TRAFFIC IMPACT ANALYSIS
FIRST SOUTHERN BANK PROFESSIONAL PARK
Prepared for
FIrst Southern Bank Realty CorporatIOn
Prepared by
YVONNE 2IEL TRAFFIC CONSULTANTS, INC
1144086 STREET NORTH
WEST PALM BEACH, FLORIDA 33412
(561) 624-7262
December 11, 2000
TABLE OF CONTENTS
INTRODUCTION
EXISTING CONDITIONS
ASSURED CONSTRUCTION
BACKGROUND TRAFFIC
MAJOR PROJECTS
TRIP GENERATION
TRIP DISTRIBUTION
PERFORMANCE STANDARDS ANALYSIS
Test One
Alternate Test One
IntersectIOn AnalysIs
Test Two
Dnveway AnalysIs
CONCLUSION
APPENDIX A - GROWTH RATE WORKSHEET
APPENDIX B - INTERSECTION ANALYSIS WORKSHEETS AND TRAFFIC COUNTS
4
4
4
6
6
6
6
11
11
11
11
LIST OF TABLES
TABLE TITLE PAGE
EXIstmg (1999 - 2000) Dally Traffic CondItIOns ..,
.)
2 EXIstmg (1999 - 2000) Peak Hour Traffic CondItIOns ..,
.)
3 Tnp GeneratIOn Rates 5
4 Tnp GeneratIOn 5
5 Internal/External Tnps 5
6 Pass-by and New Tnps 5
7 Future (2001) Daily Traffic CondItIOns 8
8 Future (2001) Peak Hour Traffic CondItIOns 8
9 Future (2001) AM Peak Season Peak DIrectIOn Traffic CondItIOns 10
10 Future (2001) AM Peak Season Off-Peak DIrectIOn Traffic CondItIOns 10
11 Future (2001) PM Peak Season Peak Duectlon Traffic CondItIOns 10
12 Future (2001) PM Peak Season Off-Peak DIrectIOn Traffic CondItIOns 10
11
FIGURES
1
2
3
4
LIST OF FIGURES
TITLE
PAGE
2
7
9
12
SIte LocatIOn
Tnp DIstributIOn
Future (2001) Dally Traffic CondItIOns
Dnveway Volumes
III
INTRODUCTION
Yvonne ZIel Traffic Consultants, Inc was retaIned to perform a Traffic Impact AnalysIs to assess
the traffic Impact of a proposed 33 909 square foot (SF) medIcal office and 2,091 SF bank to be
located along the south sIde of Woolbnght Road west ofI-95 as shown In Figure 1 BuIld-out IS
antICIpated In 2001
EXISTING CONDITIONS
The major roadway adjacent to the project IS Woolbnght Road, WhICh IS a SIX lane road. Table 1
shows the eXIstIng (1999 - 2000) average daIly traffic (ADT) condItIOns on the Impact area roadways
and Table 2 proVIdes the peak hour traffic condItIOns at the same locatIOns The ADT volumes were
obtaIned from the Palm Beach County 1999 - 2000 Traffic Volumes Map the peak hour volumes
were determIned by factonng the ADT volumes by 0093
ASSURED CONSTRUCTION
ConstructIOn of a northbound left turn lane on Seacrest Boulevard at W oolbnght Road IS a reqUIred
Improvement by Lowe's of Boynton Beach.
~~
(SITE)
Lake Ida Rd
YVONNE ZIEL
TRAFFIC CONSULTANTS, INC
TRAFFIC ENGINEERING & PLANNING
1144086 Street North, West Palm Beact1. F!onda 33412
Telephone 561-824-7262 Fax 561-624-9578
J
N.T.S.
Boynton Beach Blvd.
Q) LO "C
> O'l
<{ ...!.. > >-
Ul m :=
Ul U; I
Q)
.... cv Cij
Cl ....
C t.) Qj
rn
0 cv "C
U (/) cv
LL
Woolbright Rd
-
FIGURE 1
FIRST SOUTHERN BANK PROFESSIONAL PARK
SITE LOCATION
.oc.f)
(j)0
(j)~ cO cOW
(j)
..-
00 00<t
t-t-O
5~ 00"-
0::
.01-0 .0 .0 cO
(j)~~ ..-..-<t
C'l C'l to.
$ '2. -i<tcrJ
...... 0:: crJcrJcrJ
I-
b%: 000
c.f) 000
~ 0 (j)(j).o
~z cOcO~
~Q <t<t
a..t:. tOto .0
0 u...c.f)
-;tz OW
zO *~
00
-0 ~
c.f)-
c.f)u... w..........
w'2. c:: c::
'(50:: t:.ww
c.f).o.o
..-0::1- u..."?"?
wa..~ 0--
c6~4. 3:'0'0
.c(~o 3:~
I-cO"-- .0
z<6 00
0::0 ~to
wC';l
:I:(j)
I-(j)
?(j)
0::::" Z
c.f)t9
IU)~ 0
o::~ ~
u:;<. 0
W S
~
o a..
o .0
b<t
(\).
O~
I .
......<t
......0
~
~
4-
o
0::
009
o::o::u-
I-~~
r5(9t9
~~~
cO cO cO
~~~
000
000
3:3:3:
c.f)
o
~
00
5~
0::
.o~O::
(j)<!.?
(j)u.l0
~a..:I:
c.f)
z
o
~E
~o
a..z
o
-;to
zo
o~
(i)'2.
~o::
u...t-
00::
C'l0::?
wa..o
~~:I:
~~~
t-co~
za..
~g
:I: 0
S'd,
o(j)
c.f)~
-"
1U)t9
o::z
U:~
c.f)
;<.
u.l
':t. c.f) ~
<!.O~
w~
a..
cO COW
00<t
t-t-O
00......
~~~
..................
crJcrJcrJ
000
.o.oC'l
.0.00
<t<tcrJ
to to .0
c.f)
u...W
o~
*~
z
Q
~
o
S
W'C'C
I-Wu.l
(j).o\!)
u..."?"?
0--
:::>,'0'0
:::>'3:~
0<6
~to
000
0::0::0::
r-t-'i
:I::t.t9
(9t9-
~~o::
cOcO':}
~~o
000
00
3: 3: 3:_
*
~
o
0::\
.------
BACKGROUND TRAFFIC
The Palm Beach County Urban Study Area Traffic Volume Growth Tables provIded by the Palm
Beach County Engmeenng Department, mcludes hIstoncal traffic count data for the roadways wIthm
the Impact area of the proJect. The growth rates for the roadway were determmed from these tables,
and then applIed to the respectIve lmks to determme background traffic growth to 2001 AppendIx
A contams a table WIth the grovvth rate calculatIOns
MAJOR PROJECTS
The Palm Beach County (PBC) Engmeenng Departments major project map and lIst were consulted
to locate those projects needed to be reVIewed for consIderatIOn m proJectmg background traffic The
Lowe s project on Woolbnght Road has been mcluded as a major project m the traffic study The
Lowe s IS projected to be completed by Januarv 2001
TRIP GENERATION
Tnp generatIOn was performed usmg the rates found m the Palm Beach County Impact Fee
Ordmance, and the InstItute of TransportatIOn Engmeers', Tnp GeneratIOn, 6th EdItIOn. Table 3
shows the tnp generatIOn rates used and Table 4 shows the tnps generated by the proposed proJect.
Table 5 shows the IntemallExtemal tnps and Table 6 provIdes the Pass-by and New tnps, Tnp
generatIOn resulted m 1,358 dally tnps, 90 AM peak tnps and 174 PM peak tnps. Based on the daIly
tnps generated by the proJect, the radIUS of development mfluence IS two mIles
4
-----
-------------
--~'-----
TRIP DISTRIBUTION
The tnp dIstnbutIOn was based on the prevIOusly approved dIstributIOn for the Woolbnght MedIcal
Offices project m the Traffic Impact AnalYSIS, dated July 1997 FIgure 2 shows the percent project
tnps and the project volumes on the Impact area roadways
PERFORL\1ANCE STANDARDS ANALYSIS
Test One
Table 7 shows the ADT capacIty analVSIS WIth the project tnps and background growth WIth the
performance standards analYSIS on those hnks WIth project Impact greater than one percent of the
LOS D capaCIty Table 8 shows the same mformatIOn for the peak hour FIgure 3 shows the above
mformatIOn on a map Woolbnght Road, from 1-95 to Seacrest Boulevard, falls the Test One LOS
standard. An AlternatIve Test One analYSIS was performed for thIS hnk.
Alternate Test One
The 2000 peak season, peak hour, peak dIrectIOn volume was obtamed from the Palm Beach County
Traffic DIVISIon for the faIled hnk. Tables 9 10 11, and 12 show the projected AM and PM peak
dIrectIOn and off-peak dIrectIOn/peak season/peak hour volumes for the faIled roadway hnk. All of
the peak dIrectIOn lmk LOS standards are met. The mtersectIOns at each end of the Alternate Test
One hnk were analyzed to determme If they meet the mtersectIOn standards
6
Boynton Beach Blvd.
Q)
>
~.". N <(
Ib 0"" If)
.....NO If)
Q)
....
Cl
17% 6
231 ()
071
*LO~
t--O>o
Lake Ida Rd
LEGEND
3% Percent of Project Trips on Link
32 Number of Project Trips on Link
o 07 Percent of LOS 'D" Capacity
~~
YVONNE ZIEL
TRAFFIC CONSULTANTS, INC
TRAFFIC ENGINEERING & PlANNING
1144066 Street North, West Palm Beach. Florida 33412
Telephone 561-624-7262 Fax 561-624-957&
FIGURE 2
FIRST SOUTHERN BANK PROFESSIONAL PARK
PROJECT TRAFFIC DISTRIBUTION AND ASSIGNMENT
::$!,......,--
(b....."!
,....NO
40%
543 60%
815
1 11 1 67
Woolbright Rd.
-
23 Ave
~Nt--
Ot--,,!
NNO
Lt)
0>
I
"C
>
*,--~ co
COCOci Ui
Q)
24% ....
l)
326 l\J
Q)
1 00 CI)
*v~
.".1.00
j
N.TS
~
I
ro
W 3%
~ 41
u... 0.27
f-f-u.. >- ~I'-O
ZUO f- ~tOO
WW <:3 ~ ~ ~
U"'"
0:::0 <(
wo::: Cl..
<(
Cl..Cl.. U
en UUw
en UUw 0
0 .-J
.-J ~.-Jo::: U
~ .-J ~ g~I u::: O<XlN
0<( -.rtOO> NO>I'-
Of- u.. NLOM NO~ u.. tOtOM
NO u.. I'--.r~ 1-<( <( MMM
<( <Xl 0> to w 0:::
f- 0::: MMM Cl..1-
f- I-
f-en U O-.rN
UCl.. MLOtO o:::~en f'.~-.::t
W- -.r~N
....,0::: LO<XlM IO!:!:
Of- ~o:::o:::
0::: Cl..Cl..f-
Cl.. l-
I- o:::U ~MO'l
o:::U MMtO O~ <XlNO
O~ -.r01'- ~N~
(J')~_..- ....,0
....,0 ~N~ <(0:::
<(0::: ::2Cl..
en ::2Cl.. ~O:::O:::I
:;.:::Z ~O:::I en gI0f- <Xl<XlN
o:::Q 00~ M M O'l :;':::Z N:;':::~S <Xl <Xl 0>
~:;.::: NN<Xl ~~
<(!:: 000> 0:::0 Cl..UO
Cl..O Uo NN- <(- <(0:::
.-JZ <(0::: Cl..!:: C00
<(0 C00 .-JO
ZU <(Z LO~O:::
Qu LOI-U zO 0><(:J NNO'l
0'l0- LO LO <Xl OU O>WO <Xl <Xl N
en- ~<(l::: ~~-.r ~~~
enu.. NNtO -U ~Cl..I MMM
wu.. en_
u..<( ~ <( ~~M enu..
00::: 0::: MMM Wu..
f- u..<(
1'-0:::1- 00::: ~ 000
WCl..~ en= Cl.. COo:::f- <(en LOLON
.-J:;.:::- OP<( 000 WCl..o::: W 0 = LOLOO
000
COZ<( .-J U O>O>LO .-J~:J Cl...-JP -.r-~M
<(<(0 COCON COZO tOtOLO
f-COW -.r-.rM <(<(I en
Z0 f-CO~ u..W
0:::<( u..en tOtOLO Z<( OZ
wO::: Ow o:::w ,,*,:'5
IW ,,*,Z WCl..
f-> <( I~ W--
:J<( .-J f-~ I-cc
00 :Jo _WW
enW Z W-- O~ enLOLO
f-f- 0 f-cc en~ u..O>O>
_WW O~-!..
enU ~ enLOLO f-W see
o:::~ <( LLO>O> en 0:::
u:::o U o.....!...l. 0::::J sW
0::: 0 see -I- - (:)
Cl.. .-J u..:J 00
s~ u.. ~tO
- 0 Z
00 0
~tO ~
<(
U
0
.-J
000
0:::0:::0:::
000 f-f-f-
0:::0:::0::: III
>- 000
I-f-I- <( OCOCOC
::2 III S CO CO CO
0Cl.. >- 000 0 .-J.-J.-J
9tO <( OCOCOC <( 000
uN S CO CO CO 0 000
Q) . 0 .-J .-J .-J 0::: sss
9~ <( 000
~-.r 0 000
~O 0::: SSS
Boynton Beach Blvd.
Lake Ida Rd
LEGEND
C
37.594
111
~
37.818
= Level of Service
= Existing Traffic
= Future Growth
::: Project Traffic
::: Total Traffic
~
~7
.~
/1 ~
/ ......../
YVONNE ZIEL
TRAFFIC CONSULTANTS, INC
TRAFFIC ENGINEERING & PLANNING
1144086 Street North. West Palm Beach, Florida 33412
Telephone 561 <624-1262 Fax 5E1-624-9578
a.>
>
<(
I/)
I/)
~
Cl
C
o
U
C
34,215
3966
543
38 724
C
29 258
4426
815
39 456
Woolbright Rd.
-
23 Ave
E
33 648
2,165
326
--
36 139
LO
0)
...!..
FIGURE 3
"0
>
iii
iii
a.>
L-
U
ctl
a.>
en
J
NT S
~
I
lii
L-
a.>
"0
a.>
u..
FIRST SOUTHERN BANK PROFESSIONAL PARK
FUTURE (2001) DAILY TRAFFIC CONDITIONS
I-I-u...>- r-;:;;-.
ffi~ot: \ .,j'
I-I-u...>- cr> 0'" 0
I'-
ZOOt: 0 ~o g:
0 UJUJ 0 UJ~ o:!
I-I-u...>- I-I-u.>- I"- 0'" o:!
ZOOt: cr> N ~O 0- 0-0- 0
0 ZOOt: ci UJ~ o:! i
UJW 0 UJUJ 0 (/) \
0'" o:! 0'" o:! 0-0- 0 0
~O 0- ~O 0- 0
W~ o:! ...J \
UJ~ o:! (/) I
0-0- 0 0-0- 0 0 0 ..-...JO <D \
...J oo:!- <D
(/) (/) Ol-u. .,j'
0 ..-...JO 0 NOU.
0 0 CO Oo:!- <D I-c? \
...J ...J Ol-u. I"-
..-...JO .0 ..-...JO NOU. ..- I-
0 I-c?
Oo:!- (<) Oo:!- "'" I-(/) I'-
Ol-u. .,j' Ol-u. (<). I- 00- N
NOU. NOU. UJ-
I-c? I-~ I-(/) .0 ..,~
00- ..- (/) OI-
l- I- ~R Z ~ I
I-(/) I'- (/) I-(/) .0 (/) 0 0- I
00- ..- Z 00- Z 01- ~ \
(/) w- 0 w- 0 ~ 5 (/) cr>
..,~ ~ ..,~ 0- I- <r
Z 01- 01- ~ Z ~~
0 ~ 5 ~ 5 I- .,j' 0
~ z ~~ oq- 0 0'"
0- 0- Z ..,0 \
5 I- 0 I- 0 0'" ~ o:!~
<D 0 (<)
Z ~~ N ~~ N 0 ..,0 u... 'ZO-
O ~ ~ o:!~ u...
0 0'" u... 0'" 'ZO- c? ..-~:c \ 1"-
..,0 ..,0 u... 0(91- N
~ o:!~ u... o::,::~ \
c? o:!~ u... ..-~:c (<) ::,::1-
u. 'ZO- 'ZO- ::,::C? 0(91- (<) NO
u... ....~:c ::,::1- O::,::~ ~Z o:!O
~~ 1"- ..-~:c .0 ~I- NO \ o:!Q C!l~
0(91- N ~z 001- N O:!Z o:!O 0-1- \
~I- o~~ o:!Q ~~3 0-0 coO:: ...JO o~o (<)
O:!Z NO 0-1- 00 0 o:!UJ go:!G: <D
o:!O ...J- 0~0 ("'l
0-0 CO~ ...JO o:!~ o:!l- cr> z~ NWu...
...J- o:!w co0 ZO g~u: <D 0- Cl.c?
o:!l- Z~ Q~ \ <D \ _0
ZO 0::,::0 <D 0- o~o \ 1"- NO-u... (/)~ I-
OW Oo:!- <D _0 Oo:!- co (/)- ~ (/)o:!
owu... (<) (/)~ oUJu... N. (/)0 WW
-~ NO-u... I- 'Z
(/)- (/)o:! NO-U- w~ u...o- W
(/)0 ~ UJw ~ u...o:! NOu:.. 'Z Cl.
UJ::':: I- u...o- I- Ow w 'Z ..-~u... ~
u...o:! 00 . I ::0::0- 'Z 0- WO-O
OUJ ~ ..-~~ 'Z UJO-Ii ~ ...J~ - ~ CO
._ cr> ~ 0- W WO-;:) W \ is w
'Z 'Z o:! ...J~;:) 0:: CO COZO::
W 0- . ...J::,::O COZO o:!o:!;:)
...J~~ ~ COZ:C ~ ~~:c 5 ~ I-COO (/)= 0.. 0
coz::l ~ co o:!<c~ z:C 09<c U"l
o:!<co ~ I-COo:! 0:: CO z~ (/)= 0- 0 ...J - 0 co
I-co:C 5 is UJ 09<c .0 ~::.::
ZW ~o:! ...J - 0 co w<c
z~ (/) = 0- 0 ~a, (/)= 0- 0 WW :cw
~o:! 09<c .0 wu... 09<C U"l :c 0... 1-0- u...(/) U"l
UJW ...J - 0 <Xl :cu... ...J' 0 co I-Z ::l OW
:c Cl.. 1-0 ;:)0 u...(/) \ .0 OZ ""Z
I-Z ::l o(/) OUJ (/)0 :5 i
::lo u...(/) .0 OZ .0 (/)o:! ""Z I-(/) \
o(/) OUJ (/)0 u.(/) I-W :5 (/)<c I
(/)o:! ""Z I-(/) Ow (/)(/) ~w \ -- \
I-W (/)o:! ""Z ~~ -(/) c
(/)(/) :5 ~w :5 \i:o:! c: u..::.:: W
~::.:: -(/) o:!
u.::.:: W w U"l
\i:<C 0- W ~ I
;ii Ir> Cl. \
w c: c: 'Z ~
0.. UJ 0- W 0- 'Z '0
'Z .0 .0 0 '0 0.. W
'Z
<c ~ <c ~ w W 0 b
0 I- UJ \ 0
UJ '0 0 '0 0 b I- <D
b W W 0 0 \
UJ I- UJ .., <D W
(,) 0 ..,
UJ b b Z 0
.., 0 UJ Z 0 ~ 0 ~ I
0 <D .., 0 <D 0- \
0:: Z ~ ~ 0- Z
0- 0 ~ 0 \
~ 0.. 0 ~
(,) 0 \
0 ...J
(,) ...J 0
0 S
...J
0
0:: 0
0 I- ~
~ :c I-
~ 'Z ~ 0 :c
00- R 'Z ~ 0 'Z
'Z ~ 0 01.0 ~ CO 00- R ~ ~\
00.. R bo ...J 0.0 ~ CO 00-
01.0 ~ CO 8~ <c 0 bo ...J Olr> ~
bo ...J 0 8~ 0 0 bo 0
<Il .. 0 :-~ 0 ~ o:! 0 8~ <c 0
q~ <c 0 ...-0 ~ ~"i 0 ~ 0 0
0 ~ ...-0 ~ .:-~ ~ ~
..-.,j' ~ ..-0
..-0
------
------_.~.
IntersectIOn AnalysIs
Capacity analYSIs usmg a spreadsheet based on the 1985 HIghway CapacIty Manual Cntical
Movement Analysis, was performed at the signalIzed mtersectIOns at each end of the faIled lInIe The
turnmg movement counts were obtamed from the PBC Traffic DIVisIOn and a new traffic count
performed on December 6,2000 IntersectIOn analysIs resulted m the followmg cntIca1 movements
INTERSECTION
Woolbnght Rd & 1-95
Woo1bnght Rd & Seacrest Blvd
AM
912
1,163
PM
1,242
1,166
STATUS
Under/ CapacIty
UnderlUnder CapaCity
Smce the above mtersectIOns meet the LOS standards, the project meets the Test One reqUIrements.
AppendIX B contams the count data and capacIty analYSIS worksheets
Test Two
There are no Test Two Impacted roadways withm the project Impact areas, therefore the project
meets the Test Two Standards
Dnveway AnalysIs
The projects turnmg movements and dally dnveway volumes are shown m FIgure 4 Based on the
projected dnveway volumes, turn lanes are not reqUIred.
CONCLUSION
ThIS project meets the Palm Beach County Traffic Performance Standards Ordmance, and may be
approved.
11
l
iE
e::
0
Z
N IS
55(61) -. Woolbright Rd 23 (26) -.
I ~ I r
a M !
0
..- ~
-
en 00
..-
1,160 ADT 499 ADT
-
----
LEGEND
i ~ 16 (14) 302
!
~ Total Daity Volume
i i PM Peak Hour Volume
-~
i i AM Peak Hour Volume
~~ YVONNE ZIEL FIGURE 4
TRAFFIC CONSULTANTS. INC. FIRST SOUTHERN BANK PROFESSIONAL PARK
TRAFFIC ENGINEERING & PLANNING
11440 86 Street North, West Palm Beach, FL 33412 PEAK HOUR DRIVEWAY TURNING MOVEMENTS
Telephone (561) 624-7262 Fax (561) 624-9578
APPENDIX A
GROWTH RATE WORKSHEET
IWO 00.000000
~I-W OlOlOlONO
<((f) MMT'""T"""~O
00::::>
0::
C)
IW 00.0000000
~I- O>O>OlON,...
MM~T"""~O
O~ ~ .
0::
C)
W tOlOCOtOCO""
:2: "'-"-VNCOCO
::> ~N_tO""tD,...
...J 'V 'V ("")C"'1 lOc)
0 MM(",,)"-"- ,....
>
::.:: 0:: .0.0.0.0.0.0
0:: <( Olaioioioioi
<( W 0l0l0l0l0l0l
0.. >- 0l0l0l0l0l0l
...J ,... T""" T'"""""" T"""
<((f)
Zz
Qo
(f)i= W ..-_"Ilt('l')T"""C)
~:5 :2: OOtO-oeo
u.::> ::> LOlOf"oo..O..-N
Ou ...J O-O,.....otOa>
O::...J 0 M{"I")(""),.....-..-
0..<( >
::.::U 0::: lOlOlJ")L.()l,()L(')
ZW <( <0<0<0<0<0<0
<(I- W 0l0l0>0l0l0l
1Il<( >- 0l0l0l0l0l0l
zO:: ..-..- '11"""""" T'""""
0:: I
~~
1-0
::>0::
gC)
I-
(f)
0::
u.
Z W--<1l'O<1l
0 ~c:cC)>>
-WW'Offi<(
i= (f) lO to "i::
<( ~cn(J')ClJt5"E
u O-"--"-~CIl'"
0 __ N
3:00 ~W
...J 3:WUc(f)
bg::Bo
o 0 c z
'<1'<03: iJ'-
b~re
OO~
~C/)
0
~
N
:2:
00..
~~
~g
NM
~O
>-
<(
3:
o
<(
o
0::
000000
0:::0::0::0:::>>
I-I-I-I-...J...J
IIIIIIlIIl
C)C)C)C) 1-1-
----(f)(f)
0:::0::: 0:: 0:: WW
1Il1Il1Il1Il0:::0::
...J...J...J...JUU
0000<(<(
OOOOWW
3:3:3:3:(f)(f)
APPENDIX B
CAP ACITY ANALYSIS WORKSHEETS
TRAFFIC COUNT DATA
SEAS ADJ FACTOR. 099
INTERSECTION TURNING MOVEMENT SUMMARY GROWTH RATE. 2925
INTERSECTION WOOLBRIGHT RD & 1-95 PROJECTED YEAR. 2001
A.M. PEAK PERIOD PEAK-SEASON TRAFFIC CONDITIONS GR= (39+195)/2
2000 2001
RAW 2000 2000 2001 BACKGROUND 2001
TM TRAFFIC ADJUST APPR BACKGR COMMITTEe PROJECT TRAFFIC TOTAL
VOLS VOLS VOLS GROWTH DEVELOP TRAFFIC VOLUMES VOLUME
-------------- ------------ ---------- ---------- ------------- --------------- ------------ --------------- ----------
SB - RT 1 442 438 13 13 11 463 474
- TH 2 0 0 861 0 0 0 0
- LT 3 428 424 12 0 436 436
WB - RT 4 439 435 13 0 447 447
-TH 5 435 431 1212 13 26 17 469 486
- LT 6 350 347 10 0 357 357
NB-RT 7 249 247 7 0 254 254
- TH 8 0 0 450 0 0 0 0
- LT 9 206 204 6 15 14 225 239
EB-RT 10 525 520 15 12 4 547 551
- TH 11 494 489 1381 14 23 5 526 531
- L T 12 376 372 11 11 3 394 397
SEAS ADJ FACTOR 099
INTERSECTION TURNING MOVEMENT SUMMARY GROWTH RATE. 2.925
INTERSECTION WOOLBRIGHT RD & 1-95 PROJECTED YEAR. 2001
P M PEAK PERIOD PEAK-SEASON TRAFFIC CONDITIONS GR= (3 9+1 95)/2
2000 2001
RAW 2000 2000 2001 BACKGROUND 2001
TM TRAFFIC ADJUST APPR BACKGR COMMITTED PROJECT TRAFFIC TOTAL
VOLS VOLS VOLS GROWTH DEVELOP TRAFFIC VOLUMES VOLUME
----- ------ --------- ---------- --------------- ---------- ---------------------- -----------_.
SB - RT 1 365 361 11 21 10 393 403
- TH 2 0 0 751 0 0 0 0
- LT 3 394 390 11 0 401 401
WB - RT 4 571 565 17 0 582 582
- TH 5 767 759 1612 22 44 15 826 840
- LT 6 290 287 8 0 295 295
NB - RT 7 303 300 9 0 309 309
- TH 8 0 0 745 0 0 0 0
- LT 9 450 446 13 24 12 483 495
EB - RT 10 210 208 6 28 23 242 265
- TH 11 482 477 1182 14 49 27 540 567
- L T 12 502 497 15 24 18 536 554
FIRST SOUTHERN BANK PROFESSIONAL PARK
INTERSECTION TURNING MOVEMENT SUMMARY SEAS ADJ FACTOR: 100
INTERSECTION WOOLBRIGHT RD & SEACREST BLVD GROWTH RATE. 356
A.M PEAK PERIOD PEAK SEASON TRAFFIC CONDITIONS PROJECTED YEAR. 2001
GR= (1.28-1'11 +0+1 95)/4
2000 2001
RAW 2000 2000 2001 BACKGROUND 2001
TM TRAFFIC ADJUST APPR BACKGR COMMITTED PROJECT TRAFFIC TOTAL
VOLS VOLS VOLS GROWTH DEVELOP TRAFFIC VOLUMES VOLUMES
SB RT 1 129 129 5 9 4 143 147
TH 2 508 508 778 18 0 526 526
LT 3 141 141 5 0 146 146
WB RT 4 31 31 1 0 32 32
TH 5 570 570 695 20 14 9 604 613
LT 6 94 94 3 0 97 97
NB RT 7 89 89 3 0 92 92
TH 8 313 313 774 11 0 324 324
LT 9 372 372 13 3 3 388 391
EB RT 10 390 390 14 3 1 407 408
TH 11 623 623 1137 22 12 3 657 660
LT 12 124 124 4 8 1 136 138
INTERSECTION TURNING MOVEMENT SUMMARY SEAS ADJ FACTOR: 1 00
INTERSECTION. WOOLBRIGHT RD & SEACREST BLVD GROWTH RATE. 3.56
P M PEAK PERIOD PEAK-SEASON TRAFFIC CONDITIONS PROJECTED YEAR. 2001
GR= (1.28+11 +0+1.95)/4
2000 2001
RAW 2000 2000 2001 BACKGROUND 2001
TM TRAFFIC ADJUST APPR BACKGR COMMITTED PROJECT TRAFFIC TOTAL
VOLS VOLS VOLS GROWTH DEVELOP TRAFFIC VOLUMES VOLUMES
SB RT 1 102 102 4 15 4 121 124
TH 2 247 247 473 9 0 256 256
LT 3 124 124 4 0 128 128
WB RT 4 108 108 4 0 0 112 112
TH 5 922 922 1137 33 23 8 978 986
LT 6 107 107 4 0 0 111 111
NB RT 7 93 93 3 0 0 96 96
TH 8 487 487 1066 17 0 0 504 504
LT 9 486 486 17 6 2 509 512
EB RT 10 416 416 15 6 5 437 441
TH 11 629 629 1187 22 26 15 677 692
LT 12 142 142 5 17 7 164 171
YVONNE ZIEL TRAFFIC CONSULTANTS, INC,
CRITICAL MOVEMENT ANALYSIS
INTERSECTION:
ANALYSIS PERIOD:
WOOLBRIGHT RD & I 95
PROJECTED TRAFFIC
AM PEAK
LR
12/1/00
ANALYST
DATE.
IMPROVEMENTS.
LANE HRLY LANE
GEOM VOL DIST
SB RT 1 474 474
THRU- 0 0 0
LEFT 2 436 218
WB RT 1 447 447
THRU' 2 486 243
LEFT 1 357 357
NB RT 1 254 254
THRU 0 0 0
LEFT 2 239 119
EB RT 1 551 551
THRU 2 531 266
LEFT 1 397 397
2001
SB TOTAL 911 I I 447 I-
I I 1 I I
1 I I I I 486 <- ~_.- WB TOTAL 1290
<-I I 1-> I I
V I 1 357 1----
474 0 436 I I V
____I '- ----
---- -----
239 0 254
<-I 1->
--------1 397 I 1
I I
EB TOTAL -----> 531
1480 NB TOTAL
I 551 492
V
MAXIMUM
WB-L T= 357 NB L r, 29 SUM OF CRITICAL CAPACITY
WB TH= 243 SB TH= 0 VOLUMES LEVEL
CRITICAL= 357 TOT= 29
o TO 1 ,200 UNDER
EB L T= 397 SB L TO: 128 1.201 TO 1 400 NEAR
EB TH= 266 NB TH= 0 > 1400 OVER
CRITICAL= 397 TOT= 128
E+W CRITICAL +
754
N+S CRITICAL =
157
STATUS?
912 UNDER CAPACITY
YVONNE ZIEL TRAFFIC CONSULTANTS, INC,
CRITICAL MOVEMENT ANALYSIS
INTERSECTION: WOOLBRIGHT RD & I 95
ANALYSIS PERIOD: PROJECTED TRAFFIC 2001
PM PEAK
ANALYST LR
DATE: 12/1/00
IMPROVEMENTS:
LANE HRLY LANE
GEOM VOL DIST
SB RT 1 403 403
THRU' 0 0 0
LEFT 2 401 201
WB RT 1 582 582
THRU: 2 840 420
LEFT 1 295 295
NB RT 1 309 309
THRU' 0 0 0
LEFT 2 495 247
EB RT 1 265 265
THRU- 2 567 284
LEFT 1 554 554
SB TOTAL 804 1 I 582 I-
I 1 I 1 I
I 1 I 1 I 840 <- WB TOTAL 1718
<-I 1 1-> 1 I
V 1 1 295 1-
403 0 401 1 I V
____I 1- ----
- ----
495 0 309
<-I 1->
--, 554 1 I
I
1
EB TOTAL -> 567
1,386 NB TOTAL
--I 265 803
V
MAXIMUM
WB-L T= 295 NB L T'= 157 SUM OF CRITICAL CAPACITY
WB TH= 420 SB TH= 0 VOLUMES LEVEL
CRITICAL= 420 TOT= 157
o TO 1.200 UNDER
EB L T= 554 SB L TO= 111 1.201 TO 1 400 NEAR
EB TH= 284 NB TH= 0 > 1 400 OVER
CRITICAL= 554 TOT= 111
E+W CRITICAL + N+S CRITICAL = STATUS?
974 268 1.242 NEAR CAPACITY
REDUCTION BY 90 VEH/HR BASED ON 3 VEH/CYCLE WHICH USE THE 6 SEC OVERLAP PHASE
YVONNE ZIEL TRAFFIC CONSULTANTS INC
CRITICAL MOVEMENT ANALYSIS
INTERSECTION:
ANALYSIS PERIOD'
WOOLBRIGHT RD & SEACREST BLVD
PROJECTED TRAFFIC 2001
AM PEAK
LR
12/4/00
ANALYST
DATE.
IMPROVEMENTS:
LANE HRL Y LANE
GEOM VOL DIST
SB RT 0 147 0
THRU' 2 526 336
LEFT 1 146 146
WB RT 0 32 0
THRU' 2 613 323
LEFT 1 97 97
NB RT 0 92 0
THRU' 2 324 208
LEFT 2 391 195
EB RT 0 408 0
THRU 2 660 534
LEFT 1 138 138
SB TOTAL 819 1 I 32
I I 1 I 1
1 1 I 1 1 613 <- WB TOTAL 743
<-I I 1- > 1 I
V 1 1 97 I ---
147 526 146 I I V
____I 1____-
----
I
I
1
138 I
I
EB TOTAL --> 660 1
1205 I
1 408 I
V
EB-L T= 138 NB LT 195
WB TH= 323 S8TH: 336
OR OR
WB RT= 0 SB RT 0
TOT= 460 TOT= 532
WB L T= 97 SB L T= 146
EB TH= 534 NB TH' 208
OR OR
EB RT= 0 NB RT 0
TOT= 631 TOT= 354
E-W CRITICAL + N-S CRITICAL =
631 532
391 324 92
<-I
1
I
1->
1
I
NB TOTAL
807
MAXIMUM
SUM OF CRITICAL CAPACITY
VOLUMES LEVEL
o TO 1,200
1,201 TO 1 400
> 1 400
UNDER
NEAR
OVER
STATUS?
1163 UNDER CAPACITY
RIGHT TURN CHECK
VOL LEFT RTOR
SB OK NA
WB OK NA
NB OK NA
EB OK NA
CRITICAL
RIGHT"
o
o
o
o
'RIGHT TURN ON RED' 0
% TRAFFIC INCREASE 0
RTOR (LESS 15%): 0
"RIGHTS LESS LEFT LESS RTOR
YVONNE ZIEL TRAFFIC CONSULTANTS INC.
CRITICAL MOVEMENT ANALYSIS
INTERSECTION:
ANALYSIS PERIOD:
WOOLBRIGHT RD & SEACREST BLVD
PROJECTED TRAFFIC 2001
PM PEAK
LR
12/4/00
o
ANALYST
DATE.
IMPROVEMENTS
^
LANE HRLY LANE
GEOM VOL DIST
SB RT 0 124 0
THRU: 2 256 190
LEFT 1 128 128
WB RT 0 112 0
THRU' 2 986 549
LEFT 1 111 111
NB RT 0 96 0
THRU' 2 504 300
LEFT 2 512 256
EB RT 0 441 0
THRU: 2 692 567
LEFT 1 171 171
SB TOTAL 508 1 1 112
1 1 1 1 I
1 1 1 I I 986 <- WB TOTAL 1208
<-I 1 1- > 1 I
V I 1 111 I ---
124 256 128 1 I V
____I 1____-
---- -----
1 512 504 96
I ^
^ 1 <-I 1->
171 I 1 1
I 1 I
EB TOTAL ---> 692 1
1304 I NB TOTAL
1 441 I 1112
V
MAXIMUM
EB-L T= 171 NB L T= 256 SUM OF CRITICAL CAPACITY
WB TH= 549 SB TH= 190 VOLUMES LEVEL
OR OR -------
WB RT= 0 SB RT= 0 o TO 1,200 UNDER
TOT= 720 TOT= 446 1.201 TO 1 400 NEAR
> 1 400 OVER
WB L T= 111 SB L T= 128
EB TH= 567 NB TH= 300
OR OR
EB RT= 0 NB RT= 0
TOT= 678 TOT= 429
E-W CRITICAL +
720
N-S CRITICAL =
446
STATUS?
1166 UNDER CAPACITY
RIGHT TURN CHECK
VOL LEFT RTOR
SB OK NA
WB OK NA
NB" OK NA
EB OK NA
CRITICAL
RIGHT"
o
o
o
o
"RIGHT TURN ON RED'
% TRAFFIC INCREASE.
RTOR (LESS 15%):
o
o
o
"RIGHTS LESS LEFT LESS RTOR
LJ
PALM BEACH COUNTY TRAFFIC ENGINEERING
VOLUME REPORT
Volume Report with 24 Hour Totals Page
******************************************************************************
Data File 00207014 PRN
Station 000000005303
Identification 000000000024 Interval
Start date Feb 7, 00 Start time
Stop date Feb 8, 00 Stop time
City/Town RWR County
Location WOOLBRIGHT RD 600' E OF 1-95
1. ******************************************************************************
Feb 7/Feb 8 Eastbound Volume for Lane 1
tJ
J
lJ
15 minutes
11 00
11 00
P B COUNTY ~
~
------------------------------------------------------------------------------
;
J..
End Time 00 01 02 03 04 05 06 07 08 09 10 1
--------
15 35 17 15 10 8 14 93 248 301 294 257 31
30 26 14 9 8 10 25 135 277 256 268 268 27,
45 15 11 5 5 19 34 252 321 278 291 299 31
00 11 13 6 4 15 67 308 322 289 250 261 30
--------
Hr Total 87 55 35 27 52 140 788 1168 1124 1103 1085 120
J.
J
4 ______________________________________________________________________________
- End Time
L
L
15
30
45
00
329
341
307
289
Hi Total 1266
L
,
12
293
284
277
323
1177
13
337
307
326
297
1267
14
307
308
343
331
1289
15
350
322
309
367
1348
16
333
323
340
334
1330
17
314
300
307
234
1155
18
224
167
163
180
734
19
141
130
134
120
525
20
143
103
107
86
21
292
22
2
88
73
64
67
6
~
-'
5
3\
20
End Time 00 01 02 03 04 05 06 07 08 09 10 1
---1-5---- 35 21 12 11 13 41 105 269 314 271 -302 -jT:7
30 15 14 15 15 12 47 152 308 297 269 312 350
45 21 15 7 9 20 72 233 397 275 288 267 29[
00 11 11 7 8 27 88 239 347 281 269 304 27-
I ~~-~~~~i 82 61 41 43 72 248 729 1321 1167 1097 1185 124=
-------------------------------------------------------------------------------
I
- End Time
I --------
15
30
45
00
J
J
1
12
317
350
288
315
Hr Total 1270
13
324
349
326
315
1314
14
340
349
352
417
1458
15
424
415
413
402
1654
16
366
401
412
407
1586
17
434
366
370
296
1466
18
325
292
247
240
1104
19
219
217
195
165
796
20
169
139
112
118
538
21
136
104
122
100
462
276
22
2:::
71
68
75
62
4C
51
31
3~
-------------------------------------------------------------------------------
15-
24 Hour Total 19369
-AM peak hour begins 07 15 AM peak volume 1366 Peak hour factor 0 8(
PM peak hour begins 14 45 PM peak volume 1669 Peak hour factor 0 9[
******************************************************************************~
.i.L/U~/LUUU U~ ~O
...JD.i. L ..... "'JU.i.
IOOLllrGIT lOAD , BIACIIST BOOtBVAID
BOlITO. IIACI, 'LOUDl
COVITID BY LOIS PUllano
Traffic Sijrvey Specialists, Ine
62. Gardenia Terrace
Delray Belch, 'lorida 33444
ISUI 272 3155 '11 15'11 272-4381
ALL mIenS
Slltll'r BLVD
'rOI forth
WOOLlIIGIIT lOAD
Prol But
SlIeRlS! BLVD
lrot SOllth
WOOLBIIGIT lOAD
PrOI lest
Site Code
Start Date
Pile I D
Page
Ugbt Thru Left light Thru Left light Thru Left ilgbt Thru Left Toul
Dne 12/06/00
'elk lour IDIly.is By Intire Intersection for tbe Period 07 00 to 12 30 on 12/06/00
teak .tart 07 30 07 ]0 07 ]0 07 30
'011. 12! 5U 141 J1 570 9. n 113 372 390 Ul 124
Pereelt In 6H 11\ 41 en w 11' 40' U\ )4' m llt
pt totll 771 US 774 1117
lig.eft 01 00 07 30 07 45 07 45
'0111. U IU 3t , 14' 21 2' 9) U 121 153 2'
Ii total 226 110 217 lOO
PI1 " 97 ., 95
SBACRBST BLVD
00000162
12/0'/00
IOOLSlAC
)
IOOLIIIGIT 10lD . SIICIIST BOULIlIRD
IOtITOI BllCI, FLORIDl
COOlTlD IY LOI! PlLOKJJO
Traffic Survey Specialists, Inc
624 Gardenia Terrace
Delray Beacb, Plorlda 33444
1m) m 3255 PaJ (sU) 27HlBl
suellST BLVD
Protl IOrtb
ALL "lleLlS
IOOLlUGIT ROAD
Prol last
SUCIIST BLVD
'rol South
Il00LBiIGIT ROlD
'rol lelt
Site Code
Start Date
Pile I D
Page
OOOOOHl
12/06/00
IOOLSIAC
4
Right ThI'1l Left ligbt Thrll Left light Tbru Left ligbt Tbru Left Total
Dite 1210'/00
'tlk lout l~IIYli6 By Intire Intersection {or the Period 12 3D to 18 00 OC 11/0'/00
Pelt ltart Ii 45 IH5 H 45 UH
loh. 102 247 124 108 922 107 93 417 41' 416 m 141
Puc:ear 22t 52\ 2" n III " 9t 4n ." m sn m
Pk toU} 473 1137 1066 1187
li,.btn 16 4S 17 15 17 00 16 45
'0111. 27 62 )I a w 26 H 115 148 100 110 tt
Ii total 127 302 2U 324
PIP 9l '4 92 92
WOOLBRIGHT ROAD
486
922 1,510
102
142
142
629
629
416
416
0
0
SRACRBST BLVD
o 102 247 124 142
487
108
o 102 247 124 737
473
1,210
, r
F7
l
L
ALL VBHICLRS
l
1 2,697
Ij187 Intersection
3,863
J
1,983
Total
1,836
0
0
108
108
922
922
107
107
124
846 62g
93
WOOLBRIGHT ROAD
1,066
107 486 487 93 0
247
416
------ ------ ------ ------ ------
770 486 487 9 0
SBACRBST BLVD
J...L/ UJ/ ":'UUU u-' JU ......LJ.... ...... ...... ~ -''-'..
Traffic Survey Specialists, l~c
IOOLIIIGBT ROAD , SI1CRIST BOULIVARD 624 Gard@nia Terrace Site Code 00000162
IOTITOI IIACB, rLOIID1 Delray Beacb, Plorida )3444 Start Date 12/06/00
COUITID BY LUIS PALORIWO 1S61) 272 l255 Pal 1S61) 272 4181 Pile I D IOOLSIlC
Page 1
Ul, VIII eLls
SUCIIST BLVD 'OOLBRIGHT lOAD SUCUST BLVD 100LBI1GIT lOAD
'rOl loull Prol Rut Prol South frol lelt
Kight Tbru Left light Tbru Left light Tbru Left Right Tbn Left Total
Dlte 12/0'100
07 00 29 78 27j 1 92 11 11 53 100 1'1 110 IS "4
01 15 23 101 26 , 113 10 20 '5 102 m 110 14 7H
07 30 22 111 24 , 146 28 20 104 90 U 158 H 839
If Total 10' 426 121 27 509 73 11 315 390 417 531 101 mo
.. DO 46 HI 19 6 128 24 11 63 ,. 79 151 21 114
O. 15 29 In 27 11 148 11 2S 53 86 106 HI 11 117
DI ]0 3S 96 21 9 127 23 21 72 112 79 159 28 7U
II Totd 140 449 124 38 555 12 94 m m 127 m 101 3177
, BlIlI t
16 DO U U 28 2S 2}) 21 11 19 95 105 171 36 811
U 15 n " H 25 202 2S H 128 104 81 161 16 9l)
U )0 2& 78 3D 24 193 23 25 124 124 81 1'2 40 m
Ir Toul 95 241 129 102 842 17 99 m 428 m "4
17 00 J3 B 23 27 234 J1 26 115 148 92 141 31 964
17 15 16 S5 36 H 167 2S 20 138 123 112 155 19 996
17 10 H 61 27 H 227 12 20 11' 110 112 15) 28 942
Ir Toul 88 251 120 105 m ll9 101 471
-~-_._~ ~--.~_... ..--- -- _.-,.-...-~.._-
'TOTAL' 429 137) 501 I m 2793 )61 I 311 1m 1694 I 1595 2415 UI I 13781
~
I.rII
Ia
LEI
~
l,II
~
~
~
NO
DATE 3-/3-00
TRAFFIC DIVISION.. PROJECT SHEET
rc1 GJ____ T-9<; (eCt< r) PRIORITY
NATURE OF REQUEST
RCVD BY
FROM
NAME ATLAS PG
ADDRESS DIST
PHONE (H)# PHONE (W)#
ASSIGNED TO (J,V III Hf
DESIRED ACTION
SIGNAL STUDY
APPROACH VOL.
PK HR TURN COUNTS
_ ( ) MO CD
PED STUDY
SIGNAL PLAN
WORK ORDER
P R I NTS
ISOLATED RETIMING
SYSTEM RETIMING
FIELD CHECK
SKETC H
STRIPING PLAN
DETOUR PLAN
GEOMETRIC PLAN
GEOMETRICS SPEED
LIMIT
L L T T TR R
NA
-----
SA ~ _ _ _...L
EA _ _ -6- _ -'-
WA ..L _ A _ _
J TRAFFIC SIGNAL? yeS
1
LI
I
IJ ACTION TAKEN
~
~
L
1.
WARRANTS
2
SPEED STUD\
DELAY STUD'-
PHOTOS
VIDEO
FILE CHECK
OTHER
DATE
BY
RESPONSE MADE TO
BY LETTER MEMO
PHONE
-f-
--.
--.
-.
--.
_J~
-.
-.
-..
..
..
r1
rw
II
n
n
.~
n
n
Stte Code
B-~ Street
H S Street
WEATBER
RYA/BLP
WOOLBRICHT RD
I-95(UST)
CLBAR
PALM BBACll COUNTY TRAPPIC
MOJements by PrImary
Tile
Begin
------- ----------------------------------------------------- -------------------------------------------------- -------------
LT
PACE 1
PILE 47550AJ
-~~~:~~
VehIcle
Total
- .----------------------------------------------------------------------------.- ---------------- __e. ___ .__
7 30
745
DR TOTAL
Prom Horth
RT TBRU LT
o
o
o
o
o
o
o
o
o
Prom East
RT THRU
Proll South
RT THRU LT
o
o
o
40
51
91
Prom West
RT THRU
o
o
o
277
347
624
94
lOB
202
737
859
1596
LT
103
106
209
179
190
369
o
o
o
44
57
101
8 00 AM 0 0 0 124 206 72 0 60 0 306 94 862
8 15 0 0 0 106 210 0 76 0 55 0 329 80 856
~.~~e[_~~~~_________~_______________________l~______________________;?~______________________~~_________________ _
\Je~'c\p
DA Y TOTAL
DIRBCTION
PROM
North
Bast
South
Vest
North
Bast
South
West
o
o
o
439
785
o
249
PEAK PERIOD ANALYSIS POR THE PBRIOD
STAn
PEAl HOUR
12 00 AM
7 30 AM
7 30 AM
7 30 AM
7 30 A~
PBAl HR
FACTOR
o 00
o 93
o 86
o 90
o 00
o 93
o 86
o 90
o
7 30 AM - 8 30 AM
VOLUMES
Right Thru Left
Total
0 0 0 0
439 785 0 1224
249 0 206 455
0 1259 376 1635
Entire Intersection
0 0 0 0
439 785 0 1224
249 0 206 455
0 1259 316 1635
206
P BiCERTS
Right Thru Left
o
36
55
o
o
36
55
o
o 1259
o
64
o
77
o
64
o
77
376
3314
o
o
45
23
o
o
45
23
r
r
~
-I
"
,.,
~,
~
r
l'
r
r
r
r
f'
r
r
r
r
r
site Code
E-I/ Street
N-S Street
WEATHER
RVA/HLP
1I00LBRIGHT RD
I -95( EAS 1)
CLEAR
PALH BEACH COUNTY TRAFFIC
Hovements by Primary
PAGE 1
FILE 47550P30
rile
Beg in
---------------------------------------------------------------------------------------------------------------------------- ---
DATE 3/13/00
Fro. North
RT THRV LT
Frail East
RT THRU U
Fro. South
RT THRU LT
Fro. West
RT THRU LT
----------------------------------------------------------------------------------------------------------------------------------
Vehicle
Total
4 30
4 45
HR TOTAL
000
o 0 0
o 0 0
147 288 0
140 272 0
287 560 0
65 0 106
85 0 128
150 0 234
o 228 127
o 261 115
o 489 242
961
1001
1962
5 00 PH 0 0 0 128 252 0 74 0 100 0 236 112 902
5 15 0 0 0 156 245 0 79 0 116 0 252 148 996
~~~r:~~______c:t____________________'1_____________________~---------------------------!~----------------________
UehI0\~5
DAY TOTAL 0 0 0 571 1057 0 303 0 450 0 977 502 3860
--------........_-------~-- ----
PEAK PERIOD ANALYSIS FOR THE PERIOD 4 30 PH - 5 30 PH
DIRECTION START
FROH PEAK HOUR
PEAK HR
FACTOR
VOLUHES
Right Ihru Left lotal
-----------------------------------------------------------------------------------------------
PERCENTS
Right Thru Left
North
East
South
"est
North
East
South
West
12 00 AH
4 30 PM
4 30 PM
4 30 PH
4 30 PH
o 00
o 94
o 88
o 92
o 00
o 94
o 88
o 92
0 0 0 0
571 1057 0 1628
303 0 450 753
0 977 502 1479
Entire Intersection
0 0 0 0
571 1057 0 1628
303 0 450 753
0 977 502 1479
000
35 65 0
40 0 60
o bb 34
000
3S 65 0
40 0 bO
o 66 34
,--
,--
I
f-
f'- 8 00 AM 115 0 100 0 181 89 0 0 0 143 212 0 840
8 15.t1 97 0 102 0 174 80 0 0 0 146 224 0 823
/btJ~~,1J C/n1-
Jr~ l;1~~(~~-~~__________~~____________________~_~__________----------~--------------------~~------------------------
r-
r-
J-
f-
r~-
r-
r
,-
f
f
r
r
r
--_.~ -----~ ~----
Site Code
E-W street
N-S Street
UEATHER
ZAHN/RWR
WOOLBRIGHT RD
I -95( WEST J
CLEAR
PALM BEACH COUNTY TRAFfIC
Movements by Primary
PAGE 1
FILE 47550At.l0
DATE
3/13/00
Tille
Be9in
----------------------------------------------------------------------------------------------------------------------------- - -
From North
RT THRU L T
From East
RT THRU LT
From South
RT THRU LT
----------------------------------------------------------------------------------------------------------------------------------
From West
RT THRU LT
Vehicle
Total
7 30
7 45
HR TOTAL
DAY TOTAL
DIRECTION
FROII
107
123
230
o 111
o 115
o 226
2
o
2
124
159
283
86
95
181
o
o
o
o
o
o
o
o
o
118 218
118 216
236 434
o
o
o
766
826
1592
442
o 428
2 638 350
o
o
o
525 870
o
3255
PEAK PERIOD ANALYSIS FDR THE PERIDD
7 30 AM - 8 30 AM
--------~-------------------------------------------------------------,------------------------
PERCENTS
Right Thru Left
North
East
South
lIest
North
East
South
lIest
START
PEAK HOUR
PEAK HR
FACTOR
VOLUMES
Ri9ht Thru Left Total
7 30 All
7 30 AM
7 30 AM
7 30 All
o 91
092
o 00
o 94
442 0 428
2 638 350
000
525 870 0
870
990
o
1395
Entire Intersection
7 30 All
o 91
092
o 00
o 94
442 0 428
2 638 350
000
525 870 0
870
990
o
1395
51
o
o
38
o
64
o
62
49
35
o
o
51
o
o
38
o
64
o
62
49
35
o
o
-
rl
rl
--0
'1
r-I
r-I
PALM BRACH COUHTY TRAPPIC
SIte Code ZABR/UR PACE 1
E W Street ~OOLBiIGHT iD PILE 41550m
N S Street [-95 (nST)
WEATHER CLEn MOHIeDts by Prlury DArE 3/13/00
-------------.-------------------------------------------------------------------------------------------------------------------
Tille
8eglD
Fro. Hortb
U THRU LT
Proll Eut
RT TURU LT
Froll South
U TURU LT
------------------------------------------------------------------------------------------------------------------------------
Fro. West
RT TBRD LT
VehIcle
Total
4 30
4 45
HR TOTAL
DA Y TOTAL
DIRBCTION
PROM
104 0 99
106 0 106
210 0 205
365
o
394
PBAI HI
FACTOR
o 305 75
o 320 84
o 625 159
o 1205
290
PEAl PERIOD ANALYSIS FOR THE PERIOD
VOLUMES
RIght Thru Left
000
o 0 0
000
o
o
57 262 0
57 252 0
114 514 0
902
925
1827
5 00 PH 69 0 85 0 284 68 0 0 0 47 227 0 780
f-lc"M~~04C,}tL. 86 0 104 0 296 6J 0 0 0 49 243 0 841
I L/~tlL~{~s:_______________l_:7______________________L_~-------------------~-------------------------5(------------__________
tl
I I
'--
J I
I-
Ll
I
-,
-,
-,
-,
-,
I-I
-)
START
P EAr HOUR
4 30 PM - S 30 PM
Total
o
210
o
984
3448
-----------------------------------------------------------------------------------------------
P KRCRHTS
RIght Thru Left
Horth
East
South
~est
Nortb
East
South
West
4 30 PM
4 30 PH
4 30 PH
4 30 PH
4 30 PH
o 90
o 93
o 00
o 94
o 90
o 93
o 00
o 94
365 0
o 1205
o 0
210 984
BntIre IntersectIoD
365 0
o 1205
o 0
210 984
394
290
o
o
759
149S
o
1194
394
290
o
o
m
1495
o
1194
48
o
o
18
o
81
o
82
52
19
o
o
48
o
o
18
o
81
o
82
52
19
o
o