REVIEW COMMENTS
Galav Lusia
From:
Sent:
To:
Cc:
Subject:
Borden, Bob
Tuesday, June 27, 20004:08 PM
Galav Lusia
Gale, Steven
RE: Fidelity Federal NWSP 98-013
Thank you,
This site can not receive a CO Final until they have a hydrant flow test done. We have
no record of this happening. Normally this is done prior to Site plan approval. How they
got where they are to this point, i.e., above grade construction without a hydrant on site
(it was installed), no flow test to show the water availability; I don't know.
Bobby
-----Original Message-----
From: Galav Lusia
Sent: Thesday, June 27, 20003:54 PM
To: Borden, Bob
Subject
Bob,
This was your first review comment: "No water distribution plan was provided. a hydrant is required so that no
portion of the structure is more than two hundred feet (200') from the hydrant, LDR Ch. 6 Sec. 16. The
recommended placement for the hydrant is at the south entrance to the bank parking lot."
No comments were indicated for the "Conditions of Approval".
That's alii found in the file.
Lusia
1
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. PZ 99-070
TO:
FROM:
Don Johnson
Building Division
;??G~-
Michael W. Rumpf
Acting Manager of Planning and Zoning
DATE:
March 11, 1999
SUBJECT:
Fidelity Federal
Accompanying this memorandum you will find documents for your departmental records
regarding the site plan that has received final sign-off.
PROJECT NAME:
Fidelity Federal
Type of Application: NEW SITE PLAN
Planning and Zoning
File No.: NWSP 98-013
Control Plans
(Rectified Master Plan): 1 Sheet of 8
City Commission Approval: 10/6/98 Meeting Minutes and Conditions of Approval
MWRbme
Attachments
J:\SHRDA TA \Planning\SHAREO\WP\PROJECTS\Fidelity Federal\TRANSMTL-Rectified-Bldg.doc
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. PZ 98-308
TO:
FROM:
Bulent Kastarlak, Director of Development
Larry Roberts, Public Works Director
Mike Haag, Building Division
Bob Borden, Assistant Fire Marshal
Ofc. Robert Riggle, Police Department
John Wildner, Parks Division
Kevin Hallahan, Forester/Environmentalist
Pete Mazzella, Utilities Department
Ken Hall, Engineering Division
Bob Donovan, Permit Application Group
Michael W. RUt?r;c::-
Acting Planning and Zoning Manager
DATE:
November 6, 1998
SUBJECT:
Fidelity Federal - New Site Plan - MODIFIED
(sign-off)
File # NWSP 98-013
The amended site plan for Fidelity Federal has been submitted for final sign-off by the Technical
Review Committee. Four (4) sets of plans, each requiring your unconditional signature, are
available for review in Planning and Zoning. A copy of the originally reviewed plans, staff
comments and City Commission approval of the Site Plan Modification will be available for your
use to perform the review.
Please review and sign-off each of the four (4) sets of plans, NO LATER THAN 5:00 P.M.,
NOVEMBER 16, 1998. If the plans are not in compliance with your staff comments or City
regulations, sign the plans "subject to memo". To facilitate the sign-off process, please resubmit
written comments addressed to the Planning and Zoning Manager, NO LATER THAN 5:00
P.M., NOVEMBER 16, 1998.
Thank you for your prompt response to this request.
MWR:bme
cc: William Bingham, Fire Chief
Marshall Gage, Police Chief
John Guidry, Utilities Director
Sebastian Puda, Engineering Division
Central File
s:\projects\Fidelity Federal\recmslpl\nwsp 98-013
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. ENG 98-149
DATE:
Michael Rumpf, Acting Planning and Zoning Administrator
Kenneth Hall. Engineering Plan Check lnspectorrrechnician~
November 13, 1998
TO:
FROM:
RE:
FIDELITY FEDERAL MODIFIED SITE PLAN
The subject site plan and associated paving and drainage plans should be modified as follows:
I. Indicate right turn only arrow markings on both egress driveways. ~
2. Show the sidewalk along Congress A venue and Woolbright Road through both ........--.
driveways (sidewalk within driveway shall be 6" thick).
3. Show the stop sign and stop bars four (4) feet back of sidewalk at both driveways ~
4 Until Phase Two is completed, stripe and mark the north access aisle as follows:
a. Delete the "Thru" arrow pavement markings for ingress traffic and show a "Right
Turn Only" pavement arrow at the ingress driveway.
b Within the limits of the curbed area from along the north side of the bank building,
show an eight (8) foot wide yellow striped area with six (6) inch yellow cross-
hatched lines within so as to delineate a one-way out aisle for exiting drive-thru
traffic Install a "Do Not Enter" post sign at the western end area of the striped area ~
facing west to deny ingress thru traffic.
c Show a "Left Turn Only" post sign and pavement arrow for exiting traffic from the
west parking lot The purpose of these revisions is to deny inbound traffic from /
entering the drive-thru area and beyond with no legal means of exit.
KRHJck
Xc: Rav Davidson
Sebastian Puda
C \Iv D""ulll~nts Fidditv F~lkral \I,'dili"d S'l" Plan.do"
LEISURE SERVICES: PARKS MEMORANDUM #98-193
TO:
Michael W. Rumpf, Acting Planning & Zoning Director
John Wildner, Parks Superintendent ~)1/ J ,-J
Major Site Plan Modification: Fidelity Federal, 2nd Review
September 8, 1998
FROM:
RE:
DATE:
The Leisure Services Department, Parks Division, has reviewed the major site plan
modification for Fidelity Federal. There are no recreation-related comments at this time.
The plan may continue through the normal review process.
JW:ad
/; ! r'; \; .
I (J) :-.~. ".
~ ~ ~ j
i ,.d ; , (' --I"
.' '.:t..;: ,")1:1"'
~
- 8 r"~\l
.~._.~ ... ,:' r\ I I
._.~ljHlf
8 1998 ; !) n
..-J i
1
~..-_.~- - ~ ~
:, - ~,-~.T5. '
_._,^",,~...:~~J..:.J:; ;;:-:PI J
RECREATION & PARK MEMORANDUM
Re:
Mike Rumpf, Acting Director of Planning and Zoning
Kevin John Hallahan, ForesterlEnvironmentalist ~ II-
Fidelity Federal
New Site Plan
TO:
FROM:
DATE:
September 8, 1998
The applicant has commented on the existing trees. The project should continue in the normal
revIew process.
Kjh
~, ~_~.~ ~ 0 W ~ I~. ~ Jl.
)J1 dill.
. ' 1 - ~ l: ! ~
, SEP 81998 i~1
- "'~~
File
". --_.......-..,._~.~,.
MEMORANDUM
UTILITIES DEPT. NO. 98 - 221
ill~
rn 0 \VJ rn
M.2.
rn
TO: Mike Rumpf, Acting Planning Director
FROM: John A. Guidry, Utilities Director
DATE: August 12, 1998
SUBJECT: Fidelity Federal Building - 2505 Woolbright Road - New Site Plan 1st Review
We offer the following comments on this project:
GENERAL COMMENTS
1) All utilities easements shall be shown on the rectified landscaping drawings so that we may
determine which trees may interfere with utilities. In general, palm trees will be the only
tree species allowed within utilities easements. Canopy trees may be planted outside of the
easement so that roots and branches will not impact those utilities within the easement in
the foreseeable future. LDR Sec. 7.5-18.1 gives public utilities the authority to remove any
trees that interfere with utility services, either in utility easements or public rights-of-way.
2) Department of Health permits may be required for the water and sewer system extensions
serving this project. (Sec. 26-12)
3) Fire flow calculations will be required demonstrating the City Code requirement of 1500
g.p.m. as stated in LDR chap. 6, Art. , Sec. 16, or the requirement imposed by insurance
underwriters, whichever is greater. (see Sec. 26-16(a)). Please submit these calculations
with your Health Department permit application and plans.
4) Sec. 26-34(E) of the City Code requires that a capacity reservation fee be paid for this
project either upon my request for signature on the Health Department application forms or
within 30 days of site plan approval, whichever occurs first. This fee will be determined
based upon final meter size, or expected demand.
SPECIFIC CONDITIONS
1) Water and sewer lines to be owned and operated by the City shall be included within
utilities easements. Please show all existing or proposed easements on the engineering
drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate
instrument to the City as stated in Sec. 26-33(a) of the Code.
2) LDR chap. 6, Article IV, Sec. 16 requires that all points on each building will be within
200 feet of an existing or proposed fire hydrant. Please demonstrate that the plan meets
this condition, by showing all appropriate hydrants on the site plan.
3) The means of supplying water (including fire protection) and sewer service to the building
are not clear. Please indicate on the plans how the building will be served, including an
engineering justification for the size of meter and sewage lift station. It is likely that an
off-site water main extension will be required.
4) Appropriate backflow preventers will be required on the domestic water service to the
building, and the fire sprinkler line if there is one, in accordance with Sec. 26-207.
5) A building permit for this project shall not be issued until this office has approved the
plans for the water and/or sewer improvements serving the project. (Sec. 26-15)
Please refer any questions on this matter to Peter Mazzella (375-6404) of this office.
JAG/PVM
Xc: Skip Milor
Peter Mazzella
File
Department of Development Memorandum No. DD 98-258
Fidelity Federal - New Site Plan 1 sl Review Comments
August 12, 1998
Page 2
4. Following site plan approval. add to the site plan drawing that is required to be submitted for
permit review the actual setback dimensions from the property line to the leading edge of all sides
of the building and/or canopies.
5. Following site plan approval. add to the site plan or paving and drainage drawing that are required
to be submitted for permit review a detailed drawing of the proposed accessibility curb cuts that are
identitied on the site plan and, where applicable, provide detail drawings of the accessibility ramps.
The accessibility route depicted on the permit plans shall be in compliance with the Accessibility
Code for Building Construction.
En2ineerin2 Division (Site Specific Comments) - Sebastian Puda & Ken Hall 561-375-6280
1. Identify the clear sight triangles as specified in D.O.T. Index 546 for both proposed driveways.
2. Add a note to the landscape plan regarding cross visibility within the clear sight triangles as
specified in LDR Chapter 7.5, Article II. Section 5.H
3. On the paving and drainage plan show all markings, signage and striping including right turn only
signs, right turn arrows and one way arrow signs within the Woolbright and Congress Avenue
medians. [LDR Chapter 4, Section 7.8.2.]
4. All changes to each and every plan drawing shall be retlected on every other plan drawing where
appropriate.
5. Remove the 6" raised curb extending southward along the east side of the ATM lane and stripe the
area to delineate the lane. Curb acts as a contlict with garbage truck pickup and vehicles backing
out from angle parking.
6. If Congress A venue driveway variance is approved, approval by Palm Beach County Traffic
Engineering and Lake Worth Drainage District shall be required.
7. Remove the asphalt "temporary existing paved access drive" and sod and irrigate all of Phase Two.
8. Provide written response from L WDD regarding removal of existing outfalls into lateral Canal 26
prior to permitting.
9. If the variance is approved for the driveway onto Congress Avenue and if ingress traffic is allowed
eastward to Phase Two, then the following modifications shall be required:
a. Extend the second and fourth concrete median islands delineating the drive-thru area out to a
point in line with the eastward extension of the north curb line of the building
b. Add stop signs at the ends of the extended medians and at the north end of the angled parking
area.
c. Install a two foot thermoplastic white stop bar at the end of the two median islands from the
first drive-thru aisle eastward to the curbed island at the north end of the angled parking area
(next to the 3rd stop sign referenced in item b.).
Department of Development Memorandum No. DD 98-258
Fidelity Federal- New Site Plan I't Review Comments
August 12, 1998
Page 3
The purpose of the above modifications is to provide a safe and efficient flow of traffic throughout
the site for the public. [LDR Chapter 23, Article I, Section 1.]
10. Obtain variance for driveway on Congress Avenue to allow for a driveway distance of 128 ft. from
intersecting right-of-ways. [LDR Chapter 23, Article II, H.3.]
II. Provide traffic control devices at northeast drive to Phase II (18" X 18" "End of Road" markers).
[LDR Chapter 4, Section 7.B.2.]
12. All plans submitted for specific permits shall meet the city's code requirements at time of
application. These permits include, but are not limited to the following: site lighting, paving,
drainage, curbing, landscaping and irrigation. Permits required from other permitting agencies,
such as FDOT, PBC, SFWMD, DERM, LWDD, DEP and any others, shall be included with your
permit request
13. Provide Palm Beach County permits for driveways to Woolbright Road and Congress Avenue.
Recommendations/C omments
1. Close the existing easternmost driveway at Woolbright Road.
2. Locate the handicap access path from the Congress Avenue sidewalk in alignment with the
accessible path next to the proposed handicap stall - shortest path to the front entrance.
MH/SP/KH:ck
Xc: Bulent Kastarlak
Don Johnson
Sebastian Puda
Ken Hall
C: \1~.l)ll~lIl1lcnls-Fiddil\" Fcdcral Ncw Sitc Plan 1st RC\.ICW.dll~
RECREATION & PARK MEMORANDUM
TO:
Mike Rumpf, Acting Director of Planning and Zoning
KJ/f
~A..~_
FROM:
Kevin John Hallahan, Forester/Environmentalist
Re:
Fidelity Federal
New Site Plan- 1st Review
DATE:
August 11, 1998
1. The applicant should attempt to relocate any ofthe existing native or desirable non-native
trees. This is in accordance with the City Tree Preservation Ordinance. [Environmental
Chapter 7.5]
2. The applicant must provide landscape / irrigation plans for the grassed median on Woolbright
Road. The concrete medians on Woolbright Road and Congress Avenue must be cleared of
existing weeds. This is in accordance with the City Comprehensive Plan Policy. [Policy
2.4.5,p42] The project should continue in the normal review process.
Kjh
File
-.
rDJ rn @ rn n ,-
lJ1J~. .J
L----'..{---~-._.J
PLi .'; -;; ,~@
ZONl\G LJEPT.
PUBLIC WORKS DEPARTMENT
MEMORANDUM #98-224
FROM:
Mike Rumpf, Acting Planning & Zoning Director
CJ)~'
C. Larry Roberts, Public Works Director :if
v
Mark Lips, Sanitation Foreman {\'I'" L-
TO:
THRU:
SUBJ:
New Site Plan - 1 st Review - Fidelity Federal
DATE:
August 11, 1998
Public Works has no comments or objections to the above new site plan. We recommend
this project be forwarded to the Planning & Development Board for consideration.
MLlcr
FIRE & LIFE SAFETY DIVISION
Memorandum No. 98-307
w ~
113 , 1998
ill
~
'~
NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire
Protection Association codes, and the City Fire code shall be adhered to.
TO: Mike Rumpf, Act. Director
Planning & Zoning Division
FROM: Steve Gale, Fire Marshal ~c/
Deputy Chief - Fire Rescue Bep~ent
DATE: July 31, 1998
SUBJECT: Fidelity Federal
NE Corner of Woolbright Rd. & Congress Ave.
NWSP 98-013
Project Coordinator: Scott Barber
No water distribution plan was provided. A hydrant is required so that no portion
of the structure is more than two hundred feet (200') from the hydrant, LOR Ch. 6,
Sec. 16. The recommended placement for the hydrant is at the south entrance
to the bank parking lot.
C/__/I_~~
sf D . - -.-- ~
A'_/~: 1- ^~ ~~
::::-- . . ,710 ~~?-~
~2j~~
~~/.
CC:
File
.JEVELOPMENT DEPARTMENT
MEMORANDUM NO. PZ 98-226
FROM:
TRC MEMBERS
Steve Gale, Fire Marshal
Ken Hall, Engineering Division
Kevin Hallahan, Forester/Environmentalist
Mike Haag, Building Division
Pete Mazzella, Utilities Department
Ofc. Robert Riggle, Police Department
Larry Roberts, Public Works Director/City Engineer
John Wildner, Parks Superintendent
Ray Davidson, Engineering Division
';=:D~~ C~)~/2, fY\ld~ ~ ,/]
Michael W. Rumpf c;- ~
Acting Director of Planning & Zoning
TO:
DATE:
July 29, 1998
RE:
SITE PLAN REVIEW PROCEDURES
1 ST Review - New Site Plan
Project - Fidelity Federal
Location - 2505 Woolbright Road (northeast corner of Woolbright Road and
Congress Avenue
Agent - Lindsey Walter, Kilday and Associates, Inc.
File No. - NWSP 98-013
Find attached for your review the plans and exhibits for the above-referenced project. Please
review the plans and exhibits and transmit formal written comments to me no later than
5:00 P.M. on Auaust 12. 1998. When preparing your comments, please separate them
into two categories; code deficiencies with code sections referenced and
recommendations that you believe will enhance the project.
Adhering to the following review guidelines will promote a comprehensive review and enable
the applicant to efficiently obtain Technical Review Committee approval:
1. Use the review standards specified in Part IV, Land Development Regulations, Site Plan
Review and the applicable code sections of the Code of Ordinances to review and
formulate comments.
2. The documents submitted for the project were determined to be substantially complete,
however, if the data provided to meet the submittal requirements is insufficient to
properly evaluate and process the project based on the review standards or the
documents show code deficiencies, additional data and/or corrections should be
requested by the reviewer by contacting Scott Barber.
DEPARTMENT OF DEVELOPMENT
Division of Planning and Zoning
Bulent I. Kastarlak, NCARB
Director
Building
Planning &: Zoning
Engineering
Occupational License
Community Redevelopment
July 30, 1998
Mr. Dan Weisberg, Senior Engineer
Palm Beach County Traffic Division
Department of Engineering and Public Works
P.O. Box 21229
West Palm Beach, Florida 33416
Re: Traffic Study: Fidelity Federal
2502 Woolbright Road (northeast corner of Woolbright Road and
Congress Avenue)
File # NWSP 98-013
Dear Mr. Weisberg:
The enclosed traffic study on the Fidelity Federal site dated July 27, 1998, prepared by Andrea
M. Troutman, PE, Troutman Consulting, Inc. was received by Planning and Zoning recently for
the above-referenced application. Please review the enclosed information for conformance with
the County's Traffic Performance Standard Ordinance.
If you have questions regarding this matter, please call me at (561) 375-6260, otherwise please
send me your written comments/approval to the above address.
Sincerely,
~'-~\. C~~C-& {J.,,--~ C\\ \ C \.\.l'''-'-C
Michael W. Rumpf
Acting Director of Planning and Zoning
() -C
"--- rvy)1
MWRbme
cc: Central File
s:\projects\Fidelity Federal\traffic
America's Gateway to the Gulfstream
100 East Boynton Beach Blvd., P.O. Box 310 Boynton Beach, Florida 33425-0310 Phone: (561) 375-6260 FAX: (561) 375-6259
Troutman C:onsulting, .nc.
Transportation Engineers ~
1I U W m fii'J.
JU'_ 2 9 1998 I i!Jj
PLANNING AND I
Z NING DEPT
i
):
July 27, 1998
Mr. Dan Weisberg, PE
Palm Beach County Traffic Division
160 Australian Avenue
Suite 303
West Palm Beach, FL 33406
IE: Woolbright Fidelity Federal - #TC98-15
Dear Mr. Weisberg:
Enclosed, for your review, is a copy of the traffic impact analysis for the above referenced project. The
project is located in the northeast quadrant of the Congress Avenue/Woolbright Road in the City of
Boynton Beach. If you have any questions. please do not hesitate to contact this office.
Sincer ,
~
d~T~?!!1~ .
resident
cc: Michael Rumpf
Dan Turk
Lindsey Walter
D:\PROJECT FILES\TC.\TC9&-1.5\letterr.
2324 South Congress Avenue, Suite 1 H
West Palm Beach, Fl 33406
(561) 434-1644 Fax 434-1663
,fOJ ~ @ ~ D' fii1
I UU ...... l!!J
I PlANNING I .-
l, ZONING DE .
WOOLBRIGHT .FI DELlTY FEDERAL
TRAFFIC IMPACT ANALYSIS
Prepared for
Fidelity Federal
218 Datura Street
West Palm Beach, FL 33401
Prepared by
Andrea M. Troutman, PE
Troutman Consulting, Inc.
2324 South Congress Avenue, Suite 1 H
West Palm Beach, FL 33406
#TC98-15
July 27, 1 ~98
<I
,
/v
,JOo 0 fu
''\~'\~
WOOLBRIGHT FIDELITY FEDERAL
TRAFFIC IMPACT ANALYSIS
Introduction
Troutman Consulting, Inc. has been retained to conduct a traffic impact analysis for a
proposed commercial development in the City of Boynton Beach. The purpose of this study
is to determine if the proposed development meets the requirements of Article 15, Traffic
Performance Standards, of the Palm Beach County Unified Land Development Code
(ULDC).
Site Data
The site is located in the northeast quadrant of the Woolbright Road / Congress Avenue
intersection as shown on Exhibit 1. Existing on-site is a vacant 2,230 SF drive-in bank that
had been operational within the last 5 years. It is proposed to demolish the existing building
and develop a 4,200 SF drive-in bank and a 10,000 SF office building. Access to the
proposed development will be via two (2) driveway connections to Woolbright Road and one
(1) driveway connection to Congress Avenue. Year 2001 conditions were examined for this
analysis.
Existing (1997/98) Traffic Conditions
Exhibit 2 provides the 1997/98 annual average daily traffic (MDn volumes for the
surrounding roadway network as compiled by the Metropolitan Planning Organization (MPO)
of Palm Beach County. Peak hour traffic volumes were determined by applying a 'K' factor
of 9.3% to the MDT volumes. These volumes are also shown on Exhibit 2 along with
roadway lanes, levels of service (LOS) and the adopted LOS D service volumes.
1
Project Traffic
Trip Generation
Daily trip generation rates and pass-by rates for the proposed drive-in bank and office
building were obtained from Section 10.8, Fair Share Road Impact Fees, of the Palm
Beach County U LOC. Peak hour trip generation rates were obtained from the
Institute of Transportation Engineers (lTE), Trip Generation, 5th and 6th Editions.
Exhibits 3A, 3 Band 3C provide the daily, AM and PM peak hour trip generation data
respectively for the proposed development For Traffic Performance Standards
purposes, based on the net daily trip generation of 498, the Test 1 radius of
development influence for the proposed development is one-half mile and the Test 2
radius is the directly-accessed link.
Trip Distribution and Assignment
A directional distribution was developed based on land use patterns and existing
travel patterns. Exhibit 4 shows the assignment of daily and peak hour project traffic
as well as the project impact percentage (% of daily adopted service volume).
Future Traffic Conditions
Roadway Improvements
No roadways within the study area radius are scheduled for construction based on a
review of the adopted roadway improvement programs.
Background Traffic
Historic growth trends and Major Project traffic must be analyzed in the projection of
future background traffic volumes. Historic growth data is provided on Exhibit 5 for
the surrounding roadway links. Major Project data, compiled by Palm Beach County,
was reviewed. No Major Project was identified that is projected to have a 10%
impact on the study area roadways within the analysis time frame of the proposed
development Therefore, per the Traffic Performance Standards, no background
traffic in addition to historic growth is required to be included in future background
traffic projections.
2
Traffic Performance Standards Analysis
Test 1 (Link Test)
This first test of the Traffic Performance Standards examines if any roadway links,
required to be analyzed, are projected to operate below adopted level of service
standards on an average daily and average peak hour basis. Exhibits 6A, 6B and 6C
show future daily, AM and PM peak hour traffic conditions respectively for the
analyzed roadway links.
All roadway links required to be analyzed are projected to operate above the
adopted Test 1 level of service standards by Year 2001. Therefore, the requirements
of Test 1 are met
Test 2 (Model Test)
The second test examines traffic conditions based on model projections that are
developed and maintained by Palm Beach County. This Test 2 model shows that the
directly-accessed links of Congress Avenue and Woolbright Road are not deficient
links. Therefore, the requirements of Test 2 are met
Intersection Analysis
Major intersections for which a proposed development adds more than 10% of the
total traffic on any link connecting a major intersection are required to be analyzed.
No major intersections meet this requirement based on the proposed development's
impact
Driveway Volumes
AM and PM peak hour project driveway volumes are provided on Exhibit 7.
Conclusions
This analysis shows that the proposed development meets all of the requirements of the
Traffic Performance Standards of Palm Beach County.
3
EXHIBITS
o
u
~
~
I
NT
(t\
BOYNTON BEACH BOULEVARD \..1...1
....,
0 :::>
< z
0 ....,
>
0:: -< Lf'l
u.J V) T
u V)
z ....,
u.J c>:::
0:: (,J
~ z
0
-' u
.."- SITE
~
;. ! ('"\
WOOLBRIGHT ROAD \~
SW 23RD AVENUE (GOlF ROAD)
~
~
s.
7(27(98
~
EXHIBIT 1
PROJECT LOCATION
WOOLBRIGHT
FIDELITY FEDERAL
o
o
BOYNTON BEACH BOULEVARD
o
<
o
e<:
LU
U
Z
LU
e<:
~
-'
~
4LD
18601 C
31100
1730C
2890
WOOlBRIGHT ROAD
, 6LD
! 32291 D
47500
3003 D
4420
6LD
30898 0
i 47500
, 28740
4420
2L
9555 D
i 14300
, 889D
! 1330
6LD
31489 D
47500
2928 D
4420
SW 23RD AVENUE (GOlF ROAD)
WOOLBRIGHT
FIDELITY FEDERAL
I 6LD
, 32706 D
47500
30420
4420
6LD
30694 0
47500
2855 D
4420
LU
=>
Z
LU
:;c
'"
'"
LU
e<:
lJ
Z
o
U
-SITE
~
t' " 1
~
2L
11253 D
14300
1047D
1330
LEGEND
6LD - ROADWAY lANES
30898 D - DAILY TRAfFIC AND LOS
47500 - DAILY ADOPTED
SERVICE VOLUME
2874 D - PEAK HOUR TRAFFIC AND LOS
4420 - PEAK HOUR ADOPTED
SERVICE VOLUME
6LD
32346 D
47500
3008 D
4420
N.T.S.
U")
~
~
7/27/98
EXHIBIT 2
EXISTING (1997/98) TRAFFIC CONDITIONS
~
~
~
"'"
Jb
5
~
~
%
~
~
(:)
~
;:.
-0
~
-';:'
?
~
s
5
.so
~
0)
c;.
~
~
C>-
t
--0
f.,
0)
"'"
"'0
%
;;-
-0
1>
r>>-
~
~
.~
--
tP.
~
~
~
oJ>
.~
~
s..
'S
~
.t
~
--a~
,5
~~
.~
~(l$
~~
~~
.~ ~
.oo!
.L ~.t
c'J .~ 'Y""
~~~
.~ 0 (l$
~~o
~-~-'
/~
~~/~
.~
i
~
\
v
\
'?;
-.;
~
o
-0
'fa
...
-0
"
~
?
~;g
'% ~
",,0
~~
i ~
,~ ~
~1-
~ "
" ~
~"'6
;;... ~
a;i ~
~~
t ~
~ .-
'EI> -0
~ '&
't,~
.;2 ~
~fj;
'?lr .'i>
~ ~-
.;::. fP.
'"'6~
2!. 't,
~.~
$i1>
.' 't,
~ -
~ ~
'3>'"
".-c:;
~'-'"
t
.~
&
t
8
c:.
~
~tt
'&\
~~
\loo'
l;.g:
.,::;;:'
~...
.~ ~
~~
~~~
,-. ~ ~
~~~
.~ o~
~~
----~.~~~~-
-~-
----~~~
-~_/
on co .e.~
'"
d;, i': .= 0
'" ~ '""
u ~
.....
""
c
o
III
;:
l\:l
Q..
E
o
u
c
o
-~
l\:l ...
~ ~
"C CII
~O
~.~
C111-
:E ...
... 5
:i::c
~ .~..:.li
.Q m
- Q.
8~
~Cl..
-
:.E
:E
l<
I.I.l
E
! -0
-0
I~
..: - M
l- =' M
~ 0
z ~ -
M
.5 M
rf!..
-0
>-~ ~
~t!.
'" .s -
" .- -0
Q.~ LO
! N
N
.s ,...
... - -
l-
ii - ,...
=' -0
e: 0
...
~ - -
..... :c
.5
rf!..
0
ii .s.
e:
... -
.!! ...
.5 I-
0
! N
N
,...
&
~ - ,...
=' -0
! 0
- -
,...
.5 -0
~ 6'
C LO
.!! --
0
... ~
ell: W-
e: en
0 0
::: 0
... o.
..
III ,...
e: --
III ......
(.;) ......
.e ~
.. LO
I-
~ W-
en
'"
e: 0
.!! M
.5 <'t
N
III
'"
::l
"l::l ~
c:
e: l'Il
... a:l
....
c:
.~
0
)
l M 0 M
N M '"
,... ,...
,~
..: - LO -0
l- =' :c N co
~ 0
Z
N LO ......
.5 -0 -0
rf!.. rf!..
-0 LO
>-~ ~
.a~
I en
'"
" .Eo LO N ......
Q.~ 0 0
,... ,...
! co N 0
N M -0
J N N
..
l-
ii - ~ ...... ,...
=' ,... N ~
e: 0 ,... ,...
..
~ ~ '" c:r>
.....
.5 ,... ,...
,... ,...
rf!.. rf!.. rf!..
,... 0 1Il
l & ,... ,...
ti .;:
il- N N ~
! 0 ~ ~
M M -0
N N
a.
"i: '" co M
I- - ,... N ~
='
:g 0 ,... ,...
I- '" -0 ,...
.5 ,... N
,... ,...
n
;;,
~ 6' ~
C '" .....
.!! 0- ~
... ~ ~
ell: '"
u... c:q
e: V> ~
0 0 ~
::: 0
l! 0, ~
III ,... <::
e: -- --'
III ...... .....
(.;) ...... '"
.2- ~ .....
0
.. '"
l- II
~
--'
~ W- W-
en en
en
e: 0 0
.!! 0 0
.5 N 0
~ o'
,...
III
'"
::l QJ
"l::l ~ u
c: E
e: l'Il
... a:l 0
....
c: ~ III
....
.~ QJ ~
c:
0 QJ g
(,J
......
co
M
'"
~
M
II)
'C
I-
tii
e:
..
~
..... gb
~ e
Z ~
"OJ .0
Z fj
~
~
0;
!i
.,Q
e
.Q
1i'i
;;;.
a>
e
0
.,
'0
....
.,s
<0
.,s
.~
r
'0
DO
g <::
.,
III
.... E
2- ~
'" ~
-0 '"
0 >
u 0
0: .9
'" '"
E :J
Q. -0
0 e
Q; 0
> ..,
'" '0
Cl ....
-0 .,s
<:: on
III -0
....
-0 '"
.!:;
'" 'i5
""
.c ::J
c: ::J c:
0 c 0
.., e ..,
~ :J '0
0 ....
~ u .,s
ii on
C III e-
'"
0 "" c
., E .,
~ III
'" ~ Q;
e e
'" '" '"
lJ .,s lJ
Q. '0 c..
~ ..- ~
;:;:; '" ;:;:;
'"
~ .... ~
.. ~ ..
Q; c.. OJ
'" .s '"
<:: e
.61> -0 .61>
e III ~
.... 0
e '" e
0 ~ 0
~ III .~
-=
~ lI'l 0
~ fj,
e <::
III ~
;;; <Xi .....
'0 ci '0
~ e ~
.3 0 3
~ 'tl ~
.E '" .E
lI'l
~ ~ ~
:J :J :J
0 0 0
lI'l lI'l lI'l
~ ii ~
o
. ~
o
BOYNTON BEACH BOULEVARD
12%
60
5
10
0.1%
6%
30
2
5
, 0.06%
6f1
.JJ
N.T.S.
LU
0 :::::>
< z
0 LU
>
Cl! < '"
LU V> T
u V>
Z LU
LU 30% Cl!
Cl! lJ
3: 149 Z
< 12 0
-' 26 U
0.3%
WOOLBRIGHT ROAD
SW 23RD AVENUE (GOLF ROAD)
WOOLBRIGHT
FIDELITY FEDERAL
20%
100
8
17
i 0.3%
- SITE
~
~
~
20%
100
8
17
0.2%
2%
10
1
2
0.07%
3%
15
1
3
0.1%
LEGEND
13%
65
5
11
0.1%
30% - PERCENT DISTRIBUTION
149 -DAlLYPROJECTTRAFFIC
12 - AM f'EAI( HOUR
PROJECT TRAFFIC
26 - PM PEAK HOUR
PROJECT TRAFFIC
0.3% - % OF DAILY AOOPTED
SERVICE VOLUME
i!27!98
EXHIBIT 4
PRO ECT TRAFFIC ASSIGNMENT
~
Exhibit 5
Woolbright Fidelity Federal
Historic Growth
Daily Traffic Volumes Growth
Roadway 1994/95 1997/98 Rate
Congress Avenue
North of Woolbright Road 29,091 30,898 2.03%/year
North of 23rd Avenue (Golf Rd) 29,545 31,489 2.15%/year
South of 23rd Avenue (Golf Rd) 27,698 32,706 5.70%/year
Woolbright Road
West of 1-95 26,941 32,346 6. 28o/o/year
East of Lawrence Road 15,732 18,601 5.74%/year
SW 23rd Avenue (Golf Road)
East of Congress Avenue 10,117 11,253 3.61%/year
West of Congress Avenue 7,947 9,555 6. 33o/o/year
#TC98-15
growth
7/27/98
Page 1 of 1
o
BOYNTON BEACH BOULEVARD
o
,<
:0
co::
.......
U
Z
.......
co::
3:
<
--J
~
18601
4013
100
22714
1311(0)
D
WOOLBRIGHT ROAD
SW 23RD AVENUE (GOLF ROAD)
WOOLBRIGHT
FIDELITY FEDERAL
9555
2290
10
11855
[143ooJ
D
.......
::>
z
.......
~
<J>
<J>
.......
co::
t.J
z.
30898 0
2252 U
149
33299
. [47500]
D
t'/;:-/ ~
31489
2434
100
34023
147500]
D
I 32706
. 7003
65
. 39774
[475ooJ
D
- SITE
32346
7685
149
40180
[475OOJ
o
o
N.T.S.
1.f'l
~
~
7/27/98
11253
1487
15
12755
, [143(0)
D
LEGEND
32346 - EXISTING TRAFFIC
7685 - BACKGROUND TRAFFIC
149 - PROJECT TRAFFIC
40180 - TOTAL TRAFFIC
[475ooJ - A[X)PTED SERVICE VOLUME
D - LEVEL OF SERVICE
EXHIBIT 6A
TOTAL (2001) DAILY TRAFFIC CONDITIONS
~
o
.. ~
Cl
C5
OIl:
UJ
U
Z
UJ
OIl:
~
-'
BOYNTON BEACH BOULEVARD
i 1730
\ 373
8
2111
[2890]
D
WOOLBRIGHT ROAD
889
213
1
1103
!133O)
D
SW 23RD AVENUE (GOlF ROAD)
WOOLBRIGHT
FIDELITY FEDERAL
2874
209
12
I 3095
I (44201
I 0
1. 2928
226
, 8
3162
. \4420]
o
o
LU
:::)
Z
LU
~
~
LU
OIl:
(,)
z
8
~//.,..
.:'>><..-:: .:.
3042
651
5
3698
[4420J
o
/- SITE
3006
715
12
3735
i [4420]
. D
, 1047
i 138
1
1186
. 11330]
o
LEGEND
3008 . EXlSllNG TRAfFIC
715 . BACKGROUND TRAffiC
12 - PROJECTTIWflC
3735 - TOTAl TIWRC
14420] - ADOPTED SERVICE VOLUME
D . lMlOF SERVICE
EXHIBIT 68
TOTAL (2001) AM PEAK HOUR
T F N
N,T.S.
""
5:
~
7/27/98
~
o
BOYNTON BEACH BOULEVARD
o
<
o
eo::
L.U
U
Z
L.U
eo::
3:
<
--'
~
1730
373
17
2120
[2890]
o
WOOlBRIGHT ROAD
SW 23RD AVENUE (GOlF ROAD)
WOOLBRIGHT
FIDELITY FEDERAL
889
213
2
1104
[1330]
o
L.U
=>
Z
L.U
>
<
V'l
V'l
L.U
eo::
LJ
Z
2874 0
209 U
26
3109
[4420]
o
2928
226
17
3171
14420J
o
3042
651
11
3704
[4420]
o
o
N.T.S.
Ln
T
- SITE
'30081
! 715
26
3749
[44201
D
~
~
~,<:".:.' . .1
1047
138
3
1188
11330]
o
LEGEND
3008 - EXISTING TRAFFIC
715 - BACKGROUND TRAFFIC
26 - PROjEG TRAFFIC
3749 - TOTAl TRAFFIC
[4420] - ADOPTED SERVICE VOLUME
o - LML OF SERVICE
7/27/98
~
- ~
o
BOYNTON BEACH BOULEVARD
o
<:
o
co:
LU
U
Z
LU
co:
3:
<:
~
LU
=>
Z
~
'"
'"
LU
co:
<.J
Z.
o
U
. 9 (48)
;::::-
::'!,.
"
- SITE
WOOLBRIGHT ROAD
SW 23RD AVENUE (GOLF ROAD)
LEGEND
23 - AM PfAK HOUR
PROJEG TRAFFIC
(31) - PM PfAK HOUR
PROJEG TRAFFIC
-416- -DAlLYPROJEGTRAFFIC
WOOLBRIGHT
FIDELITY FEDERAL
EXHIBIT 7
PRO EeT DRIVEWAY VOLUMES
o
N.T.S.
""
5::
~
7/27/98
~
APPLICATION TRACKING LOG
PROJECT TITLE: Fidelity Federal FILE I: NWSP 98-013
PROJECT LOCATION: 2505 Woolbright Rd. (northeast comer of Woolbright Rd and Congress Ave)
TYPE OF APPLICATION: New Site Plan
PUBLIC NOTICE REQUIRED: (Y IN) 0 REVIEWER'S NAME
AGENT: Lindsey Walter, Kilday 8l Assoc. ADDRESS:
AGENT PHONE: 561-689-5522 FAX: 561-689-2592
DATE REC'D: 7/28/98 AMOUNT:
RECEIPT NO.:
12 SETS OF PRE-ASSEMBLED PLANS SUBMllTED FOR REVIEW:
2 OF 12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
SITE PLAN WITH SITE DATA 0
APPLlCATION/SUBMllTAL: DATE ACCEPTED:
DRAINAGE PLAN
ELEVATION VIEW DRAWINGS
COLORED ELEVATIONS RECEIVED
MATERIAL SAMPLES RECEIVED
PHOTOGRAPHS RECEIVED
o
o
o
o
o
DATE DENIED:
DATE OF SUBMllTAL ACCEPTANCE LElTER:
DATE OF LElTER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES:
I INITIAL 1 ST REVIEW MEMO: DATE SENT: 7/29198
I MEMO NO. 98-226
I RETURN DATE: 8/12/98
1 ST REVIEW COMMENTS RECEIVED
DATE OF LElTER SENT TO SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENTS:
90 DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID:
DATE 12 COMPLETE (ASSEMBLED) SETS OF AMENDED PLANS SUBMllTED FOR 2ND REVIEW:
PRE-ASSEMBLED PLANS SUBMllTED FOR REVIEW:
UTIL.
P.W.
PARKS
FIRE
POLICE
PLANNING
BLDGIENGR
FORESTER
AMENDED APPLICATION 0
2 OF12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
SITE PLAN WITH SITE DATA 0
2ND REVIEW MEMO: DATE SENT:
o
o
Qt<
PLANS MEMOI
-
DRAINAGE PLAN
ELEVATION VIEW DRAWINGS
COLORED ELEVATIONS RECEIVED
MATERIAL SAMPLES RECEIVED
TRANSPARENCY RECEIVED
PHOTOGRAPHS RECEIVED
o
o
o
o
o
o
MEMO NO.
RETURN DATE:
2nd REVIEW COMMENTS RECEIVED
PLANS MEMOI DATE PLANS MEMOI DATE
UTIL. 0 POLICE [J
P.W. 0 PLANNING 0,
PARKS rtY qtj-i<1J 1/9: BLDGIENGR ill
FIRE G:1 c:r11 -'1/'\1 Cf/i/ FORESTER ~ - "UK
BOARD MEETING DATE:
BOARD:
LAND DEVELOPMENT SIGNS PLACED AT THE PROPERTY. DATE SENT 1 SIGNS INSTALLED:
DATE:
CITY COMMISSION: DATE:
DEVELOPMENT ORDER RECEIVED FROM CITY CLERK: 0 DATE:
DEVELOPMENT ORDER SENT TO APPLICANT: 0 DATE:
S:\FORMS\TRACKING LOG FORM