Loading...
REVIEW COMMENTS ~L,,1J/2t~ ,v1.WIl-AL ~PFI a:g - ~ ~ - ~~&N6t. "1Au.. PI.tll6N&.N (l~",J ) Cf ~ t. ,Nt;Ut4;> t)f- .. -t-I B c.,(~~ - P''''AI'l'-E. of' A \~c...a ~ e. ptl-lI)i ""-rHfe4cJ4tA ~ p"lk - At,e., "... ~"~tot4S }ADOl~--r lOtl1 wall~ ~. G#Nc.wT/~'~N~ AA.6. $Tl l..t... C,.a/tl'&I ~ 1"-E:o.lC-E. , ..; ~~~ ~ &&)1" ~/'L ~ iHAN ~. I TRAFFIC IMPACT ANALYSIS FIRST SOUTHERN BANK PROFESSIONAL PARK Prepared for FIrst Southern Bank Realty CorporatIOn Prepared by YVONNE 2IEL TRAFFIC CONSULTANTS, INC 1144086 STREET NORTH WEST PALM BEACH, FLORIDA 33412 (561) 624-7262 December 11, 2000 TABLE OF CONTENTS INTRODUCTION EXISTING CONDITIONS ASSURED CONSTRUCTION BACKGROUND TRAFFIC MAJOR PROJECTS TRIP GENERATION TRIP DISTRIBUTION PERFORMANCE STANDARDS ANALYSIS Test One Alternate Test One IntersectIOn AnalysIs Test Two Dnveway AnalysIs CONCLUSION APPENDIX A - GROWTH RATE WORKSHEET APPENDIX B - INTERSECTION ANALYSIS WORKSHEETS AND TRAFFIC COUNTS 4 4 4 6 6 6 6 11 11 11 11 LIST OF TABLES TABLE TITLE PAGE EXIstmg (1999 - 2000) Dally Traffic CondItIOns .., .) 2 EXIstmg (1999 - 2000) Peak Hour Traffic CondItIOns .., .) 3 Tnp GeneratIOn Rates 5 4 Tnp GeneratIOn 5 5 Internal/External Tnps 5 6 Pass-by and New Tnps 5 7 Future (2001) Daily Traffic CondItIOns 8 8 Future (2001) Peak Hour Traffic CondItIOns 8 9 Future (2001) AM Peak Season Peak DIrectIOn Traffic CondItIOns 10 10 Future (2001) AM Peak Season Off-Peak DIrectIOn Traffic CondItIOns 10 11 Future (2001) PM Peak Season Peak Duectlon Traffic CondItIOns 10 12 Future (2001) PM Peak Season Off-Peak DIrectIOn Traffic CondItIOns 10 11 FIGURES 1 2 3 4 LIST OF FIGURES TITLE PAGE 2 7 9 12 SIte LocatIOn Tnp DIstributIOn Future (2001) Dally Traffic CondItIOns Dnveway Volumes III INTRODUCTION Yvonne ZIel Traffic Consultants, Inc was retaIned to perform a Traffic Impact AnalysIs to assess the traffic Impact of a proposed 33 909 square foot (SF) medIcal office and 2,091 SF bank to be located along the south sIde of Woolbnght Road west ofI-95 as shown In Figure 1 BuIld-out IS antICIpated In 2001 EXISTING CONDITIONS The major roadway adjacent to the project IS Woolbnght Road, WhICh IS a SIX lane road. Table 1 shows the eXIstIng (1999 - 2000) average daIly traffic (ADT) condItIOns on the Impact area roadways and Table 2 proVIdes the peak hour traffic condItIOns at the same locatIOns The ADT volumes were obtaIned from the Palm Beach County 1999 - 2000 Traffic Volumes Map the peak hour volumes were determIned by factonng the ADT volumes by 0093 ASSURED CONSTRUCTION ConstructIOn of a northbound left turn lane on Seacrest Boulevard at W oolbnght Road IS a reqUIred Improvement by Lowe's of Boynton Beach. ~~ (SITE) Lake Ida Rd YVONNE ZIEL TRAFFIC CONSULTANTS, INC TRAFFIC ENGINEERING & PLANNING 1144086 Street North, West Palm Beact1. F!onda 33412 Telephone 561-824-7262 Fax 561-624-9578 J N.T.S. Boynton Beach Blvd. Q) LO "C > O'l <{ ...!.. > >- Ul m := Ul U; I Q) .... cv Cij Cl .... C t.) Qj rn 0 cv "C U (/) cv LL Woolbright Rd - FIGURE 1 FIRST SOUTHERN BANK PROFESSIONAL PARK SITE LOCATION .oc.f) (j)0 (j)~ cO cOW (j) ..- 00 00<t t-t-O 5~ 00"- 0:: .01-0 .0 .0 cO (j)~~ ..-..-<t C'l C'l to. $ '2. -i<tcrJ ...... 0:: crJcrJcrJ I- b%: 000 c.f) 000 ~ 0 (j)(j).o ~z cOcO~ ~Q <t<t a..t:. tOto .0 0 u...c.f) -;tz OW zO *~ 00 -0 ~ c.f)- c.f)u... w.......... w'2. c:: c:: '(50:: t:.ww c.f).o.o ..-0::1- u..."?"? wa..~ 0-- c6~4. 3:'0'0 .c(~o 3:~ I-cO"-- .0 z<6 00 0::0 ~to wC';l :I:(j) I-(j) ?(j) 0::::" Z c.f)t9 IU)~ 0 o::~ ~ u:;<. 0 W S ~ o a.. o .0 b<t (\). O~ I . ......<t ......0 ~ ~ 4- o 0:: 009 o::o::u- I-~~ r5(9t9 ~~~ cO cO cO ~~~ 000 000 3:3:3: c.f) o ~ 00 5~ 0:: .o~O:: (j)<!.? (j)u.l0 ~a..:I: c.f) z o ~E ~o a..z o -;to zo o~ (i)'2. ~o:: u...t- 00:: C'l0::? wa..o ~~:I: ~~~ t-co~ za.. ~g :I: 0 S'd, o(j) c.f)~ -" 1U)t9 o::z U:~ c.f) ;<. u.l ':t. c.f) ~ <!.O~ w~ a.. cO COW 00<t t-t-O 00...... ~~~ .................. crJcrJcrJ 000 .o.oC'l .0.00 <t<tcrJ to to .0 c.f) u...W o~ *~ z Q ~ o S W'C'C I-Wu.l (j).o\!) u..."?"? 0-- :::>,'0'0 :::>'3:~ 0<6 ~to 000 0::0::0:: r-t-'i :I::t.t9 (9t9- ~~o:: cOcO':} ~~o 000 00 3: 3: 3:_ * ~ o 0::\ .------ BACKGROUND TRAFFIC The Palm Beach County Urban Study Area Traffic Volume Growth Tables provIded by the Palm Beach County Engmeenng Department, mcludes hIstoncal traffic count data for the roadways wIthm the Impact area of the proJect. The growth rates for the roadway were determmed from these tables, and then applIed to the respectIve lmks to determme background traffic growth to 2001 AppendIx A contams a table WIth the grovvth rate calculatIOns MAJOR PROJECTS The Palm Beach County (PBC) Engmeenng Departments major project map and lIst were consulted to locate those projects needed to be reVIewed for consIderatIOn m proJectmg background traffic The Lowe s project on Woolbnght Road has been mcluded as a major project m the traffic study The Lowe s IS projected to be completed by Januarv 2001 TRIP GENERATION Tnp generatIOn was performed usmg the rates found m the Palm Beach County Impact Fee Ordmance, and the InstItute of TransportatIOn Engmeers', Tnp GeneratIOn, 6th EdItIOn. Table 3 shows the tnp generatIOn rates used and Table 4 shows the tnps generated by the proposed proJect. Table 5 shows the IntemallExtemal tnps and Table 6 provIdes the Pass-by and New tnps, Tnp generatIOn resulted m 1,358 dally tnps, 90 AM peak tnps and 174 PM peak tnps. Based on the daIly tnps generated by the proJect, the radIUS of development mfluence IS two mIles 4 ----- ------------- --~'----- TRIP DISTRIBUTION The tnp dIstnbutIOn was based on the prevIOusly approved dIstributIOn for the Woolbnght MedIcal Offices project m the Traffic Impact AnalYSIS, dated July 1997 FIgure 2 shows the percent project tnps and the project volumes on the Impact area roadways PERFORL\1ANCE STANDARDS ANALYSIS Test One Table 7 shows the ADT capacIty analVSIS WIth the project tnps and background growth WIth the performance standards analYSIS on those hnks WIth project Impact greater than one percent of the LOS D capaCIty Table 8 shows the same mformatIOn for the peak hour FIgure 3 shows the above mformatIOn on a map Woolbnght Road, from 1-95 to Seacrest Boulevard, falls the Test One LOS standard. An AlternatIve Test One analYSIS was performed for thIS hnk. Alternate Test One The 2000 peak season, peak hour, peak dIrectIOn volume was obtamed from the Palm Beach County Traffic DIVISIon for the faIled hnk. Tables 9 10 11, and 12 show the projected AM and PM peak dIrectIOn and off-peak dIrectIOn/peak season/peak hour volumes for the faIled roadway hnk. All of the peak dIrectIOn lmk LOS standards are met. The mtersectIOns at each end of the Alternate Test One hnk were analyzed to determme If they meet the mtersectIOn standards 6 Boynton Beach Blvd. Q) > ~.". N <( Ib 0"" If) .....NO If) Q) .... Cl 17% 6 231 () 071 *LO~ t--O>o Lake Ida Rd LEGEND 3% Percent of Project Trips on Link 32 Number of Project Trips on Link o 07 Percent of LOS 'D" Capacity ~~ YVONNE ZIEL TRAFFIC CONSULTANTS, INC TRAFFIC ENGINEERING & PlANNING 1144066 Street North, West Palm Beach. Florida 33412 Telephone 561-624-7262 Fax 561-624-957& FIGURE 2 FIRST SOUTHERN BANK PROFESSIONAL PARK PROJECT TRAFFIC DISTRIBUTION AND ASSIGNMENT ::$!,......,-- (b....."! ,....NO 40% 543 60% 815 1 11 1 67 Woolbright Rd. - 23 Ave ~Nt-- Ot--,,! NNO Lt) 0> I "C > *,--~ co COCOci Ui Q) 24% .... l) 326 l\J Q) 1 00 CI) *v~ .".1.00 j N.TS ~ I ro W 3% ~ 41 u... 0.27 f-f-u.. >- ~I'-O ZUO f- ~tOO WW <:3 ~ ~ ~ U"'" 0:::0 <( wo::: Cl.. <( Cl..Cl.. U en UUw en UUw 0 0 .-J .-J ~.-Jo::: U ~ .-J ~ g~I u::: O<XlN 0<( -.rtOO> NO>I'- Of- u.. NLOM NO~ u.. tOtOM NO u.. I'--.r~ 1-<( <( MMM <( <Xl 0> to w 0::: f- 0::: MMM Cl..1- f- I- f-en U O-.rN UCl.. MLOtO o:::~en f'.~-.::t W- -.r~N ....,0::: LO<XlM IO!:!: Of- ~o:::o::: 0::: Cl..Cl..f- Cl.. l- I- o:::U ~MO'l o:::U MMtO O~ <XlNO O~ -.r01'- ~N~ (J')~_..- ....,0 ....,0 ~N~ <(0::: <(0::: ::2Cl.. en ::2Cl.. ~O:::O:::I :;.:::Z ~O:::I en gI0f- <Xl<XlN o:::Q 00~ M M O'l :;':::Z N:;':::~S <Xl <Xl 0> ~:;.::: NN<Xl ~~ <(!:: 000> 0:::0 Cl..UO Cl..O Uo NN- <(- <(0::: .-JZ <(0::: Cl..!:: C00 <(0 C00 .-JO ZU <(Z LO~O::: Qu LOI-U zO 0><(:J NNO'l 0'l0- LO LO <Xl OU O>WO <Xl <Xl N en- ~<(l::: ~~-.r ~~~ enu.. NNtO -U ~Cl..I MMM wu.. en_ u..<( ~ <( ~~M enu.. 00::: 0::: MMM Wu.. f- u..<( 1'-0:::1- 00::: ~ 000 WCl..~ en= Cl.. COo:::f- <(en LOLON .-J:;.:::- OP<( 000 WCl..o::: W 0 = LOLOO 000 COZ<( .-J U O>O>LO .-J~:J Cl...-JP -.r-~M <(<(0 COCON COZO tOtOLO f-COW -.r-.rM <(<(I en Z0 f-CO~ u..W 0:::<( u..en tOtOLO Z<( OZ wO::: Ow o:::w ,,*,:'5 IW ,,*,Z WCl.. f-> <( I~ W-- :J<( .-J f-~ I-cc 00 :Jo _WW enW Z W-- O~ enLOLO f-f- 0 f-cc en~ u..O>O> _WW O~-!.. enU ~ enLOLO f-W see o:::~ <( LLO>O> en 0::: u:::o U o.....!...l. 0::::J sW 0::: 0 see -I- - (:) Cl.. .-J u..:J 00 s~ u.. ~tO - 0 Z 00 0 ~tO ~ <( U 0 .-J 000 0:::0:::0::: 000 f-f-f- 0:::0:::0::: III >- 000 I-f-I- <( OCOCOC ::2 III S CO CO CO 0Cl.. >- 000 0 .-J.-J.-J 9tO <( OCOCOC <( 000 uN S CO CO CO 0 000 Q) . 0 .-J .-J .-J 0::: sss 9~ <( 000 ~-.r 0 000 ~O 0::: SSS Boynton Beach Blvd. Lake Ida Rd LEGEND C 37.594 111 ~ 37.818 = Level of Service = Existing Traffic = Future Growth ::: Project Traffic ::: Total Traffic ~ ~7 .~ /1 ~ / ......../ YVONNE ZIEL TRAFFIC CONSULTANTS, INC TRAFFIC ENGINEERING & PLANNING 1144086 Street North. West Palm Beach, Florida 33412 Telephone 561 <624-1262 Fax 5E1-624-9578 a.> > <( I/) I/) ~ Cl C o U C 34,215 3966 543 38 724 C 29 258 4426 815 39 456 Woolbright Rd. - 23 Ave E 33 648 2,165 326 -- 36 139 LO 0) ...!.. FIGURE 3 "0 > iii iii a.> L- U ctl a.> en J NT S ~ I lii L- a.> "0 a.> u.. FIRST SOUTHERN BANK PROFESSIONAL PARK FUTURE (2001) DAILY TRAFFIC CONDITIONS I-I-u...>- r-;:;;-. ffi~ot: \ .,j' I-I-u...>- cr> 0'" 0 I'- ZOOt: 0 ~o g: 0 UJUJ 0 UJ~ o:! I-I-u...>- I-I-u.>- I"- 0'" o:! ZOOt: cr> N ~O 0- 0-0- 0 0 ZOOt: ci UJ~ o:! i UJW 0 UJUJ 0 (/) \ 0'" o:! 0'" o:! 0-0- 0 0 ~O 0- ~O 0- 0 W~ o:! ...J \ UJ~ o:! (/) I 0-0- 0 0-0- 0 0 0 ..-...JO <D \ ...J oo:!- <D (/) (/) Ol-u. .,j' 0 ..-...JO 0 NOU. 0 0 CO Oo:!- <D I-c? \ ...J ...J Ol-u. I"- ..-...JO .0 ..-...JO NOU. ..- I- 0 I-c? Oo:!- (<) Oo:!- "'" I-(/) I'- Ol-u. .,j' Ol-u. (<). I- 00- N NOU. NOU. UJ- I-c? I-~ I-(/) .0 ..,~ 00- ..- (/) OI- l- I- ~R Z ~ I I-(/) I'- (/) I-(/) .0 (/) 0 0- I 00- ..- Z 00- Z 01- ~ \ (/) w- 0 w- 0 ~ 5 (/) cr> ..,~ ~ ..,~ 0- I- <r Z 01- 01- ~ Z ~~ 0 ~ 5 ~ 5 I- .,j' 0 ~ z ~~ oq- 0 0'" 0- 0- Z ..,0 \ 5 I- 0 I- 0 0'" ~ o:!~ <D 0 (<) Z ~~ N ~~ N 0 ..,0 u... 'ZO- O ~ ~ o:!~ u... 0 0'" u... 0'" 'ZO- c? ..-~:c \ 1"- ..,0 ..,0 u... 0(91- N ~ o:!~ u... o::,::~ \ c? o:!~ u... ..-~:c (<) ::,::1- u. 'ZO- 'ZO- ::,::C? 0(91- (<) NO u... ....~:c ::,::1- O::,::~ ~Z o:!O ~~ 1"- ..-~:c .0 ~I- NO \ o:!Q C!l~ 0(91- N ~z 001- N O:!Z o:!O 0-1- \ ~I- o~~ o:!Q ~~3 0-0 coO:: ...JO o~o (<) O:!Z NO 0-1- 00 0 o:!UJ go:!G: <D o:!O ...J- 0~0 ("'l 0-0 CO~ ...JO o:!~ o:!l- cr> z~ NWu... ...J- o:!w co0 ZO g~u: <D 0- Cl.c? o:!l- Z~ Q~ \ <D \ _0 ZO 0::,::0 <D 0- o~o \ 1"- NO-u... (/)~ I- OW Oo:!- <D _0 Oo:!- co (/)- ~ (/)o:! owu... (<) (/)~ oUJu... N. (/)0 WW -~ NO-u... I- 'Z (/)- (/)o:! NO-U- w~ u...o- W (/)0 ~ UJw ~ u...o:! NOu:.. 'Z Cl. UJ::':: I- u...o- I- Ow w 'Z ..-~u... ~ u...o:! 00 . I ::0::0- 'Z 0- WO-O OUJ ~ ..-~~ 'Z UJO-Ii ~ ...J~ - ~ CO ._ cr> ~ 0- W WO-;:) W \ is w 'Z 'Z o:! ...J~;:) 0:: CO COZO:: W 0- . ...J::,::O COZO o:!o:!;:) ...J~~ ~ COZ:C ~ ~~:c 5 ~ I-COO (/)= 0.. 0 coz::l ~ co o:!<c~ z:C 09<c U"l o:!<co ~ I-COo:! 0:: CO z~ (/)= 0- 0 ...J - 0 co I-co:C 5 is UJ 09<c .0 ~::.:: ZW ~o:! ...J - 0 co w<c z~ (/) = 0- 0 ~a, (/)= 0- 0 WW :cw ~o:! 09<c .0 wu... 09<C U"l :c 0... 1-0- u...(/) U"l UJW ...J - 0 <Xl :cu... ...J' 0 co I-Z ::l OW :c Cl.. 1-0 ;:)0 u...(/) \ .0 OZ ""Z I-Z ::l o(/) OUJ (/)0 :5 i ::lo u...(/) .0 OZ .0 (/)o:! ""Z I-(/) \ o(/) OUJ (/)0 u.(/) I-W :5 (/)<c I (/)o:! ""Z I-(/) Ow (/)(/) ~w \ -- \ I-W (/)o:! ""Z ~~ -(/) c (/)(/) :5 ~w :5 \i:o:! c: u..::.:: W ~::.:: -(/) o:! u.::.:: W w U"l \i:<C 0- W ~ I ;ii Ir> Cl. \ w c: c: 'Z ~ 0.. UJ 0- W 0- 'Z '0 'Z .0 .0 0 '0 0.. W 'Z <c ~ <c ~ w W 0 b 0 I- UJ \ 0 UJ '0 0 '0 0 b I- <D b W W 0 0 \ UJ I- UJ .., <D W (,) 0 .., UJ b b Z 0 .., 0 UJ Z 0 ~ 0 ~ I 0 <D .., 0 <D 0- \ 0:: Z ~ ~ 0- Z 0- 0 ~ 0 \ ~ 0.. 0 ~ (,) 0 \ 0 ...J (,) ...J 0 0 S ...J 0 0:: 0 0 I- ~ ~ :c I- ~ 'Z ~ 0 :c 00- R 'Z ~ 0 'Z 'Z ~ 0 01.0 ~ CO 00- R ~ ~\ 00.. R bo ...J 0.0 ~ CO 00- 01.0 ~ CO 8~ <c 0 bo ...J Olr> ~ bo ...J 0 8~ 0 0 bo 0 <Il .. 0 :-~ 0 ~ o:! 0 8~ <c 0 q~ <c 0 ...-0 ~ ~"i 0 ~ 0 0 0 ~ ...-0 ~ .:-~ ~ ~ ..-.,j' ~ ..-0 ..-0 ------ ------_.~. IntersectIOn AnalysIs Capacity analYSIs usmg a spreadsheet based on the 1985 HIghway CapacIty Manual Cntical Movement Analysis, was performed at the signalIzed mtersectIOns at each end of the faIled lInIe The turnmg movement counts were obtamed from the PBC Traffic DIVisIOn and a new traffic count performed on December 6,2000 IntersectIOn analysIs resulted m the followmg cntIca1 movements INTERSECTION Woolbnght Rd & 1-95 Woo1bnght Rd & Seacrest Blvd AM 912 1,163 PM 1,242 1,166 STATUS Under/ CapacIty UnderlUnder CapaCity Smce the above mtersectIOns meet the LOS standards, the project meets the Test One reqUIrements. AppendIX B contams the count data and capacIty analYSIS worksheets Test Two There are no Test Two Impacted roadways withm the project Impact areas, therefore the project meets the Test Two Standards Dnveway AnalysIs The projects turnmg movements and dally dnveway volumes are shown m FIgure 4 Based on the projected dnveway volumes, turn lanes are not reqUIred. CONCLUSION ThIS project meets the Palm Beach County Traffic Performance Standards Ordmance, and may be approved. 11 l iE e:: 0 Z N IS 55(61) -. Woolbright Rd 23 (26) -. I ~ I r a M ! 0 ..- ~ - en 00 ..- 1,160 ADT 499 ADT - ---- LEGEND i ~ 16 (14) 302 ! ~ Total Daity Volume i i PM Peak Hour Volume -~ i i AM Peak Hour Volume ~~ YVONNE ZIEL FIGURE 4 TRAFFIC CONSULTANTS. INC. FIRST SOUTHERN BANK PROFESSIONAL PARK TRAFFIC ENGINEERING & PLANNING 11440 86 Street North, West Palm Beach, FL 33412 PEAK HOUR DRIVEWAY TURNING MOVEMENTS Telephone (561) 624-7262 Fax (561) 624-9578 APPENDIX A GROWTH RATE WORKSHEET IWO 00.000000 ~I-W OlOlOlONO <((f) MMT'""T"""~O 00::::> 0:: C) IW 00.0000000 ~I- O>O>OlON,... MM~T"""~O O~ ~ . 0:: C) W tOlOCOtOCO"" :2: "'-"-VNCOCO ::> ~N_tO""tD,... ...J 'V 'V ("")C"'1 lOc) 0 MM(",,)"-"- ,.... > ::.:: 0:: .0.0.0.0.0.0 0:: <( Olaioioioioi <( W 0l0l0l0l0l0l 0.. >- 0l0l0l0l0l0l ...J ,... T""" T'"""""" T""" <((f) Zz Qo (f)i= W ..-_"Ilt('l')T"""C) ~:5 :2: OOtO-oeo u.::> ::> LOlOf"oo..O..-N Ou ...J O-O,.....otOa> O::...J 0 M{"I")(""),.....-..- 0..<( > ::.::U 0::: lOlOlJ")L.()l,()L(') ZW <( <0<0<0<0<0<0 <(I- W 0l0l0>0l0l0l 1Il<( >- 0l0l0l0l0l0l zO:: ..-..- '11"""""" T'"""" 0:: I ~~ 1-0 ::>0:: gC) I- (f) 0:: u. Z W--<1l'O<1l 0 ~c:cC)>> -WW'Offi<( i= (f) lO to "i:: <( ~cn(J')ClJt5"E u O-"--"-~CIl'" 0 __ N 3:00 ~W ...J 3:WUc(f) bg::Bo o 0 c z '<1'<03: iJ'- b~re OO~ ~C/) 0 ~ N :2: 00.. ~~ ~g NM ~O >- <( 3: o <( o 0:: 000000 0:::0::0::0:::>> I-I-I-I-...J...J IIIIIIlIIl C)C)C)C) 1-1- ----(f)(f) 0:::0::: 0:: 0:: WW 1Il1Il1Il1Il0:::0:: ...J...J...J...JUU 0000<(<( OOOOWW 3:3:3:3:(f)(f) APPENDIX B CAP ACITY ANALYSIS WORKSHEETS TRAFFIC COUNT DATA SEAS ADJ FACTOR. 099 INTERSECTION TURNING MOVEMENT SUMMARY GROWTH RATE. 2925 INTERSECTION WOOLBRIGHT RD & 1-95 PROJECTED YEAR. 2001 A.M. PEAK PERIOD PEAK-SEASON TRAFFIC CONDITIONS GR= (39+195)/2 2000 2001 RAW 2000 2000 2001 BACKGROUND 2001 TM TRAFFIC ADJUST APPR BACKGR COMMITTEe PROJECT TRAFFIC TOTAL VOLS VOLS VOLS GROWTH DEVELOP TRAFFIC VOLUMES VOLUME -------------- ------------ ---------- ---------- ------------- --------------- ------------ --------------- ---------- SB - RT 1 442 438 13 13 11 463 474 - TH 2 0 0 861 0 0 0 0 - LT 3 428 424 12 0 436 436 WB - RT 4 439 435 13 0 447 447 -TH 5 435 431 1212 13 26 17 469 486 - LT 6 350 347 10 0 357 357 NB-RT 7 249 247 7 0 254 254 - TH 8 0 0 450 0 0 0 0 - LT 9 206 204 6 15 14 225 239 EB-RT 10 525 520 15 12 4 547 551 - TH 11 494 489 1381 14 23 5 526 531 - L T 12 376 372 11 11 3 394 397 SEAS ADJ FACTOR 099 INTERSECTION TURNING MOVEMENT SUMMARY GROWTH RATE. 2.925 INTERSECTION WOOLBRIGHT RD & 1-95 PROJECTED YEAR. 2001 P M PEAK PERIOD PEAK-SEASON TRAFFIC CONDITIONS GR= (3 9+1 95)/2 2000 2001 RAW 2000 2000 2001 BACKGROUND 2001 TM TRAFFIC ADJUST APPR BACKGR COMMITTED PROJECT TRAFFIC TOTAL VOLS VOLS VOLS GROWTH DEVELOP TRAFFIC VOLUMES VOLUME ----- ------ --------- ---------- --------------- ---------- ---------------------- -----------_. SB - RT 1 365 361 11 21 10 393 403 - TH 2 0 0 751 0 0 0 0 - LT 3 394 390 11 0 401 401 WB - RT 4 571 565 17 0 582 582 - TH 5 767 759 1612 22 44 15 826 840 - LT 6 290 287 8 0 295 295 NB - RT 7 303 300 9 0 309 309 - TH 8 0 0 745 0 0 0 0 - LT 9 450 446 13 24 12 483 495 EB - RT 10 210 208 6 28 23 242 265 - TH 11 482 477 1182 14 49 27 540 567 - L T 12 502 497 15 24 18 536 554 FIRST SOUTHERN BANK PROFESSIONAL PARK INTERSECTION TURNING MOVEMENT SUMMARY SEAS ADJ FACTOR: 100 INTERSECTION WOOLBRIGHT RD & SEACREST BLVD GROWTH RATE. 356 A.M PEAK PERIOD PEAK SEASON TRAFFIC CONDITIONS PROJECTED YEAR. 2001 GR= (1.28-1'11 +0+1 95)/4 2000 2001 RAW 2000 2000 2001 BACKGROUND 2001 TM TRAFFIC ADJUST APPR BACKGR COMMITTED PROJECT TRAFFIC TOTAL VOLS VOLS VOLS GROWTH DEVELOP TRAFFIC VOLUMES VOLUMES SB RT 1 129 129 5 9 4 143 147 TH 2 508 508 778 18 0 526 526 LT 3 141 141 5 0 146 146 WB RT 4 31 31 1 0 32 32 TH 5 570 570 695 20 14 9 604 613 LT 6 94 94 3 0 97 97 NB RT 7 89 89 3 0 92 92 TH 8 313 313 774 11 0 324 324 LT 9 372 372 13 3 3 388 391 EB RT 10 390 390 14 3 1 407 408 TH 11 623 623 1137 22 12 3 657 660 LT 12 124 124 4 8 1 136 138 INTERSECTION TURNING MOVEMENT SUMMARY SEAS ADJ FACTOR: 1 00 INTERSECTION. WOOLBRIGHT RD & SEACREST BLVD GROWTH RATE. 3.56 P M PEAK PERIOD PEAK-SEASON TRAFFIC CONDITIONS PROJECTED YEAR. 2001 GR= (1.28+11 +0+1.95)/4 2000 2001 RAW 2000 2000 2001 BACKGROUND 2001 TM TRAFFIC ADJUST APPR BACKGR COMMITTED PROJECT TRAFFIC TOTAL VOLS VOLS VOLS GROWTH DEVELOP TRAFFIC VOLUMES VOLUMES SB RT 1 102 102 4 15 4 121 124 TH 2 247 247 473 9 0 256 256 LT 3 124 124 4 0 128 128 WB RT 4 108 108 4 0 0 112 112 TH 5 922 922 1137 33 23 8 978 986 LT 6 107 107 4 0 0 111 111 NB RT 7 93 93 3 0 0 96 96 TH 8 487 487 1066 17 0 0 504 504 LT 9 486 486 17 6 2 509 512 EB RT 10 416 416 15 6 5 437 441 TH 11 629 629 1187 22 26 15 677 692 LT 12 142 142 5 17 7 164 171 YVONNE ZIEL TRAFFIC CONSULTANTS, INC, CRITICAL MOVEMENT ANALYSIS INTERSECTION: ANALYSIS PERIOD: WOOLBRIGHT RD & I 95 PROJECTED TRAFFIC AM PEAK LR 12/1/00 ANALYST DATE. IMPROVEMENTS. LANE HRLY LANE GEOM VOL DIST SB RT 1 474 474 THRU- 0 0 0 LEFT 2 436 218 WB RT 1 447 447 THRU' 2 486 243 LEFT 1 357 357 NB RT 1 254 254 THRU 0 0 0 LEFT 2 239 119 EB RT 1 551 551 THRU 2 531 266 LEFT 1 397 397 2001 SB TOTAL 911 I I 447 I- I I 1 I I 1 I I I I 486 <- ~_.- WB TOTAL 1290 <-I I 1-> I I V I 1 357 1---- 474 0 436 I I V ____I '- ---- ---- ----- 239 0 254 <-I 1-> --------1 397 I 1 I I EB TOTAL -----> 531 1480 NB TOTAL I 551 492 V MAXIMUM WB-L T= 357 NB L r, 29 SUM OF CRITICAL CAPACITY WB TH= 243 SB TH= 0 VOLUMES LEVEL CRITICAL= 357 TOT= 29 o TO 1 ,200 UNDER EB L T= 397 SB L TO: 128 1.201 TO 1 400 NEAR EB TH= 266 NB TH= 0 > 1400 OVER CRITICAL= 397 TOT= 128 E+W CRITICAL + 754 N+S CRITICAL = 157 STATUS? 912 UNDER CAPACITY YVONNE ZIEL TRAFFIC CONSULTANTS, INC, CRITICAL MOVEMENT ANALYSIS INTERSECTION: WOOLBRIGHT RD & I 95 ANALYSIS PERIOD: PROJECTED TRAFFIC 2001 PM PEAK ANALYST LR DATE: 12/1/00 IMPROVEMENTS: LANE HRLY LANE GEOM VOL DIST SB RT 1 403 403 THRU' 0 0 0 LEFT 2 401 201 WB RT 1 582 582 THRU: 2 840 420 LEFT 1 295 295 NB RT 1 309 309 THRU' 0 0 0 LEFT 2 495 247 EB RT 1 265 265 THRU- 2 567 284 LEFT 1 554 554 SB TOTAL 804 1 I 582 I- I 1 I 1 I I 1 I 1 I 840 <- WB TOTAL 1718 <-I 1 1-> 1 I V 1 1 295 1- 403 0 401 1 I V ____I 1- ---- - ---- 495 0 309 <-I 1-> --, 554 1 I I 1 EB TOTAL -> 567 1,386 NB TOTAL --I 265 803 V MAXIMUM WB-L T= 295 NB L T'= 157 SUM OF CRITICAL CAPACITY WB TH= 420 SB TH= 0 VOLUMES LEVEL CRITICAL= 420 TOT= 157 o TO 1.200 UNDER EB L T= 554 SB L TO= 111 1.201 TO 1 400 NEAR EB TH= 284 NB TH= 0 > 1 400 OVER CRITICAL= 554 TOT= 111 E+W CRITICAL + N+S CRITICAL = STATUS? 974 268 1.242 NEAR CAPACITY REDUCTION BY 90 VEH/HR BASED ON 3 VEH/CYCLE WHICH USE THE 6 SEC OVERLAP PHASE YVONNE ZIEL TRAFFIC CONSULTANTS INC CRITICAL MOVEMENT ANALYSIS INTERSECTION: ANALYSIS PERIOD' WOOLBRIGHT RD & SEACREST BLVD PROJECTED TRAFFIC 2001 AM PEAK LR 12/4/00 ANALYST DATE. IMPROVEMENTS: LANE HRL Y LANE GEOM VOL DIST SB RT 0 147 0 THRU' 2 526 336 LEFT 1 146 146 WB RT 0 32 0 THRU' 2 613 323 LEFT 1 97 97 NB RT 0 92 0 THRU' 2 324 208 LEFT 2 391 195 EB RT 0 408 0 THRU 2 660 534 LEFT 1 138 138 SB TOTAL 819 1 I 32 I I 1 I 1 1 1 I 1 1 613 <- WB TOTAL 743 <-I I 1- > 1 I V 1 1 97 I --- 147 526 146 I I V ____I 1____- ---- I I 1 138 I I EB TOTAL --> 660 1 1205 I 1 408 I V EB-L T= 138 NB LT 195 WB TH= 323 S8TH: 336 OR OR WB RT= 0 SB RT 0 TOT= 460 TOT= 532 WB L T= 97 SB L T= 146 EB TH= 534 NB TH' 208 OR OR EB RT= 0 NB RT 0 TOT= 631 TOT= 354 E-W CRITICAL + N-S CRITICAL = 631 532 391 324 92 <-I 1 I 1-> 1 I NB TOTAL 807 MAXIMUM SUM OF CRITICAL CAPACITY VOLUMES LEVEL o TO 1,200 1,201 TO 1 400 > 1 400 UNDER NEAR OVER STATUS? 1163 UNDER CAPACITY RIGHT TURN CHECK VOL LEFT RTOR SB OK NA WB OK NA NB OK NA EB OK NA CRITICAL RIGHT" o o o o 'RIGHT TURN ON RED' 0 % TRAFFIC INCREASE 0 RTOR (LESS 15%): 0 "RIGHTS LESS LEFT LESS RTOR YVONNE ZIEL TRAFFIC CONSULTANTS INC. CRITICAL MOVEMENT ANALYSIS INTERSECTION: ANALYSIS PERIOD: WOOLBRIGHT RD & SEACREST BLVD PROJECTED TRAFFIC 2001 PM PEAK LR 12/4/00 o ANALYST DATE. IMPROVEMENTS ^ LANE HRLY LANE GEOM VOL DIST SB RT 0 124 0 THRU: 2 256 190 LEFT 1 128 128 WB RT 0 112 0 THRU' 2 986 549 LEFT 1 111 111 NB RT 0 96 0 THRU' 2 504 300 LEFT 2 512 256 EB RT 0 441 0 THRU: 2 692 567 LEFT 1 171 171 SB TOTAL 508 1 1 112 1 1 1 1 I 1 1 1 I I 986 <- WB TOTAL 1208 <-I 1 1- > 1 I V I 1 111 I --- 124 256 128 1 I V ____I 1____- ---- ----- 1 512 504 96 I ^ ^ 1 <-I 1-> 171 I 1 1 I 1 I EB TOTAL ---> 692 1 1304 I NB TOTAL 1 441 I 1112 V MAXIMUM EB-L T= 171 NB L T= 256 SUM OF CRITICAL CAPACITY WB TH= 549 SB TH= 190 VOLUMES LEVEL OR OR ------- WB RT= 0 SB RT= 0 o TO 1,200 UNDER TOT= 720 TOT= 446 1.201 TO 1 400 NEAR > 1 400 OVER WB L T= 111 SB L T= 128 EB TH= 567 NB TH= 300 OR OR EB RT= 0 NB RT= 0 TOT= 678 TOT= 429 E-W CRITICAL + 720 N-S CRITICAL = 446 STATUS? 1166 UNDER CAPACITY RIGHT TURN CHECK VOL LEFT RTOR SB OK NA WB OK NA NB" OK NA EB OK NA CRITICAL RIGHT" o o o o "RIGHT TURN ON RED' % TRAFFIC INCREASE. RTOR (LESS 15%): o o o "RIGHTS LESS LEFT LESS RTOR LJ PALM BEACH COUNTY TRAFFIC ENGINEERING VOLUME REPORT Volume Report with 24 Hour Totals Page ****************************************************************************** Data File 00207014 PRN Station 000000005303 Identification 000000000024 Interval Start date Feb 7, 00 Start time Stop date Feb 8, 00 Stop time City/Town RWR County Location WOOLBRIGHT RD 600' E OF 1-95 1. ****************************************************************************** Feb 7/Feb 8 Eastbound Volume for Lane 1 tJ J lJ 15 minutes 11 00 11 00 P B COUNTY ~ ~ ------------------------------------------------------------------------------ ; J.. End Time 00 01 02 03 04 05 06 07 08 09 10 1 -------- 15 35 17 15 10 8 14 93 248 301 294 257 31 30 26 14 9 8 10 25 135 277 256 268 268 27, 45 15 11 5 5 19 34 252 321 278 291 299 31 00 11 13 6 4 15 67 308 322 289 250 261 30 -------- Hr Total 87 55 35 27 52 140 788 1168 1124 1103 1085 120 J. J 4 ______________________________________________________________________________ - End Time L L 15 30 45 00 329 341 307 289 Hi Total 1266 L , 12 293 284 277 323 1177 13 337 307 326 297 1267 14 307 308 343 331 1289 15 350 322 309 367 1348 16 333 323 340 334 1330 17 314 300 307 234 1155 18 224 167 163 180 734 19 141 130 134 120 525 20 143 103 107 86 21 292 22 2 88 73 64 67 6 ~ -' 5 3\ 20 End Time 00 01 02 03 04 05 06 07 08 09 10 1 ---1-5---- 35 21 12 11 13 41 105 269 314 271 -302 -jT:7 30 15 14 15 15 12 47 152 308 297 269 312 350 45 21 15 7 9 20 72 233 397 275 288 267 29[ 00 11 11 7 8 27 88 239 347 281 269 304 27- I ~~-~~~~i 82 61 41 43 72 248 729 1321 1167 1097 1185 124= ------------------------------------------------------------------------------- I - End Time I -------- 15 30 45 00 J J 1 12 317 350 288 315 Hr Total 1270 13 324 349 326 315 1314 14 340 349 352 417 1458 15 424 415 413 402 1654 16 366 401 412 407 1586 17 434 366 370 296 1466 18 325 292 247 240 1104 19 219 217 195 165 796 20 169 139 112 118 538 21 136 104 122 100 462 276 22 2::: 71 68 75 62 4C 51 31 3~ ------------------------------------------------------------------------------- 15- 24 Hour Total 19369 -AM peak hour begins 07 15 AM peak volume 1366 Peak hour factor 0 8( PM peak hour begins 14 45 PM peak volume 1669 Peak hour factor 0 9[ ******************************************************************************~ .i.L/U~/LUUU U~ ~O ...JD.i. L ..... "'JU.i. IOOLllrGIT lOAD , BIACIIST BOOtBVAID BOlITO. IIACI, 'LOUDl COVITID BY LOIS PUllano Traffic Sijrvey Specialists, Ine 62. Gardenia Terrace Delray Belch, 'lorida 33444 ISUI 272 3155 '11 15'11 272-4381 ALL mIenS Slltll'r BLVD 'rOI forth WOOLlIIGIIT lOAD Prol But SlIeRlS! BLVD lrot SOllth WOOLBIIGIT lOAD PrOI lest Site Code Start Date Pile I D Page Ugbt Thru Left light Thru Left light Thru Left ilgbt Thru Left Toul Dne 12/06/00 'elk lour IDIly.is By Intire Intersection for tbe Period 07 00 to 12 30 on 12/06/00 teak .tart 07 30 07 ]0 07 ]0 07 30 '011. 12! 5U 141 J1 570 9. n 113 372 390 Ul 124 Pereelt In 6H 11\ 41 en w 11' 40' U\ )4' m llt pt totll 771 US 774 1117 lig.eft 01 00 07 30 07 45 07 45 '0111. U IU 3t , 14' 21 2' 9) U 121 153 2' Ii total 226 110 217 lOO PI1 " 97 ., 95 SBACRBST BLVD 00000162 12/0'/00 IOOLSlAC ) IOOLIIIGIT 10lD . SIICIIST BOULIlIRD IOtITOI BllCI, FLORIDl COOlTlD IY LOI! PlLOKJJO Traffic Survey Specialists, Inc 624 Gardenia Terrace Delray Beacb, Plorlda 33444 1m) m 3255 PaJ (sU) 27HlBl suellST BLVD Protl IOrtb ALL "lleLlS IOOLlUGIT ROAD Prol last SUCIIST BLVD 'rol South Il00LBiIGIT ROlD 'rol lelt Site Code Start Date Pile I D Page OOOOOHl 12/06/00 IOOLSIAC 4 Right ThI'1l Left ligbt Thrll Left light Tbru Left ligbt Tbru Left Total Dite 1210'/00 'tlk lout l~IIYli6 By Intire Intersection {or the Period 12 3D to 18 00 OC 11/0'/00 Pelt ltart Ii 45 IH5 H 45 UH loh. 102 247 124 108 922 107 93 417 41' 416 m 141 Puc:ear 22t 52\ 2" n III " 9t 4n ." m sn m Pk toU} 473 1137 1066 1187 li,.btn 16 4S 17 15 17 00 16 45 '0111. 27 62 )I a w 26 H 115 148 100 110 tt Ii total 127 302 2U 324 PIP 9l '4 92 92 WOOLBRIGHT ROAD 486 922 1,510 102 142 142 629 629 416 416 0 0 SRACRBST BLVD o 102 247 124 142 487 108 o 102 247 124 737 473 1,210 , r F7 l L ALL VBHICLRS l 1 2,697 Ij187 Intersection 3,863 J 1,983 Total 1,836 0 0 108 108 922 922 107 107 124 846 62g 93 WOOLBRIGHT ROAD 1,066 107 486 487 93 0 247 416 ------ ------ ------ ------ ------ 770 486 487 9 0 SBACRBST BLVD J...L/ UJ/ ":'UUU u-' JU ......LJ.... ...... ...... ~ -''-'.. Traffic Survey Specialists, l~c IOOLIIIGBT ROAD , SI1CRIST BOULIVARD 624 Gard@nia Terrace Site Code 00000162 IOTITOI IIACB, rLOIID1 Delray Beacb, Plorida )3444 Start Date 12/06/00 COUITID BY LUIS PALORIWO 1S61) 272 l255 Pal 1S61) 272 4181 Pile I D IOOLSIlC Page 1 Ul, VIII eLls SUCIIST BLVD 'OOLBRIGHT lOAD SUCUST BLVD 100LBI1GIT lOAD 'rOl loull Prol Rut Prol South frol lelt Kight Tbru Left light Tbru Left light Tbru Left Right Tbn Left Total Dlte 12/0'100 07 00 29 78 27j 1 92 11 11 53 100 1'1 110 IS "4 01 15 23 101 26 , 113 10 20 '5 102 m 110 14 7H 07 30 22 111 24 , 146 28 20 104 90 U 158 H 839 If Total 10' 426 121 27 509 73 11 315 390 417 531 101 mo .. DO 46 HI 19 6 128 24 11 63 ,. 79 151 21 114 O. 15 29 In 27 11 148 11 2S 53 86 106 HI 11 117 DI ]0 3S 96 21 9 127 23 21 72 112 79 159 28 7U II Totd 140 449 124 38 555 12 94 m m 127 m 101 3177 , BlIlI t 16 DO U U 28 2S 2}) 21 11 19 95 105 171 36 811 U 15 n " H 25 202 2S H 128 104 81 161 16 9l) U )0 2& 78 3D 24 193 23 25 124 124 81 1'2 40 m Ir Toul 95 241 129 102 842 17 99 m 428 m "4 17 00 J3 B 23 27 234 J1 26 115 148 92 141 31 964 17 15 16 S5 36 H 167 2S 20 138 123 112 155 19 996 17 10 H 61 27 H 227 12 20 11' 110 112 15) 28 942 Ir Toul 88 251 120 105 m ll9 101 471 -~-_._~ ~--.~_... ..--- -- _.-,.-...-~.._- 'TOTAL' 429 137) 501 I m 2793 )61 I 311 1m 1694 I 1595 2415 UI I 13781 ~ I.rII Ia LEI ~ l,II ~ ~ ~ NO DATE 3-/3-00 TRAFFIC DIVISION.. PROJECT SHEET rc1 GJ____ T-9<; (eCt< r) PRIORITY NATURE OF REQUEST RCVD BY FROM NAME ATLAS PG ADDRESS DIST PHONE (H)# PHONE (W)# ASSIGNED TO (J,V III Hf DESIRED ACTION SIGNAL STUDY APPROACH VOL. PK HR TURN COUNTS _ ( ) MO CD PED STUDY SIGNAL PLAN WORK ORDER P R I NTS ISOLATED RETIMING SYSTEM RETIMING FIELD CHECK SKETC H STRIPING PLAN DETOUR PLAN GEOMETRIC PLAN GEOMETRICS SPEED LIMIT L L T T TR R NA ----- SA ~ _ _ _...L EA _ _ -6- _ -'- WA ..L _ A _ _ J TRAFFIC SIGNAL? yeS 1 LI I IJ ACTION TAKEN ~ ~ L 1. WARRANTS 2 SPEED STUD\ DELAY STUD'- PHOTOS VIDEO FILE CHECK OTHER DATE BY RESPONSE MADE TO BY LETTER MEMO PHONE -f- --. --. -. --. _J~ -. -. -.. .. .. r1 rw II n n .~ n n Stte Code B-~ Street H S Street WEATBER RYA/BLP WOOLBRICHT RD I-95(UST) CLBAR PALM BBACll COUNTY TRAPPIC MOJements by PrImary Tile Begin ------- ----------------------------------------------------- -------------------------------------------------- ------------- LT PACE 1 PILE 47550AJ -~~~:~~ VehIcle Total - .----------------------------------------------------------------------------.- ---------------- __e. ___ .__ 7 30 745 DR TOTAL Prom Horth RT TBRU LT o o o o o o o o o Prom East RT THRU Proll South RT THRU LT o o o 40 51 91 Prom West RT THRU o o o 277 347 624 94 lOB 202 737 859 1596 LT 103 106 209 179 190 369 o o o 44 57 101 8 00 AM 0 0 0 124 206 72 0 60 0 306 94 862 8 15 0 0 0 106 210 0 76 0 55 0 329 80 856 ~.~~e[_~~~~_________~_______________________l~______________________;?~______________________~~_________________ _ \Je~'c\p DA Y TOTAL DIRBCTION PROM North Bast South Vest North Bast South West o o o 439 785 o 249 PEAK PERIOD ANALYSIS POR THE PBRIOD STAn PEAl HOUR 12 00 AM 7 30 AM 7 30 AM 7 30 AM 7 30 A~ PBAl HR FACTOR o 00 o 93 o 86 o 90 o 00 o 93 o 86 o 90 o 7 30 AM - 8 30 AM VOLUMES Right Thru Left Total 0 0 0 0 439 785 0 1224 249 0 206 455 0 1259 376 1635 Entire Intersection 0 0 0 0 439 785 0 1224 249 0 206 455 0 1259 316 1635 206 P BiCERTS Right Thru Left o 36 55 o o 36 55 o o 1259 o 64 o 77 o 64 o 77 376 3314 o o 45 23 o o 45 23 r r ~ -I " ,., ~, ~ r l' r r r r f' r r r r r site Code E-I/ Street N-S Street WEATHER RVA/HLP 1I00LBRIGHT RD I -95( EAS 1) CLEAR PALH BEACH COUNTY TRAFFIC Hovements by Primary PAGE 1 FILE 47550P30 rile Beg in ---------------------------------------------------------------------------------------------------------------------------- --- DATE 3/13/00 Fro. North RT THRV LT Frail East RT THRU U Fro. South RT THRU LT Fro. West RT THRU LT ---------------------------------------------------------------------------------------------------------------------------------- Vehicle Total 4 30 4 45 HR TOTAL 000 o 0 0 o 0 0 147 288 0 140 272 0 287 560 0 65 0 106 85 0 128 150 0 234 o 228 127 o 261 115 o 489 242 961 1001 1962 5 00 PH 0 0 0 128 252 0 74 0 100 0 236 112 902 5 15 0 0 0 156 245 0 79 0 116 0 252 148 996 ~~~r:~~______c:t____________________'1_____________________~---------------------------!~----------------________ UehI0\~5 DAY TOTAL 0 0 0 571 1057 0 303 0 450 0 977 502 3860 --------........_-------~-- ---- PEAK PERIOD ANALYSIS FOR THE PERIOD 4 30 PH - 5 30 PH DIRECTION START FROH PEAK HOUR PEAK HR FACTOR VOLUHES Right Ihru Left lotal ----------------------------------------------------------------------------------------------- PERCENTS Right Thru Left North East South "est North East South West 12 00 AH 4 30 PM 4 30 PM 4 30 PH 4 30 PH o 00 o 94 o 88 o 92 o 00 o 94 o 88 o 92 0 0 0 0 571 1057 0 1628 303 0 450 753 0 977 502 1479 Entire Intersection 0 0 0 0 571 1057 0 1628 303 0 450 753 0 977 502 1479 000 35 65 0 40 0 60 o bb 34 000 3S 65 0 40 0 bO o 66 34 ,-- ,-- I f- f'- 8 00 AM 115 0 100 0 181 89 0 0 0 143 212 0 840 8 15.t1 97 0 102 0 174 80 0 0 0 146 224 0 823 /btJ~~,1J C/n1- Jr~ l;1~~(~~-~~__________~~____________________~_~__________----------~--------------------~~------------------------ r- r- J- f- r~- r- r ,- f f r r r --_.~ -----~ ~---- Site Code E-W street N-S Street UEATHER ZAHN/RWR WOOLBRIGHT RD I -95( WEST J CLEAR PALM BEACH COUNTY TRAFfIC Movements by Primary PAGE 1 FILE 47550At.l0 DATE 3/13/00 Tille Be9in ----------------------------------------------------------------------------------------------------------------------------- - - From North RT THRU L T From East RT THRU LT From South RT THRU LT ---------------------------------------------------------------------------------------------------------------------------------- From West RT THRU LT Vehicle Total 7 30 7 45 HR TOTAL DAY TOTAL DIRECTION FROII 107 123 230 o 111 o 115 o 226 2 o 2 124 159 283 86 95 181 o o o o o o o o o 118 218 118 216 236 434 o o o 766 826 1592 442 o 428 2 638 350 o o o 525 870 o 3255 PEAK PERIOD ANALYSIS FDR THE PERIDD 7 30 AM - 8 30 AM --------~-------------------------------------------------------------,------------------------ PERCENTS Right Thru Left North East South lIest North East South lIest START PEAK HOUR PEAK HR FACTOR VOLUMES Ri9ht Thru Left Total 7 30 All 7 30 AM 7 30 AM 7 30 All o 91 092 o 00 o 94 442 0 428 2 638 350 000 525 870 0 870 990 o 1395 Entire Intersection 7 30 All o 91 092 o 00 o 94 442 0 428 2 638 350 000 525 870 0 870 990 o 1395 51 o o 38 o 64 o 62 49 35 o o 51 o o 38 o 64 o 62 49 35 o o - rl rl --0 '1 r-I r-I PALM BRACH COUHTY TRAPPIC SIte Code ZABR/UR PACE 1 E W Street ~OOLBiIGHT iD PILE 41550m N S Street [-95 (nST) WEATHER CLEn MOHIeDts by Prlury DArE 3/13/00 -------------.------------------------------------------------------------------------------------------------------------------- Tille 8eglD Fro. Hortb U THRU LT Proll Eut RT TURU LT Froll South U TURU LT ------------------------------------------------------------------------------------------------------------------------------ Fro. West RT TBRD LT VehIcle Total 4 30 4 45 HR TOTAL DA Y TOTAL DIRBCTION PROM 104 0 99 106 0 106 210 0 205 365 o 394 PBAI HI FACTOR o 305 75 o 320 84 o 625 159 o 1205 290 PEAl PERIOD ANALYSIS FOR THE PERIOD VOLUMES RIght Thru Left 000 o 0 0 000 o o 57 262 0 57 252 0 114 514 0 902 925 1827 5 00 PH 69 0 85 0 284 68 0 0 0 47 227 0 780 f-lc"M~~04C,}tL. 86 0 104 0 296 6J 0 0 0 49 243 0 841 I L/~tlL~{~s:_______________l_:7______________________L_~-------------------~-------------------------5(------------__________ tl I I '-- J I I- Ll I -, -, -, -, -, I-I -) START P EAr HOUR 4 30 PM - S 30 PM Total o 210 o 984 3448 ----------------------------------------------------------------------------------------------- P KRCRHTS RIght Thru Left Horth East South ~est Nortb East South West 4 30 PM 4 30 PH 4 30 PH 4 30 PH 4 30 PH o 90 o 93 o 00 o 94 o 90 o 93 o 00 o 94 365 0 o 1205 o 0 210 984 BntIre IntersectIoD 365 0 o 1205 o 0 210 984 394 290 o o 759 149S o 1194 394 290 o o m 1495 o 1194 48 o o 18 o 81 o 82 52 19 o o 48 o o 18 o 81 o 82 52 19 o o