Rumpf, Director of Planning and Zoning
DATE: February 14, 2000
SUBJECT: Rectified Plans for SAPS Development
Conditional Use & site plan (COUS 99-008)
The amended new conditional use and site plan for BAPS Development has been submitted for
final sign-off by the Technical Review Committee. Four (4) sets of plans, each requiring your
unconditional signature, are available for review in Planning and Zoning. A copy of the originally
reviewed plans, staff comments and development order are available for your use to perform
the review.
Please review and sign-off each of the four (4) sets of plans, No later than, 5:00 P.M.,
FEBRUARY 23, 2000. If the plans are not in compliance with your staff comments or City
regulations, do not sign the plans but only indicate the memorandum number where your
comments are documented.. To facilitate the sign-off process, please resubmit written
comments addressed to the Planning and Zoning Director, NO LATER THAN 5:00 P.M.,
FEBRUARY 23, 2000.
Thank you for your prompt response to this request.
MWR:dim
cc: William Bingham, Fire Chief
Marshall Gage, Police Chief
John Guidry, Utilities Director
J:\SHRDATA\F'LANNING\SHAREO\WP\PROJECTS\BAPS TEMPLE CHURCH\CONDITIONAl USE\RECTIFIED 2-14-OO.DOC
MEMORANDUM
UTILITIES DEPARTMENT NO. 00 - 26
Michael Rumpf, Planning Direct\\ t.. /
John A. Guidry, Utilities Director ~ V ~
--//"
DATE: February 1, 2000 .//
SUBJECT:~estfuf.r~.f-",::waayy.3 a~: by
~S~~.
---- -
TO:
FROM:
~
, ~
'"
Please be advised that this Department have no objection to the requested
abandonment of the isolated right-of-way illustrated on the attached application.
Please refer any questions on this matter to Peter Mazzella (742-6404) of this
office.
Attachment
JAG/PVM
Xc: Peter Mazzella, (wi attachment)
Sue Kruse, City Clerk
File
r:=-'.---'
lrolJ~
d .
! ~ r
:. FEll
l{ .'
.u ,.)
.)
,I n i.
'II
I
J..J
v M;~D
DEPT.
MEMORANDUM
UTILITIES DEPARTMENT
TO: Diane Reese, Finance Director
~
FROM: t-John A. Guidry, Utilities Director
DATE:
U-....., t .2.""0)
SUBJECT: Reservation fee transmittal for - (J/fP.J lJ_dOf'...e....t
Enclosed is a reservation fee for the subject project:
Amount -
$ 7';0.01.
Check no. - '1..0'2..1
From -
'So, / f.)..../,~. &~ ,... "", ""
.
+- -;"ft./
L3+ts'
~
S/r:
c .....?
c- r-/
-,;, ~\
Ce::.
, -
s
Please deposit this fee in the appropriate account. You may refer any questions on this
matter to Peter Mazzella of this office.
JAG/PVM
bc: Peter Mazzella
xc: Michael Rumpf, Planning Director
File
1/'01, r1Jit-' . /1/'
lUll: 1/11
/' iJ!. - 72000 ! II "
I L ',. ,/,
! IGAiifj--..J /
.-..-.. , DEPT. _
~/
'lit" ()r~'
DEPARTMENT OF DEVELOPMENT
MEMORANDUM
ENG 99-136
TO: Michael W. Rumpf, Director of Planning & Zoning
FROM: r Jack Casler, P.E., P.L.S., Acting City Engineer
DATE: October 29,1999
RE: BAPS TEMPLE CHURCH (NWSP 99-021) NEW SITE PLAN
1 ST REVIEW COMMENTS
I. On the Site Plan add a general note that all plans submitted for specific permits shall meet the City's
code requirements at time of application. These permits include, but are not limited to the following:
site lighting, paving, drainage, curbing, landscaping and irrigation. Permits required from other
permitting agencies, such as FDOT, PBC, SFWMD, DERM, LWDD, DEP and any others, shall be
included with the permit request.
2. Show the location of the proposed light poles on both the Site and Paving & Drainage Plans. [LDR
Chapter 4, Section 7.B.]
3. On both the Site and Paving & Drainage Plans show all traffic control markings and signage. [LDR
Chapter 4, Section 7.B.]
4. Regarding the general notes page, make the following corrections/revisions:
a. Under the "Paving" section, item D4, replace the reference to the "Town of Davie" with the City
Engineer of Boynton Beach. Regarding note B2, the asphalt thickness may be a compacted
minimum of one inch rather than I Yz inches.
b. Under "Storm Drainage" notes, add the following:
i. Provide a certification by your engineer that the drainage will conform with all rules,
regulations and codes of the City of Boynton Beach's Land Development Regulations.
ii. The drainage system shall conform to the City's Standard Drawing B-91007.
c. Under "Water Distribution System", item Fl, replace the "City of Sunrise Engineering
Department" with the "City of Boynton Beach Utilities Department".
d. Under "Preconstruction Responsibilities", item II F, replace the "Engineering Department" with
the "Utilities Department"
e. Under "Pavement Markings and Signing", add a note that all striping and marking shall conform
to City of Boynton Beach Standard Drawing B-9800 I.
5. No trees will be allowed in the center landscaped island because of the two foot vehicle overhang
into the landscape area on both sides.
6. It should be noted that as part of Phase 2 there will be a requirement of five additional handicap
parking spaces based on the required 219 spaces.
,
,
FIRE & LIFE SAFETY DIVISION
Memorandum No. 99-364
0',
,,'
. ...... "
. . .~
NFPA Ufe Safety Code 101, National Fire Code 1, all applicable National Fire
Protection Association codes, and the City Fire code shall be adhered to.
TO: Mike Rumpf, Director
Planning & Zoning Division
FROM: Steve Gale, Fire Marshal 0~-
Deputy Chief - Fire Rescue D~ment
DATE: October 26, 1999
SUBJECT: NWSP 99-021
Baps Temple Church
SE 18th Ave & US 1 & SE 20th Ave
A fire flow test is required prior to construction. LDR 6-16. Part of storage shed is
more than 200' from hydrant. LDR 6-16.
Roads and hydrants will be in place prior to any construction above grade. NFPA 1.
Plans may go forward in the process with the above comments.
CC: File
rr~,
ill, 01, I ; CJ 'V)(~ ..:Ji
,___1,-, __._"" :,j".J I
-_.~-~
.--
-'_._K~
~
LEISURE SERVICES: PARKS DIVISION MEMORANDUM
TO: Michael W. Rumpf
Director of Planning & Zoning
FROM:
John Wildner
Parks Director
y~ tJ / d
RE:
Raps Temple Church
DATE:
October 27,1999
I have no comments on the above-named project. The project should continue in
the normal review process.
JW:ad
......-
PUBLIC WORKS DEPARTMENT
MEMORANDUM #99-199
TO:
Mike Rumpf, Director of Planning & Zoning
THRU:
Chris Roberts, Public Works Director
FROM:
Mark A. Lips, Sanitation Foreman
SUBJ:
151 Review - New Site Plan for Baps Temple Church
DATE:
October 26, 1999
The Public Works Department can not approve this project, we request that all Dumpsters
have detailed drawings showing 10'XI0' minimum inside dimensions. Also, a 60'
turning radius and a 45' backing.
If you have any questions please contact me at (561) 742-6200.
ML/dc
,~
/
CITY OF BOYNTON BEACH
DEVELOPMENT DEPARTMENT
100 East Boynton Beach Blvd.
P. O. Box 310
Boynton Beach, Florida 33425-0310
PLAN REVIEW COMMENTS
PLEASE NOTE THAT THE EFFICIENCY BY WHICH YOU RECEIVE YOUR PERMIT
DEPENDS ON YOUR RESPONSE TO THE CONTENTS OF THIS DOCUMENT. IT IS
RECOMMENDED THAT YOU CAREFULLY READ AND CORRECTLY RESPOND TO
ALL ASPECTS OF THIS DOCUMENT.
COMMENTS:
For permit application number:
Project Name or Address:
Baps Temple Church
REVIEWED BY:
Department and/or Division: Police Department
Name of Reviewer: SGT, Lee D. Thompson Jr
Trade: Police
Phone # (561) 742-6100 ex!. 3166
Fax # (561) 375-6185
Date Started Review: 10/29/99
Type of Review: Traffic Data submitted on Site Plans
Which Review:
~ 1st D2cd D3rd o 4th 0 Other
COMMENT DISTRIBUTION:
Person identified on the application to receive comments:
Name
Phone # (area code:561) ext.
Fax # (area code:561)
Date(s) reviewer called:
Person who received the call
THE FOllOWING AREA SHAll BE FlllED,lN IN THE PRESENCE OF THE PLANS ANALYST
AND/OR PERMIT CLERK:
COMMENTS/PLANS PICKED UP:
Comment(s) reed. by print name and date:
OR
Plans/Comments reed. by print name and date:
Page2of2 1" 2'd 3,d4th Plan Review Comments for Permit Application #
Your permit application and supporting documentation do not comply with the City of
Boynton Beach Code of Ordinances. Prior to receiving a permit to construct or install
the requested improvements the plans and documents shall be amended to show
compliance with the below listed comments. Prior to making the changes to the plans
and/or documents please read the attached Submittal of Corrected Plans form. This
form contains important information relative to amending documents and submitting
corrected plans and/or documents. Questions regarding the comments may be
directed to the reviewer named above. If a conference is necessary, please schedule
an appointment with the reviewer. Please note that additional comments may be
generated following staff review of the amended plans. Timely approval of your project
is dependent upon your prompt and correct response to the information provided in this
document. Find attached, a form titled Submittal of Corrected Plans, this document
shall be properly completed and stapled to the file copy of the corrected plans when
submitting them to the Plans Analyst.
I have reviewed the Site Plans for the Baps Temple Church Located at SE 18th Ave &
US-1 & SE 20th Ave. The plans currently meet with Citv Code and State Statute
involvina traffic. and I have no comments at this time.
2
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 99-258
TO:
Michael Rumpf, Planning and Zoning Director
FROM:
Michael E. Haag, Deputy Building Official
DATE:
November 4, 1999
RE:
Baps Temple Church - New Site Plan (NWSP 99-021) 1st review comments
We have reviewed the subject plans and offer the following comments that shall be addressed
prior to the project being forwarded for Board review:
Buildine: Division (Permit & Site Specific Comments) - Michael E. Haag (561) 742-6352
I. Add to the buildings that are depicted on the site plan drawing, a labeled symbol that
identifies the location of the handicap accessible entrance door to each building. Show and
label the same door(s) on the floor plan drawing.
2. Identify on the site plan the location of the handicap accessible parking spaces. The
quantity of the spaces shall be consistent with the regulations specified in the Florida
Accessibility Code for Building Construction. The accessible parking space(s) that serve a
use shall be located on the shortest safely accessible route of travel from adjacent parking
to an accessible entrance. The Florida Accessibility Code for Building Construction states
that buildings with multiple accessible entrances shall have accessible parking spaces
dispersed and located closest to the accessible entrance.
3. Add to the site plan drawing a symbol that represents the location of the accessible route
that is required between the accessible parking spaces and the accessible entrance door to
both buildings. The symbol shall start at the accessible parking spaces and terminate at the
accessible entrance door to the buildings. The symbol will represent the location of the
path of travel, not the location of the detectable warning or other pavement markings that
are required to be installed along the path. IdentifY that the symbol represents the
accessible route and state that the route is designed in compliance with Section 4.3
(Accessible Route) and 4.6 (Parking and Passenger Loading Zones) of the Florida
Accessibility Code for Building Construction. Please note that at time of permit review,
the applicant shall provide detailed documentation on the plans that will verify that the
accessible route is in compliance with the regulations specified in the Florida Accessibility
Code for Building Construction.
Building Division Memo No. 99-258 to Michael Rumpf
RE: Baps Temple Church - New Site Plan - I st review comments
November 4, 1999
Page Two
4. Within the site data, identify the proposed finish floor elevation of the building (lowest
floor elevation). Verify that the proposed elevation complies with regulations of the code
by adding specifications and notes to the site data that address the following issues:
a. From the FEMA map, identify the title of the flood zone that the building is located
within. Where applicable, specify the base flood elevation. If there is no base flood
elevation, indicate that on the plans.
b. As the design professional-of-record for the project, state that the proposed floor
elevation is above the highest I DO-year base flood elevation applicable to the building
site, as determined by the South Florida Water Management District's surface water
management construction development regulations. [Section 3107.1.2, Chapter 31 of
the Boynton Beach amendments to the 1997 edition of the Standard Building Code]
c. Identify the floor elevation that the design professional has established for the building
within the footprint of the building that is shown on the site plan, floor plan and civil
plan.
5. Show on the site plan drawing the location of all signs that are proposed to be located on
the site. Dimension the distance the site signs are located from the adjacent property lines
(note: ten feet is minimum setback dimension from adjacent property lines). Add to the
submittal detailed and dimensioned elevation view drawings of the site signage. The
drawings shall include the width and height dimension of the signage and the overall height
of the sign structure. Add computations to the drawing that verify the total sign area
complies with the requirements of the Sign Code. If site signage is proposed, delineate on
the landscape plan the location of the landscaping that is required for the site signage.
Drawings of the signage shall comply with the applicable regulations specified in the Sign
Code (Chapter 21 ofthe Land Development Regulations).
Or
Place the following note on the site pIan: "Site signage is not approved for this project.
Separate site plan review and approval is required for site signage."
6. On the elevation view drawings ofthe building, identify the location of the proposed wall
signage. Add to the submittal detailed and dimensioned elevation view drawings of the
building signage. The drawings shall include the length and height dimension of all
signage. Also, identify the total sign area and provide computations that verify the sign
area complies with the requirements ofthe Sign Code. Drawings ofthe signage shall
comply with the applicable regulations specified in the Sign Code (Chapter 21 of the Land
Development Regulations).
Or
Place the following note on the site plan and building elevation view drawing(s):
"Building signage is not approved for this project. Separate site plan review and approval
is required for building signage."
Building Division Memo No. 99-258 to Michael Rumpf
RE: Baps Temple Church - New Site Plan - 1st review comments
November 4,1999
Page Three
7. Add to the site plan drawing a labeled symbol that represents the location ofthe site
lighting poles. Add a note to the site plan that includes the following information:
a. The locations of the site lighting poles are conceptual.
b. The proposed site lighting fixtures will illuminate the site consistent with the
specifications identified in the Parking Lot Code.
c. Compliance with the code will be evaluated at time of permit review.
Add to the site plan the pole detail drawing depicted on sheet LP-l of 1. Omit from the
submittal the photometric drawing. This information is required at time of permit
submittal, not at site plan review.
8. On the site plan drawing, identify the symbol that represents the property line.
9. Add to the site plan all easements that are shown on the survey. The location, type and
size of the easements shall be shown and identified on the site plan. Where applicable,
amend the plans so that structures do not encroach into an easement.
10. Add to the site data the number of stories in each building. Also, indicate the overall
height of each building (finish grade to the highest point of the roof). The overall height of
the buildings shall not exceed the height limitations of the Zoning Code. Dimension the
overall height of the building on the elevation view drawings of the building.
II. Below the drawing titled Floor Plan found on sheet A I of 3, add text that would indicate
that the room layout that is shown on the floor plan is conceptual.
12. Please note that overhangs, covered walkways, canopies, awnings or other appurtenances
that are attached to the building shall be considered when identifying building setbacks.
Therefore, identify the width of the overhangs, covered walkways, canopies, awnings, etc.
The building setbacks shall comply with setback regulations specified in the Zoning Code.
13. At time of permit submittal, provide an executed City unity of title form. The form shall
combine all lots or parcels as one lot. The processing of the form shall follow the City's
unity of title procedures.
MEH:bg
J :\SHRDA T A \Development\Building-6870\Documents\TRC\NWSP 99-021 1 st review Baps Temple Church.doc
MEMORANDUM
UTILITIES DEPT. NO. 99 - 295
TO:
MIk'e Rumpf, Planning Director ~ J
John A. Guidry, Utilities Director ~ V'"
November 2, 1999
FROM:
DATE:
SUBJECT:
Baptist Temple Church, New Site Plan- I" Review
We offer the following comments on this project:
GENERAL COMMENTS
I) All utilities easements shall be shown on the rectified landscaping drawings so that we may determine which
trees may interfere with utilities. In general, palm trees will be the only tree species allowed within utility
easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact
those utilities within the easement in the foreseeable future. LDR Sec. 7.5,18.1 gives public utilities the
authority to remove any trees that interfere with utility services, either in utility easements or public rights-of-
way.
2) Dept. of Health permits may be required for the water and sewer systems serving this project. (Sec. 26,12).
3) Fire flow calculations will be required demonstrating the City Code requirement of 1500 g.p.m. as stated in
LDR chap. 6, Art. IV, Sec. 16, or the requirement imposed by insurance underwriters, whichever is greater.
(see Sec. 26-I6(a)). Please submit these calculations with your Health Department permit submittal.
4) Sec. 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project either upon my
request for signature on the Health Dept. application forms or within 30 days of site plan approval, whichever
occurs first. This fee will be $790.02 based upon a 1 "meter size.
5) Comp Plan policy 3C.3.4 requires the conservation of potable water. City water may not, therefore, be used
for irrigation where other sources are readily available.
6) Provide an engineer's written certification that drainage will conform to all rules of the City and the South
Florida Water Management District. (LDR Chap. 4, sec. 7F)
SPECIFIC CONDITIONS
I) Water and sewer lines to be owned and operated by the City shall be included within utility easements.
Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The
easements shall be dedicated via separate instrument to the City as stated in Sec. 26-33(a) of the Code.
2) This office will not require surety for installation of the water and sewer utilities, on condition that the
systems be fully completed, and given to the City before the first permanent meter is set. Note that setting of
a permanent water meter is a prerequisite to obtaining the certificate of occupancy.
3) LDR chap. 6, Article IV, Sec. 16 requires that all points on each building will be within 200 feet of an
existing or proposed fire hydrant. Please demonstrate that the plan meets this condition, by showing all
hydrants.
4) Appropriate backflow preventers will be required on the domestic water service to the building, and the fire
sprinkler line if there is one, in accordance with Sec. 26-207.
5) A building permit for this project shall not be issued until this office has approved the plans for the water
and/or sewer improvements required to serve the project. (Sec. 26-15)
6) Provide drainage calculations showing the amount of rainfall to be retained on-site.
Please refer any questions on this matter to Peter Mazzella (742-6404) of this office.
JAG/PVM
Xc: Skip Milor
Peter Mazzella
File
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. PZ 99-291
FROM:
Chairman and Members
Community Redevelopment Agency
-yz~
/-/Cc. -
Michael Rumpf /
Director of Planning and Zoning
)jy' ,.
Lusia Galav '
Senior Planner.) .
J
December 3, 1999
TO:
THROUGH:
DATE:
SUBJECT:
BAPS Temple- COUS-99-008
Conditional Use- Churchrremple
INTRODUCTION
Contained herein is a description of the subject project The site is situated on 3.97 acres of vacant land
including 1.73 acres zoned R-3, Multiple-Family Residential and 2.24 acres zoned C-3 Community
Commercial. It is located on SE 18th Avenue between Federal Highway and the FEC Railroad tracks
within the Community Redevelopment Agency (CRA) area. The applicant proposes to construct a temple
facility including ancillary education and youth recreaiion accommodations. The R-3 zoned portion of the
site requires Conditional Use approval for a church. A church is a permitted use in the C-3 zoning
district The first version of the site plan indicated that the temple buildings would be located in both
zoning districts. The proposed temple structure is now entirely located within the C-3 zoning district with
parking located in the R-3 zoning district The applicant has agreed with Staff's original recommendation
to proceed with the Conditional Use approval process for the entire site.
Project Name: BAPS Temple Church.
Applicant! Agent Jay Patel
General Description: Conditional use approval for a temple
Property Size: 172,954 square feet (3.97 acres)
land use: High Density (HDR) 10.8 du/ac
General Commercial (GC)
Zoning: R-3 Multiple-Family Dwelling District
C-3 Community Commercial District
location: On SE 18th Avenue, north of SE 23rd Avenue, east of the FEC Railroad Tracks
and west of Federal Highway.
(See Exhibit "A"- Location Map).
Building area:
Phase 1:
Phase 2:
TOTAL:
8,320 square feet
23.250 SQuare feet
31,570 square feet
BAPS Temple
COUS 99-008
Adjacent land Uses and Zoning:
North-
Publix Supermarket zoned C-3
East-
Parking lot for a medical office building zoned C-3
South-
Various Multiple Family Residential units zoned R-3
West-
FEC Railroad Tracks beyond which is the City of Boynton Beach Water Plant and a
Residential development zoned PUD.
STANDARDS FOR EVALUATING CONDITIONAL USES AND ANALYSIS
Section 11.2.D of the land Development Regulations contains the following standards to which
conditional uses are required to conform. Following each of these standards is the Planning and Zoning
Division's evaluation of the application as it pertains to standards. .
1. Ingress and egress to the subject property and proposed structures thereon, with the particular
reference to automobile and pedestrian safety and convenience, traffic flow, and control, and
access in case of fire or catastrophe.
The subject site proposes three (3) points of ingress and egress. The main driveway entrance is
located on SE 18'" Avenue in the northwesi corner of the site. An additional driveway is proposed
for the southeast corner of the site accessing SE 20th Avenue. This drive provides access for the
Phase 1 and Phase 2 parking area. Both of these driveways will be operational in Phase 1 of the
development. As part of the Phase 2 development, a second driveway entrance will be provided
further east along SW 18'" Avenue as an additional access to that portion of the parking area.
Traffic circulation on site meets the requiremenis for emergency access and provides proper
separation between vehicular and pedestrian traffic. A sidewalk is provide adjacent to the building
and provides a continuous path connecting with a sidewalk along SE 18'" Avenue.
2. Off-street parking and loading areas where required, with particular attention to the items in
subsection 1 above, and the economic, glare, noise, and odor effects the conditional use will
have on adjacent and nearby properties, and the city as a whole.
The site plan provides the required number of parking spaces for this use. The development of
the site will take place in two phases and the parking will be provided as required to
accommodate each phase. Parking areas are properly buffered from right-of-ways and adjacent
property. For the most part religious services will be conducted on Sundays with limited use of the
facility during the week. No adverse impacts to adjacent property are anticipaied.
3. Refuse and service areas, with particular reference to the items in subsection 1 and 2 above.
One dumpster is being provided towards the back of the site in the south parking lot area. The
location is acceptable to Public Works for trash removal. With incorporation of staff comments the
dumpster will be properly screened and buffered.
SAPS Temple
COUS 99-008
4. UWities, with reference to locations, availability, and compatibility.
Water and sewer utilities are currently provided to the site. With incorporation of Utiliiy
Department comments, utilities are available and consistent with the Comprehensive Plan
policies and City regulations.
5. Screening, buffering and landscaping with reference to type, dimensions, character.
The applicant is proposing to provide landscaping on the site to meet the City's current zoning
code regulations. A landscape buffer including a continuous hedge, and required buffer trees will
be provided along the road right-of-way and vehicular use areas. With incorporation of staff
comments, screening and buffering will meet the code.
6. Signs and proposed exterior lighting, with reference to glare, traffic safety, economic effect, and
compatibility and harmony with adjacent and nearby properties.
The applicant proposes one monument sign for the project to be lOCated adjacent to the west
entrance on SW 18'h Avenue. The sign as proposed will meet sign code requirements and match
the design of the building. No signage is proposed for the building facade.
Site lighting consists of several pole fixtures 25 feet high to be located in the parking areas.
These fixtures will meet the code requirements assuring proper illumination of the parking area
and minimizing glare. No lighting is proposed for the building.
7. Required setbacks and other spaces.
The site meets the setback requirements for both the R-3 and C-3 zoning districts.
8. General compatibility with adjacent property and other property in the zoning district.
The site is located on SE 18th Avenue, a local street which dead ends at the FEC Railroad tracks.
The site borders the FEC Railroad tracks to the west. The temple is a permitted use in C-3 and a
conditional use in R-3. The surrounding uses consist of commercial, office and multifamily
residential. Most of the surrounding property is commercial with some multifamily located to the
southeast. The scale of the temple building is compatible with the surrounding structures which
vary from one to four stories. The color, materials and decorative features of the building will
blend well with the surroundings. The temple will be minimally used during the week with Sunday
being the busiest day. Most of the traffic generated will be confined to this off-peak time period.
9. Height of building and structures, with reference to compatibility and harmony to adjacent and
nearby properties, and the city as a whole.
The maximum height of the one-story temple will be 37.49 feet with a mean building height of
34.64 feet. The structure is totally located within the C-3 zoning district and is within the maximum
height requirement of 45 feet.
SAPS Temple
CO US 99-008
10. Economic effects on adjacent and nearby properties, and the city as a whole.
The site is currently vacant. The proposed project would be considered infill development for the
CRA area. The development is a permitted use in the C-3 zoning district and is a desirable
improvement to this vacant parcel. The temple is a non-profit organization and will not be
contributing to the City's tax base. However, it will be providing a community facility for residents
of Boynton Beach and adjacent municipaliiies as well.
11 . Conformance to the standards and requirements which apply to site plans, as set forth in the
Land Development Regulations, Chapter 4. Site Plan Review.
With incorporation of staff comments, the proposed project will comply with requirements stated
within this section of city code.
12. Compliance with, and abatement of nuisances and hazards in accordance with the performance
standards within Section 4 of the zoning regulations; also, conformance to the City of Boynton
Beach Noise control Ordinance.
The proposed temple will not create any nuisance, hazard or excessive noise.
SUMMARY/RECOMMENDA TION
The applicant, BAPS Development, is requesting site plan approval to construct a 31,570 square foot
temple in two (2) phases. Site plan approval for this project includes the site improvements for both
phases and the building floor plan and elevations for the Phase 1 temple building. The applicant will
require site plan approval for the floor plan and elevations for the Phase 2 building addition at a later
daie.
The site is located on a local street, west of Federal Highway, in the expanded CRA area. In terms of
redevelopment potential it is a vacant infill parcel with low visibility from the Federal Highway corridor. It
is zoned R-3.Multiple Family Residential and C-3 Community Commercial. The temple building will be
located on that portion of the site zoned C-3 which permits the temple use. The parking area will be
located on that portion of the site zoned R-3 which requires the conditional use approval. The entire
project is being reviewed and processed as a conditional use.
The only outstanding issue at this time involves the review of the traffic statement. Palm Beach County
requested additional information from the applicant in order to complete their review. The applicant must
provide this information and resolve any outstanding issues so that the project meets the Traffic
Performance Standards of Palm Beach County prior to application for a building permit.
Staff recommends that the application be approved subject to meeting all the conditions in Exhibit "C"
including compliance with the Palm Beach County Traffic Performance Standards.
LG/dim
Attachments
J:\SHRDATA\PLANNING\SHAREOIWP\PROJECTS\FH FOSTER OIL CORP\STAFF REPORT CQUS 99-006 .DOC
-. -
LJCt-.T\ON Mp..~
Bp..PS TEMPLE CHURCH
I~I 1[' rt ~.
tdI . . [ ogj"~ ',.: 1 ,=t ~,i ~ r - ~ -
~i::L'f7'J ,;] : ".-.' 1U,' 't 0_ JI ~ 1r-~~. -"'-
"IDW! [C r ::1".... ." " ' ..,j,:11;:' 0 c<' '1 - II-
~ m'" ',1.W'I~'" .' ~ ,. . ,1 '.- c>" 'C, I U
'::JiIIIIIrl! rn; "..0'" \:-",.,. '\ r" . \ ,..,. ." '-'-' · 1 L
:,=" "'.1' . ,r- "',,:i 1 ", C ,I" ' ~' . '" · ---~- ,:.. '~'1
,..~.",,"1"']fC' . "'. r "" ' 'lc, . ,'. . ~-="
!:;;\Ii' i', .,,,.m'",,,, mT'" "" "", =-... ~ .:: .::,:;' ..: ).. - -
. .,.." ~ .".,., .", 1m" .~, . .' . " . · · ~ ~
.' . . ." '" : ,...' .
1 ".... ,. ..."", '" .T" " ","" I ,; ;;,,;~!..' T l l ' ': ~- -'-.' ~, '-~"---="I /
. ,1 ", T.".n I hI" .11 .m, ~,,~., /1
t.-1.,n."T\ 11" ,n "" I" "',, IIU ' ~ 'I ,! ,/ .
",he' \ ",.,n ."" "'. . jj ,\' '" T ..-2 ~--- ~
I T,;': ,,,,,,:\.,I\! .14'%' l,l'\\i\\!:.' =' cP ".. I;";" I ' /:
n1"'iC' -nT.' ,,"IT lII1e "",\' . or ~ L' ,T:" 7~
, l' 'f1 l':::;l'J , _. in, rm;"-:; \",~3--=' l "(T~i \ I;~J
\.' q~ '""'., ;iitl' , '1 ~ -,.' .II Lrf'
. 0 .,' j't. " '/ ~i7fa:' _\t~.I:_
~eC pU ~ S\ '<; ~. .....,. I' ,'rsJ1. i.. :.., \:'.
\ r ~,,,,,,, I . ~ . G ,', W," 1 ,I
,\. ,,'--'~T ~;,~;,oJ ,1";!!l;: L)tI \ \cr1 i~
\ \\, Ii <= ~',~L- ,,> ",..' ~ elk' . crL.:J.~ I /1
... 'Ii- _ ,.,ll. /'"
yl.c_=-=-~n r.:;;:' j\~.l- ~-~.; I _ ~ I'.lt~" ' :'51r..~\
~r; .--:::. ~ ..1 "U" . -4-"-- J~. U --- -' .
\ _10 ! ,_~ _ c e'" . '~\ I n C ....,..... -';
\ ~": ' .1 . ~ ' 0'.' .' . '\ I \ \\1 1-'4_.....-.......l /1
, ~~^:'" // ,.... , ' '1' ' ' . ~\ ~ F~ "\" II
\1\ ~ t~' ,,~ >,.... . . ro" '" .
~ T .. . .,~ -, . ""'''''-c .-....
'.,"1 '7iI' ,',., T' . - 1t~ 'f.J 'T, ~ ,\-
11"''= ",it . . ,.. '":-. ' f" " T i~lfi :1"-'
'11: 'Ij/l~\ I~ \~f:;!I;~~.~.' \nHP: i4i koJ'" ~E-I
..T " n ~'., I' .,;-! 1 ." u u . C . ,-.;";='J'
" .. 1"' ..
\ '0 1/8 M\LESV~~~ g P eC r ~ 1 ','
i\\\\\ \ \ . :~T~"L' . i-~ ,~.
1\.'0 400. 89,0 FEE.T __. \' . . I f)
" .... ,.,. I ( I
........J.1~-..~-.~...-.: 'I' - ....
\,"':-"lq :3
t.~
------~~---------~-~'--~-
_.,--_...._~---- .-_.--~------ -- -
lll!II'd'
efii;!il!li~li;
· ,.,11'1,'111
o!ll" 1;;'11'
;lIm, nlo..1
.~, ,.- ~
::;-- _..........::"""""-...:c'i
..~. "avo.............. __
HOU.YmVI\1'::lNlNNVW' :!W\D1LIOW
dnOl:l~ N~I'S3a Vd
- -
lHOltl^Jl
-----
I l'j
I!t.~,
1"'" .
"!liil
il!',ii:
1/ ~I~ ~
~
~
,i~
,
,
~
I hi
. g.!
~ i ~ ~ 3
i ~, ! I,!':
.. , .,1,
"1' , '1000'
II'! i I 5iiii i
I' '" II.! i I
.~.. ~}a.~" .....cI 1
I
I
L_~-=---
I
I
I
I
I
II
It
I " I
L=--_J
it ----
.
I
I
I
I
I
I
I
I
I
I
I
I
J
"--~{7
I --L
J
.
--~~- = i
.i
~g
~~ ~
I. I'
-,
I' '
I ~ 51~
~ t..1I p
~ij ~:~!~
,. "1'1
;l "~ ~..
~I" ~ j~!f~
., ,'!il
,'" ,.j.",
5 ,,'":I~
~ g~h8
~~ i~l!I~~
,., "I!~
kH!:~ ~ai
;lliln.
i"'l'I ..~
,M'l'
d~:;~~;:~
~
.
c_
~, :~
iI~ 1,,1
IiI; Inl
.
.a
E
""''''''' ......."",-,oo~rn
"I-IJ.OZ"'lo;m,~..,I-t.j..I" ~ Iii
-~NI .L.~~O""""'.C 9G""'Q 5 l 0
~i""'... 9V:;:l mllN ~o~1 I i
; ;
III
I,
. . .., .
. ; 1N;:; ;
!
i! i i Iii l
, , ,
.. " . .-. -
-0"
~::; , 1l5\l1t:;
-- , : ~8 ~ :
i.l~ ~ 3 ~!i!
t!:;;-
~~~ I ~n !.'
":i1 'i ,- "!
d -I
III I hi' I' ~! ~
,I
,II 22 ~ 1l ~ : :~ ;;:
;;;~ .. , ," ."
..' ~~ ~ ~ !I! !
H' i h!! U i. I
!!I . ;!l ;1
"i~~ ! ~~L\ I " 1:1 " 1
~u ~n .. !' :i~ e :~ ~ c
... . ...,. ~ ~ ~; ili i~iI I
." I ~ilIil1 !i II Ii! 'II
~! ~ ~!; " III
! I " "
1 I,' "~I n III
, - .I
I i h~ h.! ~u ~H
9,-!
i ili~ u
11
01
~--,~.-- --~~---~
~iv'liiiljs---l--- ------
_.n;::: I .
< ~~~':I ~ :;;;;--4;;,-, \J);Ti>-,
,rtOO~~~'~: r--~~~~~~~S~I' F~~
:: Ii ::~____ ...l__~:__ _____, ,t~= ' --~
\1:: :H- I --~
ll_ ~I ....If ' --~
., :~]= I -~~
IlL" __J
:~~- i i~
;t~ i "l-j
II 'lI: Tj
I~ ,~-;Ol
:,t-- I --1
1,......- __~
: I- ~
, ,
~_~~~j;~~~~~:OO~:_~::;'::~ : ~:i.lJ
J .Illli
~!~d lliil
o
,
.
o
,
~ '
!Il~
~
i
/
-----l
I!
! I
I
T
J
~i
~
,
;
~
~---
j1~ W.IX :]'S
!
z
j
0-
'"
;-.
in
,
;
~,
'I
t.
I
I
""'1'11'
.11"1""1'
1..:;:1-,'11'1:'1'
,,';,111.11 .~.
1110:11;.lii'0
!'i..I,dil.,!;1
~'~
'" c !
f I -
'" * ~ i
!G[r
- -
IloIOI IAl
oae<;-t"Llo (.....s) :XV~/:'!NO"'d
Oi:~"-'it"li:!Oli: ''''OIIllO'", '31^VO
"l.S ''-I~ OZ: 'M'S l..~l.l
-,-::;>3l.IH:},MV 3dV::)SONV,
YlSY 'H3I3HI 9IlO1 3:lYaNY~
~ ~it~ ~
3 g g~~ ~~
~~~ ~ ~~~ ii
~~iI 8 .~3 ~,
~~~ ~ U~ ;<~
l_ < !"~ "~
B b ~ 3b <~.
~ 'i~ ~ ~~ m
M ~i ~j. ~~l
I ~.". .~2 ~:8
. .~g. ~.. q;-
~ <!~ ~~ .~~ ;. ~i"
. . .. ~~2 I
~ ~ ~~ ~,~. .
~ - i~< .~ .,~~ ~ ~
. < ,~,~~o ~.Q
. , LI " ,,,, ,"
:
.
.
.
"".~.I"
I
,~
I
j
o
. ~I...~.
"2." "l"l0l"l0l'l
.....f: .,"'''''''...
;;~...;~:;;
I
~ ~
~~g~~~~
... g"''' '" '"
~~~~~~~
o ~ ~ g~ I ~
~ ~1~3 i ~ ~~ ~ ~ ~ ~~~
'B ~~Il'~ ~ ~1II ~
, 2B~' ~ ~ '" 0"' I
~ ~~~~ ~.~ ~i ~i -I ~ m, ~h 31
a oSO' 0 I' ~~ ,~ ~ l m ~ f< r ~
~ !iilil! i ;~ ir ll~m I~ hiii ~glil!llil~~
- !~'.i < t .~ ~ <~ ~i ~ ~~~~~ ,~ln, ;gis~~~+~~
I ~~~~, i ~ h ~B!~ ~! I ~HH ~ ~ h~n bu~~~~I~h~.
~ j1;~~ . ~ ;i .~.~ ~~ , ~ ~
3 ~I~~~ ~ ~ ~i ~g ~d ~~ 01" ,.. .0 .'"..;.. .g~ · · ~
~ Mil. ~ ij d s~ <g~ ~~ ~ ,.. n " ~ ~
~ . , .. 0 - . ~ 5 Uol1 ~~~ S'WiI .. ~ 3'~ ~ ~ ~
.
~
'-,II "
---::-- ,~:-~;-----~------- ---
.
I
I
~
I
II
.
I!
.
,I
---1t- ~-;;.~------
~~
~~
.'
h
i~
.c
~l
,~
~~
ge
~
z
~
0'
w
:!to
u~
i'$L
Z,
~~
111'11',1'
iliil!liii!iin
"'111',11'1';&"
!IillII il,..il
- =
INOlIlAlll
,.- ~
-- - --,...
.... -..-:>...-....
........... 'CJV<:nI _""" osn
NQt1VfT1VM'!)NfoINVW' JWUJi1J1001V
c!ln01t:l N~IS3a Veil
-
F
~
IlIO'I ""'"" ""...00 ~ I ro
.,"'.l.Ql.:..'I9M'...."tI'tJ..I.. ~ II : i
'ONI J.~O""T""'.a ....""S1 It. ~ Q ..
[.0""..0 ...." -- ~""I I I ~ !!
I
!
.E]
,
i'
~
"
0 "
" 0
< ~
>
:J
"' "'
H
~ "'
z el
0
~
~ "' ~
~
-
51'11SIAt.
0""'" """""NO....... ~ rnmrno ruEJ
",~...o!:"'19I"I'''''''I'!.j.91" ~ i ru f. 1 13
:::>NI .I.~o"'......a <eca"'. M' d I
r""""" ~,." -- ORaao_] , I G rn ~ ~ [)
'"
0 '"
" 0
< "
>
~ <
>
'" '"
~
~ '"
'" t
"
@ '" ,
, ~
i! ,
"
I!
EXHIBIT "C"
Project name: BAPS TEMPLE CHURCH
File number: COUS 99-008
Reference: 3rd Review, New Site Plan. File # COUS 99,008 with a November 23. 1999 Planning and Zoning
Deoartrnent date stamo marking
DEPARTMENTS INCLUDE REdl
PUBLIC WORKS
Comments: None
UTILITIES
Comments:
1. Dept. of Health permits will be required for the water and sewer systems
serving this project. (Sec. 26-12).
2. Fire flow calculations will be required demonstrating the City Code
requirement of 1500 g.p.m. as stated in LDR chap. 6, Art. IV, Sec. 16, or
the requirement imposed by insurance underwriters, whichever is
greater. (see Sec. 26-16(a)). Please submit these calculations with your
Health Department permit submittal.
3. Sec. 26-34(E) of the City Code requires that a capacity reservation fee be
paid for this project either upon my request for signature on the Health
Dept. application forms or within 30 days of site plan approval,
whichever occurs first. This fee will be $790.02 based upon a I "meter
size.
4. Comp Plan policy 3C.3.4 requires the conservation of potable water.
City water may not, therefore, be used for irrigation where other sources
are readily available.
5. This office will not require surety for installation of the water and sewer
utilities, on condition that the systems be fully completed, and given to
the City before the first permanent meter is set. Note that setting of a
permanent water meter is a prerequisite to obtaining the certificate of
occupancy.
6. A building permit for this project shall not be issued until this office has
approved the plans for the water and/or sewer improvements required to
serve the project. (Sec. 26-15)
7. Provide drainage calculations showing the amount of rainfall to be
retained on-site.
FIRE
Comments:
8. A fire flow test is required and the hydrant will be in place prior to above
grade construction.
Page 2
BAPS TEMPLE CHURCH
File No.: COUS 99-008
DEPARTMENTS INCLUDE REJECT
POLICE
Comments:
9. Each parking lot traffic plan shall provide directional arrows.
ENGINEERING DIVISION
Comments:
10. On the Landscape Plan indicate the required clear sight triangles at the
driveway with a note that all landscaping within the triangle shall have a
clear visibility window between 30" and 6' from the finished grade.
[LOR Chapter 7.5, Article II, Section 5.H.]
II In Section "B-B" of the paving, grading and drainage details, correct the.
detail to reflect the required type "0" curb - (4 places) and delete the
"extruded curb" reference on the water/sewer plan.
12. Since Phase I includes a portion of parcels I and II, provide the City with
a recordable Unity of Title of all three parcels.
13. Provide note on site plan and landscape plan that the Phase II parking
area adjacent to Phase I will be seeded and mulched.
14. On the site plan and related drawings. relocate the Phase II line such that
it includes the construction of the grassed median in Phase 1.
BUILDING DIVISION
Comments:
15. Permits are required to construct the improvements that are shown on the
approved site plan/conditional use documents. Permit application forms
are available in the Building Division of the Development Department.
A permit submittal checklist is available in the Building Division. The
list identifies the basic documents that the Plans Analyst checks for when
an applicant submits for permit review.
16. Amend note #5 found on the sheet titled Site Plan (sheet SPI of 2) to
state that the finish floor elevation is above the highest 100-year base
flood elevation applicable to the building site, as determined by the
South Florida Water Management District's surface water management
construction development regulations. [Section 3 107.1.2, Chapter 31 of
the Boynton Beach amendments to the 1997 edition of the Standard
Building Code]
17. Considering that detail drawings of the building signage were not
Page 3
BAPSTEMPLECHURCH
File No.: COUS 99-008
DEPARTMENTS INCLUDE REJECT
provided and the location of the signage was not shown on the elevation
view drawings of the building, place the following note on the site plan
and each drawing that depicts the elevations of the building: "Building
signage is not approved for this project. Separate site plan review and
approval is required for building signage."
18. At time of permit submittal, provide an executed City unity oftitle form.
The form shall combine all lots or parcels within the subject site as one
lot. The processing of the form shall follow the City's unity of title
procedures.
19. At time of permit review, attach a current survey of the subject property
to both sets of permit documents.
20. Compliance with the Building Codes will be evaluated at time of permit
review. The permit fee, water and sewer facility fees, Fire Department
fees, County fees and State fees will be determined at time of permit
review.
21. Compliance with the Building Codes will be evaluated at time of permit
review. The permit fee, water and sewer facility fees, Fire Department
fees, County fees and State fees will be determined at time of permit
review.
PARKS AND RECREATION
Comments: None
FORESTER/ENVIRONMENTALIST
Comments:
22. The applicant should indicate on the landscape plans if the existing
desirable trees will be preserved, relocated or removed/replaced on the
site.
PLANNING AND ZONING
Comments:
23. The following comments are requirements ofCh. 4, Sec. 7, D.
- Label the floor plan and elevation drawings as Phase I, Building I.
- Identify building colors on the elevation drawings.
24. The following comments are requirements of Chapter 9, Sec. 10.
- Identify all sidewalks on the site plan. Label and provide
dimensions.
- Review placement of dumpster to ensure that they are easily
accessible for pick-up.
Page 4
BAPS TEMPLE CHURCH
File No.: COUS 99-008
DEPARTMENTS INCLUDE REJECT
- Provide a six foot high concrete stucco wall for all dumpster
locations.
25. The following comments are requirements ofCh. 7.5, Sec 5.
,Provide shrubs and hedges eighteen (18) inches high and two (2) feet
on center at time of planting.
- Provide a 2.5 foot perimeter landscape buffer between all vehicular
use areas and adjacent property. Label and dimension this buffer on
the site plan and landscape plan.
- Provide a tree relocation plan for phase II.
, Provide a tree count for the number required and the number
provided.
26. Clearly identify doors to restroom through foyer on site plan.
27. Identify color for proposed sign.
28. Correct site plan data regarding building square footage to match
building footprint. Total square footage is 31,570.
29. Revise site data to correct area calculations for each zoning district.
],ISHRDATA\Pl.ANNING\SHARED\WP\PROJECTS\BAPS TEMPLE CHURCH\CONDITIONAL USEIJRD REVIEW COMMENTS DOC
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 99-258
TO:
Michael Rumpf, Planning and Zoning Director
Michael E. Haag, Deputy Building Official~ ~
November 4, 1999 U
FROM:
DATE:
RE:
Baps Temple Church - New Site Plan (NWSP 99-021) 1st review comments
We have reviewed the subject plans and offer the following comments that shall be addressed
prior to the project being forwarded for Board review:
Buildinl! Division (Permit & Site Snecific Comments) - Michael E. Haag (561) 742-6352
1. Add to the buildings that are depicted on the site plan drawing, a labeled symbol that
identifies the location of the handicap accessible entrance door to each building. Show and
label the same door(s) on the floor plan drawing.
2. Identify on the site plan the location of the handicap accessible parking spaces. The
quantity of the spaces shall be consistent with the regulations specified in the Florida
Accessibility Code for Building Construction. The accessible parking space(s) that serve a
use shall be located on the shortest safely accessible route oftravel from adjacent parking
to an accessible entrance. The Florida Accessibility Code for Building Construction states
that buildings with multiple accessible entrances shall have accessible parking spaces
dispersed and located closest to the accessible entrance.
3. Add to the site plan drawing a symbol that represents the location of the accessible route
that is required between the accessible parking spaces and the accessible entrance door to
both buildings. The symbol shall start at the accessible parking spaces and terminate at the
accessible entrance door to the buildings. The symbol will represent the location of the
path oftravel, not the location ofthe detectable warning or other pavement markings that
are required to be installed along the path. Identify that the symbol represents the
accessible route and state that the route is designed in compliance with Section 4.3
(Accessible Route) and 4.6 (Parking and Passenger Loading Zones) of the Florida
Accessibility Code for Building Construction. Please note that at time of permit review,
the applicant shall provide detailed documentation on the plans that will verify that the
accessible route is in compliance with the regulations specified in the Florida Accessibility
Code for Building Construction.
Building Division Memo No. 99-258 to Michael Rumpf
RE: Baps Temple Church - New Site Plan - 151 review comments
November 4, 1999
Page Two
4. Within the site data, identify the proposed finish floor elevation of the building (lowest
floor elevation). VerifY that the proposed elevation complies with regulations ofthe code
by adding specifications and notes to the site data that address the following issues:
a. From the FEMA map, identify the title of the flood zone that the building is located
within. Where applicable, specifY the base flood elevation. Ifthere is no base flood
elevation, indicate that on the plans.
b. As the design professional-of-record for the project, state that the proposed floor
elevation is above the highest I DO-year base flood elevation applicable to the building
site, as determined by the South Florida Water Management District's surface water
management construction development regulations. [Section 3107.1.2, Chapter 31 of
the Boynton Beach amendments to the 1997 edition of the Standard Building Code]
c. IdentifY the floor elevation that the design professional has established for the building
within the footprint of the building that is shown on the site plan, floor plan and civil
plan.
5. Show on the site plan drawing the location of all signs that are proposed to be located on
the site. Dimension the distance the site signs are located from the adjacent property lines
(note: ten feet is minimum setback dimension from adjacent property lines). Add to the
submittal detailed and dimensioned elevation view drawings ofthe site signage. The
drawings shall include the width and height dimension ofthe signage and the overall height
of the sign structure. Add computations to the drawing that verify the total sign area
complies with the requirements of the Sign Code. If site signage is proposed, delineate on
the landscape plan the location of the landscaping that is required for the site signage.
Drawings of the signage shall comply with the applicable regulations specified in the Sigu
Code (Chapter 21 of the Land Development Regulations).
Or
Place the following note on the site plan: "Site signage is not approved for this project.
Separate site plan review and approval is required for site signage."
6. On the elevation view drawings ofthe building, identify the location of the proposed wall
signage. Add to the submittal detailed and dimensioned elevation view drawings of the
building signage. The drawings shall include the length and height dimension of all
signage. Also, identifY the total sign area and provide computations that verify the sign
area complies with the requirements of the Sign Code. Drawings of the siguage shall
comply with the applicable regulations specified in the Sign Code (Chapter 21 of the Land
Development Regulations).
Or
Place the following note on the site plan and building elevation view drawing(s):
"Building signage is not approved for this project. Separate site plan review and approval
is required for building signage."
Building Division Memo No. 99-258 to Michael Rumpf
RE: Baps Temple Church - New Site Plan - 1st review comments
November 4,1999
Page Three
7. Add to the site plan drawing a labeled symbol that represents the location of the site
lighting poles. Add a note to the site plan that includes the following information:
a. The locations of the site lighting poles are conceptual.
b. The proposed site lighting fixtures will illuminate the site consistent with the
specifications identified in the Parking Lot Code.
c. Compliance with the code will be evaluated at time of permit review.
Add to the site plan the pole detail drawing depicted on sheet LP-l of 1. Omit from the
submittal the photometric drawing. This information is required at time of permit
submittal, not at site plan review.
8. On the site plan drawing, identify the symbol that represents the property line.
9. Add to the site plan all easements that are shown on the survey. The location, type and
size of the easements shall be shown and identified on the site plan. Where applicable,
amend the plans so that structures do not encroach into an easement.
10. Add to the site data the number of stories in each building. Also, indicate the overall
height of each building (finish grade to the highest point of the roof). The overall height of
the buildings shall not exceed the height limitations of the Zoning Code. Dimension the
overall height ofthe building on the elevation view drawings of the building.
II. Below the drawing titled Floor Plan found on sheet Al of 3, add text that would indicate
that the room layout that is shown on the floor plan is conceptual.
12. Please note that overhangs, covered walkways, canopies, awnings or other appurtenances
that are attached to the building shall be considered when identifying building setbacks.
Therefore, identify the width of the overhangs, covered walkways, canopies, awnings, etc.
The building setbacks shall comply with setback regulations specified in the Zoning Code.
13. At time of permit submittal, provide an executed City unity of title form. The form shall
combine all lots or parcels as one lot. The processing of the form shall follow the City's
unity of title procedures.
MEH:bg
J:\SHRDATA\Development\Building-6870\Documents\TRC\NWSP 99-021 1st review Saps Temple Church.doc
Parks Division Memorandum- TRC
Subject:
Mike Rumpf, Director of Planning and Zoning
Kevin J Hallahan, Forester / Environmentalist f,.:;y ;1--
Baps Temple Church
New Site Plan -I'" Review
To:
From:
Date:
November 8, 1999
The applicant should indicate on the landscape plans if the existing desirable trees will be
preserved, relocated or removed / replaced on the site The project should continue in the normal
review process.
Kjh
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. PZ 00-033
TO: Bob Borden, Assistant Fire Marshal
Larry Quinn, Public Works
Mike Haag, Building Division
Ken Hall, Engineering Division
Kevin Hallahan, Forester/Environmentalist
Pete Mazzella, Utilities Department
Mike Lane, Police Department
John Wildner, Parks Division
I"V<=:
FROM: Michael W. Rumpf, Director of Planning and Zoning
DATE: February 14, 2000
SUBJECT: Rectified Plans for BAPS Development
Conditional Use & site plan (COUS 99-008)
The amended new conditional use and site plan for BAPS Development has been submitted for
final sign-off by the Technical Review Committee. Four (4) sets of plans, each requiring your
unconditional signature, are available for review in Planning and Zoning. A copy of the originally
reviewed plans, staff comments and development order are available for your use to perform
ihe review.
Please review and sign-off each of the four (4) sets of plans, No later than, 5:00 P.M.,
FEBRUARY 23, 2000. If the plans are not in compliance with your staff comments or City
regulations, do not sign the plans but only indicate ihe memorandum number where your
comments are documented.. To facilitate the sign-off process, please resubmit written
comments addressed to the Planning and Zoning Director, NO LATER THAN 5:00 P.M.,
FEBRUARY 23, 2000.
Thank you for your prompt response to this request.
MWR:dim
cc: William Bingham, Fire Chief
Marshall Gage, Police Chief
John Guidry, Utilities Director
J:\SHRDATA\PLANNING\SHARED\'NPIPROJECTS\BAP$ TEMPLE CHURCH\CONOITIONAl USE\RECTIFIED 2.14..()Q.DOC
DEVELOPMENT DEPARTMENT
MEMORANDUM NO. PZ 00-051
TO:
John Guidry, Interim Director of Engineering
Mike Haag, Building Code AdmLnistrator
Michael W. Rumpf h wf?. JcL..-.
Planning and Zoning Director
FROM:
DATE:
February 28, 2000
SUBJECT:
BAPS TEMPLE
COUS 99-008
South of SE 18th Avenue
Attached are the rectified plans for the above-referenced project approved by the City Commission. This
is being sent to you for your files as it has been rectified and staff comments have been addressed and
accurately represents the approved master plan.
MWR/nl
l:\SHRDA TA\PJanning\SHARED\WP\PROJECTS\9APS TBMPLE CHVRCH\CONDlnONAL USE\MEMO rectified control plans,doc
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. PZ 99-267
TO:
FROM:
SUI;.. Krusa
City Clerk
[Y1 <rtC
Michael W. Rumpf
Director of Planning and Zoning
DATE:
November 17, 1999
SUBJECT:
BAPS Temple Church
Conditional Use 99-008
Accompanying this memorandum you will find an application and supporting documentation
for the above-referenced case. A check in the amount of $1,500.00 to cover the review and
processing of this application has been forwarded to the Finance Department.
The legal advertisement for this request will be forwarded to your office after review by the
City Attorney. This request is scheduled for the December 8, 1999 Community
Redevelopment Agency meeting and the December 21, 1999 City Commission meeting.
Please advertise in the newspaper and notify property owners accordingly.
MWRjma
Attachments
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. PZ 99-291
</V.
i^ II ~4"
c:; ~~
TO:
Chairman and Members
Community Redevelopment Agency
THROUGH: Michael Rumpf
Director of Planning and Zoning
FROM: Lusia Galav
Senior Planner
DATE: December 3,1999
SUBJECT: BAPS Temple- COUS-99-008
Conditional Use- ChurchfTemple
INTRODUCTION
Contained herein is a description of the subject project. The site is situated on 3.97 acres of vacant land
including 1.73 acres zoned R-3, Multiple-Family Residential and 2.24 acres zoned C-3 Community
Commercial. Ii is located on SE 18th Avenue between Federal Highway and the FEC Railroad tracks
within the Community Redevelopment Agency (CRA) area. The applicant proposes to construct a temple
facility including ancillary education and youth recreaiion accommodations. The R-3 zoned portion of the
site requires Conditional Use approval for a church. A church is a permitted use in the C-3 zoning
district. The first version of the siie plan indicated that the temple buildings would be located in both
zoning districts. The proposed temple structure is now entirely located within the C-3 zoning district with
parking located in the R-3 zoning district. The applicant has agreed with Staff's original recommendation
to proceed with the Conditional Use approval process for the entire site.
Project Name: BAPS Temple Church.
Applicant! Agent Jay Patel
General Description: Conditional use approval for a temple
Property Size: 172,954 square feet (3.97 acres)
Land use: High Density (HDR) 10.8 du/ac
General Commercial (GC)
Zoning: R-3 Multiple-Family Dwelling District
C-3 Community Commercial District
Location: On SE 18th Avenue, north of SE 23rd Avenue, east of the FEC Railroad Tracks
and west of Federal Highway.
(See Exhibit "A"- Location Map).
Building area:
Phase 1:
Phase 2:
TOTAL:
8,320 square feet
23,250 sauare feet
31,570 square feet
BAPS Temple
COUS 99-008
Adjacent land Uses and Zoning:
North-
Publix Supermarket zoned C-3
East-
Parking lot for a medical office building zoned C-3
South-
Various Multiple Family Residential units zoned R-3
West-
FEe Railroad Tracks beyond which is the City of Boynton Beach Water Plant and a
Residential development zoned PUD.
STANDARDS FOR EVALUATING CONDITIONAL USES AND ANALYSIS
Section 11.2.D of the land Development Regulations contains the following standards to which
conditional uses are required to conform. Following each of these standards is the Planning and Zoning
Division's evaluation of the application as it pertains to standards.
1. Ingress and egress to the subject property and proposed structures thereon, with the particular
reference to automobile and pedestrian safety and convenience, traffic flow, and control, and
access in case off ire or catastrophe.
The subject site proposes three (3) points of ingress and egress. The main driveway entrance is
located on SE 18th Avenue in the northwest corner of the site. An additional driveway is proposed
for the southeast corner of the site accessing SE 20th Avenue. This drive provides access for the
Phase 1 and Phase 2 parking area. Both of these driveways will be operational in Phase 1 of the
development. As part of the Phase 2 development, a second driveway entrance will be provided
further east along SW 18th Avenue as an additional access to that portion of the parking area.
Traffic circulation on site meets the requirements for emergency access and provides proper
separation between vehicular and pedestrian traffic. A sidewalk is provide adjacent to the building
and provides a continuous path connecting with a sidewalk along SE 18th Avenue.
2. Off-street parking and loading areas where required, with particular attention to the items in
subsection 1 above, and the economic, glare, noise, and odor effects the conditional use will
have on adjacent and nearby properties, and the city as a whole.
The site plan provides the required number of parking spaces for this use. The development of
the site will take place in two phases and the parking will be provided as required to
accommodate each phase. Parking areas are properly buffered from right-of-ways and adjacent
property. For the most part religious services will be conducted days with limited use of the
facility during the week. No adverse impacts to adjacent prope . ant' ipated.
_ co<-
3.
Refuse and service areas, with particular reference to the it
bsection 1 and 2 above.
One dumpster is being provided.~t1 towards the back of the site in the south parking lot area.
The location is acceptable to Public Works for trash removal. Wiih incorporation of staff
comments the dumpster will be properly screened and buffered.
SAPS Temple
COUS 99-008
4. Utilities, with reference to locations, availability, and compatibility.
Water and sewer utilities are currently provided to the site. With incorporation of Utility
Department comments, utilities are available and consistent with the Comprehensive Plan
policies and City regulations.
5. Screening, buffering and landscaping with reference to type, dimensions, character.
The applicant is proposing to provide landscaping on the site to meet the City's current zoning
code regulations. A landscape buffer including a continuous hedge, and required buffer trees will
be provided along the road right-of-way and vehicular use areas. With incorporation of staff
comments, screening and buffering will meet the code.
6. Signs and proposed exterior lighting, with reference to glare, traffic safety, economic effect, and
compatibility and harmony with adjacent and nearby properties.
The applicant proposes one monument sign for the project to be located adjacent to the west
entrance on SW 18th Avenue. The sign as proposed will meet sign code requirements and match
the design of the building. No signage is proposed for the building facade.
Site lighting consists of several pole fixtures 25 feei high to be located in the parking areas.
These fixiures will meet the code requirements assuring proper illumination of the parking area
and minimizing glare. No lighting is proposed for the building.
7. Required setbacks and other spaces.
The site meets the setback requirements for both the R-3 and C-3 zoning districts.
8. General compatibility with adjacent property and other property in the zoning district.
The site is located on SE 18th Avenue, a local street which dead ends at the FEC Railroad tracks.
The site borders the FEC Railroad tracks to the west. The temple is a permitted use in C-3 and a
conditional use in R-3. The surrounding uses consist of commercial, office and multifamily
residential. Most of the surrounding property is commercial with some multifamily located to the
southeast. The scale of the temple building is compatible with the surrounding structures which
vary from one to four stories. The color, materials and decorative features of the building will
blend well with the surroundings. The temple will be minimally used during the week with Sunday
being the busiest day. Most of the traffic generated will be confined to this off-peak time period.
9. Height of building and structures, with reference to compatibility and harmony to adjacent and
nearby properties, and the city as a whole.
The maximum height of the one-story temple will be 37.49 feet with a mean building height of
34.64 feet. The structur,eJs otally located within the C-3 zoning district and is within the maximum
height requirement of AJife t.
!(~
BAPS Temple
COUS 99-008
10. Economic effects on adjacent and nearby properties, and the city as a whole.
The site is currently vacant. The proposed project would be considered infill development for the
CRA area. The development is a permitted use in the C-3 zoning district and is a desirable
improvement to this vacant parcel. The iemple is a non-profit organization and will not be
contributing to the City's tax base. However, it will be providing a community facility for residents
of Boynton Beach and adjacent municipalities as well.
11. Conformance to the standards and requirements which apply to site plans, as set forth in the
Land Development Regulations, Chapter 4. Site Plan Review.
With incorporation of staff comments, the proposed project will comply with requirements stated
within this section of city code.
12. Compliance with, and abatement of nuisances and hazards in accordance with the performance
standards within Section 4 of the zoning regulations; also, conformance to the City of Boynton
Beach Noise control Ordinance.
The proposed temple will not create any nuisance, hazard or excessive noise.
SUMMARY/RECOMMENDA TION
The applicant, BAPS Development, is requesting site plan approval to construct a 31,570 square foot
temple in two (2) phases. Site plan approval for this project includes the site improvements for both
phases and the building floor plan and elevations for the Phase 1 temple building. The applicant will
require site plan approval for the floor plan and elevations for the Phase 2 building addition at a later
date. r:
r(~
The site is located on a local sireet, west of Federal Highway, in they e~~ga~~~~!:l CRA area. In terms of
redevelopment potential it is a vacant infill parcel with low visibilit . the Federal Highway
corridor. It is zoned R-3 Multiple Family Residential and C-3 Community Commercial. The temple
building will be located on that portion of the site zoned C-3 which permits the temple use. The parking
area will be located on that portion of the site zoned R-3 which requires the conditional use approval. The
entire project is being reviewed and processed as a conditional use.
The only outstanding issue at this time involves the review of the traffic statement. Palm Beach County
requested additional information from the applicant in order to complete their review. The applicant must
provide this information and resolve any outstanding issues so that the project meets the Traffic
Performance Standards of Palm Beach County prior to application for a building permit.
Staff recommends that the application be approved subject to meeting all the conditions in Exhibit "C"
including the Palm Beach County Traffic Performance Standards.
/'
('<'-"'flr'-t~ Cc \,,)./1.
LG/dim
Attachments
J:\SHRDATA\PLANNING\SHARED\WP\PROJECT$\FH FOSTER OIL CORP\STAFF REPORT COUS 99.000 .DOC
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. PZ 99-291
TO:
FROM:
Chairman and Members
Community Redevelopment Agency
Michael RU~~
Director of Planning and Zoning
Lusia Galav ) ~
Senior Planner~)
December 3, 1999
THROUGH:
DATE:
SUBJECT:
BAPS Temple- COUS-99-008
Conditional Use- ChurchfTemple
INTRODUCTION
Contained herein is a description of ihe subject project. The site is situated on 3.97 acres of vacant land
including 1.73 acres zoned R-3, Multiple-Family Residential and 2.24 acres zoned C-3 Community
Commercial. It is located on SE 18th Avenue between Federal Highway and the FEC Railroad tracks
within the Community Redevelopment Agency (CRA) area. The applicant proposes to construct a temple
facility including ancillary education and youth recreation accommodations. The R-3 zoned portion of the
site requires Conditional Use approval for a church. A church is a permitted use in the C-3 zoning
district. The first version of the site plan indicated that the temple buildings would be located in both
zoning districts. The proposed temple structure is now entirely located within the C-3 zoning district with
parking located in the R-3 zoning district. The applicant has agreed with Staffs original recommendation
to proceed with the Conditional Use approval process for the entire site.
Project Name: SAPS Temple Church.
Applicant! Agent Jay Patel
General Description: Conditional use approval for a temple
Property Size: 172,954 square feet (3.97 acres)
Land use: High Density (HDR) 10.8 du/ac
General Commercial (GC)
Zoning: R-3 Multiple-Family Dwelling District
C-3 Community Commercial District
Location: On SE 18th Avenue, north of SE 23rd Avenue, east of the FEC Railroad Tracks
and west of Federal Highway.
(See Exhibit "A"- Location Map).
Building area:
Phase 1:
Phase 2:
TOTAL:
8,320 square feet
23.250 SQuare feet
31,570 square feet
BAPS Temple
COUS 99-008
Adjacent Land Uses and Zoning:
North-
Publix Supermarket zoned C-3
East-
Parking loi for a medical office building zoned C-3
South-
Various Multiple Family Residential units zoned R-3
West-
FEC Railroad Tracks beyond which is the City of Boynton Beach Water Plani and a
Residential development zoned PUD.
STANDARDS FOR EVALUATING CONDITIONAL USES AND ANALYSIS
Section 11.2.D of the land Development Regulaiions contains the following standards to which
conditional uses are required to conform. Following each of these standards is the Planning and Zoning
Division's evaluation of the application as it pertains to standards.
1. Ingress and egress to the subject property and proposed structures thereon, with the particular
reference to automobile and pedestrian safety and convenience, traffic flow, and control, and
access in case off ire or catastrophe.
The subject site proposes three (3) points of ingress and egress. The main driveway entrance is
located on SE 18th Avenue in the northwest corner of the site. An additional driveway is proposed
for the southeast corner of the site accessing SE 20'h Avenue. This drive provides access for the
Phase 1 and Phase 2 parking area. Both of ihese driveways will be operational in Phase 1 of the
development. As part of the Phase 2 development, a second driveway entrance will be provided
further east along SW 18'h Avenue as an additional access to that portion of the parking area.
Traffic circulation on site meets the requirements for emergency access and provides proper
separation between vehicular and pedestrian traffic. A sidewalk is provide adjacent to the building
and provides a continuous path connecting with a sidewalk along SE 18th Avenue.
2. Off-street parking and loading areas where required, with particular attention to the items in
subsection 1 above, and the economic, glare, noise, and odor effects the conditional use will
have on adjacent and nearby properties, and the city as a whole.
The site plan provides the required number of parking spaces for this use. The development of
the site will take place in two phases and the parking will be provided as required to
accommodate each phase. Parking areas are properly buffered from right-of-ways and adjacent
property. For the most part religious services will be conducted on Sundays with limited use of the
facility during the week. No adverse impacts to adjacent property are anticipated.
3. Refuse and service areas, with particular reference to the items in subsection 1 and 2 above.
One dumpster is being provided towards the back of the site in the south parking lot area. The
location is acceptable to Public Works for trash removal. With incorporation of staff comments the
dumpsier will be properly screened and buffered.
SAPS Temple
COUS 99-008
4. Utilities, with reference to locations, availability, and compatibility.
Water and sewer utilities are currently provided to the site. With incorporation of Utility
Department comments, utilities are available and consistent with the Comprehensive Plan
policies and City regulations.
5. Screening, buffering and landscaping with reference to type, dimensions, character.
The applicant is proposing to provide landscaping on the site to meet the City's current zoning
code regulations. A landscape buffer including a continuous hedge, and required buffer trees will
be provided along the road right-of-way and vehicular use areas. With incorporation of siaff
comments, screening and buffering will meet the code.
6. Signs and proposed exterior lighting, with reference to glare, traffic safety, economic effect, and
compatibility and harmony with adjacent and nearby properties.
The applicant proposes one monument sign for the project to be located adjacent to the west
entrance on SW 18th Avenue. The sign as proposed will meet sign code requirements and match
the design of the building. No sign age is proposed for the building facade.
Site lighting consists of several pole fixtures 25 feet high to be located in the parking areas.
These fixtures will meet the code requirements assuring proper illumination of the parking area
and minimizing glare. No lighting is proposed for the building.
7. Required setbacks and other spaces.
The site meets the setback requirements for both the R-3 and C-3 zoning districts.
8. General compatibility with adjacent property and other property in the zoning district.
The site is located on SE 18th Avenue, a local street which dead ends at the FEC Railroad tracks.
The site borders the FEC Railroad tracks to the west. The temple is a permitted use in C-3 and a
conditional use in R-3. The surrounding uses consist of commercial, office and multifamily
residential. Most of the surrounding property is commercial with some multifamily located to the
southeast. The scale of the temple building is compatible with the surrounding structures which
vary from one to four stories. The color, materials and decorative features of the building will
blend well with the surroundings. The temple will be minimally used during the week with Sunday
being the busiest day. Most of the traffic generated will be confined to this off-peak time period.
9. Height of building and structures, with reference to compatibility and harmony to adjacent and
nearby properties, and the city as a whole.
The maximum height of the one-story temple will be 37.49 feet with a mean building height of
34.64 feet. The structure is totally located within the C-3 zoning district and is within the maximum
height requirement of 45 feet.
BAPS Temple
COUS 99-008
10. Economic effects on adjacent and nearby properties, and the city as a whole.
The site is currently vacant. The proposed project would be considered infill development for the
CRA area. The development is a permitted use in the C-3 zoning district and is a desirable
improvement to this vacant parcel. The temple is a non-profit organization and will not be
contributing to the City's tax base. However, it will be providing a community facility for residents
of Boynton Beach and adjacent municipalities as well.
11. Conformance to the standards and requirements which apply to site plans, as set forth in the
Land Development Regulations, Chapter 4. Site Plan Review.
With incorporation of staff comments, the proposed project will comply wiih requirements stated
within this seciion of city code.
12. Compliance with, and abatement of nuisances and hazards in accordance with the performance
standards within Section 4 of the zoning regulations; also, conformance to the City of Boynton
Beach Noise control Ordinance.
The proposed temple will not create any nuisance, hazard or excessive noise.
SUMMARY/RECOMMENDA TION
The applicant, BAPS Development, is requesting site plan approval to construct a 31,570 square foot
iemple in two (2) phases. Site plan approval for this project includes the site improvements for both
phases and the building floor plan and elevations for the Phase 1 temple building. The applicant will
require site plan approval for the floor plan and elevations for the Phase 2 building addition at a later
date.
The site is located on a local street, west of Federal Highway, in the expanded CRA area. In terms of
redevelopment potential it is a vacant infill parcel with low visibility from the Federal Highway corridor. It
is zoned R-3 Multiple Family Residential and C-3 Community Commercial. The temple building will be
located on that portion of the site zoned C-3 which permits the temple use. The parking area will be
located on that portion of the site zoned R-3 which requires the conditional use approval. The entire
project is being reviewed and processed as a conditional use.
The only outstanding issue at this time involves the review of the traffic statement. Palm Beach County
requested additional information from the applicant in order to complete their review. The applicant must
provide this information and resolve any outstanding issues so thai the projeci meets the Traffic
Performance Standards of Palm Beach County prior to application for a building permit.
Staff recommends thai the application be approved subject to meeting all the condiiions in Exhibit "C"
including compliance with the Palm Beach County Traffic Performance Standards.
LG/dim
Attachments
J:\SHRDATA\PLANNING\SHARED\W'P\PROJECTS\FH FOSTER Oil CORP\STAFF REPORT COUS 99.Q06 .DOC
DEPARTMENT OF DEVELOPMEN1
MEMORANDUM NO. PZ 99-291
TO:
Chairman and Members
Community Redevelopment Agency
~k~
Michael Rumpf --
Director of Planning and Zoning
,
\~
Lusia Galav j Y /
Senior Planner ~ '
J
December 3, 1999
r...~r-'-~--.~.......
~.l._..:_ _ :' ..< ,~__)
THROUGH:
FROM:
Ofe 13
j":':.:)
. ~ ,',
DATE:
C,1"'".:" r~~,". ')~_~... .
~ ,'- :, -\ ';:'
., .....c
SUBJECT:
BAPS Temple- COUS-99-008
Conditional Use- ChurchlTemple
INTRODUCTION
Contained herein is a description of the subject project. The site is situated on 3.97 acres of vacant land
including 1.73 acres zoned R-3, Multiple-Family Residential and 2.24 acreS' zoned C-3 Community
Commercial. It is located on SE 18th Avenue between Federal Highway and the FEC Railroad tracks
within the Community Redevelopment Agency (CRA) area. The applicant proposes to construct a temple
facility including ancillary education and youth recreation accommodations. The R-3 zoned portion of the
site requires Conditional Use approval for a church. A church is a permitted use in the C-3 zon1ng
district. The first version of the site plan indicated that the temple buildings would be located in both
zoning districts. The proposed temple structure is now entirely located within the C-3 zoning district with
parking located in the R-3 zoning district. The applicant has agreed with Staff's original recommendation
to proceed with the Conditional Use approval process for the entire site.
Project Name: BAPS Temple Church.
Applicantl Agent Jay Patel
General Description: Conditional use approval for a temple
Property Size: 172,954 square feet (3.97 acres)
Land use: High Density (HDR) 10.8 du/ac
General Commercial (GC)
Zoning: R-3 Multiple-Family Dwelling District
C-3 Community Commercial District
Location: On SE 18th Avenue, north of SE 23rd Avenue, east of the FEC Railroad Tracks
and west of Federal Highway.
(See Exhibit "A'- Location Map).
Building area:
Phase 1:
Phase 2:
TOTAL:
8,320 square feet
23.250 SQuare feet
31 ,570 square feet
BAPS Temple
CO US 99-00S
Adjacent Land Uses and Zoning:
North-
Publix Supermarket zoned C-3
East-
Parking lot for a medical office building zoned C-3
South-
Various Multiple Family Residential units zoned R-3
West-
FEC Railroad Tracks beyond which is the City of Boynton Beach Water Plant and a
Residential development zoned PUD.
STANDARDS FOR EVALUATING CONDITIONAL USES AND ANALYSIS
Section 11.2.0 of the Land Development Regulations contains the following standards to which
conditional uses are required to conform. Following each of these standards is the Planning and Zoning
Division's evaluation of the application as it pertains to standards. .
1. Ingress and egress to the subject property and proposed structures thereon, with the particular
reference to automobile and pedestrian safety and convenience, traffic flow, and control. and
access in case of fire or catastrophe.
The subject site proposes three (3) points of ingress and egress. The main driveway entrance is
located on SE 1Sth Avenue in the northwest comer of the site. An additional driveway is proposed
for the southeast comer of the site accessing SE 20th Avenue. This drive provides access for the
Phase 1 and Phase 2 parking area. Both of these driveways will be operational in Phase 1 of the
development. As part of the Phase 2 development, a second driveway entrance will be provided
further east along SW 1Sth Avenue as an additional access to that portion of the parking area.
Traffic circulation on site meets the requirements for emergency access and provides proper
separation between vehicular and pedestrian traffic. A sidewalk is provide adjacent to the building
and provides a continuous path connecting with a sidewalk along SE 1Sth Avenue.
2. Off-street parking and loading areas where required, with particular attention to the items in
subsection 1 above, and the economic, glare, noise, and odor effects the conditional use will
have on adjacent and nearby properties, and the city as a whole.
The site plan provides the required number of parking spaces for this use. The development of
the site will take place in two phases and the parking will be provided as required to
accommodate each phase. Parking areas are properly buffered from right-of-ways and adjacent
property. For the most part religious services will be conducted on Sundays with limited use of the
facility during the week. No adverse impacts to adjacent property are anticipated.
3. Refuse and service areas, with particular reference to the items in subsection 1 and 2 above.
One dumpster is being provided towards the back of the site in the south parking lot area. The
location is acceptable to Public Works for trash removal. With incorporation of staff comments the
dumpster will be properly screened and buffered.
SAPS Temple
CO US 99-008
4 Utilities. with reference to locations, availability, and compatibility.
Water and sewer utilities are currently provided to the site. With incorporation of Utility
Department comments, utilities are available and consistent with the Comprehensive Plan
policies and City regulations. .
5. Screening, buffering and landscaping with reference to type, dimensions, character.
The applicant is proposing to provide landscaping on the site to meet the City's current zoning
code regulations. A landscape buffer including a continuous hedge, and required buffer trees will
be provided along the road right-of-way and vehicular use areas. With incorporation of staff
comments, screening and buffering will meet the code.
6. Signs and proposed exterior lighting, with reference to glare, traffic safety, economic effect, and
compatibility and harmony with adjacent and nearby properties.
The applicant proposes one monument sign for the project to be located adjacent to the west
entrance on SW 18'" Avenue. The sign as proposed will meet sign code requiremenis and match
the design of the building. No signage is proposed for the building facade.
Site lighting consists of several pole fixtures 25 feet high to be located in the parking areas.
These fixtures will meet the code requirements assuring proper illumination of the parking area
and minimizing glare. No lighting is proposed for the building.
7. Required setbacks and other spaces.
The site meets the setback requirements for both the R-3 and C-3 zoning districts.
B. General compatibility with adjacent property and other property in the zoning district.
The site is located on SE 18'" Avenue, a local street which dead ends at the FEC Railroad tracks.
The site borders the FEC Railroad tracks to the west. The temple is a permitted use in C-3 and a
condiiional use in R-3. The surrounding uses consist of commercial, office and multifamily
residential. Most of the surrounding property is commercial with some multifamily located to the
southeast. The scale of the temple building is compatible with the surrounding structures which
vary from one to four stories. The color, materials and decorative features of the building will
blend well with the surroundings. The temple will be minimally used during the week with Sunday
being the busiest day. Most of the traffic generated will be confined to this off-peak time period.
9. Height of building and structures, with reference to compatibility and harmony to adjacent and
nearby properties, and the city as a whole.
The maximum height of the one-story temple will be 37.49 feet with a mean building height of
34.64 feet. The structure is totally located within the C-3 zoning district and is within the maximum
height requirement of 45 feet.
BAPS Temple
COUS 99-008
10. Economic effects on adjacent and nearby properties, and the city as a whole.
The site is currently vacant. The proposed project would be considered infill development for the
CRA area. The development -is a permitted use in the C-3 zoning district and is a desirable
improvement to this vacant parcel. The temple is a non-profit organization and will not be
contributing to the City's tax oase. However, it will be providing a community facility for residents
of Boynton Beach and adjacent municipalities as well.
11. Conformance to the standards and requirements which apply to site plans. as set forth in the
Land Development Regulations, Chapter 4. Site Plan Review.
With incorporation of staff comments, the proposed project will comply with requirements stated
within this section of city code.
12. Compliance with, and abatement of nuisances and hazards in accordance with the performance
standards within Section 4 of the zoning regulations; also, conformance to the City of Boynton
Beach Noise control Ordinance.
The proposed temple will not create any nuisance, hazard or excessive noise.
SUMMARY/RECOMMENDA TION
The applicant, BAPS Development, is requesting site plan approval to construct a 31,570 square foot
temple in two (2) phases. Site plan approval for this project includes the site improvements for both
phases and the building floor plan and elevations for the Phase 1 temple building. The applicant will
require site plan approval for the floor plan and elevations for the Phase 2 building addition at a later
date.
The site is located on a local street, west of Federal Highway, in the expanded CRA area. In terms of
redevelopment potential it is a vacant infill parcel with low visibility from the Federal Highway corridor. It
is zoned R-3 Multiple Family Residential and C-3 Community Commercial. The temple building will be
located on that portion of the site zoned C-3 which permits the iemple use. The parking area will be
located on that portion of the site zoned R-3 which requires the conditional use approval. The entire
project is being reviewed and processed as a conditional use.
The only outstanding issue at this time involves the review of the traffic statement. Palm Beach County
requested additional information from the applicant in order to complete their review. The applicant must
provide this information and resolve any outstanding issues so that the project meets the Traffic
Performance Standards of Palm Beach County prior to application for a building permit.
Staff recommends that the application be approved subject to meeting all the conditions in Exhibit "C"
including compliance with the Palm Beach County Traffic Performance Standards.
LG/dim
Attachments
J\SHRDATA\PlANNING\SHARED\'M'\PROJECTS\FH FOSTER OIL CORP\STAFF REPORT COUS 99-006 .DOC
LOCATION MAP EXHIBIT "A'
-
::~ . [If::lv lE~PLE CHURCH
'il~ " I ~1-1lL ~'l " ~ ;'[" II,i[.- ~
, 'l ;......._.I~ '" - ]l!.4.. ,.- ~'I 1 ri'
-==:m lJl:.. '1'11"";:1 "1 J..C: _. '~3:- L-J J ~' =
~'" '''~!,''_ R ," "TO =: - ", II; ,- -..-~
.,il€ rrTJil;"'I.,' TI,:rm I ,. l. .=i F I ~ J ' II
',. .~, ,TI",I".,. ,-+' ,:1 . n ' c:=: 'J ,. ! L'
"'~ .u. 11'1I,.':;'1fffiL. 3ffi . ' r . J-: - ~ r."" U
""",,~[i,:.,:' ,,"IT .." I, I, .:11;::;:; .. T?S' ,it ' =- -.-..-
II,' 'I'. T H ;::: = ..,..' .. Ie::-:
+-,-,,""""'" .m' .' . 2" c.' , ~~-',
, , M ,I' .1111,II,ifT'i - "I :l'flio - .... -.-.-. .
~ . '," 1'1 ,mr rTTT ~:rj;'; fi . c.-:ftP' ; .e-.'~' '-. J)
, _' \ I. ," ' " v. C;
".! , . ,,1"'Hi'," . ~ "IT i ~ 1'1 ~, ~,' 'if:' ' -_.=,.....~.:~_.
."....,IF'&:' .. " . '" ~~, u, -- ,'. '- ,
~ -,...d.:u.;..:l:l[ 11 . il'" or;. "'/- .' ..--J/
~ ~, ,IT" IT" I . . ~ 'I ", J ' '
!idi:hljd "',.ei,: .'T'W~I: . ~~...r;;j1"~~~~/-4
L ... '1::11' ) 11- In - \.. -i.... ~ ' ~
lEe "'u~1 .. -;;; +- ~' I -~ "'Y.:...j;.' ~ ~~'T,::
P'"' . S ~. ..J' r.: c;=-" Lr -' . '.
_ I~I:~ sa I~ : 1!:~'=;7. !.~i :.1 ~-,".
-1- .....r;- I' :1 I . If "oj 1:. , - .~
. -, ~' , I ~ .
J~Iiii"T ",-, ~. - ~. L C.. '''- -
_ _. .' ,'~ c::: .' ,t::. ,-[" Ji ~ - ILJ!~;::[I,,- 7L
3- . ~L ~ . '::::::::::::;.:. '. I r I ''''1 1 1 r ; U/."'=,i. .'~.
I . ,',' - .- -- f- - n ~ '.l . r";l /
. .' , ' "" u ,le
f.
"
, :C '{ {{' j, > " "'=!" , I, !f-. ;'
~'=:~':"~.~I /~7'~" -.I' 3'!rE;\.il~:..-~",li
=ut ~ " . R -,."':I~ ".' " .~ !
::;;;- 31i';&:::!" 71 ~ _. C1 L, ,r- -..,...~- .. ..,-' ~. r - ~ I~~ '
"" ~ ~ ,'.' '-I ~ "I'l - - ~'r
,'77i ;" ~ ccJ' c10' " !.. {LC,'nlijLi._.._._~:=-"~r ~
~,,'/~=-'~,rri! C02":1. .-1. :[ ~:':'~I;'-JI ~_~.~~.":J"':r' ~
~ ~~ .;."'. I, . ' . I I ' . (<J
I :""" '" I ~ l' . '-, 1 ! '"
. -r.'.,...lJ -,-l..! I I . .~ 1 ,. . 1 . mr'~- I
. . , 10: :1, < ... J j'luRuR : I . . - . . ~
.r--./' r \ I ,- ~ ..' '<r
':, . , " I . .
--.& ,. .~ c '-:l.g ,,-
01'.111181 MILESV I ~ ~ REC ';t::i If:,''';' /
" ,.L R3 "!
o 400. 800 FE .j '.. ,./?:-,...... I r'.... - -
';;' ET f I (~~ :....- r;;r), L~" :...-."
,,, " _._' _.' "-.., I _ l " I; -n .:i" ...."
___ ( ( ~ 1.\
t:.^i' "'''''' I I
-i.,lr . I lD '~~~I -:':i : =f [" t - '-J.J
~..,...:. fil'1::uu'l~ : .::' - iElH ~~:t' ~4 ~,Hr
I I \:\',:: .:lill!i'~ C, ..,"'1 II. , II
, '1\"".;i,,\-\"9ll-"~I!l' " ~:=Ej:: J i' f \'lrL
..'1.'. ~1:1'~~ ,1\ I. :T'~ : ~
;;:;;:;~m.,"~'''' n, . , , 0." ~ or- ' . .~. ~ l~:.c -....-'
.' ..,II:I:II\I:I\IIII'!I\, ,', :;m\tt\ ::m. 11 f .",:11 ~ ,- ' '"
_\."",, ' , . :' _,_u -, )"
,I., ..,1 ,'Ii :.,IC;'] : ,I II r; " . \I J..,..: :"- . ::... ,-
};:':'~:'': ;~~;(~:~~lln "'~':' ~~_ ,ID.~7~ .' f~::~-:-7
.'rr;, ,,..T" W' 'II W4 _'" dlJ '
. ~--N-~u} ,;T:Timn I "m jrt'L,. ' ~I.I:. n.:.:J"'1';~. .r~d/'
...~.~ "';j',m' ,". d.~ ...--.x-' T. If'" l-
I W-,;'" TIT, ,,,,,"'IT. '~, - T i'F-'f1 '
,iH ': ,'IT J . '" , b .O'--J f T..:. r~ ~~---;,.-
-,JFlr=rnm\ ", ..:ft,:n: ~ ~-=-, TT lAt.: ~-:l
FlU' ~.! :r'" I ~llri-~\~_"'.:I,.
· S h:1= G-3' · .' Or :~. i~ ~
'm I I . ~
I -"-'~;U'lfl.,-.. i:~/."v~ ' r n:'~l i1L; \ It~! 1..,,1"".
=:...--'~ ~ . i ..._' -'~ ..- - "....'fl >-h-'ii\''c-
"3 _. L.111-=-- ~ 1'1 ,'# - :' :"'~~' . )-" I,
~~_""c<.,,~ .'ll:[1jj=y:J..", '-I. =;'t, '.~ . r~- 'tl
,~y Li Co '"" ,. ,......IJ, ' j
\ -;=-. ,_ r-'.:. ,~.: ~ r~~",-I
,_ __~.,.__ " / ~,_!:j~~ R~' ,'O~:1 "~'-~r\
. puo 1M'7- " jl!1 il"t' ---''i::-' f' ~-''''...;?~
~J~~dj71 I" ~. ~'!.. .~ _ ,. ~ I I I"LJi'f.lIU ~"_.....-~::' i I ~
III ~ t.. E: _ __ 1-_ ,_ "1.. . 1.- --"" ~l n~ .. -- '.-" 'I v
I .._ _:' -'1 ' r c;{ :':'1 ~'<l
----1" ~7~/i6', " ~ iii~2--1.-' . 1. r"....~"\: , -.-.--.: l.. L ! ~
.'.J" .. ' ~' ~"
"I'I'f >/{II L~l:;'. I~:~ I ~Rl lC i --. '.lfl~I~'~ . I ~
.11. r-,' rt~~ ""d-l-.:2 ~ L :1. ... ..~.,ll JI I H : ;:.,.Q I . ~. ~
: 7 rr .' '~.: e' U U ;~c'~'-"I
o 1/8 MILEs(/"'~:3 FlEC r~ '
,,\.\\\\ 1\' I ..:" IR3;~
. }I ifr~~ -r-r>... L . '~--"
'0 400.800 FEET / . '-' ,J' .L~>':..) - I -...."
.... , .u.':--~ ~ ,,:'''' N-" I ,I _l ,I I !} L Ii
LO~AT'ON MAP
SAPS TEMPLE CHURCH
~-o.
REC
.--
:~! I:::'::':' ~ : i '[ 'lilt - ~
,;:,iICT-1:H- ".:- .':I~> "i' 1r4 ~ rr--~
:ilffi :'; .,11::,1,1", ,::1 ~.: - I ' , 1 : '1 a,,"': >- ~ ~... i c I [J'LI
~1fT1lI'1',!li""'!I!llllr '! ': '1
~"li','.!' '11'iT'" ',"" "'1 rr:::; . ~Af .' F . . :t I -----;1
":TIll!TIllln ,11"li'I".111 lll. ,I' n I ""I. - -X;j~'" 1- !. Jr:--:~--: '
:::JlilllliJ~II: 1:'11 TTl.~411i I., ,. II tic.:...... c:. 'frio ; ~-_. ,~. J) , .
IrllfTl~li'" '111111. III, I' . 1\ :T'.II.-;I"" ~ -~ =- =tp' "/ ; ~ .... '--.-
:2IJ' '1i !, -IIII,ITI\ IlllL .TI,~,mHI ~ ~~':'1 -.;;:: ,..' i~---'="---~7~
...,..;.{ II.' '. I 11:(jrlT; IIIIL 'I .1 '...... .,.' : ---. /1
, , I r . . I I:'. \:, tilt ~ 1/-
~j~_!'ll:i!i-'m r' ;lrt' ~ 11,\'. .rL\l..~r-.'
(".l!~1\~~~.:~T+1::;-;r::rf l I I I I ti 4 !:~3 . ~ II. '. . ~ [ . . I I /I
~LJ I . 1'1: liil rrtr "li-l ' L- -T .. 7/"-=-"
:..::d~=t .. I.. :11, mtthfllJ: ~ ..~f"~' J..L~I/I r: i~I'
JTI~ ,""" t~ ,:tft- ' J/; ~[ l --~'f
'. u ' .. G~L 'L -) I,
PU g ::' f I ' F 7 , r:;==--=-;/~ I. -f[-'"
, SI~:1f: sa t' r;:"-' It" 'C:H,
_-', I' '!I1J,...r",~.i' r. ~I!~~_::I: ;... 11 n 1 '6
~li#t~iI r=, ":':':':':':$lL..:= ':;;-_ . ~l'~" ...u. U :miJr
=._ .._ ,......... -J, ' J~ : 1<$:' ~.:~\t~~~:~ . - -... - , ~eJI"':.,.,. ,;: I T I J r II,'
3 L.-:)I' I.C/ll 'ut.... .r- . .-. '..'. .. -r I
,~....:" ~..JIb7" . ,.;;-... ", - H -- tI
~~,~ J~)~IY;;, 7l~:, J.~.'r r-l,:S 1,.~,'~7 ~_~:-~-'::k!
I: .~~I'7' ~.. .I~ ~~= .D'~\I -~f~
P_UC VAll . :... ~ - : '"7.1":;-u;J 1
?"!"Yj:Z71 rb~ ...... 1:1. i u '~_ ' '- f-r I- 1,'~lij ~1o~..","_.......J I I!
ill I V" ...}- -r '1:_ ~;:: ,,:i:._ : ,_. ~I ~ L--=-___. 'I v
'- / L f--- r.-;~, ,.., I r ILl:; :'i'l J '; /' / \)
" -, -3(, '"l' ' :. r_..'TT l' ; . r 1'""'C.....,r>1. -,--_...., f ..
, ':'\// ~ :v,. _' ---' I .. ' ' . ,.If ! ;;
-=;:::;::<i .. I: ,C::21,:I_," L ,.., I S
. ... J4 1... I" ,.' I . It-- , --- .. - - mt '1.Yi'1/ ..
::;0"" :1'.' ~' I l!:i~' ~
-l.., ~ ' I I I ..JT : I ___ I 1-: ,_. .' .
/, I ..' u . C : I =;.)=<.
1/8 MILE~: ~ REC '~IQ ":::".!
1111'1 ,--LJ'"~ ~ It.;;';':;'3
400. 82Q .FE~T ...~. 11_'. ' . I ), j). ~.
',.........:..z,............-~, II. ... I I. _L I {f ~...\~
LOCATION MAP
SAPS TEMPLE CHURCH
EXHIBIT" An \
EC
.
______u__.________________...' ~ - - ----
I""'j""
.";1'1 ",I.!r'
.,.,.111" "
U~'I;IIIII'I'I'
,,,. '."t.. f
~i9idili!itl
- -
".OHIIl 1
~. ,.- ~I ""-. ......- ~ I
___I ___
_ _ __ ."'.LOt"'I,,"'~.loI.l..l"; ~
..aurw ____ I
":;INI .~..,.,.....c:: ....... I D
NOtlWT1VA.J':NN'MI' N'lDl1JOW a ~
dnOll~ N~IS:la Vd prw... ".:;J ~ ~o"'l ~ I
II
I,
.-
[i11' I II.
1 .. I!lsdl
, . .j
- ~ . . I..... .
. : . .I.' !
. , c" I ~:.II!
~! I'" I,
I Illil 'I I mil
I, , ~yil
., ml! If 1!11
I! .'-.. ~; i
!Ii,
!. lllli Ii ~ll !!I~ ,. :T
~i ~..<j ; ;:~; '.
;1 !I!!! '''1'
, iii i Iii i !lIli ~ ~1 Ii i' Ilil " I
I 1,lt'l !1I,~ ,I lill
I" ! ,
I I !.I., ... ; ~~ 2 = --' ! ~>:>: ~ " i
I' !!:.. ... p :~! Iii
, i i:l ~ :s I I'll: ill::;. ill alJllJI II ~u If' ~~P'
!!d ...., .' I
! 1111; ., ,!l,i ~~ :2 8!8 ~, ... I; hll
i:!! ~ :!-:, ulll l ~ illlI e
~ .~~ ..~! ~ ~:i : ~U:- ~~~
! !I! ~ ~ ~ ~ ;; ; lllO'..r;ga' ,0 ,.. -
~ !il' ,I lilll ' i " .
IIn i nUl I I , -
il'!~ I i I' I IIII III III m I
I.,.. ,~>I.l!'" .....0 1 ; 11 '!- ,! I! I
.,! I'll! oil ,,, !'i!'lo! .
> t:c:~~ ..'I ~i" . III. III Iii! ~H !lEI! ,
... II .
I ~
111* ~l
-, ----,......-~------~-.----j I
-- \----il;-;ouiT.ii-.--r--- ------ -- -=i r---- --j
.' "t2..'!!!!!.. _,It .~~~ J,& - 1
" =t"~!&Ji.!~1 : .++~::.) l...tEJ'rt;), : I
~.. -~.-.- ---'- ~?---.- - .-\ I
:'-1''' _:;;;;;.~ ..I'---~ /~~-===~;-}~I ~-.1 r.
~ r rff-----;]I ~'!lt=__.....(.. -+r__ --1
. ~ II ,,~--- .J_";'=l--- -----, I l....._ . -- I I
r~ n:: :}t I =::~ ;:;:
l \&..__=_==~J : if i ::.:: r"" "1
::. I ,- ~dl iE:I!1)
~"o I ,~- I -t-'
'~l lIll;.>". . I I :: J' ~~
: d ~ :f!- I -:'
... :t..... --j
, -
~::=,;~;.t~~;~=:=:::::::; : ~:i.1J
~
,
I
c=-~~_---
I ,
/ I
I I
/, {l,
, I I
I. ,
I ' I
,I.:.=-.='.='.:!
. .-
,
I
'. t
dJ
:r> t.. . ,
. ". - -.., ,
:.': ,';_ ~ I -
;-/.-: If-: / ....
-.f 't:: . :iJ
.' I I :1/
"
-
.
I
I
,
I
I
,
,
I
I
,
I
I
,
I
"--.
, -
'I
II
- - - - - - ---?
lIIlU."fIlR...
,)0..,.,.7
!
--'--- I ;
!rn~
djG
,
"
.,
il
I
~
~I
..'!II'll'
,1,:'1'.' ','
1,..1'1'1111'"
11'.hl :11_
'1''''1''''1'''[''
1"'"1011'
!il9lldil:!!lI
- ,--
"'Oll'^ I
OIlS<;-l:l.. (.<;e) :>(",j/3",0,",_
O't~"-<;l:I;;I;;S; '''alilllO"l..l '~I^"O
.J..5 ''-I~ OZ: '"",,'S ...~ ~ l
.J..::l3..l'''':JM''' 3d"'::>5CN...'
VlSY 'H3I3HI UNO' 3:lYCIIIY~
,
, 'I'
, .
:; .~'
. ",I = ~ .
i": · - : I
'I:: :
~~i!
~~
:: '''..." U
--;;. -. =--~'~-.: ""...., -=-"'''-'0 I
::"uww . -.. -, ,....,..,...Ot..,,9I'I'...."'......81..!
avo. .....,~ -: ':;:11'11 .~O"'T1&to"\ac "''V'II ! l !
NOUvn1'IAil '::lfrlHNW. 3W\OllJ.OW
dnOlliCl NClIS3G Vd.' : I"""'''~'''''''~-I I i
I
~ < '~d
~ l,~, O;R ~ d ~~ ~ . "." . ~L.~. ~ ~H ~ ~
B ! ~~Q ~i ,.toB i. ~i j ~ ~ ~~~ ;;~_~::.:.:-.. ,~.,i l "
~~~ 8 ~Q~ ~i j i~r~ 0 > <~ ! ' -- . . ... . ;
iijH_ ,:3 ~~ ~ ~H~ i ~ ~; ~i i 111 ~ ~
l~'"W-<.~~3" .1;~-~liH.' l~~ 3~
;1; i !~~ ~t ; li~~ < ~ ~ I~ ~i ~i ~ In !~ ~I~~! g i~i~i ~ ~
~ U~ ~~ j!S ~;~ ~ hh I i I ! i~ ~~ ~i ~hU ;~ hili ~g~idh;U~
~ i'~!" ,.~ ~g~ ~ ~l;o~ ~ I ;~ d ': h ~~ ~!iH ,,. 3f~-' la~~I~I~jt~~
~d~ ~~ m ~I~ ~ mi~; ~ ~~ ;~ U ~! ~ ~HH m ~hU ~U.~in~h~l
~ ~l~~ i~ m~ ~~~ ~ l~:;i : ! i! ~! ~~. ~~ ~s~. ... n. .'"..;'. .~~ " , l
ul ~ ~n ~~ 2~l:" ,:",Q 0: 2~Ol-2 ~ 8 ;.J" Jll!!? ~~!I ~~ z
; OJ ,~l ,~ ,:~~ n~ , ,~i8< ~ ~ d Ii ~ig ~~ . ".. n . ~ 0 ~
" ". . . .. Q - " ~ ~ ~u M:~ ~'iBl ...!.. ~ 1
. . .
I
r~
I ----t- _
~~
~~
j
,-
----j-'------------'
:a ~
I
,-
d
j ~
~j
,~
..
29
I i
.
I '!
III I i
I! r'
I
! /'
.
~
I" .- ~
I I ~
'"
~ ~~
u.
= "'"
~.
~~
i
i
i
, I
, i
-+ ~-:rz.w--------l-j
~ "-~.
---.... ---I .
- -,,--
........... 'Cfto'aOI__
NClt1vnft'AJ'~'JW\1li1IK)Ilf
dnOlt::> N~IS3a Vd
..,... ...... ""...... ru I
...I"IJ.QZ..'I..,'......."',j,~.. ~ Ii
:;JNI .~~.c:: ...""'. J t. Jill
f-o"''''''''.''''''''ClRQojQ-1 I 1
-
1>. "'''''1
-
-
I
.
.
i
II
iI
-
-
L-J
!
.
.'
iI
ED
z I
0 z
" 0
~ IS "
~ ~
>
'" I OJ
... '"
z , I ei 1
0-
='
~ , ",'
= ,
111'11'111.
illilliuittilh I
'J:1'iill"."U'
I Dln)"._,'. '
II.pl. I -
.,WlliueHII ~.. li'~ I
"oC'" ~"'...,. ~rnm CTlO ril EJ
.,,"...ot"'I9"'~"''''.Il. ~ .tij wru ". ~'
:>"'1 ._~.'" -... I' 'Q fJll r=l [J
r=-M"....." - """"'"'-I ! 1 ~ tili I rJ .
"
"
;::
.
>
:=l
'"
~ ~
Q.
;: I
.
I'
I
,. ,:
II
%
EXHIBIT "C"
Project name: BAPS TEMPLE CHURCH
File number: COUS 99-008
Reference: 3rd Review. New Site Plan. File # COUS 99-008 with a November 23. 1999 Planning and Zoning
Deoartment date stamo markimz
DEPARTMENTS fNCLUDE REJECT
PUBLIC WORKS
..
Comments: None
UTILITIES
Comments:
1. Dept. of Health permits will be required for the water and sewer systems
serving this project. (Sec. 26-12).
2. Fire flow calculations will be required demonstrating the City Code
requirement of 1500 g.p.m. as stated in LDR chap. 6, Art. IV, Sec. 16, or
the requirement imposed by insurance underwriters, whichever is
greater. (see Sec. 26-16(a)). Please submit these calculations with your
Health Department permit submittal.
3. Sec. 26-34(E) of the City Code requires that a capacity reservation fee be
paid for this project either upon my request for signature on the Health
Dept. application forms or within 30 days of site plan approval,
whichever occurs first. This fee will be $790.02 based upon a I "meter
size.
4. Comp Plan policy 3C.3.4 requires the conservation of potable water.
City water may not, therefore, be used for irrigation where other sources
are readily available.
5. This office will not require surety for installation of the water and sewer
utilities, on condition that the systems be fully completed, and given to
the City before the first permanent meter is set. Note that setting of a
permanent water meter is a prerequisite to obtaining the certificate of
occupancy.
6. A building permit for this project shall not be issued until this office has
approved the plans for the water and/or sewer improvements required to
serve the project. (Sec. 26-15)
7. Provide drainage calculations showing the amount of rainfall to be
retained on-site.
FIRE
Comments:
8. A fire flow test is required and the hydrant will be in place prior to above
grade construction.
Page 2
BAPS TEMPLE CHURCH
File No.: COUS 99-008
DEPARTMENTS INCLUDE REJECT
POLICE
Comments:
9. Each parking lot traffic plan shall provide directional arrows.
ENGINEERING DIVISION
Comments:
10. On the Landscape Plan indicate the required clear sight triangles at the
driveway with a note that all landscaping within the triangle shall have a
clear visibility window between 30" and 6' from the finished grade.
[LOR Chapter 7.5. Article II, Section 5.H.]
II In Section "B-B" of the paving, grading and drainage details, correct the.
detail to reflect the required type "0" curb - (4 places) and delete the
"extruded curb" reference on the water/sewer plan.
12. Since Phase I includes a portion of parcels [and II, provide the City with
a recordable Unity of Title of all three parcels.
13. Provide note on site plan and landscape plan that the Phase II parking
area adjacent to Phase I will be seeded and mulched.
14. On the site plan and related drawings. relocate the Phase II line such that
it includes the construction of the grassed median in Phase I.
BUILDING DIVISION
Comments:
IS. Permits are required to construct the improvements that are shown on the
approved site plan/conditional use documents. Permit application forms
are available in the Building Division of the Development Department.
A permit submittal checklist is available in the Building Division. The
list identifies the basic documents that the Plans Analyst checks for when
an applicant submits for permit review.
16. Amend note #5 found on the sheet titled Site Plan (sheet SPI of2) to
state that the finish floor elevation is above the highest 100-year base
flood elevation applicable to the building site, as determined by the
South Florida Water Management District's surface water management
construction development regulations. [Section 3 107.1.2, Chapter 31 of
the Boynton Beach amendments to the 1997 edition of the Standard
Building Code]
17. Considering that detail drawings of the building signage were not
Page 3
BAPS TEMPLE CHURCH
File No.: COUS 99-008
DEPARTMENTS INCLUDE REJECT
provided and the location of the signage was not shown on the elevation
view drawings of the building, place the following note on the site plan
and each drawing that depicts the elevations of the building: "Building
signage is not approved for this project. Separate site plan review and
approval is required for building signage."
18. At time of pennit submittal, provide an executed City unity oftitle fonn.
The fonn shall combine all lots or parcels within the subject site as one
lot. The processing of the fonn shall follow the City's unity of title
procedures.
19. At time of pennit review, attach a current survey of the subject property
to both sets of penn it documents.
20. Compliance with the Building Codes will be evaluated at time of penn it
review. The penn it fee, water and sewer facility fees, Fire Department
fees, County fees and State fees will be detennined at time of pennit
review.
21. Compliance with the Building Codes will be evaluated at time of penn it
review. The penn it fee, water and sewer facility fees, Fire Department
fees, County fees and State fees will be detennined at time of pennit
review.
PARKS AND RECREATION
Comments: None
FORESTERlENVIRONMENTALIST
Comments:
22. The applicant should indicate on the landscape plans if the existing
desirable trees will be preserved, relocated or removed/replaced on the
site.
PLANNING AND ZONING
Comments:
23. The following comments are requirements of Ch. 4, Sec. 7, D.
- Label the floor plan and elevation drawings as Phase I, Building 1.
- Identify building colors on the elevation drawings.
24. The following comments arc requirements of Chapter 9, Sec. 10.
- Identify all sidewalks on the site plan. Label and provide
dimensions.
- Review placement of dumpster to ensure that they are easily
accessible for pick-up.
Page 4
BAPS TEMPLE CHURCH
File No.: COUS 99-008
DEPARTMENTS INCLUDE REJECT
, Provide a six foot high concrete stucco wall for all dumpster
locations.
25. The following comments are requirements ofCh. 7.5, Sec 5.
-Provide shrubs and hedges eighteen (18) inches high and two (2) feet
on center at time of planting.
- Provide a 2.5 foot perimeter landscape buffer between all vehicular
use areas and adjacent property. Label and dimension this buffer on
the site plan and landscape plan.
- Provide a tree relocation plan for phase II.
- Provide a tree count for the number required and the number
provided.
26. Clearly identify doors to restroom through foyer on site plan.
27. Identify color for proposed sign.
28. Correct site plan data regarding building square footage to match
building footprint. Total square footage is 31,570.
29. Revise site data to correct area calculations for each zoning district.
J,\SHRDA TA\PLANNING\SHARED\WP\PROIECTS\BAPS TEMPLE C!im.CH\CONDmONAL USE\JRD REVIEW COMMEmS.DOC
Galav Lusia
From:
Sent:
To:
Cc:
Subject:
Galav Lusia
Monday, June 11,2001 4:11 PM
Harper, Andrea
Rumpf, Michael
SAPS Temple
Andrea,
FYI. I gave verbal approval to Mr. Jay Patel from the SAPS Temple group regarding a color change for the building. They
will now be using lei #349 Seashell Pink for the walls and Designer White for trim, columns and molding.
If you have any questions give me a call.