APPLICATION
- ~
PROJECT NAME: GROVE PLAZA
LOCATION: SOUTHEAST CORNER HYPOLUXO RD. AND LAWRENCE RD.
COMPUTER ID: GROVEPLAZA\MPMD
I FILE NO.: MPMD 97-004 I TYPE OF APPLICATION: MASTER
PLAN MODIFICATION
APPLICANT/CONTACT PERSON:
DONNA WEST OWNER:
PHONE: 954-972-3959
FAX: 954-972-4178 PHONE:
ADDRESS: 6191 WEST ATLANTIC FAX:
BLVD ADDRESS:
PO BOX 4399
MARGATE, FL 33063
DATE:
SUBMITTAL / RESUBMITT AL 8/24/98
1ST REVIEW COMMENTS DUE: 9/21/98
PUBLIC NOTICE:
TRC MEETING: 10/6/98
RESUBMITTAL DATE: 10/6/98
2ND REVIEW COMMENTS DUE:
LAND DEVELOPMENT SIGNS POSTED:
PLANNING & DEVELOPMENT BOARD 10/27/98
MEETING:
CITY COMMISSION MEETING: 11/3/98
COMMENTS:
,L
S:\FOR.'\1S\PROJECT TRACKING INFO
PROJECT NAME: GROVE PLAZA
LOCATION: SOUTHEAST CORNER HYPOLUXO RD. AND LAWRENCE RD.
COMPUTER ID: GROVEPLAZA\MPMD
I FILE NO.: MPMD 97-004 I TYPE OF APPLICATION: MASTER
PLAN MODIFICATION
APPLICANT/CONTACT PERSON:
DONNA WEST OWNER:
PHONE: 954-972-3959
F~: 954-972-4178 PHONE:
ADDRESS: 6191 WEST ATLANTIC F~:
BLVD ADDRESS:
PO BOX 4399
MARGATE, FL 33063
DATE:
SUBMITTAL / RESUBMITT AL 10/23/97
1ST REVIEW COMMENTS DUE: 11/10/97
PUBLIC NOTICE:
TRC MEETING: 11/10/97
RESUBMITTAL DATE: 12/11/97
2ND REVIEW COMMENTS DUE:
LAND DEVELOPMENT SIGNS POSTED:
PLANNING & DEVELOPMENT BOARD 1/1~98
MEETING:
CITY COMMISSION MEETING: 2$98
COMMENTS:
S:\FORMS\PROJECT TRACKING INFO
-------~
f 'J
\ ~\\-/
\\\;
.'
"
Ct..flahan, Proctor and Cross, In\,.
Consulting Engineers' Surveyors' Planners' Land Development Consultants
August 24, 1998
Mr. Michael W. Rumpf, Senior Planner
Planning & Zoning Department
City of Boynton Beach
100 E. Boynton Beach Blvd.
Boynton Beach, FL 33425
RE: GROVE PLAZA: master site plan modification
Dear Mr. Rumpf:
On behalf of our client, we hereby re-submit our request for approval of the attached
Master Site Plan for the Grove Plaza project.
As per your requirements, attached please find 12 sets of the following:
1. This letter of request describing the changes made to the master site plan.
2. Master site plan.
3. Master stormwater management plan.
4. Master stormwater management calculations.
The updated traffic study was submitted with our previous application.
The modifications which have been made to the master plan since the previous approval
are as follows:
1) The parcel lines have been reconfigured to create a separate common area tract
which will accommodate the trunk road and drainage system and maintain a
200' distance from the property line of the proposed gas station parcel to the
existing residences.
2) Parcel A has been modified from 7500 square feet of retail/pharmacy to 2940
square feet of convenience store/gas station and the site has been redesigned to
the actual site plan of the 7-Eleven Convenience Store with gas sales which is
being submitted concurrently with this application.
3) Parcel C has been modified from 4500 square feet of retail to 6540 square feet
of retail.
4) Parcel D has been modified from 6500 square feet of retail to 9000 square feet
of retail.
5) Site Data and Parking Data tables have been updated accordingly.
6) Proposed turn lanes on Hypoluxo Road have been added.
Web Page: www.carnahan-proctor.com
Email: margate@carnahan-proctor.com
6101 West Atlantic Blvd. . P.O. Box 4399, Margate, FL 33063' (954) 972-3959 . FAX (954) 972-4178 . Palm Beach (561) 364-0687
7) The southerly access drive has been modified from one-way to two-way traffic
flow and the dumpsters along the south drive have been rotated accordingly.
8) A proposed 5' sidewalk has been added along Hypoluxo Road, and the
proposed 6' sidewalk to be constructed by Palm Beach County has been
shown along Lawrence Road.
9) The 15' landscape buffer has been clarified along the north boundary.
10) The proposed pavement for the widening of Lawrence Road has been added.
As always, thank you for your assistance, and please feel free to call me should you have
any additional questions or comments.
ci:Q~
Donna C. West, P.S.M.
Planning Manager
cc: Bob and Alice Fay
Kent Wilmering
Chuck DeSanti
\\ismp\o'.word6\donna'.platlet\letbbmod doc
Grove Plaza
Boynton Beach, Florida
CP&A PROJECT NO. 950404
SFWMD SURFACE WATER MANAGEMENT CALCULATIONS
1) SITE DATA: 2) STAGE ELEVATIONS:
ACREAGE Percent: From: To:
Building 0.70 Ac. 8.7% 17.30 up
Pavement 4.69 Ac. 58.0% 14.75 16.70
Exfil. Tr. 0.00 Ac. 0.0% 0.00 0
Lake Bank 0.00 Ac. 0.0% 0.00 0.00
Green Lineal(1) 2.07 Ac. 25.6% 14.00 16.70
Detention (side slope) 0.50 Ac. 6.2% 12.70 14.70
Detention (bottom) 0.13 Ac. 1.6% 12.70 up
TOTAL AREA: 8.09 Ac. 100.0%
Total Impervious:
5.39
66.63%
Total Pervious:
2.70
33.37%
3) FLOOD AND RAINFALL CRITERIA:
24 Hour Rainfall:
3 Year
25 Year
100 Year
6.20 in.
11.00 in.
14.00 in.
Maximum Available Soil Storage, SFWMD:
4) COMPUTE STAGE STORAGE:
Green
Staqe: Pavement Lake Bank Lineal(1 )
12.50 0.00 0.00 0.00
13.00 0.00 0.00 0.00
13.50 0.00 0.00 0.00
14.00 0.00 0.00 0.00
14.50 0.00 0.00 0.10
15.00 0.08 0.00 0.38
15.50 0.68 0.00 0.86
16.00 1.88 0.00 1.53
16.50 3.68 0.00 2.40
17.00 5.98 0.00 3.42
17.50 8.32 0.00 4.45
18.00 10.67 0,00 5.49
18.50 13.01 0.00 6.52
Stage_1.xls
Average Existing Grade:
Average Proposed Grade:
Lake, Water Table:
16.00
16.00
10.00
Min. Road Crown (NGVD) 15.00
Min. Floor Elev. (NGVD): 17.30
8.18 in.
Detention Detention
Exfil. Tr. (side slope) (bottom ) Total:
0.00 0.00 0.00 0.00
0.35 0.01 0.04 0.40
0.35 0.08 0.10 0.53
0.35 0.21 0.17 0.73
0.35 0.41 0.23 1.08
0.35 0.65 0.30 1.76
0.35 0.90 0.36 3.15
0.35 1.15 0.43 5.34
0.35 1.40 0.49 8.32
0.35 1.65 0.56 11.95
0.35 1.90 0.62 15.65
0.35 2.15 0.69 19.34
0.35 2.40 0.75 23.04
~
PAGE 1
~b
}~
~r
Grove Plaza
Boynton Beach, Florida
CP&A PROJECT NO. 950404
SFWMD SURFACE WATER MANAGEMENT CALCULATIONS
5) WATER QUALITY:
Store the first inch for the entire site.
A. First Inch:
v = 1 in. x Total Area x 1 ft./12 in.
Total (Ac.): V = (ac-ft)
8.09 0.67
C. Total Required Detention:
1. The total required detention is either the first inch or 2.5 times
the percent impervious, whichever is greater.
The total required detention is:
V(t) (ac-ft):
0.67
2. From the Stage - Storage Curve, the elevation is:
Interpolate Stage between...
Interpolate Runoff between...
14.50
0.64
15.00
0.95
Stage: 14.56
3. Allowable discharge thru bleed down device is 1/2" per day of the detention for the total project s
Tot. Ac.
8,09
Ac Ft.
0.34
Allow.CFS
0.17
The minimum bleeder size within the Lake Worth Drainage District
will produce more than the minimum allowable discharge.
Stage_1.xls
PAGE 2
Grove Plaza
Boynton Beach, Florida
CP&A PROJECT NO. 950404
SFWMD SURFACE WATER MANAGEMENT CALCULATIONS
6) RUNOFF (ZERO DISCHARGE)
A. Soil StoraQe
1. Avg. Depth to Water Table = Avg. Proposed Grade - Water Level
Avq. Grade: Water Level: D=(ft. ):
16.00 11.20 4.80
2. Soil Storage (S) = Available Soil Storage x Pervious Area/Total Area
(See C-35, SFWMD VoI.IV)
Av. Soil St. Pervious: Total (Ac.): S = (in. ):
8.18 2.70 8.09 2.73
B. 100 Yr.-3 Dav Storm Event
Finished Floor Elevation:
17.30 NGVD
1. Rainfall - 3 Day Duration (P):
P72 = P24 x 1.359
P24 =
P72 =
14.00 in.
19.03 in.
2. Runoff, Q (in.)
Q = {(P - 0.2 x S)^2}/(P + 0.8 x S)
P72 (in.): S = (in. ):
19.03 2.73
Q (in.):
16.10
3. Total Runoff Volume, V (ac-ft.)
V = Q x Total Area x 1 ft. /12 in.
Q (in.): Total (Ac.):
16.10 8.09
V=(ac-ft):
10.85
4. From the Stage - Storage Curve, the zero discharge elevation is:
Interpolate Stage between...
Interpolate Runoff between...
16.50
8.32
17.00
11.95
Stage: 16.85
The proposed Finish Floor Elevation is adequate.
Stage_1.x/s
PAGE 3
Grove Plaza
Boynton Beach, Florida
CP&A PROJECT NO. 950404
SFWMD SURFACE WATER MANAGEMENT CALCULATIONS
C. 25 Yr.-3 Dav Storm Event
1. Rainfall - 3 Day Duration (P):
P72 = P24 x 1.359
P24 = 11.00 in.
P72 = 14.95 in.
2. Runoff, Q (in.)
Q = {(P - 0.2 x S)^2}/(P + 0.8 x S)
P72 (in.): S = (in.): Q (in. ):
14.95 2.73 12.11
3. Total Runoff Volume, V (ac-ft.)
V = Q x Total Area x 1 ft. /12 in.
Q (in.): Total (Ac.): V = (ac-ft):
12.11 8.09 8.16
4. From the Stage - Storage Curve, the zero discharge elevation is:
Interpolate Stage between...
Interpolate Runoff between...
16.00
5.34
16.50
8.32
Stage: 16.47
D. 3 Year -1 Dav Storm
Min. Road Elevation(B.F.1. Site):
15.00 NGVD
1. Rainfall - 1 Day Duration (P):
P24 = 6.20 in.
2. Runoff, Q (in.)
Q = {(P - 0.2 x S)^2}/(P + 0.8 x S)
P24 (in.): S = (in.): Q (in. ):
6.20 2.73 3.81
3. Total Runoff Volume, V (ac-ft.)
V = Q x Total Area x 1 ft. /12 in.
Q (in.): Total (Ac.): V = (ac-ft):
3.81 8.09 2.57
4. From the Stage - Storage Curve, the zero discharge elevation is:
Interpolate Stage between...
Interpolate Runoff between...
15.00
1.76
15.50
3.15
Stage: 15.29
N.G.
(See flood routing calculations for correct 3 yr. stage elevations)
Stage_1.x/s
PAGE 4
Grove Plaza
Boynton Beach, Florida
CP&A PROJECT NO. 950404
SFWMD SURFACE WATER MANAGEMENT CALCULATIONS
7) SUMMARY
Required Storage:
0.67 ac-ft
Soil Storage:
2.73 in
ZERO DISCHARGE
3 Yr.-1 Day Storm:
25 Yr.-3 Day Storm:
100 Yr.-3 Day Storm:
2.57 ac-ft
8.16 ac-ft
10.85 ac-ft
15.29 NGVD Stage Elevation
16.47 NGVD Stage Elevation
16.85 NGVD Stage Elevation
FLOOD ROUTING
3 Yr.-1 Day Storm:
25 Yr.-3 Day Storm:
15.01 NGVD
16.06 NGVD
0.90 cfs Disch.
1.10 cfs Disch.
DATE PRINTED: PREPARED BY: REVISED BY: DATE:
24-Aug-98 dma J. Thiele 12/31/97
dma BMF 1/15/98
dma BMF 2/12/98
dma BMF 2/25/98
dma BMF 3/19/98
Stage_1.xls
PAGE 5
Grove Plaza
Boynton Beach, Florida
950404
SFWMD EXFILTRATION TRENCH DESIGN CALCULATIONS
1) SITE DATA: 2) STAGE ELEVATIONS:
Acreaqe: Percent: From: To:
Building: 0.70 Ac. 8.7% 17.30 up
Pavement: 4.69 Ac. 58.0% 14.75 16.70
Detention (bottom) 0.13 Ac. 1.6% 12.70 up
Detention (side SlOPE 0.50 Ac. 6.2% 12.70 14.70
Open Space: 2.07 Ac. 25.6% 14.00 16.70
Retention: 0.00 Ac. 0.0% 0.00 0.00
TOTAL AREA: 8.09 Ac. 100.0%
Total Impervious: 5.390 Average Existing Grade: 16.00
66.63% Average Proposed Grade: 16.00
Ground Water Table: 10.00
Total Pervious: 2.700 Low Inlet Elevation: 14.00
33.37%
3) EXFIL TRATION TRENCH CRITERIA:
Length of Trench Provided:
Top of Trench:
Bottom of Trench:
Pipe Invert:
Hydraulic Conductivity:
Exfiltration Trench Width:
Available Soil Storage, SFWMD:
1,350.00 ft.
13.00 NGVD
9.00 NGVD
10.00 NGVD
1.680E-04 cfs/ft.2 - ft. Head
8.00 ft.
8,18 in.
4) COMPUTE STAGE STORAGE: (Without exfiltration trench)
Detention Detention Open
Staqe: (bottom ) (side slope) Pavement: Space: Retention: Total:
12.00 0.00 0.00 0.00 0.00 0.00 0.00
12.50 0.00 0.00 0.00 0.00 0.00 0.00
13.00 0.04 0.01 0.00 0.00 0.00 0.05
13.50 0.10 0.08 0.00 0.00 0.00 0.18
14.00 0.17 0.21 0.00 0.00 0.00 0.38
14.50 0.23 0.41 0.00 0.10 0.00 0.73
15.00 0.30 0.65 0.08 0.38 0.00 1.41
15.50 0.36 0.90 0.68 0.86 0.00 2.80
16.00 0.43 1.15 1.88 1.53 0.00 4.99
16.50 0.49 1.40 3.68 2.40 0.00 7.97
17.00 0.56 1.65 5.98 3.42 0.00 11.60
17.50 0.62 1.90 8.32 4.45 0.00 15.30
18.00 0.69 2.15 10.67 5.49 0.00 18.99
Exfilstd,xls PAGE 1 ~~~
,)
-. -- ------.- ______..~..___.u_. - - ~- ------ ---_._--~----_. -------- ------------- -----
Grove Plaza
Boynton Beach, Florida
950404
SFWMD EXFILTRATION TRENCH DESIGN CALCULATIONS
5) WATER QUALITY:
Greater of the following (3A. & 3B.)
Store the first inch for the entire site or the amount
of 2.5 times the percentage of imperviousness.
A. First Inch:
V = 1 in. x Total Area x 1 ft./12 in. (The first inch has been accounted for previously
with the common roadway system)
V = (ac-ft)
0.67
Total (Ac. ):
8.09
B. 2.5 times percent imperv.:
1. Site Area = Total Area - (Lake Area + Bldg. Area)
Total (Ac.): Lake: Bldq.:
8.09 0.50 0.70
Site (Ac.):
6.89
2. Impervious Area = Site Area - Pervious Area
Site (Ac.): Pervious: Imperv.:
6.89 2.70 4.19
3.2.5 in. x Imperv.lSite x Total Area x 1 ft.l12 in.
Imperv.: V=(ac-ft)
4.19 1.02
Therefore, the total required detention is either the First inch or 2.5 times the percent
impervious, whichever is greater. If 2.5 times the percent imperviuos is greater than
the first inch, the difference between the 2.5 percent and the first inch will be the
required detention:
Vet) (ac-ft): V(t) (ac-in ):
0.35 4.26
Exfilstd.xls PAGE 2
Grove Plaza
Boynton Beach, Florida
950404
SFWMD EXFILTRATION TRENCH DESIGN CALCULATIONS
6) EXFIL TRATION TRENCH COMPUTATIONS:
1. Length= VI { Kx((HxW)+(2xHxDu)-(DuxDu)+(2xHxDs)) + (O.000139xWxDu) } for Du > Ds
Length= VI { Kx((2xHxDu)-(DuxDu)+(2xHxDs)) + (O.000139xWxDu) } for Du < Ds
Length= VI { C }
Where:
(K) (cfs/ft.2 - ft. Head) =
(V) (Ac-in.) =
(H) (ft.) =
Hydraulic Conductivity:
Volume to be Treated:
Depth to Water Table:
(Low Inlet Elevation - Water Table)
Unsaturated Trench Depth:
Saturated Trench Depth:
Trench Wid 8.00 ft.
(Du) (ft.) =
(Ds) (ft.) =
(W) (ft.) =
V=(Ac-in. )
4.26
H = (ft.)
4.00
Du = (ft.)
3.00
Ds = (ft.)
1.00
K=
1.68E-04
c
2. Required and Proposed length of trench:
Q
0.01258
L = (ft.)
338,69
L=(ft) L=(ft)
(Required) (Available)
338.69 370.00
Storage in Trench:
V(tr):
0.39
7) SOIL STORAGE:
1. Avg. Depth to Water Table = Avg. Proposed Grade - Water Level
Avq. Grade: Water Level: D=(ft. ):
16.00 10.00 6.00
2. Soil Storage (S) = Available Soil Storage x Pervious ArealTotal Area
(See C-35, SFWMD VoI.IV)
Av. Soil St. Pervious: Total (Ac.): S = (in.):
8.18 2.70 8.09 2.73
DATE PRINTED:
DATE PREPARED:
DATES REVISED:
24-Aug-98
BY:
dma
hhb
JAT
BMF
20-0ct-97
31-Dec-97
25-Feb-98
Exfilstd.xls
PAGE 3
"-
S C S PRO G R A Ii
PROJECT NAME. : GROVE PLAZA
REVIEWER . . . : B. Ii. fAY
PROJECT AREA . 8.09 ACRES
GROUND STORAGE 2.73 INCHES
TERMINATION DISCHARGE: 100.00 CFS
DISTRIBUTION TYPE. : SFHHD
RETURN FREQUENCY . 25.00 YEARS
RAINFALL DURATION . 3-DAY
24-HOUR RAINFALL . 11.00 INCHES
REPORTING SEQUENCE : STANDARDIZED
STAGE STORAGE DISCHARGE
(FT) (AF) (CFS)
12.50 .00 .00
l~.OO .40 .25
13.50 .53 .49
14.00 .73 .65
14.50 1.08 .78
15.00 1. 76 .89
15.50 3.15 .98
16.00 5.34 1.07
16.50 8.32 1.15
17.00 11.95 1. 23
17.50 15.65 1. 30
- - - - - - RES E R V 0 I R - - - - -
RAIN ACCUH. BASIn ACCUH. ACCUH. INSTANT AVERAGE
TIME FALL RunOFF DISCHGE INFLOfl VOLUME OUTFLOW DISCIIGE DISCHGE STAGE
(HR) (IN) (IN) (crS) (AF) (Af) (AF) (CFS) (eFS) (FT)
.00 .00 .00 .0 .0 .0 .0 .0 .0 12.50
4.00 .27 .00 .0 .0 .0 .0 .0 .0 12.50
8.00 .54 .00 .0 .0 .0 .0 .0 .0 12.50
12.00 .80 .02 .1 .0 .0 .0 .0 .0 12.52
16.00 1.07 .08 .2 .1 .1 .0 .0 .0 12.56
20.00 1. 34 .18 .2 .1 .1 .0 .1 .0 12.62
24.00 1.61 .30 .3 .2 .2 .0 .1 .1 12.69
28.00 2.00 .50 .5 .3 .3 .0 .2 .1 12.81
32.00 2.39 .74 .5 .5 .4 .1 .2 .2 12.93
36.00 2.78 1.00 .6 .7 .4 .3 .3 .3 13.14
40.00 3.17 1. 28 .6 .9 .5 .4 .4 .4 13 .39
44.00 3.56 1. 58 .6 1.1 .5 .6 .5 .5 13.53
48.00 3.95 1. 89 .6 1.3 .6 .7 .5 .5 13.62
52.00 4.44 2.29 1.0 1.5 .7 .8 .6 .6 13.83
56.00 5.46 3.16 2.3 2.1 1.0 1.1 .8 .7 14 .40
58.00 6.29 3.90 3.5 2.6 1.4 1.2 .8 .8 14.71
59.00 6.91 4.45 5.2 3.0 1.7 1.3 .9 .8 14.92
59.50 7. 46 4.95 8.2 3.3 2.0 1.3 .9 .9 15.06
59.75 9.11 6.49 50.2 4.4 3.0 1.4 .9 .9 15.27
60.00 11.16 8.45 63.8 5.7 4.3 1.4 1.0 1.0 15.62
60.50 11.97 9.22 12.6 6.2 4.8 1.4 1.0 , 1.0 15.85
61.00 12.39 9.62 6.6 6.5 5.0 1.5 1.1 1.0 15.91
62.00 12.95 10.16 4.0 6.9 5.3 1.6 ' 1.1 1.1 15.98
64.00 13.63 10.82 2.6 7.3 5.6 1.7 1.1 1.1 16.04
68.00 14.42 11.59 1.6 7.8 5.1 2.1 1.1 1.1 16.06
72.00 14.95 12.11 1.0 8.2 5.7 2.5 1.1 1.1 16.06
SUMHARY INFORIIATION
HAXIMUlI STAGE 11M 16.06 FEET 1\T 68.25 \lOURS
MAXIMUM DISCHARGE WAS 1.1 eFS AT 68.25 !lOURS
~'q~
^', ~
,w
-........
S C S PRO G R A H
PROJECT NAME. .: GROVE PLAZA
REVIEWER .. . : B. H. FAY
PROJECT AREA . 8.09 ACRES
GROUND STORAGE 2.73 INCIIES
TERHIIIAT ION DI SCIIARGE: 100.00 eFS
DISTRIBUTION TYPE. : SFHHD
RETURN FREQUENCY . 3.00 YEARS
RAINFALL DURATION . . : I-DAY
H-HOUR RAINFALL . 6.20 INCIIES
REPORTING SEQUENCE STANDARDIZED
STAGE STORAGE DISCHARGE
(FT) (AF) (CFS)
12.50 .00 .00
13.00 .40 .25
13.50 .53 .49
14.00 .73 .65
14.50 l.08 .78
15.00 1. 76 .89
15.50 3.15 .98
16.00 5.34 1.07
16.50 8.32 1.15
17 .00 11.95 l. 23
17.50 15.65 1. 30
- - - - - - RES E R V 0 I R - - - - -
RAIN ACCUH. BASIN ACCUH. ACCUH. INSTANT AVERAGE
TIME FALL RUNOFF DISC\lGE INFLOK VOLUME OUTFLOK DISC\lGE DISCHGE STAGE
(HR) (Ill) (IN) (CFS) (AF) (AF) (AF) (CFS) (CFS) (FT)
.00 .00 .00 .0 .0 .0 .0 .0 .0 12.50
4.00 .28 .00 ,,0 .0 .0 .0 .0 .0 12.50
8.00 .85 .03 .3 .0 .0 .0 \ .0 .0 12.52
10.00 1. 32 .17 .8 .1 .1 .0 .1 .0 12.63
11.00 1. 67 .33 1.6 .2 .2 .0 .1 .1 12.74
11.50 1. 98 .49 2.8 .3 .3 . .0 .2 .1 12.86
11.75 2.91 1.10 19.7 .7 .7 .0 .5 .3 13.42
12.00 4.07 1. 98 29.0 1.3 1.3 .0 .8 .6 14.39
12.50 4.52 2.36 6.1 1.6 1.5 .1 .8 .8 14.77
13.00 4.76 2.55 3.2 1.7 1.6 .1 .9 .9 14.87
14.00 5.07 2.82 2.0 1.9 1.7 .2 .9 .9 14.96
16.00 5.46 3.16 1.3 2.1 1.8 .3 .9 .9 15.01
20.00 5.90 3.55 .8 2.4 1.8 .6 .9 .9 15.00
24.00 6.20 3.81 .5 2.6 1.7 .9 .9 .9 14.92
SUMMARY INFORHATION
HAXIMUH STAGE HAS 15.01 FEET AT 16.25 \lOURS
HAXIHUK DISCIIARGE HAS .9 CFS I\T 16.25 \lOURS
WEIR LENGTH
WEIR ELEVATION
WEIR COEFFICIENT
TYPE OF BLEEDER SLOT
SLOT INVERT ELEV.
ORIFICE HEIGHT
ORIFICE BASE WIDTH
(-
o F'!'
16.2 FT. NGVD
3.13
TRIANGLAR ORIFICE
12.5 FT. NGVD
.5 FT.
.5 FT.
WEIR FLOW IN CFS
STAGE
WEIR
-----------------------------------
BLEEDER
TOTAL
--------------------------------------------------
--------------------------------------------------
12.50 0.00 0.00 0.00
13.00 0.00 0.25 0.25
13.50 0.00 0.49 0.49
14.00 0.00 0.65 0.65
14.50 0.00 0.78 0.78
15.00 0.00 0.89 0.89
15.50 0.00 0.98 0.98
16.00 0.00 1.07 1. 07
16.50 0.00 1.15 1.15
17.00 0.00 1. 23 1.23
17.50 0.00 1.30 1.30
18.00 0.00 1.37 1.37
/-
EL. /2.50
LWDO M/N/MUMBLEEOERS/ZE
(
(~
GROVE PLAZA
TOTAL REa'D. STORAGE EXFIL TRATION
PARCEL AREA LESS TRENCH STORAGE TRENCH STORAGE EXFILTRATION
PARCEL (ac) @ EL.15.00 (ac-ft) (ac-ft) TRENCH (ft)
.COMMON
ROADWAY 1.67 0.97 0.07 76
A 1.20 0.08 0.05 55
.
8 1.14 0.08 0.05 52
C 0.83 0.06 0.04 38
D 1.23 0.08 0.05 56
E 0.88 0.06 0.04 40
F 1.14 0.08 0.05 52
--
BOYNTON BEACH. FL
C P Be A PROJECT NO. 950404
SFWMD EXFllTRATION TRENCH DESIGN CALCULATIONS
TOTALS:
8.09
1.41
0.35
370
MIN. ROAD CROWN = 15.00 (NGVD)
VOL STORAGE@EL 15.00 =
VOL STORAGE IN TRENCH =
VOL STORAGE @ EL 15.00 =
LESS VOLUME IN TRENCH
TOTAL TRENCH LENGTH =
TOTAL TRENCH STORAGE =
TOTAL SITE AREA =
1.76 ac-ft
0.35 ac-ft
1.41 ac-ft
370 ft
0.35 ac-ft
8.09 ac
VOL STORAGE @ EL 15.00 = (1.41 ac-ft . 0.97ae-ft) I (8.09ac . 1.67ae) =
PER ACRE (less common roadway)
0.07 ae-ftlae
· For the common roadway parcel, exfiltration trench may not be used to store water quality.
Water quality must be maintained either in the first inch as detention or in the first half inch
in retention. One inch of detention equals 0.67 ac-ft
The stage storage volume for the common roadway parcel account for the actual
roadway plus the dry detention areas.
':.b........... ,.
CXFIL TBLXLS
PAGE 1
( -
(-
FINISHED GRADE OR
PAVED SURFACE
~'7~" r ~~"r ~'74~ ~~~
~. 'COMPACT SUB GRADE AND
"'---BACKFILL ABOVE CULVERT
TO Q5i.: MAX. DENSITY
<l2'L1FTSI
TRENCH LINER
CATCH
BASIN
NON-PERFORATED
CULVERT
-L
CUT FILTER FABRIC a CULVERT
AND INSERT BETWEEN PIPE &
CULVERT BANO <SUCH THAT
BAND CLAMPS TRENCH LINERI
SIDE VIEW
z
:.. i:
-
~r:- .. --
.
~
. / ~ t,,;;;
L..
"'"
CARNAHAN. PROCTOR AND ASSOCIATES, INC.
Consulting Engineers . Surveyors . Planners . Land Development Consultants
October 21, 1997
Mr. Jerzy Lewicki
Planning Department
City of Boynton Beach
100 E. Boynton Beach Blvd.
Boynton Beach, FL 33425
HAND DELIVERED
RE: GROVE PLAZA: master site plan modification
Dear Mr. Lewicki:
On behalf of our client, we hereby request approval of the attached modified master site
plan for the Grove Plaza project.
As per your requirements, attached please find the following:
1. This letter of request describing all changes made to the master site plan (12
copies)
2. Letter from Palm Beach County Roadway Production regarding the 5-laning
of Lawrence Road (12 copies)
3. Modified master site plan (12 copies)
4. Modified storm water management plan (12 copies)
5. Storm water calculations (12 copies)
6. Revised traffic study (6 copies)
7. Sketch of distances from Parcel A to the existing residences (1 copy)
8. Fee for master site plan modification: $500.00
The modifications which have been made to the master site plan are as follows:
1) Parcel lines have been reconfigured to create a separate common area tract
which will accommodate the trunk road and drainage system, and maintain a
200' distance from the property line of the proposed gas station parcel to the
existing residences.
2) Parcel A has been modified from 7500 square feet of retail/pharmacy to 2960
square feet of convenience store/gas station.
3) Parcel C has been modified from 4500 square feet of retail to 6540 square feet
of retail.
4) Parcel D has been modified from 6500 square feet of retail to 9000 square feet
of retail.
5) Site Data and Parking Data tables have been updated accordingly.
6191 West Atlantic Blvd. . P.O. Box 4399 . Margate. FL 33063 . (954) 972-3959 . FAX (954) 972-4178 . Palm Beach (561) 364-0687
6) Proposed turn lanes on Lawrence Road and Hypoluxo Road have been added.
7) Southerly access drive has been modified from one way to two way traffic
flow.
Please accept this submittal for review at the TRC meeting of November 12th.
As always, thank you for your assistance, and I look forward to working with you on this
project.
Very truly yours,
~Q.~
Donna C. West, P.S.M.
Planning Manager
l\ismp\olword6ldonnalplatlel\lelboynt.doc
ULa-",,-U-::'1
.&. .&. ,; ~~, HI'I
~j ~'
CARNAHAN. PROCTOR AND ASSOCIATES, INC.
Consultlno [nUU1eers ,Survoyc)r'i Planmm. Land ()l;lvo(npment COrl:llJllanls
1-'.11:":
,~
MEl\~ORANDUM
DA'f(.:: October 15, 1997
TO: Mr, William R. Sears, Project EI1&illeet, Roadway Production
FROl\I: Jame~ A, Thiele. P.E.
HE: Lawrence Ruad (Gateway Boulevard to Hypoluxo Road)
P.D. Project No. 95511
t..
Pursuant to our telephone conversalion on this dale, please confinn by signalure below thallhe
fullowing is the currcur schedule for the above referenced project:
July
Bid Date Mf 1998
1 understand from other documentation you have provided us that Lindahl, Browning Fcrrnri &
Hellstrom, Inc, have submitted these 35% drawings and that these projects typically commence
construction approximately 90 dllYs folluwing the hid date. This cunfirmation is requested to
document same to the City of Boynton Beach for our project "Grove Plaza" localed at the
Southeast comer of Lawrence Road and Hypoluxo Road.
note: the above bid dale is [or Palm Deach County
budgeting purposes and is subject to change due
to unCorseen circumstances.
tV~~4----
. William R. Sears, Project Engineer
, .~aJm Beach County Roadwuy Production
f
-
..
'=5
.'
. .
i
JA T:scw
,:" ~
'"
~
I :\...."'IMj.u\~"" .....JIl.,.h, pulnc
..
~
-
-
i
,
i
.&
7-ELEVEN AT GROVE PLAZA
ADJACENT RESIDENCES
HYPOLUXO RD.
r--" ---- -..- -.... -.... -....-.. --.. --.... - -- - -- --.. -.. --.... -- --.... --- --.. --.. --.. -.... -.... --.. -.... --.. -....
Q
a:::
w
U
Z
w
a:::
;::
. <:
-J
I
.
.
I
.
.
I
ADDENDUM
JOB NO. 950~0~A
7-ELEVEN . GROVE PLAZA
L.W.D.D. L-18 CANAL
7-ELEVEN AT
GROVE PLAZA
PARCEL "A"
I
L__-
Ot
ai
..,
N
EXISTING
RESIDENCE
FILE. q.\proIects\sdO~o\sdO~oSk.don
-------
I
I
I
I
I
I
I
I
I
I
I
I
-"
"
"
'-------
TRACT "G"
-----
----
EXISTING
RESIDENCE
CMNAHAN~PROCTOR & ASSOCIATES INC.
6191 W. ATLANTIC BLVD., MARGATE, Fl 33063
PHONE (954)972-3959 FAX (954)972-4178
1-. 80'
10-15-97
ADJACENT RESIDENCES
SHEET I OF I SHEETS
Carnahan · Proctor · Cross
[L~1111~lfu @[f 1100~~~~ 011 ,
TO
Consulting Engineers · SUNeyors . Planners
Land Development Consultants
6101 West Atlantic Blvd. · Margate, FL 33063
(954) 972-3959 · FAX (954) 972-4178
Web Page: www.carnahan-proctor.com
Email: margate@carnahan-proctor.com
WE ARE SENDING YOU ~ Attached 0 Under separate cover via--.delivered
the following items:
o Shop drawings
o Copy of letter
C Prints
C Change order
C Plans
o Samples
o Specifications
c
DATE NO.
THESE ARE TRANSMITTED as checked below:
}! For approval 0 Approved as submitted
0 For your use 0 Approved as noted
. As requested 0 Returned for corrections
0 For review and comment r
L.J
0 FOR BIDS DUE 19
REMARKS
r:J Resubmit_copies for approval
o Submit_copies for distribution
o Return_corrected prints
C PRINTS RETURNED AFTER LOAN TO US
COPY TO
SIGNED~a.J:2. ~