REVIEW COMMENTS
'l'RACKING JG - SI'l'E PLAN REVIEW SUB' 'TAL
S &11 P 9.j--'ov I
PROJEC'l' 'l'lTLE:
DEScRIPTION:
'l'YPB: X
DA'l'E REC; D :
Grove Plaza
Retail Center Construction
NEW SITE PLAN ;
6/29/95 AMOUNT:
FILE NO.: 95 OW
MAJOR SITE PLAN MODIFICATION
$1500.00 kECEIPT NO.: 01934
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
TWELVE (12) SETS SUBMITTED:
COLORED ELEVATIONS REC'D:
(Plans shall be pre-assembled. The Planning & Zoning Dept. will number each
sheet of their set. The Planning Dept. set will be used to check the
remaining sets to ensure the number and type of sheets match.)
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
APPLICATION & SUBMITTAL:
DA'l'.E; :
ACCEPTED
DENIED
DATE:
DATE OF LET'rER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES:
2nd SUBMIT'I'AL :
DATE:
ACCEPTED
DENIED
DATE:
DATE UF SbBMITTAL ACCEPTANCE LETTER:
REVIEWER'S NAME:
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
(Label TRC Departments on each set of plans)
DATE AND MEMO NUMBEk OF MEMO SENT TO TRC TO PERFORM INITIAL REVIEW.
DATE SEN'!,:
RETUkN DATE:
MEMO NUMBER:
\. Util.
~.W.
Parks
Fire
Police
~t REVIEW COMMENTS RECEIVED
MEMO # / DATE I IIC;;
9.:> v~,~j /?fT?/ / v
9S'~3 't '; 7jJ;I:::j -L-
9J-.3J~ ~ '7h.:J.. ~ ~
PLANS
Planning
Building V)
Engineer AI 0
SD'Jin~8r
.forester VIE. oS
0.117
'l'Y PE 0.1:;
DA'TE OF MEE'I'ING: -!P."j -; ;/
--'
DATE OF LETT~R SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENT~:
(Aesthetic Review App., dates of board mtgs. & checklist sent out wi comments
NINETY DAY CALENDAR DATE WHEN APPLICA'l'ION BECOMES NULL AND VOID:
DATE 12 COMPLETE SETS OF AMENDED PLANS SUBMITTED FOR 2nd REVIEW:
(Must be assembled. Reviewer shall accept amended plans & support documents)
COLORED ELEVATIONS REC' D:
MEMO SENT TO 'l'RC TO PERFORM 2nd REVIEW.
DATE SENT: MEMO #: RETURN DATE:
St..'c:n''l:tf"'" L
2nd REVIEW RECOMMENDATION/DENIAL
PLANS
MEMO #. if!I.AT /IIR/.DII
q'j ~ 2r; - 1)_ I C
~- ~ I I
q -~CP/ /
I /
I /
PLANS
SCHEDULE OF BOARD MEETINGS: PAD
, ~.
E
'/
TO APPLICANT REGARDING TRC APPROVAL/DENIAL AND
AT 'I'HE PROPERTY DATE SENT/SIGNS INS'I'ALLED:
c; J/ J-
Planning
BUilding
Engineer
Engineer
For.ster
v(
MEMO # / DATE
/
I
Cls - ;;Zul~ / 7 !7(
/
fj'~-....YT. / .,Jz,7
l YWtW) 1/z.(
LAND DEVELOPMENT
/IlR/DII
/
I
/ c
/
/ 0~
Util.
P.W.
Parks
Fire
Police
(!. M.
LETTER
PLACED
SIGNS
CCICRA
7'/;7'
DATE APPRO~L LETTER ~ENT:
A: rrRACKING. ::)P
.."
/"} I
(,t..
'\ .
(. ~.' _f\.......
-..;
7.C.l
GROVE PLAZA
LANDSCAPE APPEAL
PLANNING AND ZONING DEPARTMENT
MEMORANDUM NO. 95-483
TO: Chairman and Members
Planning and Development Board
FROM: Tambri J. Heyden
Planning and Zoning Director
DATE: September 12, 1995
SUBJECT: Grove Plaza - LAAP 95-004
Landscape Code Appeal (interior landscape strips)
NATURE OF REQUEST
charles DeSanti and Julian Bryan, agents for Dr. WaIte Lanke and
Ms. Auce Fay are requesting approval to appeal Chapter 7.5,
Article II - Landscape Code, Section 5.E. of the Land Development
Regulations (see Exhibit "A" - letter of request). The appeal, to
omit all interior landscape strips along the interior lot lines
of five abutting parcels, is in connection with a concurrent
master plan approval for subdivision of a commercial property
(see Exhibit "B" - location map) .
BACKGROUND
The master plan being processed concurrently with this request
depicts a parcel which will consist of 18,000 square feet of
general retail, 3,600 square feet of bank with a drive-through
and 7,200 square feet of fast food restaurant with drive-through
(see Exhibit "C" - Naster Site plan). The appeal to the Landscape
Code is to maintain a portion of the required perimeter landscape
barrier between the parcels, but to also allow the cross access
corridors for vehicular traffic travelling internally from parcel
to parcel within the development. The landscape code does not
allow the proposed breaks ln the perimeter landscaping, hence the
appeal. Individual site plan approval will be required as each
parcel is indivldually developed. Since approval of this appeal
affects how the property can be subdivided, processing of the
appeal is necessary concurrently with subdivision master plan
approval.
ANALYSIS
The requested appeal pertains to the perimeter landscape strips
that would normally run between individual adjacent properties.
Chapter 7.5, Article II Section 5.E. states the following:
Perimeter landscaping relating to abutting propertles.
On the slde of the building or structure or open lot use
providlng an off-street parking area or other vehicular use
area, such area shall be provided with a landscaped barrier,
perferably a hedge not less than four (4) feet nor greater
than SlX (6) feet in helght to form a continuous screen
between the off-street parking area or other vehicular use
area and such abutting property. Such landscape barrier
shall be located between the common lot line and the off-
street parking area or other vehicular use area in a
planting strip of not less than two and a half (2 1/2) feet
in width. The provisions of this subsection shall not be
appllcable in the followlng situations:
1. When a property line abuts a dedlcated alley.
2. Where a proposed parking area or other vehicular use
area abuts an existing hedge, said existlng hedge
may be used to satisfy the landscape requirements of
thlS subsection provlded that such existing hedge
meets all appllcable standards of thlS article.
Page 2
Memorandum No. 95-483
Grove Plaza - LAAP 95-004
The applicant 1S requesting that the landscape barrier be amended
to allow the proposed cross access corridors between the interior
parcels. The remaining areas defining the perimeter of the
parcels will meet or exceed landscape code requirements.
RECOMMENDATION
The impact of the proposed cross access corridors is limited to
those areas where adjoining parcels allow 1ngress and egress
between them. The problem occurs with property lines between the
parcels running down the middle of the accessways instead of down
one side or the other. This problem could be remedied by
shifting the location of the interior property lines and thereby
negating the need for an appeal. Therefore, the Planning and
Zoning Department recommends denial of this request.
DCD
Attachments
xc: Central File
A:LDSCAPEA.GRO
E X H I BIT
nAn
..
DeSanti & Associates, Inc.
August 1, 1995
Mr. Mike Haag
Planning and Zoning Site Administrator
Department of Planning and Zoning
City of Boynton Beach
100 East Boynton Beach Blvd
Second Floor
Boynton Beach, Florida 33435~31O
RE: Request for appeal from the T anrl~pe code - Article II, Section 5.E."Perimeter Landscaping
relating to abutting properties", per Master Plan for Grove Plaza submitted concurrently for
approval.
Dear Mr. Haag,
Please accept this request for approval of the attached Master Landscape Plan. which locates the required
perimeter landscape barrier adjacent to the access corridor at the entranCes to the development, in ten (10)
foot landscape strips, which is four (4) times the size of the minimum required landscape strips. The code
literally requires that the "landscape barrier be placed between the common lot line and the off-street
parking area or other vehicular use area in a planting strip of not less than two and one-half (2 1/2) feet in
width" .
The development is of unified design and will be controlled by an association of all property o~ners,
required by the platting process. Therefore, proper maintenance is assured The development will
provide for meeting the intent of the Ja(lds=pe code by providing landscape barriers from parking and
access ways and will provide at a minimum of between 50% and 100% more landscaping than required by
the code as a minimum.
By approving our request , the Board uill be setting higher standard than is othenvise provided by the
Code minimums. We therefore respectfully request approval of our request to adjust the location of the
required landscape barrier.
Thank you for your consideration throughout the review process.
With warm regar
Charles W. De Santi
".,. -J,#
xc: Robert Fay
Julian Bryan
9558,JIagellan Circle #191, North Miami Beach, Fla. 93180 - (Office) 305-995-6269
(Fax) 905- 992- 9098 - (Mobile) 407- 346- 2857
E X H I BIT
"B"
"
DEPARTMENT OF DEVELOPMENT
ENGINEERING DIVISION MEMORANDUM NO. 97-220
TO:
Jcrzy Lcwicki, Assistant Planner
Al Newbold, Deputy DirectorlBuilding Official ~
Ken Hall, Plan Check Inspector/TeChniCian~
October 29, 1997
THRU:
FROM:
DATE:
RE:
FINAL SIGN-OFF OF GROVE PLAZA MASTER PLAN (SBMP 95-001)
OUTSTANDING COMMENTS
The remaining comments to be satisfied prior to engineering sign-off are as follows:
1. Items A*, E and J of Development Department Memo 95-323 (attached).
*Subject to the review and recommendation by the Palm Beach County Traffic Division of the
8/27/97 traffic study by Carnahan-Proctor and Associates, Inc.
KRH/ck
Xc: John Yeend, P .E., City Engineer
Sebastian Puda, Engineering Inspector
C:\My nocuments".Grove Plaza Final Sign Off doc
DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION MEMORANDUM NO. 95-323
TO:
Ta~!i J. Heyden, Planning & Zoning Director
~~am HUkill, P.E., City Engineer
August 28, 1995
FROM:
DATE:
RE:
GROVE PLAZA - 2ND MASTER PLAN REVIEW
Based on our previous review, the following items remain to be
addressed:
General - #1 and #6
Future - #1 thru #13
Please consider the following additional comments:
A. Project shall conform to County approved phasing plan
regarding amount of development (see attached County
Traffic Study Review.
B. All plans submitted for specific permits shall meet the
City's code requirements at time of application. These
permits include, but are not limited to the following;
site lighting, paving, drainage, curbing, landscaping,
irrigation and traffic control devices. Permits required
from agencies such as the FDOT, PBC, SFWMD and any other
permitting agency shall be included with your permit
request.
C. The master plan is subject to the provision of Chapter 2
of the LDR Sec. 9C, pg.2-80.
D. Specify the name, address, telephone number of the
applicant's agent. Chap.3, Art.IV, Sec.3D, pg.3-4
E. Provide a statement that all utilities are available and
will be provided by appropriate agencies. Chap. 3,
Art.IV, Sec.3R, pg.3-5
F. Provide Traffic Impact Analysis. Chap.2, Sec.9C4h(S),
pg.2-85 and Chap.3, Sec.3S, pg.3-S
G. Provide a master stormwater management plan. Chap.3,
Art.IV, Sec.3T, pg.3-6
H. Site plan review & approval required. Chap.4, Sec.2,
pg.4-1
I. Sidewalks are required on both sides of all local and
collector streets. Chap.6, Art.III, Sec.11A, pg.6~3
J. Provide Certification by Developer'S Engineer that
drainage plan complies with all City codes & standards.
Chap.6, Art.IV, See.SA, pg.6-7 & Chap.23, Art.IIF,
pg.23-8
K. Provide sidewalk locations & details. Chap.6, Art.IV,
Sec. lOT, pg.6-14
L. Need SFWMD & LWDD acceptance prior to Engineering
approval. Chap.6, Art.VII, Sec.4B, pg.6-24
~--~ --~--.-------------- ~._-
Engineering Division Memo No. 95-323
Re: Grove Plaza - 2nd Master Plan Review
August 28, 1995
Page #2
M. County and/or State permits required for construction in
R.O.W. Chap.6, Art.VII, Sec.4B, pg.6-24
N. Install appropriate turn arrows on pavement to supplement
left & right turn only signs. Chap.23, Art.IIB1, pg.23-7
O. Install one way arrow signs in medians for egress
driveways with no median opening. Chap.23, Art.IIB2,
pg.23-7
Additional review time 1 hour for Mr. Hall ($20.64) and one hour
for Mr. Hukill ($43.17), for a total of $63.81.
WVH:ck
C;GROVEPLZ.2MP
MEMORANDUM
UTILITIES DEPT. NO. 97 - 352
00
rn@~~w~rn
OCT I 6_
FROM:
Tambri Heyden, Planning Directo~ I /'
John A. Guidry, Utilities Directoru ~~
October 15, 1997
TO:
DATE:
SUBJECT: Grove Plaza - Comments on Master Plan
After reviewing the supposedly rectified master plan for this project, we noted
that two of our original comments have not been addressed. We therefore repeat
our request for the following items to be included on the r~ctified plan:
1. Chapter 3, Article IV, section 3(0) of the Land Development Regulations
requires Master Plans to show all utilities on or adjacent to the tract. The plan
must therefore show the point of service for water and sewer, and the
proposed off-site utilities construction needed in order to service this site.
2. Chapter 3, Article IV, section 3(P) of the Land Development Regulations
requires a statement be included that utilities are available and will be
provided by appropriate agencies. This statement is lacking on the submitted
plans.
Please refer any questions on this matter to Peter Mazzella of this office.
JAG/PVM
xc: Skip Milor
File
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. 97-260
TO:
't-ambri Heyden, Planning & Zoning Division
Al Newbold. Deputy Director/Building Official ~
Ken Hall, Engineering Plans Check Inspe~w~
Sebastian Puda, Engineering Inspector ~
THRU:
FROM:
RE:
GROVE PLAZA - OUTSTANDING 2:'iD REVIEW MASTER PLAN
COMMENTS
We have reviewed subject plans and offer the following comments:
Engineering Division (Ken Hall 561-375-6283 & Sebastian Puda 561-375-6280)
1. The development is subject to the review of the new traffic study by Palm Beach County and
their recommendations.
2. Provide a statement that all utilities are available and will be provided by the appropriate
agencics. [LDR Chapter 3, Article IV, Section 3.P.]
3. Provide a mastcr stormwater management plan consisting of all requircd items listed in
referenced section. [LDR Chapter 3, Article IV, Section 3.T.]
4. If subject parcel is to be subdivided, applicant must enter the plat process.
5. Prior submission showed eastbound traffic only on service road. Provide justification for
two-way traffic.
AN:KH:SP:/ck
C:'L'Vty Documents"'Orove Plaz.a, Outstanding Comments lnd.doc
rn
mnw~~
&..,
tEl'
RECREATION & PARK MEMORANDUM
TO:
Tambi Heyden, Planing and Zoning Director
FROM:
Kevin John Hallahan, ForesterlEnvironmentalist
~t
Re:
Grove Plaza--Rectified Master Plan
SBMP #95-001---1st Review
DATE:
October 6,1997
Problem Formulation:
The Congress Avenue medians landscape 1 irrigation plans are shown in item #7 to be completed
in phases. The applicant must complete all of the medians in conjunction with the first on site
parcel. The applicant must apply for the permit to Palm Beach County and assign the City of
Boynton Beach as the permittee.
Code Reference:
The above requirement is in accordance with: Comprehensive Plan Policy 2.4.5.,p42
Directive:
The applicant must:
I. Submit landscape and irrigation drawings for all of the medians as part of the first
site plan review.
2. Submit the above plans, after approval by my office, to Palm Beach County for
permits to install the landscape and irrigation improvements. This should be
completed (installation) prior to receiving a permit for common areas landscape
inspections for the first site on the parcel.
3. My previous memorandum # 95-394 submitted on 8-28-95 is still in effect. The
applicant prior to the site-clearing permit being issued by the Building Department should
adhere to the contents ofthis memo.
kjh
DEVELOPMENT SERVICES DEPARTMENT
PLANNING AND ZONING DIVISION
MEMORANDUM NO. 97-264
FROM:
Jerzy Lewicki
-rlf.... ;, \. ·
. I ''\.
~...~
\
TO:
Tambri J. Heyden
Planning and Zoning Director
DATE: June 4, 1997
SUBJECT: Master Plan - Rectification
Project:
Grove Plaza
Location:
Southeast corner of Hypoluxo Road and Lawrence Rd.
Agent:
Charles W. DeSanti
File No.:
SBMP 95-001
\
The following is a list of comments regarding the rectification of the above-referenced
master plan.
COMMENTS REGARDING RECTIFIED MASTER PLAN REVIEW.
txr"f. 1. The traffic analysis should be expanded to include left hand turning
lane for Hypoluxo Road into entrance into development median
break. Due to phasing of project, at time of site plan review of each
parcel, additional reviews must be made to determine impact of
turning lane, interior traffic, signage, and one way traffic proposed
(!) that connects the back of the parcel.
~) ~ 2.' A master storm water management plan (section 3,T) must be
submitted showing impact of phasing as proposed (this plan is
required regardless of whether phasing is proposed).
v.>/tt 3. Computations for required number of handicapped parking spaces
O ) shall be shown.
"'~ OtJ
n A~l'E€ p-(,RfJ
"'WI:! ~:9
.J/, .
WlM.,;
h~
b~~'
G;;
'V"'4~~
{L~/ Ii ~,~.
how on the master plan the buildable area within each of
the six (6) parcels including the required setbacks and their
dimensions.
Staff recommends the south access driveway be completely installed
with development of the easternmost property (parcel F).
All J3Fel'sSlid E'~i8FRente GRail be s~e':JR QQ tee m~'ilt(jr rl~HJ _....
It is recvmmendedthat a n<?~~ e added.t61pe master P!9D"that will
carry oVer and be r~f1ected . ocur,nent that sfates\!hat
.si~nage\flnd qliilding design fo! all si)"parcels shall pe unified~!1
cWpeararte&3s one pla~i in cor\f(J9flance with !~.J'city's sign code
and Community Desfgrl Plan.
1-\
,~Ia hasing In~S on tl)ef{1aster pi t reflect the
\~h sin of G ewa~ ~Ievctfd . ovements, as requ d by Palm
~ ach C --
! I Q, ~- I '- ~
S:\Pla Ing\SHARED\WP\PROJ ECTS\g roveplaza\Gr~plaza\rect-mastr-plan-1 st -comments-groplaza.doc
<71~ ..
Subject master plan appears approvable subject to the following general
conditions:
V}.. Platting
~2. written explanation of storm drainage system
'.A~ \.._~. Corr7ct south landscape. buffer .
. ~4. Prov1de eastbound traff1c only on south serV1ce road
~_ \IS. Review location of distribution lines near south property line
_ ~. ~ervice road and wall
~t~,;;;v'-/6. plan . .
~ addition, the follow1ng cornmen must be complied with as you proceed
toward construction, although most of them can be dealt with later in
the site planning and/or platting process. . They are presented to you
now to provide advance notice.
~Vi. Provide drainage calculations. Chap.4 Sec.7Fl, pg.4-6i
N Chap.6, Art. IV, Sec.SA, pg.6-7
. ~~~ ~2. Provide Certification by Developer's Engineer that drainage
[~~~~""~' ~ plan complies with all City codes & standards. Chap.6,
~ON .~ 3 Art.IV, Sec.SA, pg.6-7 & Chap.23, Art.IIF,pg.23-8
3. All swales, detention areas & disturbed areas must be sodded.
If not irrigated, use bahia sod. Chap.7.S, Art.II, Sec.SC6,
pg.7.S-lS
Minimum IS" pipe must be used in storm sewer. Chap. 6, Art .-IV,
Sec.SA, pg.6-7
Top of drainage pipes must not interfere with subgrade.
Chap.6, Art.V, Sec.4B2i(6), pg.6-20
Minimum pavement width 22'. Chap.6, Art.IV, Sec.lOC, pg.6-ll
parking lot section must conform to City code . Chap .6 , Art. IV,
Sec.10F, pg.6-12
Provide dumpster location & details, including drainage.
Chap.7.S, Art.II, See.SJ, pg.7.5-18 & Chap.9, See.lOC3, pg.9-4
Photometries must be approved for both pedestrian and parking
lot lighting before building permit can be issued. Chap.23,
Art.II,Ala, pg.23-6
Parking lot dimensions, striping, aisles, stalls, radii,
signs, landscaping, etc. must conform with City codes and
standards. Chap.23, Art.II, pg.23-6
Wheel stops or curb required, all stalls. Chap.23, Art. lIE,
pg.23-7
Provide 27' backup area, all stalls.
pg.23-9
Parking stall minimum 18' long. Chap.23, Art.II,II, pg.23-9
..
TO:
FROM:
~
;
f
;l
'~
~
~
~
.
;i
~
DATE:
RE:
~vl4.
*- vis.
/6.
~l/7.
8.
.
1
*-V9.
-
~Ao.
*-. \/11.
* \/12. ~
...::K.' J.. 3 .
,~ v~
walck
C:OROVEPU.COM
..____ ...... . _ .. ._,-.:..",~. ~~'-<,,\;,~'"C<~J~--' T- .. . :' "" ~.~.,..,;~...,.:t< ..".. ~'..
.;.,;:, ;:':;~;...' . .'. ,- '"", .l~~'lh- ~.,
BHGIRBBRIH:~~~~~U:~jij~j5-238
"'!;~;';f;'~1:;~;;~'~~:;~i~':-~.'~:7:.. ..
'- ~-ij~"",....',
Tamb~i J. Heyden, Planning & Zoning Director
~~am Hukill, F.E., City Engineer
July 13, 1995
,_. , -':":'l~.~<a;'~ ..
MAS~BR PLAR
REVIEW
tV\' l)~ '~~T Q; r-:-:':;(i',
.( \"'f.~.~ \h 9r-~z.3
Chap. 23 , Art. I I, II,
...~.....- .--
TO:
FROM:
DATE:
;
~
I
~
;
I
,
!
I
RE:
DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION MEMORANDUM NO. 95-323
T~~J[i J. Heyden, Planning & Zoning Dire
~iW'tam Hukill, P.E., City Engineer
August 28, 1995 .
gROVE PLAIA - 2ND MASTER PLAN REVIEW
'-I'" 2
.:, 9 r:;:;
Based on our previous review, the following items remain to be
addressed:
General - 11 and '6. "( SQ5L.. o.;J;to..cA\JrA ~~k cilZl.f97
Future - 11 thru 113~
Please consider the following additional comments:
/i.
Project shall conform to County approved phasing plan
regar~ing amount. of developme~~ __~ ~e.~..~.tra~!1ed -C;o_l!!1~f.. .
TraffJ.c Study RevJ.ew. 'P\\r.>..5'I~J~) ,- ?~....}..J ,Jl'l\ \\_ {~\:-'\<JII";;t' (~
All plans submitted for specific permits shall meet the~t~;V0~
City's code requirements at time of application. These(-..-.
permits include, but are not limited to the following; .,H-\-~wr.J!
~it~ li?hting, pavi~g, drainage,. curbing, ~andscap~ng, 0 ~~~V ~
J.rrJ.gatJ.on and traffJ.c control devJ.ces. PermJ.ts requJ.red r
from agencies such as the FDOT, PBC, SFWMD and any other
permitting agency shall be included with your permit
request.
The master plan is subject to the provision of Chapter 2
of the LDR Sec. 9C, pg.2-80.
Specify the name, address, telephone number of the
applicant's agent. Cha .3, A . V S c 3-
J. a ement t a I utilities are available a arJ
will be provided by appropriate agencies. Chap. 3,
~~t.JV, Sec.3R, pg.3-5
<.. '-'i5?OVI e ra.I pace: nalys is. Chap. 2, Sec. 9C4h (S ) ,
pg.2-85 and Chap.3, Sec.3S, pg.3-S
Provide a master stormwater management plan.
Art.IV, Sec.3T, pg.3-6
Site plan review & approval required.
pg.4-1
Sidewalks are required on both sides of all local and
aIle stree C ap.6, A t. .
_ . ProvJ. e Certi ication by Developer'S Engineer that
~~~'~~\Q~ drainage plan complies with all City codes & standards.
Chap.6, Art. IV, Sec.SA, pg.6-7 & Chap.23, Art.IIF,
~ ...og.a-8 ~~~
~~K:~viae~ewalk locations & details. Chap.6, Art.IV,
/ Sec. lOT, pg.6-l4
~vL. Need SFWHD & LWDD acceptance prior to Engineering
approval. Chap.6, Art.VII, Sec.4B, pg.6-24
0.
*~.
~.
V G.
/H.
*0.
Chap.3,
Chap.4, Sec.2,
.
N,L-\J\)~' (,..) ,:~\"' l"t~ 13.
.~ o~
~:r-6 '-.T -C-O C~\"f'"\\,^~"'..J-r~
1\;\ \>\:::;\.J \:.1 '- 'f:\ \~vlS 1 Az/ '17 ~
u_._..._...-_...-_.._.__ -. -- .
MEMORANDUM
Utilities # 97-143
~ '-;1 r? ~;~) ;< .
t ' I ~, \ irJ ; ! .
~' "' I ':J "'. c." c
\ \ li I ~....:.__...~-'"' ."
1 -'.j ~
i ~1 ~
~j 1 MAY 2 0
l
Pt.~~{;g~i;:{.:i'--~'
."'...........'
TO:
Tambri Heyden.
Planning & Zo .
Cv
FROM:
John A. Guidry,
Director of Utilities
Date: May 19, 1997
SUBJECT: Grove Plaza,
Rectified Master Plan, First Review
Staff has reviewed the above referenced project and offer the following comments:
1. Please provide a statement that all utilities are available and will be provided
by appropriate agencies, (LDR Chapter 3 Art. IV. Sec. 3 (P)).
2. : Plan shall show existing utilities on or adjacent to the tract, and the proposed
points of connection to the existing water and sewer mains,
(LDR Chapter 3 Art. IV Sec. 3 (0)).
It is our recommendation that the plan proceed through the review process.
If you have any questions regarding this subject, please contact Skip Milor at 375-6407 or
Peter Mazzella at 375-6404.
sm/ grove2m
xc: Clyde "Skip" Milor
Peter Mazzella
File
r~~--'~-R'-0'"-'f2'~'l~-'-"- ", "
l!; 10 l!:, t' .,:;.;;._....:-,;".
J j ,.\\ \
" U 1
MAR , 4 1991 LJ
PLANNING AND
ZONING DEPT.
PUBLIC WORKS DEPARTMENT
MEMORANDUM #97-042
TO:
Tambri Heyden, AICP
FROM:
Larry Quinn, Sanitation Superintendent
SUBJ:
Grove Plaza - Request for One Year Extension
DATE:
March 14, 1997
as no problems with granting the request for extension.
Larry Quinn
Sanitation Superintendent
LQ/cr
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. 97-050
March 11, 1997
To:
Tambri Heyden, Planning & Zoning Director
From:
Al Newbold, Acting Development Director
Re:
Grove Plaza - Request for Extension
rn ~~~:
. i..-'
!~i~= '.'." fLAHNING AND
:;~~~, NING DEPT.
In review of the request made by the agent for this project, it appears that such an
extension is provided by the Code and should be recommended for approval.
~
"J\ I
A1Ne. 01 -'
AFO/AN:mh
C:\MYDOCU-l \TRC\GROVEPLA.WPD
~~~-14-1~~~ W~:W~
A
t
II
J I
Ii
II
II
I I
I I
[ I
~~~~~~~~~~~~~~~~
,tA,.. ~s.
4~],( 4'(1::l ~.('(w
r-'.W~/k:l~
I. IF TRA/fS7:r;.v IS ::cNC ()1{1J ON ONi SIDE " THf JII:W).
A IXJJBJJIIC OF THl RIGHT" OF 'if'" TIWISf17DIi ..~ BE REflJUtfD.
Z. lVW !JEWfREJlfJtr! !HOtfN RUua .& ill) ~
ItrE1fsECfIOJl.FOR rHHEIt IIfI"EASEt:r1JlQ ~ IiODIW
QJ/OI$/OKS JC:ORCXItGI1.
34C. .
'- .. STatAli&' IT""".)
;SO.s' or tuw TO CENTER LiNEl
C
,
1S0. .
TURN LNolE r.oPE:R
430.0' (RIW TRNISITIOHI
:-
~-----. ---
.- - - -
D
- ...,....
~._._._.
q
o.
..
<:I
o
- - 250.0' ~ar- TIf'fltI
430.0' l1IVW TftIlf\lSlTIONl
fU'rI LIIC
b:i
~.
I~I~;I~~
c - C
I
w
,..
Z
w
U
0
~ I-
~ ~
...
)- CII::
l- I&.
~ 0
ill
~ t::
~ e:,
& i
d .,
~
II
I
I
I I J
I
I I I
I I I
I I
I
I I
9
I I
..
LV'
RlW
'0
10.5' ]~
...
urc
.... M." l\D'
~ ~r>
t.CI'
I JUW I.M
,
11. 14.JI"
\:> . !
~ .!!r~ if tl
o - D
..., O4lft
/lE:\'1lIKIlQ
',-
PAl...t.l SEA!:" COuNTy. "LoRI:'" .
VIlltAlF'lF[JO IDH1'l?D8I1C
TYPIC"1.
80' X 120' EXPNCED lNTERSECTIOI
DUAL. LEFT TURN UNES
-
-.. ,...
...
.
... _. z_IV
[~
~
~114 J C,5
(1. s~ \a k L.J4~V'-1 C!~boi{.
8'.~ ~~ ,~~)
~ .(YW 'o('~,
~ S:i"l k. ""O.~ \~ ~)G 'IV\.L c.. (..D(>\., d ~"I\~\
eo r "\\.0' "'''3\\.-t- o~ ~ l.t\.~~\..c..s- .p\~s-
~~ ~Q'rSI q5('Qt.~\- w,~ Lab wos+!... lhS\.'~~ 't),s-k,d .f..o
~~ \'0......,) \.<,,)~ ~J.~ ~ '~r f'0Q.~ '--J .6e~~ ~1 ~.... W~~ ~
-\\o..\- <.\0SJl~ ~ e~ q\ ~qt-\- P ro 'G~~:l~ "f ~~ \.~ te~~,""
.\0 w ,~.cM' ~ cr-\ ~1 po \'"t,) L 0 f'O, I.( C9"^C(,~ ~~ e {'O blD..-.
Qr ~~ ~..\. So '1-s. ~"" So,.AL.. Q"> ~ ~~ ~ t ~ ~
~.....t ..,~ ~ ~ ~..,'~~ ~ Q.c~d ~'~\.,,\4 ~ ~vq
cA.~\.,", ~ qcq~~~ ~t. ~( r,,~,^\ e.~ ~ ~r- ~~Ul.
Ee,.. ~ k.,.~ c bo"'" L ~ \)\) ~\ ~~ (X r-a- ~ \tv) ~~ ~
f\~~ 4C'o':'~"'~ \.\ ~
.1 Q\So fV\~~
f'~,J ,,~ d O-~-\\-O
S;n~ --l~ c~,^q.\
\^ ~\~ ~ I -\\-.e
\oa..~ e~FZc,,", ~~
G\.f\.\\upc~n -\~Q.\-
-\~ 4Q.~~ \e~ (~ C\.~(,~) ~\o..\ '-"$<
~\"'~ ~ ~~~e('\ \'li. 501"') \.V\. ~ ~.
\oS ~ cv'-~~~ 'D'1 ~'I'O'" 0-( .... '72." (2C~
w \...c~ 9-""~ ~" 0 ~ t" '3 '^ ~ 0 t; <-J~ -G..- ~
'oAA""\ f~.,) \.o~\ q, ~~ ~'i:e \.. b'1 L w u \:) '\ '""
\\'1f'O \'ltO.o '-.JO~ \~ ~ ~'f'~~Q.~ 0.... SC:l~ ~. ",l
:t. ~{'~\ ('y4~ '-I~ ~4.-(\ ~~ ~~ ~~~
~ ~ ~ ~u. R.c, 1 0A6 .-\\.Q fA C>./'6~ Q c;.
-\~ ~~
I~ eOr 118tr-..~~~ ,,~ ~
Sv\:>.tn~~ ~~w~
- ,\.4, 5Jt,)~ ~~'V,~~ D,\ h..-o.,.Jl {>\QLA .s~s ~ ~'-'I>~u. ~
~A\". (h'O~~ ClW ~ L W 1)<:) 0, 2<11i-, Zq (-\-~ .~x mqp ~~s
'\ ~~1>~c.g o~ 2'1 ~t ~'1) \\.... ~~ oS; .~ ('rof~~ ~ s~~:"
,
~\.o~ ~'1('o\\'\11.P f'~v,~~ o'=' 5vt.JJt,\ ~'s \1."(( :.sS(~ lTO.f \2,-lLLS')
~'l6 'roO 1>P \e (' \. ~~\.e J \ ~ {\ c.. t .
~.:..
~/
.---;.."-
CARNAHAN. PROCTOR AND ASSOCIATES, INC.
Consulting Engineers . Surveyors . Planners . Land Development Consultants
DRAINAGE LETTER
GROVE PLAZA
CPA 950404
Grove Plaza is an 8.228 acre retail commercial project located in the southeast quadrant
of the intersection of Hypoluxo and Lawrence Roads.
A Drainage System consisting of exfiltration trench, catch basins and storm sewer pipes
will collect storm runoff and convey it to the Lake Worth Drainage District (LWDD)
canal L-18 located on the north line of the Grove Plaza Site. The LWDD canal L-18 is
culverted by means of a 72" Rep in this area.
Water quality will be accomplished on site by means of dry retention in grass areas and
exfiltration trench. Furthermore to enhance water quality inlets will be located in
"Grassed" areas.
Benning and perimeter road elevations will be utilized to contain the twenty five year
three day event on site. #
Finally finish floor elevations will-be set above the one hundred year three day zero
discharge event.
I
~,"r
~~O
;:\word6\w.;ssldra.grov.doc
S-o-.k,;. \-c. ('Oc, '--J-l"~~
r ..-
D(-<J "'\o.~,J:~'~ c-
C' ..."1' '"'
L\r.)~~ .~.~ ~'\"'<#"""("\Q...
q / l l\ Ilj~ I -C/\~,~~",\
\\ \-.o~
......J -.::,." ,c...
p~~0'"
r.\ {. f''^
~\\\
c " --.A. \u:,-~
".-..... 'tC ~
~(v
6191 West Atlantic Blvd. . P.O. Box 4399 . Margate, FL 33063 . (05) 972-3959 . E\X (305) 972-4178
Dade (305) 949.6826 . Palm Beach (407) 364-0687
11930 Fairwa)' kes Drive, Bldg. 6, Suite 4, Ft. Myers, FL 33913
(813) 561.2800 . Fax (813) 561.2821
J3:~5 2222222222222~~~~
.t..D.r 12. 1995
Tambrt Heyden, Director
A1VE PLAZA
,age two
Palm Beach County has programmed the widening of l.wrence Road for FY 97/987.
This will be a S-lane roadway within a right-of-w~ of 8 feet. Hypoluxo Road
is shown to have an ultimate right.of-way of 11 feet. Th will accommodate a
6-1ane rOldway, although the widening is not $C eduled at th s time. Palm Bea~h
County request that the tity of Boynton Beach re uire the devil opment to dedicate
or reserve the right-or-way necesnry for the u imate ~rou $e t ion for Lawrence
Road and Hypo 1 uxo Road, and an expanded 1 ersett i on at l wrence Road and
HypoluXQ Road.
OFFICE Of THE COUNTY ENGINEER .
kl.-?4'4
Dan We1sberg, P.E.
Sen10r Reg'stered C1v11 Eng1neer
CC. W1ll1am Huk1", P.E., D1rector
Boynton Beach Department of D~elopment
1- /
F1le: TPS - "un. - Traff1c Stud Rev1ew !
/
g:\USe~'dwe1sblr\wp50\tps\boyn46b
/j .v/~ ~~~ h ;:to
I}J .. .
~O -! J -Mpv'-'~?
o.~.-p- I(DI(M'
-P ~~ ~/ # ? L' ~
/~I\. J ,5iJ.-k
~.P"N :JJP I If/' S~f''':i-- \-~
~~ Ie) ~~~
} ~ ~~LP..'
'l~). 'fp ~
~rr L.I;J DD .>>r .
~ .C" yIfi bV~-v- ~
t~J (. wrr1 . l~~'
s 1"- f./~ ~ ,LL~ ~o{(j..J-OJ'
r1~~ ~ ~iJt ~ .
J o~ ~r- L j' ~ ~.turrY7
~ -f}/UJ (v'tj ~
,11." . P. ~ oJV--' :hA,~ niP
IV ~~ ~ ltJL;r ,jk;....cr
. -!( oJ fJ-Y~ .,P,.w
~ {O~e'o~ )pljfr
f'-' ~ -lL- 'OV ~
~~/}f) . ;....ft~ .vJ,g~ _ . &-- ,\JJ1J
./ WI.0-~t/or I
,D oJi'x ~ I oJ!!{" < bALl\.
~ V . v'00\JV' { Vi () ./'r
{J- ~ ~ '(),Q,,-\\.,QV
Sincerely,
,
,
~ - &frk
JJ~:::::;D
~ V ~~t ~,:i11r-of--J.z
~~/~-(/J ?
-. .~~-1'?LJ... r~
f: ~~/k~ Ih-L
~ ~ r ~/ .-P"A/J112~";
, ~ ~ _ ,'J 1- ~ J~. . /.
~... I JA/L. 0~ --"
J!t;ttiv 1D .~ {jl/ -
/ .~
/ I ~ '
,I
4v~
~
. {<S 4--
~~ (;;l
~ .../f-v' ) ~
/~ <9
.~
(?o
f" > "' f~ f~f'1j
~_ Il/ o/w ~ - "
n ;fvj (lJY'-~ IV -f<o If) ~ (~..
~." v-*J ~5 ~ ~
~~. 1,A>' ~ ~ . .nI ftP'-
/ r: \tV- r ~ ) ~. ;\vcr 7
_ .Vr _ ~ ~/ t!J -0) -rt.~ v/'
~ ~/o/<J -to <J~jJ- {'~
(
J
. OfL~\; ~,~
~ c)~-
~ "vol" e-v\"-'
\..0, ~ '-'>...~
(sM""\ -f
~~~
. - - .------
BOYNTON BEACH POLICE DEPARTMENT
TRAFFIC UNIT
TO:
FROM:
DATE:
REF:
T AMBRI HEYDEN, PLANNING & ZONING DIRECTOR
SGT. MARLON HARRIS. POLICE DEPARTMENT
24 AUGUST 95
GROVE PLAZA 3RD SUBMITf AL MEMO #0162
I have reviewed the above listed plans...~:~9:::!lft,. rioj~~m~~~at!~.is time.
.",.<,:.::1 i;::.:.:..~.~.:.;::.~..:::.:.~~.:~::::::::~;~:::::;'",..;::::' LJ .::(::.' & /~?:;;::~::~
. ~ ~ ~ .~/'~~:~~;~
i.J \. .{/" ..4;'<:,
~<",..::} V' ::' ....
,iLJ! ..::;!"~'IIY(.f""'\\{\ ~
::.......:' ~...'>........
~.-::....:....~...:-=..
J .""
r;::Si.t~,:tv'arlqrrHmri~
11.J~gti.~ De~"rtme~n
l r'''w'''''''',v l l ~
I.J C~ i...::::::.~~<:.l {J
rr'~:~::~
, "''''''''''Y'
I..,~~~:::::::::::~....J
ulBo
..;.....-v...
;::" ..:..:.........:~~:::~..
.:., ..\
.~ ':-. .::.
"~"'.:t. ~'-...
..:,,~~:::::~~.i
-r',;-:
lllrj)
/f1l:~::~
'l .' ~ .'.,
(~...,:~\~:~~::::~::r
...p..:..:........ .......
.{~:\::.(~"~.:.:::;::;;~l}
r, :(\::'.'::::::":::::::~~ ',:.<~>
:..: ...:...........;.....
.....:.,.:...,....:...~'."
::" --. ....^..~....
.:........:.-.......::....:;.,
\\
c~.:~.::::::)
PUBLIC WORKS DEPARTMENT
MEMORANDUM #95-151
TO:
Tambri J. Heyden, Planning & Zoning Director
FROM:
Robert Eichorst. Public Works Director
SUBJ:
Site Plan Review - Grove Plaza
DATE:
August 23, 1995
The Public Works Department has no problems with the above site.
obert Eichorst
ublic Works Director
RE/cr
xc: \MemO only)
Carrie Parker, City Manager
Floyd Jordan, Fire Chief
Charlie Frederick, Recreation & Parks Director
Police Chief
John Guidry, utilities Director
Central File
a:3rdr8v.gro/~RC
RECREATION & PARK MEMORANDUM #95-395
TO:
Tambri Heyden. Planing & Zoning Director
John Wildner. Parks Superintendent W
Revised Master Plan: Grove Plaz{
FROM:
RE:
DATE:
August 28, 1995
The Recreation & Park Department has reviewed the revised master plan for Grove Plaza. There are
no outstanding recreation requirements for this project.
JW:ad
Time: Parks Superintendent - I hr. = $27.17
Secretary - .25 hrs. = $3.49
Total: $30.66
RECREATION & PARK MEMORANDUM #95-394
TO: Tambri Heyden, Planning & Zoning Director
Kevin J. Hallahan, ForesterlEnvironmentalist ~~ ~
Grove Plaza - Master PlanlExisting Trees
FROM:
RE:
DATE:
August 28, 1995
The following is a summary of the trees to be relocated on the site based upon the tree survey:
Tree Survey #: ~
H1. SllL
1 8' 10'
3 14' 16'
4 25' 25'
8 25' 30'
9 8' 6'
16 16' 10'
26 12' 10'
27 12' 10'
28 12' 10'
29 12' 10'
The following trees noted to be removed should be relocated:
10
11
14
II
14 total trees to be relocated.
12'
14'
14'
18'
10'
10'
10'
10'
The landscape plan should show at least 61 trees on site. including the 14 transplanted trees and
newly installed trees JlQt required for landscape c()de compliance.
The applicant must tag all trees for relocation and preservation prior to issuance of the land clearing
permit.
The plan should continue in the normal review process.
KH:ad
Time: ForesterlEnvironmentalist
Secretary:
1 hr. @ $23.28/hr. = $23.28
.25 hr. = $ 3.49
Total: $26.77
fD) I\'
l~~!
L.
-.
'1 " \\y R r"'
"j \ I \, IS fI
_::-'] \ l II
'I
I I'
t$ ISS5 ~,
MEMORANDUM
Utilities # 95-274
--- --------~
-~:\ll!<;'.G 3W
__L0.!,:,i.i l)':.,-T. _' \,
TO: Tambri 1. Heyden.
Planning & Zonin
FROM: John A. Guid ,
Director of Utilities
Date: August 25. 1995
SUBJECT: Grove Plaza,
Master Plan, Third Review
Staff has reviewed the above referenced project and offer the following comments:
1. Utilities has no additional comments.
It is our recommendation that the plan proceed through the review process.
If you have any questions regarding this subject. please contact Skip Milor at 375-6407 or
Peter Mazzella at 375-6404.
sm
xc:
Clyde "Skip" Milor
Peter Mazzella il'
File
Skip Milor O.5hrs @ $19.16per hr.
PROJECT NAME: Grove Plaza
..:r vi hQ"^ ~ ~1 c~
FA~ 3S<?-S"'}Q6
CONTACT PERSON: NAME Charles
W. Desanti
PH('\Nr.
v .u. (407) 338-0395
FAX:
TYPE OF APPLICATION: Site Plan Review
FILE NO.: 95-003
1st REVIE\i COMMENTS DUE: 7t'l/9S-
PUBLIC NOTICE:
TRC MEETING DATE: 7 /;; / '} J -
,
RESUBMITTAL DATE:
2nd REVIEW COMMENT DUE:
LAND DEVELOPMENT SIGNS POSTED:
PLANNING & DEVELOPMENT BOARD MEETING: 7//,2 / q)/
CITY COMMISSION MEETING: r I JfJcj:>./
BOARD OF ADJUSTMENT MEETING:
a:project.X!:x
TO:
RECREATION & PARK MEMORANDUM #9
lo.~ ~ @.-~ ~ w rn,rnl
i ~', ' !, III
, ':... "'l "-""'5 !!I!
, i . /~ r I :~~;;J i, _.<~_j
Tambri Heyden, Planning & Zoning Director 1 !
;..,..~.._-~~~ I
I"... .""" \
Kevin 1. Hallahan, Forester/Environmentalist l< ~ jf, )r:;:;'~ctE1'~J' '>
Grove Plaza (2nd Submittal) - Revised
FROM:
RE:
DATE:
July 27. 1995
The applicant must submit an existing tree survey and indicate a tree management plan for the site.
There is a portion of the site which was an old omamental tree nursery. This information should be
provided as part of the master plan approval. The project should continue in the normal review
process.
KH:ad
RECREATION & PARK MEMORANDUM #334
TO:
Tambri Heyden. Planning & Zoning Director,
John Wildner, Parks Superintendent j J
Grove Plaza (2nd Submittal)
e..-'
j~lr~. ~ & ~ il W
JJI
PLANNING AND
ZONING DEPT.
FROM:
RE:
DATE:
July 27, 1995
The Recreation & Park Department has reviewed the above referenced subject and we have no
comments at this time. The project should continue on the normal review process.
JW:ad
MEMORANDUM
Utilities # 95-23 '
TO:
FROM: John A. Guidry,
Director of Utilities
Date: July 13. 1995
SUBJECT: Grove Plaza,
Master Plan First Review
.;
Staffhas reviewed the above referenced project and offer the following comments:
1. Palm Beach Health Department permits for water and sanitary sewer will
be required. (Sec. 26.12).
2. City water will not be supplied for irrigation, (City Compo Plan. Policy 3C.3.4).
It is our recommendation that the plan proceed through the review process.
If you have any questions regarding this subject. please contact Skip Milor at 375-6407 or
Peter Mazzella at 375-6404.
sm
xc: Clyde "Skip" Milor
Peter Mazzella jJ
I ..~
File
PUBLIC WORKS DEPARTMENT
MEMORANDUM #95-116
r,---- .
lroJ ~ @ ~ 0 Wi ~ fn1i
IIJl) II n I 3!9'JS ; ~'
J
PLANNING AND
ZONING DEPT. ~S
TO:
Tambri Heyden, Planning & Zoning Director
FROM:
Robert Eichorst, Public Works Director
SUBJ:
Site Plan Review - Grove Plaza
DATE:
July 10, 1995
The applicant has agreed to re-visit dumpster locations at this site with the Public Works Director
as they are not acceptable at this time.
bert Eichorst
ublic Works Director
RE/cr
BOYNTON BEACH POLICE DEPARTMENT
TRAFFIC UNIT
I~~-~?-~-_._... '1
rr' ! i' :, r;; r ~' I
f f \oJ) r'~-:-:" , ' b r -~ 1 ~
~ ~ i .: ~
, \ ~
i
i
j
~~
TO:
FROM:
DATE:
REF:
Planning & Zoning
Ofc. Riggle
July II, 1995
Grove Plaza
After meeting with parties involved witb-.Jbe"Opri~tion QfJb.is project, I believe that they have
an understanding into the severity of;::~~:~~~.i.m~:E~gardii}g'~fic flow and safety. I have no
negative comments at this ti:f~ "(:';',;;fY ''-
.:....... :..:'
............
...... .
.:.... ..........
.. ... .......
:;~
\\:. ...
.....,:;::......;....~:J
RECREATION & PARK MEMORANDUM #95-312
TO: Tambri Heyden, Planning & Zoning Director
FROM:
Kevin J. Hallahan. F orester/Environmentalist
K. ~ H- rr..:.....:\.-~--_.._.__.,._.,.... _.'
11 t :....
f: ,.'.
i : ~.s-::: ;
RE:
Grove Plaza
DATE:
July 12, 1995
)'7
~__....__-i
The applicant should provide information on the existing trees within this site. A tree survey may
be required since part of this property was once a commercial tree nursery. The applicant must
also provide landscaping/irrigation plans for this grass median on Hypoluxo Road, adjacent to the
property. This is in conjunction with the City comprehensive plan. The plan should continue in
the normal review process.
KH:ad
uEVELOPMENT DEPARTMENT
ENGINEERING DIVISION MEMORANDUM NO. 95-238
TO:
Tambri J. Heyden, Planning & Zoning Director
d(~~m Hukill, P.E., City Engineer
July 13, 1995
FROM:
DATE:
RE:
GROVE PLAZA - MASTER PLAN REVIEW
Subject master plan appears approvable subject to the following general
conditions:
1. Platting
2. written explanation of storm drainage system
3. Correct south landscape buffer
4. Provide eastbound traffic only on south service road
5. Review location of distribution lines near south property line
with respect to landscape buffer, service road and wall
6. Provide approximate phasing plan
In addition, the following comments must be complied with as you proceed
toward construction, although most of them can be dealt with later in
the site planning and/or platting process. They are presented to you
now to provide advance notice.
1. Provide drainage calculations. Chap.4 Sec.7F1, pg.4-6i
Chap.6, Art.IV, Sec.5A, pg.6-7
2. Provide Certification by Developer's Engineer that drainage
plan complies with all City codes & standards. Chap. 6,
Art.IV, Sec.5A, pg.6-7 & Chap.23, Art.IIF,pg.23-8
3. All swales, detention areas & disturbed areas must be sodded.
If not irrigated, use bahia sod. Chap.7.5, Art.II, Sec.5C6,
pg.7.5-15
4. Minimum 15" pipe must be used in storm sewer. Chap.6, Art.IV,
Sec.5A, pg.6-7
5. Top of drainage pipes must not interfere with subgrade.
Chap.6, Art.V, Sec.4B2i(6), pg.6-20
6. Minimum pavement width 22'. Chap.6, Art.IV, Sec.10C, pg.6-11
7. Parking lot section must conform to City code. Chap.6, Art.IV,
Sec.10F, pg.6-12
8. Provide dumpster location & details, including drainage.
Chap.7.5, Art.II, Sec.5J, pg.7.5-18 & Chap.9, Sec.10C3, pg.9-4
9. Photometries must be approved for both pedestrian and parking
lot lighting before building permit can be issued. Chap.23,
Art.II,A1a, pg.23-6
10. Parking lot dimensions, striping, aisles, stalls, radii,
signs, landscaping, etc. must conform with City codes and
standards. Chap.23, Art.II, pg.23-6
11. Wheel stops or curb required, all stalls. Chap.23, Art.IIE,
pg.23-7
12. Provide 27' backup area, all stalls. Chap. 23, Art. II, 11,
pg.23-9
13. Parking stall minimum 18' long. Chap.23, Art.II,I1, pg.23-9
WVH/ck
C:GROVEPL7..COM
July 13, 1995
I
!
L.
BUILDING DIVISION
MEMORANDUM NO. 95-233
To:
Tambri Heyden, Planning & Zoning Director
From:
Al Newbold, Deputy Building Official
Re:
Grove Plaza
Southeast corner of Lawrence Road and Hypoluxo Road
Because of the short time we had to review the plans for the
above project building made no comment at the 7/11/95 meeting,
however, we would like for the applicant to be made aware that at
the next stage review he needsto address the following:
1. Signage.
2. Setbacks from the property line or phasing line.
3. Handicap ramps and access walkways from the road to the
entrance of the building.
4. Elevations and floor plans.
5. Each phase must have enough parking, etc., to comply
with the code for each building within that phase.
AN:mh
cc: William V. Hukill, P.E., Department of Development Director
A:GROVlI.TRC
rn
oo~owrnfR)
.". lEJ
FIRE PREVENTION MEMORANDUM NO. 95-297 WD
TO:
Planning Department
FROM:
Fire Department
DATE:
July 17, 1995
RE: Grove Plaza
Lawrence Rd & Hypoluxo Rd
(SE corner)
SBMP 95-001
We have no objections to this project at this time.
//; # -j& />- ~il7
/ c' -C l-Crc:'a--- . ~ -U~L uc---"t.. Y/
william D.Cavanaugh, FP
PARKS AND RECREATION DEPARTMENT
MEMORANDUM
FROM:
Tambri J. Heyden
Planning and Zoning Director
John Wildner ~
Parks Sup. /.
July 17, 1995
TO:
DATE:
SUBJECT:
Grove Plaza First Review
Recreation and Park Department has reviewed the above-referenced
has no comments at this time.
xc: central File
PLANNING AND ZONING DEPARTMENT
MEMORANDUM NO. 95-349
TO: Tambri J. Heyden
Planning and Zoning Director
FROM: Dan DeCarlo
Assistant Planner
DATE: July 12, 1995
SUBJECT: Site Plan Review - 1st Review
Project: Grove Plaza
Location: S.E. corner of Hypoluxo Rd. and Lawrence Rd.
Agent:
Charles W. Desanti
File No.: SBMP 95-001
Please be advised of the following comments relative to the review
of the master plan for the above-referenced project, pursuant to
Chapter 2 and Chapter 3, Article IV, Section 3 of the Land
Development Regulations:
1. Master plan approval is based on premise that site plan
approval must be obtained for each of the six parcels as
they are developed.
2. A buffer wall along the south property must be shown on
plan to screen the residential area to the south.
3. The traffic analysis should be expanded to include left
hand turning lane for Hypoluxo Road into entrance into
development median break. Due to phasing of project, at
time of site plan review of each parcel, additional
reviews must be made to determine impact of turning lane,
interior traffic, signage, and one way traffic proposed
that connects the back of the parcel.
4. The necessary landscape appeals must be submitted
immediately to rum concurrently with Master plan approval
by Planning and Development Board and city Commission.
The outcome of these appeals impact interior property
lines.
5. A master storm water management plan (sec. 3,T) must be
submitted showing impact of phasing as proposed. (This
plan is required regardless of whether phasing is
proposed. )
6. Show loading zones for each parcel to ensure at time of
site plan approval that all parcels proposed are large
enough to accommodate loading zones as required.
7. Computations for required number of handicapped parking
spaces shall be shown along with location of the
handicapped parking spaces being delineated on the master
plan. (see # 1 )
8. Show on the master plan the buildable area within each of
the six (6) parcels including the setback dimensions.
(see #1)
9. A reference to phasing the project shall be noted on the
plan.
Page 2
Comments for Grove Plaza
File # SBMP 95-001
10. staff recommends the south access aisle be completely
installed with development of the east property line of
the proposed parcel development.
ex: Build parcel F. with complete entire access
aisle
ex: Build parcel C. with complete entire access
aisle to the east property line of parcel C.
11. Change the title of the plan to read "Master Plan."
12. Cross access easements shall be shown on the master plan.
13. All proposed easements shall be shown on the master plan.
14. It is recommended that a note be added to the master plan
that will carryover and be reflected on the plat
document that states that signage and building design for
all six parcels shall be unified in appearance as one
plaza.
15. A master property owners' association agreement/documents
for maintenance of common infrastructure will be
necessary for review by staff, prior to recording and
prior to platting.
MEH:dim
a:l&trevco.Qro
TO:
FROM:
SUBJ:
DATE:
PUBLIC WORKS DEPARTMENT
MEMORANDUM #95-135
Tambri Heyden, Planning & Zoning Director
Robert Eichorst, Public Works Director
Master Plan - Grove Plaza (2nd submittal)
July 28, 1995
The Public Works Department has no problems with the above site.
RElcr
rn~~~~Wffirn\
~.~,~_... ....-.--.\! \1\
L-.. 'c. L:
PLp,mm~G AND
ZONING OEPI
bert Eichorst
ic Works Director
ENGINEERING MEMO # 95-269
DATE: July 28, 1995
TO: T AMBRI HEYDEN, P&Z DIR.
FROM: KEN HALL, ENG. AIDE PHONE: 407-375-6283
SUBJECT: GROVE PLAZA - 2nd REVIEW
COMMENTS
1. All plans submitted for specific permits shall mect the city's code requirements at time of
application. These permits include, but are not limited to the following: Site lighting, Paving,
Drainage, Curbing, Landscaping, Irrigation, and Traffic Control Devices. Permits required from
agencies such as the F.D.O.T., P.B. County, S.F. W.M.D.. and any other permitting agency shall
be included with your permit request.
2. Provide an eight foot pedestrian/bike path along Lawrence Road. Traffic Circulation Element
ofthe city's Comprehensive Plan, pg. 65-66.
3. Provide only two driveways onto Hypoluxo Road. Chap.23, Art.2H7, pg. 23-9. Note: If
subject property is subdivided, consideration will be given to additional driveways onto Hypoluxo.
4. County permits required for driveways onto both county roads prior to city permits. Chap.23.
Art. 2H6, pg. 23-9.
5. Consider two way traffic on service road to facilitate efficient and safe, on site traffic
circulation within the development. Chap. 23, Art. I, Sect. A&B, pg. 23-1, and Art. 2B, pg. 23-7.
. KRH/krh
C: William Hukill, Dev. Dir. and to file
grplaza.2rv
MEMORANDUM
Utilities # 95-243
fD) ~ @ ~ II W ~ i~
lill Jl 2 8 1995 ~
TO:
Tambri J. Hey
Planning &
Plfl-NNING AND ",> S
ZONING OEPT. ~
FROM: John A. Guidry.
Director of Utilities
Date: July 28. 1995
SUBJECT: Grove Plaza,
Master Plan Second Review
Staffhas reviewed the above referenced project and offer the following comments:
1. Gravity sanitary sewer system does not show connection to an existing system.
Please show on your plans that in fact you can reach an existing gravity
sanitary sewer system, (Sec. 26.16 (a)).
2. Once approved for use the developer shall provide unobstructed stabilized
access to the water and sanitary sewer mains and appurtenances at all
times, (Sec. 26.33(a)).
It is our recommendation that the plan proceed through the review process.
If you have any questions regarding this subject. please contact Skip Milor at 375-6407 or
Peter Mazzella at 375-6404.
sm
xc: Clyde "Skip" Milor
Peter Mazzella
File
RECREATION & PARK MEMORANDUM #334
TO:
Tambri Heyden. Planning & Zoning Director .
John Wildner, Parks Superintendent /' .j
Grove Plaza (2nd Submittal) tl
1m ~@ ~ U \l7 lIfiil'
"U '- 7/995 ~i
FROM:
RE:
PLANN!NG AND
lONING DEPt
DATE:
July 27. 1995
The Recreation & Park Department has reviewed the above referenced subject and we have no
comments at this time. The project should continue on the normal review process.
JW:ad
Sh~--,
OiL
FROM:
Kevin J. Hallahan, ForesterlEnvironmentalist
I, j) / /~
-r-, ( /Ivf/
RECREATION & PARK MEMORANDUM #95-331
TO: Tambri Heyden, Planning & Zoning Director
RE:
Grove Plaza (2nd Submittal)
_oj'
v
DATE:
July 27. 1995
The applicant must submit an existing tree survey and indicate a tree management plan for the site.
There is a portion of the site which was an old omamental tree nursery. This information should be
provided as part of the master plan. The project should continue in the normal review process.
KH:ad
RECREATION & PARK MEMORANDUM #95-331
TO:
Tambri Heyden, Planning & Zoning Director
FROM:
Kevin J. Hallahan, ForesterlEnvironmentalist
h~!,/!, .
. - '" / (
{.. ...-
..-._~ .
PL4NI\,"f~IG
'.,., ' . I "^,'D '
'.} "t.. ,.,.,
n ....'~'::!i; ;)CPT \." \ -"-
-~
RE:
Grove Plaza (2nd Submittal)
~
DATE:
July 27. 1995
-_.__.~,
The applicant must submit existing tree s d indicate a tree management plan for the site.
There is a portion of the sit . as old ornamental tree nursery. This information should be
provided as part of the master plan. T project should continue in the normal review process.
KH:ad
:yJ~' - fcjl~ j:t
f,~~~, ~~ f rvrifJP~
" J-LfJ/yJ .. tfJV ( ;r
r~ I ~ fjV~.L fVl) · ff
t. c, lJJi.ff · v /
~i r if ~~ r, '
J fJff" 1 ( y})
~. f f^. . %
aJf;& 0 ~~/-v - _
~ r ^lc~~
f44f! /
A;r ~V '. p,-t.
,/1 ~
}/ ~7' tJ-y
jeV D'.FYl-~Y-(
rA-~j~p fr-~
Jb vi-'l-- ~ V''-
. /v 1/
1 ~y,#:' n v~/
v'Y I,v- /J
~ ' /if,
rp' Pi
.
~ \'"2- f'~0
~\ \(( (O~.
~
'-)'J \: "CV'
--;'? /n ,$ ~
CJ:> '
~ .'Y"' ~J ) /
~~
roJ mmrnuwrnfn)
Ul1 MITIIIi ~
FIRE PREVENTION MEMORANDUM NO. 95-297 WD
TO:
Planning Department
FROM:
Fire Department
DATE:
July 17, 1995
RE: Grove Plaza
Lawrence Rd & Hypoluxo Rd
(SE Corner)
SBMP 95-001
We have no objections to this project at this time.
~dYW-.- '~d/~U2<-I:'
William D. Cavanaugh, FPO;r
July 13, 1995
---...
BUILDING DIVISION
MEMORANDUM NO. 95 - 233
From:
Tambri Heyden, Planning & Zoning Director
Al Newbold, Deputy Building Official
To:
Re:
Grove Plaza
Southeast corner of Lawrence Road and IIypoluxo Road
Because of the short time we had to review the plans for the .
above project building made no comment at the 7/11/95 meeting;
however, we would like for the applicant to be made aware that at
the next stage review he needsto address the following:
1. Signage.
2. Setbacks from the property line or phasing line.
3. Handicap ramps and access walkways from the road to the
entrance of the building.
4. Elevations and floor plans.
5. Each phase must have enough parking, etc., to comply
with the code for each building within that phase.
AN:mh
cc: William V. Hukill, P.R., Department of Development Director
A:~1l0V..TIlC
'Tv ~ ;"'\~ \\(.l.c~'V
f r::) '. Y" "~~C""' '0 ~ ( c2..A 0
Q E - (C;'.n ~,,~ ~> Ey<.; V..... -\-\'(\.(. C
-7/1 7-/ 'I '::)'
~
A \<<.~ ' ~~. ~'-"0~._\ ~" G<:C\'''I \\ C. '1.G, 'oc;~~. () .',"\ ~\o,...\
. . ~
c."'J S '-' '0 '."{\ \.~~ .~ -C:,\ ~\ ~ \j '~'-'~
Q~,~. ~
p<t~ .~- 4
\1\ c;,"::,~- ~.)\s;:'-" G:.. ,*<\
~c 3
\) I' \ c:.:~k' ~ Cf..... C, :.X? -:z~. c ~
op~) " .~ <i(;.~ ~~\ ~).~ \
, "
\-JC~ " ,'J... \< ~ c:.
-) \\C',,\ .~ Ox
lC .. '-....
'2)
\2.~ '-' .;,....'- ~
v.."\.~'<....-
3)
b~~~ 0:.... P',""""''-'''-\<::'''k' -\~\- s~ D\."-'''
C'".\...>\l. \\ ,~\. ~" EGc \'" () -=\.-l~ ~. '"^-
A,I.' ,."'-\(: ~" (',. A \\ 01.. ~\"'\\" s~, -,,~,(.Ao-~~
\ ,'"" 0r<J '0 y,:- C")\ Q....... C::;0, <.; ,(; \. Sc;,
:.) \ ,\ .. '-- "-
.\;\ ,:/.....;< :s\I.:,'~.(~..~....
L<.<
r),.....~,.. '<... \
"!-. .. ...
,
\.\'" . C~
\ l '
1..~,CWc...~ (;,
,'\'- 12 ~ \s.
'"\(C,..'~
\ ( -"',(
o ..1, \'':',t .\
G
I ,...~
,",\ :>..4-= \
..... ." .....,"\
(:::J'-.. f':k.-""'\' \~.
~'1)o. V\ .
~~
C1--"c ..\<
\" -I. _...... .;)
&\
~~-.:.,-~,",
E::. t:., '- \.... 5'\ < ...... c \ ,--' .-"<. 11\.v :; \ .f<..l.. \ \
C \ :.'__ ~~- .n- \ ,\(
~?? ~-<:'......'""-~ -,' .,.......~~~ ,~..)~"''"',
'-' ...'\ ~~~-
~'\'\ e \.(.:. \'\..) :_\
'"'t'.:'. .
;-(.(' \...,' .'.<.:. -:y-..J.....,'- \:~
)
c.."-."
"- \ \
\).'....> \ c_~-, ~"
r'.~ ,
\ ;'\~- \\
n\.) . .' '-~~:)..\
,\:->'-.(y, ,.;... t\
p<.c':""":" ~ \..
<\ <' _,\ c\. .,,~ .", ,', c" c\ ..., "-
- - -...... (- -...i ...... --.... - <:.
. r \
\C:l. ......-;., -'rc.:> < ~\ '" c:::;, 'V l...:l ~ c.
\ \ \,
~~ -..: I.i..\.() (;> 'r~\ '\ ~~l............__
, .
\) J'" ~ 6"-~ s\ "-\ C f) "~)- (: ( \. c_~ ~ ~ \-<'-c v _\ ,-'2,J ,~.....' .c...:.,
(\\-'<'~\ ~:..~ -I.....\C~\... '\-c, J<< ~.'\"'<("''''~ ,-,"" ;-)<,.\t..\ 0
, ....... \
'\\'~" -\ \..:" :'."__\ \.,-<\~ ,.,'..\....... ...< \,r, \ ,\-'...<.. \ S' \'S'C\C..t~\. !
<:~~( ~~'~'i1,;~~:~"""='-q"-' .~~C:\.\ I.._~<"-\ ~'C-(-" \..c t);':';:)C-<:>\.~
r.... \.r:', --') \. ~~ \)1.... l \.L C~::- \.. \....... ,~L.............. \. '\ y,,\ '--..; .\. \ ~.s......
Ce, \ .['~ l \ - 0 ~ t.,i" <" ~c l, ..-:; < t.::. \ ,-{ c. .... \.. -::'> :S \., (" <.: k I(. ~ \. V--..A \,
~ t'".~ '~\
Ct ;J P :..c;: '..k.. .~, ~
. '
r:; P\J"~~ <',;\'-Q-":-\ ~ "'J.? .,<:.' (:Q~(> C\V'"' 2. ('.~~... ,~~ ~
p<...: '~\'J \--=. ("> c ,:<\\. -::( ':".', . ,~''\ ~____\-Q. ~ '
.0\0... C\<*C 'Q!.. ~~'--.....:., C:p,,<.....r,;\-,. Lq ,-./Y:::J:.. ('fA-- 0\;::' '\ <", \.c....,\ ~
"\...... ~ " \ "
\)<.i '\ ~;,~) ~'C \/"'-. C ~,">Lo :- Eo:.., ,.., c- ~ <::""-X .;F"~ '....I.!.\ '-c, ~ \ N\'u ')~.. ?'-Q,...,
C\()? t-Q\,.,c..& '..
'1)
p.
~)
C'
.\(;..... ~'-.
\<l. .'. \:
'-\-e
(-J
lc--..:......c.~<....c =>--'.
\:,....:..\.....-.;~'<.., \..'
c, (<'.c :::" ~
'-0
~ f't\ Q<JL
~) . ~ b rn f-\-.e ~
i)\":'S\
"'--" \.'\.c......... -, "
- "" -
c' ,....
~c.
.~
.:')\Q.:\
~ c: \-....;L~
c. _ ':~2...s.::~_
(. r'\ "", <
. !\ -, ....,.>";:,
."'.....c..v, ~ \'-..:Jt '" \ ,~'--~
~...-"-~\j,,,.,<....9- '-,"'~~j
~,
"\';',<" \_~-'<..
./("~~
\0 ,'-~..\.. .
.J~"'\"_ ....-....)'.~-
:s n.c- .......;, \ \..,i
pc" ( ~<... ~;, ') (V\ ,)~~\
() ~:S, \1...;\ . <:;. C,':> 'v P\;;;o"'-..k ~ .
~ -J, ....'\ " ~
'0..-,
J,
:;'<'-0. . \ q.~ "- ~ 'f-sLv.\
\ -v ,")ell '\ _ ,::.
. \ ,,-.
GROVE PLAZA
Response To Staff Comments, 7-11-95, TRC Meeting
BUILDING DIVISION
1. Signage will be shown on detailed site plans submitted with each phase.
2. Setbacks from property lines will be shown on detailed site plans submitted with
each phase.
3. All handicap ramps and access walks will be shown on detailed site plans submitted
with each phase.
4. Building elevations and floor plans, with all exterior colors, will be shown on plans
accompanying detailed site plans submitted with each phase.
5. Inasmuch as the phase lines may change slightly based upon the final order of site
plan submittals, the final parking layouts may also vary. In any case, each phase or
use will meet minimum parking requirements when submitted.
CITY UTILITIES
1. Palm Beach County Health Department permits will be obtained for the site
concurrent with building permit applications.
2. Landscape irrigation will not utilize City water.
FORESTER/ENVIRONMENT ALlST
A detailed site survey accompanied this submittal. No additional trees remain on the
site. Each phase or use will provide detailed landscape and irrigation plans for its
portion of the site and the adjacent Hypoluxo Road median.
PUBLIC WORKS DEPARTMENT
The master plan has been revised to redirect the dumpsters located along the rear
drive. The rear drive has also been made one way, west bound only. Should additional
location refinements for dumpster pads be necessary, they will occur with detailed final
site plans submitted for each use.
FIRE DEPARTMENT
No response required.
(1 )
POLICE DEPARTMENT (TRAFFIC UNIT)
A detailed discussion of this departments concerns occured at the TRC Meeting. The
applicant has revised the rear access drive to be one qay, west bound only. In addition
dumpster locations were revised to facilitate traffic flow. Final site plans submitted with
each use may show additional internal traffic control pavement details should they
prove necessary.
CITY ENGINEER
1. In the normal course of pre development permitting the parcel will be platted. It is not
certain at this time of it will be a boundary plat or subdivided into two or as many as
six lots.
2. A written explanation of the storm drainage system has been provided with this
resubmittal.
3. The south landscape buffer has been corrected to accurately reflect its 20' width.
4. The south service road has been revised to one way west bound only. This was the
consensus of other staff members at the TRC Meeting. The applicant does not share
the staff opinion that internal vehicular circulation will be improved with one way
traffic, however we will continue to work with the Committee inan attempt to reach a
reasonable and functionally safe solution.
5. A letter from the Surveyor of record is attached with this resubmittal. That document
verifies the fact that no poles, overhead lines or utility easements exist north of the
south property line of this tract.
6. Phase lines have been added to the revised master site plan. It should be noted,
however that these lines may vary depending upon the order in which uses are
submitted.
JULIAN BRYAN & ASSOCIATES
7-19-95
(2)
BOYNTON BEACH POLICE DEPARTMENT
TRAFFIC UNIT
m~@~o
In f
'1.
: :: ~
~. .! '
i -"j!
ilfT -.: .....~
~ -~ !
. ..,
.1
..~
TO:
FROM:
DATE:
REF:
Planning & Zoning
Ofc. Riggle
July II. 1995
Grove Plaza
After meeting with parties involved witb.'llte''Cpn~~ri Qf.tll.is project, I believe that they have
an understanding into the severitY oj;"~@:;:Co~~.dm~;rJgardii1rtriln.c flow and safety. I have no
negative comments at this tim~~:;i) '~;E::~~~;;:~::::~::~r'" ..>.....~:. l' jf .....;}
<:::,>,~..::~
......;:-.:t-
Ofc. ~~b't\~:;
.:...... :...:.
"::.::'
L~/J.
(~.~- 1//'~f(,' ~,"vO;;0
~ ./'
............................-..
~j ....:\
. .
. . .
. .
. .
. .
. .
. . .
. ..
. ......
...............................
. "..
. .
. ..
. -.... --. -.
". ..-.................. ....
-. ".".
. . "..
.. ..
. . .
:,... .:~
.~ ;:'
. . .:-'.':
. .
.. -..
. . ...
'. ,....................." .........
".' .." ,"..
. ... .
. d" ..
..... ..........-.;...:............. ...:.:.'.
-
---;,~-- ;AJ:; ~,/!'/!'/)
:. .:
tJ
_ /\./., .::t ..-:?J"^,
..:.,x-:- .crV~' ,--t.. ~.
~ .' , /1.- A ! k/'J) / S VI.; ~ ~
1-- I c.~u. c; i/'"
,
..- /.' '" " ./' -~.-.-
,: .' e-- '\ ...'
..,.-.....' ...I'~"-
. ,.-.-..... /'" -
...:.".x.. .
f./:,'J-::':,.
:~{/{ )$
.: '. .;.;-=.' ;.'
. .
)/'.1 1/: t !'-=',...-.J
:..... ~.
.::' .~~;:~::~:~;...;::-.
.'. .'. ....
.. . ..
...... ....
/ .~; :? ~-:
......:= il
''';'.-.-:
ENGINEERING DIVISION MEMORANDUM NO. 95-149
(:)
WI
~)0
~~I ;J!.' /"
Lf ~
FROM:
Tambri Heyden
Planning & Zoning Director
/JJIi&am Hukill, P.E.
Lfl;rY~Engineer
TO:
DATE:
May 11, 1995
RE:
JTB III
The sketch you left for us to look at appears to subdivide a
property at the corner of Hypoluxo Road and Lawrence Road into
three lots. LDR Chapter 5, Article II, Section 1, page 5-1
entitled "Waiver" specifies when platting can be waived. This
sketch does not fit the waiver conditions because it is subdivided
into more than two contiguous lots.
WVH/ck
C:JTBIII
F~::;- '5' ~f2 ~_. n IW 17. rU\ '
'! ,I I, '0, 12 lJ \:' i5 I"..
, i ~)! c""",-,--~o.lli"
!Jwl I~~
PLAt..!Nlfl1C: M"D
zof\'f!~G' ciErI.
.,I
PLANNING AND ZONING DEPARTMENT
MEMORANDUM NO. 95-506
Agenda Memorandum for
september 19, 1995 City Commission Meeting
TO: carrie Parker
City Manager
FROM: Tambri J. Heyden 7~
Planning and Zoning Director
DATE: September 14, 1995
SUBJECT: Grove Plaza - SBMP 95-001
Master Plan
Please place the above-referenced request on the September 19, 1995
City Commission agenda under Development Plans.
DESCRIPTION: Charles W. Desanti and Julian Bryan, agents for Dr.
Wal ter Lanke and Ms. Auce Fay, proper1:y owner, are requesting
master plan approval to initiate subdivision of a commercial site
into six (staff report incorrectly indicates five) separate
parcels. The 8.23 acre site is located at the southeast corner of
Hypoluxo Road and Lawrence Road.
RECOMMENDATION: The Planning and Development Board, with a 4-3
vote, recommended approval of this request subject to statt
comments (Utilities Department Memorandum No. 94-243, Engineering
Division Memorandum No. 95-323, BUilding Division Memorandum No.
95-233, Parks and Recreation Memorandum No. 95-394, Planning and
Zoning Department Memorandum No. 95-482 and the September 12, 1995
comments from Palm Beach County Traffic Division regarding
dedication of rights-of-way for the expanded intersection at
Lawrence Road and Hypoluxo Road and phasing of construction to the
widening of Gateway Boulevard from Military Trail to Congress
Avenue and to the widening of Lantana Road from Militay Trail to
congress Avenue). The September 12th letter from Palm Beach County
supersedes their August 4th letter and indicates that traffic
concurrency can now be certified sUbject to compliance with their
right-of-way dedication and phasing comments.
TJH:dim
Attachment
xc: Central File
e:CCA;enMe.G~~
SEP-12-1995 13:~5
Board of Count)' Conuni&&ioner&
Ken 1. Foster, Chairman
Burj: Aaronson, Vice Chairman
Karen T. Mllrcus
Carol A. Roberts
Warren H. Newell
Mcuy McCarty
Maude" Ford Lee
22222222222222222
-,4l2l7 478 577l2l P.l2l2/l2l3
Count)' Admi11i,trator
Robert Weisman
Depanment of EngIneering
and Public Works
September 12. 1995
Ms. Tambri Heyden. Oir.ctor
Boynton Baach Planning and Zoning Department
100 ~. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach. Fl 3342&-0310
R[I GROVE PLAZA
Dear Ms. Heyden:
The Palm Baach County Traffic Division has reviewed the revised traff1c 1mpact
study for the proje~t entitled G~ove Plaza, pursuant to the Traffic Performance
Standards in Article 1.9 of t~e Palm Beach County Land Development Code. The
proposQd project will consist of 18,000 square feet of general retail. 3,600
square feet of bank with dt"ive-through and 7,200 square feet of fast food
restaurant with drive through. The build-out has been rcv1sed from m1d year 1996
to the end of 1996. The pt"cposed proje~t will generate 4,788 da1ly trips. given
a 5% inte~nal;zation ~ate.
The traffic study corrects the def1t1ency Of the earl1er traffic stUdy. It
addressed the t~affic on Gateway Boulevard. The project 1s required to phase to
the widening of Gateway Boulevard from M1l1tary Trail to Congress Avenue. The
project can bllild development generat1ng up to 1,083 external daily trips before
the contrlct is let for th1s roadway improvement. This roadway improvement is
schedll-l ed for FY 96/97. .
The projet:t is aho requ1red to phase to the widen1ng of lantana Road from
Military Trail to Congress Avenue. The project can build development generating
up tu 3,492 external daily tr1ps before the contract is. let for this roadway
improvement. Th1s roadway 1mprovement is a requirement of the Winston Trails
PUD. They are requ1re to pay for the lmprovement by the end of 1995. I do not
have the proposed contract letting date at this time.
The Traff1c D1v1s1on has determined that, based on the phasing of the project to
the w1den1ng of Gateway Boulevard from Military Trail to Congress Avenue and the
widen1ng of Lantana Road from Military Trail to Congress Avenue, the project
meets the requ1rements of the Traff1c Performance Standards of Palm Beach County.
If you have any questions regarding this determination, please contact me at 684-
4030. .
,
@ prlnloq "'; 'PCy(:/QtJ 1"'iX'f
"..IU1 Equal Opportunity - Mfirml1tive Action Employer'
Box 21229 West Palm Beach, Florida 33416.1219 (407) 684-4000
5EP-12-1995 13:~5
22222222222222222
-4~7 478 577~ P. 03/03
September 12, 1995
Ms. Tambrt Hoydon, Director
GROVE PLAZA
page two
Palm Beach County has programmed the widening of Lawrence Road for FY 97/987.
This will be a S-lane roadway within a rjght-Df-w~ of 80 feet. Hypoluxo Road
is shown to have an ultimate right-of-way of 110 feet. This will accommodate a
6-1ane roadway, although the widening ;s not scheduled at this time. Palm Beach
County request that the City of Boynton Beach require the development to dedlcate
or reserve the right-or-way necessary for the ultimate cross $ection for Lawrence
Road and Hypo 1 uxo Road, and an expanded i ntersett i on at Lawrence Road and
Hypoluxo Road.
Sincerely,
OFFICE OF THE COUNTY ENGINEER
~~4
Dan We1sberg, P.E.
Sen10r Reg1stered C1v11 Engineer
CC. William Huk1l1, P.E., D1rector
Boynton Beach Department of Development
F11e: TPS - Mun. - Traffic Study Review
g:\user\dweisber\wpSO\tps\boyn46b
,
TOTAL P.0:5
PLANNING AND ZONING DEPARTMENT
MEMORANDUM #95-481
SITE PLAN REVIEW
STAFF REPORT
FOR
PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION
September 12, 1995
DESCRIPTION OF PROJECT:
project Name:
Grove Plaza
Applicant:
Dr. Walter Lanke and Ms. Auce Fay
Agen t :
Charles W DeSanti/Julian Bryan
756 st Aubans Drive
Boca Raton, Florida 33486
Location:
southeast corner of Hypoluxo Road and Lawrence
Road (See Exhibit "A" - location map)
File No.:
SBMP 95-001
Land Use Plan
Designation:
Local Retail Commercial (LRC)
Zoning
Designation:
Community Commercial (C-3)
Type of Use:
Master plan approval of a commercial site to
be divided into five separate parcels through
platting.
Number of
Units:
N/A
Square
Footage:
Site area:
358,412 square feet
8.23 acres
29,500 sq. ft. in six
separate buildings.
BUilding area:
,
Surrounding Land
Uses and Zoning
District:
North
Hypo! uxo Road and farther north
is Santaluces High School
located in Palm Beach County.
South
Agricul tural area located in
Palm Beach County.
East
Residential property
Knollwood Groves PUD
zoned,
West
AQricultural area located in
Palm Bp;:ll"'n ,..",..~.....
Existing Site
Characteristics:
The property is a vacant lot that was once the
location of a landscaping and nursery
business.
Proposed
Development:
The project will require future site plan or
conditional use approval for six buildings for
commercial, restaurant and retail uses. The
six bUildings will be located on five parcels
(see Exhibit "BI! - master plan).
Page 2
site Plan Review Staff Report
Memorandum # 95-481
Grove Plaza
concurrency:
a. Traffic - The Palm Beach County Traffic Division has
reviewed the traffic impact study for the
proj ect pursuant to the Traff ic Performance
Standards in Article 7.9 of the Palm Beach
county Land Development Code. The proposed
project will consist of 18,000 sq ft of general
retail, 3,600 square feet of bank with drive
through and 7,200 square feet of fast food
restaurant with a drive through. The build out
is 1996. The proposed project will generate
4,788 daily trips, given a 5% internalization
rate.
The Traffic Division has determined that the
project does not meet requirements of the
Traffic Performance Standards of Palm Beach
county. However, phasing or up to 23\ of the
project can be build up to 1,108 trips. Because
of the project's proximity to Gateway Boulevard
and the eXisting traffic volumes on Gateway
Boulevard, from Lawrence Road to Congress, the
project would be required to be phased in
conjunction with the widening of Gateway
Boulevard that is now scheduled for FY 96/97.
(see Exhibit "e")
b. Drainage - A drainage system consisting of an
exfiltration trench, catch basins and storm
sewer pipes will collect storm runoff and
convey it to the Lake Worth Drainage District
(LWDD) canal L-18 located on the north line of
the Grove Plaza site. The LWDD canal L-18 is
culverted by means of a 72 inch Rep in this
area. (see Exhibit "0")
Driveways:
Fou~ entrances into the proposed commercial
development are proposed. One entrance on
Lawrence Road that will allow northbound
traffic onto the site. Traffic will be one way
at this point. No traffic will be allowed to
re-enter Lawrence Road from the development.
Three entrances into the site will be on
Hypoluxo Road. The question of a pos2ible
traffic signal for one of these entrances onto
Hypoluxo Road will need to be addressed at
time of site plan review (see comment #1
Planning and Zoning Department Memorandum No.
95-482) .
Parking Facility:
The proposed parking facilit~; =:.:: ~'-_~_ _.:. _.._
five parcels shall contain the spaces required
for the uses located on the parcel. Each
individual parcel will undergo further review
at the time of actual site plan approval.
Landscaping:
An appeal to the city's landscape code is to be
filed to run concurrently with this master plan
application. The appeal is to the required
perimeter landscape strip adjacent to the
access corridors between the individual parcels
within the development.
Page 3
Site Plan Review Staff Report
Memorandum # 95-481
Grove Plaza
Building and Site
Regulations:
Building and site regulations will be addressed
and met during site plan approval for each
parcel. The proposed structures meet all
setback requirements in the C-3 zoning
district.
Community Design
Plan:
Requirements relating to the city's Community
Design Plan should be addressed for all six
parcels at the time of submission for site
plan approval for the first parcel to be
developed (see comment #10 Planning and Zoning
Department Memorandum No. 95-482).
signage:
Requirements relating to the city's sign code
and the Community Design Plan should be
addressed for all five parcels at the time of
submission for site plan approval for the
first parcel to be developed (see comment #10
Planning and Zoning Department Memorandum No.
95-482) .
REVIEW OF DEPARTMENTAL COMMENTS:
Below is a list of those departments that have comments regarding
this request. (see Exhibit "E" - staff comments)
DEPARTMENT
ATTACHED MEMORANDUM
Public Works
utilities
Fire
Police
Engineering Division
Building Division
Parks & Recreation
Forester/Environmentalist
Planning and Zoning
N/A
95-243
N/A
N/A
95-323
95-233
95-394
N/A
95-482
The Utilities, Engineering, Building, Parks and Recreation and
Planning and Zoning Departments' comments may be addressed on the
recitified master plan prior to platting. The remaining
departments did not have comments regarding their review of the
amended plans.
RECOMMENDATION:
The Planninq and Zoning Department recommends approval of this
Master Plan request, subject to the rectified master plan showing
compliance with staff comments and the applicable City of Boynton
Beach Code of Ordinance.
a;STPRPT.GRO
E X H I BIT
"A"
.
LC-~ATION MAt:
GROVE PLAZA
C~T~ 1~'}~Jr ~rf ~E~ · ~-G ; -, ~ - .
n I I . ::'r= ~, I !
LL IJ ~ j == - ' -
I !! s =
-'1"-
, { '..-
_--'_ I. ~"::::
I \~111,',r III .~~, J II r, ~
I -i.J:'o;"" TJ I 1~: i4J,q~ - '"
::'J..-)-~.' ,= ~
.JI u.f'J ,- : - 1\
~I .-:;; ~ ?too.., ,y<.t = ~
~! -, - -=i ~/ - ~
: .=::1 :' " :f:-1" ~ AG
)0.' · -< 1)' . .
If~--_~It;~t7\~ L ";'~:'h 1_ 1r:-1 L 1
~') R\:Ltl\31 H+?'\Y"- .~ _L.
. _ I' 1 _ ~-/ni. nTITIIIII) 1I111~ . ., ., 0" . ~ 'r'1 il (llfrl- r.rr.r {.
~f '.t\. ..1..11 II
~., ,..-:;;-
~ . ,:rjg. TTTTl Ii c
__ . 1.''\." ~ 11I11fl '- _ \. ~ Ie
I ' ..J h- i J.\.: ..,,; I ' , . ~ (' '.
.>. 'I ill)' . 0- . ", ~'" '
""" j- -- - - ;,/~1Ii~ -."0 UL ( ;j~\~ ",
ff
rj , "~_'! / :. lC.-=, [_d 'T1f'!f1I: 111.\1
J1~ ,.,-00 C-",,,'-L L ~D -.:..., /.11.'111 JJ!lUlU,~~t1;,~II(,'1'-
. ! ,., U.-JI~. J Il,J~..~ ~ AG. " ,; ~~L:, ~:~ \ c.~';'~.I'~~
. (!lxr ~ ~.::' ~iy'i '.. ."['1 \\1}-: _
1\ 11 TTi I - ~ - .;=.I ;:-'t"~'",:.:',~ ~~~,~\ 1\):-:1" 1'.0
-'/,jlll'~J,.IIU'~I'!""-:"H- "BOYNTON ~~1l ~~:;~ \nTrtJ I ,~H+E- 1-$
.... dL...l~~111~"du NURSERIES'" l-l"""'f"-o".~L~ ,,:, ~-:; ,.-l. ':....... I 1:= f\;:::~: .
_ \;:::::~;i]:~~:~.~:(~ L~~4~O -' ':;i~;~~ C~;~~..~.: 11r~ ",
r i t 7:;~~ . '=
E ~1AA:~ ", - -
--~,
~~..: _0 --- ~
-)\_.l-.l, : '::' . 0= I "SAUii:::::J~B" - j~l,:f."~T -I~" ~r;Ci
tl'51 1 ~ L~~~.O I -__=:olw!W41_~, ~ tzJ ,I II :
lEi 'I \r= I _ :_....~: [) 'l,:}l~'" \~ \ wdu
{~fi \. II ill - L ~ \\J i L .
. .~.... --- L-__.-J L ~t=:-~J::':
:"-1, 1/8 MILESV ~ --- -;:::.._n--'I.."Ar~'I.n ~.-I7\-T__Jr-
'0
PL.Afll.N/~r... . PEPf". q f'5_=:,j~- , ~. . I n I J I'I ,I .
I
~
SITE~
NIC::
r:
L
R1A
n~
PUD rr
'KNO~~:O~~J h-,:
GROVSSr =-=
1
1-~
~$.t\1.~
" ~ "
..
s:
~i
I
J
~!
~
RUU
I:AWAENCE~ ' - - - - - - -MAD - -- - -..-.- --'--80'RlW- '__,
, '
"
... n'
f
~
\ ~ - .r,___
~ ~ ~ lJ
iUI
I I
\ I ... ~I !It
I In 1\ ~ Ii i ~
~. ~H8
1"'-
... ------- ~
. I
t--.-.-.-
\'1
Ir .~ ~
II :/ /'\ ~ .!
ik,/. I 0 ~~I: =1' ~ J :b I.
10 : .! L ! I- r L, <
.' .:01 I
I a ./ :::]lJl
: ,\ 0, .e=' r; :':\
I I "- ~---: ..
'::-1---~--------~- ~- ! I
; " -::1 ,..
J ~0 ,it?l :! I
: I I ' ~ I !J--
,- ,---.J '-.-I ~: \ I
. I - 1! I I
i.ll~~,_-:=-~~ {___ i ~I
I -~ (..-~~. !
--------- 0-
.....
\1
~
R
~ -: ...,
!i-:~ - 1
I -, ~
~
t
~
o "
. ---'0 ----.....
'~
I
~I i I't- --- '\ II
dt ~i~U.\~ ~i
l --, ~ I ,.' ~ jl
l__~_- ~ I, ) 'I~I q
I ~J ~
I ' . \d- i ::
J--C
\I =1
Ii =1
u =1
~
/'
,
/ -
'.-!
o
o
.---..--
r
,
'..J
'-
, ~
',,-,
'"-'
r
.. ('-.
ii'
e., II;
~
.:.J
:::::t
o
....~..... -
...
_TN
\
'--
\\1
JBR
JuhDn BrYDn l Aaoollstes
ur-Don d..ton .It. plQl'Y\lnO
rezonl tw;I.
I
L_ :- !" !" ~ ~ !" ,. G>
!!Ie'" ;:S~ II;: ~ ~ ~ m
!:!%o m!!:; ,.. ,.. ,.. Z
n....!!J ,.,,..'" @e2 ,.. ,.. ,.. m
xx~!: ...I!! 1:0- - ! .. :II
o~'-'" cn;=z :a,.,c ..z... c ..
"'i~~ %.." .....;z ..... ;Z .. ,., )>
00,.. -4!:2t a .. c r-
~Jto,.. ."'z ....21 ai~ i 5 ~
nOZ Z
Ole". z:a.. "..I) " .. c
!!.~~ .... ~m. ,.,"" .. 0 .. 0
a:; .. ..
lena'" ii ='"~ .. .. -t
!l~ES ",0 0 :2
"'''c <..ot C .. .. m
c... OInC .. .. 0 en
:~!= ..%..
... .... 0_1: .. .. ..
.zz_ liE ~~. J=:a .. 0 '"
!\ !r:.j ~ % 0
!: mU "'~O .. ~ z
Jlil~. DO. !5j!!J ~ c ..
..
r:~ ~~ ;:r:~ .. m III
I. ~:i ... n ..
II ..... lalll ,. I i
j" il ~ot '"
1\ ..Ii:l ~E i; ~ I:
;l!- . =
2: "n ~ n
)1 "Ii n I
;Jm... oC! ..
SDO .... ~~ !~ I:
z" ii ..
~;I; Il" %!!! ..
0 I:
..~m III~ . ~
-,.. ~
" III Ie I)
!' ..
.. !"
;1
.'
il
l\
,I
'1,
'I
l !
I
.i
,\ :
I ~
\:
'I'
I.J.
b
....-
t ! ~ ~
~ .. .. ..
n n n n
! ! ! !
. . . .
j j ; !
i ... I E
... ; R ~
~ S n
o · ~
: ~ I i
~ ~ J :
III - ~ .
~ ; ,I ;
,11'1'1'
:I . . .
. ~ ; -
J J J i
.. 0 .
= = ::
.
~ ~
n n ~
! ! g
. .
... .
. c:
S I"
I a
n Ii
o n
:i ~
.. .
~ ..
III ~
i ~ ~
i I
J ,I
11 l'
j i
en
=i
m
~
~
'I
II
\\j
:i I
1
: \,
;
~ ~
,I
!\
I
I
il
Ii
U
I
I
I
.-
I
;~ .
:. I
li8,
I~j
I
~
I !
~
]J
"
!
~
)i
Iii i I I ~ ~
:" ':' 12 ? ~ ~ I I
r...:......
1111111111'1'111,11 , ,
11=1 II I; c,
............ I I
&I..~IS.:sIU.
Iilnlillil!ll!:lillilliln
.................
aaaaaaaaaaaa
'I
~
,
(;
III
::D
i
~
\A
prop.rty anal 'tala
market fea.IDIII ty oov.rn..-ntal proceSSlnO _
r MASTER SITE PLAN ) I , :~~1
I:~ I .<.. , ~:E ;
., iil ,
..
!~~ ., ':: GROVE PLAZA
E X H I BIT
"C"
4
, ,
[Joard of County Commissioners
. Ken I.. Foster, Chairman
Burt Aaronson, Vice Chairman
Karen T. Marcus
Carol A. Roberts
Warren H. Newell
Mary McCarty
l\Iallde Ford Lee
rror--.. "'. .
F' ',) 't'
fO) ,_:t_~:'1 ~
1 ",.j;
.' .
~ i r: \ t
'UUI
· il' ,t;, ,.jjlW
PLANNING AND \. c...
ZONING OEPT. ~,)
County Administrator
Robert Weisman
epartment of Engineerinl
and Public Works
August 4, 1995
Ms. Tambri Hayden, Director
Boynton Beach Planning and Zoning Department
100 E. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach, FL 33425-0310
RE: GROVE PLAZA
Dear Ms. Hayden:
The Palm Beach County Traffic Division has reviewed the traffic impact study for
the project entitled Grove Plaza, pursuant to the Traffic Performance Standards
in Article 7.9 of the Palm Beach County Land Development Code. The proposed
project will consist of 18,000 square feet of general retail, 3,600 square feet
of bank with drive-through and 7,200 square feet of fast food restaurant with
drive through. The build-out is 1996. The proposed project will generate 4,788
daily trips, given a 5% internalization rate.
The traffic study identifies Gateway Boulevard as being within its 2 mile study
area, but faH s to address the traffic vol umes on this roadway. As you are
aware, the existing traffic volumes on Gateway Boulevard, from Lawrence Road to
Congress Avenue, exceed the LOS D traffic volumes for both daily and peak hour,
peak direction traffic. The project would be required to phase to the widening
of Gateway Boulevard. The roadway improvement is scheduled for FY 96/97.
The Traffic Division has determined that the project does not meet requirements
of the Traffic Performance Standards of Palm Beach County. Phasing to the
widening of Gateway Boulevard is required to meet the Traffic Performance
Standards. If you have any questions regarding this deterrr.~nati:::n, plEase
contact IDe at 684-4030.
Sincerely,
fh,;.s;.,} (.r '; JOS 1':r-:.)
( .:.t y{, r..{ ..j ""
?Cj?L{ l'~..~. Lc.l~
I)~l ~'h/c,s
~.. ~ O.'..~
L\..' tf ,) ~.: ' .,
..I
OFFICE OF THE COUNTY ENGINEER
,~ J4-~
Dan Weisberg, P.E.
Senior Registered Civil Engineer
cc. William Hukill, P.E., Director
Boynton Beach Department of Development
File: TPS - Mun; - Traffic Study Review
g:\user\dweisber\wp50\tps\boyn46
"An Equal Opportunity - Affirmative Action Employer"
@ prll1red 011 recycled p.per
Box 21229 West Palm Beach, Florida 33416.1229 (407) 684-4000
~1.~
~$.t\1.
._ of'"\. \'
.. V
.
CARNAHAN. PROCTOR AND ASSOCIATES, INC.
Consulting Engineers . SUNeyors . Planners . Land Development Consultants
DRAINAGE LETTER
GROVE PLAZA
CPA 950404
Grove Plaza is an 8.228 acre retail commercial project located in the southeast quadrant
of the intersection of Hypoluxo and Lawrence Roads.
A Drainage System consisting of exfiltration trench. catch basins and storm sewer pipes
will collect storm runoff and convey it to the Lake Worth Drainage District (LWDD)
canal L-18 located on the north line of the Grove Plaza Site. The L WOO canal L-18 is
culverted by means of a 72" RCP in this area.
Water quality will be accomplished on site by means of dry retention in grass areas and
exfiltration trench. Furthermore to enhance water quality inlets will be located in
"Grassed" areas.
Benning and perimeter road elevations will be utilized to contain the twenty five year
three day event on site.
Finally finish floor elevations will be set above the one hundred year three day zero
discharge event.
19654
i:\wonJtf\wt.stv:lra.,mv.doc
6191 West Atlantic Blvd. . P.O. Box 4399 ' Marpte. FL 33063 . (305) 972-3959 . FAX (305) 97,l.4178
o.d. (3OS> 949.6826 . Palm Beach (..07) J64-0687
11930 Fairway Lakes Drivc, Bldg. 6, Suitc 4, Ft. Myers, R. 33913
(813) 561-2800 . Fax (813) 561-2821
E X H I BIT "E"
, ,
MEMORANDUM
Utilities # 95-243
~ m ~I m In Wl m 100
TO:
Tambri 1. Hey
Planning &
Pl^NNING kUO '';;, ~
ZONING OEPT. ,.-
FROM: John A. Guidry,
Director of Utilities
Date: July 28. 1995
SUBJECT: Grove Plaza,
Master Plan Second Review
Staffhas reviewed the above referenced project and offer the following comments:
I. Gravity sanitary sewer system does not show connection to an existing system.
Please show on your plans that in fact you can reach an existing gravity
sanitary sewer system, (Sec. 26.16 (a)).
2. Once approved for use the developer shall provide unobstructed stabilized
access to the water and sanitary sewer mains and appurtenances at all
times. (Sec. 26.33(a)).
It is our recommendation that the plan proceed through the review process.
If you have any questions regarding this subject, please contact Skip Milor at 375-6407 or
Peter Mazzella at 375-6404.
sm
xc: Clyde "Skip" Milor
Peter Mazzella
File
DEVELOPMENT DEPARTMEBT
ENGINEERING DIVISION MEMORANDUM NO. 95-323
RE:
GROVE PLAIA - 2ND MASTER PLAN REVIEW
---.;..-.
FROM:
Ta~j[i J. Heyden, Planning & Zoning Dire
~i3J;1am Hukill, P. E., City Engineer
August 28, 1995
t.:':, 29'(""0.
J"", .......:
TO:
DATE:
~
Based on our previous review, the following items remain to be
addressed:
General - #1 and #6
Future - #1 thru #13
Please consider the following additional comments:
A. project shall conform to County approved phasing plan
regarding amount of development (see attached County
Traffic Study Review.
B. All plans submitted for specific permits shall meet the
City's code requirements at time of application. These
permits include, but are not limited to the following;
site ligbting, paving, drainage, curbing, landscaping,
irrigation and traffic control devices. Permits required
from agencies such as the FDOT, PBC, SFWMD and any other
permitting agency shall be included with your permit
request.
C. The master plan is subject to the provision of Chapter 2
of the LDR Sec. 9C, pg.2-BO.
D. Specify the name, address, telephone number of the
applicant's agent. Chap.3, Art.IV, Sec. 3D, pg.3-4
E. Provide a statement that all utilities are available and
will be provided by appropriate agencies. Chap. 3,
Art.IV, Sec.3R, pg.3-5
F. Provide Traffic Impact Analysis. Chap.2, Sec.9C4h(S),
pg.2-BS and Chap.3, Sec.3S, pg.3-S
G. Provide a master stormwater management plan. Chap.3,
Art.IV, Sec.3T, pg.3-6
H. Site plan review & approval required. Chap.4, Sec.2,
pg.4-l "
I. Sidewalks are required on both sides of all local and
collector streets. Chap.6, Art.III, Sec.llA, pg.6-3
J. Provide Certification by Developer'S Engineer that
drainage plan complies with all City codes & standards.
Chap.6, Art.IV, Sec.SA, pg.6-7 & Chap.23, Art.IIF,
pg.23-B
K. Provide sidewalk locations' details. Chap.6, Art.IV,
See. lOT, pg.6-l4
L. Need SFWHD & LWDD acceptance prior to Engineering
approval. Chap.6, Art.VII, Sec.4B, pg.6-24
Engineering Division Memo No. 95-323
Re: Grove Plaza - 2nd Master Plan Review
August 28, 1995
Page #2
M. County and/or State permits required for construction in
R.O.W. Chap.6, Art.VII, Sec.4B, pg.6-24
N. Install appropriate turn arrows on pavement to supplement
left & right turn only signs. Chap.23, Art.IIBl, pg.23-7
O. Install one way arrow signs in medians for egress
driveways with no median opening. Chap.23, Art.IIB2,
pg.23-7
Additional review time 1 hour for Mr. Hall ($20.64) and one hour
for Mr. Hukill ($43.17), for a total of $63.81.
WVH:ck
C;(iROVEPI.7..lMP
"
BUILDING DIVISION
---
MBMORANDUM NO. 95-233
July 13, 1995
From:
Tambri Heyden, Planning & Zoning Director
A1 Newbold, Deputy Building Official
To:
Re:
Grove P1aza
Southeast corner of Lawrence Road and Bypoluxo Road
Because at the short time we' had to review the plans for the'
above project building made no comment at the 7/11/95 meeting,
however, we would like for the applicant to be made aware that at
the next stage review he needsto address the following:
1. Signage.
2. Setbacks from the property line or phasing line.
3. Handicap ramps and access walkways from the road to the
entrance of the building.
4. Elevations and floor plans.
S. Each phase must have enough parking, etc., to comply
with the code for each building within that phase.
AN:mh
cc: William V. Hukill, P.I., Department of Development Director
A:caOVI.TIC
RECREATION & PARK MEMORANDUM #95-394
TO: Tambri Heyden, Planning & Zoning Director
RE:
Kevin J. Hallahan, Fore_lEnvironmentaIist \.(~ ~
Grove Plaza - Master PlanlExistlna Trees
FROM:
DATE:
August 28, 1995
The following is a summary of the trees to be relocated on the site based upon the tree survey:
Tree Survey #:
~
HL SIlL
8' 10'
14' 16'
25' 25'
25' 30'
8' 6'
16' 10'
12' 10'
12' 10'
12' 10'
12' 10'
1
3
4
8
9
16
26
27
28
29
The following trees noted to be removed should be relocated:
10
11
14
lR
14 total trees to be relocated.
12'
14'
14'
18'
10'
10'
10'
10'
I
The landscape plan should show at least 61 trees on site, including the 14 transplanted trees and
newly installed tree. wn required for landacape code compliance.
The applicant must tag all trees for relocation and preservation prior to issuance of the land clearing
permit.
..
The plan sbould continue in tbe Donnal review process.
KH:ad
Time: F oresterlEnvironmentalist
Secretary:
1 hr. @ $23.28/hr. = $23.28
.25 hr. = $ 3.49
T otai: $26.77
PLANNING AND ZONING DEPARTMENT
MEMORANDUM NO. 95-482
TO:
Tambri J. Heyden
Planning and Zoning Director
FROM:
Dan DeCarlo
Assistant Planner
DATE:
september 12, 1995
SUBJECT: Master Plan - 2nd Review
Project: Grove Plaza
Location: Southeast corner of Hypoluxo Road and Lawrence
Road.
Agent:
Charles W. DeSanti
File No.: SBMP 95-001
The following is a list of comments regarding the second review of
the above-referenced project. It should be noted that the comments
are divided into two (2) categories. The first category is a list
of comments that identify unresolved comments either from the first
review or new comments as a result of the second review. To show
compliance with these comments will not substantially alter the
configuration of the site and design of the building. The second
category is a list of recommendations I believe will enhance the
aesthetics and function of the project.
All comments and recommendations can be rectified on the plans at
time of permitting if the site plan request is approved. The
applicant must understand that additional comments may be generated
upon review of the documents and working drawings submitted to the
Building Division for permits for the proposed project.
I. SITE PLAN REVIEW COMMENTS
1. The traffic analysis should be expanded to include left
hand turning lane for Hypoluxo Road into entrance into
development mediap break. Due to phasing of project, at
time of site' plan review of each parcel, additional
reviews must be made to determine impact of turning lane,
interior traffic, signage, and one way traffic proposed
that connects the back of the parcel.
2. Approval of a landscape appeal is required to develop the
property as shown on the Master Plan. The plans should be
modified to show the results of the final determination
of the landscape appeal and reference on the plans the
landscape appeal file number 95-004.
3. A master storm water management plan (section 3,T) must
be submitted showing impact of phasing as proposed.
(This plan is required regardless of whether phasing is
proposed. )
4. Computations for required number of handicapped parking
spaces shall be shown along with location of the
handicapped parking spaces being delineated on the master
plan.
5. Show on the master plan the bUildable area within each of
the six (6) parcels including the setback dimensions.
6. Requirements relating to the city's Community Design Plan
must be addressed for all six parcels at the time of
submission for site plan approval for the first parcel to
be developed.
Page 2
Comments for Grove Plaza
File # SBMP 95-001
7 . Staff recommends the south access aisle be completely
installed with development of the east property line of
the proposed parcel development.
ex: Build parcel F. with complete entire access
aisle
ex: Build parcel C. with complete entire access
aisle to the east property line of parcel C.
8. Cross access easements shall be shown on the master plan.
9. All proposed easements shall be shown on the master plan.
10. It is recommended that a note be added to the master plan
that will carryover and be reflected on the plat
document that states that signage and building design for
all six parcels shall be unified in appearance as one
plaza in conformance with the city! s sign code and
Community Design Plan.
11. A master property owners' assoc iation agreement/documents
for maintenance of common infrastructure will be
necessary for review by staff, prior to recording and
prior to platting.
12. The applicant shall pay the additional fee required for
the extra (third) review requested, prior to the city
Commission meeting of September 19, 1995.
13. Pla~e phasing lines on the master plan that reflect the
phasing ot the construction of the development required
by Palm Beach County.
14. Submit three copies of a rectified master plan to the
Planning and Zoning Department prior to submitting for
platting.
DCD:dim
a:2ndcolI!l.;ro
LOCATION MAP-
GROVE PLAZA
.J L_. ____._.._._~n _.-
_ _____/:ty eJ2.L(/'/<O /l.oNO
h . f=: rtJ;( 'L[~., ~. ..
~ I I -.J,!-,
rJ i i' I ~~-
jfb..,'" ~ I ~-:J. t=
-- ' ,I ~e. R1A
. I I, ~'G~ I ns.
I "-J1j41 ~li\ }~;~ I!~"' '- P U C ~"""""': ,,/','
i ~< Trr 1i~i .~~;:\ - ~ I-J
I -. Y~.0: 'H~'f.;. LU · 4 I'
;'1 .. ,::;MU'" ,i'1j~ ~ ~ 'KNOLLW.OO~.. _ I ~\:>/
~, .: - "I,; ,-=
AG " GRovell '.<:
. \
~ 'L3.
__-j . L h H _ mi Tl nIl I Lill um ' " .. m' - ::... 'ft rn,j rrrti rrl (!
:I:~~O' ;';Jt' C'ir~-'-'L... ~ .~~~~:~ . "~: /~rir~J~'/i
LiJ - L . ~{, -I' ~:?N ,,1 _ ' " / "mr I . ;--
-e i f~ '" !\ l ~ = 'ir\" ;' III ~ :~; )~- I.,q ~J.l~,~,.'
'.J~lIiW V II J.. \.',
C I
. ^",:
'-(/ :,
...... .
~ ,
./ i i
I r 1
! I J ;
~ 1 /: : I = ~'zl}A1rlJ.'.\ I.
I: ;, 11 OJ
1 I (, . '1 1111 I .. .'
.' . 'n--~-~--lJ i :=:Im~=cd) /T f"Pf' l' I I I..LI
----
'-,/7~ T~'rTO""n ;;"rTP :/_ ~~~AL L ';0 ~~ -~~~~I~ ~~~~~~ll~f --
I I I AG _ ------~~ JJ..-.r'r \.-v"'" ~
! /::::J .. = =: ,.x, 'l' \~,.
/., l-l~ - -: r-- .,~,-'~\ ~~\\
~'/ ~ iTt6 --. =-77'~~~~~~.t~:~1
1 J r~CJJ~nl) TTn~'" -~ ....BOyNTON ~. T ....,~J:;r.A~.:_ "tJ.--J J
! ) ,-,---U~.,...lLi~ 1.: ~u..~J~_ NURSERIES" 1~~'IY.:!Cl ~ .' .,.: ;:' '.- - . -: ~-' 1
J II .... I t ~... ~.,,\, { ',a_J I.. '.' . 1
I .. \;:::~,~]Ir-:;L:~JLM~';~ PUD':'~;;:~U~i, ~~~~. ~.;
_, ~~ ------~-~I-_-_-:~ LUI:4.0 PUD LUI:4.D
I-
! i i
I
oi
~
.~~
_~l r 1 T
I i
~ ;
SITE:
NIC
p'
"- . -
L'
0"
. ............
I#~l
"'1
~ -=. j I
'~:, ~I
""1 :.
~]11 [-
-IT .=
- f\ -
= \l --
== {j' '~~
~ -L ~
f- C J--
f- .
N /~. ;::::
R1AA ~r =
: ;= - . == -'::U~~~~~B" .. ~- ~)II_~'C;~~~jl
: " PUP 1_~$L~J Ld I ~ If i:
· ~ w= LU"5jP 1 i'lll ~", p V~IG' l5~-=;i
\ .";&: I ---.l ' !Q.L :--J - '-,
J V ",,-, --- ---'-.:11-- t;tfJr~'1-~. Ii:
-. :0. 1/8 MILES{" ~. ,.' Y: "'\]}}VI-T---=J1-
~ III11 II'. . I ~UL -,- ~ .. f~Y-rl ~ r~lm,:
r '0 1 4008?~;:',~~~~ ~e:.r;_q~_~ I~; ,,! L~ ;~.!)J f\1 L'J ~ Ilr :
L~
"I" .
I
- (.
r ill ~
\.: ->-)'..
7.B .1
GROVE PLAZA
MASTER PLAN
r
.) " . \'. ~
" . 1 ;.~..
\ i\"
PLANNING AND ZONING DEPARTMENT
MEMORANDUM #95-481
SITE PLAN REVIEW
STAFF REPORT
FOR
PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION
September 12, 1995
DESCRIPTION OF PROJECT:
Project Name:
Grove Plaza
Applicant:
Dr. Walter Lanke and Ms. Auce Fay
Agent:
Charles W DeSanti/Julian Bryan
756 st Aubans Drive
Boca Raton, Florida 33486
Location:
southeast corner of Hypoluxo Road and Lawrence
Road (See Exhibit IlAIl - location map)
File No.:
SBMP 95-001
Land Use Plan
Designation:
Local Retail Commercial (LRC)
Zoning
Designation:
Community Commercial (C-3)
Type of Use:
Master plan approval of a commercial site to
be divided into five separate parcels through
platting. ---------
-------.. .
Number of
Units:
N/A
Square
Footage:
Site area:
358,412 square feet
8.23 acres
29,500 sq. ft. in six
separate buildings.
Building area:
Surrounding Land
Uses and Zoning
District:
North
Hypol uxo Road and farther north
is santaluces High School
located in Palm Beach County.
South
Agricul tural area located in
Palm Beach County.
East
Residential property
Knollwood Groves PUD
zoned,
West
Agricul tural area located in
Palm Beach County.
Existing Site
Characteristics:
The property is a vacant lot that was once the
location of a landscaping and nursery
business.
Proposed
Development:
The project will require future site plan or
conditional use approval for six bUildings for
commercial, restaurant and retail uses. The
six buildings will be located on five parcels
(see Exhibit "BIl - master plan).
Page 2
Site Plan Review Staff Report
Memorandum # 95-481
Grove Plaza
Concurrency:
a. Traffic - The Palm Beach County Traffic Division has
reviewed the traffic impact study for the
project pursuant to the Traffic Performance
standards in Article 7.9 of the Palm Beach
County Land Development Code. The proposed
project will consist of 18,000 sq ft of general
retail, 3,600 square feet of bank with drive
through and 7,200 square feet of fast food
restaurant with a drive through. The build out
is 1996. The proposed project will generate
4,788 daily trips, given a 5% internalization
rate.
The Traffic Division has determined that the
project does not meet requirements of the
Traffic Performance Standards of Palm Beach
County. However, phasing or up to 23% of the
project can be build up to 1,108 trips. Because
of the project's proximity to Gateway Boulevard
and the existing traffic volumes on Gateway
Boulevard, from Lawrence Road to Congress, the
proj ect would be required to be phased in
conjunction with the widening of Gateway
Boulevard that is now scheduled for FY 96/97.
( see Exhibit "C")
b. Drainage - A drainage system consisting of an
exfiltration trench, catch basins and storm
sewer pipes will collect storm runoff and
convey it to the Lake Worth Drainage District
(LWDD) canal L-18 located on the north line of
the Grove Plaza site. The LWDD canal L-18 is
culverted by means of a 72 inch RCP in this
area. (see Exhibit liD ")
Driveways:
Four entrances into the proposed commercial
development are proposed. One entrance on
Lawrence Road that will allow northbound
traffic onto the site. Traffic will be one way
at this point. No traffic will be allowed to
re-enter Lawrence Road from the development.
Three entrances into the site will be on
Hypoluxo Road. The question of a possible
traffic signal for one of these entrances onto
Hypoluxo Road will need to be addressed at
time of site plan review (see comment #1
Planning and Zoning Department Memorandum No.
95-482) .
parking Facility:
The proposed parking facility for each of the
five parcels shall contain the spaces required
for the uses located on the parcel. Each
individual parcel will undergo further review
at the time of actual site plan approval.
Landscaping:
An appeal to the city's landscape code is to be
filed to run concurrently wi th this master plan
application. The appeal is to the required
perimeter landscape strip adjacent to the
access corridors between the individual parcels
within the development.
-
page 3
Site Plan Review Staff Report
Memorandum # 95-481
Grove Plaza
Building and site
Regulations:
Building and site regulations will be addressed
and met during site plan approval for each
parcel. The proposed structures meet all
setback requirements in the C-3 zoning
district.
Community Design
Plan:
Requirements relating to the city's Community
Design plan should be addressed for all six
parcels at the time of submission for si te
plan approval for the first parcel to be
developed (see comment #10 Planning and Zoning
Department Memorandum No. 95-482).
Signage:
Requirements relating to the City's sign code
and the Community Design Plan should be
addressed for all five parcels at the time of
submission for site plan approval for the
first parcel to be developed (see comment #10
planning and Zoning Department Memorandum No.
95-482) .
REVIEW OF DEPARTMENTAL COMMENTS:
Below is a list of those departments that have comments regarding
this request. (see Exhibit "E" - staff comments)
DEPARTMENT
ATTACHED MEMORANDUM
Public Works
utilities
Fire
Police
Engineering Division
Building Division
Parks & Recreation
Forester/Environmentalist
Planning and Zoning
N/A
95-243 + r.11lf
N/A
N/A
95-323
95-233 f 3,g
N/A
95-394
95-482
The utili ties, Engineering, BUilding, Parks and Recreation and
Planning and Zoning Departments' comments may be addressed on the
recitified master plan prior to platting. The remaining
departments did not have comments regarding their review of the
amended plans.
RECOMMENDATION:
The Planning and Zoning Department recommends approval of this
Master Plan request, subject to the rectified master plan Showing
compliance with staff comments and the applicable city of Boynton
Beach Code of ordinance.
..n'fllrT.GIIO
~ ~j~#
'\ .j)J..-.r::-
~ ,~\}sfi,V Jt.J
~/ 4/1}J}.J
~. ./( ~Jy\L '-
Page 3
Site Plan Review Staff Report
Memorandum # 95-481
Grove Plaza
BUilding and site
Regulations:
Building and site regulations will be addressed
and met during site plan approval for each
parcel. The proposed structures meet all
setback requirements in the C-3 zoning
district.
Community Design
Plan:
Requirements relating to the city's Community
Design Plan should be addressed for all six
parcels at the time of submission for site
plan approval for the first parcel to be
developed (see comment #10 Planning and Zoning
Department Memorandum No. 95-482).
Signage:
Requirements relating to the city's sign code
and the Community Design Plan should be
addressed for all five parcels at the time of
submission for site plan approval for the
first parcel to be developed (see comment #10
planning and Zoning Department Memorandum No.
95-482) .
REVIEW OF DEPARTMENTAL COMMENTS:
Below is a list of those departments that have comments regarding
this request. (see Exhibit I1EI1 - staff comments)
DEPARTMENT
ATTACHED MEMORANDUM
Public Works
utilities
Fire
Police
Engineering Division
Building Division
Parks & Recreation
Forester/Environmentalist
Planning and Zoning
N/A
95-243
N/A
N/A
95-323
95-233
95-394
N/A
95-482
The utili ties, Engineering, Building, Parks and Recreation and
planning and Zoning Departments' comments may be addressed on the
recitified master plan prior to platting. The remaining
departments did not have comments regarding their review of the
amended plans.
RECOMMENDATION:
The Planning and Zoning Department recommends approval of this
Master Plan request, subject to the rectified master plan showing
compliance with staff comments and the applicable city of Boynton
Beach Code of ordinance.
a:STPRPT.GRO
~1t\\1.131.<r
" p..."
.
LC'CATION MAP
GROVE PLAZA
H=T~ r\-rJr ~cl=jJ~ · r , _. ~. N.C I
r1 i iSE: '~l' , SITE I
'P'I 1 1 ;j ;; -, --~ R 1 A l
I " -1';'=[) !
1 -( :t:-: : ~\ ~
__L I .. .':,UJI 'I r , =:~ J,t PUD ~,........ ,'/-.,:,'.
" <;:r~TTI1 '-:w ~., ~ 14
,) ~f;'rr:JD~) "- .,~~ ~ ~ LUI: 4.1~ b
~I ~-:~ qr--- i.tA =: ~ 'KNOLLWOOD \:::--,\~'
~I~ ::' - -,.~~ " ' E, ~ AG :5 GRD VS." --o.;>~.
).' ~-. -1 .',.. :~l . , I
.,.1 ~ ::::j' .~........ ; .
I~' t=! /M''i-- _ Ai:::: I I
~ .-- .. ~~! lJ r-l J=j' fT1'~ '- 'pf L.
.~I I ~ liiJJDJ.=J IlLY' -= ~ . ._;.
:I.iii? t=,l::-oJCll;~~~tl:;"I. ~ .~tW~)~~l~-- ~~lh/iJ)lJft j!;;
~ J. _ II wm~R~(i-,:
I' ... : ~.n-&' II I I I I II I I /~ '.' " .
. '1\.' :oo.L1 IF' ~.
~I=.". 4.11111 Ji-- I~a';~l'
~\ 111111 ,III lilY;::::: w- cYi\rit
'.J'ill V \. ; I · ".1 111111111"- _.. ':. It~-:
)-9u1~ -:-:C I j Xr:~:
(( . ,) { =r-~q ~'~~i- !
~/>'"\., - ~ (( ~\(j1ill ['r :
I~ : I! -~'{l ] H+ \ I
/" . :. c'-lC,_ =' [.~..J /1 f' 'I 1 1 I I U'
..- r~~--
I P --.'---
}~.II~,~: WH
'\"ltt' ,
.. -J' /..' / l T 'll!' 111 J ~I ~ ! .. .., : '.' ~ ~~
..~ dJ..._!.~l J ..~'L'._
I:. :.:; ]J~j! I r~: ~': '~j=~(T l;~
'~'"
--- , '; '.-.:..:.' ~ - ~ : ~ -----~
..
Iii
AG
-
C
.- -
--
}t I ~'
J> I 2
~"I :
--: j I ;
_.I
. -'II
{~" t.
.~ I 'lIjLul-e:j1!-LUlrlln~~II'(j: '-
- i:! r:Jm'l .-. 'H~ ~\ ell(. ~~ "
= =:.,.."" -;.;- t::;-;:nrr. ~1-RZ~'
-- =: ";'~'y.'" ... \I~"'-:, \.
- - == -:-~K I~ ~'~"rq\\,-~
"BOVNToN ,~~J~t~t?l>j~~~ttJ' I ~lfPf'~/.-' L...~
NURSERIES" L ~~.~ 1t,~",.. '~:~j \~ ~ :::"-oJ ! :-_'- 1\ -:-'.~: ,
_ "'(~":~'rr; I ,r.. ~ ~, 11</l""I~ ,t \ ~ \1
"CITRUS GLEN e" ~-(j- ~
PUD LUI:4.0 =t t t=
~SVIt/;, .
r"f'~ -
'~~'., -
~1 AA -~A~" -
"l' t;;I:::r;
_ ~._ _ .:~."~~ .. _ =- c..w.... ~ I Jim. I . _.....,...
= . = "SAU~~~~~B" _ ~} -"~c';Jr'~r[
~ (~..-=-{.~ W I f' U
puo --~~ ~m,1J 0 .~
~, u= LU"~.D 11 ,_1: p \/~l~l! "jj
" .' ill - 1 ~(lru _~L
. ~ a...' - - L-_u--.1 ~ E-~ i:':'
~ .0. 1/8 MI LE sV ~ ---- ----:.~-p-, ,- . 'i"n~1lM 'I "~r-7 \ - -'':'" __ fL::""
"1'1111 'I _ _ . iU~
'0. I 40.0. 8?~~~~~~ :-;-:r:. q~(5 ~~~. ,I. J.i, .!J F\ 'I C';/ i I .;1:
'- ~o
puc
LUI:4.0
"I'
~ 1t II 1. 13 1. '1'
"13"
.
R....
I
J
l-AWRENCE-_ - - ----'---AOAD .--... ---.-----"-"-80'R!W--
.....
~ Ilf(J "1]-
II
..
I i': - ;
I I' tli~
n a; i e ~ ~
~ .'", ~ ... i
t- -------..
'1- -~ 0
'--.,-----.-.----0-
, \i _ ,,' ----...
It - : - 'j
III .~ .
il / '-
;;1,... , I
t I 0 ~; i, I. ~ 1
'0 18.! i! eJ- L ~
I ;' -. I) -, b
I 0 ~ P
I l \ 0, =' r;
I ~ '-- ~---: J ~
.-'I-------------_:....._~-- ~
lI,t ,-! ~ ~
l \ i --I
J fJ II I~' :::j
:8 I' I ~--1
'~I------J '----.) !J ~
; I =-1
!~ ,~rJ
I, ,,-' -- I ,
I' -~----- c..~...L_....r_;_ 0
~----.-----.-'O_
I
t:
~ - ---t
t..~ -I
I '< -:3
--, --l
~
.-J)
I
;; :1 I
~ i I
~~
! I
/'
I
f~ _
,
. J
--'
, l-
I ! t /"
5 I: ~-- "
I \ ~ Iii
\~t.L (
I
I
- I
~Ill = a
II.. = ,.
i
" 1,
~.' ~i
E- '-e
~ "l~
1 I~ i ~
'ld- i
/'-C-
\! =1
Ii ~
u :=1
J
.----
\.
o
o
o
r
"'
o
r, ,
'---'
'"-'
"--.
.
/
~ f'..
~ Ilj
fA::
i\
~
=t
t.. lMDlCul .....11
II'."
~-
+.:.. ..
rr:-
..........,
I
L_
;-f !" !" ,. 1" !" :-
~!~~ !lli:~ :a~ .."'I: . . .
F F r-
"'.... "r-r- "'Zn r-
ZZ~!: ...l!! 1:0. ~~; . ! ..
0"''''''' CftFZ =I"S C ...
"ii~a a"'D .....r- .."'. ;= '" ..
Or- :~i!: 0 :II C
i!,..O,.. J!Sj .....2 i! 0 !1
nOz
Ole". ~..D OZ.. a .. C
!!!.Ol'i .... 1)'"- ..Dr- 0 ..
xnt", .... 0..... .. III
",:a :!~~ :II III
!leIS Ej 0 <
III..C C .. ..
C.II "'nC .. III 0
=:!!~~ "'Z .... r-x_ ,. -
li~ ;1:. 0_1: ..
..:z- liil=l .. 0 "'
!r-lEi I:-c ~.. "'!10 .. z 0
:Ie !lI"'1: :II .. Z
lEo;oiS O. !i!i!ll .. e "'
z!!:r-.. ~.. ,. ,. III
!E .....t r-
~=a ...~ ",r-r- ;: n ..
I~S .. 0
rl"'z 0.. x,. 0 ..
.... ~i! "' .. -c
",Ii;!! =I.",
1:= :110 !=I :II III I:
=II:" =.. 0 .. ~
~~~ Q~ n zlft 0 n
"0 tl;!! ... n I:
o! cr- a C
00 FO lE~
z" "'z 0'" I:
~:!! -. =l- Ift
~~i! z- z!!!
"'z D D ..
....'" ... z I:
.. _r- . :0
'" .. D
III !"
, "
i ~
i'
II
J!
II
il
*
i
i .1
:1
,
,I
.j \
:1 \\
'I
'I'
il I
,I \
I
XI
-<,
<31
,....
c:
~I
I !
il .
....
'oj
~ :
.~ '
. ,
I'
1'1,
~
.. .. .. .. .. u:
. B .. ~ ~ .. .. :::::;
.. .. .. .. N
.. .. . . .. .. .. m
n n n n n n .. ~
.. ! ~ B ill .. Ii
1ft III
III III III ,.
. . . . . . l' ~
... ... ~ .. .. . "
0 0 '" . C ..
.. .. '" e f' 0
~ ~ r- I 0 ..
.. ~ I .
i .. z "i:l
1ft 0 Z n
.. ~ .. 0 0 n I:
1ft n III e
.. . n 1ft 0 .
e g t e ..
I .. ,.
6 III Z .. .. .
C a D ..
III D .. D
"i:l ii i ~ .. "' l
II: S ~ . Iil ii
N .. .. i i
l!: . . ..
. flI flI J J
flI ;a ;a ;a ,
:a x ~ :a
x ~ x i: ;a
.. ::0 ..
l!: } 1 !:l ..
i j 1 ~
II
'1
.,
11
,.
II
!I
I
.1
il
Ii
U
I
I
I
.
i
a
.
J
I
!
, ,
.: 'I
:t
~~:
)>.
Oil
, l
~
; j
, I,
II ,I
.. .. .. .. .. ... .. .. ~
. . . .. ~ .. 0 0
>> .. :II .. .. .. ~
~ Q a Q a n ~ ~
r- r- r- J!l "
.. "' 0 n ~ · i i z
G)
.......................... I I 0
~..................
11111111:11111 .. >> ~
IzUllubZi I ~
Daa DaDaaa 5 )i
....):11..1).......... I
~~ol!l!OIl!lI~ll~
51alll 5 lal . .
~
l!l1lll9l!l21l91!121l!ll9l!ll9 ..
............ ,
'I
,I
"
o
1I!
~,----.l
J..-':__
. -
.It
-
J::- -
~~
r-
JIIIi:,
if
L
A-
-
-
..
..
.
~~
E X H I BIT
"en
..
,board of County Com.l1.ljssione,rs
Ken L. Foster, Chairman
Burt Aaronson, Vice Chairman
Karen T. Marcus
Carol A. Roberts
Warren H. Newell
louy McCarty
l.mde Ford Lee
~!~'-'i::l'- ~ it"
rD) ._:...l_._:.,--'-
I -..' j
I' ,
: i 'II
UU ,! iG i I
, ;': rrl1
_,A &
County Administrato
Robert Weisman
PLANNING AND \. C
ZONING OEPT. ~/
Jepartment of Engineer
and Public Works
August 4, 1995
Ms. Tambri Hayden, Director
Boynton Beach Planning and Zoning Department
100 E. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach, FL 33425-0310
RE: GROVE PLAZA
Dear Ms. Hayden:
The Palm Beach County Traffic Division has reviewed the traffic impact study for
the project entitled Grove Plaza, pursuant to the Traffic Performance Standards
in Article 7.9 of the Palm Beach County Land Development Code. The proposed
project will consist of 18,000 square feet of general retail, 3,600 square feet
of b~nk with drive-through and 7,200 square feet of fast food restaurant with
drive through. The build-out is 1996. The proposed project will generate 4,788
daily trips, given a 5% internalization rate.
The traffic study identifies Gateway Boulevard as being within its 2 mile study,
area, but fails to address the traffic volumes on this roadway. As you are
aware, the existing traffic volumes on Gateway Boulevard, frQm Lawrence Road to
Congress Avenue, exceed the LOS D traffic volumes for both daily and peak hour,
peak direction traffic. The project would be required to phase to the widening
of Gateway Boulevard. The roadway improvement is scheduled for FY 96/97.
The Traffic Division has determined that the project does not meet requirements
of the Traffi c Performance Standards of Palm Beach County. Phasing to the
widening of Gateway Boulevard is required to meet the Traffic Performance
Standards. If you have any Questions regarding this deterrr.-:nati:m, plEase
contact me at 684-4030.
Sincerely,
fh';'S;.'j (,( ~ JO;i 1~:t's y
( :? Y/v r.{ --II--..;:
. 'J'- < ^ f I If
?" (J t: L'\ t. .r.!..., ~..: ~\. L.
I) ~\ ::.'/7 /c, S'
jJ<)-' D.!..._
LI./t! ,';)6.:, 'j
OFFICE OF THE COUNTY ENGINEER
.~ :>v~
Dan Weisberg, P.E.
Senior Registered Civil Engineer
cc. William Hukill, P.E., Director
Boynton Beach Department of Development
File: TPS - Mun; - Traffic Study Review
g:\user\dweisber\wp50\tps\boyn46
"An Equal Opportunity - Affirmative Action Employer"
@ p'inled on recycled paper
Box 21229 West Palm Beach, Florida 33416-1229 (407) 684-4000
E X H I BIT
UD"
..
CARNAr1AN. PROCTOR AND ASSOCIATES, I~~.
Consulting Engineers . Surveyors . Planners . Land Development Consultants
DRAINAGE LETTER
GROVE PLAZA
CPA 950404
Grove Plaza is an 8.228 acre retail commercial project located in the southeast quadrant
of the intersection of Hypoluxo and Lawrence Roads.
A Drainage System consisting of exfiltration trench, catch basins and storm sewer pipes
will collect storm runoff and convey it to the Lake Worth Drainage District (LWDD)
canal L-18locBted on the north line of the Grove Plua Site. The LWDD canal L-18 Is
culverted by means of a 72" RCP in this area.
Water quality will be accomplished on site by means of dry retention in grass areas and
exfiltration trench. Furthermore to enhance water quality inlets will be located in
"Grassed" areas.
Berming and perimeter road elevations will be utilized to contain the twenty five year
three day event on site.
Finally finish floor elevations will be set above the one hundred year three day zero
discharge event.
19654
;:\word6\wtiss\Jra- grov. doc
6191 West Atlantic Blvd. . P.D. Box 4399. Margate, FL 33063. (305) 972-3959. FAX (305) 972-4178
Dade (05) 949.6826 . Palm Beach (407) 364-0687
11930 Fairway lakes Drive, Bldg. 6, Suite 4, Ft. Myers, Fl 33913
(813) 561.2800 . Fax (813) 561.2821
E X H I BIT "E"
MEMORANDUM
Utilities # 95-243
---...
~ rn ~q rn, fU ,~,prn ill
TO:
Tambri 1. Hey
Planning &
PLANNING AND " S
ZONING DEPT. ?
FROM: John A. Guidry,
Director of Utilities
Date: July 28, 1995
SUBJECT: Grove Plaza,
Master Plan Second Review
Staffhas reviewed the above referenced project and offer the following comments:
1. Gravity sanitary sewer system does not show connection to an existing system.
Please show on your plans that in fact you can reach an existing gravity
sanitary sewer system, (Sec. 26.16 (a)).
2. Once approved for use the developer shall provide unobstructed stabilized
access to the water and sanitary sewer mains and appurtenances at all
times, (Sec. 26.J3(a)).
It is our recommendation that the plan proceed through the review process.
If you have any questions regarding this subject, please contact Skip Milor at 375-6407 or
Peter Mazzella at 375-6404.
sm
xc: Clyde "Skip" Milor
Peter Mazzella
File
TO:
FROM:
DATE:
RE:
DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION MEMORANDUM NO. 95-323
GROVE PLASA - 2ND MASTER PLAN REVIEW
Ta~J[i J. Heyden, Planning & Zoning Dire
fj;-~am Hukill, P.E., City Engineer
August 28, 1995
..'t ',"",\ 'J
...! :, , 9 /('.,...,-
I......,........:
Based on our previous review, the following items remain to be
addressed:
General - #1 and #6. -)
(
Future - #1 thru #13 i
_.J
..--
..:.......~--
" ! { ':1 /__
,-' -{-t. 'j, " .t".r . i'i, .,........ <.' I ?; J ,.'
, ;'. _ ,~ ... "'" ,. ~- __4_ ~ _ ~ ,.
....c ,,,'- '... .."....,. -,v.;.I -', ....j....~i J'- 1; Z I
~.
Please consider the following additional comments:
0.
*V{.
vi.
fR-..)V \ 1I\:> .5~~ E .
~- (<.:"'fC\ :;z. ;',] ::=:.... ~
CI~\:.!....U\)\S I..J,Ttt\ /F
f~-. -- J F
' '-' ,,"{'. .', ' .
...\_~-"..., ,/
" G.
\/H.
*/I.
~ \ r:- . '0
.~,~ -".)
.: ~~.-;~_:":'~ Ct ~~. ,,~: 'I-~, <'
-----.-..
.;.;..J .
':.l,J
,'*' Y"K .
*/L.
, I
::f- 1 ,,j '-, ,. - ,..F/::::'
v =- c) \<...
Project shall conform to County approved phasing plan
regarding amount of ~evelopment ..J ~e..~tta<2.l1ed r_C;o\!!lty,. "
Traffic Study Review. ~\.:.;\:~_:;!, J'-~ "; .~\:~,X~ '_ ......J\>-,~:.Jl.."""tt' \ ~
All plans submitted for specific permits shall meet theW!~~v,
City ~ s c,?de requirements at tim~ ~f application. T~ese ;<:~:::. -
permlts lnclude, but are not 11mlted to the followlng;~~~~~
site lighting, paving, drainage, curbing, landscaping, ~:J~~
irrigation and traffic control devices. Permits required ,:;J_'
from agencies such as the FDOT, PBC, SFWMD and any other
permitting agency shall be included with your permit
request.
The master plan is subject to the provision of Chapter 2
of the LOR Sec. 9C, pg.2-80.
Specify the name, address, telephone number of the
applicant's agent. Chap.3, Art.IV, Sec. 3D, pg.3-4
Provide a statement that all utilities are available and
will be provided by appropriate agencies. Chap.3,
Art.IV, Sec.3R, pg.3-5
Provide Traffic Impact Analysis. Chap.2, Sec.9C4h(5),
pg.2-85 and Chap.3, Sec.3S, pg.3-5
Provide a master stormwater management plan. Chap.3,
Art.IV, Sec.3T, pg.3-6
si te plan review & approval required. Chap. 4, . Sec. 2,
pg.4-l
Sidewalks are required on both sides of all local and
collector streets. Chap.6, Art.III, Sec.llA, pg.6-3
Provide Certification by Developer's Engineer that
drainage plan complies with all City codes & standards.
Chap.6, Art.IV, Sec.5A, pg.6-7 & Chap.23, Art.IIF,
pg.23-8
Provide sidewalk locations & details. Chap.6, Art.IV,
See. lOT, pg.6-l4
Need SFWMD & LWDD acceptance prior to Engineering
approval. Chap.6, Art.VII, Sec.4B, pg.6-24
, \
1.,.--':- i.>
\ "- ...:;......'" U..
;::::: 'J -r"t -:-.:- ..:....,.- ~-~~...,,-'''',<...,....,,,\ \"\,,-"Sy..J -r ,'S;
C) \,.;> ~ ___. '_ \ '-' ....r
l;;' I't;SN '- i L.. F>, \"'Xl\J15 '7 AZll7 €.
TO:
FROM:
DATE:
RE:
~-: .0:
~,t:L f..' ~--'-
.. - "
DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION MEMORANDUM NO. 95-238
TarnbLi J. Heyden, Planning & Zoning Director
A(~~m Hukill, P.E., City Engineer
July 13, 1995
GROVE PLAZA - MASTER PLAN REVIEW
Z I '1'7 f\ !~
l ~ o~). '_ 'I
AJ'i, -
~ 1'.':',-
~>-'," .
.-...-....-t. '.~
" . .vJi \
..;,
(9.'r...~ ...,--?
\ , -..':i. '..J '-L.,)
f~."J.-yt
Subject master plan appears approvable subject to the following general
condit;.ions:
VJ,.. Platting
~2. written explanation of storm drainage system
~: \.. '}. Correct south landscape buffer
. ~4. Provide eastbound traffic only on south service road
* \/5. Review location of distribution lines near south property line
with respect to landscape buffer, service road and wall
t,;e,:;"-;;-}'6. Provide approximate phasing plan
In addition, the following comments must be complied with as you proceed
toward construction, although most of them can be dealt with later in
the site planning and/or platting process. They are presented to you
now to provide advance notice.
:t:--v/l. Provide drainage calculations. Chap. 4 Sec. 7F1, pg. 4-6;
W Chap.6, Art.IV, Sec.SA, pg.6-7
~~~ -->2. Provide Certification by Developer's Engineer that drainage
C<5.0-.~~.is l~::'5'1"f'\ plan complies with all City codes & standards. Chap. 6,
~cN~5"-'3~3 Art.IV, Sec.SA, pg.6-7 & Chap.23, Art.IIF,pg.23-8
~~3. All swales, detention areas & disturbed areas must be sodded.
If not irrigated, use bahia sod. Chap.7.S, Art.II, Sec.SC6,
pg.7. S-lS
Minimum 1S" pipe must be used in storm sewer. Chap.6, Art.IV,
Sec.SA, pg.6-7
Top of drainage pipes must not interfere with subgrade.
Chap.6, Art.V, Sec.4B2i(6), pg.6-20
Minimum pavement width 22'. Chap.6, Art.IV, Sec.IOC, pg.6-11
Parking lot section must conform to City code. Chap.6, Art.IV,
Sec.10F, pg.6-12
Provide dumpster location & details, including drainage.
Chap.7.S, Art.II, Sec.SJ, pg.7.S-18 & Chap.9, Sec.10C3, pg.9-4
Photometries must be approved for both pedestrian and parking
lot lighting before building permit can be issued. Chap.23,
Art.II,A1a, pg.23-6
Parking lot dimensions, striping, aisles, stalls, radii,
signs, landscaping, etc. must conform with City codes and
standards. Chap.23, Art.II, pg.23-6
Wheel stops or curb required, all stalls. Chap.23, Art.IIE,
pg.23-7
Provide 27' backup area, all stalls.
pg.23-9
parking stall minimum 18' long. Chap.23, Art.II,I1, pg.23-9
-*~4.
*/5.
~.
~ V7.
IU(2~~1 va .
--
*,J9.
*' /10.
, I -
-~ \/11.
-~- -/12.
.:~ '/13.
< '
WVH/ck
C:GROVEPLZ,COM
Chap. 23 ,
Art.II,Il,
Engineering Division Memo No. 95-323
Re: Grove Plaza - 2nd Master Plan Review
August 28, 1995
Page #2
*- /M.
~ ~N.
'* /0.
County and/or State permits required for construction in
R.O.W. Chap.6, Art.VII, Sec.4B, pg.6-24
Install appropriate turn arrows on pavement to supplement
left & right turn only signs. Chap.23, Art.IIB1, pg.23-7
Install one way arrow signs in medians for egress
driveways with no median opening. Chap. 23, Art. I IB2,
pg.23-7
Additional review time 1 hour for Mr. Hall ($20.64) and one hour
for Mr. Hukill ($43.17), for a total of $63.81.
WVH:ck
'~
-~Ir-~, ',t f -. -~-~ -.:":) ~~~.~
. L...p., e' 'T" Q '\ -,..~::.._- :;; .'l\ b
'.
"'1"'1\
\'~-~. .... ~ J
V :::J\<. .
C:llROVEPI.Z,2MP
-',
"'-
'~
July 13, 1995
"--
BUILDING DIVISION
MEMORANDUM NO. 95-233
From:
Tambri Heyden, Planning & Zoning Director
~ Newbold, Deputy Building Official
To:
Re:
Grove Plaza
Southeast corner of Lawrence Road and Bypoluxo Road
Because of the short time we had to review the plans for the .
above project building made no comment at the 7/11/95 meeting,
however, we would like for the applicant to be made aware that at
the next stage review he needsto address the following:
1. Signage.
2. Setbacks from the property line or phasing line.
3. Handicap ramps and access walkways from the road to the
entrance of the building.
4. Elevations and floor plans.
5. Each phase must have enough parking, etc., to comply
with the code for each building within that phase.
AN:mh
cc: William V. Hukill, P.R., Department of Development Director
A: caovI . TRC:
RECREATION & PARK MEMORANDUM #95-394
TO: Tambri Heyden, Planning & Zoning Director
FROM:
Kevin J. Hallahan, Forester/Environmentalist \<(~ ~
Grove Plaza - Master PlanlExistlna Trees
RE:
DATE:
August 28, 1995
The following is a summary of the trees to be relocated on the site based upon the tree survey:
Tree Survey #:
~
IlL .sw:.
8' 10'
14' 16'
25' 25'
25' 30'
8' 6'
16' 10'
12' 10'
12' 10'
12' 10'
12' 10'
1
3
4
8
9
16
26
27
28
29
The following trees noted to be removed should be relocated:
10
11
14
.l.R
14 total trees to be relocated.
12'
14'
14'
18'
10'
10'
10'
10'
The landscape plan should show at least 61 trees on site. including the 14 transplanted trees and
newly installed trees wn required for landscape code compliance.
The applicant must tag all trees for relocation and preservation prior to issuance of the land clearing
permit.
The plan should continue in the normal review process.
KH:ad
Time: ForesterlEnvironmentalist
Secretary:
1 hr. @ $23,28/hr. = $23.28
,25 hr, = $ 3.49
Total: $26.77
TO:
FROM:
DATE:
PLANNING AND ZONING DEPARTMENT
MEMORANDUM NO. 95-482
Tambri J. Heyden
Planning and Zoning Director
Dan DeCarlo
Assistant Planner
SUBJECT: Master Plan - 2nd Review
September 12, 1995
Project: Grove Plaza
Location: Southeast corner of Hypoluxo Road and Lawrence
Road.
Agent:
Charles W. DeSanti
File No.: SBMP 95-001
The following is a list of comments regarding the second review of
the above-referenced project. It should be noted that the comments
are divided into two (2) categories. The first category is a list
of comments that identify unresolved comments either from the first
review or new comments as a result of the second review. To show
compliance with these comments will not substantially alter the
configuration of the site and design of the building. The second
category is a list of recommendations I believe will enhance the
aesthetics and function of the project.
All comments and recommendations can be rectified on the plans at
time of permitting if the site plan request is approved. The
applicant must understand that additional comments may be generated
upon review of the documents and working drawings submitted to the
Building Division for permits for the proposed project.
I. SITE PLAN REVIEW COMMENTS
9c. 1.
OCt.. 2.
The traffic analysis should be expanded to include left
hand turning lane for Hypoluxo Road into entrance into
development median break. Due to phasing of project, at
time of site plan review of each parcel, additional
reviews must be made to determine impact of turning lane,
interior traffic, signage, and one way traffic proposed
that connects the back of the parcel.
Approval of a landscape appeal is required to develop the
property as shown on the Master Plan. The plans should be
modified to show the results of the final determination
of the landscape appeal and reference on the plans the
landscape appeal file number 95-004.
3. A master storm water management plan (section 3,T) must
be submitted showing impact of phasing as proposed.
(This plan is required regardless of whether phasing is
proposed. )
4. (Computations for requi~ number of handicapped parking
~~s shall be sho~along wi lli-ro-cati n 0 the
handicapped parking spaces being delineated on the master
plan.
5 .
Ole.
6 .
Show on the master plan the buildable area within each of
the six (6) parcels including the setback dimensions.
. . . ~\~f
Requlrements relatlng to the Cl ty I S Community Des ign Plan
must be addressed for all six parcels at the time of
submission for site plan approval for the first parcel to
be developed.
Page 2
Comments for Grove Plaza
File # SBMP 95-001
Qc
7.
8 .
9 .
10.
11.
12.
IN . 13.
14.
DCD:dim
a:2ndcOMm.Qro
staff recommends the south access aisle be completely
installed with development of the eas~rop'erty ~e of
the proposed parcel development. ~ r"~ (td~ ~.
ex: Build parcel F. with complete entire access
aisle
ex: Build parcel C. with complete entire access
aisle to the east property line of parcel C.
Cross access easements shall be shown on the master plan.
All proposed easements shall be shown on the master plan.
It is recommended that a note be added to the master plan
that will carryover and be reflected on the plat
document that states that signage and building design for
all six parcels shall be unified in appearance as one
plaza in conformance with the city's sign code and
Community Design Plan.
A master property owners' association agreement/documents
for maintenance of common infrastructure will be
necessary for review by staff, prior to recording and
prior to platting.
The applicant shall pay the additional fee required for
the extra (third) review requested, prior to the City
Commission meeting of September 19, 1995.
Place Ph~:l~ the master plan that reflect the
phasing~ , ~c1:; l"\n of the develepn,eld~~~equired
by Palm Beach County.
Submit three copies of a rectified master plan to the
Planning and Zoning Department prior to submitting for
platting.
7.B.l
Grove Plaza
MASTER PLAN
HANDOUT
~4~~~~L~~~~~L~~~'
4fJf1 .t"I'el ~ f' .1a2~
Count)' Admi.ni,trator
Robert Weisman
Boatd at Caunt)' Commi"joner&
Ken L. Foster, Chairman
Burt Aaronson, Vice Chairman
Karen T. Marcus
Carol A. Roberts
Warren H. Newell
Mary McCarty
Maude Ford Lee
Department of Engineering
and Publlc Works
September 12. 1995
Ms. Tambri Heyden, Diractor
Boynton B9iCh Planning and Zoning Department
100 E. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach, Fl 33425-0310
RE:! GROVE PLAZA
Dear Ms. Heyden:
The Palm BQ~ch County Traffic Division has reviewed the rev1sed traff1c impact
study for the projett entitled ftrove Plaza, pursuant to the Traffic Performance
Stindards in Article 7.9 of the Palm Beach County land Development Code. The
P~opoSQd project will consist of 18,000 square feet of general retail, 3,600
square feet of bank with drive-through and 7,200 square feet of fast food
rQstaurant with drive through. The build-Dut has been rcv1sed from mid year 1996
to the end of 1996. The proposed project will generate 4,788 daily trips, given
a 5% internalization rate.
The trllffic study corrects the def1c1ency of the earl1er traffic study. It
addl"essed the t~affic on Gateway Boulevard. The project 15 required to phase to
the widening of Gateway Boul~vard from Mf11tary Trail to Congress Avenue. The
project can build development generat1ng up to 1,083 external daily trips before
the contr~ct is let for th1s roadway improvement. This roadway improvement is
schedll-I ed for FY 96/97. '
The projer;t is also requ1red to phase to the Widening of lantana Road from
Military Trail to Congress Avenue. The prOject can build development generating
up tu 3,49Z external daily tr1ps before the contract is, let for this roadway
improvement. Th1s roadway 1mprovement is a requirement of the Winston Trails
PUD. They are require to pay for the improvement by the end of 1995. I do not
have the proposed contract letting date at this time.
The Traff1c D1v1s1on has determined that, based on the phasing of the project to
the w1den1ng of Gateway Boulevard from Military Trail to Congress Avenue and the
widen1ng of Lantana Road from Military Trail to Congress Avenue, the project
meets the requirements of the Traffic Performance Standards of Palm Beach County.
If you have any questions regarding this determination, please contact me at 684-
4030.
"An Equal Opportunity -l\ffirmative .~ction Employer"
@ prln~"" Dr; 'JlCYt;Ind pil;;ll1r
Box 21229 West Pum Beach, Florida 33416-1229 (407) 6844000
..._1 .~ ,J..Jj-' ~....lI.",,-,
~~~~~~~~~~~~~~~~,
"Jlo:r ( "J (1:1 ::)' r" rk:l ,... . k:I.J/k:I.J
September 12, lDDS
M~. Tambrt Hayden, Director
GROVE PLAZA
page two
Palm Beach County has programmed the widening of Lawrence Road for FY 97/987.
This will be a S-lane roadway within a ~ight-of-wey of 80 feet. Hypo1uxo Road
is shown to have an ultimate right-of-way of 110 feet. This will accommodate a
6-1ane roadway, although the widening is not $cheduled at this time. Palm Bea~h
County request that the City of Boynton Beach require the development to dedicate
or reserve the right-of-way necessuy for the ultimate c:rOSli st!c:tion for Lawrence
Road and Hypoluxo Road, and an expanded intersec:tion at Lawrence Road and
Hypoluxo Road.
Sinc:enly,
OFFICE Of THE COUNTY ENGINEER
~~4
Dan We1sberg, P.E.
Sen10r Reg1stered C1v1l Eng1neer
cc. W1111am HUk1l1, P.E.) D1rector
Boynton Beach Department of Development
F11e: TPS - Mun. - Trafflc Study Review
g:\user\dweisber\wp50\tps\boyn46b
TOTAL P.\!!:3
E X H I BIT
"C"
..
s~
.
~!
RI'"
-l:AWRENCE--.- h. h.hhh.-ROAO h.h.h. - --'h"hhh-hhh._ilE)'R!W___,
" Y .
\ ,I.. ... D' ---..",
" ~ \1 ~ '~.-c.......... '''-''
.1 ' U
111 ~
, (
,I
U', ..
\ \0,': ;
; I ~ ~
nl \l,! ~dj~
~ ~.$i
, :, \.., ~-'
I '
I '"
t-. ------.
, I 0
,L---r------------O
. C\ /
H
il
" '1
!I
~ 1 ,
. t ;., <> ,i: ~ !I ~
)<) ,~.\ ~~ u-
\ ;' ( · --,"'J
:1 I a ---I
I
I' 0 =1
! ~ ",- ----- ;=J
.-1---- ----------:]--t:-
l '=:j
I ~"\ ~ ~ --!
AIV 'i I--
I ~ ~
'Il , ' -.-J
,_ j'-'" ---.J -,
, I -
!~ ~ (~~
j. ~:..--_.! -(..~IIL..TI.T.".. 0
S __------------0-
)
~
t::
~
@
-'1
,-
........,
j
~
~h
:-;z
----.
..../
---'
,-
~
--~.)
/--'
'--
~l
"
'\
-1
~
-~
J
r-'
',--
~
~~--
E I
~
!
-==1
,
I
z
/----
,_I
11
i i: t,~./ '\ ~
5 r r,,.h' di
1 i I 10,\, J t a ='I
;: r :, ; .. >
. i:.-=- Ii:'. E ~ a ~ ,--' ;a
l, '"'to: " w ~ I' ~I ~I ..
_~_-0 " L l=i~ ~
: ~- -
'l-~' ~--~- ~- ~ ~
, ~_ \, -1
\ t=..\ " ~
\ \ t= 1\ \ : =1
'l'- i " :j
\o~\ . 'n rJ
+- ~ z;-...- ....., no, 0
..-/
1-
4_-----
/'
"
,,---.
,-,'
...
,
'---'
/'
r'.,
!i'
~._ Ii'
\ lti,\
/;~-
r--..
r -
...,
--1
r
~
o
... LAteICA.. ..,,_ -
IOU'
\
NORTH ~
Q-
\ .,
~
JIR
J uhen Brycn & AaOClctes
urban de.IOn .It. plonnlnQ
o
I
L_ :-0 !" !" ~ !" !" ,. G)
~~I ~~~ . . . m
;!~~ ...n. I'" I'" I'" Z
1ft oJ: I'" I'" I'" m
~~~~ m... "I'" ge2
...!!! 1:011 .. z .. :D
~~r;~ vaFZ =I:IIe: :i: e: .. .. )>
%mlOl .....;: ;: m :II
m>CO 00.. :i~ 0 .. c: ....
i!~~~ ~!i ......g z S n
nOZ ..
:oo..lOl OZIII g .. e: Z
"c...OZ mOl .m. ..lOll'" .. 0 .. 0
.....0 0." -< m
M~a~ ..... ~:d ~ .. -l
~% :!~~ 0
.. m
!~It Z~ ~;i c: III 0
moe: .. .. (f)
_,.0'" "Z Il!!" S~I 1ft -< ..
:z~: e:1: :1~= ~'"~ .. " m
a~~i I~ m!:lo . % 0
mml: :II . Z
~o;=g :1< 00" ~e:1Il :II < m
.... 1ft 1ft
z~;~ ~~ !j'" "'O.~ I'" ..
0 ..
,,< ..~ ml'"" -< 0
;=mO %.. I~~ F g ..
..",z 0.. ,,2 1ft <
oc:... ... ::;;!S
...... Ill" Ii .. .. I:
1\ =tEP .m 0 . .
"':il oa -<0 zm 0 0 >c
%e: ..0 g... " 0 i
I; ;2m", 0'" ~~ .... i c:
" .00 ,,0 ~~ I:
z-.. Z =I'
.,.:~ ~:!! 2.. 1ft
Ii z- % !I! ;
IIlZ g g
~:;lft ... Z :'"
-.. .
.. >c lOl
m
.. !"
'..
i
"I
1'1
, '
...
~
o
!::l
r:-
,\,1
Ii
I'
'1,1
i! '\
i I,
ll'
\:1
I~!
~!!
c'I'
!~!
Ii
I) ';\
\, '1
:1 I
I ,
,\
I
.. I I
~ ',I '
>
...
,i
,\
, i
~
I
-..
'j
l\ ,
\\ ;
;\1.
~
".'\1'
'; J
,e
'I
'I
'!
':'! J
,
,i
il
~ i
I
I
I'
1\
II
II
r
"
i
I
I
g
.j
'oj
1"
:t
!Ie!:
\\~!:.
:1
:\ \1
r \1
.I :
il ':
\1
1 ,I
<5
"'!
::D
~
rezonlnQs property anal y.sls
MASTER SITE PLAN
L......... 0.. .
r II ;~l~~l
'i()_:';~~l
,
~!
:~:
'------l'-
GROVE PLAZA
r '.
.. ..
t I ~
. . .
non
:II :II :II
m m m
.. ... ...
, , ,
.... .... z
S ~ ~
~ ~ ~
~
i ;: CI
... .. ..
III < n
~ is ~
o e: z
e: .. -
(I) N ...
"2 ~ J
t i ~
I; .I ;
.; ~ l'
~ ~ :
!ll J J
! - -
. "
~ ~ ::
. . .
o 0 n
:II .. :II
m m m
... .. ..
. . ,
... ... ..
III :. c:
;D < F
~ ~ ~
Z 0 lOl
~ ~ 8
. m <
... .. III
Z ~ ~
lOl m lOl
__ .. III
Ii -
A. _ :I
: i I
fJ ; J
~ :t ~
; ~ ~
1 ! ~
.. (f)
.. :::j
..
.. m
. 0
n
:II ~
..
!'
g )>
"
0
..
..
i:l
..
..
A.
N
.p
l
... ... ... ... ... ... .. ..
. . . . . . 0 0
21 ill :II .. :II ill -< -<
n 0 n n 1= .
m m m m m J!! I'"
I'" ,. .. I'" .. ... ...
'" 1ft 0 n .. . . .
.. ..
:00 :00
"""111-0"'0"'0 "D"'a" ""a" Z Z
......~......,.......,. lOl g
:II2I2II2:D::D:a:a:lf2l::D:D ... ..
Junuul(:X;lllll: ~~ :x,,~ .. m
izzzzzzzizzz 0 I:)
GlGllOllOllOllOllOllOllOllOlQlOl < c:
~ 3ii
~i:JiIlJnnillJiIl m
a a
~g~o~@o~~@~@ . .
a3iii5Sa3ii~3ii~3iii5!ii ~ i
...",,,,ilmlftmlft 1ft"""
"aaaaa"aaaa" ..
............ .. ..
... ...
I~XK~t:t=::=.=i& . .
J;l n
CltUJUJUlCftUJCftUJ0utCltUJ m
""'''''''''''''''a'''''O''''''' .. ..
........,............
onnnnnnnnnnn
...rnrnlftlftmmm,"mm",
c~tCn en uun en ell en f/I en en en
~
:D
^
Z
G>
o
~
)>
~
'^
mor-Ket feoslbllJty
Qovernmenta I process I nQ ----
, ,
I ~J-."':"j:
I .~ ~~..~ :It
i~ ~I~~ ;
I ' ,~
I I ' :1
I I '
i I i
PLANNING AND ZONING DEPARTMENT
MEMORANDUM NO. 95-506
Agenda Memorandum for
September 19, 1995 City Commission Meeting
TO: Carrie Parker
City Manager
FROM: Tambri J. Heyden 7<;11J
Planning and Zoning Director
DATE: september 14, 1995
SUBJECT: Grove Plaza - SBMP 95-001
Master Plan
Please place the above-referenced request on the September 19, 1995
City Commission agenda under Development Plans.
DESCRIPTION: charles W. Desanti and Julian Bryan, agents for Dr.
Wal ter Lanke and Ms. Auce Fay, proper'ty owner, are requesting
master plan approval to initiate subdivision of a commercial site
into six (staff report incorrectly indicates five) separate
parcels. The 8.23 acre site is located at the southeast corner of
Hypoluxo Road and Lawrence Road.
RECOMMENDATION: The Planning and Development Board, with a 4-3
vote, recommended approval of this request subject to staff
comments (utilities Department Memorandum No. 94-243, Engineering
Division Memorandum No. 95-323, Building Division Memorandum No.
95-233, Parks and Recreation Memorandum No. 95-394, Planning and
Zoning Department Memorandum No. 95-482 and the September 12, 1995
comments from Palm Beach County Traffic Division regarding
dedication of rights-of-way for the expanded intersection at
Lawrence Road and Hypoluxo Road and phasing of construction to the
widening of Gateway Boulevard from Military Trail to congress
Avenue and to the widening of Lantana Road from Militay Trail to
congress Avenue). The September 12th letter from Palm Beach county
supersedes their August 4th letter and indicates that traffic
concurrency can now be certified subject to compliance with their
right-of-way dedication and phasing comments.
TJH:dim
Attachment
xc: Central File
a:CCAgenHe.Gro
SEP-12-i99S 13:~S
.
'Board at Count)' Cornmi&&ianer&
.Ken L. Foster, Chairman
Burt Aaronson, Vice Chairman
Karen T. Marcus
Carol A. Roberts
Warren H. Newell
Mary McCarty
Maude Ford Lee
2~222222222222222
4~7 478 S77~ P.~2/~3
Count)' Administrator
Robert Weisman
Department of EngineerIng
and. PubUc Works
September 12, 1995
Ms. Tamb~i Heyden, Director
Boynton 89ach Planning and Zoning Department
100 E. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach, Fl 33425-0310
R[ ! GROVE PLAZA
Dear Ms. Heyden:
The Palm RQach County Traffic Division has reviewed the rev1sed traff1c 1mpact
study for the project entitled G~ove plaza, pur~uant to the Traffic Performance
Standards in Art;cle 7.9 of t~e Palm Beach County land Development Code. The
proposQd project will cons1$t of 18,000 square feet of general retail, 3,600
square feet of bank wi th drive-through and 7,200 square feet of fast food
rQshurant with drive through. The build-Dut has been rcv1SeCS from mid year 1996
to the end of 1996. The proposed project will generate 4,788 da1ly trips, given
a S% inte~naliz.t;on ~ate.
The tr.f'fi~ study corrects the def1c1ency Qf the earl1er traffic stUdY. It
add~essed the t~affi~ on Gateway Boulevard. The project 1s required to phase to
the widening of Gateway 8Dul~vard from M111tary Trail to Congress Avenue. The
project can build develDpment generat1ng up to 1,083 external daily trips before
the contract is let for this roadway improvement. This roadway improvement is
schedul ed for FY 96/97, '
The project is also required to phase to the Widening of Lantana Read from
Military Trail to Congress Avenue. The project tin bu11d development generating
up to 3,492 external da1ly tr1ps before the contract is, let for this roadway
imprcve~ent. Th1s roadway 1mprovement is a requirement of the Winston Trails
PUD. They are requ1re to pay for the improvement by the end of 1995. J do not
have the proposed contract letting date at this time.
The Traff1c D1v1s1on has determined that, based on the phasing of the project to
the w1den1ng of Gateway Boulevard from Military Trail tD Congress Avenue and the
Widening of lantana Road from Military Trail to Congress Avenue, the project
meets the requ1rements of the Traffic Performance Standards of Palm Beach County.
If you have any questions regardi ng thi s determination, please contact lIIe at 684-
4030.
,
@ primCi;/ ~r; 'fIo/~ p;I;)fK
"An Equal Opportunity- /\ffirmative Action Employer.
Box 21229 West Pdm Bea<:h, Florida 33416-1229 (407) 684-4000
SEP-12-199S 13:~S
2~222222222222222
4~7 478 S77~ P.~3/03
Septemb8r 12, 1995
M~. Tambr1 Heyden? Director
GROVE PLAZA
page two
P.lm Beach County has programmed the widening of Lawrence Road for FY 97/987.
This will be a S-lane roadway within a right-of-w~ of 80 feet. Hypo1uxo Road
is shown to have an ultimate ri9ht~of-way of 110 feet. Thi, will accommodate a
6-1ane roadway, although the widening ;s not scheduled at this time. Palm Bea~h
County request that the City of Boynton Beach require the development to dedicate
or reserve the right-or-way necessary for the ultimate ~ross settion for Lawrence
Road and Hypo 1 uxo Road, and an expanded 1 nter:sett i on at Lawrence Road and
Hypoluxo Road.
Sincerely?
OFFICE Of THE COUNTY ENGINEER
.G.-- ~4
Dan We1sberg, P.E.
Sen10r Reg1stered C1v1l Eng1neer
cc. W1111am Huk1ll, P.E.) D1rector
Boynton Beach Department of Development
F11e: TPS. Mun. - Traffic Study Review
g:\user\dweisber\wpSO\tps\boyn46b
,
TOTAL P.12l3
PLANNING AND ZONING DEPARTMENT
MEMORANDUM #95-4B1
SITE PLAN REVIEW
STAFF REPORT
FOR
PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION
september 12, 1995
DESCRIPTION OF PROJECT:
Project Name:
Grove Plaza
Applicant:
Dr. Walter Lanke and Ms. Auce Fay
Agent:
Charles W DeSanti/Julian Bryan
756 st Aubans Drive
Boca Raton, Florida 33486
Location:
Southeast corner of Hypoluxo Road and Lawrence
Road (See Exhibit "A" - location map)
File No.:
SBMP 95-001
Land Use Plan
Designation:
Local Retail Commercial (LRC)
Zoning
Designation:
Community Commercial (C-3)
Type of Use:
Master plan approval of a commercial site to
be divided into five separate parcels through
platting.
Number of
Units:
N/A
Square
Footage:
Site area:
35B,412 square feet
B.23 acres
29,500 sq. ft. in six
separate buildings.
BUilding area:
Surrounding Land
Uses and Zoning
District:
North
Hypoluxo Road and farther north
is Santaluces High School
located in Palm Beach County.
South
Agricultural area located in
Palm Beach County.
East
Residential property
Knollwood Groves PUD
zoned,
West
Aqricultural area located in
Palm Beach County.
Existing Site
Characteristics:
The property is a vacant lot that was once the
location of a landscaping and nursery
business.
Proposed
Development:
The project will require future site plan or
conditional use approval for six bUildings for
commercial, restaurant and retail uses. The
six bUildings will be located on five parcels
(see Exhibit "B" - master plan).
Page 2
Site Plan Review Staff Report
Memorandum # 95-481
Grove Plaza
Concurrency:
a. Traffic - The Palm Beach County Traffic Division has
reviewed the traffic impact study for the
proj ect pursuant to the Traff ic Performance
standards in Article 7.9 of the Palm Beach
county Land Development Code. The proposed
project will consist of 18,000 sq ft of general
retail, 3,600 square feet of bank with drive
through and 7,200 square feet of fast food
restaurant with a drive through. The build out
is 1996. The proposed project will generate
4,788 daily trips, given a 5% internalization
rate. .
The Traffic Division has determined that the
project does not meet requirements of the
Traffic Performance standards of Palm Beach
County. However, phasing or up to 23b of the
proj ect can be build up to 1,108 trips. Because
of the project I s proximity to Gateway Boulevard
and the existing traffic volumes on Gateway
Boulevard, from Lawrence Road to Congress, the
proj ect would be required to be phased in
conjunction with the widening of Gateway
Boulevard that is now scheduled for FY 96/97.
(see Exhibit "C")
b. Drainage - A drainage system consisting of an
exfil tration trench, catch basins and storm
sewer pipes will collect storm runoff and
convey it to the Lake Worth Drainage District
(LWDD) canal L-18 located on the north line of
the Grove Plaza site. The LWDD canal L-18 is
culverted by means of a 72 inch RCP in this
area. (see Exhibit "Oil)
Driveways:
Fou~ entrances into the proposed commercial
development are proposed. One entrance on
Lawrence Road that will allow northbound
traffic onto the site. Traffic will be one way
at this point. No traffic will be allowed to
re-enter Lawrence Road from the development.
Three entrances into the site will be on
Hypoluxo Road. The question of a posElible
traffic Signal for one of these entrances onto
Hypoluxo Road will need to be addressed at
time of site plan review (see comment #1
planning and Zoning Department Memorandum No.
95-482) .
PJ:lirlr;.....- Y"I~ _.J" "" t--...'P'*
~ho proposed parking facility for each of the
five parcels shall contain the spaces required
for the uses located on the parcel. Each
individual parcel will undergo further review
at the time of actual site.plan approval.
Landscaping:
An appeal to the city's landscape code is to be
filed to run concurrently wi th this master plan
application. The appeal is to the reqUired
perimeter landscape strip adjacent to the
access corridors between the individual parcels
within the development.
Page 3
Site Plan Review staff Report
Memorandum # 95-481
Grove Plaza
Building and Site
Regulations:
Building and si te regulations will be addressed
and met during site plan appl-oval for each
parcel. The proposed structures meet all
setback requirements in the C-3 zoning
district.
Community Design
Plan:
Requirements relating to the cityts Community
Design Plan should be addressed for all six
parcels at the time of submission for site
plan approval for the first parcel to be
developed (see comment #10 Planning and Zoning
Department Memorandum No. 95-482).
Signage:
Requirements relating to the city's sign code
and the Community Design Plan should be
addressed for all five parcels at the time of
submission for site plan approval for the
first parcel to be developed (see comment ?lO
Planning and Zoning Department Memorandum No.
95-482) .
REVIEW OF DEPARTMENTAL COMMENTS:
Below is a list of those departments that have comments regarding
this request. (see Exhibit "E" - staff comments)
DEPARTMENT
ATTACHED MEMORANDUM
Public Works
utilities
Fire
Police
Engineering Division
Building Division
Parks & Recreation
Forester/Environmentalist
Planning and Zoning
N/A
95-243
N/A
N/A
95-323
95-233
95-394
N/A
95-482
The utili ties, Engineering, Building, Parks and Recreation and
Planning and Zoning Departments' comments may be addressed on the
recitified master plan prior to platting. The remaining
departments did not have comments regarding their review of the
amended plans.
RECOMMENDATION:
The Planninq and Zoning Department recommends approval of this
Master Plan request, subject to the rectified master plan shoWing
compliance with staff comments and the applicable City of Boynton
Beach Code of Ordinance.
a:STPRPT.GRO
E X H I BIT
:t A "
.
. '
LC-~ATION MAF
GROVE PLAZA
: L _ _ __ . _-
--C="r-; r]~Jr~Fri~: :CP , ~
~ i ~ ," -.1,,~
nil -:: ~=
ff1 i ~~~ R1A
----1 ,?~~~ n ..,:
___J---1 / - ~ 7 C ~(
I ,~~Jlll I, ~~ U-;; L- PU ~"... .,...J.-..
I ~.:J 1 1-1; iUJ~~ - \4 J
-. 't~~: . = ~ LUI. 4 I
~i " '- :t*'l - i..t ~ ~ 'KNOLLW.OO~ L;d'~ .
f~ ~;'~ 1~"~" ":~. - ~ AG .. GRovell- =,
~-- --~ ~ - m::r-I,_ I I L \
~I) h '<...Ll k+rv .::: _~---t ,-"
,_ "f.-l_~-/fJj.nTTTlr"IJ,1I111:- _' .. .. .'- "~ 'ftit('"lfr(r.I.CC'(,
:iJl[f! '--';:'JI~- c~fF;U 'J. ~ · ~"~~ " :'II~- ~ ~~I-_' l?fii~-; ,/~,~i'
, ,j 8_" ::: H"-CI '- - m F:l r" '
== il =- ~ _, I
1
J-
.__ ll:.n.r 1~rrE-
/ ' ..U-p,~N: ""; / ~ .
.- 1-. ~~ill~~\ <"r- :)" ~: .
/ d -.-- 1/ lJI' oJ \J.l~ dJ J &~l~" ".
~" P _d__ ((.j \ =r--E ~ ~\~{l"
~ ~--'~. '~I ~. --- _A \l-!~ ,.
: /.' -f'~ \ H-j \ I
I :::=un-:cd [~ml'Cn.'-=l /1 f'!"1I1 I I I U
- -
l~ .., 0'0 C-1ti"A L to ~Q --=-., 1'111.1'11 'E J]JlillTnq(~~ll;, -
, I -1_.1~' ,.llI~,J~_~1 :=1- AG, ~ ~)8'-c-,,-:. ~~.~~~~.~~
.. . lY~ =:J: "';.Y'i'''i~nD~
\ ~ -:= =-l-T~)/.', ~ ~P~~~~\\.,'f.:-:~11 "'" \Ill IT
. I 111 II "J "BOYNTON' t ,~J~~'II:j.L"11 "',~ L/'-^..Pl. _ _"" ,tr_ 1 ~-_, !!ll--JJr--=r~~
-'~~~la:..;;~il;l=::~~~ NURSERIES" I~M..J~ ..~.'t:.A';'\7:~' '.:..:1 I ,= r\::= 7:. t..)
1:::::~~~![[;:;;:'I:~'i;~ L~~4~O -' .:j~~~~~~;:-:~~~" ~.: 1\1!~ ",
---- I ; -=.... ~.::~ -----~ PUO LUI:4.D =t tJ-,~
i: I ~ . ~ '1:1. ~=
~..
E ~1AA -~~"T:-
.., . ~~AJ.'-
................."'"
-
It ,. =; ==
I "BAUBAL'TO
GROVes"
~, ,-, i ~
~\~~~.I,I ; '"' L~~~.O -- f'" r/fJln II (II:
\~-1! rr= I ill- ~' L G> V'llnS; I -=!~_I
, /' ~ ..... - - L-.___-.-J L ~ ~-n::i 1:;::':
~ '.01, 1/,8 .MILESV ~ ~U~ -~--~~:~~Y ~i"Vrl-'1r
"1111 I. 1- -.. ~ h-f:~-f-II ~ I fl' ""
'0 400.800 FEET - 111111111, ' ~ I {~ ,
Pi.Af\/NI':'r. Lll":Y~ q--~5 I~i~-= I. i.1 I I i (\ I ,I ('~'/ I; I ,J
I
r
~
SITE:
N.C
r
l
~)tl:\ '1 B '1 rr
" 'B "
..
\
\
\-----
60l ~ -:--
.. '
., or ....." ~ ~
.. .,. ~." if. r II'
'0 ~o'l ~~if. Q\~ '! "!. ~
~~~'!I. I'I!~\ \O,! i~; r-. ~ ~
~~$~ ~HI ~"&f' 'r.~"f. 9.\ \ c:.
~~~'tt ~<;. l:ol ~~ ., \
{.,,<>.. \'$.\ ~f,- o..a 'i '\ ...
..ll.'6"'i ... i"''i '1~ll! ~ to <>
-a~i~ t~ ll!'r.e. ti~' .. ... f,
"'jij ~ li:i. 0:."'" 'o_~. <>
~~\\ lIIS \~ \~ -,\ \.
'l""- ',\ ~11" \~:;. ~ 'r.
f!....'S~ '" ~i)1O .,," ('\ q
,r .I.... ....'II'.. '.1
\\~ r\ \~ V'tt ':. \
t~ '!\ + "\\
\\\ \ \\ ~ .
,%\ ~ i.'- ~~ \
'\~.. 1-1 ~ '\ .
'n,l ~~ "
"'~ ,.
'30
-
_,,_,-,WiJ..~IIJ-'--' ,
-------
\
. \
" \ ~
\ \,
, \\
" ~
\ \\
,
\
\
....,
"'\.
"
"
\
\
....
,
\~',
~\,
, .
'1', \\
, \ \
',\ '\\
'\' ' I
\
'$\
"i.
..
\
~
~.
0. 1!" ..
..;,,~;t.1. '
~1$"'" ,,~.,.
.. ,,~(l. ':II ~
~~\\~,,\
\ '\. . ~ . 'Q
.' ... t. \
. ...~~~~
~'1'''\\
,'f~t; '\
1.... \ \' ~ c;, .~
.. t'\ ~ "" '
"', '"'\\' \
.. '" ;.
'''''l~\l
...\\~.,'\1
~~$"
~1'~~~
?\.~~
\.\ \ 1.
..
\\1
, ...
~~ ~
~
1
\
\
ttJ'"_\1
~ i'lIlt
~",dl"~
ft'-
__I""
.t'.O'\'l'-
4lI-1'"
~..d'
)\\\\
~ .-d)",e.'f/II'6
d of\ '" ~-
~\l.\",of\ ,..~
E X H I BIT
"e"
..
August 4, 1995
Ms. Tambri Hayden, Director
Boynton Beach Planning and Zoning Department
100 E. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach, FL 33425-0310
P.E: GROVE PLAZA
Dear Ms. Hayden:
The Palm Beach County Traffic Division has reviewed the traffic impact study for
the project entitled Grove Plaza, pursuant to the Traffic Performance Standards
in Article 7.9 of the Palm Beach County Land Development Code. The proposed
project will consist of 18,000 square feet of general retail, 3,600 square feet
of bank with drive-through and 7,200 square feet of fast food restaurant with
drive through. The build-out is 1996. The proposed project will generate 4,788
daily trips, given a 5% internalization rate.
The traffic study identifies Gateway Boulevard as being within its 2 mile study
area, but fails to address the traffic volumes on this roadway. As you are
aware, the existing traffic volumes on Gateway Boulevard, from Lawrence Road to
Congress Avenue, exceed the LOS 0 traffic volumes for both daily and peak hour,
peak direction traffic. The project would be required to phase to the widening
of Gateway Boulevard. The roadway improvement is scheduled for FY 96/97.
The Traffic Division has determined that the project does not meet requirements
of the Traffic Performance Standards of Palm Beach County. Phasing to the
widening of Gateway Boulevard is required to meet the Traffic Performance
Standards. If you have any questions regarding this detcrlr.~nati~n, pleas€:
contact me at 684-4030. .
r ~ I~-"::l~ ~ ;l:. -'~;-l W
PLANNItlG AND \ <--
ZONING OEPT. ""'::::".J
County Administrator
Robert Weisman
[loa'rd of County Commissioners
. Ken'l.. roster, Chairman
Burt Aaronson, Vice Chairman
Karen T. MarclIs
Carol A. Roberts
Warren H. Newell
Mary McCarty
t.-tallde Ford Lee
epartment of Engineerinl
and Public Works
Sincerely,
ph.;. s',", j (.{ ':) os 1~ :r,;)
(~y{. r.{ -41'"
?cjfL{ t-..!..~. L<,(f
I J ~ I ('hie, s
~.' ,. o.'...~
~I.!ti' ,)L,:. ,,/
J
OFFICE OF THE COUNTY ENGINEER
,~ ')r~
Dan Weisberg, P.E.
Senior Registered Civil Engineer
cc. William Hukill, P.E., Director
Boynton Beach Department of Development
File: TPS - Mun~ - Traffic Study Review
g:\user\dweisber\wp50\tps\boyn46
"An Equal Opportunity - Affirmative Action Employer"
@ printed on 'ecycled "aper
Box 21229 West Palm Beach, Florida 33416-1229 (407) 684-4000
E X H I BIT
"nil
<II
, ,
CARNAHAN. PROCTOR AND ASSOCIATES, INC.
Consulting Engineers ' Surveyors ' Planners ' Land Development Consultants
DRAINAGE LEITER
GROVE PLAZA
CPA 950404
Grove Plaza is an 8,228 acre retail commercial project located in the southeast quadrant
of the intersection of Hypoluxo and Lawrence Roads.
A Drainage System consisting of exfiltration trench, catch basins and storm sewer pipes
will collect storm runoff and convey it to the Lake Worth Drainage District (LWDD)
canal L-18 located on the north line of the Grove Plaza Site. The LWDD canal L.18 Is
culverted by means of a 72" RCP in this area.
Water quality will be accomplished on site by means of dry retention in grass areas and
exfiltration trench. Furthermore to enhance water quality inlets will be located in
"Grassed" areas.
Berming and perimeter road elevations will be utilized to contain the twenty five year
three day event on site.
Fi.nally finish floor elevations will be set above the one hundred year three day zero
discharge event.
19654
i:lwordfftw.isNJ",.,,,,,,.doc
6191 West Atlantic Blvd. . P.O. Box 4399 ' Margate, FL 33063 . (305) 972-3959 . FAX (305) 97104178
Old, (30S> 949.6826 , Palm Beach (407) ]64~7
11930 Fairway Lakes Drive, Bldg. 6, Suite 4, Ft. Myers, FL 33913
(813) 561.2800 . Fax (813) 561-282l
E X H I BIT "E"
I '
MEMORANDUM
Utilities # 95-243
---
~ rn@~n~J ~IOO
,1\11 ',' \ '
PLANNING AND >S
ZONING OEPT.
TO:
FROM: John A. Guidry,
Director of Utilities
Date: July 28, 1995
SUBJECT: Grove Plaza,
Master Plan Second Review
Staffhas reviewed the above referenced project and offer the following comments:
1. Gfavity sanitary sewer system does not show connection to an existing system.
Please show on your plans that in fact you can reach an existing gravity
sanitary sewer system, (Sec. 26.16 (a)).
2. Once approved for use the developer shall provide unobstructed stabilized
access to the water and sanitary sewer mains and appurtenances at all
times, (Sec. 26.33(a)).
It is our recommendation that the plan proceed through the review process.
If you have any questions regarding this subject, please contact Skip Milor at 375-6407 Of
Peter Mazzella at 375-6404.
8m
xc: Clyde "Skip" Milor
Peter Mazzella
File
,
DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION MEMORANDUM NO. 95-323
TO:
Tambri J. Heyden, Planning & Zoning Dire
0'i~am Hukill, P.E., City Engineer
August 28, 1995
," '''\ 'J
J-!" '1 .c.. 9 ,,....r- ~~
J"",,, ...~......
RE:
GROVE PLAIA - 2ND MASTER PLAN REVIEW
-~'.-.
FROM:
DATE:
t-..
Based on our previous review, the following items remain to be
addressed:
General - #1 and #6
Future - #1 thru #13
Please consider the following additional comments:
A. Project shall conform to County approved phasing plan
regarding amount of development (see attached County
Traffic Study Review.
B. All plans submitted for specific permits shall meet the
City's code requirements at time of application. These
permits include, but are not limited to the following;
site lighting, paving, drainage, curbing, landscaping,
irrigation and traffic control devices. Permits required
from agencies such as the FOOT, PBC, SFWMD and any other
permitting agency shall be included with your permit
request.
C. The master plan is subject to the provision of Chapter 2
of the LOR Sec. 9C, pg.2-80.
D. Specify the name, address, telephone number of the
applicant's agent. Chap.3, Art.IV, Sec. 3D, pg.3-4
E. Provide a statement that all utilities are available and
will be provided by appropriate agencies. ' Chap.3,
Art.IV, Sec.3R, pg.3-S
F. Provide Traffic Impact Analysis. Chap.2, Sec.9C4h(S),
pg.2-8S and Chap.3, Sec.3S, pg.3-S
G. Provide a master stormwater management plan. Chap.3,
Art.IV, Sec.3T, pg.3-6
H. si te plan review & approval required. Chap. 4, Sec. 2,
pg . 4 -1 "
I. Sidewalks are required on both sides of all local and
collector streets. Chap.6, Art.III, Sec.11A, pg.6-3
J. Provide Certification by Developer's Engineer that
drainage plan complies with all City codes & standards.
Chap.6, Art.IV, Sec.SA, pg.6-7 & Chap.23, Art.IIF,
pg.23-8
K. Provide sidewalk locations & details. Chap.6, Art.IV,
See. lOT, pg.6-l4 '
L. Need SFWHO & LWOD acceptance prior to Engineering
approval. Chap.6, Art.VII, Sec.4B, pg.6-24
Engineering Division Memo No. 95-323
Re: Grove Plaza - 2nd Master Plan Review
August 28, 1995
Page #2
M. County and/or State permits required for construction in
R.O.W. Chap.6, Art.VII, Sec.4B, pg.6-24
N. Install appropriate turn arrows on pavement to supplement
left & right turn only signs. Chap.23, Art.IIB1, pg.23-7
O. Install one way arrow signs in medians for egress
dr i veways with no median opening. Chap. 23, Art. I IB2 ,
pg.23-7
Additional review time 1 hour for Mr. Hall ($20.64) and one hour
for Mr. Hukill ($43.17), for a total of $63.81.
WVH:ck
C:(lROVEPI.7..2MP
BUILDING DIVISION
-
MBMQRANDOM NO. 95 - 233
July 13, 1995
From:
Tambri Heyden, Planning & Zoning Director
Al Newbold, Deputy Building Official
Grove Plaza
Southeast corner of Lawrence Road aDd Bypoluxo Road
To:
Re:
Because of the short time we" had to review the plans for the'
above project building made no comment at the 7/11/95 meeting,
however, we would like for the applicant to be made aware that at
the next stage review he needsto address the following:
1. Signage.
2. Setbacks from the property line or phasing line.
3. Handicap ramps and access walkways from the road to the
entrance of the building.
4. Elevations and floor plans.
5. Each phase must have enough parking, etc., to comply
with the code for each building within that phase.
AN:mh
cc: William V. Hukill, P.I., Department of Development Director
A:aaOYI.TRC
RECREATION & PARK MEMORANDUM #95-394
TO: Tambri Heyden. Planning & Zoning Director
RE:
Kevin J. Hallahan, ForesterlEnviroomentalist ~~>>
Grove Plaza. Master PlanlExJstlnl Trees
FROM:
DATE:
August 28, 1995
The following is a summary of the trees to be relocated on the site based upon the tree survey:
Tree Survcqr #: ~
HL Sl2L
I 8' 10'
3 14' 16'
4 25' 25'
8 25' 30'
9 8' 6'
16 16' 10'
26 12' 10'
27 12' 10'
28 12' 10'
29 12' 10'
The following trees noted to be removed should be relocated:
10
II
14
.lR
14 total trees to be relocated.
12'
14'
14'
18'
10'
10'
10'
10'
The landscape plan should show at least 61 trees on site, including the 14 transplanted trees and
newly installed trees Am required for landscapo codo complianco,
The applicant must tag all trees for relocation and preservation prior to issuance of the land clearing
permit.
..
The plan should continue in the normal review process.
K.H:ad
Time: ForesterlEnvironrnentalist
Secretary:
I hr. @ $23.28/hr. = $23.28
.25 hr. = $ 3.49
Total: $26.77
PLANNING AND ZONING DEPARTMENT
MEMORANDUM NO. 95-482
TO:
Tambri J. Heyden
Planning and Zoning Director
FROM:
Dan DeCarlo
Assistant Planner
DATE:
September 12, 1995
SUBJECT: Master plan - 2nd Review
Project: Grove Plaza
Location: Southeast corner of Hypoluxo Road and Lawrence
Road.
Agent:
Charles W. DeSanti
File No.: SBMP 95-001
The following is a list of comments regarding the second review of
the above-referenced project. It should be noted that the comments
are divided into two (2) categories. The first category is a list
of comments that identify unresolved comments either from the first
review or new comments as a result of the second review. To show
compliance with these comments will not substantially alter the
configuration of the site and design of the building. The second
category is a list of recommendations I believe will enhance the
aesthetics and function of the project.
All comments and recommendations can be rectified on the plans at
time of permitting if the site plan request is approved. The
applicant must understand that additional comments may be generated
upon review of the documents and working drawings submitted to the
Building Division for permits for the proposed project. .
I. SITE PLAN REVIEW COMMENTS
1. The traffic analysis should be expanded to include left
hand turning lane for Hypoluxa Road into entrance into
development me~iap break. Due to phasing of project, at
time of si te plan review of each parcel, additional
reviews must be made to determine impact of turning lane,
interior traffic, signage, and one way traffic proposed
that connects the back of the parcel.
2. Approval of a landscape appeal is required to develop the
property as shown on the Master Plan. The plans should be
modified to show the results of the final determination
of the landscape appeal and reference on the plans the
landscape appeal file number 95-004.
3. A master storm water management plan (section 3,T) must
be submitted shOWing impact of phasing as proposed.
(This plan is required regardJp~~ n~ ~~"~~"- ~hft~in" i~
proposed. )
4. Computations for required number of handicapped parking
spaces shall be shown along with location of the
handicapped parking spaces being delineated on the master
plan.
5. Show on the master plan the buildable area within each of
the six (6) parcels including the setback dimensions.
6. ReqUirements relating to the city's Community Design Plan
must be addressed for all six parcels at the time of
submission for site plan approval for the first parcel to
be developed.
Page 2
Comments for Grove Plaza
File # SBMP 95-001
7. Staff recommends the south access aisle be completely
installed with development of the east property line of
the proposed parcel development.
ex: Build parcel F. with complete entire access
aisle
ex: Build parcel C. wi th complete entire access
aisle to the east property line of parcel C.
8. Cross access easements shall be shown on the master plan.
9. All proposed easements shall be shown on the master plan.
10. It is recommended that a note be added to the master plan
that will carryover and be reflected on the plat
document that states that signage and building design for
all six parcels shall be unified in appearance as one
plaza in conformance with the city's sign code and
Community Design Plan.
11. A master property owners' association agreement/documents
for maintenance of common inf~astructure will be
necessary for review by staff, prior to recording and
prior to platting.
12. The applicant shall pay the additional fee required for
the extra (third) review requested, prior to the city
Commission meeting of September 19, 1995.
13. Pla~e phasing lines on the master plan that reflect the
phasing of the construction of the development required
by Palm Beach County.
14. Submit three copies of a rectified master plan to the
Planning and Zoning Department prior to submitting for
platting.
DCD:dim
a:2ndcolZI:l..ljJt"o
PLANNING AND ZONING DEPA
MEMORANDUM NO. 95-50~
VIII. DEVELOPMENT PLANS
D.
cc: Planning, Develop.
Utilities
Agenda Memorandcm for
September 19, 1995 City Comm1ssion Meet1ng
TO:
C3.rrie Parker
City Manager
FROM:
Tambr1 J. H~Yden~/~
Planning and 20n1ng D1rector
DATE:
September 14, 1995
SUBJECT: Grove Plaza - SBMP 95-001
Master Plan
Please place the above-referenced request on the September 19, 1995
City Commlssion agenda under Development Plans.
DESCRIPTION: charles W. Desanti and Julian Bryan, agents for Dr.
Wal ter Lanke and Ms. Auce Fay, property owner, are requesting
master plan approval to 1nitiate subd1vision of a commerc1al site
into SlX (staff report incorrectly indicates five) separate
parcels. The 8.23 acre site is located at the southeast corner of
Hypoluxo Road and Lawrence Road.
RECOMMENDATION: The Planning and Development Board, with a 4-3
vote, recommended approval of this request subject to staff
comments (Ut1l1ties Department Memorandum No. 94-243, Engineering
Division Memorandum No. 95-323, Building Division Memorandum No.
95-233, Parks and Recreation Memorandum No. 95-394, Planning and
20n1ng Department Memorandum No. 95-482 and the September 12, 1995
comments from Palm Beach county Traffic Div1sion regarding
dedication of rights-ot-way for the expanded intersection at
Lawrence Road and Hypoluxo Road and phasing of construct1on to the
Widening of Gateway Boulevard from Military Trail to Congress
Avenue and to the widening of Lantana Road from Mil1tay Trail to
Congress Avenue). The September 12th letter from Palm Beach county
supersedes their August 4th letter and indicates that traffic
concurrency can now be certified subject to compliance with their
right-af-way dedication and phasing comments.
TJH:dim
Attachment
xc: Central File
a:':::CAije:1He.G::-:J
,.,.
407 478 S771J P .1J2/1J::: I . ,
COWlt)' Admini,trator
Robert Weisman
SEP-12-199S 13:0~
Baatd of County Commis&ion"""
Ken L. FOSler, Chainnan
Bwi: AarOnson, Vice Chairman
Karen T. Marcus
Carol A. Roberts
Warren H. Newell
Mary McCarty
Maude Ford lee
22222222222222~22
Department of Engineering
and Publlc Works
September 12, 1995
Ms. Tamb~i "eyden, Oir.eto~
Boynton Baach P1anning and Zoning Department
100 E. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach. Fl 33425-0310
U! GROVE PLAZA
Dear Ms. Heyden:
The Palm Beach County Traffic Division has reviewed the rev1sed traff1C 1mpact
study for the project entitled arove Plaza, pursu&nt to the Traff1c PerfDrmance
Standards in Article 7.9 of the Palm Beach County Land Development Code. lhe
proposad project will consist of 18,000 square feet of general retail, 3,600
5quare feet of bank wi th drive-through 41nd 7, 200 squa~e feet of fast food
restaurant with drive through. The build-o~t has been rov1sed from mid year 1996
to the end of 1996. The proposed prQje~t will generate 4,788 daily trips, given
a 5% ;nte~nal;z.t;on ~.te.
lhe traffic study corrects the deflc1ency Of the larl ter traffic stUdy. It
addressed the t!-affic on Gateway Boulevard. The project 1s requ;red to phase to
the widening of Gateway Boulevard from Mtl1tary Tra11 to Congress Avenue. The
project can build development generat1ng Up to 1,083 external daily trips before
the contract is let for th1s road~ay improvement. This roadway improvement is
schedlll ed for FY 96/97, '
The project 15 also requ1 red to phase to the Widening of lantana Raad frDm
Military Trlil to Congress Avenue. The project cln bu1ld development 98n.rating
up to 3,492 external da11y tr1ps before the contract is, let for thlS roadway
improvement. Th1s roadway improvement 1s a requirement of the Winston Trails
PUD. They are requ1re to pay for the improvement by the end of 1995. I do not
have the proposed contract letting date at this time.
The Traff1c D1v1s1on has determined that, based on the phasing of the project to
the W1den1ng of Gateway 80ulevard from Military Trail to Congress Avenue and the
widening of Lantana Road from Military irail to Congress Avenue, the project
meets the requ1rements of tne Traff1 c Performance Sta.ndards of Palm Beach County.
If you have any questions regarding this determination, please contact lie at 684-
4030.
,
@ ""'''ltI "" "",.. pIf;W
..A.n Equal Opportunity - ,\ ffirmlltive Action Employer"
Box 21229 Welt Palm Beich, Florida 3M16-1219 (401) 68+-4000
5EP-1~-1995 13:05
22222222222222222
407 478 5770 P.03/03
Septemb8r 12, IOOS
Ms. lambri Hayden) Director
GROVE PLAZA
pige two
Palm Beach County has programmed the widening of Lawrence Road for FY 97/987.
This will be a S-lane roadway within a right-Df-~~ of 80 feet. Hypoluxo Road
is shown to have an ultimate right.of-way of 110 feet. This will accommodate a
6-1anl roadway) .lthough the widening ;s not $cheduled at this time. Palm Beach
County request that the City of Boynton Belch require the development to dedicate
or reserve the right-of-way necessary for the ultimate crD~S $ection for Lawrence
Road and Hypoluxo Road) and an expanded intersection at Lawrence Road and
Hypoluxo Road.
Sinl;enly)
OFFICE OF THE COUNTY ENGINEER
~~4
Dan Weisberg, P.E.
Senior Reg1stered C1v1l Eng1neer
CC. W1ll1am Huk111, P.E., D1rector
Boynton 8each Department of Development
File; TPS - Mun. - Traffic Study Rev1ew
g:\user\dwe1sblr\wpSO\tps\boyn46b
,
TOTAL P.eJ:3
..,
~
PLANNING AND ZONING DEPARTMENT
MEMORANDUM #95-481
SITE PLAN REVIEW
STAFF REPORT
FOR
PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION
September 12, 1995
DESCRIPTION OF PROJECT:
Project Name:
Grove Plaza
Applicant:
Dr. Walter Lanke and Ms, Auce Fay
Agen t :
Charles W DeSanti/Julian Bryan
756 st Aubans Drive
Boca Raton, Florida 33486
Location:
Southeast corner of Hypoluxo Road and Lawrence
Road (See Exhibit "A" - location map)
File No.:
SBMP 95-001
Land Use Plan
Designation:
Local Retail Commercial (LRC)
Zoning
Designation:
Community Commercial (C-3)
Type of Use:
Master plan approval of a commercial site to
be divided into five separate parcels through
platting.
Number of
Units:
N/A
Square
Footage:
Site area:
358,412 square feet
8.23 acres
29,500 sq. ft. in six
separate buildings.
Building area:
Surrounding Land
Uses and Zoning
District:
North
Hypoluxo Road and farther north
is Santaluces High School
located in Palm Beach County.
South
Agricul tural area located in
Palm Beach County.
East
Residential property zoned,
Knollwood Groves PUD
West
AQr1cultural ar.a located in
Palm Beach County.
EXisting Site
Characteristics:
The property is a vacant lot that was once the
location of a landscaping and nursery
business.
Proposed
Development:
The project will require future site plan or
conditional use approval for six buildings for
commercial, restaurant and retail uses. The
six bUildings will be located on five parcels
(see Exhibit "B" - master plan) .
Page 2
site Plan Review staff Report
Memorandum # ~-481
Grove Plaza
Concurrency:
a. Traffic - The Palm Beach County Traffic Division has
reviewed the traffic impact study for the
proj ect pursuant to the Traff ic Performance
Standards in Article 7.9 of the Palm Beach
County Land Development Code. The proposed
project will consist of 18,000 sq ft of general
retail, 3,600 square feet of bank with drive
through and 7,200 square feet of fast food
restaurant with a drive through. The build out
is 1996. The proposed project will generate
4,788 daily trips, given a 5% internalization
rate.
The Traffic Division has determined that the
project does not meet requirements of the
Traffic Performance Standards of Palm Beach
County. However, phasing or up to 23\ of the
proj ect can be build up to 1,108 trips. Because
of the project's proximity to Gateway Boulevard
and the existing traffic volumes on Gateway
Boulevard, from Lawrence Road to Congress, the
proj ect would be required to be phased in
conjunction with the widening of Gateway
Boulevard that is now scheduled for FY 96/97.
(see Exhibit "en)
b. Drainage - A drainage system consisting of an
exfiltration trench, catch basins and storm
sewer pipes will collect storm runoff and
convey it to the Lake Worth Drainage District
(LWDD) canal L-18 located on the north line of
the Grove Plaza site. The LWOD canal L-18 is
culverted by means of a 72 inch Rep in this
area. (see Exhibit "D")
Driveways:
FOUL entrances into the proposed commercial
development are proposed. One entrance on
Lawrence Road that will allow northbound
traffic onto the site. Traffic will be one way
at this point. No traffic will be allowed to
re-enter Lawrence Road from the development.
Three entrances into the site will be on
Hypoluxo Road. The qUlist10n of a p08siblli
traffic signal for one of these entrances onto
Hypoluxo Road will need to be addressed at
time of site plan review (see comment #1
Planning and Zoning Department Memorandum No.
95-482).
P~~~~~7 ~~~i1~.u.
The proposed parking facility for each of the
five parcels shall contaln the spaces required
for the uses located on the parcel. Each
individual parcel will undergo further review
at the time of actual site plan approval.
An appeal to the city's landscape code is to be
filed to run concurrently with this master plan
application. The appeal is to the required
perimeter landscape strip adjacent to the
access corridors between the individual parcels
within the development.
Landscaping:
., ,..
Page 3
Site Plan Review staff Report
Memorandum # 95-481
Grove Plaza
Building and Site
Regulations:
Building
and me t
parcel.
setback
district.
and site regulations will be addressed
during site plan approval for each
The proposed structures meet all
requirements in the C-3 zoning
Community Design
Plan:
Requirements relating to the city's Community
Design plan should be addressed for all six
parcels at the time of submission for site
plan approval for the first parcel to be
developed (see comment #10 Planning and Zoning
Department Memorandum No. 95-482}.
signage:
Requirements relating to the city's sign code
and the Community Design Plan should be
addressed for all five parcels at the time of
submission for site plan approval for the
first parcel to be developed (see comment ~la
Planning and Zoning Department Memorandum No.
95-482) .
REVIEW OF DEPARTMENTAL COMMENTS:
Below is a list of those departments that have comments regarding
this request. (see Exhibit liE" - staff comments)
DEPARTMENT
ATTACHED MEMORANDUM
Public works
utilities
Fire
Police
Engineering DiVision
Building Division
Parks & Recreation
Forester/Environmentalist
Planning and Zoning
N/A
95-243
N/A
N/A
95-323
95-233
95-394
N/A
95-482
The util i ties, Engineering, Building, Parks and Recreation and
Planning and Zoning Departments' comments may be addressed on the
recitified master plan prior to platting. The remaining
departments did not have comments regarding their review of the
amended plans.
RECOMMENDATION:
The Plann1nq and Zoning Department recommends approval of this
Master Plan request, subject to the rectified master plan shOWing
compliance with staff comments and the applicable City of Boynton
Beach Code of Ordinance.
.,S'I'PIlP'I'.GIlC
E X H I BIT
"A"
..
, ,
... - - - ......... ,...,... -. . -...
- ..
,., LOCATION I-flAP
GROVE PLAZA
. L _ _ _ ~
tt"" ~CI~v .eot:H' _,
c~T,4 r~~r! TJ T~i~ · r-~_ ~ r-
I 1: ~- ~ -)
r-1, i' --11- - r;,
I J I I - ~
HbL" I 1/ ~j~ ~ . --
~ I ./ f= R ... A r
--r---l [,' ?J~ r i ";111
___.1--1, . ~~~l fiT I I:,:t. ~,~ P.UD' fft"':f
;' [:~('Q'f'J~' ,:~,~.~ LUI. 4.tO If' - ,
.../ --~: .~i.: 1:~]t:: ~ 'KNDLLWDOD Il~-=-,I~
~ '-, - ~ '- ~ v ~^ ~ =-=
~i ~, _ ~.n.~ ~ . - ~ AG ... GRD s. ,
If- ;'~~~ ~~~ I . ~,
~I, f- \(En cD.=j E . .~rI f
- J 'b 1__ - "")fT;~lm ElU1TlIIT. ..-=-. ~~ 1....1 ni' I / 111 1.111' r.1 rf2=. I,',.
"rr r / '-Jf 1 .:.Iv~L :al .~ 1_5'~""-~E~ ~' I"
;IJI] I I~ rn. J.1, .,. ~ --;- .... - ~,= - & :<"
1/l 11 - 1. -~t--~C:_:l(J -~' 1'; E ~:r" '_I~ ~ .,- ,,~r~l t'
, If~'-)"~ ~"~ :~, -, == III :111111 ~ -. (;'rVI
-- . 117~~'\:" IrlmrrT '\1"
-- ., ..I r W. \C'-: f- ", " / (" ..
L ) G\ s'~ ", -.' . ),,~ ~~' "
_ / - h - -- ~-10~\ .'.r rr. j ~~",\l,,~:
-~ p- -.---- ~. ;..); ~J-'==-"F ~ I~~~\~~'>:
- .'- '. -- ___L ~ 11~ \ I
"'-/\" .I (( t- "/lrl 4 I.,
): :, Fie ~ Tlll H-I i
f. . I "n-=C: [nnurn".:::a >1-" ",i II I 11_\
'~ OA~A, AG ~ ~~mJ!!A [J~~l'('l ,-
ill <~. ~.~_.~~_" .~. ~:" '}~'r ~~t:;'i\.i~
)1 \ /lJ I II.r~ ~ - C ~l '~~l ~ [:~~}.~'f-=l '~llfl.f/.~=- L,!
-'/,j1l- .: .".'I'r"'.....~- "BOYNTON --'" ~i.LI 1,>1" '''.1'<- v..t.-l I ~ ;r
I ,--.1 _\ LJlA ~ ,... - l . : ~.... :- ~ -:
..~ ;J...._i~_. 1:---.............._ NURSERIES" '~T . _,. ., I = _ __ .
I -'- . ' .. ~ \ J . h r f" . . 1 _ '
I:::: ~~;!~i;:;~:-I~~'i;~ L~~4~D -" ':;~~~~U~L ~~~.:~. ~.: ~ Ij'l- E=f: "('
.- : _:-J~_::: -.-_-7-: PUD LUI.4.D ==i L...Il-
I , ~. -:- ~_.
E1:' R1AA :,,~~~
.. · '......~-~~~.. I ~l Ilm~
,ll..lTI1 - .. ::~. = "BA~~~:::~:i'B" ".......:r~.:..r1tn '~";JI~~- [ .
1.li : ~ _ ~[![T1';J Q Ii
~._I i
1 ''':':;;''
, ~j I "-IF II . : L t1 ~ I~-
I~J, ~. II · ill =- L u ~ -........J L
. ~~'\ I--L. ~__~ ! E-~~:.:
: '0 1II11tl . MILESY I "" ~U~ ~.::.- --I:~:~"",n ~'-I~T-I_jL"-
'0 400. 800 FEET 111111111 I' i I If. II, ( , I;
P/...A/IININr. OF.pr, q~f.5 I~_j=:-~ I': ./1 J lJ n. I '!.' I'
I
~ '
SITij
NIC
=
E X H I BIT
liB"
4
, ,
""'"
...,
\
\---- -
\
-?
0'_ _ _ ..- - eocIV""--""
I
\
, \\
\ \\
\\
\
\
-
... ... ":"
.. ~ .
... .
. - '" .. ~ ~
':" . ..,,-...,.~f"""
o ~'i1. ;'9.~ lI!l~ \ ~ ~
,\" ~\ \,\\ ,\~\ ,\ \
..~lI! ~~ ......<1 <<< ~~ .. ~
~~~o at'" ~~, t'" C l
... Of" .~\ ~.. ~... ... 'll '"
t.~1I\. ...'" \...... O' 0 0 ~ ...
...O~~ '" ......0 ill "" ~ 0
~\~~ tft t~\ "\ \. a '
'!1.~\\ ~\ ~~ \~\ \s 0
,~9_ \~ \1 ,~O ~,
\l\~ ~,. tt;- '!4l~ t' '" ~
\;~"i ~) \\ \~ t \ \
\"', ," \\ !.'i~ \ " ~
~\~~\y~ \\
~\\ ~\~ t\ \
.1.;' ~, ~
Cj",;' !"
\
\
\
\\
~~':.~~ \
... ~ '... '.. .,. to .
':,,,...-;,....\
~~\c;:.\\
\\,,~";";f
a ~ ~ l ;\'\\
,'ft't' \.
\\\\\\'
,.\\'~\l'
. " l "
,,~~~~
.. ~ $ -:. 'l:
'\ 1 \ '1"
\
'\ \ '.
\ '.
I \
\ '
, .
..
\\
"
"
\
\
-; ii\
~" . t' ..
':..f/l~
. .
\1
\ ... \'
, , 1
, \ \\
'\' I .'
,..
\ i "
~ \ ~
"i
~
1....\0\ \
.........
"",,'1'"
~o",,~'1
,.e'l-oC""\f"i4*
vltod' 0'>.,0"
.'0' \>\........,"4
-r c: ~\..p..\'\
,....p..'O\E. t\ '0\''''
Gf\O\,J €. t>\.. p..1. po.
"
=
'E1tU1.~1.'t
" C "
lJoard of County Commissioner~
Ken 1.. foster, Chairman
llu rt Aaronson, Vice Chairman
K:lrcn T. Marcus
Carol A. [~obl'rts
Warren H. Newell
Mary t-..tcCarty
f\lallue Ford Lee
IrolJ~';- ~ II
I .' I
iUUI
i \;
':W.l
, . :'~-I' U
I : .
County Administrator
Robert Weisman
August 4, 1995
Ms. Tambri Hayden, Director
Boynton Beach Planning and Zoning Department
100 E. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach, FL 33425-0310
P.E: GROVE PLAZA
PLANNING AND
ZONING DEPT.
~~
epartment of Engineerir
and Public Works
Dear Ms. Hayden:
The Palm Beach County Traffic Division has reviewed the traffic impact study for
the project entitled Grove Plaza, pursuant to the Traffic Performance Standards
in Article 7.9 of the Palm Beach County Land Development Code. The proposed
project will consist of 18,000 square feet of general retail, 3,600 square feet
of bank with drive-through and 7,200 square feet of fast food restaurant with
drive through. The build-out is 1996. The proposed project will generate 4t788
daily trips, given a 5% internalization rate.
The traffic study identifies Gateway Boulevard as being within its 2 mile study
area, but fails to address the traffic volumes on this roadway. As you are
aware, the existing traffic volumes on Gateway Boulevard, from Lawrence Road to
Congress Avenue, exceed the LOS D traffic volumes for both daily and peak hourt
peak direction traffic. The project would be required to phase to the widening
of Gateway Boulevard. The roadway improvement is scheduled for FY 96/97.
The Traffic Division has determined that the project does not meet requirements
of the Tra ffi c Performance Standards of Pal m Beach County. Phas i ng to the
widening of Gateway Boulevard is required to meet the Traffic Performance
Standards. If you have any Questions regarding this detC!rn:~nati~n, plEase:
contact me at 684-4030.
Sincerely,
fhk ~., .. j (.{ ': I () S 1.: r..... )
( .:? Ylc., r..{ ~ {"
{.l.. <-'jE L t \ -. .! .. L:... L, I ~
I j ~ \ ~ -/7 Ie, s
j-J'-" o,'...~
L\,' ~ ,~C.: ' .,
-'
OFFICE OF THE COUNTY ENGINEER
,~ )1,--:!/
Dan Weisberg, P.E.
Senior Registered Civil Engineer
cc. William Hukill, P.E., Director
Boynton Beach Department of Development
File: TPS - Mun. - Traffic Study Review
g:\user\dweisber\wp50\tps\boyn46
"An Equal Opportunity - Affirmative Action Employer"
@ p"med on '<<ycJed ".".,.
Box 21229 West Palm Beach, Florida 33416.1229 (407) 684-4000
E X H I BIT
liD"
.
, ,
-., ,..
CARNAHAN. PROCTOR AND ASSOCIATES, INC,
Consulting Engineers . Surveyors . Planners ' Land Development Consultants
DRAINAGE LETTER
GROVE PLAZA
CPA 950404
Grove Plaza is an 8.228 acre retail commercial project located in the southeast quadrant
of the intersection of Hypoluxo and Lawrence Roads.
A Drainage System consisting of exfiltration trench, catch basins and storm sewer pipes
will collect storm runoff and convey it to the Lake Worth Drainage District (L WOO)
canal L-18 located on the north line of the Grove Plaza Site. The L WOO canal L-18 Is
culverted by means of a 72" RCP in this area.
Water quality will be accomplished on site by means of dry retention in grass areas and
exfiltration trench. Furthermore to enhance water quality inlets will be located in
"Grassed" areas.
Berming and perimeter road elevations will be utilized to contain the twenty five year
three day event on site.
Finally finish floor elevations will be set above the one hundred year three day zero
discharge event.
i,\wordlfuulSNra. ,_,doc
6191 West Atlantic Blvd. . P.O. Box 4399 ' Marple. FL 3J063 . (30S) 972-3959 . FAX (305) 97J.4178
o.dlI (305) 9..9-6826 . "'1", Beach (401) 364-0617
11930 Fairway lake. Drive, Bid.. 6, Suite 4, Ft. Myers, FL 33913
(813) 561.2800 . Fax (813) 561-2821
E X H I BIT "E"
~
.,
MEMORANDUM
Utilities # 95-243
--
~ ~ @ ~ U ~J ~,rn
\III .. \
PLANNING ~ND ~S
lor~ING DEPT.
TO:
FROM: John A. Guidry,
Director of Utilities
Date: July 28, 1995
SUBJECT: Grove Plaza,
Master Plan Second Review
Staffhas reviewed the above referenced project and offer the following comments:
1. Gravity sanitary sewer system does not show connection to an existing system.
Please show on your plans that in fact you can reach an existing gravity
sanitary sewer system, (Sec. 26.16 (a)).
2. Once approved for use the developer shall provide unobstructed stabilized
access to the water and sanitary sewer mains and appurtenances at all
times, (Sec. 26.33(a)).
It is our recommendation that the plan proceed through the review process.
If you h~ve any questions regarding this subject, please contact Skip Milor at 375-6407 or
Peter Mazzella at 375-6404.
sm
xc: Clyde .Skip" Milor
Peter Mazzella
File
DEVELOPMENT DEPARTMEBT
BNGINBERING DIVISION MEMORANDUM NO. 95-323
TO:
6(~:mJ~u::::~n:.:~~n:~::
August 28, 1995
GROVE PLASA - 2ND MASTER PLAN REVIEW
& Zoning
,-
FROM:
Engineer
--......;-.-.
DATE:
.' 1 '""\ ~J
io-: 1 , 9 !,-.--:
J................
RE:
.....
Based on our previous review, the following items remain to be
addressed:
General - '1 and '6
Future -'1 thru #13
Please consider the following additional comments:
A. Project shall conform to County approved phasing plan
regarding amount of development (see attached County
Traffic Study Review.
B. All plans submitted for specific permits shall meet the'
City's code requirements at time of application. These
permits include, but are not limited to the following;
site lighting, paving, drainage, curbing, landscaping,
irrigation and traffic control devices. Permits required
from agencies such as the FOOT, PBC, SFWMD and any other
permitting agency shall be included with your permit
request.
C. The master plan is subject to the provision of Chapter 2
of the LDR Sec. 9C, pg.2-80.
O. Specify the name, address, telephone number of the
applicant's agent. Chap.3, Art.IV, Sec. 3D, pg.3-4
E. Provide a statement that all utilities are available and
will be provided by appropriate agencies. Chap. 3,
Art. IV, Sec.3R, pg.3-S
F. Provide Traffic Impact Analysis. Chap.2, Sec.9C4h(5),
pg.2-85 and Chap.3, Sec.3S, pg.3-5
G. Provide a master stormwater management plan. Chap.3,
Art. IV, Sec.3T, pg.3-6
H. Site plan review & approval required. Chap.4, Sec.2,
pg . 4 -1 "
I. Sidewalks are required on both sides of all local and
collector streets. Chap.6, Art.III, Sec.l1A, pg.6-3
J. Provide Certification by Developer's Engineer that
drainage plan complies with all City codes & standards.
Chap.6, Art.IV, Sec.SA, pg.6-1 & Chap.23, Art.IIF,
pg.23-8
K. Provide sidewalk location. 'detail.. Chap.6, Art.IV,
Se~.lOT, pg.6-14 '
L. Need SFWHD & LWDD acceptance prior to Engineering
approval. Chap.6, Art.VII, Sec.4B, pg.6-24
...
,.,
Engineering Division Memo No. 95-323
Re: Grove Plaza - 2nd Master Plan Review
August 28, 1995
Page #2
M. County and/or State permits required for construction in
R.O.W. Chap.6, Art.VII, Sec.4B, pg.6-24
N. Install appropriate turn arrows on pavement to supplement
left & right turn only signs. Chap.23, Art.IIB1, pg.23-7
O. Install one way arrow signs in medians for egress
driveways with no median opening. Chap. 23, Art. I 1B2,
pg.23-7
Additional review time 1 hour for Mr. Hall ($20.64) and one hour
for Mr. Hukill ($43.17), for a total of $63.81.
WVH:ck
C;<lROVEPJ.7..2MP
- .
BUILDING DIVISION
MBMORANDUM NO. 9S - 23 3
July 13, 1995
-._-
=
From:
Tambri Heyden, Planning & Zoning Director
A1 Newbold, Deputy Building Official
To:
Re:
Grove PJ.aza
Southeast corner of Lawrence Road aDd Bypoluxo Road
Because of the short time vehad to review the plans for the'
above project building made no comment at the 7/11/95 meeting,
however, we would like for the applicant to be made aware that at
the next stage revi.ew he needs to address the following:
1. Signage.
2. Setbacks from the property line or phasing line.
3. Handicap ramps and access walkways from the road to the
entrance of the building.
4. Elevations and floor plans.
S . Each phase must have enough parking, etc., to comply
with the code for each building within that phase.
AN:mh
cc: William V. Hukill, P.I., Department of Development Director
.:aIOYI.TIC
..
~
RE eRE A nON & PARK MEMORANDUM #95-394
TO: Tambri Heyden, Planning & Zoning Director
RE:
Kevin I. Hallahan, Forester/Environmentalist \<(~ ~
Grove Plaza - Master PlanlEIIstiol Trees
FROM:
DATE:
August 28, 1995
The following is a summary of the trees to be relocated on the site based upon the tree survey:
Tree Survey #: ~
IlL Sl1L
I 8' 10'
3 14' 16'
4 25' 25'
8 25' 30'
9 8' 6'
16 16' 10'
26 12' 10'
27 12' 10'
28 12' 10'
29 12' 10'
The following trees noted to be removed should be relocated:
10
Jl
14
.l.R
14 total trees to be relocated.
12'
14'
14'
18'
10'
10'
10'
10'
The landscape plan should show at least 61 trees on site, including the 14 transplanted trees and
newly installed tree. lam required for landleape code compliance.
The applicant nmst tag all trees for relocation and preservation prior to issuance of the land clearing
permit.
The plan should continue in the normal review process.
KH:ad
Time: ForesterlEnvironmentalist
Secretary:
I hr. @ $23.28/hr. = $23.28
.25 hr. = $ 3.49
Total: $26,77
..
TO:
FROM:
DATE:
.,
W"
PLANNING AND ZONING DEPARTMENT
MEMORANDUM NO. 95-482
Tambri J. Heyden
Planning and Zoning Director
Dan DeCarlo
Assistant Planner
SUBJECT: Master Plan - 2nd Review
september 12, 1995
Project: Grove Plaza
Location: Southeast corner of Hypoluxo Road and Lawrence
Road.
Agent:
Charles W. DeSanti
File No.: SBMP 95-001
The following is a list of comments regarding the second review of
the above-referenced project. It should be noted that the comments
are divided into two (2) categories. The first category is a list
of comments that identify unresolved comments either from the first
review or new comments as a result of the second review. To show
compliance with these comments will not substantially alter the
configuration of the site and design of the building. The second
category is a list of recommendations I believe will enhance the
aesthetics and function of the project.
All comments and recommendations can be rectified on the plans at
time of permitting if the site plan request is approved. The
applicant must understand that additional comments may be generated
upon review of the documents and working drawings submitted to the
Building Division for permits for the proposed project.
I. SITE PLAN REVIEW COMMENTS
6.
1.
The traffic analysis should be expanded to include left
hand turning lane for Hypoluxo Road into entrance into
development mediap break. Due to phasing of project, at
time of site' plan review of each parcel, additional
reviews must be made to determine impact of turning lane,
interior traffic, signage, and one way traffic proposed
that connects the back of the parcel.
2 .
Approval of a landscape appeal is required to develop the
property as shown on the Master Plan. The plans should be
modified to show the results of the final determination
of the landscape appeal and reference on the plans the
landscape appeal file number 95-004.
3.
A master storm water management plan (section 3,T) must
be submitted shOWing impact of phasing as proposed.
(This plan is required rea~r~'~r~ "& .~~~~~- ~~~~inn is
,1JLoposed. ) -- oJ
4.
Computations for reqUired number of handicapped parking
spaces shall be shown along with location of the
handicapped parking spaces being delineated on the master
plan.
5 .
Show on the master plan the buildable area within each of
the six (6) parcels includin9 the setback dimensions.
ReqUirements relating to the city's Community Design Plan
must be addressed for all six parcels at the time of
submission for site plan approval for the first parcel t~
be developed.
Page 2
Comments for Grove Plaza
File # SBHP 95-001
=
7. Staff recommends the south access aisle be completely
installed with development of the east property line of
the proposed parcel development.
ex: Build parcel F. with complete entire access
aisle
ex: Build parcel C. with complete entire access
aisle to the east property line of parcel C.
8. Cross access easements shall be shown on the master plan.
9. All proposed easements shall be shown on the master plan.
10. It is recommended that a note be added to the master plan
that will carryover and be reflected on the plat
document that states that signage and building design for
all six parcels shall be unified in appearance as one
plaza in conformance with the city's sign code and
Community Design Plan.
11. A master property owners' association agreement/documents
for maintenance of common infrastructure will be
necessary for review by staff, prior to recording and
prior to platting.
12. The applicant shall pay the additional fee required for
the extra (third) review requested, prior to the City
Commission meeting of september 19, 1995.
13. Place phasing lines on the master plan that reflect the
phasing ot the construction of the development required
by Palm Beach County.
14. Submit three copies of a rectified master plan to the
Planning and Zoning Department prior to submitting for
platting.
DCD:dim