TRAFFIC STUDY (NOV 1997)
Traffic Impact Study
Commercial Development
Palm Beach County
Grove Plaza
Traffic Analysis
Lawrence and Hypoluxo
Commercial Center
Prepared for the
Bob Fay
Prepared by
Carnahan · Proctor and Associates
November 20, 1997
fn)~@~U~~i
IJI) IIW 2 5 I!I!JI l!!J
PLANNING AND
ZONING DEPT.
\
PROFESSIONAL ENGINEER CERTIFICATION
I hereby certify that I am a registered professional engineer in the
State of Florida practicing with Carnahan. Proctor and Associates,
Inc., a Florida corporation authorized to operate as an engineering
business, EB #0002936, by the State of Florida Department of
Professional Regulation, Board of Professional Engineers, located at
6191 West Atlantic Boulevard, Margate, Florida 33093-4399 and that
I have approved the evaluation, findings, opinions, conclusions, and
technical advice hereby reported for:
PROJECT
Lawrence and Hypoluxo Commercial
Center
CLIENT
Bob Fay
160 N.W. 16th Street
Boca Raton, Florida 33432
PROJECT DESCRIPTION
Traffic Impact Study in accordance with
Palm Beach County Land Development
Code.
LOCATION
Boynton Beach, Palm Beach County
I acknowledge that the procedures and references used to develop the
results contained in this report are standard to the professional
practice of transportation engineering as applied through professional
judgment and experience.
,0/) / ./) /],/)
SIGNATURE:~t): ~
NAME: Robert L. Campbell
P.E. NUMBER: 26782
DATE: November 20,1997
TABLE OF CONTENTS
INfRODUCTION
STUDY OBJECTIVE
TRANSPORTATION ANALYSIS
project Trip Generation
Study Area
Existing Conditions
Future Roadway Improvements
Development Access
Background Traffic
Project Traffic Distribution & Assignment
Future Traffic
Level of Service Analysis
Test I . Link/Buildout Test
Alternative Test I
Test 2 - Model test
Pa$le
I
I
3
3
3
5
5
5
5
10
10
13
13
13
15
CONCLUSIONS & RECOMMENDATIONS
16
INTRODUCTION
DeSanti & Associates retained Carnahan-Proctor & Associates, Inc. to prepare the Traffic Impact
Study for the proposed Lawrence and Hypoluxo Commercial Center. The Study was performed
in conformance with Section 15. (1) E of the Palm Beach County Land Development Code.
The Development Site is "about 8.3 acres and located in the southeast quadrant of the Lawrence
Road and Hypoluxo Road intersection. Figure 1 depicts the general location of the site. This
was the former location of the Living Color Nursery Retail and wholesale garden center until
December of 1989. The proposed site modifications consist of the followings type and gross
floor area of building space:
. 15,560 Square Feet (S.P.) of general retail
. 2,940 S.P. Convenience Store with Gas Pumps
. 3,800 S.F. of bank with drive-through
. 7,200 S.F. of fast food restaurant with drive-through
Site access will be by driveway connections with Lawrence and Hypoluxo Road.
STUDY OBJECTIVE
These Standards require development to meet two "tests". Test 1, Link Buildout Test, requires
that total traffic on any roadway link within the project's radius of Development Influence that
would result in an average annual daily traffic volume that is less than the adopted threshold
level of service during the buildout period of the project.
Test 2, Model Test, requires that total traffic on any link within the project's Model Radius of
Development Influence would result in an average annual daily traffic volume that is less than
the adopted threshold level of service, as determined by the FSUTMS model.
1
Lawrence and Hypoluxo Commercial Center
La~ ~~O~d - - -l- _ _ _ _ - - -
"
III
o
a:
en
o
.,
I
~I
il
:EI
I
I
CD
j
c
CD
>
<
In
In
CD
...
en
c
o
o
------r-
~
,
Hypoluxo Road
BiI
i ~(J)
o LL.Z<
a: en!,!!!2
~ ~~li!
i ~~~
~ oen
U
~~ I ~~
8~ . ~~
~ <Da:
!
u.....J
en;;;:
~~
....
Z
u..<
en a:
~~
"'en
w
a:
I
I
---1 I
HypolU.O Road
rive wa
I Gateway Blvd L I
/-- I
1-......-- \.. I
I -: ----,-----
: I ~ I
~I
CD
I g I
I I ~ I I
I ~ I
III I
.J;;;;;\ I Boynton Beach Blvd I ..J J I _ - L - -
~1------r----- I-------T--". U I
: I I I
I I I
Figure 1. Development Site Location and Development Master Plan.
TRANSPORTATION ANALYSIS
Project Trip Generation
The traffic to be generated by the proposed development is based on the trip generation rates
presented in Table 10.8-1 of Article 10 in Palm Beach County Land Development Codes for
daily trips and I.T.E. Trip Generation, 5th Edition for peak periods.
Land Use
Size Rate Gross Tips
7,200 632.12 4,551
1 748 748
2,940 737.99 2,170
15,560 formula 2,209
3,800 265.21 1,008
Total 10,686
Pass-by Rate Pass-by Trips New Trips
0.3 1,365 3,186
0.58 434 314
0.45 976 1,193
0.447 989 1,221
0.46 464 544
Total 6,458
Internal Rate Internal Trips New Trips
0.05 159 3,027
0.37 116 198
0.05 60 1,134
0.05 61 1,160
0.05 27 517
Total 6,035
Fast Food Restaurant
Gas Station
Convenience Store
Retail
Drive-in Bank
Land Use
Fast Food Restaurant
Gas Station
Convenience Store
Retail
Drive-in Bank
Land Use
Fast Food Restaurant
Gas Station
Convenience Store
Retail
Drive-in Bank
Study Area
The maximum radius of development for Test I, for the net trip generation of 6,035 trips per day
is 3 miles. This comes from Table 2A, Test 1 - Link/Buildout Test, maximum radius of
development influence. The influence for test 2 is 2 miles from Table 28. (See Figure 2).
3
,
,
\ I
\ \'
',..........., \)
I \ (', I /
Ii: " /
:- ~a::;! .!!!V\! L \ ~
I [-I ----Ir----- ,/
\ , I /
.....r-----------------i-l ~""
o -........- ,,'
I : i : ..-------- I
I I ~ I I
I ca I 1
-€V 1S0y.to~ ~~v~ - ~ - - - _....-j_ - - ---+--- - -I... - -
: I : : I
"C
ca
o
a:
en
o
..,
Lawrence and Hypoluxo Commercial Center
La~ ~~o:d - - -1- _ - - - - --
Gl
:;,
C
Gl
>
<C
III
III
Gl
..
en
c
o
o
,
.iij ,
51
:Sl
___1_-_ //
",,- I -..0.....
, , ..
, ....
, ....
, ..
, ..
:' ........
: I ..............
I -----
I
,
,
,
,
-'
Lantana Road r
3 - Mile Iso line
Test 1
i
I
I
I
I
,
,
,
,
,
,
,
,
,
"
....
....
,,"
,..
'YPOIUXO Road (
--
-
(
,
/
..........
I
,
... ..l....
\'" T
'" .....................
..
\
\
Ell
/"
,
,
,
"
1/
1
/,
,
I
I
/
,
,,'
,
,
,
,
,
,
,
,
,
,
,
,
,
I
,
I
I
I
,
I
,
,
,
,
,
,
Figure 2. (solines of Development Influences for Tests 1 and 2.
Existing Conditions
Existing traffic counts were obtained from the Palm Beach County Metropolitan Planning
Organization for 1996-97. Figure 3 shows the available traffic counts for the roads within study
area.
The existing number of lanes for the roads was also obtained from the Palm Beach County
Metropolitan planning Organization and is presented in Figure 4.
Future Roadway Improvements
Palm Beach County "Five Year Road Program" and Florida Department of Transportation
"Transportation Improvement Program" were the sources for the funded roadway improvements
assured for construction. Lawrence Road is included in the County's Budget for construction in
FY 97/87. This improvement is a 2.0 mile upgrade to a 5-lane typical cross-section from
Gateway Boulevard to Hypoluxo Road. Gateway Boulevard is to be upgraded to 6-lanes
between Military Trail and Congress A venue. Congress Avenue is to be upgraded to 6-lanes
between Miner Road and Hypoluxo Road.
Development Access
Development access will be driveways connecting to Hypoluxo Road and Lawrence Road.
Hypoluxo Road at Lawrence Road location is a four lane divided arterial with exclusive left-turn
and exclusive right-turn lanes. Lawrence Road northbound direction, south approach, consists of
a single left-turn lane and a through and shared right-turn lane. The southbound direction, north
approach, consists of one through lane and exclusive left and right-turn lanes. Lawrence Road is
asserted for construction as a 5-lane roadway that is four travel lanes and a two-way-Ieft-turn
lane.
Background Traffic
Background traffic growth was calculated using the mSTORICAL TRAFFIC GROWTH
TABLES of the County Engineer. Table 1 contains a portion of the County Tables for road
segments within the 3-mile isoline of development influence.
The Map review was to infer if any major roadway project would induce any diversion of traffic
to new routes. No major projects were found which would make any significant changes.
Figure 5 is a roadway network map annotated with the total background traffic. The background
traffic is for the period of mid-1998 to mid-1999, that is 1998-1999. This is the estimate of the
market absorption for the proposed development. The convenience store with gas pumps will
likely be the first parcel developed.
5
Lawrence and Hypoluxo Commercial Center
La~ ~orth RO~d - - -1- _ _ _ _ _ _ _
BiI
I I
( ~ I
I : !
I Gateway !!v~ L 14748 I 22507
~ '-....../ \. .. . ... .
I -: ----!-----
: I ~I
I ~'~I
: ~H ~
I I ~ I ,- :
I al I
~ IBoynton Beach Blvd I ...IJ I _ _L --
~l------I---- :---~ I
Sou rce: Palm Beach County 1996.1997 Daily Traffic Count Volumes, August. 1997.
"
al
o
a:
Cl
o
-,
I
~I
il
:el
I
~I!
~ I
I
29994
... .
Lantana Road
25445
... .
~I !
I
~I:
~ I
I
25929 I
... .
28937
... .
Hypoluxo Road
15087
... .
G)
::J
C
Gl
>
<
fn
fn
G)
...
Cl
C
o
o
I
30536
... .
~----+-
33345
... .
I
I
~I!
~ I
I
I
I
Figure 3. Existing Traffic Volume Counts for Major Roads Withins Influence Area.
6
Lawrence and HYPoluxo Commercial Center
'0
as
o
a::
Cl
o
..,
1
161
...
il
:EI
1
I
CD
~
c:
CD
>
<
en
en
CD
...
Cl
c:
o
o
41
La~ ~o~O:d - - -1- - - - 6. - - - -
I
4
4
I
I
---6----r-
..L
"
I
41
I
1
I
6
I
6
: ( I : I
I : I I I
~ Gate;~!!v~\. L : 047
I "'- -I ----1---6---1
1 2 1
I "C I 1
6 6 ~I
I 1 g I LEGEND
1 I ~ I
1 ~ I Freeway
-@~BOynto~ ~~v~ _ t-- _ _ _ -l 6 Lanes - - --
: I
Lantana Road
4
I
I
I
2
I
I
Hypoluxo Road
I DiI
1 I
J I
I
6 6
~
Arterials
6 Lanes
4 Lanes
2 Lanes
Figure 4. Number of Existing and Assured Construction Road Lanes.
7
TABLE 1
SELECTED ROAD SEGMENTS. 1996-1997 YEAR COMPOUND GROWTH RATES
--..- -- - - u _ -- -.---
'i;,:9p~~6: " .... Avg.,
if Annual
"'AD! '" Growth
,. . . ...
~: - -. ": ~ - ,~ !:
Lawrence Rd. Lantana Rd. Hypoluxo Rd. 6.796 7.004 7.125 7.443 3.08%
Lawrence Rd. Hypoluxo Rd. Gateway Blvd. 7.646 7.866 9.615 10.743 12.00%
Lawrence Rd. Gateway Blvd. Old Boynton Rd. 10.652 10.911 12.300 11.934 3.86%
Military Trail Melaleuca Ln. Lantana Rd. 31 .639 30.968 31 .402 33.837 2.26%
Military Trail Lantana Rd. HYPoluxo Rd. 24.849 25.632 26.336 29.501 5.89%
Military Trail Hypoluxo Rd. Gateway Blvd. 23.763 24.693 23.763 24.693 1,29%
Congress Ave. Lantana Rd. HYPoluxo Rd. 23.439 23.854 23.583 23.976 0.76%
Congress Ave. HYPoluxo Rd. Miner Rd. 25.540 28.327 27.375 28.813 4.10%
Lantana Rd. Jog Rd. Military Trail 21.064 23.140 23.520 25.445 6.50%
Lantana Rd. Military Trail Congress Ave. 28.259 28.169 28.192 29.994 2.01%
Hypoluxo Rd. Jog Rd. Military Trail 10.556 12.693 13.492 15.087 12.64%
HYPoluxo Rd. Military Trail Lawrence Rd. 21. 716 22.696 24.309 25.929 6.09%
Hypoluxo Rd. Lawrence Rd. Congress Ave. 23.995 26.947 27,198 28.957 6.47%
Hypoluxo Rd. Congress Ave. 1-95 27.973 30.439 29.809 33.345 6.03%
Gateway Blvd. Military Trail Lawrence Road 14. 130 14.219 14.089 14.748 1.44%
Gateway Blvd. Lawrence Road Congress Avenue 19.783 21.190 20.875 22.507 4.39%
Areawide 321.910 337.127 342.983 366.952 4.46%
Source: 1996-97 Year Compound Growth Rate Table. Department of Engineering and Public Works.
Palm Beach County. September 1997.
8
I: \ excelS \ ftles \alt\mlsctrat\lw-hypo3.xls
Lawrence and Hypoluxo Commercial Center
La~ ~~O~d - - -1- _ _ _ - - - -
"
ca
o
a:
en
o
..,
1
el
il
:21
1
G)
::l
C
G)
>
<
lIJ
lIJ
G)
...
en
c
o
(J
I
~1!
:g 1
I
Lantana Road
31120
. .
I
31610
. .
28860
.
.
~1 !
I
81:
~ I
I
29180 I
. .
~----+-
Hypoluxo Road
32880
.
37490
. . .
19140 ~y -
. .
I I
I I
~1! ~1!
,.
(
I I
I Gateway ~v~ L 15180 I 24530
1-...... ___/ \ . . I. .
I -: ----!-----
I il I
I ~I 01 I
: gl~
I lilT"":
I ca I
~ I Boynton Beach Blvd I -lJ I _ _L --
~l------I---- :------:--- I
Sou rca: Palm Beach County 1996-1997 Daily Traffic Count Volumes, August, 1997, and Growth Factors
Figure 5. Background Traffic Volumes for Major Roads Within Influence Area.
9
Project Traffic Distribution and Assignment
Distribution of project trips came from proportioning trips by using the Palm Beach County
Metropolitan Planning Organization's socioeconomic data. The socioeconomic data are
available through the "ZDATAl files" of the Urban Area's Transportation Models for all zones
within the study area. The generation files include all single and multi family development
within the study area. Residentialland use was the basis for distribution of trips. The following
distribution was obtained:
TRIPS DISTRIBUTION
DIRECTION
North
South
East
West
PERCENTAGE
27%
33%
24%
16%
The assignment of site traffic was performed assuming the minimum travel time that drivers
would more frequently favor in their route solution. Figure 6 reports the assigned project to the
area's roadways.
Four access driveways are proposed. Three will be limited to right entry and exit: one
intersection with Lawrence Road and two intersections with Hypoluxo Road. The fourth
driveway will be the eastern most entry and exit access point and will have full access. That is,
the intersection will have an eastbound right turn lane and a westbound median left turn lane and
the exiting vehicles may turn left to go west on Hypoluxo Road.
The traffic volume using the driveways by direction are related to the trip distribution are related
to the trip distribution and site circulation. Twenty percent (20%) of the development entering
traffic will likely use the westbound left turn lane for entry, that is 80 vph during the AM peak
hour and 70 vph during the afternoon peak hour. During the PM peak hour the median opening
would serve 110 vph development generated eastbound-to-westbound "U-turn" and 48 vph
outbound "Left-Turns."
Future Traffic
Figure 7 contains the total 1999 traffic volume for the development. The total traffic volumes
are the summation of the assigned project traffic, the projected 1999 background traffic growth,
and the existing 1996-1997 traffic volume.
The future traffic volumes were the basis for determining the level of service. Figure 7 also
contains the maximum limiting traffic volume values for the roads within the influence area.
10
Lawrence and Hypoluxo Commercial Center
La~ ~orth RO~d - - -1- _ _ _ _ _ _ _
"C
I'll
o
a:
Cl
o
-,
I
el
il
~I
I
GI
:J
C
GI
>
<
In
In
Q)
..
Cl
C
o
o
I
~1!
I
177
.. .
I
Lantana Road
331
544
..
.
I
~1:
~ I
I
966 I
.
~----+-
153
..
.
~1 !
1440
446
Hypoluxo Road
..
..
.
..
.
..
.
EIiI
204
,
I ( !
I Gateway!!v!.. L 456 I 683
1-.............../ \ .. . .. .
I -: ----!-----
I I ]: I
I ~ I
I ; I
: I ~: I
~ I Boynton Beach Blvd I -JJ I.... _L --
~l------I---- :-------r--- I
Source: Palm Beach County 1996-1997 Daily Traffic Count Volumes, August, 1997. and Growth Factors
I
I
r:tl'
C\/ I
I
I
I
Figure 6. Development Traffic Volumes for Major Roads Within Influence Area.
11
Lawrence and Hypoluxo Commercial Center
La~ ~orth RO~d - - -1- _ _ _ _ _ _ _
"C
I'll
o
a:
Cl
o
-,
Lantana Road
Hypoluxo Road
'"
: (
I I
I Gateway!!v!.. L
I- / \
I '--- -:
: I
LEGEND
I
1ii1
il
~I
I
I
GI
:J
C
GI
>
<
In
In
GI
..
Cl
C
o
o
I
I
---r-
.L
"
I
I
)
EIiI
Project plus Background Traffic
LOS D Limiting Traffic Volume
Figure 7. Daily Total Future Traffic Volumes and Level of Service D Theshold Values.
I
I
12
Level of Service A1Ullysis
The traffic analysis must demonstrate compliance with the standards contained in Section 15. (I)
D, subsection 2 (A) and (B). the Palm Beach Traffic Performance Standards. The Standards
consist of complying with the adopted level of service for Test 1 or Alternative Test 1 and Test 2.
The following details the analyses for each tests.
Test 1 - UNKlBuildout Test
The following segments within the 3 mile area of development of influence exceed the allowable
level of service for Test 1:
. Lantana Road from Military Trail to Congress Avenue
. Hypoluxo Road from Lawrence Road to Congress Avenue
. Congress Avenue from Hypoluxo Road to Melaleuca Lane
However, the project traffic for Congress Avenue, 166 vehicles per day, does not exceed the
allowable 1/5 of 5% tolerance which is 311 vehicles per day.
The Lantana Road and Hypoluxo Road segments fail Test 1 and the project traffic is more than
the allowable 1/5 of 5% rule. Alternate Test 1 was analyzed for these segments to determine if
improvements are needed because of the project traffic.
Alternate Test 1
Alternate Test 1 can be satisfied if peak hour, peak season, peak direction volume does not
exceed the allowable level of service listed for the peak hour directional volumes for urbanized
areas in Table 5-1, Class la and 16 and Group 1 of the FDOT Level of Service Manual, (August
1995) and the intersection's critical volumes do not exceed 1400 vehicles as outlined in the
Highway Capacity Manual, planning analysis method.
The peak hour, peak season, peak direction volumes for the failed links were analyzed for
existing and future conditions. The peak season traffic counts for Lantana Road east of Military
Trail and Hypoluxo Road from Lawrence Road to Congress A venue are included in Appendix A.
The peak to daily ratio (KPm = 9.1 % and Kam = 8.2%) and directional factors for the morning
(64% eastbound) and evening (60% wetbound) peak hours were applied to the existing average
daily traffic count information from the Metropolitan Planning Organization and the future
volumes. The future volume is the sum of the project traffic and background traffic. The results
of the analysis are as follows:
13
LINK ANALYSIS
Lantana Road, East of Military Trail
Condition
Direction
Peak Hour
Peak Volume
Existing
Existing
Future
Future
Eastbound
Westbound
Eastbound
Westbound
AM
PM
AM
PM
1574
1683
1637
1703
Hypoluxo Road, East of Lawrence Road
Condition Direction Peak Hour Peak Volume
Existing Eastbound AM 1517
Existing Westbound PM 1579
Future Eastbound AM 1801
Future Westbound PM 1874
The maximum peak hour, peak season, peak directional volumes does not exceed the 1890 vph
threshold. Therefore, the link capacity requirements for Lantana Road and Hypoluxo Road are
satisfied.
Peak hour turning movement counts were factored to the future for the intersections of Lantana
RoadlMilitary Trail, Lantana Road/Congress Avenue, Hypoluxo Road at Lawrence Road, and
Hypoluxo Road Congress Avenue. Intersection planning capacity analyses were preformed to
obtain the sum of the critical movement volume.
14
These intersections will operate with the following critical volumes:
INTERSECTION ANALYSIS
Locations Condition Peak Hour Sum Critical Volumes
LantanaIMilitary Future AM 1226
Future PM 1081
HypoluxolLawrence Future AM 1202
Future PM 1227
Hypoluxo/Congress* Future AM 917
Future PM 1174
These three intersections do not exceed the maximum allowable 1400 sum of critical volume.
This analysis uses the assured construction for the Congress Avenue improvement. The
intersection of Lantana Road and Congress Avenue currently operates in the P.M. Peak Hour
with the sum of critical movement exceeding 1400 vehicles. The project adds at total of 31
vehicles to the intersection which has an incoming P.M. volume of 1411 vehicles. Given the
lane arrangement, the project adds 3 vehicles to the sum of critical movements.
The Lantana Road segment from Congress A venue to Military Trail and Hypoluxo Road from
Lawrence Road to Congress A venue will meet Alternate Test 1 for future conditions.
Test 2 - Model Test
The analysis consists of obtaining the project's net trips as projected in the trip generation section
and utilizing the net trips to obtain the model radius of development influence through Table 2B
of the Palm Beach County Traffic Performance Standards. The total traffic differs from Test 1
and is defined as model traffic. Model traffic consists of forecasted traffic volume as assigned by
the urban model on the future 2010 roadway network. Similar to Test 1, the Standards allow the
level of service to be exceeded by 5% of level of service D provided no one project can utilize
more than 1/5 of the 5%.
From Table 2B of the code, the maximum radius of development influence for the generated
6,035 trips/day is 2 miles. Therefore, all roadway segments within 2 miles from the site need to
be lower than Test 2's capacity. The Palm Beach County's List of Roadway Segments Failing
Test 2 was reviewed and no roadway links fail Test #2 within 2 miles from the site.
The proposed development passes Test #2.
15
CONCLUSIONS AND RECOMl\1ENDATIONS
From performing Test 1, Alternate Test 1 and Test 2 the proposed development conforms with
the Palm Beach County Traffic Performance Standards. We recommend that the project be
granted a Site Development Order.
16
e:\word6laltlhypolawr\law-hyp4.doc
APPENDIX A
Volume R~p0rt with 24 Huur Iotnl~ raGe 1
~**~*~~*+~~~*~****~*~~****~~~~~~~~.*~**~~*~~***+~+***********~*~*~*~***~*****~~*
-"'<ita rile
lar.ioll
1 "nt.ifiC:::.lt.i.011
t" t d.:t to:-
t(.p d.Jtl!:
.ity/TONl1
L,;q;-:lti0n
DOI04.013.PRN
000000004605
00000000000:
J:;IU ," ').+
Jnn 5,9.',
CHARLES RALPH
LANTANA RD. :?OO'
1. n r. l': 1." v .:J 1
Start time
Stop tLmQ
CoulIly
R or MILITARY TR.
.:.~ minut':.;-.";
O'~:30
09:.30
P.B.
::\11 .',/Jan )
--,~~~*********~~*****~***~*******~**~********~*~~**~*******~~**~~*~*~~~~~~~~~~~~~~*~
01
0::
~a5tbound Voluw~ for L~ne 1
" .
v'.}
.~ !1 d T 1111 '='
ao
-----------------------------------------------------_________________4.__________
11
15
30
!. 5
00
1.5
20
10
11
.J.jl- Tot.:ll
,'5 G
.----------------------------~..----------~.~~~----------__________________._J..___
"l"
-...
23
~lIJ T lUl~~
12
, .
..!.)
30
.+S
00
1 n,
J..u....
20~
21')
219
Ill" T'ital
825
--------------------------------------------------------------------------------.
t J 9
221
197
20~
221.
('7 , ~
') -to .)
II ,Hll- T'J t: ':11
p~ak hour b~~ins
r~ p~ak hour bQgins
7
4
l~
10
.3
OJ
29
15
2~9
" , ,
~~....
22[1
2 (; 1
96.',
6
7
fl
('7
l!
2.'3(,
259
269
':',,~
...._J
991
04
05
11
21
46
72
7G
95
172
236
280
379
389
!.02
391.
731 15(,1
245
., ., n
~ _, u
1.33
198
369
18
1.55
1 . "
.L ') v
115
112
-?"l
:1__
1~1)5
1036
07
3:1:-;
""""
,Jv,
300
236
.. ",., 1
~.:..~ .1.
19
85
lor;
7.',
7 :'
340
o[)
09
215
18~
209
207
CH,
2,113
10
200
202
20.1
218
.. ") .)
u_-'
77
G?
57
53
43
".
~"I
, ..,
...,
:S
2 O!~
1""
I ...
200
180
75 S
20
21
l' Po .l k 1/ <J U L' L."1 '_' t " i.' : O. 9 7
P~ak hour factoc : O.9~
02
~,; .:! .5 t b tl U 11 d V (I 1 OJ m e f 0 ;.- L .3 11 ~ 2.
n
\J
22
'1 ,
-...
62
209
,
u
l~
15
4.1
21
,"
.L 'J
17
::!5!t
2:,9
:2 .3 "
:! 2 'I.
961
AH P Ii? a k -.; 01 unt<o.:
E'~1 l'f;'dk '.;olllTf:"
103
3D
7 ~1
77
.3 ,.7
J .:Ill .', / . J .i. n
.-~~*~~~*~*****~**~~~********~*~~~*~*~*~~~*~~******~**~****~********+******~*~*~J.~
c:
..J
1.J
l-'t
-';.n(l Time
""
vv
... . .. ~ - - - - ---- ----- - -- - --- --------- -------------- ------ ---------------------.--- --
.1.1.
1 S
::0
'.5
00
3:J
.,,,
,.I'"
23
17
-~-{ L' T IJ t ;J 1
lOG
C 1
2:!
12
17
11
64
"...?
_ .J_
277
265
') ":l e-
_._' J
1009
14':"~ :'
: 07: 1. 5
1.',:15
1 ~
.1 _J
.., .
J't
".,
\.J .J
7
G
,-
'J
(;i
S
" .
v"
.... ~
'0' _J
G5
q
7
14
17
00
, ..,
\) ;,
~l 0
1 t (,
137
/ 1'\ ~
...v....
07
161
203
:!19
2213
81G
Og
177
1 ().',
182
170
693
oq
162
1 .- ":'
. u....
15<:1
1(.7
(,5 (}
164
17-+
.., . ..,
_ L j
Inl"
'J _'
7J6
10
194-
170
,,,..,
.L IJ ..
::09
7GO
[IlJ T..i.me
12
---------------------------------.----------------------------------------------
"...
':'.J
1 5
19 (j
~23
206
..."
.) \.J
,'.5
GO
'n"
, ,oJ
Hi" Tot.;!1
813
u__ _ _ _ _ _ _ _ _ _. _ ~. . _ _. _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ '_ _ _ _ ... ...._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ '- _'" _ _ _ _ _ _ .. _
:.29
13
22(>
2 (. '3
22.'1
233
("'C ., "!
7.J .'
1 I
":"1
2'+1
2 (,(1
2().l
3.', :)
('7
"
:?
t (,
3~)
32 C,
329
171
n
'.'
21
" ."1
_v
T .5
26~
:305
313
JOG
9
)"
..
1 0
.LU
:-,. 1 ~l
,.., , c:
~ V.1
230
:2 30
10c.-c.-
19
" ., .,
"-~-
163
1. 'i (,
147
G88
10
1.39
129
117
1 , "
J. 1_
527
21
1 . n
.L', U
150
il6
. 1 '"
J J oJ
)2~
.to:1
7(.
91
66
]J6
2:!
,~ n
61
S8
42
2~ Uuu~ Total 14756
A;vJ pt.::~k h'_"J!;' beg..i.ns : 07: 1S A;:.! 1"~d1, 'H.'l~:l!lt. n3: Fc.:\~: 110Ul." LIt:.!.!.,!: : 0.91
pC.lk hou~ b@g1ns : 16:4.5 PM p~ak volume IG~4 Peak hvu~ factoi" : O.~5
~:~*~~***~*~*****~****~~*~~~~~~~~~**~~***~~~~.~~.~-~~*~*~~~~~:~~~~~.~~~*.~~~~~~:~*~~~-~~~-~
cO/rO'd
0.!..':':; 8.::.p .!..(l17
91
17
.',2.'.
,~ 31
.+18
355
1050 1189 1381 1628
ccccccccc~z~C~CCG
S[:91 :;E61-6T-~d~
v 0 lu m E' RAP 0 r t: ,,, i 1. h :!.'t i1 .:) 11 1~ T 0 L a 1 ::; F d J!: Eo 2
.:.: ..... ..... .': 01. .'l ..,'. "f ~. ..I. .1. .r. J. .'. .0. .'. .... .... .!. .'. .'r .F.. ,'. ~. J. J. J.. .... .". ..... ~ t/. ~, .~ .,J. .t. J. .... .... v. .."" .'. .'. "I .f.. .I. .II .', J. .I.. ..... J. ..... .I. .f. J. ..', ...'. ..... ..... ./, .1.- ,. .1. ~ ~ ~ .... ..... .... ... .... ..'. .'" ~ ..", ... .". .I.
...... . I .",). ro. .... .. ....". ....' ,. 1"0.' ," ^ -. ~, .. .... . , .. ., '. " ... i" ... . ..... ..... ..,.,\ n t. ... ,.. ,.. .... .. .. 'e .. .. ,f ,. ... .. .. . _ .' ,,, '. , .. '. ....
D~ta Pil~
D0104018.PRN
000000004605
OOGO o (H) 0 OOG Z
Jail 4. 9~
Jdn 5,?~
CHARLES RAL~H
LAN'l'ANA RD. 200'
III tBr.'v'':; 1
S t-:Jr t t 1m€'
:.; L o~ t tr"f~
CouuLy
E or ~'~ILITARY TR.
: r 1 5. r(l in jJ t e$
O'~:JO
09:10
P.C.
:=: .ILl.;.!)
T '1 t i [ .i '~'. a t .l .;, n
:,- .: t c1::t t .:-
S op d~l ~.~
C I. t y / T '.J ... H
Locat. t'_,n
~ ~*~~*****~*~~***~~*.~~~4~.~A~~~'~*~*~.~~~1~*~*****~*~~~~~~*~~*~~**~~*~*~~~:~~*.~~~~~~*
J 1)
!. / J ;_~ n
5
TaLal Volum~ Lor All L~ne5
---------------------------------------------------------------------~-._-------
P--d -f' . 00 01 02 OJ Q.!t 05 aG 07 C13 09 10 11
.L.Lm~
- - -----
1 :; 5.3 29 1 1 12 20 35 150 S!.O ...." ]('G ~..,,.., j I)!..
.LJ. .J I) " v' J "
30 50 , /) :0 13 15 C.J 262 5'>7 46(, JJ3 3:.9 J72
...v
!, 5 .3.3 30 ')") 1J 30 94 .352 621 , "... 3~9 , " " 390
......t ., u.::.. "1 '- "-
00 ., n 2n 11 1 . """ 108 :. 1 7 GI9 :'06 :~~ 7 3~2 .'127
.:ow .1- .j 'J
- ..... - ----
F- Total . .. , 105 55 .', '} ?j .100 1189 '2J77 1914- 1/,05 15~2 1533
.1 u-+
----------- ~.-------------------~---------------------_________________t.
I.;nd Time.> .12 . ., 14 1 ~ 1G 17 1 8 19 20 ~1 2:2 ?""
.L .J .1..) _ J
----......
15 ..."" 4' ~ 47"3 52.', 591 678 '5 (, :.. :"77 ??' .,,. . 111n III
..) \1 ,.f .... , --.... ~.l.:.
::0 , " ,. ~~C) 5:, l) 51~ Sr..) 6GO 50~ .'1,.... ~ 235 238 1 'I 5 ... =
10'='\.1 ~v ) ,) J
~5 ' -) ~ .',2S ~ (; 6 'i41 j9fJ (.,.')2 418 271 191 . <:) ~ 14tl 105
~_J .1., .
00 .,+ 11 , 59 575 ),;? 598 )7') , ..~ I" 259 " . 7 187 121 (,7
-+..::..tJ .!-I
---- --
U 1" To t.:Jl 16 ' .., 177.+ 205<:l ~153 ""...,.'"'7..... 2539 1"1~ 1 .., , " G67 " '"'11 594 360
l.} .:....}/~ .1..7.1."} I.~.!. 'J \.1 / '.
-~--------~...--------------------_.------------_.----------------------------.----.
H IJ U r T .:. t. .:\ 1
2'.}201
'. pt:i:li.. h'HI\.' ::'.:::;ins : 07:15 A~.r peak v<..dlJm~ 2Y~7 P",.,J, hi)Ul: f~lt~LI.I:r ; 0.9(,
p"~1 L) .:: .:; k 11 '.' u r ~),:, ~ .i n :3 1 (, : !, ~ P ~1 P ~ .3 k v 0 III In ~ 2 (. n [] p '': .:\ k 11') u t' f.; c :: (I r : O. ';) C
: .*~**~******.~****~~~****~**~*.~**~***~-~***~******,~~~~~*~*~*~~~~~~~~~.~*.~~~~~~~~*~
60/S0'd
0a:; 8"7 WI:'
~c~~c~cccccc~~~cc
S~:91 S~~1-61-od~
volume Report with 24 Hour Totals Page 1
~~*****************************************************************************~
Data FilA D0821001.PRN
tat ion 000000000002
.~~ntification 000000000622 Interval
rt date Aug 21, 95 Start time
top date Aug 22, 95 Stop time
ity/Town BOYNTON BEACH County
Location HYPOLUXO RO BETWEEN CONGRESS @ LAWRENCE
-*****************************************************************************~
ug 21/Aug 22 Eastbound Volume for Lane 1
C-nd Time
15
30
45
00
" T0ta 1
00
20
20
25
8
73
01
9
18
39
02
7
6
7
10
10
03
11
4
11
8
34
04
10
22
33
19
84
05
35
39
58
84
216
06
90
143
158
201
234
282
345
289
592 1150
15 mi nutes
21:30
21:30
PALM BEACH
07
08
09
172
166
152
163
653
166
177
145
169
657
10
11
5
33
261
243
210
193
907
178
208
1~9
243
828
.------------------------------------------------------------------------------
2:3
End rime
15
30
-- 45
00
12
190
167
165
~J Total 716
13
155
189
226
190
760
14
224
200
202
230
856
15
243
245
229
222
939
16
242
247
228
204
921
17
207
229
224
207
867
18
211
197
204
171
783
153
162
148
147
610
19
20
21
100
82
148
103
4:33
22
86
72
60
65
283
58
46
41
17
----------------------------------------------------------------------------.-
162
157
117
103
107
484
o:."T riour Total 13080
AM pef;~ l'lour begins : 07: 15 AM peak volume : 1177 Peak hour factor : 0.85
! 1 peak houl begins : 14:45 PM peak volume ; 947 Peak hour factor : 0.97
,***************************************************************************~*
Aug 21/Aug 22 Westbound Volume for Lane 2
------------------------------------------------------------------------------
I 1d Time 00 01 02 03 04 05 06 07 08 09 10 11
-- ... . ..... - --
.- 15 47 18 16 3 3 8 71 146 150 124 135 166
30 16 10 11 5 5 22 109 177 142 138 186 173
45 17 10 14 6 12 37 140 225 132 129 142 163
-~~- 00 21 15 8 7 16 63 129 176 126 143 145 152
--- .--.......
r II' Total 101 53 49 21 36 130 449 724 550 534 608 654
-------------------------.-...--------------------------------------------------.--
-- "Id Time 13 14 15 16 17 18 19 20 21 "?..., 23
12 .. ....
-------
15 155 191 199 j94 246 323 306 189 154 109 94 70
- 30 173 186 190 .208 247 306 270 203 191 126 79 50
4.:. 195 211 210 216 294 281 253 189 130 112 62 60
00 167 219 213 274 255 267 230 176 128 99 61 54
--------
I Tot(:11 690 807 812 892 1042 1177 1059 7...,7 603 446 296 234
---------------------------------------------------------------------------------
~.: iou r Tot.:d 12724
- begins peak volume 728 Peak h(Jur factor : 0.81
I , pp.a k hour : 07: 15 AM :
i 1 pe8k hOU1- begins : 16:30 PM peak volume . 1178 Peak hour fa c t 0 1" 0.91
****~***~~****~*********.**********************>> ~*********~**********~~~*%*
Volume Report with 24 Hour Totals Page 2
7 k****************************************************************************
[L-,...a. File D0821001.PRN
, .atian 000000000002
lden~ific8~ion 000000000622 Interval
Start date Aug 21,95 5tsyt time
\ ,C)p date Aug 22. 95 Stop time
LA tv IT (."')wn BOYNTON BEACH County
location HYPOLUXO RD BETWEEN CONGRESS @ LAWRENCE
. *~~~*~*~*********************************************************************
~ 19 ~?l/AlJg 22 Total Volume for All Lanes
15 minutco
21:30
21:30
PALM BEACH
tld Time
-------------------------------------------------------------------------------
11
1
- 30
45
00
00
67
36
42
29
Tot.al 174
01
25
15
19
33
92
02
22
18
24
18
82
03
14
9
17
15
55
04
13
27
45
35
120
05
43
61
95
147
06
161
252
298
330
380
459
570
465
07
08
09
296
304
281
306
301
363
287
314
10
3.:14
381
362
395
346 1041 1874 1457 1187 1265 1482
411
385
342
319
E!ld Time
------------..------------------------------------------------------------------
23
15
30
- 45
)0
1.2
349
363
362
332
13
346
375
437
409
14
423
390
412
443
15
437
453
445
496
16
488
494
522
459
17
530
535
505
474
18
517
467
457
401
342
365
337
323
19
20
311
308
233
235
~. Total 1406 1567 1668 1831 1963 2044 1842 1367 1087
21
209
208
260
202
879
22
180
151
122
126
57'7
128
96
101
71
. ._-----_._.~--------------------------------------------------------------------
396
~4 Hour Total 25804
~~ peak hour begins: 07:15 AM peak vclume : 1905 Peak hour factor: 0.84
11 peak hour begins: 16:30 PM peak volume: 2046 Peak hour factor: 0.96
:.~******~******************************************************************~~
APPENDIX B
Site Code: CALRAM95
N-S Street: CONGRESS AVENUE
E-W Street: LANTANA ROAD
'ATION : PALM BEACH
Sum of the Primary and Secondary
PAGE: 1
FILE: TEMP-4
----------------------------------------------------------------------------------------------------------------------------------
DATE: 5/04/95
Total Turning Volumes for the Period: 7:00 AM - 9:00 AM
[PEDS.] 2
------------------*
. . . . . . . . .. 1484
. .. LANTANA ROAD
633
CONGRESS AVENUE
" 2121
191
852
415
1458
1887 2804
284
------------------*
[PEDS.] 2
1560
I
. . . . . . . . . . . . I
,
. . . I
I
. . . . . . . . . . . . I
I
. . . . . . . . . . . . I
I
. . . . . . . . t
:1197
,
I
I
I
I
I
I
,
259
., 1251
CONGRESS AVENUE
N
W-+-E
S
2 [PEDS. ]
*------------------
291
1440 1034
104
115
LANTANA ROAD ..,
. 2406
*------------------
3 [PEDS. ]
RECEIVED
- ..- ,... r-
, ':'J)
BY:
PAGE: 1
FILE: TEMP-4
__ Site Code : CALRAM95
N-S Street: CONGRESS AVENUE
E-W Street: LANTANA ROAD
\TION : PALM BEACH
Sum of the Primary and Secondary
DATE: 5/04/95
----------------------------------------------------------------------------------------------------------------------------------
PEAK PERIOD ANALYSIS FOR THE PERIOD: 7:00 AM - 9:00 AM
. . . . .. PERCENTS
PEDS. Right Thru Left
. . . . . . . . . .. VOLUMES ...........
PEDS. Right Thru Left Total
DIRECTION START
FROM PEAK HOUR
PEAK HR
FACTOR
-----------------------------------------------------------------------------------------------
13 59 29
16 72 10
5 76 1 i
10 66 21
0 99 460 224 783
0 142 552 76 770
0 44 676 143 663
0 155 1058 332 1545
Entire Intersection
0 99 460 224 783
0 150 543 66 759
0 44 676 143 863
0 154 1024 347 1525
North
East
South
West
7:30 AM
7:45 AM
7:30 AM
7: 15 AM
0.91
0.97
0.89
0.76
13 59 29
20 72 9
5 78 17
10 67 23
N
W-+-E
S
North
East
South
West
0.91
0.96
0,69
0.75
7:30 AM
I I
I . . . I
CONGRESS AVENUE :.....:
I I
r .. .. .. I
I
.. .. .. .. .. .. .. .. .. .. .. .. I
I
.. .. .. .. .. .. .. .. .. .. .. .. I
I
.. .. .. .. .. .. .. .. .. .. .. .. I
.. 1173 .. .:
224 ........ . . . . : 0 [PEDS. ]
*------------------
[PEDS. ] 0
------------------*
460
99
150
783
785
759 543
. .. LANTANA ROAD
66
347
LANTAI'~A ROAD ...
1024 1525
. 1292
863
154
*------------------
o [;:JEDS. ]
------------------~
[PEDS.] 0
J
.. .. .. . .. .. .. .. .. .. .. .. I
I
.. .. .. I
I
.. " .. .. .. 4 .. .. .. .. .. .. I
I
. . . . . . . . . . . . I
I
. . . . . . . . . . . . I
I
44
r - /
0/0
143
680
COI'~GRE~,S AVENUE
Site Code : CALRAM95 PAGE: 1
N-S Street: CONGRESS AVENUE FILE: TEMP-4
E-W Street: LANTANA ROAD
'A TION : PALM BEACH Sum of the Primary and Secondary
DATE: 5/04/95
------------------------------------------------------------------------------------------------------------.---------------------
Time .. .. From North .... to o' From East .1.. .. .. From South .... "" . From West II.. Vehicle PEDS.
~- Begin PEDS. RT THRU LT PEDS. RT THRU LT PEDS. RT THRU LT PEDS. RT THRU LT To ta 1 Total
----------------------------------------------------------------------------------------------------------------------------------
7:00 AM 0 20 76 24 0 17 128 11 0 9 95 20 1 27 239 63 729 1
7: 15 0 27 105 44 0 42 108 5 0 10 152 26 0 33 223 72 847 0
7:30 0 14 120 57 0 36 132 10 0 10 150 36 0 57 352 97 1071 0
7:45 0 31 124 60 0 41 131 17 0 15 192 35 0 34 227 66 973 0
HR TOTAL 0 92 425 185 0 136 499 43 0 44 589 117 1 151 1041 298 3620 1
8:00 AM 0 21 107 44 0 28 144 22 0 9 144 41 0 31 256 97 944 0
8:15 0 33 109 63 0 45 136 17 0 10 190 31 0 32 189 87 942 0
8:30 1 21 106 58 0 28 141 20 3 20 117 32 1 36 191 74 844 5
8:45 1 24 105 65 2 54 114 13 0 21 157 38 0 34 210 77 912 3
HR TOTAL 2 99 427 230 2 155 535 72 3 60 608 142 1 133 846 335 3642 8
----------------------------------------------------------------------------------------------------------------------------------
- DAY TOTAL 2 1~1 852 415 2 291 1034 115 3 104 1197 259 2 284 1887 633 7262 9
PEAK PERIOD ANALYSIS FOR THE PERIOD: 7 : 00 AM - 9:00 AM
DIRECTION START PEAK HR .. . .. .. .... VOLUMES .. ......... .. .... PERCENTS .......
FROM PEAK HOUR FACTOR PEDS. Right Thru Left Total PEDS. Right Thru Left
-----------------------------------------------------------------------------------------------
North 7:30 AM 0.91 0 99 460 224 783 13 59 29
East 7:45 AM 0.97 0 142 552 76 770 18 72 10
South 7:30 AM 0.89 0 44 676 143 863 5 78 17
West 7:15 AM 0.76 0 155 1058 332 1545 10 68 21
Entire Intersection
North 7:30 AM 0.91 0 99 460 224 783 13 59 29
East 0.96 0 150 543 66 759 20 72 9
South 0.89 0 44 676 143 863 5 78 17
West 0.75 0 154 1024 347 1525 10 67 23
Site Code : CAHTPH95
N-S Street: CONGRESS AVENUE
E-w Street: LANTANA ROAD
'TION : PALM BEACH
Sum of the Primary and Secondary
PAGE: 1
FILE: TEHP-5
----------------------------------------------------------------------------------------------------------------------------------
DA TE: 5/04/95
Total Turning Volumes for the Period: 4:00 PH - 6:00 PH
[PEDS.J 0
------------------*
2712
. .. LANTANA ROAD
450
1181
134
------------------*
[PEDS. J 1
1765
I
. . . I
I
. . . I
I
. . . I
I
. . . . . . . . . . . . I
I
. . . . . . . . . . . . I
I
. . . . . . . . . . . . I
I
. . . I
. . . . . . . . : 0 [PEDS. ]
*------------------
CONGRESS AVENUE
315
I
I
I
I
I
I
I
I
: 1285
605
.. 2575
2205
N
W-+-E
S
517
2677 1889
2294
. . . . . . . . . . . .: 508 : 1608
I
. . . I
I
. . . . . . . . . . . . I
I
.. .. .. .. .. .. .. .. .. .. .. .. I
I
. . . . . . . . . . . . I
I
.. .. .. I
.....: CONGRESS AVENUE
I
.. .. .. I
.. 1690
178
271
LANTANA ROAD
1964
*------------------
3 [PEDS.J
Site Code : CAMTPM95
N-S Street: CONGRESS AVENUE
E-W Street: LANTANA ROAD
,TION : PALM BEACH
PAGE: 1
FILE: TEHP-5
Sum of the Primary and Secondary
----------------------------------------------------------------------------------------------------------------------------------
DATE: 5/04/95
PEAK PERIOD ANALYSIS FOR THE PERIOD: 4:00 PM - 6:00 PM
DIRECTION
FROM
START
PEAK HOUR
PEAK HR
FACTOR
. . . . . . . . . .. VOLUMES ...........
PEDS. Right Thru Left Total
. ..... PERCENTS
PEDS. Right Thru Left
-----------------------------------------------------------------------------------------------
North
East
South
West
4:00 PM
4:30 PM
4:30 PM
4:30 PH
0.98
0.98
0.95
0.96
North
East
South
West
4:30 PH
0.99
0.98
0.95
0.96
[PEDS. ] 0 158
------------------*
. . . . . . . . .. 1472
... LANTANA ROAD
257
595
922
70
0 184 623 310 1117 16 56 28
0 268 1036 142 1446 19 72 10
3 104 858 278 1240 8 69 22
1 70 595 257 922 8 65 28
Entire Intersection
0 158 647 309 1114 14 58 28
0 268 1036 142 1446 19 72 10
3 104 858 278 1240 8 69 22
1 70 595 257 922 8 65 28
I I
I . . . I
CONGRESS AVENUE I I N
I . . . I
--------------- I I W-+-E
I . . . I
I I S
I . . . . . . . . . . . . I
I I
I . . . . . . . . . . . . I
I I
I . . . . . . . . . . . . I
I 1383 I
I . . . . . I
647 309 I 0 [PEDS. J
. . . . . . . . . . . . I
*------------------
1114
268
1446 1036
142
LANTANA ROAD ...
. 1008
1240
*------------------
104 3 [PEDS. ]
------------------*
[PEDS. J 1: . . . . . . . . . . . .: 278 858
: .... 8~9 ..... :
I I
I . .. .. .. .. .. .. .. .. .. .. .. I
I I
I .. .. .. .. .. .. .. .. .. .. .. .. J
I I
I .. .. .. .. .. .. .. .. .. .. .. .. I
I I
I .. .. . I
: .. .. ..: CONGRESS AVENlJE
I J _______________
I .. .. . t
Site Code : CAHTPH95 PAGE: 1
N-S Street: CONGRESS AVENUE FILE: TEHP-5
E-W Street: LANTANA ROAD
'A TION : PALH BEACH Sum of the Primary and Secondary
DATE: 5/04/95
----------------------------------------------------------------------------------------------------------------------------------
Time . ,.. From North .... .... From East '0 ,. ,.," From South .... II .. From West I. .. Vehicle PEDS.
_ Begin PEDS. RT THRU LT PEDS. RT THRU LT PEDS. RT THRU LT PEDS. RT THRU LT Total Total
----------------------------------------------------------------------------------------------------------------------------------
4:00 PH 0 51 164 69 0 66 202 28 0 17 176 57 0 14 150 42 1036 0
4:15 0 42 150 83 0 57 203 31 0 15 189 62 0 17 155 45 1049 0
4:30 0 46 154 77 0 63 266 36 3 22 217 72 0 17 158 66 1194 3
4:45 0 45 155 81 0 69 249 38 0 23 197 67 1 17 151 62 1154 1
HR TOTAL 0 184 623 310 0 255 920 133 3 77 779 258 1 65 614 215 4433 4
5:00 PH 0 37 165 79 0 72 264 33 0 32 223 71 0 20 142 67 1205 0
5:15 0 30 173 72 0 64 257 35 0 27 221 68 0 16 144 62 1169 0
5:30 0 35 167 76 0 68 232 39 0 23 200 60 0 20 144 58 1122 0
5:45 0 29 157 68 0 58 216 31 0 19 185 51 0 13 137 48 1012 0
HR TOTAL 0 131 662 295 0 262 969 138 0 101 829 250 0 69 567 235 4508 0
----------------------------------------------------------------------------------------------------------------------------------
- DAY TOTAL 0 315 1285 605 0 517 1889 271 3 178 1608 508 134 1181 450 8941 4
PEAK PERIOD ANALYSIS FOR THE PERIOD: 4:00 PM - 6:00 PM
DIRECTION START PEAK HR . .. .. . .. ... VOLUMES ........... .. . ... PERCENTS .......
FROM PEAK HOUR FACiOR PEDS. Right Thru Left Total PEDS. Right ihru Left
-----------------------------------------------------------------------------------------------
North 4:00 PM 0.98 0 184 623 310 1117 16 56 26
East 4:30 PM 0.98 0 268 1036 142 1446 19 72 10
South 4:30 PH 0.95 3 104 858 278 1240 8 69 22
West 4:30 PH 0.96 1 70 595 257 922 8 65 28
Entire Intersection
North 4:30 PH 0.99 0 158 647 309 1114 14 58 28
East 0.98 0 268 1036 142 1446 19 72 10
South 0.95 3 104 858 278 1240 8 69 22
West 0.96 1 70 595 257 922 8 65 28
Site Code : MTLRAM95
N-S Street: MILITARY TRAIL
E-W Street: LANTANA ROAD
:ATION : PALM BEACH
PAGE: 1
FILE: TEHP-l
Sum of the Primary and Secondary
DATE: 5/02/95
----------------------------------------------------------------------------------------------------------------------------------
Total Turning Volumes for the Period: 7:00 AM - 9:00 AM
MILITARY TRAIL
I
. . . I
I
. . . I
I
. . .1
I
. . . . . . . . . . . . I
1
. . . . . . . . . . . . I
I
. . . . . . . . . . . . 1
I
. . . I
............: 0 [PEDS.]
*------------------
N
W-+-E
S
[PEDS. ] 0 208
------------------*
I
I
I
I
I
I
I
I
: 1925
.. 2197
814
2947
346
..........1518
. .. LANTANA ROAD
1579 985
494
248
1868 2743
LANTANA ROAD ...
. 2914
381
1914
------------------*
[PEDS.] 1: . . . . . . . . . . . .: 325
: .. 2554 ...:
I
. . . . . . . . . . . . I
I
. .. .. . .. .. .. .. .. .. .. .. I
I
. . . . . . . . . . . . I
I
. . . I
.....: MILITARY TRAIL
I ______________
. . . I
:1357
I
I
I
I
I
I
I
I
*------------------
232 1 [PEDS. ]
Site Code : MTLRAM95
N-5 Street: MILITARY TRAIL
E-W Street: LANTANA ROAD
'ATION : PALM BEACH
PAGE: 1
FILE: TEHP-l
Sum of the Primary and Secondary
----------------------------------------------~-----------------------------------------------------------------------------------
DATE: S/02/95
PEAK PERIOD ANALYSIS FOR THE PERIOD: 7:00 AM - 9:00 AM
DIRECTION
FROM
START
PEAK HOUR
PEAK HR
FACTOR
. . . . . . . . . .. VOLUMES .........,.
PEDS. Right Thru Left Total
...... PERCENTS
PEDS. Right Thru Left
-----------------------------------------------------------------------------------------------
North
East
South
West
7:30 AM
7:45 AM
7:30 AM
7:30 AM
0.84
0.94
0.83
0.95
North
East
South
West
0.84
0.91
0.83
0.95
7:30 AM
[PEDS.] 0 116
------------------*
826
. .. LANTANA ROAD
304
1038 1528
186
0 116 1119 439 1674 7 67 26
0 194 571 110 875 22 65 13
1 122 806 185 1115 11 72 17
1 186 1038 304 1528 12 68 20
Entire Intersection
0 116 1119 439 1674 7 67 26
0 202 525 118 845 24 62 14
1 122 808 185 1115 11 72 17
1 186 1038 304 1528 12 68 20
I I
I . . . I
MILITARY TRAIL I I N
I . . . I
-------------- , , W-+-E
I .. .. .. I
I I I C
I I .. .. .. .. .. .. .. .. .. .. .. .. I ...)
I I I
I I . . . . . . . . . . . . I
I I I
I , .. .. .. .. .. .. .. .. .. .. .. .. j
I I 1314 I
I I . . . . . I
:1119 439 I 0 [PEDS. ]
. . . . . . . . . . . . I
*------------------
1674
202
845 525
118
LAI'HANA ROAD ...
. 1599
111.5
*------------------
------------------*
LPEDS . J 1: . . . . . . . . . . . .: 185 808
: .. 1423 ... :
I I
I .. .. .. .. .. .. .. .. .. .. .. .. I
I I
, .. .. .. .. .. ~ .. .. .. .. .. .. J
I I
I .. .. .. .. . .. .. . . .. .. . I
I I
I . .. .. I
: .. .. ..: r1ILITARY TRAIL
I I ______________
I .. .. . I
122 1 [PEDS.]
_ Site Code : MTLRAM95 PAGE: 1
N-S Street: MILITARY TRAIL FILE: TEMP-1
E-W Street: LANTANA ROAD
A TI ON : PALM BEACH Sum of the Primary and Secondary
DATE: 5/02/95
----------------------------------------------------------------------------------------------------------------------------------
Time ... . From North .... .... From East .... .... From South .... ... . From West 10 ,. Vehicle PEDS.
- Begin PEDS. RT THRU LT PEDS. RT THRU LT PEDS. RT THRU LT PEDS. RT THRU LT Total Total
----------------------------------------------------------------------------------------------------------------------------------
7:00 AM 0 25 179 79 0 46 114 24 0 28 124 29 0 72 265 52 1037 0
7:15 0 19 220 95 0 23 99 27 0 33 112 31 0 54 240 40 993 0
7:30 0 17 290 98 0 46 88 42 0 36 187 36 1 64 251 82 1237 1
7:45 0 57 307 134 0 56 140 37 0 32 239 66 0 43 284 76 1471 0
HR TOTAL 0 118 996 406 0 171 441 130 0 129 662 162 1 233 1040 250 4738 1
8:00 AM 0 21 247 104 0 55 149 19 1 30 192 33 0 32 241 90 1213 1
8:15 0 21 275 103 0 45 148 20 0 24 190 50 0 47 262 56 1241 0
8:30 0 13 223 116 0 38 134 34 0 27 147 45 0 34 183 41 1035 0
8:~5 0 35 184 85 0 37 113 45 0 22 166 35 0 35 142 57 956 0
HR TOTAL 0 90 929 408 0 175 544 118 1 103 695 163 0 148 828 244 4445 1
----------------------------------------------------------------------------------------------------------------------------------
- DAY TOTAL 0 208 1925 814 0 346 985 248 232 1357 325 381 1868 494 9183 2
PEAK PERIOD ANALYSIS FOR THE PERIOD: 7:00 AH - 9:00 AM
DIRECTION START PEAK HR .. . .. .. .... VOLUHES ........... ...... PERCENTS.......
FROM PEAK HOUR FACTOR PEDS. Right Thru Left Total PEDS. Right Thru Left
-----------------------------------------------------------------------------------------------
North 7:30 AM 0.84 0 116 1119 439 1674 7 67 26
East 7:45 AM 0.94 0 194 571 110 875 22 65 13
South 7:30 AM 0.83 1 122 808 185 1115 11 72 17
West 7:30 AM 0.95 1 186 1038 304 1528 12 68 20
Entire Intersection
North 7:30 AM 0.84 0 116 1119 439 1674 7 67 26
East 0.91 0 202 525 118 845 24 62 14
South 0.83 1 122 808 185 1115 11 72 17
West 0.95 1 186 1038 304 1528 12 68 20
Site Code : HTLRPH95
N-S Street: MILITARY TRAIL
E-W Street: LANTANA ROAD
CATION : PALM BEACH
PAGE: 1
FILE: TEHP-2
Sum of the Primary and Secondary
OA TE: 5/02/95
----------------------------------------------------------------------------------------------------------------------------------
Total Turning Volumes for the Period: 4:00 PH - 6:00 PM
MILITARY TRAIL
I
. . . I
I
. . . I
I
. . . I
I
. . . . . . . . . . . . I
I
. . . . . . . . . . . . I
I
. . . . . . . . . . . . I
I
. . . I
. . . . . . . . . . . . : 16 [PEDS. ]
*------------------
N
W-+-E
S
[PEDS. J 2 275
------------------*
I
I
I
I
I
I
I
I
: 1500
., 2604
557
2332
601
.......... 2237
LANTANA ROAD
2472 1564
359
307
1149 1832
LANTANA ROAD
1899
324
2235
.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..
., 2131
: 1644
I
I
I
I
I
I
I
I
193
*------------------
o [PEDS.J
------------------*
[PEDS. J 0
. . . . . . . . . . . .: 398
I
. . . I
I
.. .. .. .. .. .. .. .. .. .. .. .. I
I
.. .. .. .. .. .. .. .. .. .. .. .. I
I
.. .. .. .. .. .. .. .. .. .. .. .. I
I
. . . I
...: MILITARY TRAIL
I ______________
.. .. .. I
Site Code : HTLRPH95
N-S Street: MILITARY TRAIL
E-W Street: LANTANA ROAO
CATION : PALM BEACH
PAGE: 1
FILE: TEMP-2
Sum of the Primary and Secondary
DATE: 5/02/95
----------------------------------------------------------------------------------------------------------------------------------
PEAK PERIOD ANALYSIS FOR THE PERIOD: 4:00 PM - 6:00 PM
DIRECTION
FROH
START
PEAK HOUR
PEAK HR
FACTOR
. . . . . . . . . ., VOLUMES ...........
PEDS. Right Thru Left Total
...... PERCENTS
PEDS. Right Thru Left
-----------------------------------------------------------------------------------------------
North
East
South
West
4:30 PH
4:45 PM
4:30 PM
4:4S PM
North
East
South
West
4:45 PM
(>.89
0.97
0.97
0.97
0.89
0.97
0.96
0.97
[PEDS.] 2 159
------------------~
. . . . . . . . .. 1196
... LANTANA ROAD
----~-------
181
625
174
980
2 150 807 299 1256 12 64 24
1 281 825 157 1263 22 65 12
0 96 873 209 1178 8 74 18
0 174 625 181 980 18 64 18
Entire Intersection
2 159 798 298 1255 13 64 24
1 281 825 157 1263 22 65 12
0 103 861 212 1176 9 73 18
0 174 625 181 980 18 64 18
I
I
MILITARY TRAIL I N
I . . .
-------------- I l.J-+-E
I . . .
I S
r . . . . . . . . . . . .
I
I . . . . . . . . . . . .
I
I . . . . . . . . . . . .
I 1323
I . .
798 298 I I 1 [PEDS. ]
I . . . . . . . . . . . . I
*------------------
1255
------------------*
[PEDS. ] 0: . . . . . . . . . . . . :
I
.. .. .. I
I
.. . .. .. .. .. .. .. .. . .. .. I
I
.. 1129
.. - .. .. .. .. .. .. .. .. .. .. I
J
.. .. .. .. .. .. .. .. .. .. .. .. I
I
281
1263 825
157
LANTANA ROAD .,.
. 1026
1176
212
861
*------------------
103 0 [PEDS.]
I
.. .. . I
MII_ITARY TRAIL
-Site Code: MTLRPM95 PAGE: 1
N-S Street: MILITARY TRAIL FILE: TEMP-2
F-W Street: LANTANA ROAD
ATION : PALM BEACH Sum of the Primary and Secondary
DATE: 5/02195
------~-----------------------------~----------------------------------------------------------------------------------------------
TilDe II.. Frolll North .... .1., FrOIl East ... . .1.. From South .... .... From West I.'. Vehicle PEDS.
-- Begin PEDS. RT THRU LT PEDS. RT THRU LT PEDS. RT THRU LT PEDS. RT THRU LT To ta 1 Total
----------------------------------------------------------------------------------------------------------------------------------
4:00 PM 0 21 154 76 0 69 202 43 0 25 193 46 0 34 107 51 1021 0
- 4:15 0 27 166 57 5 103 171 39 0 23 187 44 0 43 139 48 1047 5
4:30 0 32 201 72 10 86 182 32 0 20 213 49 0 38 142 39 1106 10
4:45 0 40 220 94 1 77 202 38 0 26 222 57 0 48 164 41 1229 1
HR TOTAL 0 120 741 299 16 335 757 152 0 94 815 196 0 163 552 179 4403 16
5:00 PM 2 38 196 68 0 64 203 38 0 25 231 46 0 42 159 43 1153 2
5:15 0 40 190 65 0 63 222 39 0 25 207 57 0 41 159 SO 1158 0
5:30 0 41 192 71 0 77 198 42 0 27 201 52 0 43 143 47 1134 0
5:45 0 36 181 54 0 62 184 36 0 22 190 47 0 35 136 40 1023 0
HR TOTAL 2 155 759 258 0 266 807 155 0 99 829 202 0 161 597 180 4468 2
----------------------------------------------------------------------------------------------------------------------------------
- DAY TOTAL 2 275 1500 557 16 601 1564 307 0 193 1644 398 0 324 1149 359 8871 18
PEAK PERIOD ANALYSIS FOR THE PERIOD: 4:00 PM - 6:00 PM
DIRECTION START PEAK HR ........,.. VOLUMES .......... . ...,.. PERCENTS
FROM PEAK HOUR FACTOR PEDS. Right Thru Left Total PEDS. Right Thru Left
-----------------------------------------------------------------------------------------------
North 4:30 PM 0.89 2 150 807 299 1256 12 64 24
East 4:45 PM 0.97 1 281 825 157 1263 22 65 12
South 4:30 PM 0.97 0 96 873 209 1178 8 74 18
West 4:45 PM 0.97 0 174 625 181 980 18 64 18
Entire Intersection
North 4:45 PM 0.89 2 159 798 298 1255 13 64 24
East 0.97 1 281 825 157 1263 22 65 12
South 0.96 0 103 861 212 1176 9 73 18
West 0.97 0 174 625 181 980 18 64 18
Site Code: LRHRAK95
H-S Street: LAWEREHCE ROAD
E-W Street: HYPOLUXO ROAD
LOCATION : PALM 8CH COUNTY
PAGE: 1
FILE: LRHRAH9S
SUI of the Prilary and Secondary
OATE: 8/22/95
-----....----..-------------.-.-----.---.---...--------------_._.._---_.---------_.._---_._----------~_._~.----.-.-----.-.------.-
Total Turning Volules for the Period: 7:00 A~. 9:00 AM
,
I
I
I
I
,
I
t
I
I
I
I
I
I
[PEDS. ] 10 I 99
I
I I
I . .. .. I
LAWERENCE ROAD t. ..:
______________ I .
I . . . I
I I
,............1
N
W-+-E
S
I 1
~ .............1
I I
t ............1
183
: .... 476 . .. ..:
135 :............: 2 [PEDS.)
*------------------
------------------*
.. .. .. .. .. .. .. .. . .. .. .. . .. .. .. .. ..
417
146
. . . . . . . . .. 1220
.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. . ..
. .. HYPOLUXO ROAD
1252 986
10
120
1752 2057
HYPOLUXO ROAD '"
. 2090
199
562
.. .. .. .. .. .. . .. .. .. .. .. .. .. .. .. .. ..
------------------*
[PEDS.] 3 :............: 135
: .. 502 ...:
I I
I.............
t I
,............1
t I
J . . . . . . . . . . . . t
224
*------------------
203 1 [PEDS.]
1 I
I . . . I
I I
I . . . I
I 1
I . . . 1
LAWERENCE ROAD
~ ---~;:: ~-~-,--
--)ite Code: LRHRAH95
I-S Street: LA~ERENCE ROAD
~-W Street: HYPOLUXO ROAD
_J,QCATION : PALl! BCH COUNTY
SUI of the Prilary and Secondary
PAGE: 1
FILE: lRHRAK95
------~-..._._---------.._.--_._.-------~~.-_.--_.-_..---._------_.----_.--~-----------_._-----------_.....---------~----_.__._--
DA TE; 8/22/95
PEAK PERIOD ANALYSIS FOR THE PERIOD: 7:00 A" - 9:00 AN
o {RECTION
FRO"
START
PEAK HOUR
PEAK HR
fACTOR
. ... .... . .. VOLUMES ...........
PEDS. Right Thru Left Total
. . . . .. PERCENTS
PEDS. Right Thru Left
..----------~.----_._---~------..._----_.--_.---._------.-.---.----.-------------.-------.-----
North ]:00 AI: 0.74 8 52 105 80 237 22 44 34
East 7: 15 AH 0.94 0 95 556 70 721 13 77 10
South 7: IS A" 0.93 1 101 121 78 300 34 40 26
West 7 : 15 AN 0.93 1 111 1037 6S 1213 9 85 5
Entire Intersection
Horth
East
South
West
T: 15 AH
0.72
0.94
0.93
0.93
[PEDS. ] 5 46
------------------*
beo
'" HYPOLUXO ROAD
65
1037 1213
111
5 46 106 79 231 20
0 95 556 70 721 13
1 101 121 78 300 34
1 111 1037 65 1213 9
I
I .. . .
LAWERENCE ROAD I
, . - .
-------------- I
I . . .
I
I............
I
I.............
r
I............
I 281
I . .
106 79 , t
1.............1
231
721 556
300
46 34
77 10
40 26
85 S
N
W-+-E
5
o (PEDS.]
*------------------
95
70
HYPOLUXO ROAD ...
.. .. .. .. .. .. .. .. .. .. .. .. .. .. . .. .. ..
. 1217
. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..
121
*------------------
101 1 [PEDS. ]
I
I . .
I
------------------*
[PEDS. J 1: . . _ . . . . . . . . . : 78
287
I
. . . I
I
I .. .. .. .. .. .. .. . .. .. .. . I
I I
. " .. .. .. .. .. .. .. .. .. .. .. I
I I
I .. .. .. .. .. .. .. .. .. .. .. .. I
I I
I . . . I
I I
I .. .. .. I
I I
, - . . I
F? ~::
LAWERENCE ROAD
-.- -..... ""'-
- - --
- -,'- --:
:- ."- -
,ite Code: LRHRAH9S rng,-. .
,1-5 street: LAUEREMCE ROAD FILE: LRHRAK95
E-W Street: HYPOlUXO ROAD
_OCA nON : PALK BCH COUNTY SUI of the Priliry and Secondary
DATE: 8/22/95
__~____..___..___a.__.__._.___-...---...-.-._----.-.-.__~..__4.___.________._._______._.-.._.------.____4_.-------..-.---....-
Fro. Horth .... Frol East IIII .... Fro. Soutb ..._ .,t. Fro. West f'" Vehicle PEDS.
.. ., "" .
Begin PEOS. Rr THRU LT PEOS. RT TKRU LT PEOS. RT THRU LT PEDS. RT THRU LT Total Total
...__._.__._.____..._..._____._____.__..___...--._..__..____.._______________________________-_-__...________._____..__a..________
7: 00 A~ 3 18 22 18 0 11 12~ 8 0 23 22 12 0 28 193 5 484 3
7: l5 2 9 21 13 0 10 133 24 1 25 26 20 1 2~ 242 11 558 4
7:30 1 14 35 31 0 22 149 16 0 26 37 18 0 32 277 18 675 1
7:45 2 11 27 18 0 30 1H 14 0 25 26 17 0 37 278 12 642 2
HR TOTAL 8 S2 105 80 0 73 553 62 1 99 111 67 1 121 990 46 2359 10
8:00 AM 0 12 23 17 0 33 127 16 0 25 32 23 0 18 240 24 590 0
-- a: 15 1 11 20 12 1 14 98 16 0 25 20 13 0 24 193 18 464 2
8:30 0 13 18 15 1 15 104 12 0 23 36 18 0 19 173 10 456 1
8:4S 1 11 17 11 0 11 104 14 0 31 25 14 2 17 156 8 419 3
- HR TOTAL 2 47 78 S5 2 73 433 58 0 104 113 68 2 78 762 60 1929 6
OAY fOTAL 10 99 183 135 2 146 986 120 203 224 135 3 199 1752 106 4288 16
~EAK PERIOD ANALYSIS FOR THE PERIOD: 7:00 All - 9:00 A"
OIRECHOH STAR T PEAK HR . . . . . . . . . .. VOLUIIES ........... ...... PERCENTS .......
rROII PEAK HOUR FACTOR PEDS. Right Thru left Total PEDS. Right Thru left
--.-..----__w._____________4_._____.__..____...._______.______.__._______~--____.___4.___~-____
North 7:00 AK 0.74 a 52 105 80 237 22 U 34
East 7: 15 All 0.94 0 95 556 70 721 13 77 10
South 7:15 All 0.93 1 101 121 78 300 34 40 26
West 7: 15 All 0.93 1 111 1037 65 1213 ~ 85 5
Entire Intersection
North 7: 15 A" 0.72 S 46 106 79 231 20 46 3.
East 0.9. 0 9S 556 70 721 13 77 10
South 0.13 1 101 121 78 300 34 40 26
West 0,93 1 111 1037 65 1213 9 85 5
::- :: .- ~ ..
.-...;---.....;::.-.,;.-"";-
~:.-.:.:-~.:= -,
= ,... ~. .
~~---~----
site Code : LRHRPK95
N-S Street: LAWEREMCE ROAD
E-W Street: HYPOLUXO ROAD
-- LOCATIOH : PAL" 8CH COUNTY
FILE: TEKP-l
SUI of the Prilary and Secondary
DATE: 6/21/95
.___~.___..___.w__~_.~_~.___...-~_..-_._--~._-_._--~.-__.__---____..___.__._______.._.w-..______-___~___.__.___._.w~._.____-___
Total Turning volu..s for the Period: 4:00 P" - 6:00 P"
I I
t . . . f
LAWERENCE ROAD: ...:
-------------- : ...:
I I
,..............
N
W-+-E
S
I I
1............1
I I
t.............
(PEDS.] 8 153
------------------*
167
141
: .. 665 . . . :
I I
I............,
1 [PEDS. ]
*------------------
..............."..
461
232
. . . . . . . . .. 2246
. .. HYPOLUXO ROAD
2356 1895
------------------
140
229
1454 1771
HYPOLUXO ROAD .,.
. 1746
177
642
------------------*
(PEDS. ] 1: . . . . . . . . . . . .: 198
293
*------------------
151 3 (PEDS.]
I
I . .
I
573
I
. . . ,
I
I . . . . It . . ,. . . . . I
I I
, . . . . . . . . . . . . I
, I
1..#.........1
I I
I . , . I
I I
I . . .1
I I
I . . . I
LAWERENCE ROAD
. -~ ~~-'?=~.-.:,;::
lite Code : LRHRP"~)
1-5 Street: LAWEREHCE ROAD
E.~ Street: HYPOlUXO ROAD
'-~OCArIOM : PAL" 8CH COUNTY
FILE: TE"P-l
SUI of the Pri.ary and Secondary
DATE: 8/21/95
---------_..----..--~----_.-.--..-.-....--~..--.-..-_...---...---..--...-.---.----....----.-.-....--...--.-------------.-..,..----
PEAK PERrOO ANALYSIS FOR THE PERIOD: 4:00 P". 6:00 P"
01RECTIOH START
FRO" PEAK HOUR
PEAK HR .. . .. .. . ... VOL V}\ES ...........
FACTOR PEDS. Right Thru Left Total
...... PERCENTS
PEDS. Right Thru left
--...---..----------..-.--...-----------..--.--.----------------------.--...------.------------
North 4:~5 PH 0.83 .. 99 105 S8 292 34 36 30
East 4:45 Pit 0,91 0 118 1124 134 1376 9 82 10
South 4:15 PM 0.86 2 77 1b5 102 344 22 48 30
West 4:45 PM 0.91 t 104 812 71 987 11 82 7
Entire Intersection
Horth 4:45 Pit 0.93 4 99 105 9S 292 34 36 30
East 0.91 0 118 1124 134 1376 9 82 10
South 0.84 1 91 152 93 336 27 45 28
West 0.91 1 104 812 71 987 11 82 7
I I I
J l . . . l
l LAWERENCE ROAD I I N
I I . . . ,
I -------------- I I W-+-E
, , . . .. I
l , I S
I (. .............)
I I I
I ,.....,.."...,
I I I
I 1..............1
I I 341 I
I I . . .. .. II I
[PEDS. ] 4 I 99 105 88 I I 0 [PEDS. ]
I , ............,
------------------* *------------------
292
118
. . . . . . . . .. 1316
. .. HYPOLUXO ROAD
1376 1124
71
134
812
987
HYPOLUXO ROAD .,.
991
104
336
------------------*
(PEDS. ] 1: . . . . . . . . . . . .: 93
: " 343 . . . :
I I
I .. .. .. .. .. lit .. .. .. .. .. .. ,
152
*------------------
91: 1 [PEDS.J
I
I
I
f
I
I
I
I
,
I
I
I
I
I
I ,
I .. .. .. .. .. .. .. .. .. .. .. .. J
I I
I .. .. .. .. .. .. .. .. .. .. .. .. I
I I
I . . .1
I I
I . . . I
I I
I .. .. .. I
LAWERENCE ROAD
F?::,~ __~ -';8--:: ;_~::::
.:~-:=-;:=
--Site Code : LRHRPH~S r""'I;' .
N-S Street: lAWERENCE ROAO FILE: TE"P-l
E-W Street: HYPOLUXO ROAD
-- LOCATION : PALK 8CH COUNTY SUI of the Prilary and Secondary
DATE: 8/21/95
.____~.____....___._.___.._.-__.__.__._..___.__.~___._.__._.___~_._____.__.__._._.4_______.___-__._____.__~____.__________4_______
... . Fro. Hortlt .... ... . Fro. East t. ,. .... Fro. South .... ..,. Fro. West . ,.. Vehicle PEDS.
Begin PEDS. RT TltRU LT PEOS. RT THRU LT PEDS. Rf THRU LT PEOS. RT THRU LT Tota I Total
____a.._____._____.___-___._____._______.___________~_---.--------..--.-.----------------.-----------.-..----.-.---.-------.----..
4:00 PM 2 a 24 14 0 20 144 20 0 11 33 21 0 21 150 16 482 Z
4:15 0 12 9 15 1 25 191 24 0 16 43 24 0 14 170 12 555 1
4:30 1 14 17 13 0 42 215 16 2 14 38 32 0 23 165 22 611 3
4:45 0 27 24 22 0 28 270 28 0 31 44 2S 0 26 181 16 722 0
-- HR TOTAL 3 bl 74 64 1 115 820 88 Z 72 158 102 0 84 666 66 2370 6
5:00 PH 0 18 24 10 0 17 312 47 0 16 40 21 0 32 210 14 761 0
- 5: 15 2 33 27 19 0 37 271 37 0 26 33 22 1 24 228 19 776 3
5:30 2 21 30 37 0 36 271 22 1 18 3S 25 0 22 193 22 732 3
5:45 1 20 12 11 0 27 221 35 0 19 27 28 0 15 157 19 591 1
HR TOTAL 5 92 93 77 0 117 1075 141 t 79 135 96 1 93 788 74 2860 7
DAY TOTAL 8 153 167 141 1 232 1895 229 3 151 293 198 177 1454 140 5230 13
PEAK PERIOD ANALYSIS FOR THE PERIOD: 4:00 PK . 6:00 PK
OrRECrrOH START PEAK HR .. . . . . . . . ., VOLU"~$ ........... .. . ... PERCENTS .......
FRO" PEAK HOUR FACTOR PEDS. Right Thru Left Total PEDS. Right Thru Left
...--__.__________________.____.___._.__________J.._._____.__.________.4...____________________
North 4:45 P" 0.83 4 99 105 88 292 34 36 30
East 4:45 PM 0.91 0 118 1124 134 1376 9 82 10
South 4:1S PI! 0.66 2 77 165 102 344 22 48 30
West 4:45 PM 0.91 1 104 SIZ 71 987 11 82 7
Entire Intersection
North 4:45 P!t 0.83 4 99 105 as 292 34 36 30
East 0.91 0 118 1124 134 1376 9 82 10
SQuth 0.64 1 91 152 93 336 27 45 za
~est 0.91 1 10.. 812 71 987 11 82 7
:-..; -:....- .....=:- -.---
-,- -- --
- - - -.-
Site Code : CAHRAH9S
M-S Street: CONGRESS AVENUE
E.~ Street: HYPOLUXO ROAD
- LOCATION : PAL" BCH COUNTY
t'l\tll~' 1
FILE: CAHRAH9S
SUI of the Prilary and s,condary
DATE: 8/22/95
4_...___._.~___...__~...--.._--_._---_...--_._-----.--_._.______._____-___._-.____4----.~._.___.._.__._..-_.--.---.-...-.--....
Total Turning Volu..~ for the Period: 7:00 AK. ':00 A"
CONGRESS AVENUE
I
I
I
I . . .
I
I . . .
N
1,.J-+-E
S
I
,.......~....
I
,.............
I
t............
[PEDS. J 0 153
------------------*
926
.. 1355 . . . :
382 ..... .......1 0 (PEDS.]
*------------------
1461
262
. . . . . . . . .. 1444
... HYPOLUXO ROAD
1362 919
293
181
1597 2198
HYPOLUXO ROAD ..,
. 2281
308
1474
: ., 1415
*------------------
800 : 302) 0 [PEDS.]
I
I
I
I
I
I
I
I
------------------*
[PEDS.] 0: . . . . . . . . . . . .: 372
I
. . . I
I I
f............,
I I
, ............t
, I
I . " .. .. .. .. .. .. .. .. .. .. I
I I
I .. .. .. I
I ,
I . . . I
( ,
I . . . I
CONGRESS AVENUE
:t:''=t'...
: -.: .... .... - -:-.~ ~ -..;. -:: : :.
Site Code : CAHRA~9S
N-S Street: CONGRESS AVENUE
E-W Street: HYPOLUXO ROAO
LOCATION : PAL" BCH COUNTY
PAGE: 1
FILE: CAHRA"95
SUI of the Prilary and Secondary
OATE: 9/22/95
PEAK PERIOD ANALYSIS FOR THE PERIOO: 7:00 A". 9:00 AM
DIRECTION START
FROM PEAK HOUR
PEAK HR
FACTOR
North
East
South
\lest
7: 30 AM
7:15 AM
7:30 AM
7:15 AN
0.85
0.92
0.94
0.93
North
East
South
Uesl
7:15 AM
0.84
0.92
0.94
0.93
[PEDS.J 0 87
------------------*
823
. .. HYPOLUXO ROAD
158
938 1282
166
. . . . . . . . . .. VOLUMES ...........
PEDS. Right Thru Left Total
. . . . .. PERCENTS
PEDS. Right Thru Left
0 83 548 218 849 10 65 26
0 112 529 94 73S 15 72 13
0 161 457 183 801 20 57 23
0 186 938 158 1282 15 73 12
Entire InteTs.ction
0 87 541 215 843 10 64 26
0 112 529 94 735 15 72 13
0 163 424 207 794 21 S3 26
0 196 938 158 1282 15 73 12
I I
I . . . I
CONGRESS AVENUE I I N
I . . . ,
--------------- I I W-+-E
I . . . I
t I 5
. ............1
I I
J . . . . " . . . tI tI ~ tI f
I I
.............1
541
: .. 694 ...:
215 :............: 0 [PEDS. J
*------------------
843
112
735 529
94
HYPOLUXO ROAD ...
. . .. .. .. .. .. .. .. .. .. .. .. .. .. , .. a
. 1316
794
.. .. .. .. .. .. .. .. .. . . .. . .. .. .. .. ..
.. ~ . . .. .. .. .. .. .. .. .. .. .. .. .. .. ..
.~.----_. -------*
[PEDS.] 0: . . . . . . . . . . . .: 207
: .. 821 . . . :
I I
424
163
*------------------
t 0 [PEDS.]
I
I
,
I
I
I
I
I
I
I
I
I
I
I
I .. .. .. .. .. .. .. .. .. .. .. .. I
1 I
I . . . . . . . . . . . . I
I I
I .. .. .. .. .. .. .. .. .. .. .. .. ,
1 I
I . . . I
I I
I . . . I
I I
I .. .. .. I
CONGRESS AVENUE
:-~:...._-::=:-,-..;--:
--.-...---.
- - _.-
SI-J Code: CAHRAHqS
N- Street: CONGRESS AVENUE FILE: CAHRAM95
E.w Street: HYPOLUXO ROAD
liU4 nON : PALM BCH COUNTY SUI of the Prilary and Secondary
DAiE: 8/22/95
~4_~__..____..____.__...____..__._.__...__..____..__~___________...._____________-__.w.._._.__.__.____...___----.-.-.-.----..--.-.
TL ... . Frot Nor th .... .,.. Fro. East . II. .... Fro. South .... .." Frot lIest .... Vehicle PEDS.
B 10 PEDS. RT THRU LT PEDS. RT THRU LT PEOS. RT THRU lor PEDS. RT rHRU U Total T ota l
- .---~-.---_..---.-.---------------------------------------.---.-------.----...----.--------.----.-----.--.-.-----.---.-----..--
7:00 AM 0 25 79 42 0 10 100 12 0 42 8' 42 0 29 169 35 669 0
15 0 23 97 49 0 15 169 16 0 35 87 63 0 34 228 41 957 0
30 0 25 152 S3 0 23 122 I? 0 47 107 47 0 38 260 43 936 0
7:~5 0 20 170 60 0 39 123 29 0 40 120 52 0 63 241 39 996 0
P-"- TOTAL 0 93 498 204 0 87 514 76 0 164 398 2~ 0 164 898 158 3458 0
8:00 AK 0 19 122 53 0 35 115 30 0 41 110 4S 0 51 209 35 865 0
_2.; 15 0 19 104 52 0 J3 94 33 0 33 120 39 0 40 179 39 785 0
:30 0 1~ 10~ 41 0 sa 116 22 0 39 92 43 0 31 165 32 755 0
...:45 0 12 96 32 0 49 80 20 0 2S 80 41 0 22 146 29 632 0
HR TOTAL 0 60 428 178 0 17S 40S 105 0 138 402 168 0 144 699 135 3037 0
Y TOTAL 0 153 926 382 0 262 919 181 0 302 900 372 0 309 1597 293 6495 0
PEAK PERIOD ANALYSIS fOR THE PERIOD: 7:00 AIt - 9:00 A"
DIRECTION SiART PEAK HR .... . , .. . " VOLU/lES .........,. ...... PERCENTS .......
FROIl PEAK HOUR FACTOR PEOS. Right Thru Left Total PEDS. Right Thru left
_____.-___4__.________.________________________.-____._________________._.-4____._____________.
Horth 7:30 AM 0.95 0 83 548 218 849 10 65 26
East 7:15 Aft 0.92 a 112 529 94 73S 15 72 13
Soutn 7: 30 AM 0.94 0 161 457 183 801 20 57 23
West 7: 1S AM 0.93 0 186 938 Isa 1282 15 73 12
Entire Intersection
North 7; IS A" 0.84 0 87 541 215 8..3 10 64 26
East O.9Z 0 112 529 94 73S 15 72 13
South 0.94 0 163 424 207 794 21 53 26
West 0.93 0 196 938 158 t282 15 n 12
.
---- .~-----------~ ---
--5ite Code: CAHRPH95
N-$ Street: CONGRESS AVENUE
E-W Street: HYPOLUXO ROAD
--LOCATION : PALM 8CH COUNTY
SUI of the pri.ary and Secondary
t'Atll:.: 1
FILE: CAHRPH95
_..___.______.~.-__.______._..___.___.--___.---.-.______._________._._.-w.___.__.___~____._______.______.___------.-.--.-------.---
DATE: 8121195
Total Turning Volutes for the Period: 4:00 P". 6:00 PM
[PEDS.J 0
------------------*
. . . . . . . . ., 2463
.. . . . . .. . .. .. .. .. .. .. .. .. .. .. ..
. .. HYPOLUXO ROAD
380
1180 1852
292
271
I
I
I
I
I
I
I
I
11098
. I
f .. .. .. t
CONGRESS AVENUE I...:
_______________ I I
J .. .. . I
I I
).............,
I I
.............,
I I
.............1
384
: .. 2206 . . . :
I I
t .............1
N
W-+-E
S
o (PEDS.]
*------------------
1753
333
2201 1453
2448
415
HYPOLUXO ROAD...
. 1780
216
.. .. .. .. .. .. .. .. ... .. .. .. .. .. .. . .. ..
: " 1805
------------------*
[PEDS. ] 1: . . . . . . . . . . . ,: 739 : 1493
I
. ., .. ,
*------------------
I
I
I
,
I
I
I
I
I
I
I
I
I
I
I
I
t
.. .. . . . . .. .. .. .. . .. I
I
.. .. " .. .. .. . " .. .. .. . r
I
. .. .. .. . .. .. .. .. .. .. .. t
I
.. . . I
,
. . . I
I
. . . I
CONGRESS AVENUE
---~... ....- --.
- ~ , - -
. ,- .-. . .....
o [PEDS.J
.--S i t e Code : CAHRPH95
!-S Street: CONGRESS AVENUE
i.U Street: HYPOLUXO ROAO
._lOCATlOH : PALM 8CH COUNTY
PAGE: 1
FILE: CAHRPIl95
SUI of the Prilary and Secondary
DATE: 8/21/95
.._-_....-._....-.~.-------------._.._..._-----_...-----............-----.......--.----..--..-------.-------------------.----.-
PEAK PERIOD ANALYSIS FOR THE PERIOD: 4:00 PM - 6:00 PH
OlRECTIOH START
FROIl PEAK HOUR
PEAk HR . .. . . . .. . .. VOLUMES ...........
FACTOR PEDS. Right Thru left Total
" .... PERCENTS .......
PEDS. Right Thru Left
....---..--------------....--.-------------.--..-..---.-.--.-----.-.-------.-.-------------.-.-
Horth 4:00 PH 0.95 0 140 578 206 924 15 63 22
Ea,t 4: 4S PH 0.81 0 174 719 238 1191 15 65 20
South 4:45 P" 0.91 0 100 779 407 1286 8 61 32
\lest ~:45 PH 0.93 0 162 662 208 1032 16 64 20
Entire Intersection
North 4:45 PK O.9S 0 141 54t 192 874 16 62 22
East 0.81 0 174 779 238 1191 15 65 20
South 0.91 0 100 779 .07 1286 8 61 32
West 0.93 0 162 662 208 1032 16 64 20
I I I
I I . . .. I
I CONGRESS AVENUE I I N
I I . . . I
I --------------- I , W-+-E
I I . . . I
t I , S
I ,............1
, I I
I I .. .. .. . .. .. .. . . . . <I I
J I ,
I 1.............1
I I 1161 I
I I . . . . . I
(PEDS.] 0 I 141 541 192 I I 0 [PEDS. ]
I 1............1
------------------* *------------------
....~_............
.. .. .. .. - . .. .. .. .. .. .. .. .. .. .. II ..
874
174
..........1327
......................
'" HYPOLUXO ROAD
1191 779
20e
238
662 1032
HYPOLUXO ROAD...
954
162
1286
------------------*
(PEDS. ]
o :............:
: " 941 . . . :
I I
. .. ... ... .. .. .. .. .. . .. .. .. I
I ,
I .. .. .. <II .. .. .. .. .. .. .. .. I
407
779
*------------------
100 0 [PEDS.]
, I
J .. .. .. .. .. .. .. .. .. .. . .. ,
I I
I .. .. .. I
I I
I . . . I
, I
, .. .. .. I
CONGRES':, AVfNUE'
. . -... - - ...
- - ,-
,- - - - --
- - - -
__ Site Code: CAHRPH95 PAGE: 1
N-S Street: CONGRESS AVENUE FILE: CAHRPK95
E.W Street: HYPOLOXO ROAD
LOCA TI ON : PALM 8CH COUNTY SUI of the Prilary Ind Secondary
DATE: 8/21/95
----..--.--------.-----------------------..-----.-------.-------.-------------..----------------------------.----------.----..-.--
.. .. Fro. North .... .... Fro. East .... ..1. Fro. South .... ,.., Fro. ~est .... Yehi c1 e PEDS,
- ...11n PEDS. RT THRU Lr PEDS. RT THRU LT PEDS. RT THRU LT PEDS. RT THRU LT Tota! Total
~-----.-------_._-------------------------------_.--------------------.------..------------------.--------------_._--------------~
4:00 PH 0 33 U6 53 0 42 176 43 0 36 161 85 1 31 121 45 972 1
- 4:15 0 30 1~0 48 0 43 176 51 0 34 180 93 0 35 141 43 1014 0
4:30 0 36 154 54 0 45 164 46 0 29 203 92 0 36 128 47 1034 0
4:45 0 41 138 51 0 41 172 59 0 27 183 91 0 4S 169 51 1068 0
HR iOTAL 0 140 578 206 0 171 668 199 0 126 727 361 1 147 559 186 4088 1
5~OO PH 0 JO U3 45 0 47 1b4 56 0 24 205 94 0 40 159 45 1052 0
5: 15 0 33 124 50 0 51 250 68 0 19 188 101 0 40 174 63 1161 0
5: 30 0 37 136 4El 0 ~S 193 55 0 30 203 121 0 37 160 49 1102 0
5:45 0 31 117 37 0 29 158 37 0 17 170 62 0 28 128 37 851 0
HR iOTAL 0 131 520 178 0 162 765 216 0 90 766 378 0 145 621 194 4166 0
.~----.._-----._._---.-_.-------------._..-._-.._.-----.-.--------------.-----------------.-.----------...--....---------.-------.
lAY TOTAL 0 271 1098 384 0 333 1453 415 0 216 1493 739 292 1180 380 8254
PEAK PERIOO ANALYSIS fOR THE PERIOD: 4=00 PH . 6:00 PI!
DIRECTION START PEAK HR . . , , . . . . . .. YOLUI!ES ..",...... ...... PERCENTS.. ,....
FROH PEAK HOUR FACTOR PEDS. Right Thru Left Total PEDS. Right Thru Left
---------..-.----------------------------------------------.-------------------------.--------.
Horth 4:00 PH 0.95 0 140 578 206 924 15 63 22
East 4:45 Pit 0.81 0 174 779 238 1191 15 6S 20
Sou th 4:45 PI! 0.91 0 100 779 407 1286 8 61 32
West 4:45 PI! 0.93 0 162 662 208 1032 16 64 20
Entire Intersection
North 4:45 P" 0.95 0 141 541 192 874 16 62 22
East 0.81 0 174 779 238 1191 IS 65 20
South 0.91 0 100 779 407 1286 8 61 32
Ilest 0.93 0 162 662 208 1032 16 64 20
....--~.. . .---......:--:-
- - - .
AFPENDIX C
----------- - - --~--'-
------------
PLANKING APPLICATION WORKSHEET
I.
SIPA (1985 HCM Signalized Intersections Planning Analysis) version 2.0
llfTERSECTION: Congress jLantana
LANALYST: at
PROJECT: LAWRENCE & HYPOLUXO
)TlIER PROJECT INFORHATION: EXISTING CONDITIONS
DATE: 5/8/95
TIME PERIOD ANALYZED: AM PEAK (7:30-8:30)
CITY/STATE: CITY OF BOYTON BEACH
1- SB TOTAL 783
99 230 230 112 112
L I I I
<--' v '--)
99 460 224 j
1_:------------------------------1 <_, v v '-) '-)
150 ^ WB
^--- TOTAL
543 <---- 759
N
^
. .
66 v
.---,
\
,--------------------------------
^
^------------ 150
<------------- 272
<------------- 271
------------ 33
v
------------ 33
v
N-S STREET: Congress Avenue
E-W STREET: Lantana Road
^
174 ------------^
^
173 ------------,
512 -------------)
512 -------------)
154 ------------.
v
^ 347 \
<-. <-. ^ 316
^ 44
---)
1525 ----) 1024
EB
TOTAL v 154
72 71 360 360
j 143 676 44
<--. ^ .--)
I I I
NB TOTAL 863
----^
--------------------------------------------------------------------------------------------------------------------------------
---------------------------- ---------------------------- -----------------------------------------------------
EB LT = 174 NB LT = 72 MAXIMUM SUM OF CRITICAL VOLUMES CAPACITY LEVEL
WBTH = 272 446 SB TH = 230 302 ------------------------------- --------------
OR OR 0 TO 1,200 UNDER
r.~ LT = 33 SB LT = 112 1,201 TO 1,400 NEAR
.- .TH = 512 545 NBTH = 360 472 ) 1/400 OVER
, --------------------------------------------------------------------------------------------------------------------------------
E-W CRITICAL 545
+
N-S CRITICAL 472
=
1017
STATUS?
UNDER :
PLAHNING APPLICATION WORKSHEET
---------------------------------------------------------------------------------------------------------------------------------
L
SIPA (1985 HCM Signalized Intersections Planning Analysis) Version 2.0
-----------------------------------------------------------------------------------------------------------------------------
INTERSECTION: CONGRESS/LANTANA
LANALYST: CP&A.
PROJECT: 950404
mER PROJECT INFORKATION: FUTURE CONDITIONS
DATE: 8/23/95
TIME PERIOD ANALYZED: AM PEAK
CITY/STATE: BOYNTON BEACH
---------------------------------------------------------------------------------------------------------------------------------
L SB TOTAL 832
107 244 244 118 119
L I I I
(--, V ,--)
107 488 237 /
L-------------------------------1 (-, V V '-) 1_)
158 ^ WB
^--- TOTAL
575 (---- 805
N
^
. .
. .
. .
72 v
\
,--------------------------------
^
^------------ 158
(------------- 288
L
(------------- 287
L
------------ 36
v
------------ 36
L
v
N-S STREET: CONGRESS AVE
E-W STREET: LANTANA RD
t__
^
184 ------------^
^
1-
184 ------------^
541 -------------)
542 -------------)
L
163 ------------.
v
I--.------------------:--;~;------ \
(-,
(-.
^
333
^ 48
---)
/
151 713 48
(--, ^ ,--)
I I I
NB TOTAL 912
----^
1-
1614 ----) 1083
EB
TOTAL v 163
76
75 380 381
---------------------------------------------------------------------------------------------------------------------------------
~--~-~;--:---~;~-----------. ---;;-~;--:----;~----------- ---~;~~-;~-~;-~;~;~~~-;~~~;;--~~~~;;-~;;;~---
WB TH = 288 472 SB TH = 244 320 ------------------------------- --------------
OR OR 0 TO 1,200 UNDER
L ''"ll, LT = 36 SB LT = 119 1,201 TO 1,400 NEAR
,TH = 542 578 NB TH = 381 500 ) 1,400 OVER
.--------------------------------------------------------------------------------------------------------------------------------,
E-W CRITICAL 578
+
N-S CRITICAL 500
=
1078
STATUS?
UNDER :
PLANNING APPLICATION WORKSHEET
--------------------------------------------------------------------------------------------------------------------------------
SIPA (1985 HCM Signalized Intersections Planning Analysis) Version 2.0
-----------------------------------------------------------------------------------------------------------------------------
NTERSECTION: CONGRESS/LANTANA
ANALYST: CP&A
jlROJECT: 950404
TnER PROJECT INFORMATION: EXISTING CONDITIONS
DATE: 8/23/95
TIME PERIOD ANALYZED: PM PEAK
CITY/STATE: BOYNTON BEACH
--------------------------------------------------------------------------------------------------------------------------------
SB TOTAL 1664
651 650 181 182
I I I
<--' v ,--) <---
354 947 363 / 354 v
.------------------------------ , 297 v '-) '-)
296 ^ WE
^--- TOTAL N
1249 <---- 1675 ^
.
: :
130 v .---,
\
,--------------------------------
^
^------------ 296
<------------- 625
<------------- 624
------------ 65
v
------------ 65
v
N-S STREET: CONGRESS AVE
E-ji STREET: LANTANA RD
^
126 ------------~
^
126 ------------^
445 -------------)
445 -------------)
193 ------------.
v
^ 252 \
----^
1335 ----) 890
EB ----
TOTAL v 193
<-. <-. ^ ^ .-) --------------------------------
/ 323 851 126
<--. ^ .--)
I I I
162 161 425 426 126 NBTOTAL 1300
--------------------------------------------------------------------------------------------------------------------------------
EB LT = 126 NB LT = 162 MAXIMUM SUM OF CRITICAL VOLUMES CAPACITY LEVEL
WE Tn = 625 751 SB Tn = 651 813 ------------------------------- --------------
OR OR 0 TO 1,200 UNDER
r.~ LT = 65 SB LT = 182 1,201 TO 1,400 NEAR
Tn = 445 510 NB Tn = 426 608 ) 1,400 OVER
1 ____________________________________________________________________________________________________________--------------------,
E-W CRITICAL 751
+
N-S CRITICAL 813
=
1564
STATUS?
OVER ;
PLANNING APPLICATION WORKSHEET
---------------------------------------------------------------------------------------------------------------------------------
1:
INTERSECTION: CONGRESS lLAHTANA
ANALYST: CP&A
I PRoJECT: 950404
LJrnER PROJECT INFORMATION: FUTURE CONDITIONS
SIPA (1985 HeM Signalized Intersections Planning Analysis) Version 2.0
-----------------------------------------------------------------------------------------------------------------------------
DATE: 8/23/95
TIME PERIOD ANALYZED: PM PEAK
CITY/STATE: BOYNTON BEACH
---------------------------------------------------------------------------------------------------------------------------------
651 650 181 182
296 ^ 1m
^--- TOTAL N
1249 (---- 1675 ^
.
: :
130 v ,---.
.---.
1_
SB TOTAL 1664
1-
I I I
(--, V ,--)
354 947 363 /
.------------------------------,
(---
354 v
297 v
,-)
,-)
\
,--------------------------------
1-
^
^------------ 296
(------------- 417
<------------- 416
<------------- 416
1-
------------ 65
v
1-
------------ 65
v
1-
,
I--
I
N-S STREET: CONGRESS AVE
E-W STREET: LANTANA RD
^
126 ------------^
^
126 ------------^
296 -------------)
297 -------------)
297 -------------)
193 ------------.
v
1-- ^ 252 \
----,"'
1335 ----) 890
EB
TOTAL v 193
<-, (-, ^ ^ .-) --------------------------------
1 323 851 126
<--. ^ .--)
I I I
162 161 425 426 126 HE TOTAL 1300
--------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------
EB LT = 126 NB LT = 162 MAXIMUM SUM OF CRITICAL VOLUMES CAPACITY Lr.vEL
-- WB TH = 417 543 SB TH = 651 813 ------------------------------- --------------
OR OR 0 TO 1,200 UNDER
"'lll, LT = 65 SB LT = 182 1,201 TO 1,400 NEAR
TH = 297 362 NB TH = 426 608 ) 1,400 OVER I
, --------------------------------------------------------------------------------------------------------------------------------,
E-W CRITICAL 543
+
N-S CRITICAL 813
=
1356
STATUS?
NEAR t
PLANNING APPLICATION WORKSHEET
--------------------------------------------------------------------------------------------------------------------------------
SIPA (1985 HeN Signalized Intersections Planning Analysis) Version 2.0
!~ .-----------------------------------------------------------------------------------------------------------------------------
NTERSECTION: Hili tary /Lantana
nHALYST: at
PROJECT: LAWRENCE & HYPOLUXO
THER PROJECT INFORMATION: EXISTING CONDITONS
DATE: 5/8/95
TIME PERIOD ANALYZED: AM PEAK (7:30-8:30)
CITY/STATE: CITY OF BOYTON BEACH
--------------------------------------------------------------------------------------------------------------------------------
SB TOTAL 1674
116 373 373 373 219 220
I I I
<__I V 1__)
116 1119 439 /
------------------------______1 <_I V V V J_) J_)
202 1'1 liB
1'1--- TOTAL N
525 <---- 845 1'1
.
: :
118 v .---.
,---.
\
1______--------------------------
1'1
1'1------------ 202
<------------- 263
<------------- 262
------------ 59
v
------------ 59
v
N-S STREET: Military Trail
E-W STREET: Lantana Road
1'1
152 ------------1'1
1'1
152 ------------"
519 -------------)
519 -------------)
186 ------------.
v
1'1 304 \
<- <-. 1\ 1\ 1'1 .-) --------------------------------
/ 185 808 122
<--. ^ .--)
I I I
93 92 269 269 270 122 lIB TOTAL 1115
----^
1528 ----) 1038
EB
TOTAL v 186
--------------------------------------------------------------------------------------------------------------------------------
----------------------------
-----------------------------------------------------
EB LT = 152 lIB LT = 93 MAXIMUM SUM OF CRITICAL VOLUMES CAPACITY LEVEL
WB TH; 263 415 SB TH = 373 466 ------------------------------- --------------
OR OR 0 TO 1,200 UNDER
.~ LT; 59 SB LT; 220 1,201 TO 1,400 NEAR
i-- j TH; 519 578 lIB TH = 270 490 ) 1,400 OVER
I ______________________________________________________--------------------------------------------------------------------------,
E-W CRITIC\L 578
+
N-S CRITICAL 490
=
1068
STATuS?
UNDER t
PLANNING APPLICATION WORKSHEET
---------------------------------------------------------------------------------------------------------------------------------
1:
INTERSECTION: MILITARY/LANTANA
ANALYST: CP&A
I PROJECT: 950404
--OTHER PROJECT INFORMATION: FUTURE CONDITIONS
SIPA (1985 HCH Signalized Intersections Planning Analysis) Version 2.0
~-----------------------------------------------------------------------------------------------------------------------------
DATE: 8/23/95
TIME PERIOD ANALYZED: AM PEAK
CITY/STATE: BOYNTON BEACH
---------------------------------------------------------------------------------------------------------------------------------
L SB TOTAL 1770
122 395 394 394 232 233
I I I
(--, V ,--)
122 1183 465 /
----------------------___-----_1 (_I V V V ,-) 1_)
I ..
214 " WB
^--- TOTAL N
556 (---- 895 "
, ,
: :
125 v .---.
.---.
\
1______--------------------------
"
,,------------ 214
(------------- 278
(------------- 278
------------ 62
v
------------ 63
v
1-
1_-
N-S STREET: MILITARY TRAIL
E-W STREET: LANTANA RD
II
1-
161 ------------"
II
I
1--
160 ------------^
549 -------------)
549 -------------)
198 ------------.
v
(-, (-,
II
II
II
,-)
II 321 \
----^
1617 ----) 1098
EB
TOTAL v 198
/
197 854 129
(__, II ,__)
I I I
NB TOTAL 1180
99 98 284 285 285 129
.--------------------------------------------------------------------------------------------------------------------------------
I ._------------------------- ---------------------------- -----------------------------------------------------
EB LT = 161 NB LT = 99 MAXIMUM SUM OF CRITICAL VOLUMES CAPACITY LEVEL
- WBTH = 278 439 SB Tn = 395 494 ------------------------------- --------------
OR OR 0 TO 1,200 UNDER
...., LT = 63 SB LT = 233 1,201 TO I, 400 NEAR
-- "TH = 549 612 NBTH = 285 518 > 1,400 OVER
, ____________________________________________________________________________________________________________--------------______1
E-W CRITICAL 612
+
N-S CRITICAL 518
=
1130
STATUS?
UNDER t
PLANNING APPLICATION WORKSHEET
~ --------------------------------------------------------------------------------------------------------------------------------
SIPA (1985 HCM signalized Intersections Planning Analysis) Version 2.0
4______________________________________________________----------------------------------------------------------------------
DATE: 5/8/95
TIME PERIOD ANALYZED: PH PEAK (4: 45-5: 45)
CITY/STATE: CITY OF BOYTeN BEACH
N
I I I
<--, v ,--)
I 159 798 298 /
1______--------------------------,
^
. .
157 v
e.___
.---.
\
<-'
v
v
v
,-)
,-)
,--------------------------------
^
^------------ 281
<------------- 413
(------------- 412
------------ 78
v
------------ 79
v
N-S STREET: Military Trail
E-Ii STREET: Lantana Road
^
91 ------------^
^
90 ------------^
312 -------------)
313 -------------)
174 ------------.
v
^ 181 \
----^
980 ----) 625
EB
TOTAL v 174
(-. (-. ^ ^ ^ ,-) --------------------------------
/ 212 861 103
(--, ^ .--)
I I I
106 106 287 287 287 103 NB TOTAL 1176
. ~-------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------
_ EB LT = 91 NB LT = 106 MAXIMUM SUM OF CRITICAL VOLUMES CAPACITY LEVEL
WB Tn = 413 504 SB Tn = 266 372 ------------------------------- --------------
OR OR 0 TO 1,200 UNDER
. LT = 79 SB LT = 149 1,201 TO 1,400 NEAR
IrH = 313 392 NB Tn = 287 436 ) 1,400 OVER
I. ._____________________________________________________--------------------------------------------------------------------------,
E-W CRITICAL 504
+
N-S CRITICAL 436
=
940
STATUS?
UNDER t
PLANNING APPLICATION WORKSHEET
---------------------------------------------------------------------------------------------------------------------------------
L~.
SIPA (1985 HCH Signalized Intersections Planning Analysis) version 2.0
------------------------------------------------------------------------------------------------------------.----------------
INTERSECTION: MILITARY/LANTANA
ANALYST: CPliA
LpROJECT: 950404
:lTHER PROJECT INFORMATION: FUTURE CONDITIONS
DATE: 8/23/95
TIME PERIOD ANALYZED: PH PEAK
CITY/STATE: BOYNTON BEACH
---------------------------------------------------------------------------------------------------------------------------------
L
168 282 282 281 158 159
299 ^ 1m
^--- TOTAL N
873 (---- 1338 ^
. .
: :
166 v .---.
. .
SB TOTAL 1330
I I I
(--I V 1--)
168 845 317 /
-------------------------______1
L
1_
\
(_I
v
v
v
,-)
,-)
1______--------------------------
^
^------------ 299
(------------- 437
1-
(------------- 436
L
,
I-
I
I-
I
------------ 83
v
------------ 83
v
N-S STREET: MILITARY TRAIL
E-W STREET: LANTANA RD
^
96 ------------^
^
95 ------------^
331 -------------)
331 -------------)
186 ------------.
v
(-. (-.
^
^
^
.-)
I
/ 226 911 109
(--, ^ .--)
I I I
NB TOTAL 1246
^ 191 \
---.,"\
1039 ----) 662
EB
TOTAL v 186
113 113
303
304
304
109
--------------------------------------------------------------------------------------------------------------------------------
-------------------------- ---------------------------- -----------------------------------------------------
EB LT = 96 NB LT :: 113 MAXIMUM SUM OF CRITICAL VOLUMES CAPACITY LEVEL
WEITH = 437 533 SB TH = 282 395 ------------------------------- --------------
OR OR 0 TO 1,200 UNDER
-.., LT = 83 SB LT = 159 1,201 TO 1,400 NEAR
TH = 331 414 NBTH = 304 463 ) 1,400 OVER
, ____________________________________________________________________________________________________________--------------______1
E-W CRITICAL 533
t
N-S CRITICAL 463
:0
996
STATUS?
UNDER ;
PLANNING APPLICATION WORKSHEET
. .--------------------------------------------------------------------------------------------------------------------------------
L
SIP! (1985 HCM Signalized Intersections Planning Analysis) Version 2.0
-----------------------------------------------------------------------------------------------------------------------------
:NTERSECTION: HYPOLUXO ILAWRENCE
ANALYST: CP&A
-PROJECT: 950404
lTHER PROJECT INFORMATION: EXISTING CONDITIONS
DATE: 8/21/95
TIME PERIOD ANALYZED: AM PEAK
CITY/STATE: BOYNTON BCH
--------------------------------------------------------------------------------------------------------------------------------
S8 TOTAL 231
46 106 79
I I I
<--' V ,--)
46 106 79 /
--------------------------------, <-' V ,-)
95 ^ WB
^--- TOTAL
556 <---- 721
N
^
. .
. .
70 v
.---.
\
,--------------------------------
^
^------------ 95
<------------- 278
(------------- 278
------------ 70
v
r-
1-
N-S STREET: LAWRENCE RD
E-W STREET: HYPOLUXO RD
^
65 ------------^
574 -------------)
574 ----------.--) 463
v 111
^ 65 \
----^
1213 ----) 1037
EB
TOTAL v 111
(-. 121
^ 101
---)
--------------------------------
78 222
1 78 121 101
<--. ^ .--)
I I I
NB TOTAL 300
--------------------------------------------------------------------------------------------------------------------------------
---------------------------- ---------------------------- -----------------------------------------------------
EB LT = 65 NB LT = 78 MAXIMUM SUM OF CRITICAL VOLUJ.l.ES CAPACITY LEVEL
WBTH = 278 343 S8 TH = 106 184 ------------------------------- --------------
OR OR 0 TO 1,200 UNDER
..., LT = 70 S8 LT = 79 1,201 TO 1,400 NEAR
.- ,TH = 574 644 NBTH = 222 301 ) 1,400 OVER
, --------------------------------------------------------------------------------------------------------------------------------,
E-W CRITICAL 644
+
N-S CRITICAL 301
=
945
STATUS?
UNDER f
PLANNING APPLICATION WORKSHEET
--------------------------------------------------------------------------------------------------------------------------------
. .
SIPA (1985 HCM Signalized Intersections Planning Analysis) version 2.0
::..
-----------------------------------------------------------------------------------------------------------------------------
HTERSECTION: HYPOLUXO/LAWRENCE
. nNALYST: CP&A
PROJECT: 950404
--'-THER PROJECT INFORMATION: FUTURE CONDITIONS
DATE: 8/21/95
TIME PERIOD ANALYZED: AM PEAK
CITY /STATE: BOYNTON BCH
--------------------------------------------------------------------------------------------------------------------------------
SB TOTAL 289
49 134 106
I I I
<__I V ,__)
49 134 106 /
------------------------______1 <_, V ,_)
120 ^ WB
^--- TOTAL
599 <---- 793
N
^
. .
. .
. .
74 v
.---.
. .
\
'______--------------------------
^
^------------ 120
(------------- 300
<------------- 299
------------ 74
v
N-S STREET: LAWRENCE RD
E-W STREET: HYPOLUXO RD
^
69 ------------^
619 -------------)
619 ----------.--) 494
v 125
^ 69 \
----^
1307 ----) 1113
EB
TOTAL v 125
<-. 148
^ 107
---)
94 255
/ 94 148 107
(--. ^ .--)
I I I
NB TOTAL 349
--------------------------------------------------------------------------------------------------------------------------------
---------------------------- ---------------------------- -----------------------------------------------------
EB LT = 69 NB LT = 94 MAXIMUM SUM OF CRITICAL VOLUMES CAPACITY LEVEL
WBTH = 300 369 SB TH = 134 228 ------------------------------- --------------
OR OR 0 TO 1,200 UNDER
''ll, LT = 74 SB LT = 106 1,201 TO 1,400 NEAR
TH = 619 693 NBTH = 255 361 ) 1,400 OVER
, .___________________________________________________________________________________________________________--------------______1
E-W CRITICAL 693
+
N-S CRITICAL 361
=
1054
STATUS?
UNDER f
PLANNING APPLICATION WORKSHEET
--------------------------------------------------------------------------------------------------------------------------------
SIPA (1985 Hot Signalized Intersections Planning Analysis) version 2.0
-----------------------------------------------------------------------------------------------------------------------------
NTERSEcrrON: HYPOLUXO /LAWRENCE
nNALYST: CP&A
PROJECT: 950404
-/fliER PROJECT INFORMATIOlf: FUTURE CONDITIONS
DATE: 8/21/95
TIME PERIOD ANALYZED: PM PEAK
CITY/STATE: BOYNTON BCH
".-------------------------------------------------------------------------------------------------------------------------------
SB TOTAL 360
105 136 119
I I I
<--' V '--)
105 136 119 /
------------------------------, <-, V '-)
150 ^ WB
^--- TOTAL
1202 (---- 1493
If
^
. .
. .
. .
141 v
e___.
. .
\
,--------------------------------
^
^------------ 150
<------------- 601
<------------- 601
------------ 141
v
If-S STREET: LAWRENCE RD
E-W STREET: HYPOLUXO RD
^
75 ------------^
498 -------------)
499 ----------.--) 379
v 120
^ 75 \
----^
1072 ----) 877
EB
TOTAL v 120
< - . 185
^ 96
---)
113 281
/ 113 185 96
<--. ^ .--)
I I I
NB TOTAL 394
--------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------
EB LT = 75 NB LT = 113 MAXIMUM SUM OF CRITICAL VOLUMES CAPACITY LEVEL
liB TH = 601 676 SB TH = 136 249 ------------------------------- --------------
OR OR 0 TO 1,200 UNDER
'''1\ LT = 141 SB LT = 119 1,201 TO 1,400 NEAR
TH = 499 640 NB TH = 281 400 ) 1,400 OVER
, --------------------------------------------------------------------------------------------------------------------------------,
E-W CRITICAL 676
+
N-S CRITICAL 400
1076
STATUS?
UNDER :
PLANNING APPLICATION WORKSHEET
---------------------------------------------------------------------------------------------------------------------------------
L SIPA (1985 HCM Signalized Intersections Planning Analysis) Version 2.0
. .-----------------------------------------------------------------------------------------------------------------------------
rnTERSECTION: HYPOLUXO/CONGRESS DATE: 8/21/95
I ANALYST: CPliA TIME PERIOD ANALYZED: AM PEAK
_PROJECT: 950404 CITY/STATE: BOYNTON OCR
mER PROJECT INFORMATION: EXISTING CONDITIONS
---------------------------------------------------------------------------------------------------------------------------------
L SB TOTAL 843
87 271 270 215
L I I I
(--' V '--)
87 541 215 /
l~-------------------------------' (-' v V ,-)
112 ^ WB
^--- TOTAL N
529 (---- 735 ^
94 v
,---.
\
,--------------------------------
^
^------------ 112
(------------- 265
l__
(------------- 264
1-
------------ 94
v
L
L
N-S STREET: CONGRESS AVE
E-W STREET: HYPOLUXO RD
L_
^
1_
158 ------------^
469 -------------)
469 -------------)
1_
186 ------------.
v
l -------------------------------.
_ ^ 158 \
----^
(-.
^
^
.-)
--------------------------------
207 424 163
(--, ^ .--)
I I I
TOTAL v 186 207 212 212 163 NB TOTAL 794
_____________________________________________________________________________________________________________------------_____---1
[;-;;-:--;;--------. -~-~;--:--;;---------- .--;;;;;-;;-~;-;;~-;~;;;;-~~~;;~--I
w~ TH = 265 423 SB TH = 271 478 ------------------------------- --------------
OR OR 0 TO 1,200 UNDER
[ .~ LT = 94 SB LT = 215 1,201 TO 1,400 NEAR
- .J TH = 469 563 NB TH = 212 427 ) 1,400 OVER
---------------------------------------------------------------------------------------------------------------------------------,
/
1282
EB
----)
938
E-W CRITICAL 563
+
N-S CRITICAL 478
=
1041
STATUS?
UNDER t
PLANNING APPLICATION WORKSHEET
---------------------------------------------------------------------------------------------------------------------------------
L
SIPA (1985 HCM Signalized Intersections Planning Analysis) Version 2.0
-----------------------------------------------------------------------------------------------------------------------------
~NTERSECTION: HYPOLUXO/CONGRESS
ANALYST: CP&A
t!ROJECT: 950404
)'fIlER PROJECT INFORMATION: FUTURE CONDITIONS
DATE: 8/21/95
TIME PERIOD ANALYZED: AM PEAK
CITY/STATE: BOYNTON BCH
.--------------------------------------------------------------------------------------------------------------------------------
1__ SB TOTAL 902
104
286 285 227
118 ^ WB
^--- TOTAL N
576 (---- 793 ^
1_-
I I I
. .
. .
(__, V ,__)
104 571 227
99 v
/
1_.------------------------------1
\
(_,
v
v
,_)
'________________________________
^
^------------ 118
(------------- 288
l--
(------------- 288
L
l_
------------ 99
v
1-
N-S STREET: CONGRESS AVE
E-W STREET: HYPOLUXO RD
L
^
1--
178 --------~---^
502 -------------)
503 -------------)
1-
206 ------------.
v
I_.------------------:--~;~------ \ (-. ^ ^ .-) / ----------;;~--~~~--~;;---------
----^ (--. .--)
1389 ----) 1005 I I I
I EB ----. I
I-~=;;:;;=~~=;;;::::~~:=:--------::::;;;-;;==:=::;;,;-==:==::=:==:---_::~-:~~;~~~~;:~~:~~~:~:I
w~ TH = 288 466 SB TH = 286 516 ------------------------------- --------------
OR OR 0 TO 1,200 UNDER
I r.~ LT = 99 SB LT = 227 1,201 TO 1,400 NEAR
- TH = 503 602 NB TH = 224 451 ) 1,400 OVER
.___________________________________________________________________________________________________________---------------______1
E-W CRITI~~L 602
+
N-S CRITICAL 516
1118
STATUS?
UNDER t
PLAlIBING APPLICATION WORKSHEET
--------------------------------------------------------------------------------------------------------------------------------
SIPA (1985 HeM Signalized Intersections Planning Analysis) Version 2.0
-----------------------------------------------------------------------------------------------------------------------------
NTERSECTION: HYPOLUXO/CONGRESS
lfALYST: CP&A
PROJECT: 950404
--THER PROJECT INFORMATION: EXISTING CONDITIONS
DATE: 8/21/95
TIME PERIOD ANALYZED: PM PEAK
CITY/STATE: BOYNTON OCR
--------------------------------------------------------------------------------------------------------------------------------
SB TOTAL 874
141 271 270 192
I I I
(--' V ,--)
141 541 192 /
------------------------------, (-, v v '-)
174 ^ WB
^--- TOTAL N
779 (---- 1191 ^
. .
: :
238 v .---.
.---.
\
,--------------------------------
^
^------------ 174
(------------- 390
<------------- 389
------------ 238
v
N-S STREET: CONGRESS AVE
E-Ii STREET: HYPOLUXO RD
^
208 ------------^
331 -------------)
331 -------------)
162 ------------.
v
^ 208 \
(-. ^ ^ .-) --------------------------------
/ 407 779 100
<--. ^ .--)
I I I
407 389 390 100 NB TOTAL 1286
---_/\
1032 ----) 662
EB
TOTAL v 162
--------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------
EB LT = 208 NB LT = 407 MAXIMUM SUM OF CRITICAL VOLUMES CAPACITY LEVEL
-- liB Tn = 390 598 sa Tn = 271 678 ------------------------------- --------------
OR OR 0 TO 1,200 UNDER
W8 LT = 238 SB LT = 192 1,201 TO 1,400 NEAR
Tn = 331 569 NB Tn = 390 582 ) 1,400 OVER
I. .___________________________________________________________________________________________________________--------------------,
E-W CRITICAL 598
+
H-S CRITICAL 678
=
1276
STATUS?
NEAR :
PLANNING APPLICATION WORKSHEET
----------------------------------------------------------------------------------------------------------------------------------
It
.J:
SIPA (1985 HCM Signalized Intersections Planning Analysis) Version 2.0
------------------------------------------------------------------------------------------------------------------------------
INTERSEcrION: HYPOLUXO /CONGRESS
l ANALYST: CP&A
_ PROJEcr: 950404
OTHER PROJEcr INFORMATION: FUTURE CONDITIONS
DATE: 8/21/95
TIME PERIOD ANALYZED: PM PEAK
CITY/STATE: BOYNTON BCH
.---------------------------------------------------------------------------------------------------------------------------------
1 SB TOTAL 937
163 286 285 203
1 I I I
<__I V ,--)
163 571 203 /
_l--------------------------------I <-' V V ,-)
184 ^ WB
^--- TOTAL N
842 <---- 1277 ^
.
: :
251 v .---.
.---.
\
,--------------------------------
^
^------------ 184
<------------- 421
L
<------------- 421
L
------------ 251
v
l
1
N-S STREET: CONGRESS AVE
E-W STREET: HYPOLUXO RD
1
^
233 ------------^
359 -------------)
359 -------------)
L
183 ------------.
v
~-------------------------------
L
<-.
^
^
.-)
--------------------------------
^ 233 \
----^
1134 ----) 718
EB
TOTAL v 183
442
411
412 106
/ 442 823 106
(--. ^ .--)
I I I
HB TOTAL 1371
1
,---------------------------------------------------------------------------------------------------------------------------------
l"--;;-~;--:---;;;-----------. ---;;-~;--:---~~;----------- ---~~-S~-~;-~;~~-;~~~--~~CI;;-~~ ---
WB TH = 421 654 SB TH = 286 728 ------------------------------- --------------
OR OR 0 TO 1,200 UNDER
1 'oTB LT = 251 SB LT = 203 1,201 TO 1,400 NEAR
J TH = 359 610 HB TH = 412 615 ) 1,400 OVER
---------------------------------------------------------------------------------------------------------------------------------,
E-W CRITICAL 654
+
H-S CRITICAL 728
=
1382
STATUS?
NEAR :