REVIEW COMMENTS
1 st REVIEW COMMENTS
1r7V-5 ~
(, /22 Iff
PrOject name Stanton Magnetics - Quamtum Park Lot 6
File number' NWSP 99-011
Reference 1st RevIew, New SIte Plan. FIle # NWSP 99-011 wIth an Mav 12. 1999 PlannIng and Zonmg
Department date stamp markmg
(V~-~
I DEPARTMENTS I INCLUDE I REJECT I
PUBLIC WORKS
{~.., ,*,~c~'c.~ 5,/1 ~/ r VG- .
Comments ~ /( c./ ...... lD.... ~ --= VI ~) ..s- <2. II, cr- ... '-./'l ^ (..~""'~ C 6y c.- ~
..~
UTILITIES - General Comments
([) All utilItIes easements shall be shown on the rectified landscapmg drawings
so that we may determine which trees may interfere with utilities In
general palm trees will be the only tree species allowed wlthm utilIty
easements Canopy trees may be planted outside of the easement so that
roots and branches will not impact those utilities within the easement in the
foreseeable future LDR Sec 7 5-18 1 gives public utilItIes the authonty to
remove any trees that interfere with utilIty services eIther in utilIty
easements or public rights-of-way
I Dept. of HRS permits will be reqUired for the water system servmg this proJect.
(Sec. 26-12)
/ Fire flow calculatIons will be reqUIred demonstrating the CIty Code
requirement of 1500 g P m as stated m LD R chap 6, Art IV Sec. 16 or )
the reqUIrement imposed by insurance underwriters, whichever is greater
(see Sec 26-16(a)) Please submit these calculations with your HRS permIt (,.....
submittal
\9 Sec 26-34(E) of the City Code reqUires that a capacity reservation fee be paid for ea -( v
thiS project either upon my request for signature on the Health Dept. application \
forms or within 30 days of site plan approval. whichever occurs first. Based upon a
1.5-inch meter the fee is $1205 82.
A Comp Plan policy 3C.3 4 requires the conservation of potable water City water
may not. therefore, be used for irrigation where other sources are readily available
/" Water and sewer lines to be owned and operated by the City shall be mcluded withm
utilit) easements. Please show all proposed easements on the engineering drawmgs,
using a mmimum width of 12 feet. The easements shall be dedicated via separate
mstrument to the City as stated in Sec. 26-33(a) of the Code.
V This office will not require surety for installation of the water and sewer utilities, on
condition that the systems be fully completed, and given to the City before the first
permanent meter IS set. Note that settmg of a permanent water meter is a
prerequIsIte to obtaining the certificate of occupancy
/ The waste stream from the manufacturing process must meet the City s pretreatment
requirements. A sampling point must be provided to allow monitoring of thIS waste
stream (Sec 26-143 26-147)
Page 2
Stanton Magnetics - Quantum Park Lot 6
File No NWSP 99-011
DEPARTMENTS
FIRE
'0LJ
Comments
ents
A fire flow calculatIOn test will be required, LDR 6-16
All water maInS, hydrants, and roadways will be In place prIor to above
ground constructIOn, NFP A I
ENGINEERING DIVISION
None
~ GYl
'S..~+'k
Comments.
c ~ VC:::-'{ +
c (~'" f!-
( I +1.
Add to the site plan the following note: All plans submitted for specific permits
shall meet the City's code requirements at time of application. These permits
include, but are not limited to the following: site lighting, paving, dramage,
curbing, landscaping and irrigation. Permits required from other permitting
agencies, such as FOOT PBC, SFWMO OERM, L WOO OEP and any others,
shall be included with the permit request.
Add a "Right Turn Only" sign at the south egress driveway
y ProVide 6" Wide thermoplastic, white strIpes across both drIveways to
delIneate pedestrIan path through driveways.
The landscape Islands shall have a mInimum grassed area of 5' between
the backs of curb Adjust all plans accordIngly [LDR Chapter 7.5,
Article II, SectIOn 5 G ]
ProVide an EngIneer's certification that the draInage will conform With
all rules, regulatIOns and codes of the City'S Land Development
RegulatIOns. [LDR Chapter 4, SectIOn 7 F ]
Show clear sight trIangles at both drIveways and adjust the LandscapIng
Plan If needed. [LDR Chapter 75, Article II, Section 5.H.2.] Add a
note to the LandscapIng Plan that there shall be a clear unobstructed
view WithIn the Sight trIangles at a level between 30" and 6' above
finIshed grade. [LDR Chapter 75, Article II, SectIOn 5.H.]
V\e~ "
5L(;"
un
/
/')
C- -r--~ c- lie J.c:"
c~~
INCLUDE REJECT
~c.-<~
~('\5(~
c-~~
Page 3
Stanton Magnetics - Quantum Park Lot 6
File No NWSP 99-011
BUILDING DIVISION
Comments
17 Add a note to both accessible parkmg space areas shown on the site plan
drawlllg (sheet SP 1) that refers the reader back to the typical parkmg
stnplllg detail drawmg for the accessible route details. Add text to the
detail drawmg that mdlcates the route IS m compliance with SectIOn 4.3
(Accessible Route) and 46 (Parkmg and Passenger Loadmg Zones) of
the Flonda Accessibility Code for BUlldmg ConstructIOn. Please note
that at tllne of permit review the applicant shall provide detailed data on
the plans that will venfy that the path of the accessible route IS m
compliance with the regulations of the Flonda Accessibility Code for
BuIldlllg ConstructIOn.
18 Identify the filllSh floor elevatIOn wlthm the footprmt of the bUlldmg
that IS Illustrated on the site plan (sheet SP I) and the floor plan drawmg
(sheet A.I) Add to the site data, found on sheet SP I, the flood zone
that the buildmg IS located wlthm mcludmg, where applicable, base
flood elevation If there IS no base flood elevatIOn, mdlcate that on the
plans Add specificatIOns to the site data that will venfy that the
proposed filllSh floor elevatIOn IS m compliance With the mmlmum
standards of the followmg"
a) Mmlmum elevatIOn reqUired by the flood zone
b) Mlllllnum elevatIOn reqUired by the South Flonda Water Management
District permit for the proJect.
c) Show and provide computations that venfy the elevatIOn of the filllSh
floor IS SIX mches or more above the crown ofthe abuttmg nght-of-way
19 At tllne of permit review Identify on the site plan the actual setback
dllnenSlOn from the leadmg edge of the south faces of the bUlldmg to the
south property lme Please note that the setback dimenSIOn shall be
measured from the overhang, covered walkways, canopies or awnmgs.
The bUlldmg setbacks shall comply With Zonmg Code regulatIOns.
Indicate on the site plan whether the patio area IS covered. If It IS
covered. proVIde plan and elevation view drawmgs of the structure.
Also, specify the setback dimenSIOns m compliance With the zonmg
regulations.
20 Pro\ Ide detailed and dimensIOned elevation view drawmgs of the site
slgnage Indicate the total sign area and height of the sign mcludmg
proYldlllg computations that venfy the sign area complies With the
regulations of the Sign Code Also, show and dimension on the plan
view drawmgs the distance the site sign IS located from the adjacent
property Illles (note ten feet IS the mmlmum setback from any property
line)
Or
Place the followmg note on the site plan 'Site slgnage IS not approved
Page 4
St~.nton MagnetIcs - Quantum Park Lot 6
FIle No NWSP 99-011
\L-~
for thIs proJect. Separate sIte plan revIew and approval IS reqUIred for
sIte slgnage " Drawmgs of the slgnage shall comply wIth the applicable
regulatIOns speCIfied m the SIgn Code (Chapter 21 of the Land
Development RegulatIOns). If a sIte sIgn IS proposed, delIneate on the
landscape plan the locatIOn of the landscapmg that is reqUIred for sIte
sIgnage
21 On sheet SPI, Identify the symbol that represents the property lme.
22 DimensIon the wIdth of the easement that is shown along the west
property lme
23 Add to the sIte plan drawmg a labeled symbol that represents the
locatIon of the sIte IIghtmg poles. Also, note on the sIte plan that the
sIte IIghtmg fixtures wIlllllummate the sIte consIstent wIth the
speCIficatIons IdentIfied m the Parkmg Lot Code. The photometric plan
IS revIewed at tIme of permIt revIew and IS not reqUIred for sIte plan
revIew Therefore, remove the drawmg from the submIttal.
PARKS AND RECREATION
Comments. None
FORESTER/ENVIRONMENT ALIST
Comments
A4~) The applIcant has addressed the eXIstmg trees on the sIte If the IL f{
~ relocated trees do not survIve the transplantmg, the trees WIll be replaced
dUrIng the landscapmg portIon of the project.
PLANNING AND ZONING
~mments.
~ ~I
On the sIte plan show the followmg:
~ ~ Setbacks chart and dimensIOns m tabular form Chapter 4 SectIon 7
t-:: ( Paragraph E
JA 00/ Open space reqUIred and proposed m the tabular data. Chapter 2
SectIon 7 Paragraph H.13
i# ~ ProvIde loadmg space reqUIrements m the parkmg calculatIOns.
Chapter 2 SectIOn 11 Paragraph J.2
'-"-- ()J. / BearIngs and dIstances of property lInes. Chapter 4 SectIOn 7
av-/ Paragraph B
0- ReVIse plans to proVIde parkmg lot Islands dImensIOned WIth 5' of
landscape area from mSlde to mSlde of curb CIty drawmg #B-
90012
vL {)J... / Label the dashed lme shown InSIde of the west, south and east
. . property lInes
t,lF P<. #' Label the walk way paVIng materIal
-
Page 5
Stanton Magnetics - Quantum park~
. r
F lIe No NWSP 99-011 \ .eLe V .
0-<.,
'----
if'- 0 · Label the W ". '" \.t of the wmg walls adjacent to the loadmg
AI? - wells
.~ ~ Sign plan showmg location with setback reqUirements and an
1 ~ \ f-1. elevation drawmg with dimenSIOns, materials and colons.
Sign and seal all plans submitted for review Chapter 4 Section 7
'/\)' . iJ
'l./V ~
On the landscape plan show the followmg:
7' Label and dimension all reqUired landscape buffers. Chapter 7.5
...-Article II
tflL,./ Label and dimenSIOn the minimum tree spacmg along the R/\V
,.,frontage Chapter 7.5 Artlcfe n SectIon 5 Paragraph D
oy A note m the notes specifying a matenal other than cypress shall be
~sed for mu~
v--- OJ/Provide safi slgat nangles. Chapter 7 5 Article II SectIOn 5
J Paragraph H
lb~t"'; / Locate IIghtmg and fire hygrants eXlstmg and proposed. Chapter 4
SectIOn 7 Paragraph B
Submit a traffic study and wntten confirmatIOn from the Palm Beach
County Traffic DiVISIOn that the site meets traffic performance standards.
s:lprojectslcond of apprl
1
41. ~ f
Vtt)"- M bu ulf
~
~
,
.()eW6
( ___ - <t2,,- v ,~<r-'
( ,,0 Le '
( A )
? (h -,~~.f
'T$o~~
vV\ ~~ 'f
p~
..c.V(ev$~[J
hr
("\
QVt'---.I'-- .-f<.....~
~cx C' k
? r~,.f:, C dY\... .f\ r ""'~ ~C4... cs.( r ~..j I ("" (.) ~ ~
(;
~ C-cVv.-( _
f lA. {/J'" I 1U whl
fVIJV! ~u ~i 0J
~~vQtJ j
r ~.L
t.1.'fO 1 . It
t- !
7. 1 f
of
t
j., It'-
L I u(' U tr1A.t vvL
-( 0 UJ Lt J D U b~
v
llet.J V f(o V ,<5{e.
f6 <<-~ (5,
V 1\ ; +-y
1-/ r- /e
cf) (X (., L/ r'71 c .-....+
.L c- cu Sc../, c' +-
70 .... vre::.
fr-J
~
Ii I . , ':nJ~J2..~f<: 5c,,-+<, 5' ~ c!'<:
A~ bz/-~ it( Of - it ~ ~"'5 ~ eM.. !. "..; 5 (~ (.,)/d:..+t.;;r. a;,s k """"'" ~ m<c'&;... 7i- .5>""'~
"" {' L / / /.;; 4
-:;y... c: e- OVI rc;1.:' 'r;rr? c:. 0-..... <" " J1.\ AA .,1.. I~ /J ,../ /l ~ ,."\ (1 { "
;' .<< ;',., r ..<-1 c. '-"<\ GId" e.Y .r L. c:--r -- ~ .. .,.. c....'"
"} r I SS
Sp...-<.~5 G.-re ~:J t..f) I" C~V\Qo:o...f(Q,.... wr-d LcA-1 t/c;...yS....q..... ~ C"41 ~_ ~y
f' fa {..)-
(
(J
o
"
(\
DEPARTMENT OF DEVELOPMENT
MEMORANDUM
ENG 99-076
TO.
Michael W Rumpf, Drrector of Planning & Zoning
Raymond F DaVIdson, P .E., Acting City E~
May 27, 1999
FROM.
DATE.
RE
STANTON MAGNETICS - QUANTUM PARK LOT 6 (NWSP 99-011)
NEW SITE PLAN 1ST REVIEW COMMENTS
I
Add to the sIte plan the following note: All plans submitted for specific permits shall meet the City's
code reqUIrements at tune of apphcation. These permits include, but are not limited to the following:
SIte lightmg, paving, drainage, curbmg, landscaping and irrigation. Permits reqwred from other
penmttmg agencIes, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and any others, shall be
mcluded Wlth the permIt request.
2.
Add a "Right Turn Only" SIgn at the south egress dnveway
3
Provide 6" Wlde thermoplastic, wlute stripes across both dnveways to delineate pedestrian path
\
through dnveways.
4
The landscape islands shall have a mInimum grassed area of 5' between the backs of curb Adjust all
plans accordmgly [LD~ Chapter 7 5, Article II, Section 5 G ]
-..
5
ProvIde an Engmeer's certIfication that the dramage Will conform Wlth all rules, regulations and
codes of the CIty'S Land Development RegulatIons. [LDR Chapter 4, Section 7.F ]
,
6
Show clear SIght tnangles at both dnveways and adjust the Landscaping Plan if needed. [LDR
Chapter 7.5, Article II, Section 5.H.2.] Add a note to the Landscapmg Plan that there shall be a clear
unobstructed VIew Wltlun the SIght tnangles at a level between 30" and 6' above finished grade.
[LDR Chapter 75, ArtIcle II, SectIon 5.H.]
The proposed 8 mch water main to the fire hydrant at the north property lme will require a jack and
bore under Quantum Blvd., an open cut of Quantum Blvd. will not be allowed. Consider providing a
water lme to the fire hydrant at the north property line from the existmg water line at the south
property lme as an alternatIve to aJack and bore.
All plans submitted to the CIty must be sIgned and sealed by the appropriate design professionals.
The Civll drawing and the Survey are not sIgned and sealed.
RFD/ck
Xc Ken Hall
C:'My Documents\Stan!on ~agnetics. Quantum Lo! 6 New Site Plan Is! Review.doc
\J~~A +0 ~\. Uq,v'rl.W+
CQVV\ fV\ t..l'\; S
dfiO ~/6-V {JUJl, DII'. Q,\~
O1Y/41.;!& .~ h 0 \<j,
bP;} ~, ~ y
(\\ O~
Page 3 V
Stanton Magn s - Quantum Park Lot 6
File No N SP 99-0 II
@)
BUILDING DIVISION
Comments
Add a note to both accessible parkIng space areas shown on the site plan
draWIng (sheet SP 1) that refers the reader back to the typical parking
stnpIng detail draWIng for the accessible route details. Add text to the
detaIl draWIng that IndIcates the route IS In complIance With Section 4.3 .. Ii _
(Accessible Route) and 4 6 (ParkIng and Passenger Loading Zones) of v I
the Flonda AccessibilIty Code for BuildIng Construction. Please note
that at time of permit review the applIcant shall prOVide detalled data on
the plans that will venfy that the path of the accessible route IS In
complIance With the regulatIOns of the Flonda AccessibIlity Code for
BUIldIng ConstructIOn.
18 kkm.fy th", ..p;.llil:J tl~(MO cl...v cltIDn w iLhiu th~ fvotpflftt offtre lnakting
tb3t ,e;: I11"d~atea OR tht: 31tt: I'ldfI (;)ll~d Sr1) clUJ tll'G }1ggr piaR QRt\VIR~
(~heet ,'\.1 ). Asd t9 the alhil aata, fEJUnB eR Sh.ct SP I, 1I1e-flvai ~gg,e
that the I:llllkhc.g 'i lo,,"'ted wlthm.Htch.ldmg, ''''Rere Etfl~II~~ble, ~
tleod ele":.ltl0fl. If tRere ,e;: no h::!"1i fl9gd elev-at!Qn, ,"rll~~ tha~ QR.-the.
. Add specIficatIOns to the site data that will verify that the
proposed fiUlsh floor elevatIOn IS In complIance With the mlUlmum
standards oftl1", fvllovVlng: R6.9,,)itr.<~ 8y ~
~ ~::::::: :::::::~ ~~;:~ ~: ~::;h 7;1~::d~ Water Management
Dlstnct permIt for the proJect.
c) ~hg'" aRe! ~r9\'ide "omputatlone;: th"'t v@nfy d'l8 el~"Mlon of the fin~sh
flogr IS :JIX lrrches or 1I1ore ae9"p the crown of the ::lhlJttlRg fight of Way
L1?--
\
At tIme of permIt review Identify on the sIte plan the actual setback
dImenSIOn from the leadIng edge of the south faces of the bUIldIng to the
south property lIne. Please note that the setback dimenSIOn shall be ~IL..
measured from the overhang, covered walkways, canopies or aWnIngs.
The buIldIng setbacks shall comply WIth ZonIng Code regulations
IndIcate on the site plan whether the patIo area IS covered. If It IS
covered. proVide plan and elevatIOn vIew drawmgs of the structure.
Also speclfv the setback dImenSIOns m complIance WIth the zonmg
regulatIons.
)9 ProVide detaIled and dimensIOned elevatIOn vIew draWIngs of the sIte
slgnage Indicate the total sign area and heIght of the sIgn mcludIng
prOVidIng computatIOns that verify the sign area complIes WIth the
regulatIOns of the SIgn Code Also show and dImenSIOn on the plan
vIew draWIngs the dIstance the sIte sIgn IS located from the adjacent
propertY hnes (note ten feet IS the minImum setback from any property
lIne)
Or
Place the following note on the site plan "SIte slgnage IS not approved
/Jpo 1'1i-6 ~""W-wJi\J(. N~'tC:- to rw: 6u=1I(\1-Io~ /he-.lJ Pf4~hv~d we ~~;l..~'NC.
Ii 13 ud,l),Nb SIl_tJ4;,~ (,bJ J...( Cc>m,Oly MJinJ r7IC II-PIMi/If..:J 4>1Ii1....l)l.,,:" /4~I</ PI /J.
1> n A i'7'fr: 4AALIC/J Sf;;. ec.6vtdn..~..!;' 6? T7.j~ ~/6/'J ~~e {(,.JI:i.~ 21)
S I il'J rl-OU!~ -"'1 IV'" I ' r
Page 4
Stanton Magnetics - Quantum Park Lot 6
FIle No ~WSP 99-011
for thIS proJect. Separate sIte plan revIew and approval IS reqUIred for
sIte slgnage." DraWIngs of the slgnage shall comply WIth the applicable
regulatIons specIfied In the SIgn Code (Chapter 21 of the Land
Development Regulations). If a sIte sign IS proposed, delIneate on the
landscape plan the locatIon of the landscaping that is required for sIte
fJ: slgnage
!7l On sheet SP 1 Identify the symbol that represents the property hne. (J~
0'1-
a .22 DImenSIOn the WIdth of the easement that IS shown along the west
property lIne
~ Add to the sIte plan drawing a labeled symbol that represents the
~ locatIOn of the sIte hghtIng poles. Also note on the SIte plan that the o~
~j site IIghtmg fixtures will IllumInate the sIte consIstent WIth the
speCIficatIons IdentIfied In the ParkIng Lot Code. The photometnc plan
IS reviewed at tIme of permIt revIew and IS not reqUIred for sIte plan
revIew Therefore, remove the draWIng from the submIttal.
PARKS A~D RECREATION
Comments None
FORESTER/ENVIRONMENTALIST
\
Comments
24 The applIcant has addressed the eXlstmg trees on the site If the
relocated trees do not survive the transplantlllg, the trees will be replaced
during the landscapIng portIon of the project.
PLANNING AND ZONING
Comments
.,~ On the sIte plan show the followmg'
-)
. Setbacks chart and dimenSIOns m tabular form Chapter 4 SectIOn 7
Paragraph E
. Open space required and proposed III the tabular data. Chapter 2
Section 7 Paragraph H.13
. PrOVide loadmg space reqUIrements m the parkmg calculatIOns.
Chapter:2 SectIon 11 Paragraph J.2
. Bearmgs and distances of property hnes. Chapter 4 Section 7
Paragraph B
. ReVIse plans to proVide parkIng lot Islands dimenSIOned With 5 of
landscape area from Illside to Illslde of curb CIty drawmg #B-
90012
. Label the dashed Ime shown Illslde of the west, south and east
property hnes
. Label the walk way pavlllg material
o\J ~ A/ws:p 07- all
.1'0 ",~~ . rf) 0 w "
a.. 0 \lP ~ (1\ ~TA tV Tl>") m A GN f::r;~ -"' ~ () tJ ...flu ",INJ'.
\J (' rlo CO - (a-. cJ t - -
~d. ~n Ie "AlA !he BIlUliiftg G..... 'NiII be ewIulllllt!al lime 4' ~ -ril
r J -~- . The permit fee, water and sewer facifaty fees, tounty fees and State
"t fees will be determined at time of permit review. ~Ipt P~p~R-r/I'ILu{ ~(:f;.S 7
.. To efficiently move from site plan approval to pennit review it is
recommended that the permit applicant and contractor contact a Plans
Analyst in the Building Division of the Development Department to obtain a
permit submittal checklist.
38 'Jf> 1'I":L.. ~L .lL [he .....,......... r....ateg8 ,..Ivr-_lld iu III k ttnlliRg il..& 81..1/111' _ ~~
v~tA n,... -awlatiQAs of tAl 911i1~inl g..... . if ....lln't9 "'" the C!it_ FlaR Jrn~f,r
.. .. . .
of 1 'fnll_~ti........ ,.......,..aG!"u~Ll ~Hil"i... The bwlding area, occupancy an
type of construction shall comply with the specifications identified in the
Building Code. .
~~I time of permit review specify, in tabular farm, on the' I "4 J _I: ,.,
~ site plan iifl...ll-:M1. ,1111._ u._ ~L ~r l__l. L .. &L L A.L_- "_if IraB ef r~
, illig. type of construction and occupancy classification___Working . \
drawings of the buildinge shall comply with the codes specified in Chapte~
20 of the Land Development Regulations. ~Ar-I~ p(lop~
fOR'. ",8l.)iL~J .ut
~..!!S!..-=-7oIl1IY uecu~tl.RJJ.Jd 'ir-"'....tr L-r" 1 :1....1'1'1::11 ~ IY~ rll&
~ \"'\~
~d~~
4~4
1 st REVIEW COMMENTS
Project name Stanton Magnetics - Quamtum Park Lot 6
File number NWSP 99-0 II
Reference' 1st RevIew. New SIte Plan. File # NWSP 99-011 wIth an Mav 12. 1999 Planmng and Zoning
Deoartment date stamo marking.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments. None
UTILITIES - General Comments
1 All utilities easements shall be shown on the rectified landscaping drawings
so that we may determine which trees may interfere with utilities In
general, palm trees will be the only tree species allowed within utility
easements Canopy trees may be planted outside of the easement so that
roots and branches will not impact those utihtIes within the easement in the
foreseeable future LDR Sec 7 5-18 1 gives public utilities the authority to
remove any trees that interfere with utility serVIces, either in utihty
easements or public rights-of-way
2. Dept. of HRS permits will be required for the water system serving this project.
(Sec. 26-12)
3 Fire flow calculations will be required demonstrating the City Code
requirement of 1500 g p.m. as stated in LDR chap 6, Art. IV, Sec. 16, or
the requirement imposed by insurance underwriters, whichever is greater
(see Sec 26-16(a)) Please submit these calculations with your HRS permit
submittal
4 Sec. 26-34(E) of the City Code requires that a capacity reservation fee be paid for
this project either upon my request for signature on the Health Dept. application
forms or within 30 days of site plan approval, whichever occurs first. Based upon a
1.5-inch meter the fee is $1205 82
5 Comp Plan policy 3C.3 4 requires the conservation of potable water CIty water
may not, therefore, be used for irrigation where other sources are readily available.
6 Water and sewer lines to be owned and operated by the City shall be included within
utility easements. Please show all proposed easements on the engineenng drawings,
using a minimum width of 12 feet. The easements shall be dedicated via separate
instrument to the City as stated in Sec. 26-33(a) of the Code
7 This office will not require surety for installation of the water and sewer utilities, on
condition that the systems be fully completed, and given to the City before the first
permanent meter is set. Note that setting of a permanent water meter is a
prerequisite to obtaining the certificate of occupancy
8 The waste stream from the manufacturing process must meet the City's pretreatment
requirements. A sampling point must be provided to allow monitoring of this waste
stream. (Sec. 26-143,26-147)
Page 2
Stanton Magnetics - Quantum Park Lot 6
File No NWSP 99-0 II
DEPARTMENTS INCLUDE REJECT
FIRE
Comments
9 A fire flow calculation test will be required, LDR 6-16
10 All water mams, hydrants, and roadways wIll be m place pnor to above
ground constructlOn, NFP A I
POLICE
Comments None
ENGINEERING DIVISION
Comments.
11 Add to the site plan the following note: All plans submitted for specific permits
shall meet the City's code requirements at time of application. These penn its
include, but are not limited to the following: site lighting, paving, drainage,
curbing, landscaping and irrigation. Penn its required from other permitting
agencies, such as FDOT, PBe, SFWMD, DERM, L WDD, DEP and any others,
shall be included with the pennit request.
12 Add a "Right Turn Only" SIgn at the south egress dnveway
13 PrOVIde 6" WIde thermoplastIc, whIte stnpes across both dnveways to
delIneate pedestnan path through driveways.
14 The landscape Islands shall have a mImmum grassed area of 5' between
the backs of curb Adjust all plans accordmgly [LDR Chapter 7.5,
ArtIcle II, SectlOn 5 G ]
15 ProVIde an Engmeer's certIficatlOn that the dramage will conform WIth
all rules, regulations and codes ofthe CIty'S Land Development
Regulations. [LDR Chapter 4, SectlOn 7.F ]
16 Show clear sight tnangles at both dnveways and adjust the Landscaping
Plan If needed. [LDR Chapter 7.5, ArtIcle II, Section 5.H.2.] Add a
note to the Landscapmg Plan that there shall be a clear unobstructed
VIew wIthm the SIght tnangles at a level between 30" and 6' above
finished grade. [LDR Chapter 7.5, ArtIcle II, SectlOn 5.H.]
Page 3
Stanton Magnetics - Quantum Park Lot 6
File No NWSP 99-0 II
BUILDING DIVISION
Comments.
17 Add a note to both accessible park10g space areas shown on the site plan
drawing (sheet SP I) that refers the reader back to the typical parking
strIp10g detaIl draw10g for the accessible route detaIls. Add text to the
detaIl draw10g that 10dlcates the route IS 10 complIance wIth SectIOn 4.3
(Accessible Route) and 4 6 (Park1Og and Passenger Loading Zones) of
the Florida AccessibIlIty Code for Build10g Construction. Please note
that at time of permIt revIew the applIcant shall provIde detaIled data on
the plans that wIll verIfy that the path of the accessible route is in
complIance wIth the regulatIOns of the FlorIda AccessIbIlIty Code for
Build10g Construction.
18 Identify the fimsh floor elevation wlth10 the footpr1Ot of the buIld10g
that IS Illustrated on the site plan (sheet SP 1) and the floor plan drawing
(sheet A.I) Add to the sIte data, found on sheet SP 1, the flood zone
that the bUlld10g IS located wIthIn IncludIng, where applIcable, base
flood elevatIOn. If there IS no base flood elevatIOn, IndIcate that on the
plans. Add specIficatIOns to the sIte data that wIll verIfy that the
proposed fimsh floor elevatIOn IS In complIance wIth the mInImum
standards of the folloWIng:
a) Minimum elevatIOn reqUIred by the flood zone
b) Minimum elevation reqUIred by the South FlOrIda Water Management
DIstrIct permIt for the project.
c) Show and proVIde computations that verIfy the elevatIOn of the fimsh
floor IS SIX Inches or more above the crown of the abutting right-of-way
19 At tIme of permIt reVIew, IdentIfy on the sIte plan the actual setback
dImenSIOn from the leadIng edge of the south faces of the bUIldIng to the
south property lIne Please note that the setback dImenSIOn shall be
measured from the overhang, covered walkways, canopIes or awmngs.
The bUlld10g setbacks shall comply wIth Zoning Code regulations.
IndIcate on the sIte plan whether the patIO area IS covered. If It is
covered, prOVIde plan and elevatIOn vIew drawings of the structure
Also, specIfy the setback dImenSIOns In compliance with the zoning
regulations.
20 PrOVIde detaIled and dImensIOned elevatIOn vIew drawings of the sIte
slgnage IndIcate the total sIgn area and height of the sign IncludIng
prOVIding computatIOns that verIfy the sIgn area complIes WIth the
regulations of the SIgn Code Also, show and dImenSIOn on the plan
vIew draWIngs the dIstance the sIte sIgn IS located from the adjacent
property lInes (note ten feet IS the mInImum setback from any property
lIne)
Or
Place the fOllOW1Og note on the site plan. "Site signage is not approved
Page 4
Stanton Magnetics - Quantum Park Lot 6
FIle No NWSP 99-0 II
for thIs project. Separate site plan review and approval IS required for
sIte slgnage." DrawIngs of the slgnage shall comply with the applIcable
regulatIOns speCIfied In the SIgn Code (Chapter 21 of the Land
Development Regulations) If a sIte sIgn IS proposed, delIneate on the
landscape plan the location of the landscaping that IS required for sIte
signage
21 On sheet SPl, IdentIfy the symbol that represents the property hne.
22 DimensIOn the wIdth of the easement that is shown along the west
property lIne
23 Add to the sIte plan draWIng a labeled symbol that represents the
locatIOn of the site lIghtIng poles Also, note on the site plan that the
site lIghtIng fixtures wIll IllumInate the sIte consIstent with the
specificatIOns IdentIfied In the ParkIng Lot Code. The photometric plan
IS reVIewed at tIme of permIt revIew and IS not reqUIred for sIte plan
review Therefore, remove the draWIng from the submIttal.
PARKS AND RECREATION
Comments. None
FORE S TERlENVIRONMENT ALIST
Comments
24 The applIcant has addressed the eXIstIng trees on the site. If the
relocated trees do not survIve the transplanting, the trees will be replaced
dUrIng the landscapIng portIOn of the proJect.
PLANNING AND ZONING
Comments.
25 On the sIte plan show the follOWIng:
. Setbacks chart and dImenSIOns In tabular form Chapter 4 Section 7
Paragraph E
. Open space reqUIred and proposed In the tabular data. Chapter 2
SectIOn 7 Paragraph H.13
. ProVIde loadIng space reqUIrements In the parkIng calculatIons.
Chapter 2 SectIOn 11 Paragraph J.2
. BearIngs and dIstances of property hnes. Chapter 4 Section 7
Paragraph B
. ReVIse plans to prOVIde parkIng lot Islands dImensIoned WIth 5' of
landscape area from inSIde to InSIde of curb City drawing #B-
90012
. Label the dashed line shown inside of the west, south and east
property hnes
. Label the walk way paving materIal
Page 5
Stanton Magnetics - Quantum Park Lot 6
File No NWSP 99-011
. Label the type and height of the wmg walls adjacent to the loadmg
wells
. Sign plan showmg location with setback requirements and an
elevation drawmg with dimensiOns, materIals and colons.
26 Sign and seal all plans submitted for reVIew Chapter 4 Section 7
27 On the landscape plan show the followmg'
. Label and dimensiOn all reqUired landscape buffers. Chapter 7 5
Article II
. Label and dimensiOn the mmllTIUm tree spacmg along the RlW
frontage Chapter 7 5 Article II SectiOn 5 Paragraph D
. A note m the notes specifymg a materIal other than cypress shall be
used for mulch
. Provide safe sigat trIangles. Chapter 7 5 Article II SectIOn 5
Paragraph H
. Locate hghtmg and fire hydrants eXistmg and proposed. Chapter 4
SectIOn 7 Paragraph B
28 Submit a traffic study and WrItten confirmation from the Palm Beach
County Traffic DiVISiOn that the site meets traffic performance standards.
s:\projects\cond of appr\
DEPARTMENT OF DEVELOPMENT
MEMORANDUM
ENG 99-076
DATE
Michael W Rumpf, DIrector of Plannmg & Zonmg
Raymond F DaVidson, P.E., Actmg ClIy Eng~
May 27, 1999
TO
FROM.
RE.
STANTON MAGNETICS - QUANTUM PARK LOT 6 (NWSP 99-011)
NEW SITE PLAN 1ST REVIEW COMMENTS
1 Add to the SIte plan the followmg note All plans submItted for specIfic permIts shall meet the CIty'S
code reqUirements at time of apphcatIOn. These permIts mclude, but are not hmIted to the followmg
SIte lightmg, pavmg, dramage, curbmg, landscapmg and IrngatIOn. Permits reqUired from other
permIttmg agencIes, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and any others, shall be
mcluded WIth the permIt request.
2 Add a "Right Turn Only" SIgn at the south egress dnveway
3 ProVIde 6" wIde thermoplastic, whIte stnpes across both dnveways to dehneate pedestnan path
through dnveways.
4 The landscape Islands shall have a mImmum grassed area of 5' between the backs of curb Adjust all
plans accordmgly [LDR Chapter 7.5, Article II, SectIOn 5 G]
5 ProVIde an Engmeer's certIficatIOn that the dramage WIll conform WIth all rules, regulatIOns and
codes ofthe CIty'S Land Development RegulatIOns. [LDR Chapter 4, SectIOn 7.F]
6 Show clear SIght tnangles at both dnveways and adjust the Landscapmg Plan If needed. [LDR
Chapter 75, Article II, SectIOn 5.H.2.] Add a note to the Landscapmg Plan that there shall be a clear
unobstructed VIew WIthm the SIght tnangles at a level between 30" and 6' above fimshed grade.
[LDR Chapter 75, ArtIcle II, SectIOn 5.H.]
7 The proposed 8 mch water mam to the fire hydrant at the north property lme WIll require a Jack and
bore under Quantum Blvd., an open cut of Quantum Blvd. wIll not be allowed. ConSIder provIdmg a
water hne to the fire hydrant at the north property lme from the eXIstmg water lme at the south
property lme as an alternative to aJack and bore.
8 All plans submItted to the CIty must be SIgned and sealed by the appropnate deSIgn profeSSIOnals.
The CIvIl drawmg and the Survey are not SIgned and sealed.
RFD/ck
Xc Ken Hall
C:\My Documents\Stanton Magnetics, Quantum Lot 6 New Site Plan 1st Review.doc
MEMORANDUM
UTILITIES DEPT NO 99 - 165
TO'
M~mPf, Planning Director
~John A Guidry, UtilIties DIrector
FROM.
DATE.
May 25, 1999
SUBJECT
Stanton MagnetIcs - Quantum Park Lot 6 - I SI Review
We offer the following comments on this project.
GENERAL COMMENTS
1) All utilities easements shall be shown on the rectified landscaping drawings so that we may
determine which trees may interfere with utilities In general, palm trees will be the only tree
species allowed within utility easements Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities WIthin the easement in the foreseeable future
LDR Sec 7 5-18 I gives public utilities the authority to remove any trees that interfere WIth utility
services, either m utility easements or public rights-of-way
2) Dept. of HRS permits will be required for the water system serving this project. (Sec 26-12)
3) Fire flow calculations will be required demonstrating the City Code requirement of 1500 g p m. as
stated in LDR chap 6, Art. IV, Sec. 16, or the requirement imposed by insurance underwriters,
whichever is greater (see Sec 26-16(a)) Please submit these calculations WIth your HRS permit
submittal
4) Sec 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project
either upon my request for signature on the Health Dept. application forms or within 30 days of site
plan approval, whIchever occurs first. Based upon a I 5-mch meter, the fee IS $1205 82
5) Comp Plan polIcy 3C.3 4 reqUIres the conservatIOn of potable water CIty water may not, therefore,
be used for lITIgatIOn where other sources are readily available.
SPECIFIC CONDITIONS
I) Water and sewer lines to be owned and operated by the CIty shall be included within utility
easements Please show all proposed easements on the engineering drawings, using a minimum
width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in
Sec 26-33(a) of the Code
2) This office will not require surety for installation of the water and sewer utilities, on condition that
the systems be fully completed, and given to the City before the first permanent meter is set. Note
that setting of a permanent water meter is a prerequisite to obtaining the certificate of occupancy
3) A building permit for this project shall not be issued until this office has approved the plans for the
water and/or sewer improvements required to serve the project. (Sec 26-15)
4) The waste stream from the manufacturing process must meet the City's pretreatment reqUIrements
A sampling pomt must be provided to allow monitoring of this waste stream. (Sec 26-143, 26-147)
Please refer any questions on this matter to Peter Mazzella (742-6404) of this office
JAG/PVM
I~~ '- -----
i 0 :0. ~ - <-'-
'l}ll
j I '
i l. I,
I -
~
Xc Skip Milor
Peter Mazzella
File
,
If
.P I
._, "=~. I {
.........,.;..........""l~
LEISURE SERVICES PARKS DIVISION MEMORANDUM
TO
Mike Rumpf, DIrector ofPlanmng & Zonmg
(1- < \ )J
John Wildner, Parks Supenntendent 1 W
FROM
RE.
Stanton Magnetics - Quantum Park Lot 6
DATE
May 26, 1999
I have no comments on the above project. The project should contmue m the normal
reVIew process
JWad
,--..
, i i !.. 13 ['I ["'win, [l
I', .,....:..c:......;,- 'j I Yf m
j ~{ -'- - ~
UU 1~llr 2 61999 ~
PLANNING AND
ZONING DEPt
DEPARTMENT OF DEVELOPMENT
MEMORANDUM
ENG 99-076
TO
Michael W Rumpf, DIrector of Planmng & Zomng
Raymond F DaVidson, P .E., Actmg City EngI~
May 27,1999
FROM.
DATE
RE
STANTON MAGNETICS - QUANTUM PARK LOT 6 (NWSP 99-011)
NEW SITE PLAN 1ST REVIEW COMMENTS
I Add to the sIte plan the followmg note All plans submItted for specIfic permIts shall meet the CIty'S
code reqUIrements at tIme of applIcatIOn. These permIts mclude, but are not lImIted to the followmg'
sIte lIghtmg, paving, dramage, curbmg, landscapmg and ImgatIOn. PermIts reqUIred from other
permIttmg agencIes, such as FDOT, PBC, SFWMD, DERM, LWDD, DEP and any others, shall be
mcluded wIth the permIt request.
2. Add a "RIght Turn Only" sIgn at the south egress dnveway
3 ProvIde 6" wIde thermoplastIc, whIte stnpes across both driveways to delmeate pedestnan path
through dnveways.
4 The landscape Islands shall have a mImmum grassed area of 5' between the backs of curb Adjust all
plans accordmgly [LDR Chapter 7.5, ArtIcle II, SectIOn 5 G]
5 ProVIde an Engmeer's certIficatIOn that the dramage wIll conform WIth all rules, regulatIOns and
codes of the CIty'S Land Development RegulatIOns. [LDR Chapter 4, SectIOn 7.F ]
6 Show clear SIght tnangles at both drIveways and adjust the Landscapmg Plan If needed. [LDR
Chapter 7 5, ArtIcle II, SectIOn 5.H.2.] Add a note to the Landscapmg Plan that there shall be a clear
unobstructed VIew WIthm the SIght tnangles at a level between 30" and 6' above fimshed grade.
[LDR Chapter 75, ArtIcle II, SectIon 5.H.]
7 The proposed 8 mch water mam to the fire hydrant at the north property lme wIll reqUIre ajack and
bore under Quantum Blvd., an open cut of Quantum Blvd. wIll not be allowed. ConsIder provIdmg a
water lme to the fire hydrant at the north property lme from the eXIstmg water lme at the south
property lme as an alternatIve to aJack and bore.
8 All plans submItted to the CIty must be sIgned and sealed by the appropnate deSIgn profeSSIOnals.
The CIVIl drawmg and the Survey are not sIgned and sealed.
RFD/ck
Xc Ken Hall
C"\My Documents\Stanton Magnetics, Quantum Lot 6 New Site Plan 1st Review.doc
MEMORANDUM
UTILITIES DEPT NO 99 - 165
TO
M~mPf, Planning Director
1/vJohn A Guidry, Utilities Director
FROM.
DATE.
May 25, 1999
SUBJECT
Stanton Magnetics - Quantum Park Lot 6 - I SI Review
We offer the following comments on this project:
GENERAL COMMENTS
I) All utilities easements shall be shown on the rectified landscapmg drawings so that we may
determine which trees may interfere with utilities In general, palm trees will be the only tree
species allowed within utility easements Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities withm the easement in the foreseeable future
LDR Sec 7 5-18 1 gives public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way
2) Dept. of HRS permits will be required for the water system serving this project. (Sec 26-12)
3) Pire flow calculations will be required demonstrating the City Code requirement of 1500 g P m. as
stated in LDR chap 6, Art. IV, Sec. 16, or the requirement Imposed by msurance underwriters,
whichever IS greater (see Sec 26-16(a)) Please submit these calculations with your HRS permit
submittal
4) Sec 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project
either upon my request for signature on the Health Dept. application forms or within 30 days of site
plan approval, whichever occurs first. Based upon a 1 5-inch meter, the fee is $1205 82
5) Camp Plan pohcy 3C.3 4 reqUIres the conservation of potable water CIty water may not, therefore,
be used for lITIgatIOn where other sources are readily available
SPECIFIC CONDITIONS
I) Water and sewer hnes to be owned and operated by the City shall be mcluded within utility
easements Please show all proposed easements on the engineering drawings, using a minimum
width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in
Sec 26-33(a) of the Code
2) This office will not require surety for installation of the water and sewer utilities, on condition that
the systems be fully completed, and given to the City before the first permanent meter is set. Note
that setting of a permanent water meter is a prerequisite to obtaining the certificate of occupancy
3) A buildmg permIt for this project shall not be issued until this office has approved the plans for the
water and/or sewer improvements required to serve the project. (Sec 26-15)
4) The waste stream from the manufacturing process must meet the City's pretreatment requirements
A sampling point must be provided to allow monitoring of this waste stream. (Sec 26-143, 26-147)
Please refer any questions on this matter to Peter Mazzella (742-6404) of thIS office
JAG/PVM
~~::.---..-~ '-
r ~ -- ~--'-
/ 0 r:" -
j ,
I 0 I ~
;1
)/
I
., ",.-"j I !
~~-.~
Xc Skip Milor
Peter Mazzella
Pile
Parks Division Memorandum- TRC
Subject.
Mike Rumpf, Actmg Plannmg and Zomng Manager
Kevin J Hallahan, Forester / Envlronment.hst ~
Stanton Magnetics- Quantum Park Lot 6
New Site Plan - 1st Review
To
From.
Date
May 25, 1999
The applIcant has addressed the eXlstmg trees on the site. If the relocated trees do not survive
the transplantmg, the trees will be replaced dUrIng the landscapmg portIOn of the project. The
project should contmue m the normal review process.
I , tiJ ~,tr /.
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO 99-119
TO
Michael Rumpf, Plannmg and Zomng DIrector \ J
r\jrt\J
Michael E. Haag, Bmldmg Code Pernnt AdmlTIlstr~ 1.-
May 20, 1999 ()
Stanton Magnetics Quantum Park Lot 6 - New Site PI~n~sp 99-011)-
1st review comments
FROM.
DATE
RE
We have revIewed the plans for the above-referenced project and recommend that the followmg
comments be addressed pnor to the project bemg forwarded for Board reVIew'
Buildine Division (Site Specific and Permit Comments) - MIchael E Haag (561) 742-6352
I Add a note to both accessible parkmg space areas shown on the SIte plan drawmg (sheet
SP I) that refers the reader back to the typIcal parkmg stnpmg detaIl drawmg for the
accessible route detaIls. Add text to the detaIl drawmg that mdlcates the route IS m
comphance WIth SectIOn 43 (Accessible Route) and 4 6 (Parkmg and Passenger Loadmg
Zones) of the Flonda Accessiblhty Code for BUIldmg ConstructIOn. Please note that at tIme
of permIt reVIew the apphcant shall proVIde detaIled data on the plans that wIll venfy that the
path of the accessible route IS m comphance WIth the regulatIOns of the Flonda Accessiblhty
Code for BUIldmg ConstructIOn.
2 IdentIfy the fimsh floor elevatIOn wlthm the footpnnt of the buIldmg that IS Illustrated on the
SIte plan (sheet SP 1) and the floor plan drawmg (sheet A.l) Add to the SIte data, found on
sheet SP 1, the flood zone that the bUIldmg IS located wlthm mcludmg, where apphcable,
base flood elevatIon. If there IS no base flood elevatIOn, mdlcate that on the plans. Add
specIficatIOns to the SIte data that wIll venfy that the proposed fimsh floor elevatIon IS m
comphance WIth the mmlmum standards of the followmg'
a) Mmlmum elevatIon reqUIred by the flood zone.
b) Mmlmum elevatIOn reqUIred by the South Flonda Water Management Dlstnct permIt for
the proJ ect.
c) Show and provIde computatIOns that venfy the elevatIon of the fimsh floor IS SIX Inches
or more above the crown of the abuttmg nght-of-way
BUIldmg DIVISIon Memo No 99-119 to Michael Rumpf
RE Stanton MagnetIcs - 15t RevIew
May 20, 1999
Page Two
3 At tIme of permIt reVIew, IdentIfy on the sIte plan the actual setback dImenSIOn from the
leadmg edge of the south faces of the bUIldmg to the south property lme Please note that the
setback dImenSIOn shall be measured from the overhang, covered walkways, canopIes or
awnmgs. The bUIldmg setbacks shall comply WIth Zonmg Code regulatIOns. IndIcate on the
SIte plan whether the patIo area IS covered. If It IS covered, prOVIde plan and elevatIon VIew
drawmgs of the structure Also, speCIfy the setback dImenSIOns m comphance WIth the
zonmg regulatIons.
4 PrOVIde detaIled and dImenSIOned elevatIOn VIew drawmgs of the SIte sIgnage IndIcate the
total SIgn area and heIght of the SIgn mcludmg provldmg computatIOns that venfy the SIgn
area comphes WIth the regulatIons of the SIgn Code. Also, show and dImenSIOn on the plan
VIew drawmgs the dIstance the SIte SIgn IS located from the adjacent property hnes (note ten
feet IS the mInImum setback from any property lme)
Or
Place the followmg note on the SIte plan. "SIte sIgnage IS not approved for thIS proJect.
Separate SIte plan reVIew and approval IS reqUIred for SIte sIgnage." Drawmgs of the
sIgnage shall comply WIth the apphcable regulatIOns speCIfied m the SIgn Code (Chapter 21
of the Land Development RegulatIOns) Ifa SIte SIgn IS proposed, delmeate on the landscape
plan the locatIOn of the landscapmg that IS reqUIred for SIte sIgnage
5 On sheet SPl, IdentIfy the symbol that represents the property lme.
6 DImenSIOn the WIdth of the easement that IS shown along the west property lme
7 Add to the SIte plan drawmg a labeled symbol that represents the locatIOn of the SIte hghtmg
poles. Also, note on the SIte plan that the SIte hghtmg fixtures WIll Illummate the SIte
conSIstent WIth the speCIficatIOns IdentIfied m the Parkmg Lot Code. The photometnc plan IS
reVIewed at tIme of permIt reVIew and IS not reqUIred for SIte plan reVIew Therefore, remove
the drawmg from the submIttal.
MEH.bg
J '\SHRDA T A \Development\Building-6870\Document5\ TRC\NWSP 99-011 1 5t review Stanton Magnetic5.doc
CITY OF BOYNTON BEACH, FLORIDA
INTER-OFFICE MEMORANDUM
TO'
MIchael Rumpf
FILE
DATE
SUBJECT
REFERENCES
ENCLOSURES
Ref NWSP 99-011 Stanton MagnetIcs
FROM
S gt. Jensen
NO COMMENTS
5-17-99
NWSP 99-0 II
f--
r:.. ~ !o:l rs n nn
'/~~r ., il._!y J,fn)
U U J'1fl/ I 7 J9YiJ ~i
PZLANNING AND -
ONING DEPT.
PUBLIC WORKS DEPARTMENT
MEMORANDUM #99-102
SUBJ
Michael Rumpf, Plannmg & Zonmg DIrector W.
Larry QUInn, AssIstant PublIc Works DIrector V
SIte Plan RevIew - 151 RevIew - Stanton MagnetIcs - Quantum Park Lot 6
TO
FROM
DATE
May 17, 1999
The PublIc Works Department has no comments m reference to the SIte plan reVIew lIsted
above
LQ/cr
rnt~t ~ :~~ 00
PLAN!~ I \!G "~ND
ZON! NG' DT.
FIRE & LIFE SAFETY DIVISION
Memorandum No 99-287
0<"., .
"T
. - ..
NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire
Protection Association codes, and the City Fire code shall be adhered to
TO Mike Rumpf, Director
Planning & Zoning Division
FROM Steve Gale, Fire Marshal
Deputy Chief - Fire Rescue Department
DATE May 13,1999
SUBJECT Stanton Magnetics
Quantum Park Lot 6
NWSP 99-011
A fire flow calculation test will be required, LOR 6-16 All water mains, hydrants,
and roadways will be in place prior to above ground construction, NFPA 1
I recommend this plan be forwarded with the above comments
CC File
r~'1 6'-~8"-rs
. ~:-
(;..L {2 All fvJ
~ 714-J'v1tJJ f'v1A-0 U E 'n <- oS
d"~jJ\CJ~ ~ (c;
1) (3tJ lI\E 9m 'f'1fl.JJ 'S-\\<J..>J Ill-6' ~L-vi
" ~T&Tc:-\L- C. +tMvT AN ~ 'j) \ M e-N ~ kl N ~ j ~ 'T\9'e, Ii 0Art..-
fZ, (I, ^'" c it- 1- 'S 0/ C I P f\-tt. E:..
· OPt'N C;pfk.E J~\I'I~;J:....Lf;:;~ J2e0.,..hr'1..(f'O $" fr\o\u.s ED
-(rI"E'
I N-f T ff'~\..~ j)A-)~ C t+"2- S &C / Pir/I.. ++ (9
· ft2-0Jlc>E-- ~(rv I \;0 ~lk.c- 64;-&\..i\,'26v'-FA.J'T$ f;....; 7l-/fi
f % l-t All,a G4L0cJVl- Do.'vlc; C +i 1. SG-G Il ? 4fL 1" :4
-- u~...e~~ 1<';....1_ t ,-FG ':'-6". .'1...1/1 -'t-- (~,J."..- ~ I ~. ~~r'u~
d' )"3>6AvLv"&; "2 j) '" s: 1fTJ,C-<6-5 of rlU:l~'l' LI~ s= eft 'I 56::'7 PtM., 13
" (l~'J( se- 'fL~JJ I;:. ~ p(l-cu \Q ~ "" P/TIL;C IJv G LOT
IS\.A--NI,)~ Gv~L"J',')(.; CUIr.l.'L\.Ilj~
VI A./l f Jv S:, ( () ~ D V I ~
';t:;
1::
]
(
tS of-
LA- N v $ c" 1'{) t:- A-vz.. e fA- f-YVvv-. c08 q)6- . i () (,</ ;s (~f- ~r=
't
Cut~6 . to; D,'~pf'l #- /3 - ?C(j(L
L,tr(!, c-L '-n+e ]) f}S H-B> L \;J C- S I*,...... ~ &E!fI) I AI ~ I d-'<.. CJ.~
n-t (- 4/e--SJ I ~ n+ ~ fvrs, r p l1-LJ~v1 C AJc--~
L iffI~ 6L T/+f: u ~'T\.t- '--'~ ( IN \IV, v,-",A %-it--\ ~
l v9-1> E L -rJ--t-f; "1 f t ftJ0 :::> #8(.) \-PI cJf- 71-tf ~ I J\J l.?
fh/JItLe-.v\ TI TttE' Lo,w,^-J, G.J8L\....S
51i..9 N fLt'hv ~ito"'"/'J (,\ LGCr-"llo.--J w / SfrOft'O:.. ~Q.vi~~~
.;-
..>
.) n
? '-
\t:J
'" "-
~....,
'.> ~
',) j
f~
;::. .:",
~ ~
~~
W/t'lL~ ~ ~'> '-
~ s~
~~:~
'?' _'6 '-?
...;:\ <J,r ~ ~
Q,\
.
er
..
j.. ) <;; I 1.-.0 f>->J. ~ e- fh..., J4.u.., (' '-fHJ <;, S'u is "-" \ TTl71D ~fL, kvtt-W. (3 J.i 'i
75-&G 7
1,. ) () ,0T>>t- (AhfOS ( ~ ftV'rJJ <;;'l\ov-J .TItD- fo{",,--, l'Cj ~
61 lA4-o ~ A<-V D :b( A." f.\J S l(j"" 4t,L 1~5G0l1LL\J l V1vJoYG,7r~ (J v~5,. C. ~ 7 )" /tr1. r,1[
f.)
L fT--f.beL- h JJ {) VI JL,- r: JJ s ( c~~ 77J-E' tv! I )J 1,Vi r.; "'- '7fi-G ff'
~!CfG (/\1 i ft-Lo,A/~ -rc~ f2- / w Ft2f).A.,FI'I~ /;;. elf. 7 ~-
/[/1-'1 ~ -rr: S (? ( 5" f ,4-{L )>
, fr fJoTt-' j tV (jft!- IV C /6 s. sp E-Cl(=- ~ l]v I fr /Z.Ap4-it?/L- \kL
tJ(1tG-rl.- 7lfwJ.../ c1tr2-eSX S~L 06-' uSE'D fl>L )./\I,C,--,#
II Pf\DV\oe- SA-F& Si19i+T (ylIA-A;GC~7 en?)" /ill-j.fL SR s:- ;&(I. tf
'"
" ~CA---r& LJ GH-n;t G ~4/V() ftv2E HyPf-A.IvT~ 6. -. J/t- }~tJ
E-y. \ ~T7Nl.:> c; ~L<:/)C3fj) C fI (- ~ec.'') (;t/l :B
~
Su~;; P 7{44f='ft6 $-lVJ?'7 /J-,vO CJP; 7r"6-v ('P#0f2v'-'Mlol\./
F-av- ~t.- fl&tKff-' ~7f !7JIJ-H) c f) I v f {v.J 'nMr
~ yr& yvtf(5r!, ~. it'~f '~f1C 1~;t--r4tY(;~
%/frtJOAvt.P ~ "
232
STANDARD INDUSTRIAL CLASSIFICATION
Industry
Group
No.
367
Industry ?
<::....~ECTRONIC COMPONE~ ACCESSORIES-Con.
3679 Electronic Components, Not Elsewhere Classified-Con.
j
-*-
masers
Crystals and crystal assemblies, radio
Delay lines
Harness assemblies for electronic use:
wire and cable
Headphones, radio
Heads, recording for speech and musi-
cal equipment
Hermetic seals for electronic equip-
ment
Impedance conversion units, high fre-
quency
Liquid crystal displays
Loads, electronic
Microwave components
Oscillators, except laboratory type
Parametric amplifiers
Passive repeaters
Phonograph needle cartridges
Phonograph needles
Piezoelectric crystals
Power supplies, static, and variable fre-
quency
Pulse forming networks
Quartz crystals for electronic applica-
tion
Recording and playback heads, magnet-
ic
Recording heads for speech and musical
equipment
Rectifiers. electronic: except solid-state
Resonant reed devices, electronic
Rheostats, electronic
Sockets, electronic tube
Solenoids for electronic applications
,.Static power supply converters for elec-
tronic applications
Step positioners for transmitting equip-
ment
Styli, phonograph record cutting
Switches, electronic
Switches, stepping
Transducers for use in measuring and
testing instruments and equipments
Tube retainers, electronic
Tube spacers. mica
Tube transformer assemblies used in
firing electronic tubes
Video triggers, except remote control
television devices
Voice controls
Waveguides and fittings
369 MISCELLANEOUS ELECTRICAL MACHINERY, EQUIPMENT, AND
SUPPLIES
3691 Storage Batteries
Establishments primarily engaged in manufacturing storage batteries.
Alkaline cell storage batteries
Batteries, rechargeable
Lead acid batteries (storage batteries)
Nickel cadmium storage batteriee
Storage batteries
3692 Primary Batteries, Dry and Wet
Establishments primarily engaged in manufacturing primary batteries, dr:
or wet.
Batteries. primary' dry or wet
Dry cell batteries, single and multiple
cell
3694 Electrical Equipment for Internal Combustion Engines
Establishments primarily engaged in manufacturing electrical equipIDI'
for internal combustion engines. Important products of this industry incl1r
armatures, starting motors, alternators, and generators for automobiles ~
aircraft; and ignition apparatus for internal combustion engines, includi'
spark plugs, magnetos, coils, and distributors.
Alternators, motor vehicle
Armatures, motor vehicle
Battery cable wiring sets for internal
combustion engines
Battery charging generators for inter
nal combustion engines
Breaker point sets, internal combustion
Harness wiring sets for in~ r
bustioD engines ....
Ignition cable sets or. ~_..;_
for internal combustIon .....-
Ignition systems. high freq::' ...
Motors, starting: motor ve .
craft ~
Regulators. voltage: motor ~
c;:~uu.'" nlnalll Fnr internal CO