CORRESPONDENCE
..!
, .
PROJECT NAME: Amoco Retail
LOCATION: 1147 South Federal Highway, Boynton Beach
COMPUTER ID: 85-000047
PERMIT #:
I FILE NO.: MMSP 00-055 I TYPE OF APPLICATION: Minor
Modification Site Plan
AGENT/CONTACT PERSON: Ken OWNER/APPLICANT: N/A
Wright, Project Manager PHONE: N/A
PHONE: 813-805-0512 FAX: N/A
FAX: 813-805-0313 ADDRESS: NI A
ADDRESS: 4929 Bayshore Boulevard,
Tampa, Florida 33611
Date of submittallProjected meetine: dates:
SUBMITTAL 1 RESUBMITTAL 09/27/00
1ST REVIEW COMMENTS DUE: N/A
PUBLIC NOTICE: N/A
TRC MEETING: N/A
PROJECTED RESUBMITTAL DATE: N/A
ACTUAL RESUBMITTAL DATE: N/A
2ND REVIEW COMMENTS DUE: N/A
LAND DEVELOPMENT SIGNS POSTED N/A
(SITE PLANS):
PLANNING & DEVELOPMENT BOARD N/A
MEETING:
CITY COMMISSION MEETING: N/A
COMMENTS:
J:\SHRDATA\Planning\SHARED\WP\PROJECTS\Amoco Retail (MMSP)\PROJECT TRACKING INFO.doc
DEPARTMENT OF DEVELOPMENT
Division of Planning and Zoning
Building
Planning & Zoning
Engineering
Occupational License
Community Redevelopment
October 11, 2000
Mr. Ken Wright
Project Manager
4929 Bayshore Boulevard
Tampa, Florida 33611
Re: Amoco ( 1147 S. Federal Hwy.)-Renovation
MMSP 00-055
Dear Mr. Wright:
In response to your request for the administrative review and approval of modifications proposed
to the above-referenced, approved site plan, please be intormed that the proposed changes
regarding the renovation of the building and site for the Amoco Gas Station as shown on the
revised plans date stamped 9/27/00 are "minor", as defined within the Land Development
Regulations, Chapter 4- Site Plan Review. Please note that plan sheet # 11 has been revised to
reflect the maximum height for the monument sign to be fiftep.n feet, six inches, as agreed.
This project may continue to be processed by the Building Division as a permit application.
Please contact me at (561) 742-6260 if you have additional questions.
Sincerely,
'J /J
C><Li&-~ jjc,~~/
Lusia Galav, AICP
Senior Planner
LG/nl
CC: Jose Alfaro, Planner
J \SHRDA T.-\\Planning\SHARED'.Wp. PROJECTS\Amoco Re:ail i M~1SP)'Amoco Reno....ations.d:Jc
America's Gateway to the Gulfstream
100 East Boynton Beach BinI.. P.O. Box 310 Boynton Beach. Florida 33.CS-0310 Phone: (561) 375-6260 FA.X: (561) 375-6259
J}l'lJdl'€JJiu€
M M 5P-(])--OSr
DEVELOPMENT GROUP, INC.
4929 Bayshore Boulevard
Tampa, FL 33611
Tel (813) 805-0512
Fax (813) 805-0313
September 25, 2000
Mr. Jose Alfaro
Senior Planner
City of Boynton Beach
100 East Boynton Beach Boulevard
Boynton Beach, FL 33425
.~ ;~-\f. r~.~
RE: Amoco Retail Facility No. 6122
1147 South Federal Highway
Minor Modification
j
\ \ ~; ': ~
\Ul'
~ . I.
1"": -._
L I
.
. ..,--"J
Dear Mr. Alfaro:
..--~--"., .'..-..... --' .
Progressive Development Group, Inc., (PDG), has been retained by BP Amoco Oil, (BP
Amoco), to prepare plans for minor site and building modifications at the above referenced
facility. The current facility is dated and no longer meets with BP Amoco minimum design
standards. The facility is comprised of a four-dispenser canopy, a convenience store,
automobile repair services and a car wash.
The project consists of renovating the existing building and canopy, which includes painting,
window replacement and relocation and removal of all non-structural walls. New non-structural
walls will be installed in a different configuration, which will eliminate the car wash and
automobile repair service bay areas. Subsequently, the convenience store will occupy these
areas as an expansion to the existing layout. The convenience store will utilize the existing
power and water supplies on site and retain the same entrance. The sides of the building will be
landscaped and traffic will be restricted to the front where the parking will be striped.
The proposed architecture is consistent with the planning department preliminary guidelines for
future development and the proposed building and site signage comply with current city codes.
The building fac;ade will be remodeled to include clap siding, which gives the appearance of
wood planks. A standing metal seam mansard roof will be installed around all four sides of the
building, which will also screen the air conditioning system components.
The proposed site modifications will bring the parking, landscaping, irrigation and drainage into
compliance with current city codes. The amount of parking spaces will be increased from 4 to 9,
which meets the current requirement for convenience store parking. The landscaping
modifications increase the pervious area from 6.26% to 38.94% of the total site and allow for the
planting of city approved landscaping. Irrigation will be established on the site, where currently
there is none. All storm water runoff will be treated and then discharged through new trench
drains and exfiltration trenches in accordance with the Florida Department of Transportation
Mr. Jose Alfaro
Page Two
September 25, 2000
(FOOT), South Florida Water Management District and City guidelines. There is little evidence
that the existing drainage system functions properly.
Additionally, (FOOT) has indicated that the elimination of two of the driveways on Federal
Highway is in accordance with their safety guidelines. The current driveways to me modified will
include the brick pavers along the sidewalk to match the existing patterns. Another two
driveways will be eliminated on S.E. 4th Street to better define the traffic patterns on the site.
Please review the enclosed plans at your earliest convenience.
Sincerely,
cc: E. Flores, BP Amoco
K. Wright, Progressive Development Group, Inc.
003-78.01 {AlfaroNM092500