Loading...
REVIEW COMMENTS Galav Lusia From: Sent: To: Cc: Subject: Borden, Bob Tuesday, June 27, 20004:08 PM Galav Lusia Gale, Steven RE: Fidelity Federal NWSP 98-013 Thank you, This site can not receive a CO Final until they have a hydrant flow test done. We have no record of this happening. Normally this is done prior to Site plan approval. How they got where they are to this point, i.e., above grade construction without a hydrant on site (it was installed), no flow test to show the water availability; I don't know. Bobby -----Original Message----- From: Galav Lusia Sent: Thesday, June 27, 20003:54 PM To: Borden, Bob Subject Bob, This was your first review comment: "No water distribution plan was provided. a hydrant is required so that no portion of the structure is more than two hundred feet (200') from the hydrant, LDR Ch. 6 Sec. 16. The recommended placement for the hydrant is at the south entrance to the bank parking lot." No comments were indicated for the "Conditions of Approval". That's alii found in the file. Lusia 1 DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. PZ 99-070 TO: FROM: Don Johnson Building Division ;??G~- Michael W. Rumpf Acting Manager of Planning and Zoning DATE: March 11, 1999 SUBJECT: Fidelity Federal Accompanying this memorandum you will find documents for your departmental records regarding the site plan that has received final sign-off. PROJECT NAME: Fidelity Federal Type of Application: NEW SITE PLAN Planning and Zoning File No.: NWSP 98-013 Control Plans (Rectified Master Plan): 1 Sheet of 8 City Commission Approval: 10/6/98 Meeting Minutes and Conditions of Approval MWRbme Attachments J:\SHRDA TA \Planning\SHAREO\WP\PROJECTS\Fidelity Federal\TRANSMTL-Rectified-Bldg.doc DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. PZ 98-308 TO: FROM: Bulent Kastarlak, Director of Development Larry Roberts, Public Works Director Mike Haag, Building Division Bob Borden, Assistant Fire Marshal Ofc. Robert Riggle, Police Department John Wildner, Parks Division Kevin Hallahan, Forester/Environmentalist Pete Mazzella, Utilities Department Ken Hall, Engineering Division Bob Donovan, Permit Application Group Michael W. RUt?r;c::- Acting Planning and Zoning Manager DATE: November 6, 1998 SUBJECT: Fidelity Federal - New Site Plan - MODIFIED (sign-off) File # NWSP 98-013 The amended site plan for Fidelity Federal has been submitted for final sign-off by the Technical Review Committee. Four (4) sets of plans, each requiring your unconditional signature, are available for review in Planning and Zoning. A copy of the originally reviewed plans, staff comments and City Commission approval of the Site Plan Modification will be available for your use to perform the review. Please review and sign-off each of the four (4) sets of plans, NO LATER THAN 5:00 P.M., NOVEMBER 16, 1998. If the plans are not in compliance with your staff comments or City regulations, sign the plans "subject to memo". To facilitate the sign-off process, please resubmit written comments addressed to the Planning and Zoning Manager, NO LATER THAN 5:00 P.M., NOVEMBER 16, 1998. Thank you for your prompt response to this request. MWR:bme cc: William Bingham, Fire Chief Marshall Gage, Police Chief John Guidry, Utilities Director Sebastian Puda, Engineering Division Central File s:\projects\Fidelity Federal\recmslpl\nwsp 98-013 DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. ENG 98-149 DATE: Michael Rumpf, Acting Planning and Zoning Administrator Kenneth Hall. Engineering Plan Check lnspectorrrechnician~ November 13, 1998 TO: FROM: RE: FIDELITY FEDERAL MODIFIED SITE PLAN The subject site plan and associated paving and drainage plans should be modified as follows: I. Indicate right turn only arrow markings on both egress driveways. ~ 2. Show the sidewalk along Congress A venue and Woolbright Road through both ........--. driveways (sidewalk within driveway shall be 6" thick). 3. Show the stop sign and stop bars four (4) feet back of sidewalk at both driveways ~ 4 Until Phase Two is completed, stripe and mark the north access aisle as follows: a. Delete the "Thru" arrow pavement markings for ingress traffic and show a "Right Turn Only" pavement arrow at the ingress driveway. b Within the limits of the curbed area from along the north side of the bank building, show an eight (8) foot wide yellow striped area with six (6) inch yellow cross- hatched lines within so as to delineate a one-way out aisle for exiting drive-thru traffic Install a "Do Not Enter" post sign at the western end area of the striped area ~ facing west to deny ingress thru traffic. c Show a "Left Turn Only" post sign and pavement arrow for exiting traffic from the west parking lot The purpose of these revisions is to deny inbound traffic from / entering the drive-thru area and beyond with no legal means of exit. KRHJck Xc: Rav Davidson Sebastian Puda C \Iv D""ulll~nts Fidditv F~lkral \I,'dili"d S'l" Plan.do" LEISURE SERVICES: PARKS MEMORANDUM #98-193 TO: Michael W. Rumpf, Acting Planning & Zoning Director John Wildner, Parks Superintendent ~)1/ J ,-J Major Site Plan Modification: Fidelity Federal, 2nd Review September 8, 1998 FROM: RE: DATE: The Leisure Services Department, Parks Division, has reviewed the major site plan modification for Fidelity Federal. There are no recreation-related comments at this time. The plan may continue through the normal review process. JW:ad /; ! r'; \; . I (J) :-.~. ". ~ ~ ~ j i ,.d ; , (' --I" .' '.:t..;: ,")1:1"' ~ - 8 r"~\l .~._.~ ... ,:' r\ I I ._.~ljHlf 8 1998 ; !) n ..-J i 1 ~..-_.~- - ~ ~ :, - ~,-~.T5. ' _._,^",,~...:~~J..:.J:; ;;:-:PI J RECREATION & PARK MEMORANDUM Re: Mike Rumpf, Acting Director of Planning and Zoning Kevin John Hallahan, ForesterlEnvironmentalist ~ II- Fidelity Federal New Site Plan TO: FROM: DATE: September 8, 1998 The applicant has commented on the existing trees. The project should continue in the normal revIew process. Kjh ~, ~_~.~ ~ 0 W ~ I~. ~ Jl. )J1 dill. . ' 1 - ~ l: ! ~ , SEP 81998 i~1 - "'~~ File ". --_.......-..,._~.~,. MEMORANDUM UTILITIES DEPT. NO. 98 - 221 ill~ rn 0 \VJ rn M.2. rn TO: Mike Rumpf, Acting Planning Director FROM: John A. Guidry, Utilities Director DATE: August 12, 1998 SUBJECT: Fidelity Federal Building - 2505 Woolbright Road - New Site Plan 1st Review We offer the following comments on this project: GENERAL COMMENTS 1) All utilities easements shall be shown on the rectified landscaping drawings so that we may determine which trees may interfere with utilities. In general, palm trees will be the only tree species allowed within utilities easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future. LDR Sec. 7.5-18.1 gives public utilities the authority to remove any trees that interfere with utility services, either in utility easements or public rights-of-way. 2) Department of Health permits may be required for the water and sewer system extensions serving this project. (Sec. 26-12) 3) Fire flow calculations will be required demonstrating the City Code requirement of 1500 g.p.m. as stated in LDR chap. 6, Art. , Sec. 16, or the requirement imposed by insurance underwriters, whichever is greater. (see Sec. 26-16(a)). Please submit these calculations with your Health Department permit application and plans. 4) Sec. 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project either upon my request for signature on the Health Department application forms or within 30 days of site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand. SPECIFIC CONDITIONS 1) Water and sewer lines to be owned and operated by the City shall be included within utilities easements. Please show all existing or proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in Sec. 26-33(a) of the Code. 2) LDR chap. 6, Article IV, Sec. 16 requires that all points on each building will be within 200 feet of an existing or proposed fire hydrant. Please demonstrate that the plan meets this condition, by showing all appropriate hydrants on the site plan. 3) The means of supplying water (including fire protection) and sewer service to the building are not clear. Please indicate on the plans how the building will be served, including an engineering justification for the size of meter and sewage lift station. It is likely that an off-site water main extension will be required. 4) Appropriate backflow preventers will be required on the domestic water service to the building, and the fire sprinkler line if there is one, in accordance with Sec. 26-207. 5) A building permit for this project shall not be issued until this office has approved the plans for the water and/or sewer improvements serving the project. (Sec. 26-15) Please refer any questions on this matter to Peter Mazzella (375-6404) of this office. JAG/PVM Xc: Skip Milor Peter Mazzella File Department of Development Memorandum No. DD 98-258 Fidelity Federal - New Site Plan 1 sl Review Comments August 12, 1998 Page 2 4. Following site plan approval. add to the site plan drawing that is required to be submitted for permit review the actual setback dimensions from the property line to the leading edge of all sides of the building and/or canopies. 5. Following site plan approval. add to the site plan or paving and drainage drawing that are required to be submitted for permit review a detailed drawing of the proposed accessibility curb cuts that are identitied on the site plan and, where applicable, provide detail drawings of the accessibility ramps. The accessibility route depicted on the permit plans shall be in compliance with the Accessibility Code for Building Construction. En2ineerin2 Division (Site Specific Comments) - Sebastian Puda & Ken Hall 561-375-6280 1. Identify the clear sight triangles as specified in D.O.T. Index 546 for both proposed driveways. 2. Add a note to the landscape plan regarding cross visibility within the clear sight triangles as specified in LDR Chapter 7.5, Article II. Section 5.H 3. On the paving and drainage plan show all markings, signage and striping including right turn only signs, right turn arrows and one way arrow signs within the Woolbright and Congress Avenue medians. [LDR Chapter 4, Section 7.8.2.] 4. All changes to each and every plan drawing shall be retlected on every other plan drawing where appropriate. 5. Remove the 6" raised curb extending southward along the east side of the ATM lane and stripe the area to delineate the lane. Curb acts as a contlict with garbage truck pickup and vehicles backing out from angle parking. 6. If Congress A venue driveway variance is approved, approval by Palm Beach County Traffic Engineering and Lake Worth Drainage District shall be required. 7. Remove the asphalt "temporary existing paved access drive" and sod and irrigate all of Phase Two. 8. Provide written response from L WDD regarding removal of existing outfalls into lateral Canal 26 prior to permitting. 9. If the variance is approved for the driveway onto Congress Avenue and if ingress traffic is allowed eastward to Phase Two, then the following modifications shall be required: a. Extend the second and fourth concrete median islands delineating the drive-thru area out to a point in line with the eastward extension of the north curb line of the building b. Add stop signs at the ends of the extended medians and at the north end of the angled parking area. c. Install a two foot thermoplastic white stop bar at the end of the two median islands from the first drive-thru aisle eastward to the curbed island at the north end of the angled parking area (next to the 3rd stop sign referenced in item b.). Department of Development Memorandum No. DD 98-258 Fidelity Federal- New Site Plan I't Review Comments August 12, 1998 Page 3 The purpose of the above modifications is to provide a safe and efficient flow of traffic throughout the site for the public. [LDR Chapter 23, Article I, Section 1.] 10. Obtain variance for driveway on Congress Avenue to allow for a driveway distance of 128 ft. from intersecting right-of-ways. [LDR Chapter 23, Article II, H.3.] II. Provide traffic control devices at northeast drive to Phase II (18" X 18" "End of Road" markers). [LDR Chapter 4, Section 7.B.2.] 12. All plans submitted for specific permits shall meet the city's code requirements at time of application. These permits include, but are not limited to the following: site lighting, paving, drainage, curbing, landscaping and irrigation. Permits required from other permitting agencies, such as FDOT, PBC, SFWMD, DERM, LWDD, DEP and any others, shall be included with your permit request 13. Provide Palm Beach County permits for driveways to Woolbright Road and Congress Avenue. Recommendations/C omments 1. Close the existing easternmost driveway at Woolbright Road. 2. Locate the handicap access path from the Congress Avenue sidewalk in alignment with the accessible path next to the proposed handicap stall - shortest path to the front entrance. MH/SP/KH:ck Xc: Bulent Kastarlak Don Johnson Sebastian Puda Ken Hall C: \1~.l)ll~lIl1lcnls-Fiddil\" Fcdcral Ncw Sitc Plan 1st RC\.ICW.dll~ RECREATION & PARK MEMORANDUM TO: Mike Rumpf, Acting Director of Planning and Zoning KJ/f ~A..~_ FROM: Kevin John Hallahan, Forester/Environmentalist Re: Fidelity Federal New Site Plan- 1st Review DATE: August 11, 1998 1. The applicant should attempt to relocate any ofthe existing native or desirable non-native trees. This is in accordance with the City Tree Preservation Ordinance. [Environmental Chapter 7.5] 2. The applicant must provide landscape / irrigation plans for the grassed median on Woolbright Road. The concrete medians on Woolbright Road and Congress Avenue must be cleared of existing weeds. This is in accordance with the City Comprehensive Plan Policy. [Policy 2.4.5,p42] The project should continue in the normal review process. Kjh File -. rDJ rn @ rn n ,- lJ1J~. .J L----'..{---~-._.J PLi .'; -;; ,~@ ZONl\G LJEPT. PUBLIC WORKS DEPARTMENT MEMORANDUM #98-224 FROM: Mike Rumpf, Acting Planning & Zoning Director CJ)~' C. Larry Roberts, Public Works Director :if v Mark Lips, Sanitation Foreman {\'I'" L- TO: THRU: SUBJ: New Site Plan - 1 st Review - Fidelity Federal DATE: August 11, 1998 Public Works has no comments or objections to the above new site plan. We recommend this project be forwarded to the Planning & Development Board for consideration. MLlcr FIRE & LIFE SAFETY DIVISION Memorandum No. 98-307 w ~ 113 , 1998 ill ~ '~ NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire Protection Association codes, and the City Fire code shall be adhered to. TO: Mike Rumpf, Act. Director Planning & Zoning Division FROM: Steve Gale, Fire Marshal ~c/ Deputy Chief - Fire Rescue Bep~ent DATE: July 31, 1998 SUBJECT: Fidelity Federal NE Corner of Woolbright Rd. & Congress Ave. NWSP 98-013 Project Coordinator: Scott Barber No water distribution plan was provided. A hydrant is required so that no portion of the structure is more than two hundred feet (200') from the hydrant, LOR Ch. 6, Sec. 16. The recommended placement for the hydrant is at the south entrance to the bank parking lot. C/__/I_~~ sf D . - -.-- ~ A'_/~: 1- ^~ ~~ ::::-- . . ,710 ~~?-~ ~2j~~ ~~/. CC: File .JEVELOPMENT DEPARTMENT MEMORANDUM NO. PZ 98-226 FROM: TRC MEMBERS Steve Gale, Fire Marshal Ken Hall, Engineering Division Kevin Hallahan, Forester/Environmentalist Mike Haag, Building Division Pete Mazzella, Utilities Department Ofc. Robert Riggle, Police Department Larry Roberts, Public Works Director/City Engineer John Wildner, Parks Superintendent Ray Davidson, Engineering Division ';=:D~~ C~)~/2, fY\ld~ ~ ,/] Michael W. Rumpf c;- ~ Acting Director of Planning & Zoning TO: DATE: July 29, 1998 RE: SITE PLAN REVIEW PROCEDURES 1 ST Review - New Site Plan Project - Fidelity Federal Location - 2505 Woolbright Road (northeast corner of Woolbright Road and Congress Avenue Agent - Lindsey Walter, Kilday and Associates, Inc. File No. - NWSP 98-013 Find attached for your review the plans and exhibits for the above-referenced project. Please review the plans and exhibits and transmit formal written comments to me no later than 5:00 P.M. on Auaust 12. 1998. When preparing your comments, please separate them into two categories; code deficiencies with code sections referenced and recommendations that you believe will enhance the project. Adhering to the following review guidelines will promote a comprehensive review and enable the applicant to efficiently obtain Technical Review Committee approval: 1. Use the review standards specified in Part IV, Land Development Regulations, Site Plan Review and the applicable code sections of the Code of Ordinances to review and formulate comments. 2. The documents submitted for the project were determined to be substantially complete, however, if the data provided to meet the submittal requirements is insufficient to properly evaluate and process the project based on the review standards or the documents show code deficiencies, additional data and/or corrections should be requested by the reviewer by contacting Scott Barber. DEPARTMENT OF DEVELOPMENT Division of Planning and Zoning Bulent I. Kastarlak, NCARB Director Building Planning &: Zoning Engineering Occupational License Community Redevelopment July 30, 1998 Mr. Dan Weisberg, Senior Engineer Palm Beach County Traffic Division Department of Engineering and Public Works P.O. Box 21229 West Palm Beach, Florida 33416 Re: Traffic Study: Fidelity Federal 2502 Woolbright Road (northeast corner of Woolbright Road and Congress Avenue) File # NWSP 98-013 Dear Mr. Weisberg: The enclosed traffic study on the Fidelity Federal site dated July 27, 1998, prepared by Andrea M. Troutman, PE, Troutman Consulting, Inc. was received by Planning and Zoning recently for the above-referenced application. Please review the enclosed information for conformance with the County's Traffic Performance Standard Ordinance. If you have questions regarding this matter, please call me at (561) 375-6260, otherwise please send me your written comments/approval to the above address. Sincerely, ~'-~\. C~~C-& {J.,,--~ C\\ \ C \.\.l'''-'-C Michael W. Rumpf Acting Director of Planning and Zoning () -C "--- rvy)1 MWRbme cc: Central File s:\projects\Fidelity Federal\traffic America's Gateway to the Gulfstream 100 East Boynton Beach Blvd., P.O. Box 310 Boynton Beach, Florida 33425-0310 Phone: (561) 375-6260 FAX: (561) 375-6259 Troutman C:onsulting, .nc. Transportation Engineers ~ 1I U W m fii'J. JU'_ 2 9 1998 I i!Jj PLANNING AND I Z NING DEPT i ): July 27, 1998 Mr. Dan Weisberg, PE Palm Beach County Traffic Division 160 Australian Avenue Suite 303 West Palm Beach, FL 33406 IE: Woolbright Fidelity Federal - #TC98-15 Dear Mr. Weisberg: Enclosed, for your review, is a copy of the traffic impact analysis for the above referenced project. The project is located in the northeast quadrant of the Congress Avenue/Woolbright Road in the City of Boynton Beach. If you have any questions. please do not hesitate to contact this office. Sincer , ~ d~T~?!!1~ . resident cc: Michael Rumpf Dan Turk Lindsey Walter D:\PROJECT FILES\TC.\TC9&-1.5\letterr. 2324 South Congress Avenue, Suite 1 H West Palm Beach, Fl 33406 (561) 434-1644 Fax 434-1663 ,fOJ ~ @ ~ D' fii1 I UU ...... l!!J I PlANNING I .- l, ZONING DE . WOOLBRIGHT .FI DELlTY FEDERAL TRAFFIC IMPACT ANALYSIS Prepared for Fidelity Federal 218 Datura Street West Palm Beach, FL 33401 Prepared by Andrea M. Troutman, PE Troutman Consulting, Inc. 2324 South Congress Avenue, Suite 1 H West Palm Beach, FL 33406 #TC98-15 July 27, 1 ~98 <I , /v ,JOo 0 fu ''\~'\~ WOOLBRIGHT FIDELITY FEDERAL TRAFFIC IMPACT ANALYSIS Introduction Troutman Consulting, Inc. has been retained to conduct a traffic impact analysis for a proposed commercial development in the City of Boynton Beach. The purpose of this study is to determine if the proposed development meets the requirements of Article 15, Traffic Performance Standards, of the Palm Beach County Unified Land Development Code (ULDC). Site Data The site is located in the northeast quadrant of the Woolbright Road / Congress Avenue intersection as shown on Exhibit 1. Existing on-site is a vacant 2,230 SF drive-in bank that had been operational within the last 5 years. It is proposed to demolish the existing building and develop a 4,200 SF drive-in bank and a 10,000 SF office building. Access to the proposed development will be via two (2) driveway connections to Woolbright Road and one (1) driveway connection to Congress Avenue. Year 2001 conditions were examined for this analysis. Existing (1997/98) Traffic Conditions Exhibit 2 provides the 1997/98 annual average daily traffic (MDn volumes for the surrounding roadway network as compiled by the Metropolitan Planning Organization (MPO) of Palm Beach County. Peak hour traffic volumes were determined by applying a 'K' factor of 9.3% to the MDT volumes. These volumes are also shown on Exhibit 2 along with roadway lanes, levels of service (LOS) and the adopted LOS D service volumes. 1 Project Traffic Trip Generation Daily trip generation rates and pass-by rates for the proposed drive-in bank and office building were obtained from Section 10.8, Fair Share Road Impact Fees, of the Palm Beach County U LOC. Peak hour trip generation rates were obtained from the Institute of Transportation Engineers (lTE), Trip Generation, 5th and 6th Editions. Exhibits 3A, 3 Band 3C provide the daily, AM and PM peak hour trip generation data respectively for the proposed development For Traffic Performance Standards purposes, based on the net daily trip generation of 498, the Test 1 radius of development influence for the proposed development is one-half mile and the Test 2 radius is the directly-accessed link. Trip Distribution and Assignment A directional distribution was developed based on land use patterns and existing travel patterns. Exhibit 4 shows the assignment of daily and peak hour project traffic as well as the project impact percentage (% of daily adopted service volume). Future Traffic Conditions Roadway Improvements No roadways within the study area radius are scheduled for construction based on a review of the adopted roadway improvement programs. Background Traffic Historic growth trends and Major Project traffic must be analyzed in the projection of future background traffic volumes. Historic growth data is provided on Exhibit 5 for the surrounding roadway links. Major Project data, compiled by Palm Beach County, was reviewed. No Major Project was identified that is projected to have a 10% impact on the study area roadways within the analysis time frame of the proposed development Therefore, per the Traffic Performance Standards, no background traffic in addition to historic growth is required to be included in future background traffic projections. 2 Traffic Performance Standards Analysis Test 1 (Link Test) This first test of the Traffic Performance Standards examines if any roadway links, required to be analyzed, are projected to operate below adopted level of service standards on an average daily and average peak hour basis. Exhibits 6A, 6B and 6C show future daily, AM and PM peak hour traffic conditions respectively for the analyzed roadway links. All roadway links required to be analyzed are projected to operate above the adopted Test 1 level of service standards by Year 2001. Therefore, the requirements of Test 1 are met Test 2 (Model Test) The second test examines traffic conditions based on model projections that are developed and maintained by Palm Beach County. This Test 2 model shows that the directly-accessed links of Congress Avenue and Woolbright Road are not deficient links. Therefore, the requirements of Test 2 are met Intersection Analysis Major intersections for which a proposed development adds more than 10% of the total traffic on any link connecting a major intersection are required to be analyzed. No major intersections meet this requirement based on the proposed development's impact Driveway Volumes AM and PM peak hour project driveway volumes are provided on Exhibit 7. Conclusions This analysis shows that the proposed development meets all of the requirements of the Traffic Performance Standards of Palm Beach County. 3 EXHIBITS o u ~ ~ I NT (t\ BOYNTON BEACH BOULEVARD \..1...1 ...., 0 :::> < z 0 ...., > 0:: -< Lf'l u.J V) T u V) z ...., u.J c>::: 0:: (,J ~ z 0 -' u .."- SITE ~ ;. ! ('"\ WOOLBRIGHT ROAD \~ SW 23RD AVENUE (GOlF ROAD) ~ ~ s. 7(27(98 ~ EXHIBIT 1 PROJECT LOCATION WOOLBRIGHT FIDELITY FEDERAL o o BOYNTON BEACH BOULEVARD o < o e<: LU U Z LU e<: ~ -' ~ 4LD 18601 C 31100 1730C 2890 WOOlBRIGHT ROAD , 6LD ! 32291 D 47500 3003 D 4420 6LD 30898 0 i 47500 , 28740 4420 2L 9555 D i 14300 , 889D ! 1330 6LD 31489 D 47500 2928 D 4420 SW 23RD AVENUE (GOlF ROAD) WOOLBRIGHT FIDELITY FEDERAL I 6LD , 32706 D 47500 30420 4420 6LD 30694 0 47500 2855 D 4420 LU => Z LU :;c '" '" LU e<: lJ Z o U -SITE ~ t' " 1 ~ 2L 11253 D 14300 1047D 1330 LEGEND 6LD - ROADWAY lANES 30898 D - DAILY TRAfFIC AND LOS 47500 - DAILY ADOPTED SERVICE VOLUME 2874 D - PEAK HOUR TRAFFIC AND LOS 4420 - PEAK HOUR ADOPTED SERVICE VOLUME 6LD 32346 D 47500 3008 D 4420 N.T.S. U") ~ ~ 7/27/98 EXHIBIT 2 EXISTING (1997/98) TRAFFIC CONDITIONS ~ ~ ~ "'" Jb 5 ~ ~ % ~ ~ (:) ~ ;:. -0 ~ -';:' ? ~ s 5 .so ~ 0) c;. ~ ~ C>- t --0 f., 0) "'" "'0 % ;;- -0 1> r>>- ~ ~ .~ -- tP. ~ ~ ~ oJ> .~ ~ s.. 'S ~ .t ~ --a~ ,5 ~~ .~ ~(l$ ~~ ~~ .~ ~ .oo! .L ~.t c'J .~ 'Y"" ~~~ .~ 0 (l$ ~~o ~-~-' /~ ~~/~ .~ i ~ \ v \ '?; -.; ~ o -0 'fa ... -0 " ~ ? ~;g '% ~ ",,0 ~~ i ~ ,~ ~ ~1- ~ " " ~ ~"'6 ;;... ~ a;i ~ ~~ t ~ ~ .- 'EI> -0 ~ '& 't,~ .;2 ~ ~fj; '?lr .'i> ~ ~- .;::. fP. '"'6~ 2!. 't, ~.~ $i1> .' 't, ~ - ~ ~ '3>'" ".-c:; ~'-'" t .~ & t 8 c:. ~ ~tt '&\ ~~ \loo' l;.g: .,::;;:' ~... .~ ~ ~~ ~~~ ,-. ~ ~ ~~~ .~ o~ ~~ ----~.~~~~- -~- ----~~~ -~_/ on co .e.~ '" d;, i': .= 0 '" ~ '"" u ~ ..... "" c o III ;: l\:l Q.. E o u c o -~ l\:l ... ~ ~ "C CII ~O ~.~ C111- :E ... ... 5 :i::c ~ .~..:.li .Q m - Q. 8~ ~Cl.. - :.E :E l< I.I.l E ! -0 -0 I~ ..: - M l- =' M ~ 0 z ~ - M .5 M rf!.. -0 >-~ ~ ~t!. '" .s - " .- -0 Q.~ LO ! N N .s ,... ... - - l- ii - ,... =' -0 e: 0 ... ~ - - ..... :c .5 rf!.. 0 ii .s. e: ... - .!! ... .5 I- 0 ! N N ,... & ~ - ,... =' -0 ! 0 - - ,... .5 -0 ~ 6' C LO .!! -- 0 ... ~ ell: W- e: en 0 0 ::: 0 ... o. .. III ,... e: -- III ...... (.;) ...... .e ~ .. LO I- ~ W- en '" e: 0 .!! M .5 <'t N III '" ::l "l::l ~ c: e: l'Il ... a:l .... c: .~ 0 ) l M 0 M N M '" ,... ,... ,~ ..: - LO -0 l- =' :c N co ~ 0 Z N LO ...... .5 -0 -0 rf!.. rf!.. -0 LO >-~ ~ .a~ I en '" " .Eo LO N ...... Q.~ 0 0 ,... ,... ! co N 0 N M -0 J N N .. l- ii - ~ ...... ,... =' ,... N ~ e: 0 ,... ,... .. ~ ~ '" c:r> ..... .5 ,... ,... ,... ,... rf!.. rf!.. rf!.. ,... 0 1Il l & ,... ,... ti .;: il- N N ~ ! 0 ~ ~ M M -0 N N a. "i: '" co M I- - ,... N ~ =' :g 0 ,... ,... I- '" -0 ,... .5 ,... N ,... ,... n ;;, ~ 6' ~ C '" ..... .!! 0- ~ ... ~ ~ ell: '" u... c:q e: V> ~ 0 0 ~ ::: 0 l! 0, ~ III ,... <:: e: -- --' III ...... ..... (.;) ...... '" .2- ~ ..... 0 .. '" l- II ~ --' ~ W- W- en en en e: 0 0 .!! 0 0 .5 N 0 ~ o' ,... III '" ::l QJ "l::l ~ u c: E e: l'Il ... a:l 0 .... c: ~ III .... .~ QJ ~ c: 0 QJ g (,J ...... co M '" ~ M II) 'C I- tii e: .. ~ ..... gb ~ e Z ~ "OJ .0 Z fj ~ ~ 0; !i .,Q e .Q 1i'i ;;;. a> e 0 ., '0 .... .,s <0 .,s .~ r '0 DO g <:: ., III .... E 2- ~ '" ~ -0 '" 0 > u 0 0: .9 '" '" E :J Q. -0 0 e Q; 0 > .., '" '0 Cl .... -0 .,s <:: on III -0 .... -0 '" .!:; '" 'i5 "" .c ::J c: ::J c: 0 c 0 .., e .., ~ :J '0 0 .... ~ u .,s ii on C III e- '" 0 "" c ., E ., ~ III '" ~ Q; e e '" '" '" lJ .,s lJ Q. '0 c.. ~ ..- ~ ;:;:; '" ;:;:; '" ~ .... ~ .. ~ .. Q; c.. OJ '" .s '" <:: e .61> -0 .61> e III ~ .... 0 e '" e 0 ~ 0 ~ III .~ -= ~ lI'l 0 ~ fj, e <:: III ~ ;;; <Xi ..... '0 ci '0 ~ e ~ .3 0 3 ~ 'tl ~ .E '" .E lI'l ~ ~ ~ :J :J :J 0 0 0 lI'l lI'l lI'l ~ ii ~ o . ~ o BOYNTON BEACH BOULEVARD 12% 60 5 10 0.1% 6% 30 2 5 , 0.06% 6f1 .JJ N.T.S. LU 0 :::::> < z 0 LU > Cl! < '" LU V> T u V> Z LU LU 30% Cl! Cl! lJ 3: 149 Z < 12 0 -' 26 U 0.3% WOOLBRIGHT ROAD SW 23RD AVENUE (GOLF ROAD) WOOLBRIGHT FIDELITY FEDERAL 20% 100 8 17 i 0.3% - SITE ~ ~ ~ 20% 100 8 17 0.2% 2% 10 1 2 0.07% 3% 15 1 3 0.1% LEGEND 13% 65 5 11 0.1% 30% - PERCENT DISTRIBUTION 149 -DAlLYPROJECTTRAFFIC 12 - AM f'EAI( HOUR PROJECT TRAFFIC 26 - PM PEAK HOUR PROJECT TRAFFIC 0.3% - % OF DAILY AOOPTED SERVICE VOLUME i!27!98 EXHIBIT 4 PRO ECT TRAFFIC ASSIGNMENT ~ Exhibit 5 Woolbright Fidelity Federal Historic Growth Daily Traffic Volumes Growth Roadway 1994/95 1997/98 Rate Congress Avenue North of Woolbright Road 29,091 30,898 2.03%/year North of 23rd Avenue (Golf Rd) 29,545 31,489 2.15%/year South of 23rd Avenue (Golf Rd) 27,698 32,706 5.70%/year Woolbright Road West of 1-95 26,941 32,346 6. 28o/o/year East of Lawrence Road 15,732 18,601 5.74%/year SW 23rd Avenue (Golf Road) East of Congress Avenue 10,117 11,253 3.61%/year West of Congress Avenue 7,947 9,555 6. 33o/o/year #TC98-15 growth 7/27/98 Page 1 of 1 o BOYNTON BEACH BOULEVARD o ,< :0 co:: ....... U Z ....... co:: 3: < --J ~ 18601 4013 100 22714 1311(0) D WOOLBRIGHT ROAD SW 23RD AVENUE (GOLF ROAD) WOOLBRIGHT FIDELITY FEDERAL 9555 2290 10 11855 [143ooJ D ....... ::> z ....... ~ <J> <J> ....... co:: t.J z. 30898 0 2252 U 149 33299 . [47500] D t'/;:-/ ~ 31489 2434 100 34023 147500] D I 32706 . 7003 65 . 39774 [475ooJ D - SITE 32346 7685 149 40180 [475OOJ o o N.T.S. 1.f'l ~ ~ 7/27/98 11253 1487 15 12755 , [143(0) D LEGEND 32346 - EXISTING TRAFFIC 7685 - BACKGROUND TRAFFIC 149 - PROJECT TRAFFIC 40180 - TOTAL TRAFFIC [475ooJ - A[X)PTED SERVICE VOLUME D - LEVEL OF SERVICE EXHIBIT 6A TOTAL (2001) DAILY TRAFFIC CONDITIONS ~ o .. ~ Cl C5 OIl: UJ U Z UJ OIl: ~ -' BOYNTON BEACH BOULEVARD i 1730 \ 373 8 2111 [2890] D WOOLBRIGHT ROAD 889 213 1 1103 !133O) D SW 23RD AVENUE (GOlF ROAD) WOOLBRIGHT FIDELITY FEDERAL 2874 209 12 I 3095 I (44201 I 0 1. 2928 226 , 8 3162 . \4420] o o LU :::) Z LU ~ ~ LU OIl: (,) z 8 ~//.,.. .:'>><..-:: .:. 3042 651 5 3698 [4420J o /- SITE 3006 715 12 3735 i [4420] . D , 1047 i 138 1 1186 . 11330] o LEGEND 3008 . EXlSllNG TRAfFIC 715 . BACKGROUND TRAffiC 12 - PROJECTTIWflC 3735 - TOTAl TIWRC 14420] - ADOPTED SERVICE VOLUME D . lMlOF SERVICE EXHIBIT 68 TOTAL (2001) AM PEAK HOUR T F N N,T.S. "" 5: ~ 7/27/98 ~ o BOYNTON BEACH BOULEVARD o < o eo:: L.U U Z L.U eo:: 3: < --' ~ 1730 373 17 2120 [2890] o WOOlBRIGHT ROAD SW 23RD AVENUE (GOlF ROAD) WOOLBRIGHT FIDELITY FEDERAL 889 213 2 1104 [1330] o L.U => Z L.U > < V'l V'l L.U eo:: LJ Z 2874 0 209 U 26 3109 [4420] o 2928 226 17 3171 14420J o 3042 651 11 3704 [4420] o o N.T.S. Ln T - SITE '30081 ! 715 26 3749 [44201 D ~ ~ ~,<:".:.' . .1 1047 138 3 1188 11330] o LEGEND 3008 - EXISTING TRAFFIC 715 - BACKGROUND TRAFFIC 26 - PROjEG TRAFFIC 3749 - TOTAl TRAFFIC [4420] - ADOPTED SERVICE VOLUME o - LML OF SERVICE 7/27/98 ~ - ~ o BOYNTON BEACH BOULEVARD o <: o co: LU U Z LU co: 3: <: ~ LU => Z ~ '" '" LU co: <.J Z. o U . 9 (48) ;::::- ::'!,. " - SITE WOOLBRIGHT ROAD SW 23RD AVENUE (GOLF ROAD) LEGEND 23 - AM PfAK HOUR PROJEG TRAFFIC (31) - PM PfAK HOUR PROJEG TRAFFIC -416- -DAlLYPROJEGTRAFFIC WOOLBRIGHT FIDELITY FEDERAL EXHIBIT 7 PRO EeT DRIVEWAY VOLUMES o N.T.S. "" 5:: ~ 7/27/98 ~ APPLICATION TRACKING LOG PROJECT TITLE: Fidelity Federal FILE I: NWSP 98-013 PROJECT LOCATION: 2505 Woolbright Rd. (northeast comer of Woolbright Rd and Congress Ave) TYPE OF APPLICATION: New Site Plan PUBLIC NOTICE REQUIRED: (Y IN) 0 REVIEWER'S NAME AGENT: Lindsey Walter, Kilday 8l Assoc. ADDRESS: AGENT PHONE: 561-689-5522 FAX: 561-689-2592 DATE REC'D: 7/28/98 AMOUNT: RECEIPT NO.: 12 SETS OF PRE-ASSEMBLED PLANS SUBMllTED FOR REVIEW: 2 OF 12 SETS SIGNED AND SEALED 0 SURVEY 0 LANDSCAPE PLAN 0 FLOOR PLAN 0 SITE PLAN WITH SITE DATA 0 APPLlCATION/SUBMllTAL: DATE ACCEPTED: DRAINAGE PLAN ELEVATION VIEW DRAWINGS COLORED ELEVATIONS RECEIVED MATERIAL SAMPLES RECEIVED PHOTOGRAPHS RECEIVED o o o o o DATE DENIED: DATE OF SUBMllTAL ACCEPTANCE LElTER: DATE OF LElTER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES: I INITIAL 1 ST REVIEW MEMO: DATE SENT: 7/29198 I MEMO NO. 98-226 I RETURN DATE: 8/12/98 1 ST REVIEW COMMENTS RECEIVED DATE OF LElTER SENT TO SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENTS: 90 DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID: DATE 12 COMPLETE (ASSEMBLED) SETS OF AMENDED PLANS SUBMllTED FOR 2ND REVIEW: PRE-ASSEMBLED PLANS SUBMllTED FOR REVIEW: UTIL. P.W. PARKS FIRE POLICE PLANNING BLDGIENGR FORESTER AMENDED APPLICATION 0 2 OF12 SETS SIGNED AND SEALED 0 SURVEY 0 LANDSCAPE PLAN 0 FLOOR PLAN 0 SITE PLAN WITH SITE DATA 0 2ND REVIEW MEMO: DATE SENT: o o Qt< PLANS MEMOI - DRAINAGE PLAN ELEVATION VIEW DRAWINGS COLORED ELEVATIONS RECEIVED MATERIAL SAMPLES RECEIVED TRANSPARENCY RECEIVED PHOTOGRAPHS RECEIVED o o o o o o MEMO NO. RETURN DATE: 2nd REVIEW COMMENTS RECEIVED PLANS MEMOI DATE PLANS MEMOI DATE UTIL. 0 POLICE [J P.W. 0 PLANNING 0, PARKS rtY qtj-i<1J 1/9: BLDGIENGR ill FIRE G:1 c:r11 -'1/'\1 Cf/i/ FORESTER ~ - "UK BOARD MEETING DATE: BOARD: LAND DEVELOPMENT SIGNS PLACED AT THE PROPERTY. DATE SENT 1 SIGNS INSTALLED: DATE: CITY COMMISSION: DATE: DEVELOPMENT ORDER RECEIVED FROM CITY CLERK: 0 DATE: DEVELOPMENT ORDER SENT TO APPLICANT: 0 DATE: S:\FORMS\TRACKING LOG FORM revised 4/25/97