LEGAL APPROVAL
MINUTES
REGULAR CITY COMMISSION MEETING
BOYNTON BEACH, FLORIDA
?
SEPTEMBER 19, 1995
Mayor Taylor questioned whether or not the plicant was comfortable with the surety Issue Mr LIS
stated that if he is required to post sure , he wants to know why and in what amount. He learned
today that Quantum has a program r resource recovery If there are potential contaminants used,
there must be containment. Mr . has no problem complying with that.
In response to a question fr Mayor Pro Tem Matson, Ms. Heyden confirmed that it IS necessary to
amend the list of perml uses because this use IS not currently allowed
Motion
CommisSioner asklewlcz moved to amend the list of permitted uses to allow research and
developmen and the manufacture of non-aerosol spray dispenSing systems on industrially designated
lots, inc/u ng staff recommendations. Mayor Pro Tem Matson seconded the motion whIch earned
unanim sly
G
Project Name'
Owner'
Agent:
Location
Description
Packaging Concepts
P J M. and AssoCIates LC
Jeff Lis
4925 Park Ridge Boulevard
SITE PLAN Request for site plan approval to construct a
24,158 square foot manufacturing building on a portion of lots
47A and 47B (total of 1 48 acres), designated as industrial,
within the Quantum Park PID
Mr Lis confirmed for Ms. Heyden that he IS satisfied With the way the Police Department Issue has
been resolved Mr LIS explained that when he appeared before the Planning and Development Board,
there was a request that the roads be widened to 26' to accommodate semis which are 11' in width
The Issue has been resolved With the Police Department and as along as the applicant IS not required
to widen the roads to accommodate semi traffic within Quantum Park, the applicant has no problems
with any other conditions imposed by staff
Motion
Mayor Pro Tern Matson moved to approve Packaging Concepts,.4925 Park Ridge Blvd, request for site
plan approval to construct a 24,158 square foot manufacturing building on a portion of lots 47 A and
47B (total of 1 48 acres), designated as industrial, Within the Quantum Park PID CommiSSioner
Jaskiewicz seconded the motion which carried unanimously
H
Project Name'
Owner'
Agent:
Location
Description
Boynton Estates f k.a. Citrus Park
Next Boynton Homes Ltd
Ramiro Rencurrell
8350 Lawrence Road
SITE PLANS: Request for site plan approval to construct
project entrance structure, Signs and common area landscaping
23
MINUTES
PLANNING & DEVELOPMENT BOARD
BOYNTON BEACH, FLORIDA
OCTOBER 10, 1995
Board recommended denial because the application was lacking
counter applications and because of a recommendation from the
Fire Department relative to retamlng the right-of-way for future
use
The City Commission tabled thiS item pending receipt of all the
abandonment applications.
b Forest Court Abandonment - The City Attorney recommended
that we require with this, and future applications, that the
applicant secure a legal opinion from an attorney regarding
ownership of rights-of-way That legal opinion has been
submitted by Mr Hams, and It IS currently being reviewed by the
City Attorney
c Three Abandonments for POinciana School - The City
Commission approved the three abandonments subject to staff
comments
d Master Plan for Grove Plaza - This project was approved by the
City Commission subject to staff comments
e Community Design Plan Appeal for Boynton Festive Center- This
appeal was for Hops Grill & Bar The City Commission
supported the applicant's pOSition and approved the project in
the way it was presented by the applicant.
f Packaging Concepts - Use Approval and Site Plan Approval- The
Planning & Development Board discussed the possibility of
widening the road for tractor/trailer usage However, the Police
Department retracted their comment relative to Widening the
road followmg a site Visit. With regard to the use approval, the
applicant raised concerns about the requirement for surety ThiS
item was handled under the DRI for Quantum Park.
g. Site Plan Approval for Boynton Estates - The City Commission
endorsed staff's recommendation relative to the name of the
project, and approved the site plan
h Main Street Car Wash - The City Commission approved this
project.
2
MINUTES
PLANNING AND DEVELOPMENT BOARD
BOYNTON BEACH, FLORIDA
SEP1nE~ERI2, 1995
the outside of the wall The wall is required to be two feet within Ihe property line, but the
adjacent neighbor has a six foot chain link face on the propeny line. Therefore, there would
be no way to get at that area once the wall goes in. Also, he requested that an area be
designated for a future storage building He will meet with staff to see if this can be added on
the plan. He stated that this would not make a significant change to the layout.
Motion
;"\-~>Z;: ~r>-'"
Vice Chairman Golden moved to recommend approval;,pf the major site plan modification for
the Main Street Car Wash to amend the approved site plan to expaDd the car wash to include a
canopy for automobile polishing and vacuuming, additional parking and a vehicle stacking area
on a 23 acre parcel north of the existing car wash, subject to staff comments and resolution of
the buffer wall line issues between the applicant and staff. Mr wiJdie seconded the motion
which carried 6"()
E. Site Plans
..
New Site Plan
,
(1)
Project:
Agent:
Paeal"'. Coaeeptl
Jeff Lis
The Catalfumo Companies
P.J.M. and Associates LC
4925 Park Ridge Road
Request for site plan approval to constrUct a 24,158
square foot manufacturing buUctiDg on a portion of lots
47 A and 47B (total of 1 48 acres), designated as
industrial, within the Quantum Park PID
Owner-
Location:
Description:
Mr DeCarlo briefly reviewed PllDDing and Zoning Department Memorandum 95-459
Chairman Dub! uked the appliC8Dl if he had any problema with any of staff's comments. Mr
Lis asked for clarification regardina Sgt. Marlon Harris' collUDent wiIh regard to roadway
width. Sgt. Harris had recommended that the roadway width be widaJed to a minimum of 26
feet. He made a statement in his Memo #0160 that semi trUCks are 11 feet wide. Mr Lis
pointed out that semi trucks are only a little over 8 feet in width. He advised that the
roadways were approved and meet engineering designs of 22 feet to accommodate semi travel
29
~
,.., ~. ... ~ ~ -. .. .. .~~ ~ - . --'-'..... -~~'-'"
MINUTES
PLANNING AND DEVELOPMENT BOARD
BOYNTON BEACH, FLORIDA
SEPTEMBER 12, 1995
Ms Heyden stated that because this was a use that no one on the Technical Review Committee
had the opportunity to evaluate, Mr Hukill suggested the placement of the surety This is the
first this has been done, however, other surety is collected and enforced by the Engineering
Department. She deferred this question to Mr Hukill
Mr Lis felt comfortable that with Ms Heyden's assistance he will be able to find out what
this means before he goes before the City Commission.
Ms Heyden pointed out that the surety will have to be done as part of permitting, so Mr Lis
has a quite a while to do that. Mr Lis said there has been a full review of what this
applicant's method of business is going to be and what he is actually going to be doing Mr
Lis did not think anything noxious or toxic has been brought to the surface during the review,
and there is no intent of that. He imagined that if surety is required, it would be required if
the client was in violation of any of the ten standards and that the surety would guaranty that
he would be brought back into compliance He assumed the surety would be posted when a
violation was cited or when he falls out of compliance with these items Ms Heyden advised
that the surety would be collect&:i prior to a Certificate of Occupancy, not when the incident
occurs Mr Lis asked why surety is required at this time Ms Heyden could not answer this
question at this time
Motion
Vice Chairman Golden moved to recommend approval of the use approval for Packaging
Concepts, to amend the list of permitted uses for the Quantum Park PID to allow research and
development and the manufacture of non-aerosol spray dispensing systems on industrially
designated lots, subject to resolution of the surety issue Mr Beasley seconded the motion
which carried 6-0
Motion
V ice Chainnan Golden moved to recommend approval of the site plan for Packaging Concepts
to construct a 24,158 square foot manufacturing building on a portion of lots 47 A and 47B
within die Quantum Park PID. .ubje~t to .taff comments and re.olution of Sit. Harril'
comment regarding semi trucks prior to the City Commission meeting Mr Beasley seconded
the motion which carried 6-0
--
31