REVIEW COMMENTS
DEVELOPMENT DEPARTMENT
MEMORANDUM NO PZ 98-329
SITE PLAN REVIEW STAFF REPORT
PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION
December 3, 1998
DESCRIPTION OF PROJECT
Project Name/No. Quantum Business ParklNWSP 98-018
Property Owner" Boynton Industrial Corp, Trammel Crow Company
Applicant/Agent: Rhon Ernest-Jones Consultant Engineers/Rhon Ernest-Jones
Location Lots #68A, #68B, #69, #70, and #72, Quantum Industrial Park
Land Use/Zoning Industrial/Planned Industrial Development (PID)
Type of Use Industrial (spec warehouse buildings with office space)
Project size: Site Area. 16 56 acres (721,308 square feet)
Building Area. Phase A1Buildina I -
72,317 square feet: 57,8536 (warehouse), 14,4634 (office)
Phase A1Buildina II -
57,045 square feet: 45,636 (warehouse), 11,409 (office)
Phase B/Buildina III -
57,045 square feet: 45,636 (warehouse), 11,409 (office)
Phase B/Buildina IV -
79,211 square feet: 63,3688 (warehouse), 15,842 (office)
Adjacent Uses. (see Exhibit "A" - location map)
North - Quantum Lane and farther north, vacant lot zoned PID;
South - vacant lot zoned PID,
East High Ridge Road and farther east, Car Max zoned PID, and
West - environmentally sensitive lands to be preserved within PID
Site Characteristics. The subject vacant parcels within the Quantum Park PI D contain various trees and
undergrowth characteristic of disturbed scrub habitat. The submittal of a tree survey is a
condition of approval in order to ensure proper conservation consistent with the City's
tree preservation ordinance
Proposal The developer proposes the construction of four (4) separate speculative warehouse
buildings, with ancillary office space, totaling 265,618 square feet. The project is to be
constructed over two phases, the first phase will total 129,362 square feet and include
building I (72,317 square feet) and building II (57,045 square feet) Phase liB" of the
project will total 136,256 square feet and consist of building III (57,045 square feet) and
building IV (79,211 square feet) Each building will consist of approximately 20% office
space with the remaining space devoted to warehousing designed in concert with a
single fac;:ade of multiple loading bay doors oriented north or south so as not to face the
public rights-of-way (see Exhibit liB" - Proposed Site Plan)
Concurrency'
a. Traffic - No traffic analysis has been submitted Therefore, the conditions of approval
include the requirement that a study be submitted to the City and the County to
confirm compliance with the Palm Beach County traffic performance standards
/
Page 2
Quantum Business Park - Site Plan Review Staff Report
Memorandum No PZ 98-329
and for the purpose of monitoring total traffic approved within the Quantum Park
Planned Industrial Development. Staff has accepted this application without the
traffic analysis as traffic is vested in accordance with the original DRI, therefore
levels of service standards will likely be met. However, the study is still required
as a means of monitoring the accumulating traffic approved within the PID
b. Drainage - Conceptual drainage information was provided for the city's review The
Engineering Division is recommending that the review of specific drainage
solutions be deferred to time of permit review
Driveways Proposed on-site traffic circulation consists of two (32 feet and 31 6 feet) driveways from
High Ridge Road and one, 28 feet wide driveway from Quantum Lane located at the
northeast corner of the site The vehicle use areas are located along the perimeter of
the site and between each of the four buildings
Parking Facility The parking spaces required for this entire project have been tabulated based on the
ratio of 1 per 300 square feet of office space and 1 per 800 square feet of warehouse
space These standard ratios have been used to calculate the parking obligations,
rather than employee data as recommended by PID zoning regulations, due to the
current lack of employee information All spaces, except handicapped spaces, will be
dimensioned nine feet by eighteen feet (9' x 18') The parking area designs will meet
the city's Land Development Regulations, Chapter 2 - Zoning for warehouse and office
uses, and the ADA requirements for this use will be satisfied once all conditions
regarding accessible path designation are met.
Landscaping The landscaping of the site will fully meet code requirements when staff comments are
incorporated Furthermore, It is anticipated that additional landscaping, particularly
along rights-of-way, will be required by the Quantum Park architectural review board and
will exceed City standards
Building and Site Building and site regulations will be fully met when staff comments are incorporated into
the permit drawings.
Community Design The long rectangular-shaped buildings are proposed to be constructed from concrete
(tilt-up) walls The facades on two sides of the building will be enhanced with entry
features which consist of walls raised separate from the greater wall The entry walls
are proposed to be painted "taupe" (brownish gray), while the remainder of the walls
would be painted white, and enhanced with recessed line details connecting small
recessed squares and rectangles that are to be painted yellow All four facades are also
enhanced with yellow awnings over entrances, areas designated for future windows,
and over the loading bay doors The appearance of the project would be compatible
with the white and tan colors seen on adjacent buildings
Signage No project signage is proposed at this time, and notes on the plans indicate that if
signage is added it must conform to the Quantum Park sign program (see Exhibit "C" for
a diagram of the site signage approved in the sign program) If site signage differs from
this approved program, project signage, along with a revised sign program, must be
reviewed and approved by the City (including the Planning and Development Board and
ultimately the City Commission)
~
Page 3
Quantum Business Park - Site Plan Review Staff Report
Memorandum No PZ 98-329
RECOMMENDATION.
Staff recommends that this site plan request be approved, subject to the comments included in Exhibit "0" -
Conditions of Approval The Technical Review Committee (TRC) recommends that the deficiencies identified
in this exhibit be corrected on the set of plans submitted for building permit.
xc: Central File
J:ISHRDATAIPlanningISHAREDlWPIPROJECTSllnterstate SigncrafterslNWSP\STAFF REPORT.doc
~
.....,/
LOCATION MAP EXHIBIT "AI
QUANTUM BUSINES~ PARK
"
.
~
~
NO;-,
I
IN ,
CITY,
~, (~3
^~..~~
~ "
. , )
.
I
\)
I \
pI
""!"__ .... I
r]\ f-c ~
: I C ~
. I III
~
~I I
~I. IR
- ~,
, __~~.. ____ YlL,_____,____,
~\ \.
AA I ! ':
Ii ,
___________________________~___X. ,
o 1/8
1111 II
'0 400 800 FEET
____ "l.A uAi/AI ~ AI.,
1.z/9~_
/
\
,
:9-
o
~-=z::-
i ~ c:::.
-~
,---,
~i
:. \ '
C%
~'~
--------
~
~
"
~
~
0
~
..
~
~
0
..
.. if<
~ -
.....
.. '"'
\.;;. \ 0
."
r"
... ,..
'Z-
<" I
"
.. ."
-:=:
~ ,..
tfl
.. '"'
= "
0
e
-;
.
~
r
~ ..
~,
~
EXR\B\" "B"
\
;.r:
\ \
\
,
-;:;;s..\'
I
\ '\
\
, I
.
.
.
~
\
------ \
'-,
\ -
\
\;1 '
\ .
'~;\
\
\
----------
~
v
0'
~<
"il..
~.: 1
,....... . '
.....~ ..... ;; ,
,-' ---.\
--~ '
~ ,-
)
-~;:.-'&>;~:~;;;t€~~~.
,/
!
i .
.
'\
.-
c....~t.
no"~
, ~
~~
--1-
rv-:::
.:~
'-' -
- c;
--.1_
J~ ?
'-
~
-
-
~
:..-:----.-:.-
'..o~r....;
..-'
\
::
.
~~
~~~ ;:::
\~ ?
~t, ~
I,'
\~ '0
\ \ 7 ~\i
,\ \ '" '\~\'
',:' ,'~\ ,~
, \..~_...J.~~\\
,~ ~\r--
. ','\':' \'\\ ·
,\\ _",j'
,1"\ t
_~..J
.
\'
~()M:i\..c
..,.
\
. '
',-~
,......
~~
....-
J-~
J:<-
-
-----~--
--
..--~---~--- -
_ _ _ L ;:; ;;..~L-S~L;- ;;..:; 0-; 3
~ ...,.... ,...
to
\;>
I\=i~ ~i \
S~ ~~ 'a~
~;~ ~~
~~ ~
~~t ~
l%.~ ~
-~~
'io"
~;"
?~
~;..
~~~
~.~
>> ..
~
i
-;Z
is %
.1; ~
~. ~
i:' :,.
.:..'%
o ~
~" ...
~~ ~
s~ ~
:: ~
~i !"
7i~ ;.
~ 0
!~ ~
'l~ .,.
~;; t
~- "
11'1"1 ~
~~ ~
~l!
\\
\~
\c
~Z- ~
'.t:-
'"
-=
;::
~
\
i.~
}
----
$
- ......-----------------------
EXHIBIT "B"
1- ~~~t~--,~--!~
I
~
.~~
'to:
,.-
'"
~I
L....;
'=
"=
-=
F=
Z ,-.-,
c,=
~=
z ,-.-,
"u-.
""~ ~~
~ ~ oi
-=
z ,-.-,
~
! J
:;\ I
i
i
i \
;
,. I 0
I" \E j= i:>
\- i:>
a;~~ >%g
~~ i nz
~~g ~n
:: !o::: ..
~z.
~ - . z
i~ 0
." c
= ;; i~~
0 -0
< = "C
z i~g
g Ie 00
Ie % . !"'
. on 1>- n" ~ GE
--l .2: 0 i~:
n '... z
'" i= ~~~
-::J ~ ~E
; '" n ~ ~
>- >" ~
n
.. :z "Z
> ~o ~ ~
~ ,C
"'
. -c ~
~ >-
.
n on .
'" '"
" ~
: 0 tc
~
...
...
..'
::
:
- ~ TI:I-
~"
MATCH LINE PHASl
~.~ --~
--'!~16\
, '
,
is,
~
,
,
:1:
~
=
- ::-
J.
"
:::;
Z
./, -
:;
;1-
L1hl
SEt. :HEET ~p
.,., '1"-
1
1
!
1
\,
I
I, I
I,
I: I
..
I: I
f-'
,-
,
1 :1
~__+:'__"';L-.:...---
-'I" -- +- ..."- -i:":t-
: \ I t
; t
...-- -~1--- .p..tl_,.-
C ":: :i__
'I
,.
r
.c
! I
i, ;I'_=~
I '
,
0..... ==-
---r--
I' .
, '
-~
"
"- -
(c- "
I' 1
I i I :1
".
,;
II I
---z-
\
r-
10
1:-::
",..
Ie
\2
uc:
I>
""
:z
~
v.
_2
o
::
=
-~
=
; :z:
~ ~g
~ Z
:: r-n
< ~ t./l
..1 ~~
~ ~ 0\
_ :z:'
:: r-n
~
~
':\~. ", \
\!\;' \ '\ \'
,. ,
".J \ I \
\~ l\~ '\:
: :~~\ \ i
,:,\\;'\'1
-:)t \ \ \
<~
\~\; , \
--I
,~
- ~
~ ~
~,~
""
~\
..,
,'""
';;;:
'Z
.-
: ~ i:tt
~ i~~
~ -1
~ ~,
,,~
~~'% -
~ e 'C==:::!
~~i~
~~'Jl \
'l'--
\% ~
.J i
~t .
.' 8
~~l'"
"'I
l\ ~
r-
ii
~
~ O' ~
~ ~ ~!
:;. pO
'"
"
~
%
" \0
% Ie:::
'" '"' I;;:' ~
... '""
~
" V- i.....
... \"" EO
M \-;:;:.
::<l
i-:::: m
.. "" @
- ~
" -!
rr. ,""
'" ;~
~ --c
. \~
" ... 1tJ>
'" "" \~
:;z:
- I""
i'"
.....
~
~
;:.
"
~---
~-
0:
--:r
?
~-:---~.
~
~, 11\"Q' .
l' '" !
it~,~~
.t', I' '.
\, II c;y ~,
f~1~-'lh\
y-~it,
,-/,
i
~... ,r~
!--i~'
b\\J'\
i 1\11 1"
i p 1
~!I
:~l ~
i<i~ ..
;\~i i ~"
;...
...
iif,
~~~
~~
i ~..~~~
~ ..
~ 8~
i ~::
,~
~
?::.a,. ~
'::l~ :
~n
'i
ti
;':
Iii
~
f,
~
~J 'l! ~
8" ,-- ~
5ai ia; \
''''.. !-.
l ...
op ~,
! ;
~.
i;
.-
-
=" ~~;
ii "'
... """':'- ::-,;:-..~..-'
$r..~:\
......\
.SltS.
~
i>'
~t;i
P~~i
"~
, i:
; i:
:~
r.!'
t}i
~~
! ~i
H~
i ~
i
'~~."
." ~ .--'
. ,...~ .....
:.-..:;,~~(~:_~ ..~.:v
--- - -- --- ---)
EXffiBl\"B"
! \
\
~ \
\
\
\
\
\
\:
-'I
---
----
a
'"'-\'''
\
\
Ii
~
t:r--
1
&>
c:
~
%
..
c:
to:
..
.. -;:
.. ..
!" ..
';~
~..
!S
-- %
..
., '"
%
'"
~
.-
",_-z
- ~
;~~
~\" ~ ng
&i~~ iiir
-0
):0
~
~~'
, ..' ,,;t. ~i
\~ :;~
:=i t~3
E~
E ~'
:::l
- --
....~c
""r.:.;::
.
0'
r,....
-.....
.':>0'"
~Jim
~;~.~l~li
....'" ""...
.~; .Un
_-.:1......
~ i~iU.
...... .........w
,.",,1/0 .,- --
-----
,
~~
o
o
o
o
.
~
~~
~~
"\.
~.t
>.
\\
.~
\..~
-;~
~~
c
~
%,
:;
~ i:
c:-c~
""~..
.....J
"C'~...
:S:
~~~
iCl"i
..
t!
~
:~~ai~
i ~~\~ ~~i
i~~U~
\ rF'.: ;; e
c~i~
~ =~~ t~
c \*-.... t.~
. ~~ ~
~ilJ ii
1;" ,," lot
~ i~ ~.
...-~---
~ ~ ~
- ~...
,0
,,'"
':.
""
....
"'"
""
~
'"
i
1
--------------
...____ a~'-.--~~-~'---'-~"""".~
_.--~-_.._-
:i!
t--.
\
\
\
1,--
-1--
\
-~
~~
\N~
t
_%
~
c.
..
~l
~,
~
~~
"'CI
...
0;:
Iii
t:.
----'-
--------- -
7,0.
~~ ~- 4"4112" \"1'
IIJ
I~ ~
I:) ~
..... "1l
" -f r
)>-
r- :c z
r-
C m :s
~ m
Z )> <
)>
-i
m c:
:J Cl
II ~ -I
Q
'II 0 0
!'! Z ,
C
~ tn ~ 1:
m <) ,S
Z C ;~ ;j
-l -a
m
I r- m
m
E ~ :a
~ ~
~ ::! en ,
;. .1 ~ I 0 -I
( z
c 0
:a
m
~ CJ
J
j~ ..." s:" ~Jw~m I
~~ ~~ i
C:ij ~& ~@ ~€ ,,~!~~j I
~~ ~~ a~
tic: ~~ "'c: ~t~~!~!~~ I
:J:!: ~!:
.,Z <;l~
~i ..c: lJ'O
~s: er ~&f~i~EW~ G)~
~I V',.
~~ -.~ z'
~ll~ ~l ~ ~~~~ I'
~ ~~ S~ ~l!l ~~~~~~w~~
~i "I~ ~~
I & !isji~~ ~
~ ~~ ~W j
lJ
~ 'd 1
& ~ . !'l
g '" II = l=1=rQ
",
~
r
'"
'"
'"
~
~
- !
?
~-'._--- ,- - ---.-- -----
"
EXHIBIT "~,,
",,.,,,..
~;:-. ~
-:
~r~5r-'''' .oA'-; Y
I
I ~,
...,...\.
~-
EXHIBIT "en
,...,
~ ~
~ I
-
oJ, ~
~ ~ J:
~ i \\\
8 ~
l ~
1::-\ ~
~
~ t-
-
~
x:-
I
~
~
e--:
!
'~
\
&-1011
~" "111
~
""
G>
~
a
---
@
o
a.
a
2.
~
:;
p
~
'$>
'"
1
--0
~ ..9 ~-
~ \- I
Gi' '
. " -~
\ ~ ~
~
~
q
~
5-
~
EXHIBIT "D"
CondItIons of Approval
Project name' Quantum BusIness Park
FIle number' NWSP 98-018
Reference' The plans conSIst of 24 sheets IdentIfied as 2nd Review. New SIte Plan. File # NWSP 98-018
with a November 17. 1998 Planmng and ZonIng Department date stamp markIng.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments None
UTILITIES
Comments.
1 All utilIties easements shall be shown on the rectified landscaping
draWIngs so that we may determIne whIch trees may Interfere with
utilities, In general, palm trees will be the only tree speCIes allowed
withm utIlIty easements. Canopy trees may be planted outside of the
easement so that roots and branches wIll not Impact those utIlItIes wIthin
the easement In the foreseeable future LDR Sec, 7 5-18 1 gIves public
utilIties the authorIty to remove any trees that Interfere wIth utilIty
services, eIther in utIlIty easements or publIc rights-of-way
2. Dept. of Health permIts will be reqUIred for the water system extensIOns
servIng thIS project, and may be reqUIred for the sewer system
extensIOns. (Sec. 26-12)
3 Fire flow calculatIOns will be required demonstratIng the City Code
reqUIrement of 1500 g,p.m. as stated In LDR Chap 6, Art. , Sec 16, or
the requirement imposed by Insurance underwriters, whichever IS
greater (See Sec. 26-16(a)). Please submIt these calculatIons with your
Health Department permIt applicatIOn and plans.
4 Sec 26-34(E) of the City Code reqUIres that a capacIty reservation fee be
paid for thIS project eIther upon my request for sIgnature on the Health
Dept. application forms or withIn 30 days of sIte plan approval,
whIchever occurs first. ThIS fee WIll be determIned based upon final
meter SIzes, or expected demand.
5 Water and sewer lines to be owned and operated by the city shall be
included withIn utilItIes easements. Please show all existIng or proposed
easements on the engIneerIng draWIngs, USIng a mIlllmum WIdth of 12
feet. The easements shall be dedIcated via separate Instrument to the CIty
as stated in Sec 26-33(a) of the code.
6 This office will not require surety for Installation of the water and sewer
utilitIes, on condItion that the systems be fully completed, and given to
/0
Page 2
Quantum Business Park
FIle No NWSP 98-018
DEPARTMENTS INCLUDE REJECT
the city before the first permanent meter IS set. Note that setting of a
permanent water meter IS a prereqUisIte to obtammg the certificate of
occupancy
7 A bUIldmg permIt for thIS prOject shall not be issued until this office has
approved the plans for the water and/or Improvements required to serve
the proJect. (Sec 26-15)
8 Any waste stream from manufacturmg processes must meet the CIty'S
pretreatment requirements. A samplIng pomt must be provIded to allow
monitonng of thIS waste stream. (Sec 26-143,26-147)
FIRE
Comments, None
POLICE
Comments. None
ENGINEERING DIVISION
Comments.
9 All plans submItted for specific permIts shall meet the CIty'S code
reqUirements at time of applIcatIOn. These permits mclude, but are not
lImIted to the followmg: sIte lIghtmg, pavmg, dramage, curbing,
landscapmg and lITIgation, PermIts reqUired from other permItting
agenCIes, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and any
others, shall be included WIth your permIt request.
10 SubmIt engmeer's certIficatIon letter statmg that dramage conforms to
all rules, regulatIOns, etc of the City of Boynton Beach, [LDR Chapter 4,
SectIOn 7 ,F.2 ]
11 ProVIde wntten approval from FP & L to landscape withm theIr 15'
easements along High RIdge Road and Quantum Lane,
12 Add a note on the SIte plan and the landscapmg plan that there shall be an
unobstructed cross visibIlIty wlthm the lImits of clear SIght at a level
between 30 mches and 6 feet above the pavement. [LDR Chapter 7.5,
Article II, Section 5,H]
13 Show a detaIl on the paving and dramage plans of the pollutIOn retardant
baffle.
14 Show 6 inch, white thermoplastic strIpes through all driveways to
delIneate the pedestnan paths,
JI
Page 3
Quantum Busmess Park
File No NWSP 98-018
DEPARTMENTS INCLUDE REJECT
15 Add a 4- foot concrete sIdewalk along Quantum Lane along the north
property Ime [LDR Chapter 6, Article III, SectIOn 11 ]
16 ProvIde a handIcap accessible route from the Quantum Lane sidewalk to
building one per Flonda AccessibIlity Code, and mcrease the wIdth of
the accessible ramp shown on the typIcal entry enlarged plan to 3 '8"
from 3'6"
BUILDING DIVISION
Comments.
17 Amend the signage note number 2 found on sheet SP-l and note number
3 found on both elevatIOn VIew drawmgs of the proposed buildings to
read as follows. BUIldmg signs to be in compliance with the BUIldmg
Codes, Sign Code and CommunIty DesIgn Plan.
18 Amend the drawmgs to clarify that the elevatIOns along the reqUIred
accessible path are in complIance with accessibilIty code.
19 At time of permIt submIttal mclude a current survey wIth both sets of
working drawmgs submItted for plan reVIew
20 Drawmgs prepared by a design professIOnal and submItted for permIt
reVIew shall be Signed and sealed by the respective desIgn profeSSIOnal.
Amend the drawmgs accordmgly
21 IndIcate on each floor plan drawing the proposed finIsh floor elevatIOn,
Also, provIde a copy of the South Flonda Water Management Distnct
permit that verifies the proposed finish floor elevation IS m compliance
wIth the mInImUm standards ofthe permIt.
22. Compliance with the buildmg codes will be evaluated at tIme of permIt
reVIew The permIt fee, water and sewer facIlity fees, county fees and
state fees wIll be determmed at tIme of permIt reVIew
PARKS AND RECREATION
Comments. None
FORESTER/ENVIRONMENTALlST
Comments.
23 The applIcant must submIt a tree survey and a tree management plan for
the SIte The trees should be quantified and addressed m accordance WIth
the Tree PreservatIon Ordmance.
1:2
Page 4
Quantum BusIness Park
File No NWSP 98-018
PLANNING AND ZONING
Comments
24 Provide all dimensions on the site plan for the following:
- BuIldmg footprInts, Ch.4 Sec 7 Par.B 1
- All Internal drIve aIsles, City draWIng B90013
- Parking spaces (9'xI6', 2' overhang mm.) City drawmg B90012
25 PrOVide a Umty of Control and Unity of Title documents for Lots
68A&B, 69, 70, and 72
26 Amend the site plan data to mclude a break down of the square footage
for each of the bUlldmgs uses (e.g. mdustrIal/manufacturIng, warehouse,
office, etc.) Ch.4 Sec 7 Par
27 Submit traffic data to city and Palm Beach County Traffic Engmeermg
to allow for monitOrIng accumulatmg development Impact within the
Quantum Park PID, and conformance With Palm Beach County Traffic
Performance Standards.
28 PrOVide confirmation from Quantum Park ReView Board of ItS review
and approval of the subject request.
29 If employee data IS not available for parkmg calculatIOns, mdlcate same
with note on plan, and mclude parkIng reqUIrement calculatIOns for each
buildmg rather than totaled for each phase.
ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS
30 To be determIned.
ADDITIONAL CITY COMMISSION CONDITIONS
31 To be determmed.
/bme
s:\projectslcond of apprl
jJ
6,=~('l\..
1 st REVIEW COMMENTS
'{'Ils +-~ <'
-rR~ /I /17!lV
Do-.. c...
(-r: ('__~ '- c '-')
K"~
Project name Quantum Busmess Park
File number- NWSP 98-018
Permit Number' 98-3772
Reference The plans consist of 25 sheets Identified as 1 st Review. New SIte Plan, File # NWSP 98-018 wIth
an October 6. 1998 Plannmg and Zoning Department date stamp markmg,
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments. None
UTILITIES
Comments,
0 All utIlitIes easements shall be shown on the rectIfied landscapmg
drawmgs so that we may determme which trees may mterfere WIth
utIlities. In general, palm trees will be the only tree species allowed
wlthm utllity easements. Canopy trees may be planted outside of the
easement so that roots and branches will not impact those utilities wlthm
the easement in the foreseeable future LDR Sec 7.5-18 1 gives public
utilitIes the authonty to remove any trees that mterfere WIth utIlItv
servIces, eIther in utility easements or publIc nghts-of-way
GJ Dept, of Health permIts WIll be reqUIred for the water system extensIOns
servmg thIS project, and may be reqUired for the sewer system
extensions. (Sec 26-12)
3 / Fire flow calculatIOns will be reqUIred demonstratmg the City Code
-----../ requirement of 1500 g.p,m. as stated m LDR Chap 6, Art. Sec 16 or
the reqUIrement Imposed by msurance underwnters, whichever IS
greater (See Sec. 26-16(a)). Please submit these calculatIOns With your
Health Department permit application and plans,
~ Sec 26-34(E) of the CIty Code reqUIres that a capacity reservatIOn fee be
paid for thiS project either upon my request for signature on the Health
Dept. apphcatIon forms or withm 30 days of site plan approval,
whichever occurs first. This fee will be determmed based upon final
meter sizes, or expected demand,
V Comp Plan policy 3C.3 4 requires the conservatIOn of potable water City
water may, therefore, not be used for IrngatlOn where other sources are
readily available.
V Water and sewer hnes to be owned and operated by the City shall be
included WIthin utihtIes easements, Please show all eXlstmg or proposed
easements on the engmeering drawmgs, usmg a mmlmum Width of 12
feet. The easements shall be dedicated via separate mstrument to the elt\
as stated m Sec. 26-33(a) of the code
~
f 7 / This office Will not reqUIre surety for mstallatIon of the water and sewer
'----"
Page 2
Quantum BusIness Park
FIle No NWSP 98,018
DEPARTMENTS INCLUDE REJECT
utilIties, on condItion that the systems be fully completed, and gIven to
the CIty before the first permanent meter 15 set, Note that settmg of a
permanent water meter 15 a prereqUIsIte to obtaInIng the certIficate of
occupancy
/ ApproprIate backflow preventers will be reqUIred on the domestIc water
service to the buildIng, and the fire spnnkler hne if there 15 one, In
accordance wIth Sec. 26-207
........
LV A bUIldIng permit for thIS project shall not be Issued until this office has
approved the plans for the water and/or Improvements reqUIred to serve
the project. (Sec 26-15)
~ Any waste stream from manufacturmg processes must meet the CIty s
pretreatment reqUIrements. A samphng pomt must be prOVIded to alIo\,
momtormg of thIS waste stream (Sec 26-143 26-147)
FIRE
Comments,
V FIre hydrants and fire department connectIOns at dumpster locatIons
must have a mImmum of five feet (5 ) clearance
POLICE
Comments
L Show locatIOns of all STOP SIGNS
~ The loadIng area between the bUIldIngs must be strIped and SIgned for no
parkIng.
/ Show hne of sight triangles in the area of all exits from the property
ENGINEERING DIVISION
Comments'
9
15 All plans submitted for speCIfic permits shall meet the CIty'S code
reqUIrements at tIme of apphcation, These permIts mclude, but are not
hmlted to the follOWIng: site lIghtIng, pavIng, dramage, curbIng,
landscapIng and lITIgatIOn. PermIts reqUIred from other permIttmg
agenCIes, such as FDOT, PBC, SFWMD, DERM, L WDD DEP and an)
others, shall be Included with your permit request,
@ Submit engmeer's certIficatIOn letter statIng that dramage conforms to ?'r;::- ~;/ <~)'l~~
all rules, regulatIOns, etc. of the City of Boynton Beach. [LDR Chapter 4, ~ (..-4' P
t
~
I
;
Page 3
Quantum Business Park
File No NWSP 98-0 18
DEPARTMENTS
SectIOn 7 ,F.2 ]
"
~
;/
Add a 4-foot concrete sidewalk along Quantum Lane along the north I
property line [LOR Chapter 6 Article III Section I I ]
Add traffic control markings (stop slgnsistop bars) at allll1tersectlOns on
pavlI1g and drall1age plans. [LOR Chapter 4 Section 7,B.2 ]
ProVide a traffic analvsls to verIfv removal of e:\.lstll1g traffic separator
on High RIdge Road. Due to the raIlroad crossmg and confhctmg
advanced pavement strIping for R/R crossmg, It Will be unsafe to have
two wa) left turn dlrecth adjacent to R/R crossll1g. Recommend traffic
separator to remaIn [LOR Chapter 6 Article IV Section 10 ]
ReVIse SIght trIangles to reflect DOT Index 546 and add a landscapmg
note that there shall be an unobstructed cross VISibIlIty wIthm the limits
of clear Sight at a level between 30 Inches and 6 feet above the pavement,
[LOR Chapter 7.5 ArtIcle II Section 5.H ]
Specify the type and thickness of the wearIng course on the pavmg.
gradIng and draInage detail sheet and on the same sheet speclfv the size
of the aggregate wlthll1 the exfiltratlon trench.
Install pollutIOn retardant baffles In all Inlets prIor to eXltmg to
exfiltratlOn trenches
The survey should shmv all eXlstmg natural features as speCified m LDR
Chapter 4, SectIOn 7.A.l
ProVide WrItten approval from FP & L to landscape wlthm their 15
easements along HIgh Ridge Road and Quantum Lane
A separate permIt for any excavatIOn and fill operatIons would be
reqUIred.
Smce there are man) adjacent loadmg docks, It IS recommended that
stnpmg the loadmg zones With 4" black lInes (on concrete) Will prOVide
gUIdance durmg backup maneuvers
Show a I 12 slope on the Sides of all handicap curb cuts per Flonda
AccessibIlIty Code, Includmg a detectable warmng the full Width and
depth of the cut.
ReVise "Vlew-B on the master site plan. curb height shall be 18 Inches
The Clt\- recently revised the standard detaIl
lNeLl DE REJECT
,.-
Page 4
Quantum Busmess Park
File No NWSP 98-018
DEPARTMENTS
BUILDING DIVISION
Comments
;I
Amend the signage note number one found on sheet SP-I of 3 as
follows, Signs located on the site shall be m complIance With the
Quantum Corporate Park approved sIgn program.
30 To show consistency WIth respect to building slgnage notes remove from
both elevation VIew drawmgs not number three and replace It With the
exact text from sIgnage note number 2 found on sheet SP-I of 3
V The setback dimensIOn from the north property lIne to the north side of
bUlldmg I IS not legible. Amend the drawing accordmgly
V On sheet SP-2 of 3 and SP-3 of 3 add the followmg note below the
legend symbol of the handicap accessible route' "The accessible route
complIes with the regulations specIfied m the FlorIda AccessibilIty Code
for Buildmg Construction."
33
v
To show compliance With the accessibility code add to the floor plan
drawings the followmg reqUired accessible route components'
a. Identify the width of the route startmg from the accessible
buildmg entrance to the pomt where the accessible route meets
the access aIsle at the accessible parkmg spaces. Identlf) the
cross slope of all areas of the accessible route
b Identify the type of material proposed for the accessible route
mcludmg the location of detectable warnmgs.
c Show fimsh sIdewalk elevations at the begmning of the route
where It abuts the access aisle at the accessible park10g space, at
the top and bottom of all ramps, directly outside of the
accessible buildmg entrance and any other area where the
elevation of the route creates a slope.
d. Identify the width, slope and length of the ramps (where
apphcable show and Identify handrails mcludmg provldmg
detail drawings regarding heIght, shape and location).
e. Show, dimensIOn and label the locatIOn of alllandmgs that are
reqUired at the tope and bottom of each ramp
Note: If the dImensIOns and other components of the route are typical
they shall be noted as typical and placed once on each floor plan sheet.
All aspects of the accessible route shall comply With the regulations
specified 10 the Florida AccessibIhty Code for Buildmg ConstructIOn,
SectIon 4.3, Accessible Route and Section 46, Parking and Passenger
Load1Og Zones.
Add to the site plan (Sheet SP-l of 3) draw10g the distance between the
bUlld1Ogs.
INCLUDE REJECT
~
{oJ~
<: ,-'\;:'
{L-\.l
Page 5
Quantum Bus10ess Park
File No NWSP 98-018
~ {t.- .k4Q
r'~K-~ rC <Y
_ ~{Ie- r
/ r7 C ( oJ-I'-5
. () I- S ~ r"'&... r
-' $/.f~~e{
,
? liY
I DEPARTMENTS I INelL DE REJECT I
I
i
35 Indicate on each floor plan drawmg the proposed fiIUSh floor elevatIOn
Also, provIde a copy of the South Flonda Water Management Dlstnct
permit that venfies the proposed fimsh floor elevatIOn IS m comphance ,
with the mmlmum standards of the permit. I
i
!
36 Comphance with the bUlldmg codes wll] be evaluated at tllne of permit !
review The permit fee. water and sewer faclht) fees, count) fees and i
I
state fees Will be determIned at tllne of permIt review
PARKS AND RECREATION
.~
Comme~ None .-/ !
FORESTER/ENVIRONMENTALIST !
!
i
Comments. I
hI i
The apphcant must submit a tree survey and a tree management plan for
I the site The trees should be quantified and addressed m accordance
I'---
with the Tree PreservatIOn Ordmance
38 The apphcant must mdlcate If there Will be a mlcroslte on the propert) !
The project should contmue 10 the normal review process. I
!
PLANNING AND ZONING
Comments I
39 Provide dimenSIOns on the sIte plan for the followmg:
r MlIUmum parkmg Island Width (5' exclud10g curb1Og) City
drawII}gB900 12 t Ci>^- r;;/J,,.-t -r
I
V Sl~(4 ADA mlIUmum) - c,-:f-~ ~ <3...11 d2<- j'YY.......s,-,j
I
BUlldmg footpnnts, ChA Sec 7 Par.B 1-----
-;/ Entry access drIves (32 maximum) Ch.23 Art.II Par.H 1 !
r- Ail 10ternal drIve aisles, City drawmg B90013
U
/' Loadmg areas (12'x35 mm.) Ch.2 Sec 11 ParJ 1
/ Dumpster pad (lO'xlO m1O.) Ch 7 5 Art.II Sec 5 Par.J 4#
?Q Parkmg spaces (9 x16 ,2' overhang m1O.) City drawmg B90012
/' Add note to butld10g height - 37 to top of parapet
~ @ i
I
ProVide a Umty of Control and Umty of Title documents for Lots
68A&B 69 70 and 72
,/ e(~ - ( c(f~~)
. . Label the hatch@t'i areas on the master SIte plan
I
I
I , ') ,
! 0
fPr4
Amend the site plan data to ll1c1ude a break do\\n of the square foota_e
for each of the bUlld10gs uses (e g 1Odustnal/manufacturmg. warehouse.
(c-
v>~ i
~-i' ~ J.<'1:, .
(c -I e" 1 f"'"A
f11ee- ~f eZ~ s~~
Page 6
Quantum Busmess Park
File No NWSP 98-018
INCLUDE REJECT
DEPARTMENTS
43
(\L R;
fr'(z
office, etc.). ChA Sec 7 Par
Amend the right of way landscape strIp palm count to reflect the correct
number of trees reqUired. Provide palms at three palms per one reqUired
tree
~+
--? @ Provide the maximum number of employees per shift 10 the site plan
tabular data.
-;;
~
?
~~
7
{ (....{-<
c>",r\1
7
Amend the site data to reflect the appropnate parkmg calculatlOns, 1.5
spaces per each 2 employees, per maximum Shift, as well as other
reqUirements of Ch.2, Sec 7, Par.H.2.
Provide a vegetatIve screen around all mechamcal eqUipment and
dumpster enclosures. Ch.7.5 Art.II Sec.5 Pad
Show and label on the landscape plans, the eXlstmg Quantum Park
roadway landscaping within the nght of ways.
On the landscape plans label the areas to b sodde Include the symbol
in the plant lIst With a note stating that t e square footage IS to be
determ10ed in the field.
All hedges shall be planted at 2' on center Ch.7.5 Art.II Sec 5 Par C.3
/ Specify a mulch other than cypress to be used m the landscape beds.
Amend the SIte data to reflect the appropnate parkmg caIculatlOns, 1 5
spaces per each 2 employees, per maximum ShIft, as well as other
reqUirements ofCh.2, Sec.7, Par.~.2.
Locate all eXlstmg and proposed fire hydrants on the site and landscape
plans.
Label on the landscape plan, the 40' maxImum distance reqUirement for
the proposed perImeter trees and palms. Ch.7.5 Art.II Sec.S Par.D 1
Ibme jJf!-uJ 7~ ((. - cc.-k.r..-~cY \~(\."&~..r'~ nJs ('
s:\proiects\condofappr\- r<t:'. Ie c:L. r"k~~S;.s 7~; hc:,.(~~ ev-:11'
/7C:bJ r>'-~ T k"F'5 V-
- ""f r~ ~ ~c {e::I' C-r"\fr rns +r- _~.,4- ___c:!~ ctrJ ;f'~~ 15eo- ~
/
--- _._--~ ---- -----------
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO DD 98-368
Irnr~N:V::~ ~I~
I l !
. ,
PlANi~ING AND
lON! 'IG DEPT
, ---=-.-
FROM
Michael Rumpf Acting Planning and Zoning AdminIstrator I .A--
[IY/
Michael E, Haag, BUIlding Code PermIt AdmInlstratO;--~
November 2" 1998 V
TO
DATE
RE
QUANTUM BUSINESS PARk. - NEW SITE PLAN (NWSP 98-018)
2'\1) REVIEW COMMENTS
We have revIewed the subject plans and recommend that the request be forwarded for Board
review with the understanding that all remaining comments wIll be shown In compliance on the
permit drawings
Buildin2 Division (Site Soecific and Permit Comments)
Amend the slgnage note number 2 found on sheet SP-I and note number 3 found on both
elevatIon vIew drawings of the proposed butldIngs to read as follows BUIlding signs to
be In compliance with the BUIlding Codes, SIgn Code and Commul11ty DesIgn Plan
2 Increase the wIdth of the accessIble ramp shown on the typIcal entry enlarged plan to
3 8 rather than the proposed 3 6
3 Amend the drawings to c1anfy that the elevations along the reqUIred accessIble path are
In complIance wIth accessibIlity code
4 At tune of permIt submIttal Include a current survey with both sets of working drawings
submitted for plan revIew
5 Drawings prepared by a desIgn professIOnal and submItted for permIt revIew shall be
Signed and sealed by the respectIve desIgn professIOnal Amend the drawings
accordingly
6 IndIcate on each floor plan drawing the proposed fil11sh floor elevation Also provIde a
copy of the South Flonda Water Management Dlstnct permIt that venfies the proposed
fil11sh floor elevatIOn IS In compliance with the minImum standards of the permit
7 Compliance wIth the buIlding codes WIll be evaluated at tIme of permIt revIew The
permIt fee, water and sewer facIlity fees, county fees and state fees WIll be determined at
tIme of permIt review
MEH/ck
Xc Bulent Kastarlak
Don Johnson
C \1\ DO~1I1l1~llIs'()uantU1l1 Illlsin~cs Park 2nd Rc\.icw B1dg..do~
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO DD 98-364
r-- >,
, ,
:~J -
n .- 1'"'\,
N~ ;-; ~' !W,
r-: ~
TO
Michael Rumpf Acting Planning and Zomng Admmlstrator
FROM r Raymond F Davidson, P E Acting CIty Engmeer
DATE
November 18 1998
RE
QUANTUM BUSINESS PARK - NEW SITE PLAN (NWSP 98-018)
2"0 REVIEW COMMENTS
We have reviewed the subject plans and recommend that the request be forwarded for Board
revIew with the understandmg that all remalnmg comments will be shown m compliance on the
permit drawmgs
En2ineerin2 Division (Site SpeCific Comments)
All plans submitted for speCIfic permits shall meet the city's code reqUirements at time of
application These permits mclude, but are not limited to the followmg site IIghtmg,
pavmg, drainage, curbing, landscapmg and Irrigation Permits reqUired from other
permlttmg agencies, such as FOOT PBC SFWMD DERM L WOO DEP and any
others, shall be Included with your permit request
2 Submit Engmeer's certification letter stating that drainage conforms to all rules,
regulations, etc of the City of Boynton Beach [LOR Chapter 4 SectIOn 7 F 2 ]
3 ProVide WrItten approval from FP & L to landscape WIthin their 15' easements along
High Ridge Road and Quantum Lane
4 Add a note on the site plan and the landscaping plan that there shall be an unobstructed
cross VISlbl IIty Within the lllntts of clear Sight at a level between 30 Inches and 6 feet
above the pavement [LOR Chapter 7 5 Article 11, SectIOn 'i H ]
5 Show a detail on the paving and dramage plans of the pollutIOn retardant baffle
6 Show 6 mch, whIte thermoplastic stnpes through all drIveways to delmeate the
pedestrIan paths
7 ProVide a handicap accessIble route from the Quantum Lane Sidewalk to bUlldmg one
per FlOrIda AccessIbility Code
SP/KH ck
Xc Bulent Kastarlak
Michael Haag
Sebastian Puda
Ken Hall
( \h J)n':lIIn.:nts.()lI~nlllll1 1l1lSIIl':SS I'~rk '\.:w "it.: I'lan 2nd R.:n.:wuln.:
SIll
"j
Board of Supervisors
C Stanley Weaver
Kermit Dell
John I. Whitworth III
SecretaryiManager
William G. Winters
Assistant Manager
Ronald L. Crone
Attorney
Perry & Schone, P.A.
LAKE WORTH DRAINAGE DISTRICT
i Ii
~~1f111
NOV I 91998 '@'
J
13081 MILITARY TRAIL
DELRAY BEACH, FLORIDA 33484
I
......- ~'---.---, ~
PUi;~,.,:rJG AND
70NING DEPT.
November 17,1998
Michael W Rumpf, Chairman
Plannmg and Zoning DiVIsion
CIty of Boynton Beach
Post Office Box 310
Boynton Beach, Flonda 33425-0310
Re Quantum Business Park
SW Quad of Quantum Lane & High RIdge Road (Lots 68A, 68B, 69, 70 & 72)
Technical Review Committee Agenda- November 17, 1998
Dear Mr Rumpf"
This project is located outside the Lake Worth Drainage DIstrict's boundary and the
District has no comments regarding the referenced project.
Thank you for giving us the opportunity to review and comment on this project.
Should you have any questions or concerns please contact me
Respectfully,
LAKE WORTH DRAINAGE DISTRICT
a~~~
Lisa A Rowland
Right-of- TechniCIan
lar
De/ray Beach & Boca Raton (561) 498-5363 · Boynton Beach & West Palm Beach (561) 737 3835 · Fax (561) 495-9694
-,
RECREATION & PARK MEMORANDUM
TO
Mike Rumpf, Actmg DIrector ofPlannmg and Zomng
Kevin John Hallahan, ForesterlEnVlfonmentahst 1< >>- tf-
Quantum Business Park
New Site Plan- 1st review
FROM.
Re:
DATE
October 28, 1998
u
1 The applIcant must submIt a tree survey and a tree management plan for the site
The trees should be quantIfied and addressed m accordance with the Tree Preservation
Ordmance
2 The applIcant must mdlcate If there wIll be a mlcroslte on the property
The project should contmue m the normal review process
Kjh
File
~J~ ~Ui~ m,w
':::.---~ J
I-U1" .j ~JG AND
ZONiNG DEPT.
MEMORANDUM
UTILITIES DEPT NO 98 - 291
ill
rnowrn
00:
!
~T20"
TO'
Mike ~~g Planning Director
jP~ /~~<'
~John A Guidry, tilitIes Director
FROM.
DATE
October 20, 1998
SUBJECT
Quantum Business Park Lots 68,69, 70, & 72
We offer the following comments on this project.
GENERAL COMMENTS
1) All utilities easements shall be shown on the rectified landscaping drawings so that we may
determine which trees may interfere with utilIties In general, palm trees will be the only tree
species allowed within utility easements. Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities within the easement in the foreseeable future
LDR Sec 7 5-18 1 gives public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way
2) Dept. of Health permits will be required for the water system extensions serving this project, and
may be reqUired for the sewer system extensions (Sec 26-12)
3) Fire flow calculations will be required demonstrating the City Code requirement of 1500 g P m. as
stated in LDR chap 6, Art. , Sec. 16, or the requirement imposed by insurance underwriters,
whichever is greater (see Sec 26-16(a)) Please submit these calculations with your Health
Department permit applicatIOn and plans
4) Sec 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project
either upon my request for signature on the Health Dept. application forms or within 30 days of site
plan approval, whichever occurs first. This fee will be determined based upon final meter sizes, or
expected demand
5) Comp Plan pohcy 3C.3 4 reqUIres the conservatIOn of potable water CIty water may, therefore, not
be used for IrngatIon where other sources are readIly available
SPECIFIC CONDITIONS
1) Water and sewer lines to be owned and operated by the City shall be included within utilities
easements Please show all existing or proposed easements on the engineering drawings, using a
mimmum width of 12 feet. The easements shall be dedicated via separate mstrument to the City as
stated in Sec 26-33(a) of the Code
2) This office will not require surety for installation of the water and sewer utilities, on condition that
the systems be fully completed, and given to the City before the first permanent meter is set. Note
that settmg of a permanent water meter is a prerequiSite to obtaining the certificate of occupancy
3) Appropriate backflow preventers will be required on the domestic water service to the building,
and the fire sprinkler line if there is one, in accordance with Sec 26-207
4) A building permit for this project shall not be Issued until thiS office has approved the plans for the
water and/or sewer improvements required to serve the project. (Sec 26-15)
5) Any waste stream from manufacturing processes must meet the City's pretreatment requirements
A sampling point must be provided to allow monitoring of this waste stream. (Sec 26-143, 26-147)
Please refer any questions on this matter to Peter Mazzella (375-6404) of this office
JAG/PVM
Xc Skip Milor
Peter Mazzella
File
DLPARTMENT OF DEVELOPMENT
MEMORANDUM NO. DD 98-334
ill
OCT 2. 0 III
ill
~@rnnw~
DATE
Michael Rumpf Actmg PlannIng and Zonmg AdmInIstrator
W~
Michael E Haag, BUlldmg Code perml~e~trat~'::
Raymond F Davidson, P E City Engll~y U
October 15 1998
TO
FROM
RE
QUANTUM BUSINESS PARK - NEW SITE PLAN (NWSP 98-018)
1ST REVIEW COMMENTS
We have revIewed the subject plans and otTer the followmg comments that should be addressed pnor to
the project bemg forwarded for Board revIew
Buildm2 DIvIsIOn (Site Soecdic& Permit Comments) - MIchael E Haag (561) 742-6350
Amend the slgnage note number one found on sheet SP-l of 3 as follows SIgns located on the site
shall be m compliance wIth the Quantum Corporate Park approved sign program
2 To show consIstency With respect to bUlldmg slgnage notes remove from both elevatIon view
drawmgs note number three and replace It With the exact text from slgnage note number 2 found on
sheet SP-l of 3
3 The setback dimenSIon from the north property lme to the north side ofbulldmg lIS not legible
Amend the drawmg accordmgly
4 On sheet SP-2 of 3 and SP-3 of 3 add the followmg note below the legend symbol of the handIcap
accessible route "The accessIble route complies WIth the regulatIons specIfied m the Flonda
Accessibility Code for BUlldmg Construction."
5 To show compliance WIth the accessIbIlity code add to the floor plan drawmgs the followmg
reqUIred accessIble route components
a. Identify the wIdth of the route startmg from the accessible buIldmg entrance to the pomt
where the accessible route meets the access aIsle at the accessIble parkmg spaces. IdentIfy
the cross slope of all areas of the accessible route
b Identify the type of matenal proposed for the accessIble route mcludmg the location of
detectable warnIngs
c Show fimsh sidewalk elevations at the begmnmg of the route where It abuts the access aIsle
at the accessible parkmg space, at the top and bottom of all ramps, dIrectly outSIde of the
accessible bUIldmg entrance and any other area where the elevatIon of the route creates a
slope
d IdentIfy the width, slope and length of the ramps (where appltcable show and IdentIfy
handraIls mcludmg provldmg detail drawmgs regardmg heIght, shape and locatIOn)
e Show dllnenslon and label the locatIon of all landmgs that are reqUired at the top and bottom
of each ramp
Note. If the dImenSIOns and other components of the route are tYPical they shall be noted as typical
and placed once on each floor plan sheet All aspects of the accessIble route shall comply WIth the
regulations speCIfied m the FlOrida AccessIbIlIty Code for Bulldl1lg Construction, SectIon 4 3
Accessible Route and SectIOn 4 6 Parkmg and Passenger Loadl1lg Zones
Department of Development Memurandum No DO 98-334
Re Quantum BusIness Park - New SIte Plan I" Review Comments
October 1" 1998
Page #2
6 Add to the site plan (Sheet SP-l of3) draWIng the distance between the bUildIngs
7 Indicate on each floor plan draWIng the proposed fimsh floor elevatIOn. Also proVide a copy of
the ';outh FlOrIda Water Management DistrIct permit that verIfies the proposed fimsh floor
elevation IS In comphance With the mInImum standards of the permit
8 ComplIance With the bUIldIng codes will be evaluated at tlIne of permit review The permit fee,
water and sewer facI hty fees, county fees and state fees Will be determIned at time of permIt
review
En2ineerID2 DiVision (Site Specific Comments) - Sebastian Puda & Ken Hall 561-742-6280
All plans submItted for specIfic permIts shall meet the city's code reqUirements at time of
apphcatlOn These permits Include, but are not limited to the follOWIng site lightIng, pavIng,
draInage, curbIng, landscapIng and IrrigatIOn Permits reqUired from other permittIng agencies,
such as FOOT PBC SFWMD DERM LWDD DEP and any others, shall be Included WIth your
permit request
2 SubmIt EngIneer's certification letter statIng that draInage conforms to all rules, regulations, etc of
the City of Boynton Beach. [LOR Chapter 4 Section 7 F 2 ]
3 Add a 4-foot concrete Sidewalk along Quantum Lane along the north property lIne [LDR Chapter
6 ArtIcle III Section I I )
4 Add traffic control markIngs (stop slgns/ stop bars) at all Intersections on paVIng and draInage
plans [LDR Chapter 4 Section 7 B 2 ]
5 ProVide a traffic analYSIS to verIfy removal of eXistIng traffic separator on High Ridge Road. Due
to the railroad crossing and conflicting advanced pavement stnplng for RJR crossmg, It WIll be
unsafe to have two way left turn directly adjacent to RlR crossing. Recommend traffic separator to
remain [LDR Chapter 6 Article IV SectIon 10 ]
6 ReVise Sight triangles to reflect DOT Index ';46 and add a landscapIng note that there shall be an
unobstructed cross vlslblhty WIthin the IlImts of clear Sight at a level between 30 Inches and 6 feet
above the pavement [LDR Chapter 7 5 Article II Section 5 H ]
7 SpeCify the type and thickness of the wearIng course on the pavIng, gradIng and draInage detail
sheet and on the same sheet speCify the size of the aggregate Within the exfiltratlOn trench
8 Install pollutIOn retardant baffles In all mlets prIor to eXItIng to exfiltratlOn trenches
9 The survey should show all eXistIng natural features as speCified In LOR Chapter 4 C;;ectlOn 7 A 1
10 ProVIde WrItten approval from FP & L to landscape Within their I 'i' easements along High Ridge
Road and Quantum Lane
Department of Development Memorandum No DD 98-334
sl
Re Quantum Business Park - New Site Plan I. RevIew Comments
October 15 1998
Page #3
11 A separate permIt for excavatIon and fill operatIons IS reqUired If needed
12 Since there are many adjacent loading docks, It IS recommended that stnpIng the loading zones
wIth 4" black lines (on concrete) WIll provIde gUidance dUrIng backup maneuvers
13 Show a 1 12 slope on the sIdes of all handicap curb cuts per FlorIda AccessIbIlity Code, including a
detectable warning the full WIdth and depth of the cut
14 ReVise "Vlew-B" on the master sIte plan, curb heIght shall be 18 Inches The CIty recently revIsed
the standard detail
MH/SP/KH ck
Xc Bulent Kastarlak
Don Johnson
SebastIan Puda
Ken Hall
( \h ])()~U1llCnls()uantU1ll Buslncss Park' .\\ 'ilk Plan 1 st Rc\.ic\\ d()~
Ij~i~~~~~~: ~ lill!
PLA,~NING AND
ZONING DEPT.
PLANNERS
~(Q)~~
.'
ENGINEERS
October 15, 1998
Quantum Park Property Owners AssOcIatIOn, Inc
C/O Mr Douglas B MacDonald
1401 Forum Way
Suite 101
West Palm Beach, FL 33401
Subject: Proposed Development by Trammell Crow Comparues
at Quantum Corporate Park, Lots 68A, 68B, 69, 70, 72 and Part of Lot 57
ReVIew Comments of the Master SIte Plan, Job No 98-0803-0100, Dated 10/98
(Our Ref No 9812200)
Dear Doug:
We have revIewed the draWIngs proVIded by Rhon Earnest Jones, ConsultIng Engmeers,
for the above referenced project. The drawIngs provIded were also subInltted to the City of
Boynton Beach to obtain SIte plan approval of the proposed development. At the request of the
POA, we have revIewed the drawmgs and offer the follOWIng preluninary comments on the
proposed development as It relates to faCIlItIes owned and maIntaIned by the Quantum CommuDlty
Development Dlstnct
The Site plan tabular data IndIcates the project ImpervIOUS area IS calculated to be greater
than the 75% maxImum reqUIred as a special COnditIOn of the SFWMD Surface Water
Management Perrrut. The documents proVIded do not adequately demonstrate how the
Increased impervIOUS area IS accounted for In the draInage deSign. The pnmary water
management system WIthIn Quantum Corporate Park IS not designed to accommodate
more than 75% ImpervIOUS area on any given site development.
2 The applIcant IS propOSIng modifications to the eXIstmg medIan wItlun High RIdge
Road. ThIS proposed modIfication, albeit Inlnor m nature, would be precedent settIng
wlthm Quantum Corporate Park. Please be reInlnded that the current master plan for
the Quantum Corporate Park DR! IdentIfies dnveway locations for each mdlviduallot
WithIn the park. Additional comments regardIng thIS issue wIll be proVided upon
further review
3 The southerly most dnveway proposed on High RIdge Road IS shown upon an eXistIng
roadway draInage Inlet. The conceptual draInage plan does not adequately address the
proposed modIfications to the eXisting draInage system to accommodate the proposed
dnveway location.
4 In lIght of the two comments described above, It IS recommended that alternatIves be
Investigated to relocate the dnveway elIInlnate the median modIfications and reduce the
ImpervIOUS area.
Mock, Roos & Associates, Inc.
5720 Corporate Way West Palm Beach. Florida 33407 2066. (561) 683-3113. fax 478-7248
Quantum Park Property Owners Association
October 15, 1998
Page Two
5 It IS recommended the approval of the project site plan by the POA be COndItioned to
reqUire the developer to submIt construction drawings for the proposed modifications to
the median in High Ridge Road and the proposed driveways for reVIew and approval
by the POA and the CDD pnor to constructIOn.
These comments are provided for the POA conSIderation dunng the reVIew and approval of
the proposed development.
Should you have any questIOns, please contact me at xtenslOn 215
ASSOCIATES,INC.
//
/
EAG]eh
CopIes. Tom McGillIcuddy, Quantum Commumty Development DIStrIct, Chairman
Mr DaVid Auld, Trammell Crow Company
Rhon Earnest-Jones, Consultmg Engmeer, Inc
qcddgncs/98122.00/l002egjh.doc
Cll1: OF BOYNTON BEACH, FLORIDA
INTER-OFFICE MEMORANDUM
TO
MIke Rumpf
NWSP 98-018
DATE
SUBJECT
REFERENCES
ENCLOSURES
I have the followmg comments m reference to the purposed plan,
1 Show locations of all STOP SIGNS
2 The loadmg area between the bUIldmgs must be stnped and sIgned for no parkmg
3 Show hne of sIght tnangles m the area of all eXIts from the property
FROM
101398 FILE
Quantum Busmess Park
PZ 98-293
ill
~@~nw~
rn
(Ef 13.
,~
PUBLIC WORKS DEPARTMENT
MEMORANDUM #98-295
TO
Michael W Rumpf, Actmg DIrector of Plann~. mng
Larry Qumn, AssIstant PublIc Works DlfecttV
SIte Plan Review - 15t RevIew - Quantum Business Park
FROM
SUBJ
DATE
October 13, 1998
.,'3-
PLANNING AND
ZONING DElll
The PublIc Works Department has no comments m reference to the above site plan
reVIew
LQ/cr
FIRE & LIFE SAFETY DIVISION
Memorandum No 98-381
0..;.......
'.
'. (; ."
NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire
Protection Association codes, and the City Fire code shall be adhered to
TO
FROM
DATE
SUBJECT
Mike Rumpf, Acting Director
Planning & Zomng DiviSion ~~' .
Steve Gale, Fire Marshal ~ ;
Deputy Chief - Fire Rescue Depart nt
October 13 1998
Quantum Business Park
Quantum Ln & High Ridge Rd
NWSP 98-018
Fire hydrants and fire department connections at dumpster locations must have a
minimum of five feet (5') clearance We have no other comments at this time
CC File
,
~~
, J-IJ ,7~1
7 1'198 Ii~ URE SERVICES. PARKS MEMORANDUM #98-212
.~l
(
j
.- -
TO
;.. _; L
FROM.
RE
DATE
Michael Rumpf, Actmg Director ofPlannmg & Zomng
John Wildner, Parks Supenntendent .LJ
Quantum Business Park ~ ~
October 7, 1998
The LeIsure ServIces Department, Parks DIvIsIon, has receIved the site plan for Quantum
Busmess Park. There are no recreatIOn-related comments. The plan may contmue
through the normal review process.
JWad
APPLICATION TRACKING LOG
PROJECT TITLE: QUANTUM BUSINESS PARK FILE NO.: NWSP 98-018, PERMIT #918-3772
PROJECT LOCATION:
TYPE OF APPLICATION:
PUBLIC NOTICE REQUIRED: (YIN) 0 REVIEWER'S NAME
AGENT GRAHAM ERNEST-JONES ADDRESS:
AGENT PHONE: 954-344-9655 FAX: 954-341-5961
DATE REC'D: 1011198 AMOUNT
RECEIPT NO
12 SETS OF PRE-ASSEMBLED PLANS SUBMITIED FOR REVIEW:
2 OF 12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
SITE PLAN WITH SITE DATA 0
APPLlCATION/SUBMITIAL: DATE ACCEPTED:
DRAINAGE PLAN 0
ELEVATION VIEW DRAWINGS 0
COLORED ELEVATIONS RECEIVED 0
MATERIAL SAMPLES RECEIVED 0
PHOTOGRAPHS RECEIVED 0
DATE DENIED:
DATE OF SUBMITIAL ACCEPTANCE LETIER:
DATE OF LETTER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES:
I INITIAL 1 ST REVIEW MEMO: DATE SENT I MEMO NO 98-293
1 ST REVIEW COMMENTS RECEIVED
I RETURN DATE: 10/21/98
DATE OF LETTER SENT TO SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENTS:
90 DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID:
DATE 12 COMPLETE (ASSEMBLED) SETS OF AMENDED PLANS SUBMITTED FOR 2ND REVIEW:
PRE-ASSEMBLED PLANS SUBMITTED FOR REVIEW
UTIL.
PW
PARKS
FIRE
POLICE
PLANNING
BLDGIENGR
FORESTER
AMENDED APPLICATION 0
2 OF12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
SITE PLAN WITH SITE DATA 0
2ND REVIEW MEMO: DATE SENT
PLANS MEMO#
DRAINAGE PLAN 0
ELEVATION VIEW DRAWINGS 0
COLORED ELEVATIONS RECEIVED 0
MATERIAL SAMPLES RECEIVED 0
TRANSPARENCY RECEIVED 0
PHOTOGRAPHS RECEIVED 0
MEMO NO.
RETURN DATE:
2nd REVIEW COMMENTS RECEIVED
PLANS MEMO# DATE PLANS MEMO# DATE
UTIL. 0 POLICE El
PW 0 PLANNING 0
PARKS 8 BLDGIENGR 0
FIRE B FORESTER -B
UJ~ fr(r'# - /~jb'f
6/!./.1 /lb.r 7:1 3f.-.,J
LAND DEVELOPMENT SIGNS PLACED AT THE PROPERTY DATE SENT 1 SIGNS INSTALLED:
BOARD MEETING DATE:
BOARD:
CITY COMMISSION: DATE:
DEVELOPMENT ORDER RECEIVED FROM CITY CLERK: 0 DATE:
DEVELOPMENT ORDER SENT TO APPLICANT 0 DATE:
S:\FORMS\TRACKING LOG FORM
revised 4/25/97
DATE: