REVIEW COMMENTS
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO 00-013
TO
Michael Rumpf, Planmng and Zonmg DIrector , I . fer
b~~.'
Michael E. Haag, BUIldmg Code Admlmstrator
January 11,2000
GEV AS - Rectified Site Plan (NWSP 99-017) 1st review comments
FROM.
DATE
RE
Before the BUIldmg DIvIsIOn SIgnS off on the rectified sIte plan, the plans shall be amended to
comply wIth the followmg comments.
Buildine Division (Site Specific and Permit Comments) - Michael E. Haag (561) 742-6352
I Add to the submIttal a proposed floor plan. IndIcate on the plan that the room layout IS
conceptual. IdentIfy on the floor plan, wlthm the footpnnt of the bUIldmg, the appropnate
fimsh floor elevatIOn of the bUIldmg. The fimsh floor elevatIOn shall be consIstent WIth the
fimsh floor that IS Identified on the sIte plan and CIVIl plans. Also, IdentIfy on the floor
plan, wlthm the footpnnt of the bUIldmg, the occupancy classIficatIOn of the structure. The
occupancy classIficatIOn shall match the classIficatIOn IdentIfied wlthm the sIte data.
2 The plans are mconslstent wIth respect to IdentIfymg the use of the facIlIty The project
data mdlcates the use as manufactunng/office and wlthm the footpnnt of the bUIldmg found
on the sIte plan and cIvIl plan the use IS Identified as warehouse/office Correct the plans
accordmgly
The followmg IS mformatIOnal.
ComplIance wIth the bUIldmg codes WIll be evaluated at time of permIt reVIew The permIt fee,
water and sewer facIlIty fees, FIfe Department fees, County fees and State fees will be
determmed at time of permIt reVIew To efficIently make the step to permIt reVIew from sIte
plan approval, It IS recommended that the permIt applIcant and contractor contact a Plans Analyst
m the BUIldmg DIvIsIon of the Development Department to obtam a permIt submIttal checklIst.
MEH bg
00' rn m ~
j
rL, .., 4 ?mn
~
t
" r"
',I n'
'!
AND
DEPT.
nSHRDA T A\Development\Building-6870\Documents\TRC\NWSP 99-017 GEV AS rectified site plan 1st review,doc
TO
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO 00-177
Michael Rumpf, Plannmg and Zomng DIrector I (/ ~
t11 L..
~
MIchael E Haag, BUIldmg Code AdmmIstrator
RE
GEV AS - Rectified Site Plan (NWSP 99-017) - 2n
FROM
DATE
June 19,2000
Before the BUIldmg DIvIsIon sIgns off on the rectIfied sIte plan, the plans shall be amended to
comply wIth the followmg comments
Buildine Division (Site Specific and Permit Comments) - Michael E, Haae (561) 742-6352
I Add a proposed floor plan to the submIttal. IndIcate on the plan that the room layout IS
conceptual. IdentIfy on the floor plan, wIthm the footpnnt of the bUIldmg, the appropnate
fimsh floor elevatIOn of the bUIldmg. The fimsh floor elevatIon shall be consIstent WIth the
fimsh floor that IS IdentIfied on the SIte plan and CIvIl plans Also, IdentIfy on the floor
plan, wIthm the footpnnt of the bUIldmg, the occupancy classIficatIOn of the structure The
occupancy classIficatIOn shall match the classIficatIOn IdentIfied wIthm the SIte data.
2 The plans are mconsIstent WIth respect to IdentIfymg the use of the faCIlIty The project
data mdIcates the use as manufactunng/office, however, wIthm the footpnnt of the bUIldmg
found on the SIte plan and CIVIl plan, the use IS IdentIfied as warehouse/office Correct the
plans accordmgly
3 Add to the drawmg the fimsh floor mformatIOn that IS referenced wIthm general note
number 4 found wIthm the SIte data on sheet SPI of2 The mformatIOn shall mclude the
followmg'
a) From the FEMA map, IdentIfy on the plan the tItle of the flood zone that the bUIldmg
IS located wIthm. Where applIcable, specIfy the base flood elevatIOn. If there IS no
base flood elevatIOn, mdIcate that on the plan.
b) As the deSIgn professIOnal-of-record for the proJect, place a note on the plan that states
the proposed floor elevatIOn IS above the hIghest I DO-year base flood elevatIon
applIcable to the bUIldmg SIte, as determmed by the South Flonda Water Management
DIstnct's surface water management constructIOn development regulatIOns.
The followmg IS mformatIOnal
ComplIance WIth the bUIldmg codes wIll be evaluated at tIme of permIt reVIew The permIt fee,
water and sewer faCIlIty fees, FIre Department fees, County fees and State fees wIll be
determmed at tIme of permIt reVIew To effiCIently make the step to permIt reVIew from SIte
plan approval, It IS recommended that the permIt applIcant and contractor contact a Plans Analyst
m the BUIldmg DIVISIOn of the Development Department to obtam a permIt submIttal checklIst.
MEH bg
s, ,Development\Building-6870\Documents\TRC\NWSP 99-017 GEVAS recitified site plan 2nd review,doc
DEVELOPME.'" ORDER OF THE CITY COMNllSSIf'\N OF THE
,1 OF BOYNTON BEACH, FLO JI
!~
PROJECT NAME. Gevas North American Headquarters
APPLICANT'S AGENT Pierce Architectural Group
APPLICANT'S ADDRESS 1181 South Roger Circle #12
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION September 7,1999
TYPE OF RELIEF SOUGHT New site plan
LOCATION OF PROPERTY Quantum Park PID
DRAWING(S) SEE EXHIBIT "B" ATTACHED HERETO
X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida
appearing on the Consent Agenda on the date above. The City Commission hereby adopts the
findings and recommendation of the Planning and Development Board, which Board found as follows.
OR
THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above. The City Commission having considered the
relief sought by the applicant and heard testimony from the applicant, members of city administrative
staff and the public finds as follows.
1 Application for the relief sought was made by the Applicant in a manner consistent with
the requirements of the City's Land Development Regulations.
2. The Applicant
LHAS
HAS NOT
established by substantial competent evidence a basis for the relief requested.
3 The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set
forth on Exhibit "C" with notation "Included"
4 The Applicant's application for relief is hereby
L GRANTED subject to the conditions referenced in paragraph 3 hereof
DENIED
5 This Order shall take effect immediately upon issuance by the City Clerk.
S All further development on the property shall be made in accordance with the terms
and conditions of this order
7
Other
None..
DATED-
q-/o-qq
YnP~
IJ.T'f City Clerk
Iop,Order cc 9-7.GG,doc
~ ,\\ ,\\till 111/11,1.
?~~\. CITl' ;II~
~ ~-:..c-~
~ " /' , 11\'0;;... <9 ~
== ,... . -a. ~. 0 '::
= 0 / ,,.. ~\ -<. ::
. -., 0: Z ::
~o\O .f1.1"":=
-:;:, '" .A,'Y..' 0 :::
~ -y '- o~." ~ ~
~ .............. ~ ~
~/I.Z HO'4~\~\\~
11'1 \,\
JISHRDATAIPlanningISHAREDIWP\PROJECTS\GEVAS NORTH AMERICAN H
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO 99-173
TO
Michael Rumpf, Plannmg and Zonmg DIrector
FROM.
Michael E. Haag, BUIldmg Code PermIt AdmmIstrator
DATE
August 11, 1999
RE
GEV AS - New Site Plan (NWSP 99-017)
2nd Review Comments
We have revIewed the subject plans and recommend that the request be forwarded for Board
reVIew WIth the understandmg that all remammg comments will be shown m comphance on the
workmg drawmgs submItted for permIts.
Buildine: Division (Site Suecific and Permit Comments) - Michael E, Haag (561) 742-6352
I Correct the mconsIstency WIth respect to the fimsh floor elevatIOn. The sIte plan and floor
plan drawmg mdIcate the fimsh floor as 24 50' and the CIvIl plans mdIcate the elevatIOn as
17 50' Withm the site data, IdentIfy the proposed fimsh floor elevatIOn of the bUIldmg
(lowest floor elevatIOn) VerIfy that the proposed elevatIOn comphes WIth regulatIOns of the
code by addmg specIficatIOns and notes to the site data that address the followmg Issues
a) From the FEMA map, IdentIfy the tItle of the flood zone that the bUIldmg IS located
wIthm. Where apphcable, specIfy the base flood elevatIOn. If there IS no base flood
elevatIOn, mdIcate that on the plans.
b) As the deSIgn professIOnal-of-record for the project, state wIthm the SIte data that the
proposed floor elevatIOn IS above the hIghest 1 DO-year base flood elevatIOn apphcable to
the bUIldmg SIte, as determmed by the South FlOrIda Water Management DIStrICt's
surface water management constructIOn development regulatIOns.
IdentIfy the floor elevatIOn that the deSIgn profesSIOnal has estabhshed for the bUIldmg
wIthm the footprmt ofthe bUIldmg that IS shown on the SIte plan, floor plan and CIvIl plan.
2 ConsIdermg that detaIl drawmgs of the SIte sIgnage were not provIded and the locatIOn of the
SIte sIgnage was not shown on the SIte plan, place the followmg note on the site plan "SIte
sIgnage IS not approved for thIS project. Separate SIte plan reVIew and approval IS reqUIred
for SIte sIgnage."
BUIldIng DIVISIOn Memo No 99-173 to Michael Rumpf
RE GEV AS - New Site Plan - 2nd Review Comments
August 11, 1999
Page Two
3 Change the occupancy classIficatIOn ternllnology that IS lIsted wIthIn the project data to be
consIstent WIth the classIficatIOns lIsted m the 1997 edItIOn of the Standard BUIldIng Code.
The plans are mconsIstent wIth respect to IdentIfymg the use of the faCIlIty Correct the
plans accordIngly The project data IndIcates the use as warehouse and the floor plan
mdIcates the use as manufactunng/assembly Please note that wIth the office area of the
bUIldmg exceedmg 30% of the total floor area of the facIlIty, the applIcant wIll be reqUIred
to pay Palm Beach County Impact fees based on an office use for the entIre square footage
of the bUIldmg.
4 ComplIance WIth the BUIldIng Codes WIll be evaluated at tIme of permIt reVIew The
permIt fee, water and sewer faCIlIty fees, FIfe Department fees, County fees and State fees
wIll be determIned at tIme of permIt reVIew
5 To effiCIently move from SIte plan approval to permIt reVIew, It IS recommended that the
permIt applIcant and contractor contact a Plans Analyst In the BUIldmg DivlSlon of the
Development Department to obtaIn a permIt submIttal checklIst.
MEH.bg
J '\SHRDA T A\Development\Building-6870\Documents\TRC\NWSP 99-017 2nd review GEV AS,doc
-.
DEPARTMENT OF DEVELOPMENT i
BUILDING DIVISION j'
MEMORANDUM NO 99-173 , dUG' 61999
.
~! r
.....,-.-
TO
~
Michael Rumpf, Planmng and Zomng DIrector ~ h-
Michael E Haag, BUIldmg Code PermIt AdITllmstratDr4 f' ~
August 11,1999 b
<~-.-. ._',~
I
-~...--""""-... ."...;!.
FROM
DATE
RE
GEV AS - New Site Plan (NWSP 99-017)
2nd Review Comments
We have revIewed the subject plans and recommend that the request be forwarded for Board
reVIew WIth the understandmg that all remammg comments WIll be shown m complIance on the
workmg drawmgs submItted for permIts.
Buildine Division (Site Specific and Permit Comments) - Michael E. Haag (561) 742-6352
1 Correct the mconsIstency wIth respect to the fimsh floor elevatIOn. The SIte plan and floor
plan drawmg mdIcate the fimsh floor as 24 50' and the CIVIl plans mdIcate the elevatIOn as
1750' Withm the site data, Identlfy the proposed fimsh floor elevatIOn of the bUIldmg
(lowest floor elevatIOn) Venfy that the proposed elevatIOn complIes wIth regulatIOns of the
code by addmg specIficatIOns and notes to the site data that address the followmg Issues
a) From the FEMA map, Identlfy the tltle of the flood zone that the bUIldmg IS located
wIthm. Where applIcable, speCIfy the base flood elevatIOn. If there IS no base flood
elevatIOn, mdIcate that on the plans
b) As the deSIgn professIOnal-of-record for the project, state wIthm the SIte data that the
proposed floor elevatIOn IS above the hIghest 100-year base flood elevatIOn applIcable to
the bUIldmg SIte, as determmed by the South Flonda Water Management DIstnct's
surface water management constructIOn development regulatIOns
Identlfy the floor elevatIOn that the deSIgn professIOnal has establIshed for the bUIldmg
wIthm the footpnnt of the bUIldmg that IS shown on the SIte plan, floor plan and CIVIl plan.
2 ConsIdenng that detail drawmgs of the SIte sIgnage were not proVIded and the locatIOn of the
SIte sIgnage was not shown on the SIte plan, place the followmg note on the site plan "SIte
sIgnage IS not approved for thIS project. Separate SIte plan reVIew and approval IS reqUIred
for SIte sIgnage "
BUIldmg DIVISIon Memo No 99-173 to MIchael Rumpf
RE GEV AS - New Site Plan - 2nd Review Comments
August 11, 1999
Page Two
3 Change the occupancy classIficatIOn termmology that IS lIsted wIthm the project data to be
consIstent WIth the classIficatIOns lIsted m the 1997 edItIon of the Standard BUIldmg Code
The plans are mconsIstent wIth respect to IdentIfymg the use of the facIlIty Correct the
plans accordmgly The project data mdIcates the use as warehouse and the floor plan
mdIcates the use as manufactunng/assembly Please note that wIth the office area of the
bUIldmg exceedmg 30% ofthe total floor area of the facIlIty, the applIcant wIll be reqUIred
to pay Palm Beach County Impact fees based on an office use for the entIre square footage
of the bUIldmg.
4 ComplIance WIth the BUIldmg Codes WIll be evaluated at tIme of permIt reVIew The
permIt fee, water and sewer faCIlIty fees, FIre Department fees, County fees and State fees
WIll be determmed at time of permIt reVIew
5 To effiCIently move from SIte plan approval to permIt reVIew, It IS recommended that the
permIt applIcant and contractor contact a Plans Analyst m the BUIldmg DIVISIOn of the
Development Department to obtam a permIt submIttal checklIst.
MEH.bg
J 8HRDA TA \Development\Building-6870\Documents\TRC\NWSP 99-017 2nd review GEV AS,doc
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUMNO 99-173
TO
Michael Rumpf, Planmng and Zomng DIrector
FROM
Michael E. Haag, BuIldmg Code PermIt Adtmmstrator
DATE
August 11, 1999
RE
GEV AS - New Site Plan (NWSP 99-017)
2nd Review Comments
We have revIewed the subject plans and recommend that the request be forwarded for Board
reVIew WIth the understandmg that all remammg comments WIll be shown m complIance on the
working draWings submItted for permIts.
Buildine Division (Site Specific and Permit Comments) - Michael E. Haag (561) 742-6352
1 Correct the mconsIstency WIth respect to the fimsh floor elevatIOn. The sIte plan and floor
plan drawmg indicate the fimsh floor as 24 50' and the CIvIl plans mdIcate the elevatIOn as
17 50' Withm the site data, IdentIfy the proposed fimsh floor elevatIOn of the bUIldmg
(lowest floor elevatIOn) Venfy that the proposed elevatIOn complIes WIth regulatIOns of the
code by addmg speCIficatIons and notes to the site data that address the followmg Issues
a) From the FEMA map, IdentIfy the tItle of the flood zone that the bUIldmg IS located
wIthm. Where applIcable, specIfy the base flood elevatIOn. If there IS no base flood
elevatIOn, mdIcate that on the plans.
b) As the deSIgn professIOnal-of-record for the project, state wIthm the SIte data that the
proposed floor elevatIOn IS above the hIghest 1 OO-year base flood elevatIOn applIcable to
the bUIldmg SIte, as determmed by the South Flonda Water Management DIStrICt'S
surface water management constructIOn development regulatIOns.
IdentIfy the floor elevatIOn that the deSIgn professIOnal has establIshed for the bUIldmg
wIthm the footprmt of the buildmg that IS shown on the SIte plan, floor plan and CIVIl plan.
2 ConsIdermg that detail draWings of the SIte sIgnage were not prOVIded and the locatIOn of the
SIte sIgnage was not shown on the SIte plan, place the followmg note on the site plan "SIte
sIgnage IS not approved for thIS project. Separate SIte plan reVIew and approval IS reqUIred
for SIte sIgnage."
Bmldmg DIVISIOn Memo No 99-173 to Michael Rumpf
RE GEV AS - New Site Plan - 2nd Review Comments
August 11, 1999
Page Two
3 Change the occupancy classIficatIOn tenmnology that IS lIsted WIthm the proiect data to be
consIstent WIth the classIficatIOns lIsted m the 1997 edItIOn of the Standard Bmldmg Code.
The plans are mconsIstent WIth respect to Identlfymg the use of the facIlIty Correct the
plans accordmgly The project data mdIcates the use as warehouse and the floor plan
mdIcates the use as manufactunng/assembly Please note that wIth the office area of the
bmldmg exceedmg 30% of the total floor area ofthe facIlIty, the applIcant will be reqmred
to pay Palm Beach County Impact fees based on an office use for the entIre square footage
of the bmldmg.
4 ComplIance WIth the Bmldmg Codes wIll be evaluated at tlme of permIt reVIew The
permIt fee, water and sewer faCIlIty fees, FIre Department fees, County fees and State fees
wIll be determmed at tlme of permIt reVIew
5 To effiCIently move from SIte plan approval to permIt reVIew, it IS recommended that the
permIt applIcant and contractor contact a Plans Analyst m the Bmldmg DIVISIOn of the
Development Department to obtam a permIt submIttal checklIst.
MEH.bg
J '\SHRDA T A \Development\Building-6870\Documents\ TRC\NWSP 99-017 2nd review GEV AS,doc
. R ([c1 IS ~ \\~Jt.S~\ \.
\~~.- 'I',
\ n'\\ -9~
Michael W Rumpf, DIrector of Plannmg & Zonmg, \ JU \ J1
~A.l~ \ L----. -'
Jack Casler, P.E, P.L S, Actmg City Engmeer D.~
DEPARTMENT OF DEVELOPMENT
MEMORANDUM
ENG 99-097
TO.
FROM,
DATE
July 9 1999
RE
GEV AS NORTH AMERICAN HEADQUARTERS - (NWSP 99-55000008)
NEW SITE PLAN 1ST REVIEW COMMENTS
1 Locate handIcap sIgns behmd 6" curb to elImmate vehIcle encroachment.
2. Remove "Tow Away Zone" wordmg on handIcap fine plate and speCIfy that fine amount IS $250.00,
not "up to $250 00"
3 ConsIder a 6' wIde sIdewalk mstead of a 4' sIdewalk next to bUIldmg to act as a contmuous wheel
stop
4 On sheet C-2 of 6 add to general notes that all stnpmg, sIgnage and markmgs shall conform to CIty
Standard Drawmg B-98001 and correct TypIcal HandIcap Parkmg Detail on sheet SP-2 of2
5 On Sheets LNP-l delete the two references to "proposed future parkmg" to agree WIth SIte Plan.
Also delete parkmg spaces wIthm those areas on sheets C-l and C-3
6 ProVIde an accessIble route from the publIc street or sIdewalk to an accessible bUIldmg entrance per
Flonda AccessibIlIty Code
7 ProVIde a 4' wIde sIdewalk along High RIdge Road out to Park RIdge Blvd. [LDR Chapter 6, ArtIcle
IV, SectIOn 10 T ]
8 Add the followmg note to the SIte Plan. All plans submItted for speCIfic permIts shall meet the CIty'S
code reqUIrements at tIme of applIcatIOn. These permIts mclude, but are not lImIted to the followmg'
SIte lIghtmg, pavmg, dramage, curbmg, landscapmg and IrrIgatIOn. PermIts reqUIred from other
permlttmg agenCIes, such as FDOT PBC SFWMD, DERM, L WDD, DEP and any others, shall be
mcluded WIth the permIt request.
9 PrOVIde an engmeer's certIficatIOn on the Pavmg & Dramage Plans that dramage wIll conform WIth
all rules, regulatIOns, codes, etc mcludmg, but not lImIted to, Chapter 6, ArtIcle IV SectIOn 5 of
these Land Development RegulatIOns. [LDR Chapter 4, SectIOn 7.F.2.]
10 Change general note #2 on Sheet C-2 from Palm Beach County" to The CIty of Bovnton Beach.
11 PrOVIde the details of the loadmg dock trench dram.
Department of Development Memorandum ENG 99-097
Re' Gevas North Amencan Headquarters - New SIte Plan (NWSP 99-55000008) 1 st ReVIew
July 9, 1999
Page Two
12 On the SIte Plan and Pavmg & Dramage Plan show a liD curb around the curvIlmear portIOns of the
sIte, specIfically both sIdes of the loadmg dock, the area east of the dumpster, the areas adjacent to
parkmg stalls and the entrances. [LDR Chapter 23, ArtIcle ILE.]
13 Show mgress/egress arrows at the entrances and through the parkmg lot to delmeate travel aIsles.
ConsIder double yellow lane separatIOn hnes around the southwest comer of the sIte
14 ConsIder header curb m the curvIlmear areas of the dnveways from the property hnes out to the
roadways due to the truck traffic
JHC/ck
Xc Ken Hall
C:\My Documents\Gevas North American Headquarters New Site Plan 1st Review,doc
MEMORANDUM
UTILITIES DEPT NO 99 - 196
TO'
Mike Rumpf, Planning Director ~.../
John A Guidry, Utilities Director ~ V""'
July 2, 1999
FROM.
DATE.
SUBJECT
Gevas North American Headquarters - New Site Plan - 1st Review
We offer the following comments on this project:
GENERAL COMMENTS
1) Sec 26-34(E) of the City Code reqUIres that a capacity reservation fee be paid for this project
either upon my request for signature on the Health Dept. application forms or within 30 days of site
plan approval, whichever occurs first. This fee will be $1,205 82 based upon a 1 5-mch meter
2) Comp Plan polIcy 3C.3 4 reqUIres the conservatIOn of potable water CIty water may not, therefore,
be used for IrngatIOn where other sources are readily available
SPECIFIC CONDITIONS
1) This office will not require surety for installation of the water and sewer utilities, on condition that
the systems be fully completed, and given to the City before the first permanent meter is set. Note
that setting of a permanent water meter is a prerequisite to obtaining the certificate of occupancy
2) A building permit for this project shall not be issued until this office has approved the plans for the
water and/or sewer improvements required to serve the project. (Sec 26-15)
3) The waste stream from the manufacturing process must meet the City's pretreatment requirements
A sampling manhole must be provided to allow monitonng of this waste stream. (Sec 26-143, 26-
147)
Please refer any questions on this matter to Peter Mazzella (742-6404) of this office
JAG/PVM
Xc Skip Milor
Peter Mazzella
File
r'
r' i
I D) r L,~~_..
11"1 '
" << 6"
PUBLIC WORKS DEPARTMENT
MEMORANDUM #99-129
TO
Mike Rumpf, DIrector ofPlanmng & Zomif 1 () ,
C Larry Roberts, PublIc Works DIrector ()fIV
THRU
FROM.
Mark LIPS, SamtatIOn Foreman
SUBJ
SIte Plan RevIew- I 51 ReVIew- Gevas North Amencan Headquarters
DATE
July 2, 1999
The PublIc Works Department has no ObjectIOns to the above named project movmg
forward. We do recommend It to go forward.
Any questIOns please contact me at (561) 742-6200
ML/cr
r-'\ ~
i! 1"\ I ",
I 'I U I " ,",,'0
~i
. N Il
I q 1
LJ t:!
r r: n \,"-7
JUL
6 1999
;!
ji
____J
I
_,.""-"'-__l"'~~,,,......._
Parks Division Memorandum- TRC
To
Mike Rumpf, Plannmg Director
i~M
From.
Kevm J Hallahan, Forester / Environmentahst
Subject
Gevas North Amencan Headquarters-Quantum Park Lot #51-D
New Site Plan- 1 st ReView
Date
July 1, 1999
The apphcant should submit the followmg mformatiOn m reference to the Site
1 The eXistmg tree survey of the Site shows 17 native trees, which must be replaced, on the
landscape plan m accordance with the Tree PreservatiOn Ordmance
2 A Flora and Fauna statement ofthe Site m reference to any protected species.
3 Secure any State permits m reference to the results of#2 (if necessary)
4 A cleanng and grubbmg permit for the Site can be requested after the above three items have
been completed for the Site.
The project should contmue m the normal reView process.
CITY OF BOYNTON BEACH, FLORIDA
INTER-OFFICE MEMORANDUM
TO
Michael Rumpf
Planmng & onmg
DATE
063099
FILE
NWSP 99-
55000008
SUBJECT
REFERENCES
ENCLOSURES
I have no comments a tIme. If comments generated by other members effect thIS purposed plan m regards
to traffic flow or parkmg lot deSIgn I wIll reserve the nght to re-examme the plans and assocIated changes.
FROM.
Gevas N Amencan Headquarters
PZ 99-161
r~
fS ,r--~ -., D
~-I" rn~
" I
',\ ,
lQqg l
11 I\,
~-=----~
'''*..~
.J
FIRE & LIFE SAFETY DIVISION
Memorandum No 99-312
NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire
Protection Association codes, and the City Fire code shall be adhered to
TO Mike Rumpf, Director
Planning & Zoning Division
FROM Steve Gale, Fire Marshal ~
Deputy Chief - Fire Rescue ~~ment
DATE June 29,1999
SUBJECT Gevas North American Headquarters
Quantum Park - Lot 51-D
NWS P 99-55000008
A fire flow test is required Roads and hydrants will be in place prior to any
construction above grade
I recommend that this project move forward with the above comments
r
')
'I
U...
"
iU. J~I r.
L,~ '-'-..:: .-:-;._,~---J
PUt, ,t, i"D
! ZONiNG DEPT.
,
)
CC File
~, -n;jjJJ,10
\ \U\ r-~-
DEPARTMENT OF DEVELOPME~~,' ... ~ 0 ~
BUILDING DIVISION ! \\ JU"
MEMORANDUM NO 99-146
DATE
June 29, 1999
c.CL.V~ ~ ,
Quantum'"Park (Lot 51-D) - New SIte Plan (NWSP 99-55000008)
1st review comments
TO
MIchael Rumpf, Plannmg and Zomng DIrector
FROM.
MIchael E Haag, Bmldmg Code PermIt Admlmstrator
RE
We have revIewed the subject plans and offer the followmg comments that shall be addressed
pnor to the project bemg forwarded for Board reVIew'
Buildine Division (Permit & Site Specific Comments) - MIchael E. Haag (561) 742-6352
1 Add to the bmldmg that IS depIcted on the site plan drawmg a labeled symbol that
represents the locatIon of the handIcap accessible entrance door to the bmldmg. Show and
label the same door on the floor plan drawmg.
2 Add to the site plan drawmg a labeled symbol that represents and shows the locatIon and
path of the accessible route that IS reqmred between the accessible parkmg space and the
accessible entrance door to the bmldmg. Add text that would mdlcate the label represents
the accessible route and the route IS m complIance WIth SectIOn 43 (Accessible Route) and
46 (Parkmg and Passenger Loadmg Zones) ofthe Flonda AccessibIlIty Code for Bmldmg
ConstructIOn. Please note that at tIme of permIt reVIew the applIcant shall proVIde detailed
data on the plans that WIll venfy that the path of the accessible route IS m complIance WIth
the regulatIOns of the Flonda AccessibIlIty Code for Bmldmg ConstructIOn.
3 Withm the footpnnt of the bmldmg that IS Illustrated on the SIte plan drawmg and floor
plan drawmg, IdentIfy the proposed fimsh floor elevatIOn. Add to the project data, found
on sheet SP 1 of 2, the flood zone that the bmldmg IS located wlthm mc1udmg, where
applIcable, base flood elevatIOn. If there IS no base flood elevatIOn, mdlcate that on the
plans. Add speCIficatIOns, notes and computatIOns to the SIte data that WIll venfy the
proposed fimsh floor elevatIOn IS m complIance WIth the mmlmum standards of the
followmg:
a) Mlmmum elevatIOn reqmred by the flood zone.
b) Mlmmum elevatIon reqmred by the South Flonda Water Management Dlstnct
permIt for the proJect.
c) Show and prOVIde computatIOns that venfy the elevatIOn of the fimsh floor IS SIX
mches or more above the crown of the abuttmg nghts-of-way
BUIldmg DIVISIOn Memo No 99-146 to MIchael Rumpf
RE Quantum Park (Lot 51-D) -1 st Review
June 29, 1999
Page Two
4 ProvIde detaIled and dImensIOned elevatIOn VIew drawmgs of the SIte sIgnage mcludmg
dImensIOmng the wIdth and heIght of the SIgn and the overall heIght of the SIgn structure
Add computatIOns to the drawmg that venfy the total SIgn area IS m comphance WIth the
regulatIons specIfied m the SIgn Code and the Quantum Park approved SIgn Program.
Also show and dImensIOn on the site plan drawmg the locatIOn of the SIgn and the dIstance
the SIte SIgn IS located from the adjacent property hnes (note. ten feet IS mmImum setback
dImenSIOn from adjacent property hnes) The SIgn shall not encroach mto an easement. If
a SIte SIgn IS proposed, dehneate on the landscape plan the locatIOn of the landscapmg that
IS reqUIred for SIte sIgnage Drawmgs of the sIgnage shall comply WIth the apphcable
regulatIOns specIfied m the SIgn Code (Chapter 21 of the Land Development RegulatIOns)
Or
Place the followmg note on the site plan "SIte sIgnage IS not approved for thIS proJect.
Separate SIte plan reVIeW and approval IS reqUIred for SIte sIgnage."
5 Change the occupancy claSSIficatIOn termmology that IS hsted m the project data to be
consIstent WIth the claSSIficatIOns hsted m the Standard BUIldmg Code.
6 Place a note on the site plan drawmg next to the symbol that represents the SIte hghtmg
pole/fixture mdIcatmg that the pole and fixtures WIll Illummate the SIte consIstent WIth the
speCIficatIOns IdentIfied m the Parkmg Lot Code Include wIthm the note the overall heIght
dImensIOn of the SIte hghtmg pole and fixture. The overall heIght of the pole/fixture shall
not exceed the hmItatIOns of the Zonmg Code
7 Add to the survey a locator map that shows the locatIOn of the lot wIthm Quantum.
8 The plans are mconsIstent WIth respect to IdentIfymg the use of the facIhty Correct the
plans accordmgly The project data mdIcates the use as manufactunng and the floor plan
mdIcates the use as warehouse With the office area of the bUIldmg exceedmg 30% of the
total floor area of the facIhty, the apphcant WIll have to pay Palm Beach County Impact
fees based on an office use
9 At tIme of permIt reVIew, IdentIfy on the SIte plan the actual setback dImensIOn from the
leadmg edge of all four SIdes ofthe bUIldmg to the adjacent property hnes. Please note that
overhangs, covered walkways, canopIes or awnmgs are conSIdered when setbacks are
IdentIfied. The bUIldmg setbacks shall comply WIth Zomng Code regulatIons.
MEH.bg
\\CH\MAIN\SHRDA TA\Development\Building-6870\Documents\TRC\NWSP 99-55000008 1st review Quantum Park (Lot51-D),doc
LEISURE SERVICES. PARKS DIVISION MEMORANDUM
TO
Michael W Rumpf, DIrector ofPlanmng & Zon1Og
John Wildner, Parks Supenntendent ~
Gevas North American HeadqUaLs
FROM,
RE
DATE
June 28, 1999
I have no comments on the above-named project. The project should cont1Oue 10 the
normal reVIew process,
JWad
n~:
/,1 ~
J;
i
,
I
II" 'lqq I
I
.
---~~
APPLICATION TRACKING LOG
PR01ECT TITLE: GEVAS NORTH AMERICAN HEADQTRS FILE N: NWSP 99.55000008
PROJECT LOCATION QUANTUM PARK - LOT 51-D
TYPE OF APPLICATION New Site Plan
PUBLIC NOTICE REQUIRED: (Y IN) REVIEWER'S NAME
AGENT PIERCE ARCHITECTURAL GROUP ADDRESS:
AGENT PHONE: FAX:
DATE REC'D: AMOUNT
RECEIPT NO.
t 2 SETS OF PRE-ASSEMBLED PLANS SUBMllTED FOR REVIEW:
2 OF 12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
SITE PLAN WITH SITE DATA 0
APPLlCATION/SUBMllTAL: DATE ACCEPTED:
DRAINAGE PLAN
ELEVATION VIEW DRAWINGS
COLORED ELEVATIONS RECEIVED
MATERIAL SAMPLES RECEIVED
PHOTOGRAPHS RECEIVED
DATE DENIED:
DATE OF LElTER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES:
1 ST REVIEW COMMENTS DUE:~9 t) \ "2..1 q, ~
o
o
o
o
o
r:
TE q---t
~cI
~
1 ST REVIEW COMMENTS RECEIVED
POLICE
PLANNING
BLDG
FORESTER
MEMON
DATE OF LElTER SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENTS:
90-DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID:
DATE t 2 COMPLETE (ASSEMBLED) SETS OF AMENDED PLANS SUBMllTED FOR 2ND REVIEW:
PRE-ASSEMBLED PLANS SUBMllTED FOR REVIEW:
AMENDED APPLICATION 0
2 OF12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
SITE PLAN WITH SITE DATA 0
2ND REVIEW MEMO: DATE SENT
DRAINAGE PLAN
ELEVATION VIEW DRAWINGS
COLORED ELEVATIONS RECEIVED
MATERIAL SAMPLES RECEIVED
TRANSPARENCY RECEIVED
PHOTOGRAPHS RECEIVED
MEMO NO
2nd REVIEW COMMENTS RECEIVED
PLANS MEMON DATE PLANS MEMON DATE
UTIL, 0 POLICE 0
PW 0 PLANNING 0
PARKS 0 BLDG/ENGR 0
FIRE 0 FORESTER 0
BOARD MEETING DATE:
BOARD:
LAND DEVELOPMENT SIGNS PLACED AT THE PROPERTY DATE SENT I SIGNS INSTALLED:
DATE:
CITY COMMISSION: DATE:
DEVELOPMENT ORDER RECEIVED FROM CITY CLERK: 0 DATE:
DEVELOPMENT ORDER SENT TO APPLICANT 0 DATE:
S:\FORMS\TRACKING LOG FORM - 3/98
o
o
o
o
o
o
RETURN DATE:
Facsimile
TRANSMITTAL
CITY OF BOYNTON BEACH
100 E, BOYNTON BEACH BOULEVARD
POBOX 310
BOYNTON BEACH, flORIDA 33425-0310
FAX: (561) 742-6259
PLANNING AND ZONING DIVISION
To: ~Q"'\O ~~""" Q.W\ C
Fm. .~...., ~~ " "'Z.O", '" ~
Date: .-'\ \ \ C. \
Re: a.. \I ~ ~
Please find attached the first review comments for your project. To stay on the current review schedule, please do the
following steps listed below and bring all documents to the TRC meeting scheduled for August 3, 1999'
Revise your plans incorporating all comments listed herein, including the addition of notes on plans to confirm
response to general statements/comments, and bring 10 copies to the TRC review meeting (full sets including
all pages originally submitted);
2, Submit the additional information as requested within the attached comments;( i.e. traffic analysis, engineering
certification, etc,)
3, Prepare a written response (7 copies) consisting of a list briefly summarizing how each comment has been
addressed on the revised plans or with the supplemental information including location on the plans (this
promotes an expeditious 200 review by staff and your project representatives during the TRC meeting); and
4 Submit reductions (8 Yo x 11) for the proposed site plan, elevations and landscaping plan (this is required for the
final report and public presentation),
The applicant should not attend a TRC meeting (200 review) until all documents have been revised and copied for staff
review
If plans will not be fully revised and brought to the scheduled TRC meeting, contact JoAnn Alea in this office by the
Thursday prior to the schedule meeting date, Projects deviating from the original schedule are eligible for review at
subsequent meetings, which are held every Tuesday To reschedule, contact JoAnn Alea by the Thursday prior to the
Tuesday TRC meeting that you desire to attend. The remainder of the review schedule will be adjusted accordingly If
you have questions on the attached comments, please contact the respective reviewer using the attached list of TRC
representatives,
Following TRC (200 review) the project is forwarded to the Planning and Development Board meeting that falls
approximately 2 to 3 weeks following the TRC meeting,
Note: Items recognized by staff as typically outstanding at this point include a traffic report and/or confirmation of the
traffic concurrency approval from Palm Beach County drainage certification by a licensed engineer and
colored elevations of the proposed project, This information is necessary for the project to proceed, If you have
submitted this information, please disregard this note,
TRC MEMBERS
BOB BORDEN, ASSISTANT FIRE MARSHAL
KEVIN HALLAHAN, FORESTER/ENVIRONMENTALIST
LEE THOMPSON, POLICE DEPARTMENT
PETE MAZZELLA. UTILITIES DEPARTMENT
MICHAEL HAAG, BUILDING DIVISION
LARRY QUINN. PUBLIC WORKS DEPARTMENT
MARK L1PP
JOHN WILDNER, PARKS DIVISION
JACK CASLER. ACTING CITY ENGINEER
KEN HALL
MICHAEL RUMPF PLANNING AND ZONING
Page l of--.!l
742-6602
742-6227
742-6105
742-6404
742-6352
742-6202
742-6226
742-6280
742-6260
1 st REVIEW COMMENTS
PrOject name GEV AS NORTH AMERICAN HEADQUARTERS
FIle number' NWSP 99-017
Reference 1 st Review, New SIte Plan. FIle # NWSP 99-00 Plannmg and Zonmg Department
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments
1 Construction dumpsters and servIce to be provIded by CIty
UTILITIES
Comments
2 Sec 26-34(E) ofthe CIty Code reqUIres that a capaCIty reservatIOn fee be
paid for this project eIther upon my request for SIgnature on the Health
Dept. apphcatIOn forms or wIthm 30 days of SIte plan approval,
whIchever occurs first. ThIS fee wIll be $1,205 82 based upon a 1 5-mch
meter
3 Comp Plan pohcy 3C.3 4 reqUIres the conservatIOn of potable water
CIty water may not, therefore, be used for IrngatIon where other sources
are readIly aVailable
4 ThIS office wIll not reqUIre surety for mstallatIOn of the water and sewer
utIhtIes, on condItion that the systems be fully completed, and gIven to
the City before the first permanent meter IS set. Note that settmg of a
permanent water meter IS a prereqUIsIte to obtammg the certIficate of
occupancy
5 A bUIldmg permIt for thIS project shall not be Issued untIl thIS office has
approved the plans for the water and/or sewer improvements reqUIred to
serve the project. (Sec 26-15)
6 The waste stream from the manufactunng process must meet the CIty s
pretreatment reqUIrements. A samphng manhole must be prOVIded to
allow monitoring of thIS waste stream. (Sec 26-143,26-147)
FIRE
Comments
7 A fire flow test IS reqUIred, Roads and hydrants wIll be m place pnor to
any constructIOn above grade
POLICE
Comments None
Page 2
GEV AS NORTH AMERICAN HEADQUARTERS
File No NWSP 99-017
ENGINEERING DIVISION
Comments
8 Locate handIcap sIgns behmd 6" curb to elImmate vehIcle encroachment.
9 Remove "Tow Away Zone" wordmg on handIcap fine plate and specIfy
that fine amount IS $250.00, not "up to $250 00"
10 ConsIder a 6' wIde sIdewalk mstead of a 4' sIdewalk next to bUlldmg to
act as a contmuous wheel stop
11 On sheet C-2 of 6 add to general notes that all stnpmg, slgnage and
markmgs shall conform to CIty Standard Drawmg B-9800 I and correct
TypIcal HandIcap Parkmg DetaIl on sheet SP-2 of2
12 On Sheets LNP-l delete the two references to "proposed future parkmg"
to agree WIth SIte Plan. Also delete parkmg spaces wlthm those areas
on sheets C-I and C- 3
13 ProvIde an accessible route from the publIc street or SIdewalk to an
accessible bUlldmg entrance per Flonda AccessibIlIty Code
14 ProvIde a 4' WIde SIdewalk along High RIdge Road out to Park RIdge
Blvd [LDR Chapter 6, ArtIcle IV, SectIOn 10 T]
15 Add the followmg note to the SIte Plan. All plans submItted for specIfic
permIts shall meet the CIty's code reqUIrements at tIme of applIcatIon.
These permIts mclude, but are not lImIted to the followmg: sIte lIghtmg,
pavmg, dramage, curbmg, landscaping and IrngatlOn, PermIts reqUIred
from other permlttmg agencIes, such as FDOT, PBC, SFWMD, DERM,
L WDD, DEP and any others, shall be mcluded WIth the permIt request.
16 ProvIde an engmeer's certIficatIOn on the Pavmg & Dramage Plans that
dram age WIll conform WIth all rules, regulatIOns, codes, etc mcludmg,
but not lImited to, Chapter 6 ArtIcle IV, SectIOn 5 of these Land
Development RegulatIons. [LDR Chapter 4 SectIOn 7.F.2 ]
17 Change general note #2 on Sheet C-2 from Palm Beach County" to The
CltV of Bovnton Beach.
18 Provide the detaIls of the loadmg dock trench dram.
19 On the SIte Plan and Pavmg & Dramage Plan show a "D' curb around
the curvIlinear portIOns of the SIte, specIfically both SIdes of the loadmg
dock, the area east of the dumpster, the areas adjacent to parking stalls
and the entrances. [LDR Chapter 23, ArtIcle ILE ]
Page 3
GEV AS NORTH AMERICAN HEADQUARTERS
FIle No NWSP 99-017
20 Show Ingress/egress arrows at the entrances and through the parkIng lot
to delIneate travel aisles. ConsIder double yellow lane separatIOn lInes
around the southwest corner of the site
21 ConsIder header curb In the curvIlInear areas of the dnveways from the
property lInes out to the roadways due to the truck traffic
BUILDING DIVISION
22 Add to the bUIldmg that IS depIcted on the site plan drawmg a labeled
symbol that represents the locatIOn of the handIcap accessible entrance
door to the bUildIng. Show and label the same door on the floor plan
drawIng.
23 Add to the site plan drawIng a labeled symbol that represents and shows
the locatIOn and path of the accessible route that IS reqUired between the
accessible parkmg space and the accessible entrance door to the bUIldmg.
Add text that would mdlcate the label represents the accessible route and
the route IS m complIance With SectIOn 4.3 (Accessible Route) and 46
(Parkmg and Passenger Loadmg Zones) of the Flonda AccessibIlIty
Code for BUIldmg ConstructIOn Please note that at tIme of permIt
reVIew the applIcant shall prOVIde detailed data on the plans that WIll
venfy that the path of the accessible route IS m complIance WIth the
regulatIOns of the Flonda AccessibIlIty Code for BUildIng ConstructIOn.
24 Withm the footpnnt ofthe bUIldmg that IS Illustrated on the site plan
drawmg and floor plan drawmg, IdentIfy the proposed finIsh floor
elevatIOn. Add to the proiect data, found on sheet SP 1 of 2, the flood
zone that the bUIldmg IS located wlthm mcludmg, where applIcable,
base flood elevatIOn. If there IS no base flood elevatIOn, mdlcate that on
the plans. Add speCIficatIOns, notes and computatIOns to the SIte data
that wIll venfy the proposed finIsh floor elevatIOn IS m complIance WIth
the mmlmum standards of the followmg'
a) MinImum elevatIOn reqUired by the flood zone
b) MinImum elevatIOn reqUired by the South Flonda Water
Management Dlstnct permIt for the project.
c) Show and prOVIde computatIOns that venfy the elevatIon ofthe
finIsh floor IS SIX mches or more above the crown of the
abuttmg nghts-of-way
25 ProvIde detailed and dImenSIOned elevatIOn VIew drawmgs of the SIte
slgnage mcludmg dlmensIOnmg the WIdth and heIght ofthe SIgn and the
overall heIght of the SIgn structure Add computatIOns to the drawmg
that venfy the total SIgn area IS m complIance WIth the regulatIons
speCIfied m the Sign Code and the Quantum Park approved SIgn
Program Also show and dImenSIOn on the site plan drawmg the
locatIOn of the SIgn and the dIstance the SIte SIgn IS located from the
Page 4
GEV AS NORTH AMERICAN HEADQUARTERS
File No NWSP 99-017
adjacent property hnes (note ten feet IS mInImUm setback dimensIOn
from adjacent property hnes). The sIgn shall not encroach mto an
easement. If a sIte sIgn IS proposed, dehneate on the landscape plan the
locatIon of the landscapmg that IS reqUired for sIte sIgnage Drawmgs of
the sIgnage shall comply wIth the apphcable regulatIOns specIfied m the
SIgn Code (Chapter 21 of the Land Development RegulatIOns)
Or
Place the folloWIng note on the site plan "SIte sIgnage IS not approved
for thIS project. Separate sIte plan reVIew and approval IS reqUired for
sIte sIgnage "
26 Change the occupancy classIficatIOn tenmnology that IS hsted In the
proiect data to be consistent wIth the classIficatIOns hsted In the
Standard BUildIng Code
27 Place a note on the site plan drawmg next to the symbol that represents
the sIte hghtmg pole/fixture IndIcatIng that the pole and fixtures wIll
IllumInate the sIte consIstent WIth the specIficatIOns Identified m the
ParkIng Lot Code Include wIthIn the note the overall heIght dImensIon
of the sIte hghtIng pole and fixture The overall heIght of the
pole/fixture shall not exceed the hmItatIons of the Zoning Code
28 Add to the survey a locator map that shows the locatIOn of the lot wIthm
Quantum
29 The plans are mconsIstent wIth respect to IdentIfymg the use of the
facIhty Correct the plans accordIngly The proiect data mdicates the
use as manufacturmg and the floor plan IndIcates the use as warehouse
With the office area of the bUIldmg exceedIng 30% of the total floor area
of the facIhty, the apphcant wIll have to pay Palm Beach County Impact
fees based on an office use
30 At time of pemnt reVIew, Identify on the sIte plan the actual setback
dimensIon from the leadIng edge of all four sIdes of the bUIldmg to the
adjacent property hnes Please note that overhangs, covered walkways,
canopIes or awnings are conSIdered when setbacks are Identified. The
bUIldmg setbacks shall comply wIth ZonIng Code regulatIOns
PARKS AND RECREA nON
Comments None
FORESTER/ENVIRONMENTALIST
Comments
31 The eXIstIng tree survey of the SIte shows 17 native trees, whIch must be
replaced, on the landscape plan m accordance wIth the Tree Preservation
Ordmance
32 A flora and Fauna statement ofthe SIte m reference to any protected
Page 5
GEV AS NORTH AMERICAN HEADQUARTERS
FIle No NWSP 99-017
speCIes.
33 Secure any State permIts 10 reference to the results of #2 (If necessary)
34 A c1eanng and grubbmg permIt for the sIte can be requested after the
above three Items have been completed for the sIte
PLANNING AND ZONING
Comments
35 All plans shall be signed and sealed at tIme of permIt submIttal.
36 On the SIte plan provIde the followmg mformatlOn. Ch.4, Sec 7, PaLB
- Setback data 10 tabular form.
- All required landscape areas shall be protected by curbmg: Ch.7 5,
Art.II, Sec 5, Para A
- Relocate the dumpster wall outSIde of the 12' dram age easement.
- Bearmgs and dIstances on the west and south property hnes.
- BUIldmg setback dImenSIOns from all property hnes.
- Locate one accessible pedestnan cross access route to High RIdge
Road Ch.9, Sec 10, Para B2
- Locate wheel stops 10 accordance WIth CIty drawmg # B-900 12 13
- Add an addItlOnalloadmg area screen wall on the north SIde of the
loadmg area. Ch 9, Sec 7, Para Cl
37 In the SIte plan tabular data provIde the followmg data. Ch.4, Sec 7,
PaLE
- Quantum Park lot number
- Number of stones along WIth bUIldmg heIght data
- Parkmg calculatIOns mcludmg the reqUIrements found 10 Ch.2,
Sec 7, Par.H.2 & Ch.2, Sec 11, PaLH.16
38 On the archItectural plans prOVIde the followmg mformatlOn. Ch.4, Sec
7, Para D
- PrOVIde mformatIon label 109 all archItectural elements, constructIOn
matenals and proposed colors 10 tabular form.
- ProvIde a note statmg that all mechanIcal and roof top eqUIpment
WIll be screened from view' Ch 9 Sec 11, Par.E.
39 SubmIt colored elevatIOn drawmgs of all elevatIOns of the buildmg:
Ch.4, Sec 7, Par,D.2
40 On the landscape plans proVIde the followmg mformatlOn Ch.75,
Art.II, Sec 5
- Remove all references to the future parkmg area.
- Label and dImension all reqUIred landscape buffers.
- Locate all proposed fire hydrants.
- PrOVIde notatIOn on the source of the IrngatlOn system Ch.4, Sec 7,
Para C
- ProVIde calculatIons for the reqUIred parkmg lot landscape area.
Page 6
GEV AS NORTH AMERICAN HEADQUARTERS
File No NWSP 99-017
Ch,7 5, Art.II, Sec.5, Par G
- Change all notations regardmg the use of cypress for mulch
matenal Mulch other than cypress should be used.
- The plantmg plan must be drawn to the same scale as the site plan
ChA, Sec 7, Par C
- A hedge along the addltIonalloadmg area screen wall. Chapter 7.5
or 9
J:ISHRDATAIPLANNINGISHAREDlWP\PROJECTSIGEVAS NORTH AMERICAN HDQTRSINWSPI1ST REVIEW COMMENTS,DOC
l
TRANSMISSION VERIFICATION REPORT
TIME 07/16/1999 11 38
NAME BOYNTON BEACH P & Z
FAX 5513755259
TEL 5513755250
DATE, TIME
FAX NO./NAME
DURATION
PAGE(S)
RESULT
MODE
07/15 11 34
91954753471199551
00 04 03
07
or.
STANDARD
EXHIBIT "e"
CONDITIONS OF APPROVAL
Project name: GEV AS NORTH AMERICAN HEADQUARTERS
FIle number' NWSP 99-017
Reference. 2nd Review. New Site Plan. File # NWSP 99-00 Planmm!: and Zoninl!: DeDartment
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments.
I Construction dumpsters and service to be provided by City X
UTILITIES
Comments: None X
FIRE ~BUJ
Coml
2, ads and hydrants will be in place prior to X
P {04V/
POLl( ~!1/(J6
Comments: None X
ENGINEERING DIVISION
Comments
3 Use of Quantum Park master drainage facIlities requires approval by the X ~l~
U~~L
QCDD through QCDD permit process,
3 Show the elevations of the loading dock trench drain. X 0k.
BUILDING DIVISION
4 Correct the inconsistency WIth respect to the fimsh floor elevation. The X
SIte plan and floor plan drawing indicate the finish floor as 24.50' and the
civil plans indicate the elevation as 17.50' Within the site data, identify
the proposed finish floor elevation of the building (lowest floor
elevation). Verify that the proposed elevation complies with regulations
of the code by adding specifications and notes to the site data that address
\/ the following issues:
q' a) From the FEMA map, identify the title of the flood zone that the
"
buIlding IS located within. Where applicable, specify the base flood
elevation. If there is no base flood elevation, indicate that on the plans.
As the design professional-of-record for the project, state within the site
data that the proposed floor elevation is above the highest 100-year base
flood elevation applicable to the building site, as determined by the South
Florida Water Management District's surface water management
l{ll(iKJ
Cb
pzO'e 2
1:0 .
GEV AS NORTH AMERICA!'! HEADQUARTERS
File No.. NWSP 99-017
DEPARTMENTS INCLUDE REJECT
construction development regulatIOns. Identify the floor elevation that the
deSign professional has established for the buIlding wlthm the footprint of
the buildmg that is shown on the sIte plan, floor plan and clvll plan.
S Considering that detaIl qrawmgs of the site signage were not provided and X
,/ the locatIOn of the SIte signage was not shown on the SIte plan, place the
,,:1 following note on the site plan. "Site signage is not approved for this
project. Separate site plan reVIew and approval is requIred for site
signage."
6 Change the occupancy classification termmology that is listed within the X
proiect data to be consistent with the classifications listed m the 1997
editIOn of the Standard Building Code. The plans are mconsistent with
respect to identifying the use of the facilIty Correct the plans
accordmgly The project data indicates the use as warehouse and the floor
plan indicates the use as manufacturing/assembly Please note that with
the office area of the building exceeding 30% of the total floor area of the
facility, the applicant will be required to pay Palm Beach County Impact
fees based on an office use for the entire square footage of the bUIlding.
7 ComplIance with the Buildmg Codes will be evaluated at time of permIt X
review The permit fee, water and sewer facility fees, Fire Department
fees, County fees and State fees will be determined at time of permit
review
8. To efficiently move from site plan approval to permit review, it is X
recommended that the permit applicant and contractor contact a Plans
Analyst in the Building DiviSIOn of the Development Department to
obtain a permit submIttal checklist.
PARKS AND RECREA nON
Comments. None X
FORESTER/ENVIRONMENT ALIST
Comments.
9 The existing tree survey of the site shows 17 native trees, which must be X
replaced, or maintained, on the landscape plan in accordance with the
Tree Preservation Ordinance.
10 A flora and Fauna statement of the site m reference to any protected X
species,
11 Secure any State permits in reference to the results of #2. (if necessary) X
12. A clearing and grubbing permit for the site can be requested after the X
above three Items have been completed for the site.
Pa~e 3
GEV AS NORTH AMERICAN HEADQUARTERS
File No. NWSP 99-017
v
DEPARTMENTS INCLUDE REJECT
PLANNING AND ZONING
Comments.
13 All plans shall be signed' arid sealed at time of permit submittal. X
\..
14 On the site plan provide the followmg information. ChA, Sec.7, Par,B X
. Locate wheel stops in accordance with city drawing # B-90012.
IS In the site plan tabular data provide the following information. ChA, X
(j Sec.7, Par.E
- Change "warehouse" to "warehouse/assembly" in parking note and
parking calculations should also be based on # of employees. Ch,2,
Sec 7, Par.H.2 & Ch.2, Sec.II, Par.H.16
16 On the architectural plans provide the following information, ChA, Sec. X
7, Para D
\ - lor all buddmg elevations and dumpster detail all architectural
V elements, construction materials and proposed colors in tabular form,
17 On the landscape plans prOVide the following information: Ch.7.5, X
(jrt.II, Sec.S
Label and dimension width of all required landscape buffers.
VProvide notation on page LND-I on the source of the irrigation system,
ChA, Sec.7, Para C
~ Provide confirmation of review and approval of design by Quantum X
Review Board.
ADDITIONAL PLANNING AND DEVELOPMENT BOARD COMMENTS
19 None X
ADDITIONAL CITY COMMISSION COMMENTS
20 To be determined.
J:ISHROATAIPlANNINGISHAREO\WPlPROJECTS\GEVAS NORTli AMERICAN HOQTRSINWSPlCONO OF APPR CC 9-7-99,OOC
Pa~e 3
GEV AS NORTH AMERICAN HEADQUARTERS
File No NWSP 99-017
-
DEPARTMENTS INCLUDE REJECT i
PLANNING AND ZONING
Comments:
1
-} 13 All plans shall be signed-arid sealed at time of permit submittal. X
I.A-- i l,,! J:_'-'
14 ()J:1-the site plan provide the following information. Ch.4, Sec.7, Par.B X f:e l() (,fA i k
lvtA t
;> ~ Locate wheel stops in accordance with city drawing # B-90U11:---. .--1 I .i /.) "
-( ~ OL., J'~ !
d I. bV~ L-
IS In the site plan tabular crata provide the following information. Ch.4, X ','\J v.Jr
~ ~LJ'ar.E
_ Change "warehouse" to "warehouse/assembly" in parkmg note am:t
- parking calculations should also be based on # of employees. Ch.2,
" ~ec 7 Par.H.2 & Ch.2, Sec.1I, Par.H.16. -----
16 On the architectural plans provide the following information. ChA, Sec. X
7, Para D
~or all building elevations and dumpster detail all architectural
elements, construction materials and proposed colors in tabular form.
17 On the landscape plans provide the following information: Ch.7.5, X
Vrt.II, Sec.5
, Label and dimension width of all required landscape buffers.
\./' Provide notation on page LND-I on the source of the irrigation system.
ChA, Sec. 7, Para C
18 t--irovide confirmation of review and approval of design by Quantum X
Review Board.
ADDITIONAL P....AN~'N'J AND DEVELOPMENT BOARD COMMENTS
19 None X
ADDITIONAL CITY COMMISSION COMMENTS
20 To be determined.
uJ--
lvf-[
~
-1-
:1f-
J;\SHROATAIPlANNINGISHAREOIWP\PROJECTS\GEVAS NORTH AMERICAN HOCTRSlNWSPlCONO OF APPR CC 9-7-99.00C
V: ,) t\
(
l)",
(Ji'L (6) P&4plvdeeJ
J L\A.1,} \ b--
~
t)~
G
r--'
I ~ ~
~
SrQ~
livCQ X L VA. U LA.!I
r Q V l1'
!
r
2nd REVIEW COMMENTS
PrOject name GEV AS NORTH AMERICAN HEADQUARTERS
File number' NWSP 99-017
Reference 2nd ReView. New Site Plan. File # NWSP 99-00 Plannmg and Zonmg Department
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments.
1 Construction dumpsters and service to be provided by City
UTILITIES
Comments. None
FIRE
Comments.
2 A fire flow test IS reqUIred. Roads and hydrants will be m place pnor to
any constructIOn above grade
POLICE
Comments None
ENGINEERING DIVISION
Comments.
3 Show the elevations of the loadmg dock trench dram.
BUILDING DIVISION
4 Correct the mconsIstency WIth respect to the finIsh floor elevatIOn. The SIte
plan and floor plan drawmg mdIcate the finIsh floor as 24.50' and the CIvil
plans mdIcate the elevatIOn as 17 50' The mmImum bUlldmg floor
elevation shall be speCIfied by the deSIgn profeSSIOnal on the permIt
documents wIthm the project data. Venfy that the proposed finish floor
elevation IS in compliance WIth the followmg minImum standards by
provIdmg speCIfications, notes and computatIOns on the plans wIthm the
proiect data.
a) Add to the project data the tItle of the flood zone that the buildmg IS
located WIthin includmg, where applicable, specifymg the base flood
elevatIon. If there IS no base flood elevatIon, mdlcate that on the plans
b) IndIcate wIthm the project data the minImum floor elevatIon that IS
reqUIred by the South Flonda Water Management DIstnct permIt for
the project. IndIcate the permit number on the plan.
c) The mmimum buildmg floor elevatIOn (lowest floor elevatIon) shall
be set by the deSign professIOnal-of-record, establIshed above the
highest 100-year base flood elevatIOn applicable to the bUlldmg SIte, as
determmed by the South Flonda Water Management DIstnct's surface
water management constructIOn development regulatIOns. State wIthm
Page 2
GEV AS NORTH AMERICAN HEADQUARTERS
File No NWSP 99-017
DEPARTMENTS INCLUDE REJECT
the proJect data the mmimum bUlldmg floor elevatIOn.
Indicate within the footprint of the build in!! that is depicted on the
site plan. floor plan and civil plan the elevation that the desi!!n
professional wants to set the finish floor of the build in!!.
5 ConsIdenng that detail drawmgs of the site slgnage were not provided and
the location of the site signage was not shown on the site plan, place the
followmg note on the site plan. "Site slgnage IS not approved for thiS
proJect. Separate site plan review and approval IS reqUIred for site
slgnage."
6 Change the occupancy classification termmology that IS lIsted wlthm the
proiect data to be consistent with the classificatIOns listed m the 1997
edition of the Standard Buildmg Code The plans are mconslstent With
respect to IdentIfymg the use of the faCIlIty Correct the plans
accordingly The proJect data indicates the use as warehouse and the floor
plan indicates the use as manufacturmg/assembly Please note that With
the office area of the buildmg exceedmg 30% of the total floor area of the
facilIty, the applicant Will be reqUIred to pay Palm Beach County Impact
fees based on an office use for the entIre square footage of the bUlldmg
7 Compliance With the Buildmg Codes Will be evaluated at time of permit
review The permit fee, water and sewer facilIty fees, Fire Department
fees, County fees and State fees wIll be determmed at tIme of permit
review
8 To effiCiently move from site plan approval to permit reView, It IS
recommended that the permit applicant and contractor contact a Plans
Analyst in the BUlldmg DIVISion ofthe Development Department to
obtam a permit submIttal checklist.
PARKS AND RECREATION
Comments. None
FORESTERlENVIRONMENTALIST
Comments.
9 The eXlstmg tree survey of the site shows 17 native trees, which must be
replaced, or maintamed, on the landscape plan in accordance With the
Tree Preservation Ordmance.
10 A flora and Fauna statement of the site m reference to any protected
speCIes.
11 Secure any State permits m reference to the results of #2 (If necessary)
12. A clearing and grubbmg permit for the site can be requested after the
Page 3
GEV AS NORTH AMERICAN HEADQUARTERS
File No NWSP 99-017
DEPARTMENTS INCLUDE REJECT
above three Items have been completed for the site.
PLANNING AND ZONING
Comments.
13 All plans shall be signed and sealed at time of permit submittal.
14 On the site plan proVide the followlllg mformatIOn. Ch.4, Sec 7, Par.B
- Locate wheel stops m accordance With City drawmg # B-90012
15 In the site plan tabular data proVide the followmg lllformatlOn. Ch.4,
Sec 7, Par.E
- Change "warehouse" to "warehouse/assembly" m parkmg note and
parklllg calculatIOns should also be based on # of employees. Ch.2,
Sec 7, Par.H.2 & Ch.2, Sec 11, Par.H.16
16 On the architectural plans proVide the followmg mformation. Ch.4, Sec
7, Para D
- For all bUlldlllg elevations and dumpster detaIl all architectural
elements, constructIOn materials and proposed colors in tabular form.
17 On the landscape plans proVIde the followmg mformatlOn. Ch.7.5,
Art.II, Sec.5
- Label and dimenSIOn WIdth of all required landscape buffers.
- Provide notatIOn on page LND-l on the source of the IrrIgatIOn
system. ChA, Sec 7, Para C
18 ProVide confirmatIOn of review and approval of deSIgn by Quantum
ReVIew Board.
J;ISHROATAIPLANNINGlSHAREo\WPIPROJECTS\GEVAS NORTH AMERICAN HOQTRSINWSPI1ST REVIEW COMMENTS. DOC
y11as ~'f"' 8' ft (f'l
I st REVIEW COMMENTS
Project name' GEV AS NORTH AMERICAN HEADQUARTERS
File number' NWSP 99-017
Reference 1st ReVIew. New Site Plan. File # NWSP 99-00 Planning and Zoning Department
r'(\..9
~('-'
J.{'
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments.
1 ConstructIOn dumpsters and service to be provided by City
UTILITIES
Comments:
V Sec 26-34(E) ofthe City Code requires that a capacity reservatIOn fee be
paid for this project eIther upon my request for signature on the Health
Dept. applIcatIon forms or wlthm 30 days of site plan approval,
whichever occurs first. ThIS fee WIll be $1,20582 based upon a 1.5-mch
meter
V -
Comp Plan policy 3C.3 4 reqUIres the conservatIOn of potable water
City water may not, therefore, be used for lITIgatIOn where other sources
are readIly available.
V ThiS office Will not reqUIre surety for mstallatlOn of the water and sewer
utIlItIes, on conditIon that the systems be fully completed, and given to
the City before the first permanent meter IS set. Note that settmg of a
permanent water meter is a prereqUIsite to obtammg the certificate of
occupancy
V A bUlldmg permit for thiS proJect shall not be Issued untIl thiS office has
approved the plans for the water and/or sewer Improvements reqUIred to
serve the proJect. (Sec. 26-15)
/ The waste stream from the manufacturmg process must meet the City'S
pretreatment reqUIrements. A samplIng manhole must be prOVided to
allow mOllltormg of thiS waste stream (Sec 26-143,26-147)
FIRE
Comments
t9 A fire flow test is reqUIred. Roads and hydrants Will be 10 place pnor to
any constructIon above grade
POLICE
Comments. None
Page 2
GEV AS NORTH AMERICAN HEADQUARTERS
File No NWSP 99-017
J 1St.
{tl
ENGINEERING DIVISION
Comments.
/ Locate handicap signs behind 6" curb to ehminate vehicle encroachment.
V Remove "Tow Away Zone" wordmg on handicap fine plate and specify
that fine amount is $250.00; not "up to $250 00"
V ConSider a 6' Wide sidewalk instead of a 4' Sidewalk next to bUlldlllg to
act as a contmuous wheel stop.
1/ On sheet C-2 of 6 add to general notes that all stripmg, slgnage and
markmgs shall conform to City Standard Drawmg B-9800 1 and correct
Typical Handicap Parklllg Detail on sheet SP-2 of2
1/ On Sheets LNP-l delete the two references to "proposed future parkmg"
I'v agree With Site Plan. Also delete parkmg spaces with III those areas
on sheets C-l and C-3
'/ ProVide an accessible route from the publIc street or SIdewalk to an
accessible bUilding entrance per Flonda Accessibility Code.
7' PrOVide a 4' Wide SIdewalk along High Ridge Road out to Park Ridge
Blvd. [LDR Chapter 6, Article IV, SectIOn 10 T]
;/ Add the followmg note to the SIte Plan. All plans submItted for speCific
permits shall meet the City'S code reqUIrements at tIme of applicatIOn.
These permits lllclude, but are not hmlted to the followlllg: site hghtmg,
pavlllg, dramage, curbing, landscapmg and Imgation. Permits reqUIred
from other permittmg agencies, such as FDOT, PBC, SFWMD, DERM,
L WDD, DEP and any others, shall be included With the permit request.
;/ PrOVide an engmeer's certificatIOn on the Pavlllg & Dralllage Plans that
dralllage Will conform with all rules, regulatIons, codes, etc. mcludlllg,
but not lImited to, Chapter 6, ArtIcle IV, SectIOn 5 of these Land
Development RegulatIOns. [LDR Chapter 4, SectIOn 7.F.2.]
/' Change general note #2 on Sheet C-2 from Palm Beach County" to The
City of Bovnton Beach.
(18) ~~.-fh~ C.J~\k- -trW\>
9.,. J.. LL J_L:L of the loadmg dock trench dram.
l;r On the SIte Plan and Paving & Drainage Plan show a "D curb around
the curvlhnear portIOns of the Site, speCifically both sides of the loading
dock, the area east of the dumpster, the areas adJacent to parkmg stalls
and the entrances. [LDR Chapter 23, Article II.E.]
Page 3
GEV AS NORTH AMERICAN HEADQUARTERS
FIle No. NWSP 99-017
l/
Show mgress/egress arrows at the entrances and through the parkmg lot
to delineate travel aIsles. ConSider double yellow lane separation hnes
around the southwest corner of the site.
V ConSider header curb m the curvilinear areas of the dnveways from the
property hnes out to the roadways due to the truck traffic
BUILDING DIVISION 1:: b cV r a..-tJ (d--f-e. V\
22 Add to the bUIlding that IS depicted on the site plan drawing a labeled
symbol that represents the location of the handicap accessible entrance
door to the bUIld mg. Show and label the same door on the floor plan
drawmg.
23 Add to the site plan drawmg a labeled symbol that represents and shows
the locatIOn and path of the accessible route that IS reqUIred between the
accessible parkmg space and the accessible entrance door to the bUlldmg.
Add text that would mdlcate the label represents the accessible route and
the route IS lil comphance With SectIOn 4.3 (Accessible Route) and 46
(Parkmg and Passenger Loading Zones) of the Flonda AccessibilIty
Code for BUlldmg ConstructIOn. Please note that at tIme of permit
review the apphcant shall prOVide detailed data on the plans that wIll
venfy that the path of the accessible route IS m comphance With the
regulations of the Florida Accessiblhty Code for Buildmg ConstructIon.
24 Withm the footprint of the bUlldmg that IS Illustrated on the site plan
drawmg and floor plan drawmg, Identify the proposed filllsh floor
elevatIOn. Add to the proiect data, found on sheet SP 1 of 2, the flood
zone that the buildmg IS located wlthm mcludmg, where applicable,
base flood elevation. If there is no base flood elevation, mdicate that on
the plans. Add speCificatIOns, notes and computatIOns to the site data
that Will venfy the proposed finish floor elevatIOn IS m compliance with
the mmlmum standards of the followmg:
a) MInImum elevatIOn reqUIred by the flood zone.
b) Mmimum elevatIOn reqUIred by the South Flonda Water
Management Dlstnct permit for the proJect.
c) Show and prOVide computations that verify the elevation of the
filllsh floor IS SIX mches or more above the crown of the
abuttmg nghts-of-way
25 PrOVide detailed and dimenSIOned elevatIon view drawmgs of the site
slgnage mcluding dlmensionmg the Width and height of the sign and the
overall height of the sign structure Add computatIOns to the drawing
that venfy the total sign area IS m comphance With the regulatIons
specified m the Sign Code and the Quantum Park approved Sign
Program Also show and dimenSIOn on the site plan drawmg the
locatIOn of the sign and the distance the site sign IS located from the
Page 4
GEV AS NORTH AMERICAN HEADQUARTERS
File No NWSP 99-017
.( & (-f~
adJacent property lines (note' ten feet is minimum setback dimension
from adjacent property lines). The sign shall not encroach into an
easement. If a site sign is proposed, delIneate on the landscape plan the
locatIOn of the landscapIng that IS required for SIte sIgnage. Drawmgs of
the signage shall comply With the applicable regulations specified m the
Sign Code (Chapter 21 of the Land Development RegulatIOns)
Or
Place the following note on the site plan "Site signage IS not approved
for this proJect. Separate site plan review and approval is reqUIred for
site signage "
26 Change the occupancy classificatIOn termmology that IS lIsted in the
proiect data to be consistent WIth the claSSIficatIOns lIsted m the
Standard BUlldmg Code
27 Place a note on the site plan drawing next to the symbol that represents
the site IIghtmg pole/fixture mdlcating that the pole and fixtures will
Illummate the site consistent with the speCIficatIOns Identified In the
Parkmg Lot Code. Include wlthm the note the overall height dimenSIOn
of the site hghtIng pole and fixture. The overall height of the
pole/fixture shall not exceed the hmitations of the ZOnIng Code
28 Add to the survey a locator map that shows the locatIOn of the lot wlthm
Quantum
29 The plans are mconslstent with respect to Identlfymg the use of the
facility Correct the plans accordmgly The proiect data indicates the
use as manufacturmg and the floor plan Indicates the use as warehouse.
With the office area of the building exceedIng 30% of the total floor area
of the faCility, the apphcant wIll have to pay Palm Beach County impact
fees based on an office use.
30 At tIme of permit review, Identify on the site plan the actual setback
dimenSIOn from the leadmg edge of all four Sides of the building to the
adJacent property lInes. Please note that overhangs, covered walkways,
canopies or awnings are conSidered when setbacks are Identified. The
bUIlding setbacks shall comply WIth Zonmg Code regulatIOns.
PARKS AND RECREATION
Comments None
FORE STER/ENVI RONMENT ALIST
LY........c;........~ ~ -n
Comments , ~
l0 ~
The eXistIng tree survey of the site shows 17 natIve trees, which must be
replaced:'on the landscape plan m accordance With the Tree Preservation
o d ex fnC;.. .....~''''~
r mance
'{2.) A flora and Fauna statement of the site m reference to any protected
---
Page 5
GEV AS NORTH AMERICAN HEADQUARTERS
File No NWSP 99-017
species.
Secure any State permits in reference to the results of#2 (if necessary)
A cleanng and grubbmg permit for the site can be requested after the
above three items have been completed for the site.
PLANNING AND ZONING
Comments.
All plans shall be Signed and sealed at time of permit submIttal.
On the site plan proVide the following informatIOn. ChA, Sec.7, Par.B
,/' Setback data m tabular form.
(2f All required landscape areas shall be protected by curbing: Ch.7 5,
Art.II, Sec 5, Para A
/ Relocate the dumpster wall outSide of the 12' drainage easement.
/' Beanngs and distances on the west and south property lines.
./ Building setback dimensions from all property lines.
/ Locate one accessible pedestnan cross access route to Hip,h Ridge
Road Ch.9, Sec 10, Para B2
Locate wheel stops in accordance With City drawmg # B-900 12..13
Add an additIOnal loading area screen wall on the north sicie of the
loadmg area. Ch.9, Sec 7, Para Cl
7
(38/
&J
In the site plan tabular data provide the followlllg data. Ch.4, Sec 7,
Par.E
I Quantum Park lot number
I. NumberQs ones al ng "YJth bUlldmg height data ~ L, -
~ h.,.~'9 " \A'-rc.. . ~. ~ ""'--<-.&"- c:;>..SC-1f\ ~;7 ~ FC-rf
/:) parKing a culallons Ch.2, ,
C/ "> -e.~ i ..... c. '? ~=r>>f'~ <=
Sec 7, Par .H.2 & Ch.2, Sec , t'ar .H.l 0 yo .5
On the architectural plans proVide the following information. Ch.4, Sec.
7, Para D
() ProVide mformatlOn labelIng all architectural elements, constructIOn
matenals and proposed colors m tabular form ' ,., c /.....<"i2 It Y ~
I PrOVide a note statmg that all mechamcal and rooftop eqUIpment
Will be screened from view' Ch.9, Sec 11, PaLE
Submit colored elevatIOn drawlllgs of all elevations of the bUIlding:
ChA, Sec 7, Par.D.2.
@ On the landscape plans prOVide the followmg lllformation. Ch.7.5,
Aryl, Sec.5
/ Remove all referencesA to t$ future parkmg area.
- W,p.*h '"
o Label and dlmensIO~all re U1red landscape buffers.
/ Locate all proposed fire~drants.
0'"" ""..1(- l - (
o PrOVide notatioq."'on rne ource of the IrrIgation system Ch.4, Sec.7,
ParaC ~- ';;.f,
/'" ProVide calculatIOns for the reqUired parkmg lot landscape area.
J \ ~e.-
(~
o
:te-D . t-
~dt"i'; s
j, ()~~
....'\ <:; ;,<~
6J.~C- ~
~t {. ;, /) .
J-"
"",~r
~7
olC/tl j
Yl<:>j-~
c:::..n.!)
"":.._~.. ~
Page 6
GEV AS NORTH AMERICAN HEADQUARTERS
File No. NWSP 99-017
Ch.7 .5, Art.!I, Sec.5, Par G
~ Change all notatIons regard 109 the use of cypress for mulch
matenal. Mulch other than cypress should be used.
/ The planting plan must be drawn to the same scale as the site plan.
ChA, Sec. 7, Par C
/' A hedge along the additional loading area screen wall. Chapter 7.5
or9
7
-
f &cs~
<> 5rr{.~ j
r .5scc:- < <:t. ?Soy... =-.r ~ ~ ZS=~
-<-yrp YJvo.. ~ ~7 CjJ ~~f~ c~C-/f.... ,/.1- -f S....;~
? -
p~vt-
C"'1r--fz(~ftt:o".,. <:if'