Loading...
AGENDA DOCUMENTS DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. PZ 98-276 SITE PLAN REVIEW STAFF REPORT FOR PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION September 22, 1998 DESCRIPTION OF PROJECT Project Name: Fidelity Federal Property Owner: Woolbright Road Partners Applicant/Agent: Kieran Kilday I Kilday and Associates, Inc. Location: 2505 Woolbright Road, Boynton Beach (Northeast corner of Woolbright Road and Congress Avenue) File No.: NWSP 98-013 Land Use Plan Designation: Office Commercial (OC) Zoning Designation: Office and Professional Commercial (C-1) Type of Use: Financial I Bank Building with four drive-thru lanes (Phase I) Number of Seats : n/a Square Footage: Site Area: Total - 93,292 square feet, 2.14 acres (Phase 1- 44,619 square feet, 1.02 acres) Building Area: Total - 14,200 square feet (Phase 1- 4,200 square feet) Surrounding land uses and Zoning District: (see Exhibit "A" - location map) North - L.W.D.D, L-26 Canal and farther north, Palm Beach Leisureville, zoned R-1-AA. South - Woolbright Road and farther south, McDonalds and Sun Trust Bank, zoned C-3. / Page 2 Fidelity Federal File No.: NWSP 98-013 Existing Site Characteristics: Proposed Development: Concurrency: a. Traffic- b. Drainage- Driveways: East West Venecian Terrace Apartments, zoned R-3. Congress Avenue and farther west, Mobil Service Station, zoned C-3. The 2,14 acre site currently supports a vacant 2,230 square foot bank with four drive-thru lanes, Fifty percent of the site has been developed, including the building and paving. The remainder of the site contains an entrance road and grass accented with three Mahogany trees, two Ficus trees, two Cypress trees, two Oak trees and seven Sabal Palms with shrubbery. At the east end of the site is tract 'H', which consists of a drainage swale running north and south. There are no other improvements or vegetation of any significance on the site. The developer is proposing construction in two phases. Phase one consists of a new 4,200 square foot bank building, four drive-thru lanes (including one ATM lane), and related parking (see Exhibit "B"- proposed site plan), Phase two will be left for future development as a 10,000 square foot professional office building. A traffic statement regarding the number of trips generated by the anticipated traffic of both phases was submitted. Preliminary analysis indicated that this project will comply with all of the requirements of the county's traffic performance standards. Confirmation of capacity has not yet been received from the Palm Beach County Traffic Division. Conceptual drainage information was provided for the city's review. The city's concurrency ordinance requires drainage certification at time of site plan approval. The Engineering Division is recommending that the review of specific drainage solutions be deferred to time of permit review, Proposed on-site traffic circulation consists of three site access points, all to be constructed as part of phase 1. Phase I includes one, variance approved (for distance to an intersection of less than 180 feet), 24-foot wide drive connection to Congress avenue, and one, 24- foot wide drive connection to Woolbright Road. Also to be improved during phase 1 is the 20 foot wide driveway from Woolbright Road through the phase 2 portion to phase 1. In Phase I, a 27 foot wide drive aisle services 13, nine feet by eighteen feet (9'x18') parking spaces west of the bank building. Three eight (8) foot wide drive-thru J. Page 3 Fidelity Federal File No.: NWSP 98-013 and one, eight (8) foot wide vehicle accessible A TM lanes are proposed on the east side of the building. Adjacent to the ATM lane is a 19.8 foot by-pass lane which services four (4),60 degree, 9'x18' parking spaces and dumpster enclosure. Other than the eastern drive connection from Woolbright Road, no site plan, circulation or parking information was submitted for Phase II. This portion is to be constructed at a later date. Parking Facility: There are 17 parking spaces proposed for Phase I, including one (1) space designated as handicapped accessible. This design meets the city's Land Development Regulations, Chapter 2 - Zoning and ADA requirements for this use, and provides for no surplus spaces. Landscaping: The landscaping of the site will fully meet code requirements when staff comments are incorporated, The development will be provided with the required amount of perimeter landscaping. Building and Site Regulations: Building and site regulations will be fully met when staff comments are incorporated into the permit drawings. Community Design Plan: The existing 2,230 square foot building and parking areas will be removed. The proposed building facade, as viewed from adjacent rights-of-way, will enhance the character of this relatively small scale commercial node, The new structure will receive surface treatments and colors of light salmon and cream accented with white fascia and moldings and dark tan concrete roof tiles. The proposed building is distinctive, yet complements the surrounding development. Signage: Proposed signage, as submitted, will meet the land development regulations. The sign code limits the parcel to one free-standing sign and two flat wall signs. The proposed wall signs shown on the building elevations are not detailed as part of the submittal. These signs are each limited to 43 square feet. The proposed free-standing sign is 14'-2" tall with a sign face of 30 square feet, and is located on the site adjacent to the intersection of Woolbright Road and Congress Avenue. RECOMMENDATION: The Planning and Zoning Division recommends approval of this site plan request, subject to the comments included in Exhibit "C" - Conditions of Approval. The Technical Review Committee (TRC) recommends that the deficiencies identified in this exhibit be corrected on the set of plans submitted for building permit. xc: Central File J:\SHRDATA\Planning\SHARED\WP\PROJECTS\Fidelity Federal\site plan staff report Fidel.doc J LC.'~ATION. MAr EXHIBIT "A" FIDELITY FEDERAL ~.--"UI.:)': [ 1 . ..11 ....;!: ~ ';..;:::.Il T.r-~~:_~-'l 4 , :~,:-,~~r~:. \ .~. :: _ . t-~ ' \ ~,..., Nr~\"" I' l.' '~. ... I l' ' ,'l.~ . I: ~-1 ' -:'~ "',~ Y,;1= ,'),:, \:3', ~ / 1" . ......... \ '..1' .~ ~ -; ,\ \: .:-(13 E ~:;:/ I \ ~c::::!.~~' - '. ~~~r-+- ltt-r1. t,rrl '\ . 'r,'TTTi' i,__~'''''':,::=''- , _ ......... '~I ~';~~//\.I I iI- , ~~ ,/"1' 'v .. '.'-. ~~ {.riF ' . i . ~rl: '~l~"&~-. '-IT --~~ r--- ~i 1 ~ :~',",1, ~,~~~~:~".'.'-~'~, '. ' II i' t ~ _ .x-)~. ,"' "< '0 ............. ; ''''~'~~'iJ< ~"- JU~-~~-=- : q l::.:;. ~ "}.'\U'.A' 'lA&."~ ,,' ''''\ J,:'- \, ~_J \'1\:\i '-I ,-. r- I '.' :f-'~' .~<..~ ....:'l("'-<"'~",~J' ~(/ '., ,,_...... ~ ~ __ ~--.::. ..0.... ~.)j ~ ''', .(."1 '\Cv - r ~: \\ ~ lj-~_~Ul~~ ~.,.' ','F). ~ ~,r,~--F'~ \ 1 'i .~, ",\j! ~---.---~~~'i~'~._ ~~">~\P~(tt'l\ ! :. .~S '~,ll ~~- -'-"T'~:M ",.'i' / r'~'" 'y \\r'~':" \ I ~ ..-r- ~,- ~ J ~ /.. ~. -~~~. '" {C. '~ ~ --.=-? ", "'" ~. \\~~ \\ '-. ~.'..:. ' __.1 (/ ,(. -__~,..:/ : j ;> AfT..' i7~ '1~~ "...i x:... .. ,\,' " \ \, ~/- :: }/:'~/ ~ t'-+......~ \\A .'TI ~3; - \\\ \~\ :\~'%" \ .UI:~.L,;P~~,-~-:--~ ~"'\II" .,~ ~!i'~ ~~~"rS\ J~I~~I:~' ...~ ~:::~;~1~1~'" = ,.. :::~-'~.f:'Cn:4.g . ~ - ./ II ~ -1 .1 . +1" I"iiI!'l! , -J-+l.. ~!~~ ~lC.;;--;:-. ~-~'~ ~KESO~ ' ...-' ~ ~ ,..: ~.., I I -~~. ~',."v .:;.< f,,~~~~--,-,,~=a-~ ~ '=" -" ":: ,'_ ;,' r--1,.j~~~r..~'---, .. '~ --.. ~- r "!~,~ ... ',= \IrT[ ~ ~ PHASE II j t:..-~~~~ J ' .."'" .i'-.:r-.....')-. ;r ... '-' .. ~ ~_ ~ r~", ~..,:~~f~~ ~ J 11 {y IlIl\)i ~, I. ,~. .. '- ~" 'R~..3.... r' '~~, , . ' ~~. ~-~C' - ~- -~::.. .'.-. -~ ~ d _.,- I u. I~' (5 ~ ".. vENUE1. ~">L.R""" ...~- ',j""'" 1I1i~'= ~~\--~. ._'::-, I.,;.~ ~ - e- 'I "-~ " :9r~:'f-": N:'~ 2= r'J::0:: I J:lCll <;3 " . .'~A ~ ~;;~~~ \-:' )' 1 / ~mn'~:; f: ',,' "'UC ~~~~~ ~/ ~ / i ~~ IT J llU';' I:: ~ ~.~ ~~, . I :JU: -1--:f' 1 ~c ~~Z~~i'~ . /1 -;Ou., II I '"~ ~</ ... ~.xK N-Y r-r~,. 4'.) =t.' T' ~ llr-;:' ,.----. - --~ I ~,' . I if' ,I. i! ,! I .,~,,(<. -n;v'\JH-ltJX' ~" ;)~ / ;:::tIID A-yrf I L/ .. =-- ,., I . ~ ,.~~'~{ ;... =:;J- // 0,....:~ - rm ~ .F;" l 1\ -~. i . , - ..., ~ ~ .'~ ~'J. ~'::' 0-. ',' t::E ---J'~ '~ · IIi ~,~ :! = ' ";""" ,.... ~ ~ "X .v<...' ~ :x..' ~--~ - .~. '~.'WII..L. I ,- __'I ")'V II, I. '1 ~ _ \ - ~'1---= - 1.' ---- ,r----'" L!:-.' )V-,,~. I . I ' "'" u ' . . \ ~ ~ ~\ ~~I.Ii..~AKE~~' ~ -..J'-rL I , '. ~)'l~'J:~ ~ ~ ~ ' , )) I :'~ 1 ' ~. '.W1 ,', 'v I = ~ ,1'_ I. -::tf9:..P W'"<:~,,: r -1:r~'ll:~:jl= ~.,.~.. '~lf"'1 - rue .J.. -t I I~ _ ..,." ~ ><V--0-"" ., -~ J.I \ " ~.' . III - ,_;;. .. ....L ;;;\-..... " .; Fr-- ~ \ Sr." ,...~.., ", I '. ~"L 1;:;( j' ~ . " 1:.,'"''1' .~ ~ m . t..J,: ',' -~~ -_J i; i'~-'\"""""~'-~<-~\'\\U ':"',\ ~ O,C1 T'I;, "'1 111111 "~--"""""'" .... ~ ' '. ....j' II 1 \ M I I "'..... ., . . . ..' ! ;....- . r . , , ' ,. '.-- ! I I I \ !! b.. I !~; ~~0: ~r~"~: I ... _ '0 ~,-----,/ '~ ~~li:' ~'~~~ '1'1 .- ',~'~ P'U~._ L~,~. I~;' : :~.- '0 - ~ .-w....-~-I ~ -.. ~ ..-,r ~li\T~ ~i -Ii ~ l ~ ;:'~,: l ~ . _ , '/ oj ... ,- ..:- .- ~ -=: -' ~ ~r:. -~~ _1--- 1/8 III I I 400. 800 FEET P/...A "'NIN /; tJEPr: ~ MILESV' ~ .... - , l- ' ~/98 \~~;:\\l!~\\~~~~~ ;_~. '. ntH .. ... - - ...,~"" ~~ ~:. . . . .. . . ' ~ : .: ~ ; J, ~':: -: - ? . .", ~ ~ ,. ;\~ ~,~'~ ~:~.~ ~ <A ~='!.\ '" -:;,~ ~ ~~ ~~- <:.\~~ ~~., 00;;'5: '! seAle ~ '6~~~ 6<1 Q ~ V\\~~:, ~~~ - .\' \ \Wa\ .. (>;\\ } -4 \ \ \ \. \\ \ ~ ~~') ", ,:-/ ~' - -../ ' \ \ \ \ \ \ \ \ J \ Ii I ! ....;-;; - - -- ; \'" - -"... ~,~~/ ~, > & \/,' i'l~ \;.: " ""-- .';.\ \ \ l: 1!. , f. ~ ~ 'I; E~\-\\8\1 "8" ~ ro o 'to- --I 1"' ~t~ c"- ~~~ 'i.i ' ~t~;''' /l.'lt~ __l;~'----:- r- --- ---- O'':~ f ~~~ '~~ i\. ;;::""_:;:;;;;:;:; ~;;'d--- ~ ~ ~ ::: .., '1. , '\: , 1\~ \\ 'y\ \ '\ -.i I ~t.'~ \~- :.~. '( ~ . ~~ ~,1 ,', " "~ \ ~ \ ~\ r. \ 'J ~ '~t~~ ~~~~ ~~~7 .....IL ~-~ ,; !. 1 -D o ~J}}:1!i"r.\3,1)f.RPJ.- t c,..,...~..."'~ '1 ar'l>"ce \" \i ~ \:. i: \ .'" ~~ 1-, ;.. \:~'" t;<ri ~ , 1.\ ., \' a< I>SSoelol.' ,,\laOY ,.tc\"I,\el:;.'1S!V'\onf'le ,~~~scfo~:n" pta~,e , sui\. 'o~ f(.~Ocr\. f\Of,dO \IIe$\ fie. "-S'l'2. .to-':'~~~O\ ,,,,e.I' e.69-' - ---------------------------------- EXHIBIT "e" Conditions of Approval Project name: Fidelity Federal File number: NWSP 98-013 Reference: The plans consist of 6 sheets identified as 2nd Review. New Site Plan. File # NWSP 98-013 with a September 2. 1998 Planning and Zoning Department date stamp marking. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS Comments: None UTILITIES Comments: None FIRE Comments: None POLICE Comments: None ENGINEERING DIVISION Comments: 1. On the paving and drainage plan show all markings, signage and striping including right turn only signs, right turn arrows and one-way arrow signs within the Woolbright and Congress Avenue medians. [LDR Chapter 4, Section 7.B.2.] 2. Site lighting shall not be turned off prior to 2:00 a.m. 3, Approval by Palm Beach County Traffic Engineering and Lake Worth Drainage District (L WDD) shall be required, including written response from L WDD regarding removal of existing outfalls into lateral Canal 26 prior to permitting. 4. All plans submitted for specific permits shall meet the city's code requirements at time of application. These permits include, but are not limited to the following: site lighting, pavmg, drainage, curbing, landscaping and irrigation. Permits required from other permitting agencies, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and others, shall be included with your permit request. BUILDING DIVISION Comments: 5. Omit the site lighting plan found on sheet A-I and add the location of the & Page 2 Fidelity Federal File No.: NWSP 98-003 DEP AR TMENTS INCLUDE REJECT proposed site lighting poles to the site plan drawing. Place a note on the plan indicating that the permit for site lighting will comply with the site lighting regulations specified in the Code of Ordinances. Or Amend the submitted site lighting plan to show no less than 0.5 foot candles for all traffic/vehicle use areas. 6. Following site plan approval, add to the site plan drawing that is required to be submitted for permit review the actual setback dimensions from the property line to the leading edge of all sides of the building and/or canopIes. 7. Following site plan approval, add to the site plan or paving and drainage drawing that are required to be submitted for permit review a detailed drawing of the proposed accessibility curb cuts that are identified on the site plan and, where applicable, provide detail drawings of the accessibility ramps. The accessibility route depicted on the permit plans shall be III compliance with Accessibility Code for Building Construction. PARKS AND RECREATION Comments: None FORESTER/ENVIRONMENT ALIST Comments: None PLANNING AND ZONING Comments: 8. Continue the 5 foot wide landscape buffer eastward from Phase 1 along the south property line of Phase 2 between the access drive and Woolbright Road. Provide a continuous hedge, 1 tree per 40 linear foot, and irrigate accordingly. Ch.7.5 Art.II Sec.5 Par.D.l ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS 9. To be determined. ADDITIONAL CITY COMMISSION CONDITIONS 10. To be determined. /bme s:\projects\cond of appr\ 7