February 25, 2000
James Bellucy
Construction Coordinator
Bethesda Memorial Hospital
2815 South Seacrest Boulevard
Boynton Beach, Florida 33435
Re: Bethesda Hospital Expansion Phase One
MMSP 00-015
Dear Mr. Bellucy:
In response to your request for the administrative review and approval of modifications proposed to the
above-referenced, approved site plan, please be informed that the proposed change shown on the revised
plans dated 2/14/00 is "minor", as defined within the Land Development Regulations, Chapter 4- Site
Plan Review.
This project may continue to be processed by the Building Division as a permit application. Please
contact me at (561) 742-6260 if you have any further questions.
Sincerely,
ot&-~ ~v
Lusia Galav
Senior Planner, AICP
LG/nl
Attachment
1 :ISHRDA T A IPlanninglSHAREDI WPIPROlECTSIBethesdaINWSP-P.'\RKlNGIBethesda Expansion.doc
America's Gateway to the Gulfstream
100 East Boynton Beach Blvd.. P.O. Box 310 Boynton Beach, Florida 33425-0310 Phone: (561) 375-6260 FAX: (561) 375-6259
DEVELOPMENT DEPARTMENT
MEMORANDUM
TO:
Lusia Galav
Senior Planner
FROM:
Scott Barber
Acting Senior Planner (Gee & Jenson)
DATE:
February 24,2000
SUBJECT:
Bethesda Hospital 3rd and 4th floor expansion - MMSP 00-015
After preliminary review ofthe submitted documentation for the above mentioned project, I have
determined that this can be reviewed as a minor modification. The plans call for expansion of
building square footage while not increasing the number of beds. The proposed plans for the
hospital retain existing setbacks, bed count and the parking requirements.
ILlrti~jJ-m~c IS-
-
-
Bethesda Memorial Hospital
February 10, 2000
Michael W. Rumpf
Director Planning & Zoning
City of Boynton Beach
Department of Development
100 E Boynton Beach Boulevard
Boynton Beach, Florida 33425
Dear Mr. Rumpf:
As we have discussed at our meetings, Bethesda Hospital is planning two phases of
construction here to start within 4-6 months of each other. The first phase, which I
am hereby requesting a minor site modification approval, is an addition to the
existing third and forth floors. This construction is about five percent or less of the
hospital's total square footage. This addition will not in any way increase patient
volumes, visitors or any new services, but allows us to have about 50% private
rooms for patient comfort and satisfaction. Included with this request are the new
floor plans and elevations along with a $100.00 check as required.
Phase II will follow shortly after this and at that time we will submit a major
modification application with you.
If there are any questions, please feel free to call.