REVIEW COMMENTS
7.0.2
COMMERCE ROAD REAL TV
NEW SITE PLAN
DEVELOPMENT DEPARTMENT
MEMORANDUM NO. PZ - 00-137
SITE PLAN REVIEW
STAFF REPORT
FOR
PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION
May 11,2000
DESCRIPTION OF PROJECT
Project Name:
Commerce Road Realty
Property Owner:
James K. Clark/Timothy W. Swilley
Applicant/Agent:
Del Swilley, Inc.
Location:
Commerce Road, east of High Ridge Road (High Ridge Commerce Park PID,
Lot 18)
File No.:
NWSP 00-002
Land Use Plan
Designation:
Industrial (I)
Zoning
Designation
Planned Industrial Development (PID)
Proposed use:
Industrial/Office/Warehouse
Number of
Rental Bays:
Six (6)
Square
Footage:
Site Area:
55,080 square feet (1.266 acres)
Building Area: Warehouse/storage - 17,822 square feet
Office 4.494 square feet
Total - 22,316 square feet
Surrounding land
uses and zoning
district: (see Exhibit "A" - Location Map)
North - Commerce Road, farther north Boynton Pump and Irrigation Co.,
zoned PID;
South - Waste Management Inc., zoned Ml;
Page 2
Memorandum #00-137
Existing Site
Characteristics:
Proposed
Development:
Concurrency:
East - Undeveloped Lot 17 of the High Ridge Commerce Park PID;
West - Approved project, Majestic Greeting Card, on Lots 19 and 20 zoned
PID, farther west High Ridge Road R-Q-W
The subject property is a vacant, 1.266 acre lot, overgrown with a variety of
trees, mostly nuisance species of Australian Pine and Accacia, as well as a
variety of weeds, grasses and shrubs. Florida Power and Light utility
easements extend through the northern and southern property lines. The south
side ofthe property is bordered by the abandoned Miner Road, now a 25-foot
buffer, enacted through resolution R97-68.
The developer is proposing construction of a 22,316 square foot
industrial/office building with six (6) rental bays and related parking. The
building's five bays will be limited to a one story-level; the sixth, a comer
bay at the south side of the building, will have a second story storage space
(see Exhibit "B" - Proposed Site Plan). Depending on the proposed uses,
Environmental Review as well as Use Approval may be required for each
occupant.
a. Traffic - A traffic study for the project was provided as part of this submittal.
However, the study assumes the total square footage ofthe project to be
20,380 square feet, without accounting for the 1,936 square feet second story
storage space. Therefore, the study must be amended and re-submitted; prior
to final approval, staff must receive confirmation from Palm Beach County's
Traffic Division regarding standards compliance.
b. Drainage - Conceptual drainage information was provided for the City's review. The
City's concurrency ordinance requires drainage certification at time of site
plan approval. The Engineering Division is recommending that the review of
specific drainage solutions be deferred to time of permit review, when more
complete engineering documents are required.
Driveways:
Parking Facility:
Proposed on-site traffic circulation consists of one (1) two-way, 25-foot wide
entry drive aisle with access to Commerce Road. The proposed vehicular use
area will provide parking areas containing the required 9-foot by I8-foot
spaces (all at a 90 degree angle) and one (1) loading space.
There are 37 parking spaces proposed, including two (2) designated as
handicapped accessible. Required parking is calculated to be 37 spaces. The
applicant has used warehouse use-based calculations for two largest rental
bays, and alternative calculations - based on the minimum ofthe two (2)
spaces per rental bay requirement - for the remaining four bays. Regulations
Page 3
Memorandum #00-137
for the Planned Industrial Development zoning district determine that parking
space requirements are based on number of employees on a maximum shift
and projected number of visitors. However, since employee information is
not available, staff allows the calculation of parking spaces based on square
footage and use.
Landscaping:
The landscaping of the site will fully meet code requirements when staff
comments are incorporated. Special attention shall be given to strict
compliance with the master plan requirements for the 25 foot perimeter
buffer. One (1) mahogany tree is required per 40 linear foot of frontage and a
continuous eugenia hedge (maintained at 6 feet) along the outside edge of the
buffer.
Building and Site
Regulations:
Building and site regulations will fully meet code requirements when staff
comments are incorporated into the permit drawings.
Community Design
Plan:
The proposed warehouse/office building is a typical industrial structure
similar to others developed in the High Ridge Commerce Park. Consistency
with the surroundings is enhanced by the surface treatments and colors that
match surrounding buildings. In particular, the green detailings match those
of similar color for Boynton Pump and Irrigation Co., Morris and PGD
buildings.
Signage:
No freestanding sign is proposed with this site submittal. When site signage
is proposed, a separate submittal to the Planning and Zoning Division will be
required.
RECOMMENDATION:
The Planning and Zoning Division recommends approval of this site plan request, subject to the
comments included in Exhibit "C" - Conditions of Approval. The Technical Review Committee
(TRC) recommends that the deficiencies identified in this exhibit be corrected on the set of plans
submitted for building permit.
xc: Central File
J :\SHRDA T A\Planning\SHARED\ WP\PROJECTS\Commerce Road Realty\Site plan staff report CRRealty.doc
LOCATION MAP
SECTION 16, TOWNSHIP 45 SOUTH, RANGE 43 EAST
HYPOLUXO ROAD
71 st STREET S.
FINN HILL DR.
TOMA TOE RD. I{)
en
0 ~
< CEDAR RIDGE <
0 ~
Q:: VI
Q::
W
~
~ COMMERCE RD ~
<
III
III
W
0::
(;)
~
(.)
SITE
COMMERCE WAY
GATEWAY BLVD.
EXHIBIT ~
OJ
I-
-
CD
-
:I:
X
w
S il
I~.J
~h!
fa gi
~~ t~ti
.!J lis:
!~ :.-Ifi"
~.i ;~!2
- h'"
~~! ~~"l'"
j~ ,QV'~r
~ ~!~i
~ ~9f~
,I -~~ 31.T
~ * ~n ~~
~~~ ~r
..". c..,.,~
!!J '1::i
!t:J' ~lt-=
urC5 .,~..
;;j< -~u
'4l ~.J A
K e- ~. i
."~.i'i~
~;j till:
;;,i~:2,t~
.. 1.' ~~l.
t "~. ; }..
":2 ~J.'lT .:fGS"
~~~ Qlti~;
tl!ll"..!1-
~ I'I~"'" lL.d ~
Do ~5.,g Q~iit:;'%
.3 ~..f "a:,~"
~ ~11 ;!~lr
. !!~ ~~t~
0.9111 ~.!~Q
_ 0 ,
p- ...
1;1012lQ1:1 < 1f:)V9& T"J.Q).rtJ,.S
~J'! ...--- ..." .--- ., 'IIa-'" ;r.o~ ""Ii
~..iI -,,-=, II. ."...,. . ~ ;....,
l"'''',d ;U'S ..,rtX' J..;rr'ffMS '!lQ
l/.
'!
~~
..
rli
;;~
it~
,u'"
:(..
.~I
1y.
~~-
~c~
. .
~~,
Vi14
a..
'.Ii;
:.~
1~i
~!~
~S~
1 .
-.
.?;'
;, ~
t~Z
.~1
!6J
;~i
5~1
)o;1Wi
~~.
.,
~"I
..l-~
i~c
t";>~
r .
g~J", ;
8 'I .. :
l~~U i,
It'' <t; "
'i!llt..~ ~~
Sl-i ~l ...,
~.1n~ !~
,...11'-;1 ."
!: ~" !If.
""i"-~E-"'~
J~g!~ :
~!~6~ .~
10:!2r :i:f
S~Hi ~~
~ !;~iI It
~'i3~~ ;~
...... .9,
~~1~~ i~
~:t .Oc. J'I
~ca~~ ~~
'J'e "Co ,
~ai .:1 ~~
:II'''1,{'
"'\~~ III 5t
~.>,:)rl~ =2
:(1l" r ~
lli';:i @.y
Et:t~ lJ :zol:
~~ .~3 h
~'i'fi~ .:.~
..~~i~ f\S
1~jCi! !~
i!~~~ ~~
~ ~
.:,
r ,WnlJ.J"Ct"=. 'l-W d'rfl~ ~~ ~...LJJ.r'WV' J
j
>.-
1
..
l'
-'
..
t
,
o
~ i
... I I
i i I
-011' -~
I ill :1 '
i I f
i I 3
~
~
,
.
I
I
I
I
\
I
r
~
-i
',-,
i
I
--
"
E
..
~
~
~
~ I
I
.
a
l
'-
,...~t~
.6S
'r.~'~
f~ < ~
10 rr _ ,;:
~~, 1
~- m1
* C; ,
!' .
-~ :!
~
lif.~
i~~:1
~
-;i
r:;~
~-: ~!
... !:~
~"
~=~
,~,
'0'
~,~
~';i
i;:
~k
<-
...-
J
~
!
t-
.~\i
~i~ ;
I i
+-~-: i \..i"M,11 ;1
1I,....;tO'J' "'"'? J
~02 5~-""'''' "')
~
~
,
~
~;i
. . J
"J'l
3Js:
a ~..,
';1! ~-a
Hi}
! f :1";-
'" ill.
" aU
... :~
:1'""1'
011 ::f.
qH
1i :01(11
Hfi
'OJ f!"
.:r ~ ~ ~
! ~ I:
(
1
~
~
"
~
~
y
i
oS
f
!
'1.
'"
....
L.
I
w'
1-'
-,
VI,
..
~
.. .
;:: ,~~....!..
01( ~ s::=::I~
: ~"" ~~-1i
LI 1L
II- ;J 91e.
~ l!e
~ 3t: dl~
~ u;j .;J
:J 0'1 ~ 'C'
J'
..'
::<j
...
"2f.
~
....
:"i
P
if
a. :
..
\l ~
~:
H
.. <
. ~
~.
..... ..... <t
--L:l: .1
1'i
~~
~
~!
. -~
.... ..
..-
..cs~
1i~
~!l.
!I~
'..
~ ~
'!" ,.5
.J~ ..~
i ~~ ~ ~
cii J a Uc Ilf;
~ .;!1!!
J ;ti ~ ~~
Q I-~ ~ -<#,Co ol~
t- j-'ll. F.t'" ...: ~'t
III tIo;,[\. t;'" D:
.!i ~t.. ~~ .i.~
II.. ~f'I,?-: i] aC.
oj .. ~~ ~\j,. \i''=
~b<i.' ~f ~z
fa ~~~~ ~~ ~~
...:. ...i.lII.,..... ~. ""'!~
N ~. :f.
. ~ of .,
~ ~ ~ ~
~ ~ ; ~ i.
!"~ :; j
~ .j
3;f J"
...J1S ~ f
~i~ ~ 1
"
!,... -II
--
.;; ....
. .- ~- .' .'
'L- ,0 - \_ i~d l"l'l$.~" '
~.~~'
~t" ~. ~~ '.1 #1'
, .~3'~;t'1'1\tI'S ~
~~--
",.. .. ~ II "
~i. '1 -. .,
-'" - \
\ \
'" ,j; \ \ \ z
-io . ' \ ~
..
\!.
\11 'Q
.
. ~
~
..
~,
-t.
f.s
'e
t-
"
'0
...
..
!
J '0
~.-;
__ _ \lM-~. .,....<3'\',....
,~'~~.
'. ,\
."
~ "'0\
If'l\
\t,
\ ~
\\-
\.
,.-
\y
\
\
\,
'Q
-!-
~
.i \-
~\
" ~
\ '
. \
~
.
1~~
\JV;':
~~
~~~
:~i.
\.. ~.s
\\ \'
\\\~: t.
, '. -,;. \"',
\ ,_ 1 .
\'~\""
\-~ '
\~~~~;~;:, ~
"";\ \
~, i
t~
..~ ......
'\
'In
11:' o~.
~.
~e '
~
I.
I ;l
-<t" ....
(; ~ '~
''!. -~ -0
/
'" '0
.....-.~~~ '2~'
. \-:'
.01[ '\ t'!-
~~~ : ...
~.,~'
\~ ~\\
~".. ~__ k '1
...~~--_. ,', ~
~:t
';
\ ?
\
1 ~ ~ l
qj. > "r-
... -'
; ,
~ '
~~
~~
,,"
,..
~~
. .
~ ";
,
"
1-
~~
o.
'i~
,~ !~
~ .
-,
.,
~
1
.
)
"-
..
'i
WI
~
"
.'
'.
~~
-,
r
"
\
! \~~
J t~
~~:;
t ~ 7,'
,~
l.r- r t
<:I
a
"
J
"
-,
.'.
\
..........-
\ '-,.'" ~~~~\~
\ ~~~'::1'i~r;,-
\ ~,,!",r: -- - --.;~
\1 \ -:-.:. ~,~~~\:.:r:
\f\~-S~S\~~
1M ., "f. ':;. '" ':' ~ 'l<\~
~'\'." '.~
~J'~';~ ~~\\~;,
~ i\~H,H\'~
-; ,:;\~~~.,,2.2.""'\g
\L.... co ~. \P">>~ --
\ ~\.. . .... .. "\tP
-------.-------------------------
-
-
o
-
1:
><
UJ
~. ~l II II 1- \
~~ 1
1'1 }ll J~ ~Q ~
~. ., ~\~
"~~; all tilt ~:; &t ~1 ~
i tl '"
~
noli. ~~,i ~~l '"
.t!-~~ -~)-..: ~ !L3~ k l,r\. ;::'l:': "
~l i .. l t
\ l:l ~ 3 2 ..
l!! 'S: 1 ! ; ~ i.
'1 " t '" ~ ~, i
! \! J .,.. 3
! ~ ~ t~ 't !
~ ~ ~ !ii3
~ J ... 0:
W1il.t-"!,.#~
.....-... - ------ . ~
~JA ._JIG
~~q 11
'I.
)
t:I:J.~"""'"
~'r~r~
r-
~ ~
Jc 1 \ '....
!t 1 ~ -~ :0
.t '" I
:; ~ \l"
-~
{ ~ B' \\
...
i l~ t: \ -<
t ~
$ ! ~ iil, t
J ~
\ ~ '!' ...... N t t
\!'" '"
...
"I ~ (} to- n .: ~ ~ I-
J <l' <:) ...
" i .;. . I
~ l i i~ t g i .i .. \ · ;. ..
~ ~ h~ ~~, ::.-
..I 1 TI~ i.
~ ~ li-"& tiJ~f
i. t 1 ~ \ 1 ! i ' '\ '0' o. T ~ .
. !!: ~ ~ i~ \ 1 i \ \ ii, \i . , ,i ',~ U
(~ ~ ~; ~ ~ i:.. ~\ 10 e ~.~1 \~tiillt
\ ~ H H ~,~ q I \ld\ llt!lltl}
1 HtHi\~I\Jl~lb!~\\'
. . G ceo, e Q \ CO ;-<l""i uhh it
U I 11 :It
~~ i\ 4 ~ ii
\1 1 l i }~
~.. 1'" ~ 1
~~ ii Ii tl
.. Ii .. i
~ ~~! t' \ J
i~!111 it-t
~t.i ,.,..
III trf! : i!i
ii:IU~Ut I!
\i"H"'~ 1I
r l " - <:
_ J ! ;-~ \ i
i
"
.,
.,)
~
III
'r
~
8
,,-.--" ,------"---'" -_.-~--~ -,--"
EXHIBIT "C"
Conditions of Approval
Project name: Commerce Road Realty
File number: NWSP 00-002
Reference: 2nd review plans consists of 12 sheets identified as New Site Plan. File # NWSP 00-002 with a
Mav 9.2000 Planning and Zoning Department date stamp marking
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments:
1. Relocate dumpster. Current location does not allow sanitation truck to exit
properly.
UTILITIES
Comments:
2. All utilities easements shall be shown on the rectified landscaping drawings
so that we may determine which trees may interfere with utilities. In
general, palm trees will be the only tree species allowed within utility
easements. Canopy trees may be planted outside of the easement so that
roots and branches will not impact those utilities within the easement in the
foreseeable future. LDR Sec. 7.5-18.1 gives public utilities the authority to
remove any trees that interfere with utility services, either in utility
easements or public rights-of-way.
3. Dept. of Health permits will be required for the water system serving this
project. (Sec.26-12).
4. Fire flow calculations will be required demonstrating the City Code
requirement of 1500 g.p.m. as stated in LDR Chap. 6, Art.IV, Sec.16, or the
requirement imposed by insurance underwriters, whichever is greater. (see
Sec. 26-16( a)). Please submit these calculations with your Health
Department permit submittal.
5. Sec. 26-34(E) of the City Code requires that a capacity reservation fee be
paid for this project either upon my request for signature on the Health Dept.
application forms or within 30 days of site plan approval, whichever occurs
first. This fee will be $790.02 based upon a I inch meter.
6. This office will not require surety for installation of the water and sewer
utilities, on condition that the systems be fully completed, and given to the
City before the first permanent meter is set. Note that setting of a permanent
water meter is a prerequisite to obtaining the certificate of occupancy.
7. LDR Chap. 6, Article IV, See 16 requires that all points on each building
will be within 200 feet of an existing or proposed fire hydrant. Based upon
the hydrant shown, the plan does not appear to meet this criterion. Please
demonstrate that the plan meets this condition, by showing all hydrants.
Page 2
Commerce Road Realty
NWSP 00-002
DEPARTMENTS INCLUDE REJECT
8. A building permit for this project shall not be issued until this office has
approved the plans for the water and/or sewer improvements required to
serve the project. (Sec. 26-15)
9. The water main to the fire hydrant appears to conflict with dumpster
enclosure. Please relocate the enclosure. Note that a 16-inch water main
exists in an easement on the south side of the property.
10. Please show the existing FPL Utility easement on all plan sheets
FIRE
Comments: NONE
POLICE
Comments:
11. Illumination concerns for both the rear elevation and north wall. No lighting
fixtures are shown on the plans. Provide lighting fixtures in these areas.
Indicate location, type and intensity of the lighting.
ENGINEERING DIVISION
Comments: NONE
BUILDING DIVISION
Comments:
12. At time of permit review, indicate on Site plan drawing the length of the
handicap landing off each ramp.
13. At time of permit review, identify the finish floor elevation that the design
professional established on the floor plan drawing.
14. At time of permit review, show entire area of second floor storage.
15. At time of permit review, submit Unity of Title, including all abandonments.
16. Compliance with the Building Codes will be evaluated at time of permit
reVIew. The permit fee, water and sewer facility fees, Fire and Life Safety
fees, County fees and State fees will be determined at time of permit review.
17. Permits are required to construct the improvements that are shown on the
approved site plan/conditional use documents. Permit application forms are
available in the Building Division of the Development Department. A
permit submittal checklist is available on the Building Division. The list
identifies the basic documents that the Permit Application Technician
checks for when an applicant submits for permit review.
Page 3
Commerce Road Realty
NWSP 00-002
DEPARTMENTS INCLUDE REJECT
PARKS AND RECREATION
Comments: NONE
FORESTERJENVIRONMENTALIST
Comments: NONE
PLANNING AND ZONING
Comments:
18. On the site plan, correct surrounding zoning & provide land uses for the
adjacent properties in order to determine correct greenbelt and vegetative
screening application.
19. On the site plan, label and dimension all easements and required landscape
buffers. Ch. 4, Sec. 7, Par. B.
20. Project is proposed/designed with uses minimal parking spaces. Future
intensification of project by proposing addition of industrial uses will
require prior confirmation of parking capacity.
21. On the landscape plan, locate & label fire hydrants, and any utilities that
may conflict with tree locations.
22. On the landscape plan, locate & label the 25 -foot wide greenbelt easement
as well as the 10' utility easement along the south property line. Relocate
the five (5) canopy trees out of the utility easement, and leave the hedge
along the property line to match with established green belt planting
scheme. The master plan requirement is to provide one (1) mahogany tree
per 40 linear foot of frontage and a continuous eugenia hedge (maintained at
6 feet) along the outside edge of the buffer.
23. In the landscape plan plant list, provide for 50% native shrub materials, not
including the 288 liriope in the calculations.
24. Amend the traffic study to include 1,936 square feet of the second story
storage space. Prior to final approval the study must be re-submitted to the
Palm Beach County Traffic Division for confirmation of standards
compliance.
ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS
25. To be determined.
ADDITIONAL CITY COMMISSION CONDITIONS
Page 4
Commerce Road Realty
NWSP 00-002
DEPARTMENTS INCLUDE REJECT
26. To be determined.
J:\SHRDAT AlPlanningISHARED\\\'PIPROJECTS\Commerce Road Realty\IST REVIEW COMMENTS.doc
DEVELOPIV" -~. 0RDER OF THE CITY COMMIf'-' ] OF THE
l,. (Y OF BOYNTON BEACH, FLORIa...A
PROJECT NAME: Commerce Road Realty
APPLICANT'S AGENT: Del Swilley
APPLICANT'S ADDRESS: 2559 Webb Avenue, Unit 1, Delray Beach Florida 33444
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: June 6,2000
TYPE OF RELIEF SOUGHT: New Site Plan
LOCATION OF PROPERTY: High Ridge Commerce Park
DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO.
THIS MATTER came before the City Commission of the City of Boynton Beach, Florida
appearing on the Consent Agenda on the date above. The City Commission hereby adopts the
findings and recommendation of the Planning and Development Board, which Board found as follows:
OR
THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above. The City Commission having considered the
relief sought by the applicant and heard testimony from the applicant, members of city administrative
staff and the public finds as follows:
1. Application for the relief sought was made by the Applicant in a manner consistent with
the requirements of the City's Land Development Regulations.
2. The Applicant
HAS
HAS NOT
established by substantial competent evidence a basis for the relief requested.
3. The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set
forth on Exhibit "C" with notation "Included".
4. The Applicant's application for relief is hereby
_ GRANTED subject to the conditions referenced in paragraph 3 hereof.
DENIED
5. This Order shall take effect immediately upon issuance by the City Clerk.
6. All further development on the property shall be made in accordance with the terms
and conditions of this order.
7. Other
DATED:
City Clerk
IICHIMAINISHRDATAIPlanninglSHAREDlWPIPROJECTSICommerce Road RealtylCommerce Road Develop,Order,doc
~I'l i OF BOYNTON BEACH, FL01"-.a.Vn.
INTER-OFFICE MEMORANDUM
TO:
Michael W. Rumpf DATE:
Dir. of Planning & Zoning
04/26/00
FILE: NWSP-00-002
FROM:
Off. Louis J. Zeitinger
Off. John Huntington
Police Department
Crime Prevention Unit
SUBJECT: Commerce Road Realty Co., L.L.C.
REFERENCES: Provided Plans
ENCLOSURES:
I have viewed the above building plans and have the following comment:
1. Illumination concerns for both the rear elevation and north wall.
a. No lamp fixtures indicated in the building plans for either wall.
hre
MEMORANDUM
UTILITIES DEPARTMENT
7ffil
. i ! i
-..' ;1
TO: Diane Reese, Finance Director <J f
fi---'; I
FROM:/Z- John A. Guidry, Utilities Director j
DATE: ~'b.v /3, Zh<> . -. ..... '--'''",,-
SUBJECT: Reservation fee transmittal fO~ (tflul- ~~:!)
Enclosed is a reservation fee for the subject projeet:----
Amount- $17t1.~z
Check no. - 310
From- ~hn,,~.,~~i##I'i1$471d
Please deposit this fee in the appropriate account. You may refer any questions on this
matter to Peter Mazzella of this office.
JAG/PVM'
bc: Peter Mazzella
xc: Michael Rumpf, Planning Director
File
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. PZ 00-216
TO:
Bob Borden, Deputy Fire Marshal
Larry Quinn, Public Works
Mike Haag, Building Division
Kevin Hallahan, Forester/Environmentalist
H. David Kelley Jr., Utilities Department
John Huntington, Police Department
Louie Zeitinger, Police Department
Barbara Meacham, Parks Division
H. David Kelley Jr., Engineering Department
Lusia Galav, Planning Department
Michael W. Rub, of Planning and Zoning
July 24, 2000
FROM:
DATE:
SUBJECT:
Rectified Plans for -Commerce Road Realty
(NWSP 00-002)
The amended plans for Commerce Road Realty site plan modifications have been submitted for
final sign-off by the Technical Review Committee. Four (4) sets of plans, each requiring your
unconditional signature, are available for review in Planning and Zoning. A copy of the originally
reviewed plans, staff comments and development order are available for your use to perform
the review.
Please review and sign-off each of the four- (4) sets of plans, NO LATER THAN 5:00 P.M.,
August 7,2000. If the plans are not in compliance with your staff comments or City regulations,
do not sign the plans but only indicate the memorandum number where your comments are
documented. To facilitate the sign-off process, please resubmit written comments addressed to
the Planning and Zoning Director, NO LATER THAN 5:00 P.M., August 7,2000.
Thank you for your prompt response to this request.
MWRblw
cc: Steve Gale, Deputy Fire Chief
Marshall Gage, Police Chief
John Guidry, Utilities Director
John Wildner, Parks Department
J:\SHRDATAIPlannlng\SHAREDlWP\PROJECTS\Commerce Road RealtylReClified Memo to TRC members,doc
PUBLIC WORKS DEPARTMENT
MEMORANDUM #00-051
TO:
Mike Rumpf, Director of Planning & Zoning
VIA:
Christine Roberts, Interim Public Works Director
FROM:
Mark A. Lips, Forman III
DATE:
March 28, 2000
SUBJECT:
1 st Review -
Project -
Location -
Agent -
File No. -
New Site Plan
Commerce Road Realty
High Ridge Commerce Park
Del Swilley
NWSP 00-002
The Public Works Department has no comments or objections to this project going
forward.
If you have any questions please contact me at (561) 742-6200.
-If! a ~
-
MUpl
Attachment
r,fnl D rm jg~!l[Ji7. m ,. ,r;.-,' i I
f n 1J - --., "
" III I MAR 2 8 " ~;:: '
L-___
PL.-'; ;,jiNf"..:- ~-,-,~.
luNING '[]fpH_,'lLl
L,
-...J
MIit.ttiIa'!1DoriS '
"'" ", i, "
From: Mazzella, Pete
Sent: Tuesday, March 28, 2000 2:24 PM
To: Rumpf, Michael; Marttila, Doris
Cc: Guidry, John
Subject: Commerce Road realty
J
Here are my comments. Hard copy to follow.
(Note the discrepancy between the plans and survey in specific condition 6. Has the right-of-way
and easements been abandoned across this lot?
Pete
~
I
\:~moo ~..
."
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 00-087
TO:
Michael Rumpf, Planning and Zoning Director
FROM:
Michael E. Haag, Building Code Administrator
DATE:
March 27,2000
RE:
Commerce Road Realty - New Site Plan (NWSP 99-002)
1st review comments
We have reviewed the plans for the above referenced project. The applicant must acknowledge
and address the below listed comments before the project is presented to the Board for their
reVIew.
Buildin!! Division (Permit & Site Specific Comments) - Michael E. Haag (561) 742-6352
1. Add to the building that is depicted on the drawing titled site plan a labeled symbol that
identifies the location of the handicap accessible entrance door to each tenant space. Show
and label the same doors on the drawing titled general floor plan building elevations.
2. Change the title Building Gross Area to Building Footprint Gross Area. Add to the
drawing the total gross floor area of the building including the proposed 2nd floor area.
3. Add a labeled symbol to the site plan drawing that represents and delineates the path of
travel of the accessible route that is required between the accessible parking spaces and the
accessible entrance doors to each tenant space. The symbol shall start at the accessible
parking space(s) and terminate at the accessible entrances to the building. The location of
the accessible path shall not compel the user to travel in a drive/lane area that is located
behind parked vehicles. Identify on the plan the width ofthe accessible route (Note: The
minimum width required by the code is forty-four (44) inches). Add text that would
indicate that the symbol represents the accessible route and the route is designed in
compliance with Section 4.3 (Accessible Route) and 4.6 (Parking and Passenger Loading
Zones) of the Florida Accessibility Code for Building Construction. The symbol shall
represent the location of the path of travel, not the location of the detectable warning or
other pavement markings that are required to be installed along the path. Please note that
at time of permit review, the applicant shall provide detailed documentation on the plans
that will verify that the accessible route is in compliance with the regulations specified in
the Florida Accessibility Code for Building Construction.
Building Division Memo No. 00-087 to Michael Rumpf
RE: Commerce Road Realty - New Site Plan - 1 st review com
March 27, 2000
Page Two
4. Within the site data found on sheet 10f2, identify the proposed finish floor v~ion
proposed building (lowest floor elevation). Verify that the proposed elevation 1 .
compliance with regulations of the code by adding specifications to the site data
the following issues:
a) The design professional-of-record for the project shall add the following text to the site
data: "The proposed floor elevation _' _ NGVD is above the highest 1 DO-year base
flood elevation applicable to the building site, as determined by the South Florida Water
Management District's surface water management construction development
regulations." [Section 3107.1.2, Chapter 31 of the Boynton Beach amendments to the
1997 edition of the Standard Building Code]
b) From the FIRM map, identify within the site data the title of the flood zone that the
building is located within. Where applicable, specify the base flood elevation. If there is
no base flood elevation, indicate that on the plans.
c) Identify the floor elevation that the design professional has established for the building
within the footprint of the building that is shown on the site plan, floor plan and civil
plan.
5. On the drawing titled site plan, identify the symbol that represents the property line.
6. Add to the drawing titled site plan all of the easements that are shown on the survey. The
location, type and size of the easement(s) shall be shown and identified on the site plan.
Where applicable, amend the plans so that structures do not encroach into an easement.
7. Add to the site data the number of stories in the building. Also, indicate the overall height of
the building (finish grade to the highest point ofthe roof or parapet wall). The overall height
of the building shall not exceed the height limitations of the Zoning Code. Dimension the
overall height of the building on the elevation view drawings of the building.
8. Below the drawing titled Building General Floor Plan found on sheet 2 of 2, add text that
would indicate that the room layout that is shown on the drawing is conceptual.
9. At time of 2nd review, submit a copy of the recorded resolution that verifies the abandonment
ofthe Miner Road right-of-way and both easements located at the south end of the property.
MEH:bg
J:\SHRDATA\Development\Building-6870\Documents\TRC\NWSP 00-002 1st review Commerce Road Realty,doc
DEPARTMENT OF ENGINEERING
MEMORANDUM
NO. 00-059
~ ~ @ ~ u il~
~AALl >oj
1
TO:
Michael Rumpf, Director of Planning and Zoning
FROM:
John A. Guidry, Interim Director of Engineering
~.,.~,,'., PLANNING AND
- W' ZONING OEPT.
DATE:
March 23, 2000
RE:
COMMERCE ROAD REALTY (NWSP 00-002)
NEW SITE PLAN 1sT REVIEW
1. On the Site Plan add a general note that all plans submitted for specific permits shall meet the City's
code requirements at time of application. These permits include, but are not limited to the following:
site lighting, paving, drainage, curbing, landscaping and irrigation. Permits required from other
permitting agencies, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and any others, shall be
included with the permit request.
2. If the existing sidewalk within Commerce Drive right-of-way is four feet wide, change dimension on
plan
3. Add note to Paving Plan that all striping, markings and signage shall conform to City Standard
Drawing B-98001 and modify the "parking stall detail" accordingly.
4. On the Site Plan show the stop sign and stop bar at the exit. Also, on the Site & Civil Plans show 25'
double yellow lane separation stripes at the entrance.
JAG:HDK:KRH/ck
C:\My Documents\Commerce Road Realty New Site Plan 1st Rev..doc
MEMORANDUM
UTILITIES DEPT. NO. 00 - 77
.-;;-';~~~"\:"
~-:: \\ 1.1 \.,~. .
(,;\ \';1 \, \." .ft"""~-' ':J .
I) ~ \5__~~"'~"- ,
\~r- \& ",,0'
\\,;, \\ ~~-
t
TO:
Mike Rumpf, Planning Director
John A. Guidry, Utilities Director)V
March 28, 2000
FROM:
DATE:
SUBJECT:
Commerce Road Realty
We offer the following comments on this project:
GENERAL COMMENTS
1) All utilities easements shall be shown on the rectified landscaping drawings so that we may
determine which trees may interfere with utilities. In general, palm trees will be the only tree
species allowed within utility easements. Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities within the easement in the foreseeable future.
LDR Sec. 7.5-18.1 gives public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way.
2) Dept. of Health permits will be required for the water system serving this project. (Sec. 26-12).
3) Fire flow calculations will be required demonstrating the City Code requirement of 1500 g.p.m. as
stated in LDR chap. 6, Art. IV, Sec. 16, or the requirement imposed by insurance underwriters,
whichever is greater. (see Sec. 26-16(a)). Please submit these calculations with your Health
Department permit submittal.
4) Sec. 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project
either upon my request for signature on the Health Dept. application forms or within 30 days of site
plan approval, whichever occurs first. This fee will be $790.02 based upon a I-inch meter.
SPECIFIC CONDITIONS
1) This office will not require surety for installation of the water and sewer utilities, on condition that
the systems be fully completed, and given to the City before the first permanent meter is set. Note
that setting of a permanent water meter is a prerequisite to obtaining the certificate of occupancy.
2) LDR chap. 6, Article IV, Sec. 16 requires that all points on each building will be within 200 feet of
an existing or proposed fire hydrant. Based upon the hydrant shown, the plan does not appear to
meet this criterion. Please demonstrate that the plan meets this condition, by showing all hydrants.
3) A building permit for this project shall not be issued until this office has approved the plans for the
water and/or sewer improvements required to serve the project. (Sec. 26-15)
4) The waste stream from the manufacturing process must meet the City's pretreatment requirements.
A sampling point must be provided to allow monitoring of this waste stream. (Sec. 26-143, 26-147)
5) The water main to the fire hydrant appears to conflict with the dumpster enclosure. Please relocate
the enclosure. Note that a 16-inch water main exists in an easement on the south side of the
property .
6) The survey depicts Miner Road as a right-of-way, yet the plan dimension indicates the building
will encroach into that right-of-way, and over a utility easement. This issue must be reconciled
before review can continue. Please also show all existing and proposed easements on the
engineering drawings, using a minimum width of 12 feet. The proposed easements shall be
dedicated via separate instrument to the City as stated in Sec. 26-33(a) of the Code.
Please refer any questions on this matter to Peter Mazzella (742-6404) of this office.
JAG/PVM
Xc: Skip Milor
Peter Mazzella
File
Galav Lusia
From:
Sent:
To:
Subject:
Rumpf, Michael
Wednesday, March 29, 2000 10:57 AM
Galav Lusia
Congr-&i8 Road Realty project
~1?1QL.eL
Just a reminder that we need to keep on this one to see if we can make up for some of the lost time. I noticed that some
comments have come in. If you haven't already, let's send oft the comments as we receive them to get them started with
plan modifications. Also let's try to include notes to them in our transmittal that explains why they are receiving them
incrementally and as a part of our attempt to give them extra attention. Thanks for helping me hand-hold this one. MR.
1
To: Planning and Zoning
From: Officer R.G.Riggle
033000
~
'I
~t:4.
*' ..'\,.
~~ ~
'0'-:;>,..
The police department has no comments in reference to the purposed a
Reality.
{(oJ;2:,..,
~ .
o ,Jl...
f i ~ ! t
~-
"
~J' t"
MEMORANDUM
UTILITIES DEPT. NO. 00 -
TO:
Mike Rumpf, Planning Director
FROM:
John A. Guidry, Utilities Director
DATE:
March 28, 2000
SUBJECT:
Commerce Road Realty
We offer the following comments on this project:
GENERAL COMMENTS
1) All utilities easements shall be shown on the rectified landscaping drawings so that we may
determine which trees may interfere with utilities. In general, palm trees will be the only tree
species allowed within utility easements. Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities within the easement in the foreseeable future.
LDR Sec. 7.5-18.1 gives public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way.
2) Dept. of Health permits will be required for the water system serving this project. (Sec. 26-12).
3) Fire flow calculations will be required demonstrating the City Code requirement of 1500 g.p.m. as
stated in LDR chap. 6, Art. IV, Sec. 16, or the requirement imposed by insurance underwriters,
whichever is greater. (see Sec. 26-16(a)). Please submit these calculations with your Health
Department permit submittal.
4) Sec. 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project
either upon my request for signature on the Health Dept. application forms or within 30 days of site
plan approval, whichever occurs first. This fee will be $790.02 based upon a I-inch meter.
SPECIFIC CONDITIONS
1) This office will not require surety for installation of the water and sewer utilities, on condition that
the systems be fully completed, and given to the City before the first permanent meter is set. Note
that setting of a permanent water meter is a prerequisite to obtaining the certificate of occupancy.
2) LDR chap. 6, Article IV, Sec. 16 requires that all points on each building will be within 200 feet of
an existing or proposed fire hydrant. Based upon the hydrant shown, the plan does not appear to
meet this criterion. Please demonstrate that the plan meets this condition, by showing all hydrants.
3) A building permit for this project shall not be issued until this office has approved the plans for the
water and/or sewer improvements required to serve the project. (Sec. 26-15)
4) The waste stream from the manufacturing process must meet the City's pretreatment requirements.
A sampling point must be provided to allow monitoring of this waste stream. (Sec. 26-143, 26-147)
5) The water main to the fire hydrant appears to conflict with the dumpster enclosure. Please relocate
the enclosure. Note that a 16-inch water main exists in an easement on the south side of the
property.
6) The survey depicts Miner Road as a right-of-way, yet the plan dimension indicates the building
will encroach into that right-of-way, and over a utility easement. This issue must be reconciled
before review can continue. Please also show all existing and proposed easements on the
engineering drawings, using a minimum width of 12 feet. The proposed easements shall be
dedicated via separate instrument to the City as stated in Sec. 26-33(a) of the Code.
Please refer any questions on this matter to Peter Mazzella (742-6404) of this office.
JAG/PVM
Xc: Skip Milor
Peter Mazzella
File
S:\PLANNINGlSHAREDlWP\PROJECTS\COMMERCE ROAD REAL TYlUTILlTIES - 1 ST REVIEW DOC
FIRE & LIFE SAFETY DIVISION
Memorandum No. 2000-38
@,~~ .
. - "
, , '
NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire
Protection Association codes, and the City Fire code shall be adhered to.
DATE:
Mike Rumpf, Director
Planning & Zoning
Steve Gale A.? /
Fire Marshal '? ()
March 27, 2000
TO:
FROM:
SUBJECT:
NWSP 00-002
Commerce Road Realty
High Ridge Commerce Park
A fire flow test is required. LDR 6-16. Hydrant and access road shall be
in place prior to above grade construction. NFPA 1.
A turnaround is required at the south end of the parking lot with a 45'
turning radius. BBCC 9-3. Vehicle parking may not be within 5 feet of
the hydrant in any direction with a clear 5' corridor to the roadway.
BBCC 9-23.
Location of Fire Department sprinkler connection not shown so unable
to determine acceptable position in relation to building and hydrant.
BBCC 9-6.
cc: File
"I;,i. .:.. 7
i
~
l:O,a. .........,....-.,,_...._ ....~ ~ _ ._.
~.- -~:Z~:tS:hjl~2t:=~~~,
DEPARTMENT OF ENGINEERING
MEMORANDUM
NO. 00-059
TO:
Michael Rumpf, Director of Planning and ZOning~/
John A. Guidry, Interim Director of Engineering ~
March 23,2000
FROM:
DATE:
RE:
COMMERCE ROAD REALTY (NWSP 00-002)
NEW SITE PLAN 1sT REVIEW
1. On the Site Plan add a general note that all plans submitted for specific permits shall meet the City's
code requirements at time of application. These permits include, but are not limited to the following:
site lighting, paving, drainage, curbing, landscaping and irrigation. Permits required from other
permitting agencies, such as FDOT, PBC, SFWMD, DERM, L WOD, DEP and any others, shall be
included with the permit request.
2. Ifthe existing sidewalk within Commerce Drive right-of-way is four feet wide, change dimension on
plan ..
3. Add note to Paving Plan that all striping, markings and signage shall conform to City Standard
Drawing B-98001 and modify the "parking stall detail" accordingly.
4. On the Site Plan show the stop sign and stop bar at the exit. Also, on the Site & Civil Plans show 25'
double yellow lane separation stripes at the entrance.
~'
JAG:HDK:KRH/ck
C:\My Documents\Commerce Road Realty New Site Plan 1st Rev..doc
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 00-087
;f~ rT (e') '..'
. . I '
1,1 D rS-",: -", :
q ,
1! ~ 1'1
"I": ?
IULll MAR.- 9
L,~,-.-,
DATE:
Michael Rumpf, Planning and Zoning Director ~
Michael E. Haag, Building Code Administrato~.? kP
March 27, 2000 D
TO:
FROM:
RE:
Commerce Road Realty - New Site Plan (NWSP 99-002)
1st review comments
We have reviewed the plans for the above referenced project. The applicant must acknowledge
and address the below listed comments before the project is presented to the Board for their
reVIew.
Buildin~ Division (Permit & Site Specific Comments) - Michael E. Haag (561) 742-6352
1. Add to the building that is depicted on the drawing titled site plan a labeled symbol that
identifies the location of the handicap accessible entrance door to each tenant space. Show
and label the same doors on the drawing titled general floor plan building elevations.
2. Change the title Building Gross Area to Building Footprint Gross Area. Add to the
drawing the total gross floor area of the building including the proposed 2nd floor area.
3. Add a labeled symbol to the site plan drawing that represents and delineates the path of
travel of the accessible route that is required between the accessible parking spaces and the
accessible entrance doors to each tenant space. The symbol shall start at the accessible
parking space(s) and terminate at the accessible entrances to the building. The location of
the accessible path shall not compel the user to travel in a drive/lane area that is located
behind parked vehicles. Identify on the plan the width ofthe accessible route (Note: The
minimum width required by the code is forty-four (44) inches). Add text that would
indicate that the symbol represents the accessible route and the route is designed in
compliance with Section 4.3 (Accessible Route) and 4.6 (Parking and Passenger Loading
Zones) of the Florida Accessibility Code for Building Construction. The symbol shall
represent the location of the path of travel, not the location of the detectable warning or
other pavement markings that are required to be installed along the path. Please note that
at time of permit review, the applicant shall provide detailed documentation on the plans
that will verify that the accessible route is in compliance with the regulations specified in
the Florida Accessibility Code for Building Construction.
Building Division Memo No. 00-087 to Michael Rumpf
RE: Commerce Road Realty - New Site Plan - 1 st review comments
March 27, 2000
Page Two
4. Within the site data found on sheet 1 of 2, identify the proposed finish floor elevation of the
proposed building (lowest floor elevation). Verify that the proposed elevation is in
compliance with regulations ofthe code by adding specifications to the site data that address
the following issues:
a) The design professional-of-record for the project shall add the following text to the site
data: "The proposed floor elevation _' _ NGVD is above the highest 1 OO-year base
flood elevation applicable to the building site, as determined by the South Florida Water
Management District's surface water management construction development
regulations." [Section 3107.1.2, Chapter 31 of the Boynton Beach amendments to the
1997 edition of the Standard Building Code]
b) From the FIRM map, identify within the site data the title of the flood zone that the
building is located within. Where applicable, specify the base flood elevation. If there is
no base flood elevation, indicate that on the plans.
c) Identify the floor elevation that the design professional has established for the building
within the footprint of the building that is shown on the site plan, floor plan and civil
plan.
5. On the drawing titled site plan, identify the symbol that represents the property line.
6. Add to the drawing titled site plan all of the easements that are shown on the survey. The
location, type and size of the easement(s) shall be shown and identified on the site plan.
Where applicable, amend the plans so that structures do not encroach into an easement.
7. Add to the site data the number of stories in the building. Also, indicate the overall height of
the building (finish grade to the highest point of the roof or parapet wall). The overall height
of the building shall not exceed the height limitations of the Zoning Code. Dimension the
overall height of the building on the elevation view drawings ofthe building.
8. Below the drawing titled Building General Floor Plan found on sheet 2 of2, add text that
would indicate that the room layout that is shown on the drawing is conceptual.
9. At time of 2nd review, submit a copy of the recorded resolution that verifies the abandonment
of the Miner Road right-of-way and both easements located at the south end of the property.
MEH:bg
J:\SHRDATA\Development\Building-6870\Documents\TRC\NWSP 00-002 1st review Commerce Road Realty.doc
Wildner, John
From:
Sent:
To:
Subject:
Wildner, John
Thursday, March 23, 20004:02 PM
Lewis, Nicole
Commerce Road Realty
Parks Division has reviewed the above referenced plans. We have no comments at the present time,
1
MAR27;~
PLANNING AND
ZONING DEPT.
. \..o~-'
J
Parks / Plannin~ Division Memorandum- TRC
~\~~": :~UJrn'
~-
Subject:
Mike Rumpf, Director of Planning and Zoning
Kevin 1. Hallahan, Forester / Environmentalist t<- ~ ~
Commerce Road Realty
New Site Plan- First Review
-
To:
From:
Date: March 24, 2000
I have no comment on the above project. The project should continue in the normal review
process.
Kjh
File
/J. ,;/' f? ;:;..- ,.J ,~'
CLift ',1, f r"ot-f..,J f- (.> FL j f
) ~ ~Vlf'lJ eOM f.'t r-IJIS
I\j I,A,
00- 00 z.
~!zz..
A-
/,
>> (.i V ' V)::.~ /f
S&t:...t:-v cSC.V:'VE?( 0CT OLPC.::r(.... r-f,.9JJ S;x
t ,1,. t ~. 'J (
/v' \...,'-' , IJ ,"
.?,,+ ' I
~ I,.;\:-J ,.. j\._~
f>;'C"__ A-r>Jf;u LJ'J STfl 6E'S. ,14tL,;,tS
P,V,)
D2 I 'vf1.,.JA 1 So J
C fl. c(('~c. 7 PM. A
1\''-'/0 r.... '- C G
I' ,,".,' -, ,,, "
i ' ,,- ('f" 1',1')
. .......v., _.J . - \.....
j Tc-t".l ~ y<>r, ~ LIS ;;-c D ,
"':'
;...,
',1 -,~ CI~ <-:>, ,<~,.
1\J . J J '- ~.: .... ~ ~ .,..../
t h~.',\,~"'C'- ~Tft ) \/,L<..",",U) t' ThE' (~, ;"v..~...._I'.....}U
'. 1,<". ,., '
'v \ ~t;' --;.....1t-t l turJ ,
L-/f,( 5~.) 1111<, B f-' e
~. R-U!(.. Dt"jL7 H-e\\.,jlfr \~ Fu:r
b, /?UIL?("-ib Sc;Ti;ttc.~ iVfO''f'.-',-;:''''-'()t.,)
c,. P :)'L D').)\:Pr :j~ '&-s
d. ?(Qf'c~E'\) 'vr,;r: ,u~ CI";LC\jl..:~TIWS
e, '2.0!..JI!VU E DC"~Il"J..);tl:F.t Uh.Jt> u~t
2
.> ,
o ,'-.J
--- - ~--~...
5 ,.....,c:= G '
. : I... r L- -/",..t...J
? '
. ' ~
,:;"! -: ,jli.CJ€-- ~\J) \~.,,-~~~._~j}.~'(...J -Z.Qr-.;ij\...~"" .; ltiJ.l0
'. ~ ,r_",-
;,.... I' ~
Fui'...
~T-'~-f S
.., .;,.." "'i-f,' rj",)..e.-,,';-,~c.. .~
I . -...! _......... -;: , ""f \.",01_'-- " __ .,; I
:; ;'-:l c' (-:. TJ
pc. -t.:;,. -r"- i ,.) ':'
Co, ,:-::G.: ::':""'lleelv'l~CLT 1+,"-i~vt:GC',:'; ".1-:'- SLrl.C(t..l!\JG l-fy,:JLtc..'t j;QAJ,
t1, I2Gv I sc:' 1I+t1 .srn; PLA 0 Lr-\,\ \JuT So 7fiR T' T rte- /<.-i\ r"t ,;,j y(;.. \ \16-' r, IS u;~ A DJr\c[.'.JT
T~) r~:~f~VPi':"'\.i'~t;;t,.... tf-i'.\cuJ0 ~~fTL::s--01 vJ ILL. ttA.JG-' A t/' j;J IM\J"'" uJ lJ)77f-
C~ 1,,-1 F~'eT", C(T~ I>r2,"'j<-"")0# r?-'1C:;Oi~
t;,
o IV T'~' C, .:; J IC' fcA- t.J )
( \.... .l :~ \.,..
~c~.. t<7 'i 'J"' ?,~, ",
I iT\.- ,{_ v,.. (~.:./.; .....
f
L.u c...' ':! C ,.J
op ??t-'"JEc;
~)\I,...:.."-.: ..' 0 [<- ,
r
C, H'. If cc,.. ~ 7
,.....~c.,f .
D' (i? t'."
rH..., , 'I '-
G
'PI' Q v i .:.c. f'r 1'-, ,,". Ct--.J ~'-, :~-,;
;' ',r'\ \..,) <s 'T 1 ~'I,.j \.:> (l-\--A"\ AL \.... J (j:):;:--:;)
L-!.K0,\",r'i)-' f./' Js;- L.;" "'<..( t2: -Eu h2.(j''^ VI ew frT ~ yYltl'-l, t>i c,,\f~r-X(5-
br
bVO
t:~F-
. .... ~, ;
('.' Cr
......ff. .
'?t6, \ \
f',l;\- K 15
~
7
().L , r C
r tV, .....
T.fft ~i it- Pc \A t )
(,') ..j c.'J ~
t .
S (.) T'- (' ,- ,\jC
CVfr'L ,I ::.~r+D
Pv.... ~ :-;; c..E:
H : '''"' I-:- ?) \) 0C-- !20A-D. Ctf. CI Ser:... 'I Prff?-."J
8. pC/;~i0 Tt+e 5IT(, fL..A-N Ll+riJT "':".:.'."lrj7- THe <;G<.,)'Trtcrl.,J.J eND
of Tt-r~ ?,-.I" \(.. I 0(...:;; A;~(~ M :Dec''::, ,J,..;o'! (lJC. (' C(\(:. 4 f"i-<;E"'" 1070 Tift'
7,&; foo'"!" P;-I'<-';"'\lTt'{\.. i3UR-&-j2... I fSr,--'rHCr'2t)v 6P(f/,.2CLT.
C ,it. '2.- >e~. 7 P,4I"2-, t+ i ) 7
q.
,.r",'" ,,< c...\~!', ?i.,\i) LA.;<C.-L A''''- ""'",,-~~., '<:::'\"<1 j"','" e.a..t':J:...,1{:,iJ'T,' ~
'-'~ I.' \"".; -':._ \ \-A.;f" J 1 : ~ _ ,,1'-l~ V. Z . ",,,,,,, '4 \J~ _ __ jY _..... ,- ... _
f'pJ;.; 12-~a'-.))(? G ~ lA~J';;S:""I"?C P:. ,-,f~ S [U;:). eft, '" Sf?C-. '7 /'19~, B
/"0.
f?ev'':e Jtj~- :17- PLt+V lottYUiJl 10 ,>JcevDf
TUf::iJ ~V'~
tSPfK.€" AT Ti+[ 7"[(1_",",1; )Jc..)'S oF' I+~ f1;"Cj(;, "..J(.? A~t""A, Iff I"S
S( {tcC 5r+A-u..,. Aca,'......r,.' c.t),-'f re 11'1\1<( T~~lict- E::t'i'Ly'. ( ',1.10
THe- f-H..\LIT\ (e..'4',) FllLt ,) ""T;:".,.;t-t (2.f........O,JrL) eTC..)
3,
II. OJ-! TIff.' hri-U-!I rc=(T;.Jflf--C fLt:=",4T'uA,) PLr.q,.j) f4-6//IJJe- A
." Pt-"Tff 1<- r Trfc- DU^-Af S[G'fL tr"J( (c :'.I{2.p~ (NC t.. UDIIVJ
Cd(Oit~\
, - J
... fI,-/;+ Tt-rL-lll'- ~ A ,d;) 1'10'.''.6' N:::-' ijUS,. Ct!. c:r Sc:c. 10 e:,+" ~,5
('2-. SO?fJI q- A- COU(;. (2.CNOErLC'v e(:~V(IT'I()v C:J2,-if/1IG IAJc.LU;)'1)9
", A\..L E\i\..0"J\..J E'i...C"A~\o.J6 rt-Jt? -rHt-/(L r:"')fC~f'D (](;U~.
eft: d <;;.~, 7 e..~~. p. '2-
I~. 0)..) THt- If/L((+/Tfc.r...,i:..rL- C;:U..'d/,: ";.\j Pu:.iJ) e....evl<(c- we oJt3-rL!fHl..-
... 'I~V \ L.J) f ",'-", /tt! 0 HT diN Ti.f(; ff:O#.Jr /1 iv j;> /~..6-I7-iL Gt {-vt9-r:,v ~ J;j
... {'/!/r Tel-!" TH-e' L.ffr tlv'.vv-.;.H L 6'lt5v;l1!c"-,) ) 0(2.- .:r:=F t-J0"t""" "2,..() Fet5r'
.., ~Jf3'r'- H \.\.., (*\01+'1 ?rco.... \ O~ "Tl1.f=- CO{'ALf-Ci BUlLD,J.J\..::J (ft 10tfi
-r 0 TH.e- ThP of 'r 11 e- BJ ( L t), Iv "=' f?-o:.:f- 1fqr0t ~ .
/t.! Ct-J T:-i:C- Lf.,'-j-0s.(,-i.<~ ?L\~'J..,J I r(t!)';.~fi' Tftt' fiHl()vj,I...JI..) kJCTf'5'
elf d Gte..? Pr'fL-. C
a. /(2.p...i cA.-To...) .~t;J(..c't"'''' (.;Jff...f." (Cr+A,..,:ct:. ~CrE: -:il''Z.. ')
b, r...~ j L .;.... cr--i~C"L Iff..} Aj CL/i'!2../J < <;'r.-f: '_,- (1;1;'" 0<:;~
(
;.t;;. O~ -!;~'( {,;04vO'.o(,i,;t..., t?LAl--J [()(ftme.'LftiJ6L frl'-L"" u;;'fv:'......r7'r"., A>...ND A.!'v\
... \<)' ,..,.!...-i""~ "'lv', '" \
, -, I - to. L .. A..... ~ - A ' ('...' I .:: I ......, \ I _. .
v I [.... 11... oJ 'Tr.t I. 1-" '1 ....".. IV t -! 1::, ~"!'i
'-''' ,:. r:... L 1\( ,1+ -,~'t,. f, IL,
l\("........r..... I..i " 'V.....~f
if
I~, l2Gv'\~E'~ Tt-fG- Lff).W~';.r\)6' "?L~t-J Ie fV'ATC:* nt6- S!~ 'Plfi1\J ...
5 ;'-ns.. F\.t<\-.j Si1'~~< ?::.7 C:';'ff"7Cf-:c; A;-.l:'; /v'iJsr P.& i2-2\1\~E~
10 72&IA\N 7'1-It '25' FO~i 612(6,..) ~",E-Lr.
/7. otJ THE' lv'l,'J,i" (.b-'E ?LftkJj ~'~~'J ':o( /i+e-:- ltrl....,J'" S!;{6< 'at)
fC)/1;
,
tHe
2S'" fUJT" rti:,,~-"'rT!j.:, 6fL6C:~LtLT It) I.;.JCL-UC'C-'
- C (' .
I H1-' I (} t ev-l ' 1--1'--.> ~
8. TPetS - .$:.....!CTCc.-iA t.lA,l-ffY\..;c,',il ) N\.-t\1aur.U'J
b ff61/GC- - E VGE1- ,1'=+- UN'I ~lC;d-it ) '5 \.;{L_I tJ.4- M Cr:-E;:'.,1. '1 (sov'i"tf Hbc('€CNI..~:
I ~.
0;.../
Tl~ ,.:,' I 11 i :, \ :;.. 1,/" PI o,U lCJr-'-'Y:~:;'" <: / ~ f'-P. {, ~
_ \.,. ....",v-...~"tl"- L.,..- ~ _ \....- 1...... '? oIiIoioo- 1.......-_..., 111l..J
'2-6 FocT" WIDE- {., (?.tE,1'vLE"\.:r- EPr~t.--t AI\" ,q 6 uE(L-- It- 5
-,-rtt- ! () ( un (.I ry ~-t': E- t.M. G-tv' J A L-c, A.J G i7-t-r- &.u T7-f f(2 OffrL. T 7 u,.J(& .
~E:-lOCA Tt'" 17-16 5' c..1I).kP~) T1t.f(;s OtlT of we () n L Of f3;7-S.~tv't;:.^J/-,
I+tJ D t.. t:-i'ruE-' T1-f f HG~ Pc.c..JG -rHt" P<2<f ~ {("j'1 (j v {- 7?J f1-1 rl Ie. H-
(..U I r H f" f, 1'1"'1-03 l J<; rr~ D (; {2.f&t.J E cL T PCA ~TJ v ~ Sc l+6 ~ &- ..
Iq.
}0
TIf13 ( rt )J.:J S ( ite f P CNtV
-r;f,;\. r-:-'" lISt
r _~ . )--I \ ' ,
:rri.. U v' De
--- S'?
HI-. () IQ
NATIve- ~H(UJ8 M~~jt7t..6). !JeT bJCLVUltJl: -rflt' c9:8B U{lJOr~
llV rttfr Cftl..c..uL,4Tl~N~.
~a. ON Tr~ t-,.JG.JJ~\'''\Jji,;, rtf'L0 SHeeT 30F <.0 )
Di.'A E-'I;S(,~w Tfr(r H-AJu\(A~?e.~PA'v ~\NV SIG~ ) P~l""l, G~(:.'1?. G-c:r
TH-G-- f'{-i'\~~llJ0 STt"'-'-''- t(=1i}.J\ ST~-irE. r: )IJ\~, 00. i'.'O"~\tO}J...
e-n"l Dl"<-A-\,rJ,.vl..::> it g-qt;OI'Z-
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. PZ 00-077
TO:
TRC MEMBERS
Bob Borden, Deputy Fire Marshal
Kevin Hallahan, Forester/Environmentalist
Mike Lane, Police Department
Pete Mazzella, Utilities Department
Michael Haag, Building Division
Lusia Galav, Planning Division
Larry Quinn, Public Works Department
John Wildner, Parks Division
Frantz LaFontant, Engineering Department
David Kelley, Engineering Department
m.
Michael W. Rumpf . ;yv
Director of Plannin andtoning
FROM:
DATE:
March 22, 2000
RE:
SITE PLAN REVIEW PROCEDURES
1 ST Review - New Site Plan
Project: Commerce Road Realty
Location: High Ridge Commerce Park
Agent: - Del Swilley
File No: NWSP 00-002
mJ&@&aw&@
MAR 2 3 20ca
PUBLIC WORKS D
EPT.
Find attached for your review the plans and exhibits for the above-referenced project. Please review the
plans and exhibits and transmit formal written comments to me no later than 5:00 P.M. on March
27. 2000. When preparing your comments, please separate them into two categories; code
deficiencies with code sections referenced and recommendations that you believe will enhance
the project.
Adhering to the following review guidelines will promote a comprehensive review and enable the
applicant to efficiently obtain Technical Review Committee approval:
1. Use the review standards specified in Part IV, Land Development Regulations, Site Plan Review
and the applicable code sections of the Code of Ordinances to review and formulate comments.
2. The documents submitted for the project were determined to be substantially complete with the
exception of traffic data, however, if the data provided to meet the submittal requirements is
insufficient to properly evaluate and process the project based on the review standards or the
documents show code deficiencies, additional data and/or corrections should be requested by
the reviewer by contacting Lusia Galav.
3. Each comment shall reference the section of the code that is incorrectly depicted on the
documents.
4. Technical Review Committee member(s) shall identify in their comments when the plans depict or
Page 2
Development Department Memo 00-076
Commerce Road Realty
TO: TRC Members
when the location and installation of their departmental required improvements may conflict with
other departmental improvements.
5. When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the
comment and the specific code section may be included in their review comments with the name
of the appropriate TRC Member that is responsible for the review specified.
6. If a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time
frame stated above, to me. The memorandum shall state that the plans are approved and that
they do not have any comments on the plans submitted for review and that they recommend the
project be forwarded through the approval process.
All comments shall be typed, addressed and transmitted to me for distribution to the applicant. Please
include the name and phone number of the reviewer on this memorandum. Lusia Galav will be the
Planning and Zoning staff member coordinating the review of the project. First review comments will be
transmitted to the applicant along with a list of Technical Review Committee (TRC) members.
MWR/nl
Attachment
XC: Steve Gale, Fire Marshal
Marshall Gage, Police Chief
John Guidry, Utilities and Interim Director of Engineering
Don Johnson, Building Division
Christine Roberts, Public Works Director
Central File
J:ISHRDATAIPlanningISHARED\WPIPROJECTSICommerce Road Realty\1 STREVIEW-PLANS.doc
TRAFFIC IMPACT REPORT
FOR
COMMERCE ROAD REAL TV
Palm Beach County, Florida
12-14-1999
Prepared By:
Jeff H. Iravani, Inc.
Consulting Engineers
1934 Commerce Lane
Suite 5
Jupiter, Florida 33458
Tel (561) 575-6030
Fax (561) 575-6088
12.1'4- 'Ii
JeffH. lravani, P.E.
FlOiida Registration #33155
Table Of Contents
Item Page
Introduction 1
Trip Generation 1
Radius of Influence 2
Traffic Assignment 2
Affected Arterials 2
Impact Analysis 2
Exhibit "A" Location Map
Exhibit "B" ADT
Exhibit "e" PM PHT
Exhibit "D" DPHM
Introduction
The site is located east of High Ridge Road on Commerce Road and consists of 1.26 ac of vacant
land. A 20,380 SF office/warehouse is proposed.
See Exhibit "A".
The access is to be provided by one turnout onto Commerce Road.
The buildout and 100% occupation is expected by the end of 2000. This report shall analyze the
traffic impact ofthe proposed project on the adjacent roadway system in accordance with Palm Beach
County Unified Land Development Code (ULDC) Traffic Performance Standards.
Trip Generation
Institute Of Transportation Engineers (ITE) Trip Generation, 6th edition, and Palm Beach County
approved trip generation rates were utilized to obtain the Average Daily Trips (ADT) and the AM
& PM Peak Hour Trips (PHT). The proposed average daily trips is 395 Vehicle Trip Ends Per
Day (VTEPD). For the purposes of this traffic report general office was used for the calculations,
Use ADT AM PM
VTEPD VTEPH VTEPH
IN OUT IN OUT
Office (ITE 710)
20.380 KSF @ 20.4 (PBC) 416 28 4 5 25
Pass-by @ 5% 21 1 0 0
Total Generated Proposed 395 27 4 5 24
Radius Of Influence
As per Palm Beach County ULDC, the radius of influence for this project is .5 mile for test-I. Therefore,
the affected links are:
1. High Ridge Road.
For test-2, the radius of influence shall be only those links directly accessed onto the first accessed major
thoroughfare which is also High Ridge Road.
Trip Assignment
The proposed trips are assigned to the arterials within the radius of Influence based on the followings:
North 50%
South 50%
A directional split of 50% is assumed on all affected links.
Affected Arterials
Commerce Road and High Ridge Road are both two lane undivided roadways at this time. Both links are
operating below the LOS "0" threshold at the present time.
Impact Analysis
Exhibits "B" & "C" indicate the proposed and total AOT and the PM PHT on the affected arterials at
buildout All the affected arterials will be operating below the LOS "0" threshold.
Exhibit "0" indicates the driveway peak hour trips. No additional roadway improvements shall be
required.
This project meets test-l and test-2, Therefore, the proposal is in conformance with Palm Beach County
ULOC Article 15, Traffic Performance Standards.
2
HYPOLUXO ROAD
o
<(
o
cr
w
C)
o
0:::
I
C)
I
EXHIBIT "A"
TO 1-95
..
COMMERCE ROAD
VICINITY MAP
SITE
EXHIBIT "B"
HYPOLUXO ROAD
E 4,752
B 703 0 14.8%
P 198
T 5,653
~ C 14,300
o
~
w
~
Q
a=
:I:
<:>
I
COMMERCE ROAD
PROJECT
E 4,752 395
B 703 0 14.8"
P 197
T 5,652
C 14,300
E 1998/1999 AAOT PER PBC MPO
B BACKGROUND TRAFFIC PER PBC HISTORICAL GROWTH
P PROJECT TRAFFIC
T TOTAL TRAFFIC
C CAPACITY, LOS "0" THRESHOLD
AVERAGE DAILY TRIPS
(VTEPD)
EXHIBIT "c"
HYPOLUXO ROAD
E 442
8 65
P 15
T 552
CI C 1.330
""
0
~
w
~
CI
~
:r:
Q
:r:
COMMERCE ROAD
PROJECT
E 442 29
B 65
P 14
T 551
C 1,330
E 1998/1999 AADT PER PBC MPO X 0.093
B BACKGROUND TRAFFIC PER PBC HISTORICAL GROWTH
P PROJECT TRAFFIC
T TOTAL TRAFFIC
C CAPACITY, LOS "0" THRESHOLD
PM PEAK HOUR TRIPS
(VTEPH)
I
EXHIBIT "0"
5 PM
28 AM
~
COMMERCE ROAD
a
<(
o
cr
w
(j
a
cr
I
(j
I
l
PROJECT
4 AM
25 PM
DRIVEWAY PEAK HOUR MOVEMENTS
(VTEPH)
- -------------------~-----_._- ----~ - - -.-- --------------
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. PZ 00-077
FROM:
TRC MEMBERS
Bob Borden, Deputy Fire Marshal
Kevin Hallahan, Forester/Environmentalist
Mike Lane, Police Department
Pete Mazzella, Utilities Department
Michael Haag, Building Division
Lusia Galav, Planning Division
Larry Quinn, Public Works Department
John Wildner, Parks Division
Frantz LaFontant, Engineering Department
David Kelley, Engineering Department
;111~
Michael W. Rumpf i JuyV
Director of Plannin' andoZoning
TO:
DATE:
March 22, 2000
RE:
SITE PLAN REVIEW PROCEDURES
1 ST Review - New Site Plan
Project: Commerce Road Realty
Location: High Ridge Commerce Park
Agent: - Del Swilley
File No: NWSP 00-002
Find attached for your review the plans and exhibits for the above-referenced project. Please review the
plans and exhibits and transmit formal written comments to me no later than 5:00 P.M. on March
27. 2000. When preparing your comments, please separate them into two categories; code
deficiencies with code sections referenced and recommendations that you believe will enhance
the project.
Adhering to the following review guidelines will promote a comprehensive review and enable the
applicant to efficiently obtain Technical Review Committee approval:
1. Use the review standards specified in Part IV, Land Development Regulations, Site Plan Review
and the applicable code sections of the Code of Ordinances to review and formulate comments.
2. The documents submitted for the project were determined to be substantially complete with the
exception of traffic data, however, if the data provided to meet the submittal requirements is
insufficient to properly evaluate and process the project based on the review standards or the
documents show code deficiencies, additional data and/or corrections should be requested by
the reviewer by contacting Lusia Galav.
3. Each comment shall reference the section of the code that is incorrectly depicted on the
documents.
4. Technical Review Committee member(s) shall identify in their comments when the plans depict or
Page 2
Development Department Memo 00-076
Commerce Road Realty
TO: TRC Members
when the location and installation of their departmental required improvements may conflict with
other departmental improvements.
5. When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the
comment and the specific code section may be included in their review comments with the name
of the appropriate TRC Member that is responsible for the review specified.
6. If a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time
frame stated above, to me. The memorandum shall state that the plans are approved and that
they do not have any comments on the plans submitted for review and that they recommend the
project be forwarded through the approval process.
All comments shall be typed, addressed and transmitted to me for distribution to the applicant. Please
include the name and phone number of the reviewer on this memorandum. Lusia Galav will be the
Planning and Zoning staff member coordinating the review of the project. First review comments will be
transmitted to the applicant along with a list of Technical Review Committee (TRC) members.
MWR/nl
Attachment
XC: Steve Gale, Deputy Fire Marshal
Marshall Gage, Police Chief
John Guidry, Utilities and Interim Director of Engineering
Don Johnson, Building Division
Christine Roberts, Public Works Director
Central File
J:ISHRDAT AIPlanninglSHAREDlWPIPROJECTSICommerce Road Realtyl1 STREVIEW-PLANS,doc
Lewis, Nicole
From:
Sent:
To:
Subject:
Wildner, John
Thursday, March 23,20004:02 PM
Lewis, Nicole
Commerce Road Realty
Parks Division has reviewed the above referenced plans. We have no comments at the present time
1