CORRESPONDENCE
~- ~ ~ *lft-
~ :?1M
BUILCU;G LEP.~_RTMn;T
MEMC?ANDUM NO. 9')-~25
~~'l .3. ,~;"' :: _ , -I -. . '
_~:::'..~i.'.:.___2..;. _-_=">I~:""" .t:..___.::.....-.j, ."~';::~Ii.--:'='~..:
Ed Allen
Ed Hillery
John Guidry
30:' ;:i.:hcrst
;). c t i: 1 9 ..; ~ .3 i s tan t t c t 11 e ~: i t ~/ E r: g i :: = ~ r
::i::.-e Ct-"ief
Police Chief
utilitles Dlrector
,; c t ~: 1 -r F ub 2. i:; it: c r}:.s D i l' e c !. c: L'
\,'incellt. Finizi ')
.' .
--.-. --~-_._-_.
_....l.c.l..J....L:::: .t_::=;....o.e..;..~__:...-
? :i~- }:.:; ,.~ ~::.~ __ r~ 3.:'~'::.... J 1.1:2:' t.~.l~
T:;'ffiot:rj C3::non
I~teriT. ~l3~~i~~ r.lr~ct~r
FEOH:
_- '."., ,_-"'= ~~':"_'.- -_-:~ ,,-_' c-=_" .'.'" '=", 0 ,- ,< - -'," ,-- """:" --'" ~
--'-:0'. ~.- -- ..><..< -.,".,'''' .-------,- '-/'
Michael E. Haag, Zoning and Site Administrator
RE:
ISSUANCE OF CERTIFICATE OF OCCUPANCY
Q~ail Lak2 We3t (single family)
1900 Corp~rate Elvd.
Boca Ra~c~, FL 33431
Coscar. Florica Inc.
The above refere~ced proJEct is nearing completlon. Prior to the
Btlllding DE:pa:.-tmer..t issri.::"l!.g the Certificate o~ Occupancy, I wou::'d
lIke to ensure that you do not have any outstanding or pending issues
concernin':J tl'lis s::.te that E1LL3t be re:tified (excl~ding issues t:'lat
3.1-2- C:.);l-=.re:l eL~til-'-2:1};- witl'. a :i~~{ 3.pp~-o\,"-=d 8l~1-E::::~).
~F the ~~sus~ ~~~ r~lats: ~~ perm~ts :..ss~e~ ~y che Lcilding
~epartrnent, please pr~vlde this department with the permit nUffiDer and
~:.attll-e ".:.~f Ll111-esolved iz:E-tlE:. If trle llI11-.3sol\led iSS1.18.s are n0t ;:-le:..-mit
related, notify the cwnel- or the ownel-S agent V", ensure t:.hat tlj,e
issu=s ~re ~e:ti:ied.
Plea.s~ ::esFond t.:. t1113 .:r:1C-== y.,':..t:':.ir:.. 1.021: d3.js so th2.t. we maY proceed
to issue the Certificate of O=cupancy, Ttank you for your cooperation
and t~~ely response.
cc: ~. Scott Miller, Clty Manager
Bill Ca~anaugh. Fir3
Jlm :';,:-l'::=e11. ?lanniI:.g
Lt. .:>ale Hammac,;:' pcll::e
Fet~ Maz~ella, Utllitles
Warren Shelhamer, Public Works
..z.;....-. <'
John lrJildner, Rec.
DOL Jchnson, Insp.
J. Brocmf:..eld, Comm. :mp.
Kevin, Hf1l1al1ari';' FOl'ester
Flle
itECElVED
_/~~~
, 0:7 ~L
01,' ,&N ,; \'1--,' '. ._.
It~~\~,. 'I'
FIN.z:...LCCl, SDD
...-'--
-:-== '
- -~ --
Board or Crunty Commissioners
Carol A~ Rdberts, Chair
Carol J. El~quist, Vice Chairman
Karen T. Marcus
Dorothy Wilken
Jim Watt
A (?".... .J I---
'-, /'~~~
County AdministratOl
Jan Winters
---~~
Department of Engineerin~
and Public Works
II. I:' Kahler!
County Engineer
September 15, 1988
Thomas J. Lira
Director of Planning and Development
Coscan
1900 Corporate Boulevard N.W.
Suite 400, East Building
Boca Raton, FL 33431
SUBJECT:
QUAIL RUN - WOOLBRIGHT ROAD
Dear Mr. Lira:
I am writing in response to your letter of September 12, concerning a six month
time extension for the construction of Woolbright Road.
Although this section of Woolbright Road is being reviewed and permitted by Palm
Beach County, it is the City of Boynton Beach whi ch imposed the condition
requiring its construction.
I would, therefore, suggest that you contact the City with any requests for time
extensions.
Please do not hesitate to contact this office if I can be of further assistance.
AJS~-
Andrew S. Hertel --,
Engineering Asst. III - Traffic Division
ASH: j r
cc: Mr. Charles R. Walker - Traffic Division
Mr. Carmen Annunziato - City of Boynton Beach
Mr. Tom Clark - City of Boynton Beach
File: Roads "Woolbright Rd."
Municipal ity "City of Boynton Beach"
'~rP)
C~'-~ ~ ,J'
~ ,~~
....(', ,
cop w''', '\'
~" '>( '.
, \) 't-
~~\\~~
\>~
ash\qua il
.. An Equal Opportunity - Affirmative Action Employer"
BOX 2429 WEST PALM BEACH, FLORIDA 33402-2429 (407) 684-4000
/ Coscan Florida. Inc.
i I
/ f
.~.: N
Mr. Tom Clark
City Engineer
City of Boynton Beach
200 N. Seacrest Boulevard
P. O. Box 310
Boynton Beach, Florida 33425-0310
Re: Quail Run
Woolbright Road
Dear Mr. Clark:
As you are well aware, in conjunction with developing Quail
Run, we are committed to constructing the Woolbright Road
extension by April of 1989.
Unfortunately, our construction of the project has not
proceeded as expeditiously as originally planned and we
wish to request a six month extension of the deadline.
Please advise me of the proper procedures to obtain approval.
Thank you very much.
& Development
TJL:pr
cc: Carmen Annunziato - City Planner
~C1ECEIVED:
~EP 14 ..
PLANNING DEPT~.
--
-----
Boca: (407) 994,1433. Dade: (305) 935,1292 . Broward: (305) 427-3204 . N, Palm Beach: (407) 736-8118
.
Coscan Florida, Inc.
Suite 400 East Building
1900 Corporate Boulevard N.W,
Boca Raton, Florida 33431
(407) 994-1433
Mr. Andrew S. Hertel
Engineering Assistant III
Traffic Division
P. O. Box 2429
West Palm Beach, Florida 33402-2429
September 12, 1988
Re: Quail Run
Woolbright Road
Dear Mr. Hertel:
Thank you very much for your assistance in obtaining for
us a credit for constructing the Woolbright Road extension.
Unfortunately, development of Quail Run has not proceeded
as expeditiously as originally planned. We, therefore,
would like to request a six month extension to the April,
1989 deadline for constructing the road. Please advise
us as to the proper procedure for obtaining the extension.
Thanking you in advance.
, ~relY,
~~'A
ThOZ~J ~.
Director of Planning & Development
TJL:pr
cc: Carmen Annunziato - City of Boynton Beach
Tom Clark - City of Boynton Beach
ltiCEIVED
SEP 14 ._
PLANNII\~G DEPT~
..
Boca: (407) 994,1433 . Dade: (305) 935,1292 . Broward: (305) 427,3204 . N, Palm Beach: (407) 736-8118
,/
I
, 0, lr." J..{
/ ':-/QJ"
( 7J~;>r\A^ C ,'( [LCV< ,;0/
(\ lA /{.. ,('" [r
\ /'0 X (' c" '( ,,\
y'r --.::../ ' ",'
.~ O~ \( r' 11 T\~
\) kv'" _,/ (I' I t ~ (j. ) ,d 2'
\ > "'March 4. 19 tJy 'J (, 1/'''';
"*~, ley: c/ ~ C "
(~~- ,\ / L (/ ~ e
'j \\ V:; ,
. Shalloway, Foy, Schofield,
Rayman & Newell, Inc.
City of Boynton Beach
P.O. Box 310
Boynton Beach, FL 33425
Attn.: Mr. Thomas Clark, P.E.
City Engineer
,
,
Re: Quail Run - Woolbright Road
Job No.: 86-74
P.B.C. Job No.: 87538A
Dear Tom:
Please find attached one set of plans for Woolbright
Road as per our phone conversation. I have checked the
previously approved plans, the old design had 5' sidewalks.
This road is on the County thoroughfare plan. The County
typical section requires 6' sidewalks and a flexible
pavement design which exceeds the previously approved plans.
These plans have been submitted and resubmitted to the
County for approval. As discussed this is a courtesy copy
as requested.
JGF:at
cc: Coscan
RECEIVED
... ij 1988
PLANNING U~PT.
f "
-
Engineers. Planners. Surveyors
1~1 Belvedere Road, West Palm Beach, Florida 33400 3051655-1151
.
Coscan Florida. Ine,
Q-Y -^'-
~ ~ /',JZ....T-
RECEIVED
~U6r-
PLAN~~l'iG DEPT~
Suite 400 East Building
1900 Corporate Boulevard N,W,
Boca Raton. Florida 33431
(305) 994-1433
Mr. Carmen Annunziato
Planning Director
City of Boynton Beach
P.O. Box 310-33425
Boynton Beach, Florida
August 3, 1987
33425
Re: Quail Run Drainage Easement
~~€\-l
Dear M~ziato:
Enclosed please find a copy of the executed drainage easement.
I have not received the recorded copy as of this date but will
forward same when I receive it.
If you have any questions, please do not hesitate to contact
me.
. Cuozzo
or of Planning & Development
-",..~
1"\1' -,1....,\ ,,)
-,;; )....4 v
....,n ~ C:iG >>- '
vz\..jv
>-
;,1<J~1
fS.\\G
; \ .
,. ,.)'-'
~
Boca: (305) 994-1433. Dade: (305) 935-1292. Broward: (305) 427-3204. N, Palm Beach: (305) 736-8118
June 1,5, 1987
1U B"
G~~l \~ti~ \1)
~~C
RECEIVED
:'--
~
":
('
Mr. Tom Clark
City Engineer
City of Boynton Beach
P.O. Box 310
120 N.E. 2nd Avenue
Boynton Beach, FL 33435
JUN 1 7 1987
PLANf\jII~G LJc.Pf.
-
HAND DELIVER
RE: Quail Run
S.I. Job #86-74
.
Dear Mr. Clark:
Attached are two copies of the cost estimate for the
required improvements for this project. Please review the
cost estimate and approve it as soon as possible. It will
take us several weeks after the cost estimate is approved to
obtain a bond for this large amount. Please remember, as
directed by this city council and this city manager, this
item needs to be ready for final plat approval at the July 7
City Council Meeting.
Your cooperation in this matter is greatly appreciated.
Should you have any questions, please call.
Sincerely,
7;-4PL
Donald C. Palmer, E.I.
DCP : cb
cc: Don Cuozzo
ENGINEERS -' PlA~RS - SUAVEYOAS 120 1 8El\,€DEAE ROAD - WEST FfILM BEACH. R.oRIDA 33415 305/655- 1151
ENGINEERS, PLANNERS, SURVEYORS
TELEPHONE: 305/655-1151
~I!!I ~~~~~ii.."~~c"H~~~33405
April 23, 1987
Mr. Carmen Annunziato
Planning Director
City of Boynton Beach
P.O. Box 310
120 NE 2nd Avenue
Boynton Beach, Fl 33435
Re: Quail Run (formally Quail Lake West)
Sidewalk Requirements
Dear Mr. Annunziato:
This letter is to request relief from the requirement
of sidewalks as specified in section 22-25(b) of the street
and sidewalk ordinance. It is the developer's desire to
replace the two sidewalks with an 8' bicycle path along SW
26th Street.
We are also proposing to put a six foot bicycle path at
the entrance. We feel this is justified because the
majority of the expected pedestrian traffic flow is within
the development and not in and out of the development.
Should you have any questions, please do not hesitate
to call.
Sincerely,
cpd (2L
Donald C. Palmer, E.I.
DCP:kce
cc: Donald Cuozzo