PERMIT PROCESS 03/25/2003 TUE 9:04 FAX 5617402429 QUANTUM ~I002/002 Quantum CPar~CPYoperty Owners' ;4.ssociatton, Inc. 1 Ld. :ZSOO QUANTUM LAKES DRIVE SUITE 100 BOYNTON BEACH, FLoRIDA 33426 March 24.2003 filE COpy Mr. Pete. Pimentel Special"District Services 11000 Prosperity Fanns Road SUite 104 . Palm Beach Gardens, FL 33410 RE. City of Boynton Beach Letter Dated March.4. 2003 Dear Pete: Attached please find the above ref~ letter from the City of Boynton :Beaf-..h reprdiDa removal of a portion of the bike path. arouild Wa1er MaugemenfTI'8Gt"'pn as well as'the north portion ofWat.er Management Tract"O" At the Annual Landownt~ Meeting on March 6~ 2003~ the Quantum Puk PropertyOwnetS' Association, Inc-_ Board discussed said letter and is oowrequesting the Quantum Communit;y Development District (QCDD) to pmsue an investigation to determine if in fact the bike path is required. A3 the QCDD owns these facilities. we await your determination before any further action is taken. If you ,should have any questions. please contact me at any time. Sincerely. ( ~ dvlLA Julie Finch Enclosure cc: Doug MacDonald, President, QPOA Bernie Conk.o, District}J.UJmey Jim Cherof, City Attorney Kurt Bressnci> City Manager 'Lusia Galav, Principal Planner Kevin Hallahan. Foreste-rlEn\'ironmentahst C:QP'C>A/ooaeIpIS -aideMIk 1tmD\'Bl.dgo J~ '\ '- ,) J,.. ;(".A .( I'-~.€ -.v", ,. tD..0l j ',Ie - '- Ie I it:k (' tiJ# ~~Jc "'ON 0 The City of Boynton Beach . DEVELOPMENT DEPARTMENT DIRECTOR'S OFFICE 100 E, Boynton Beach Boulevard POBox 310 Boynton Beach, Florida 33425-0310 TEL, 561 742-6350 FAX 561 742-6089 www.boynton-beach.org March 4, 2003 Mr Douglas MacDonald Quantum Park Property Owners Association Inc. 2500 Quantum Lakes Drive Suite 101 Boynton Beach, FL 33426 Re Removal of Walking/Jogging Path Dear Mr MacDonald It has come to our attention that the walking/jogging path located adjacent to Water Management Tracts P and Q in Quantum Park has been removed Apparently the path was in disrepair do to invasive tree roots that may have caused an accident. There are also a "No Trespassing" signs posted indicating that the path has been closed It is my understanding that the POA will meet on March 6, 2003 to discuss the walking/jogging path Please be advised that the walking/jogging path is shown on the Quantum Park DRI Master Plan in these locations and must be maintained Only the portions around Water Management Tract Q adjacent to newly created Tracts 100 and 101 were approved for removal Both paths serve as the sidewalk along Gateway Boulevard that is used by students attending the Boynton Beach High School The residents of the Quantum Lake Villas apartments can also be expected to use the paths. Accordingly, the paths should be reconstructed using a material that is consistent with Americans with Disabilities Standards. The City's Forester/Environmentalist, Kevin Hallahan, recommends that the tree root hazard be addressed with a root-pruning program and a product called "Biobarrier " If you have any questions regarding this matter please contact Kevin Hallahan or Lusia Galav of the Planning and Zoning Division staff Thank you for your cooperation in this matter ;:;~ Quintus Greene, AICP Director of Development r I -- r1 -"!l, I ! ; ii i! ,I Xc Jim Cherof, City Attorney Kurt Bressner, City Manager Lusia Galav, Principal Planner Kevin Hallahan, Forester/Environmentalist -< MAR - 7 2003 [ f L -\ ::- 03/25/2003 TUE 9:04 FAX 5617402429 QUANTUM ~] 001/002 ~~ QUANTUM ~rrr- G R 0 U I' 0 F COM PAN I E S FACSIMILE TO- J...u../SIL (Ja/4v COMPANY Cry ~ ~ /3;rdDn FAXNUMBER. 71.f.J, -{'JGo; FROM: DATE. Julie Finch L} 4>s it; g NUMBER OF PAGES: d' with cover Remarks: 2500 OUantu/JIlakes Drive. Suite 1 m Boynton Beach. R. 33426 (561) 740-2447 . Fax: (5611740-2429 e-llIail: quafltVlP@qgc.cc O~ 10 99 THf 10 59 FAX 561 686 8863 MFT Development fnc ~OOl/007 Qll.\N'll1i\1 ('O\P\1l1NIT't !)J \'{ I ()P~II ~,I 111~TI\r( r F ACSDULE ... TO kdt~d ,b-i/llfJ6. C;:::ER~:i~fi:~ ~ch FROM. 9z-Ah..i/ Ci:Y2Ch DATE. ft; lOr 91 NUMBER OF PAGES :;z. with rover Remarks: ~~~~~~~ ~ft~U7a,~ ~;tIu f'1MJvu1 ~ ~. I~~~:r ~ ~ tlA1 ci cA' ___-// c.e<PJ'< ~ ....-- C;lJIJ !,~~/W0v?0 fl~ m r~- ~!.-lL.n Jr__~ r' n 1 J!f a' 01999 , ~ ~,..-- ------ -~ 1401 Forum Way. Suite lOt · West Palm Beach, Honda 33401 06 10 99 THV 10 59 FAX 561 686 8863 MFT Development Inc fl; 002/007 Quantum Community Development District 1401 Forum Way, Suite 101 West Palm Beacll, Florida 33401 (561) 686-6959 Fax 686-8863 February 3, 1999 Mr Doug MacDonald Quantum Limited Partners. Ltd. 1401 Forum Way, Suite 101 West Palm Beach, FL 33401 {L-ot 52) RE. Quantum CommunIty Development District Pennit Process Dear Mr MacDonaJd On Janumy 21, 1999 the Quantum ('.ommunity Development District (QCDD) Board of Commissioners fonnalized the permit process for obtaining approval to connect to and use District facilities. District faC1litle5 include the Primary SUlface Water Management System, Quantum Boulevard, Quantum Lakes Drive~ High Ridge Road (south of Gateway Boulevard) and Park Ridge Road. Enclosed for your U3e are the following: 1 QCDD Boundary Map (1)"' x 17"). 2. A cop of the QCDD Pennit. This permit 1S also the application form and we request that it be filled out completely and submitted with the proposed construction plans and other documents as necessary 3 A brief outline of the QCDD permit process 4 A listing of documents requested in suppon of the permit applicatioo_ We request the application be submitted to the Quantum Community Development District at the time of the building permit application is submitted to the City of Boynton Beach. As a condition of the site plan approval by the City of Boynton Beach, the Quantum Community Development Di9trict permit must be obtained pnor to issuance of the City's buildmg permit. Please subm1t tbe permit application and supporting documentation along with the $1,00000 Jniual deposit to. Peter L. Pimentel, District Manager Quantum Community Development District 1401 Forum Way, Suite 101 West Palm Beach, r'L 33401 06 10 99 THt 11 00 FAX 561 6Re SS63 )1FT D~"el. 'I-llIent [OC Il003 00; Doug MacDonald February 3, 1999 Page Two If you have any qu~tions~ regardirlg the permrt process or other District requirement, please call Eugene A Gerhca" P.E., of Mock Roos & As5oeiates. Inc, the District Engineer. at (561) 683- 3113. extension 215 s~ Tfiomas A. McGil!i~ Chairman of the Board of CommissioncrI Quantum Community Development District Enclosure 00' Eugene A. Gerlir;a. P,E. (via fax 478-7248) Peter L. Pimentel. District Manager (Yiafax 624-7839) Michael Rumpf. City of West Palm Beach (via. fax 375-6259) C:Qun1Wft CDMQrmit J'r<<:tJJ{ ",,""'.u Fee{ 1;.lb: 06 10 99 .HT. 11 00 FAX 561 686 8863 ~wr DeY'31n!?lI\ent Ine llJ004 '007 'i' Qua"tum Commullity Development District 1401 Forum Way, Suite 101 West Palm Beach, Florida 33401 (561) 686-6959 F(IX 686-8863 March 31. 1999 MI' Doug MacDonald Quantum Limited Partners. Ltd. 1401 Forum Way. Suite 101 West Palm Beach, FL 33401 50 l)' RE. Quantum Community Development District Permit Process Dear Mr MacDonald: On January 21. 1999 the Quantum Community Development District (QCDD) Board of Coramissionero formalized the permit process for obtaIning approval to connect to and use District faoilities. District facilities include tbe Primary Surface Water Management System. Quantum Boulevard. Quantum Lakes Drivc, High Ridge Road (south of Gateway Boulevard) 8Jld Park Ridge Road. :Enclosed for your use are the following: J QCDD Boundary Map (11" x IT'). 2. A cop of the QCDD Permit. This pennit is also the application form and we request that it be filled out c:ompletely and submitted with the proposed constructlon plans and other documents as necessary 3 A bncf outline of the QCDD permit process. 4 A Iistmg of document'j requested in support of the permit application. We request the application be submitted to the Quantum Community Development District at the time of the building permit applicatlon is submitted to the City of Boynton Beach. As a condition of the site plan approval by the City of Boynton Beach, the Quantum Community De'Veloprnent District permit must be obtained pnoc to issuance of the City's building pennit. Please submit the permit application and supporting dO\.-umcntation along with the $1.00000 miti.l deposit to Peter L. Pimentel, DIstrict Manager Quantum Community Development District 1401 Forum Way 8mte 101 West Palm Beach, FL 3340! 06 10 Slf. THLT L no FAX 561 656 8863 MFT DeyeloPlllent In.... ilJ005/00i Doug MacDonald March 31, ]999 Page Two If you have any questions, regarding the penuit prooess or other District requirement, please call Eugene A. Gerlica. P .E.. of Mock Roos & Associates, Inc.. the District Engineer, at (561) 683~ 3113. extension 215 ~Ii~ Chainnan of the Board of Commissioners Quantum Community Development District Enclosure cc: Eugene A. Gediea.. P.R. (via fax 478-7248) Peter L. Pimentel, District Manager (via fax 624-7839) Michael Rumpf, City of West p~ Beach (via fax 375-6259) C:QuuWm CDDlP-ut l\~_-'fplicalioD Pcc(lj.doc O~/10 99 THU 11 01 FAX 5~1 686 8863 Mfi Developm~nt In~ ill (joe, OOi Qualltum Community Development District 1401 Forllm Way, Suite 101 West Palm Beacll, Florida 33401 (561) 686-6959 Fax 686-8863 April 19, 1999 Mr John Ifuward Penn Florida 1515 South Federal HighwaYl Suite 306 Boca Raton, FL 33432 th\ \) RE. Quantum Community Development Distnct Pennit Process Dear Mr Howard. On January 21, 1999 the Quantum Community Development District (QCDD) Board of Commissioners formalized the permit process for obtaining approval to connect to and use District facihties, District facilities include the Pnmary Surface \\ atcr Management System, Quantum Boulevard, Quantum Lakes Drive, High Ridge Road (souli'1 of Gateway Boulevllfd) and Park Ridge Road. Enclosed for your use are the following, 1 QCDO Boundary Map (11 x )"1"). 2 A cop of the QCDD PermIt. This permit IS also the application fonn and we request that it be filied out completely and submitted with the proposed construction plans and other documents as necessary 3 A brief outl ute of the Qcon permit process 4 A listing of documents requested In support of the permIt application. We request the applical10n be submitted to the Quantum Community Development Distnct at the time of the budding permit application is submitted to the City of Boynton Beach. AB a condition of the site pllUl approval by the City of Boynton Beach, the Quantum Community Development District pennit must be obtained prior to issuanc.e of the City's buildmg permit. Please submit the permit application and supporting documentatlon along with the $1 00000 mitial deposit to Peter L. Pimentel, District Ma.nager Quantum Communit'J Development District 1401 Forum Way, Suite 101 West Palm Beach) FL 33401 1)6 10 99 THr 11 01 F.U 561 686 8863 MFf DeTeloPJlent Ine llJ007/COi John Howard April 19. 1999 Page Two If you have any questions, regarding the pennit process or other District requirement, please call Eugene A. Gerlica, P.E.. of Mock Roos &. Associates, Inc.. the District Engineer. at (561) 683- 3113, extension 21 S dt/~~ Thomas A. McGillicuddy Chairman of the Board of Commissioners Quantum Community Development District: Enclosure ce. Eugene A. Gerliea, P .E, (via fax 478-7241) Peter L. Pimentel, District Manager (via fax 624-7839) Michael Rumpf, City of West Palm Beach (via fax 375-6259) C:Qwmnim CDDIPermil ProceaI~c:vcl~"_ Quantum Community Developmellt District 1401 Forum Way, Suite 101 West Palm Beach, Florida 33401 (561) 686-6959 Fax 686-8863 February 3~ 1999 Steven R. Kamelhalr, President The Original Pancake House 400 Northwest 74th Avenue Plantation, FL 33317 RE. Quantum Community Development Dlstnct Permit Process Dear Mr Kamelhalr' On January 21~ 1999 the Quantum Community Development District (QCDD) Board of Commissioners formalIzed the permit process for obtaining approval to connect to and use District facilities. District facilIties Include the Primary Surface Water Management System, Quantum Boulevard. Quantum Lakes Dnve, High Ridge Road (south of Gateway Boulevard) and Park Ridge Road. Enclosed for your use are the following: 1 QCDD Boundary Map (11" x 17"). 2. A cop of the QCDD Permit. This permit is also the application form and we request that it be filled out completely and submitted With the proposed construction plans and other documents as necessary 3 A brief outline of the QCDD permit process 4 A listing of documents requested in support of the permit applIcation. We request the applIcation be submitted to the Quantum Community Development District at the time of the building permit application is submitted to the City of Boynton Beach. As a condition of the site plan approval by the City of Boynton Beach~ the Quantum Community Development Dlstnct permit must be obtained prior to Issuance of the City's buildIng permit. Please submit the permit application and supporting documentation along with the $1~000 00 initial deposit to Peter L. Pimentel, District Manager Quantum Community Development District 1401 Forum Way, SUite 101 West Palm Beach, FL 33401 Steven R. Kamelhair February 3~ 1999 Page Two If you have any questions, regarding the permit process or other District requirement, please call Eugene A. Gerlica, P.E.~ of Mock Roos & Associates, Inc.~ the District Engineer~ at (561) 683- 3113, extension 215 sinre7M~~ Thomas A. McGillIcuddy Chairman of the Board of CommissIOners Quantum Community Development District Enclosure cc Eugene A. Gerlica, P.E. (via fax 478-7248) Peter L. Pimentel~ District Manager (via fax 624-7839) Michael Rumpf, City of West Palm Beach (via fax 375-6259) Hendrik DeMello, Architect C:Quantum CDDlPennit Process/developers.doc Qualltum Commullity Developmellt District 1401 Forum Way, Suite 101 West Palm Beach, Florida 33401 (561) 686-6959 Fax 686-8863 February 3~ 1999 Robert B Beers~ Director Coiltronics 6000 Park of Commerce Boulevard Boca Raton, FL 33487 RE. Quantum Community Development District Permit Process Dear Me Beers On January 21, 1999 the Quantum Community Development District (QCDD) Board of CommissIOners formalized the permit process for obtaining approval to connect to and use District facilities. District facilities include the Primary Surface Water Management System, Quantum Boulevard, Quantum Lakes Drive~ High Ridge Road (south of Gateway Boulevard) and Park Ridge Road. Enclosed for your use are the following: 1 QCDD Boundary Map (11" x 17"). 2. A cop of the QCDD Permit. This permit is also the apphcation form and we request that it be filled out completely and submitted with the proposed construction plans and other documents as necessary 3 A brief outline of the QCDD permit process. 4 A hstmg of documents requested in support of the permit apphcation. We request the application be submitted to the Quantum Community Development District at the time of the building permit application is subD;1itted to the City of Boynton Beach. As a condition of the site plan approval by the City of Boynton Beach~ the Quantum Community Development District permit must be obtained prior to issuance of the City'S buildmg permit. Please submit the permit application and supporting documentation along with the $1~000 00 initial deposit to Peter L. Pimentel, District Manager Quantum Community Development District 1401 Forum Way. SUite 101 West Palm Beach, FL 33401 Robert B Beers February 3~ 1999 Page Two If you have any questions, regarding the permit process or other District requirement~ please call Eugene A. Gerlic!, P.E., of Mock Roos & Associates. Inc.~ the District Engineer, at (561) 683- 3113, extension 215 Sincerely~ ~/#~ Thomas A. McGillicuddy Chairman of the Board of CommiSSiOners Quantum Community Development District Enclosure cc' Eugene A. Gertic!, P.E. (via fax 478-7248) Peter L. Pimentel, District Manager (via fax 624-7839) Michael Rumpf. City of West Palm Beach (via fax 375-6259) Rhon Ernest-Jones, P.E. C:Quantum CDDlPermit Process/developers.doc Qualltum Commullity Developmellt District 1401 Forum Way, Suite 101 West Palm Beach, Florida 33401 (561) 686-6959 Fax 686-8863 February 3~ 1999 Me Peter L. Odorico Trammell Crow Company 1515 South Federal Highway, Suite 113 Boca Raton, FL 33432 RE. Quantum Community Development District Pennit Process Dear Me Odorico On January 21, 1999 the Quantum Community Development District (QCDD) Board of Commissioners fonnahzed the penn it process for obtaining approval to connect to and use District facihties. District facilities lDclude the Pnmary Surface Water Management System, Quantum Boulevard~ Quantum Lakes Drive, High Ridge Road (south of Gateway Boulevard) and Park Ridge Road. Enclosed for your use are the following: 1 QCDD Boundary Map (11" x 17"). 2. A cop of the QCDD Pennit. This penn it is also the application fonn and we request that it be filled out completely and submitted with the proposed construction plans and other documents as necessary 3 A brief outline of the QCDD permit process. 4 A hsting of documents requested in support of the pennit application. We request the application be submitted to the Quantum Community Development District at the time of the building pennit application is submitted to the City of Boynton Beach. As a condition of the site plan approval by the City of Boynton Beach~ the Quantum Community Development District penn it must be obtained prior to issuance of the City's building permit. Please submit the penn it application and supporting documentation along with the $1,00000 initial deposit to Peter L. Pimentel~ Distnct Manager Quantum Community Development Distnct 1401 Forum Way, SUite 101 West Palm Beach, FL 33401 Peter L. Odorico February 3. 1999 Page Two If you have any questions, regarding the permit process or other District requirement, please call Eugene A. Gerlica, P.E.~ of Mock Roos & Associates, Inc.~ the District Engineer~ at (561) 683- 3113~ extension 215 Sin~~~~ Thomas A. McGillicuddy Chairman of the Board of Commissioners Quantum Commumty Development District Enclosure cc Eugene A. Gerlica, P.E. (via fax 478-7248) Peter L. Pimentel~ District Manager (via fax 624-7839) Michael Rumpf, City of West Palm Beach (via fax 375-6259) Rhon Ernest-Jones, P.E. Justin Murphy C:Quantum CDDlPennit Processldevelopen.doc Qualltum Commullity Developmellt District 1401 Forum Way, Suite 101 West Pain' Beach, Florida 33401 (561) 686-6959 Fax 686-8863 February 3, 1999 Mr William D Chalmers Real Estate Representative for Mobile Oil Corp 1515 South Federal Highway. Suite 113 Boca Raton, FL 33432 RE. Quantum Community Development District Permit Process Dear Mr Chalmers On January 21~ 1999 the Quantum Community Development District (QCDD) Board of Commissioners formalIzed the permit process for obtaining approval to connect to and use District facilitIes. District facilities include the Primary Surface Water Management System, Quantum Boulevard, Quantum Lakes Drive, High Ridge Road (south of Gateway Boulevard) and Park Ridge Road. Enclosed for your use are the following: 1 QCDD Boundary Map (11" x 17"). 2. A cop of the QCDD Permit. This permit is also the application form and we request that It be filled out completely and submitted With the proposed construction plans and other documents as necessary 3 A brief outline of the QCDD permit process 4 A listing of documents requested in support of the permit applicatIon. We request the application be submitted to the Quantum Community Development Distnct at the time of the building permit application is submitted to the City of Boynton Beach. As a condition of the site plan approval by the City of Boynton Beach~ the Quantum Commumty Development District permit must be obtamed prior to issuance of the City's building permit. Please submit the permit application and supporting documentation along With the $1~OOO 00 initial deposit to Peter L. Pimentel, Dlstnct Manager Quantum Community Development District 1401 Forum Way, Suite 101 West Palm Beach, FL 33401 William D Chalmers February 3~ 1999 Page Two If you have any questlons~ regarding the pennit process or other DIstrict requirement, please call Eugene A. Gerlica, P.E., of Mock Roos & Associates, Inc., the District Engineer~ at (561) 683- 3113 ~ extension 215 Enclosure cc: Eugene A. Gerlica. P.E. (via fax 478-7248) Peter L. PImentel, District Manager (via fax 624-7839) Michael Rumpf, City of West Palm Beach (VIa fax 375-6259) Jeff Iravani~ P.E. C:Quantum CDDlPennit Processldevelopelll.doc i Qualltum Commullity Developmel,t Distric( 1401 Forum Way, Suite 101 West Palm Beach, Florida 33401 (561) 686-6959 Fax 686-8863 -~uw~Ql, ~-- ll\ll FEB 3 '1; ~ __._,.~__---1 .~--- J~~~? ~........-...,.,......,.............:..;.,;,..,.,...........~ February 3, 1999 Linda H. Hines, Planning and Real Estate The School District of Palm Beach County, Florida 3320 Forest Hill Boulevard, C-33I West Palm Beach, FL 33406-5813 RE. Quantum Commumty Development District PermIt Process Dear Ms. Hines On January 21, 1999 the Quantum Community Development DIstrict (QCDD) Board of Commissioners formalized the permit process for obtaining approval to connect to and use District facilities. District facilities include the Pnmary Surface Water Management System, Quantum Boulevard, Quantum Lakes Drive, High Ridge Road (south of Gateway Boulevard) and Park Ridge Road. Enclosed for your use are the following: 1 QCDD Boundary Map (11" x 17"). 2. A cop of the QCDD PermIt. This permit is also the application form and we request that it be filled out completely and submitted with the proposed construction plans and other documents as necessary 3 A brief outlIne of the QCDD permIt process 4 A lIsting of documents requested in support of the permIt application. We request the application be submitted to the Quantum Community Development District at the time of the building permit application is submitted to the City of Boynton Beach. As a condition of the site plan approval by the City of Boynton Beach, the Quantum Community Development District permit must be obtamed prior to issuance of the City's building permit. Please submit the permit applIcation and supportmg documentation along with the $I~OOO 00 initial deposit to Peter L. PImentel, District Manager Quantum Community Development DIstrict 1401 Forum Way, Suite 101 West Palm Beach, FL 33401 " Linda H. Hines February 3, 1999 Page Two If you have any questions~ regarding the permit process or other DIstrict requirement, please call Eugene A. Gerlica, P .E.~ of Mock Roos & Associates, Inc.~ the Distnct Engineer, at (561) 683- 3113 ~ extension 215 smcer~ a ~/~/Il/~~ Thomas A. MCGillicu;'-- J Chairman of the Board ~ommissIoners Quantum Community Development District Enclosure cc' Eugene A. Gerlica, P.E. (via fax 478-7248) Peter L. Pimentel, DIstrict Manager (via fax 624-7839) Michael Rumpf~ CIty of West Palm Beach (via fax 375-6259) David Tom, BRPH C:Quantum CDD/Pennit Process/developers.doc Qualltum Commullity Developmellt District 1401 Forum Way, Suite 101 West Palm Beacll, Florida 33401 (561) 686-6959 Fax 686-8863 February 3~ 1999 Mr Scott Disher Scott Blakeslee Disher - Architects 551 N W 77th Street, Suite 202 Boca Raton, FL 33487 RE. Quantum Community Development District Permit Process Dear Mr Disher On January 21, 1999 the Quantum Community Development Distnct (QCDD) Board of Commissioners formalized the permit process for obtaining approval to connect to and use Distnct facihtIes District facihtIes include the Primary SUlface Water Management System, Quantum Boulevard, Quantum Lakes Drive. High Ridge Road (south of Gateway Boulevard) and Park Ridge Road. Enclosed for your use are the following: 1 QCDD Boundary Map (11" x 17"). 2 A cop of the QCDD Permit. This permit is also the application form and we request that it be filled out completely and submitted With the proposed construction plans and other documents as necessary 3 A brief outline of the QCDD permit process. 4 A listing of documents requested in support of the permit application. We request the application be submitted to the Quantum Community Development Distnct at the time of the building permit application is submitted to the City of Boynton Beach. As a condition of the site plan approval by the City of Boynton Beach~ the Quantum Commumty Development District permit must be obtained prior to issuance of the City's buildmg permit. Please submit the permit application and supporting documentation along With the $1,00000 initial deposit to Peter L. Plmentel~ District Manager Quantum Community Development District 1401 Forum Way, Suite 101 West Palm Beach, FL 33401 Scott Disher February 3~ 1999 Page Two If you have any questions~ regarding the permit process or other District requirement, please call Eugene A. Gertica, P.E., of Mock Roos & Associates~ Inc., the District Engineer, at (561) 683- 3113. extension 215 Sincerely. 4-IjfJJ~ Thomas A. McGillicuddy / Chairman of the Board of CommissIoners Quantum Community Development Distnct Enclosure cc Eugene A. Gertica~ P.E. (via fax 478-7248) Peter L. Pimentel, Distnct Manager (via fax 624-7839) Michael Rumpf, City of West Palm Beach (via fax 375-6259) C T "Gus" Tarnowski~ P .E. C:Quanturn CDD/Pennit Process/developers.doc - 0 ~ i '" i .I, ~ III ~~ i Iii ~ i ~ i t; ~ ~ 15 ~ ii~ ~: ~ g~ ii ~g, ~ ~~ =8 .... 2; () I- ~ ~~ :s~ ~ . S~ r-Q II> ~ << <5 G z~ /: ~; m!:!! .... ~ " '0 z i=: ::> e~ L.J ~~ ~~ ~ i ~~ g;~ si z ~: z::> ~~ ~~ !g ~~ ~ i~ ~~ 00 ~'" "0 ~. m ~~ , ~.... ~~ p ~8 z~ :s~ :Oil: ~~ %~ Sj~ ~" 0 ~~ 00 ~~ () '% ~ ii :0 ~m .... 8~ ~ ~~ ~~ ~S 0 ~ ~~ 0- 00 ~B ~~ 7L --J :ll_ a: i ! ~t~ _,' :ri- - - Jr\H~ SS~:l - - irl ~tS~~ ~ 'I 1\ 11'N\f:) '-3 GO i I Ml ~ III i I ! I I i I I I ffi-------------------~ :{ .. ., i i I I I 1- _ _ _ _ _ _ _ _~~~ m .3^" SS3oGt-<O:l !I I I i I "- ~ ~ ~ f ~ ~ '_ 2Un ~ :! il ! ~ ! ~ ! :3~ ~ S~ ~i~ oaiI~ci ~~~~~i o 0 ~ ~~~~il ~ ~o o~~IlI" '" ~ ~f~bl ~iil~~~~~ g !~hi~1 ;~1~2~ Iii ~~~zlll ~ 0ll;5~~~~ <S 8 5 ll!p~clr.~~ ~~~~Si~ ~l ~ ~~:il8g"~ ! ~813~-,j;t h ! Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 QUANTUM CDD PERMIT PROCESS Submittal of Application, Check List Items and $1,000 Application Fee CDO applies $250 of Fee for Administrative Costs Engineer estimates cost to review plans and notifies COD If estimate exceeds $750, CDD invoices Applicant for the difference and, upon receipt of funds, authorizes Engineer to review plans If estimate is less than $750, COO authorizes Engineer to review plans Engineer reviews plans If found acceptable, Engineer recommends issuance of Permit, submits invoice to COD for review of Plans and provides estimate for inspection of construction COO pays Engineer from funds received from Applicant for Plan review COO submits invoice to Applicant for Engineer's inspection estimate less remainder of Application Fee (if any) CDO issues Permit upon receipt of payment from Applicant for inspection services Engineer inspects construction and is paid from funds paid by Applicant for inspection services Upon completion of construction, Applicant shall submit record drawings certifying construction QUANTUM COMMUNITY DEVELOPMENT DISTRICT Project NamelDescription. CHECK ITEMS ENCLOSED WITH PERMIT APPLICATION o Two (2) sets of signed & sealed paving & drainage plans DOne (1) set of signed & sealed calculations for the O.50-inch dry pretreatment and the 25- Year and the 3 day storm event. o EXIsting topographic survey of the site and adjacent Distnct water management areas and roadways. o Boundary survey of property o Control Structures shown on the detail sheet of plans shall be a fixed metal plate. screw gate or a combination of both. All dimensions shall be shown on plans. o Discharge pipe and/or headwall shown on detail sheet shall meet regulatory requirements. o Check for inspection/administrative fees if required. NOTE. 1 QCDD may require RIW adjacent to QCDD existing RIW by quit -claim or exclusive perpetual easement deed. 2. Minimum bleeder size shall be a 6" X 6" inverted triangular orifice. 3 Construction dewatering will require separate QCDD approval prior to dIscharge into its system. 4 If on-SIte retentIon is proposed, supporting calculations shall be submitted for review The project must prOVide for the storage of the 25-year, 3 day storm event. (1114/99) Common:.Masters:QCDD Permit A-2 QUANTUM COMMUNITY DEVELOPMENT DISTRICT PERMIT NO. (Non-Governmental) THIS PERMIT is granted this day of ,19_, by Quantum Community Development District (hereinafter referred to as "QCDD"). 1401 Forum Way, Suite 101, West Palm Beach, Florida 33401, to (hereinafter referred to as the "Permittee") as a non-exclusive permit to as shown on the plans and specifications identified as attached hereto and made a part hereof WITNES SETH. 1 In the event QCDD is not the fee title owner of the real property (the "Property") to which this Permit is applicable, the Permittee agrees to obtain all necessary consents from the fee title owners of the Property prior to commencement of the subject works. 2 Permittee hereby acknowledges that if this Permit is being issued for a connection to or modification of a QCDD facility the permitted works are being approved by QCDD in reliance upon and in accordance with the representations and documents provided by the Permittee. If, however, this Permit is not being issued for a connection to or modification of a QCDD facility, this Permit is only intended as a statement of non-objection but in any event the terms and conditions of this Permit shall apply 3 This Permit does not constitute a waiver of the necessity by the Permittee to obtain such other necessary and appropriate permits required by other governmental bodies or agencies, therefore, the Permittee, prior to commencement, is required to obtain and. upon written request, provide copies to QCDD of any and all other applicable federal, state, and local permits required in connection with Permittee's use of the Property and agrees that at all times it will comply with the requirements of all federal, state and local laws, ordinances, rules and regulations applicable or pertaining to the use of the Property or implementation of the permitted works by the Permittee. 4 Permittee understands and agrees that the use of the Property pursuant to this Permit is subordinate to the rights and interests of QCDD and, to the extent applicable, that of the fee title owner of the Property Further, Permittee does hereby acknowledge and agree that the Permittee is not relying upon any representations whatsoever by QCDD regarding QCDD'S right, title, interest. or ownership as to the Property for which this Permit is applicable. 5 QCDD specifically reserves the right to install, construct, operate. upgrade. repair, replace and/or maintain existing or future works, devices, and/or improvements on or within its real property interests and the right to enter upon the Property at all times necessary to inspect or implement the terms and conditions of this Permit. Permittee understands that in the exercise of such rights and interest, QCDD may require Permittee to relocate, alter, or remove the Permittee's facilities and equipment or other improvements made by Permittee pursuant to this Permit which interfere with or prevent QCDD, in QCDD'S opinion. from properly and faithfully constructing, improving and maintaining its Common:.Masters:qcddpennitfonn.doc Page 1 of 8 1/15/99 facilities. If the Permittee should fail to relocate, alter, or remove the Permittee~s facilities, equipment or other improvements made by the Permittee pursuant to this Permit within a reasonable time period following receipt of notice from QCDD requesting same or the specified time if set forth in the notice, then in that event QCDD shall have the right to enter upon the lands and make such relocation, alterations or removal of the Permittee's facilities, equipment/or other improvements, all of which shall be at the cost of the Permittee. 6 Permittee agrees that it will not use the Property in any manner which interferes with QCDD'S use of the Property or causes a hazardous condition to exist. 7 QCDO assumes no liability. obligation or responsibility for the ownership, operation and/or maintenance of the Permittee's facilities as herein permitted. 8 Unless otherwise set forth in the Supplemental Conditions to this Permit, the Permittee agrees to backfill any excavation it makes within the Property and to pay for~ repair and/or replace any. (i) affected below-grade facilities and features located therein, including but not limited to. water. sewer. stormwater or irrigation facilities, structures or appurtenances and (ii) at or above-grade facilities and features, including but not limited to structures, grasses and sod, sidewalks. and roadway improvements (the term roadway improvements shall include but not be limited to landscaping, irrigation facilities, lighting, striping, signage, curbing, roadway base, subgrade and asphaltic or concrete surfaces) which are removed or damaged as a result of said excavation. Such repair or replacement shall restore these features to a non-defective equivalent or better condition as existed prior to the event precipitating the excavation. 9 All Permittee activity related to subaqueous utility, water and/or sewer lines, including appurtenant facilities, shall be conducted in such fashion that the primary functional purpose of the canal or waterway facility, specifically flood control, within which the activity is takmg place is not adversely affected. 10 Permittee does hereby indemnify and hold harmless QCDD, its Board of Supervisors, officers, personnel. staff and/or consultants against any penalties. fines, claims, losses, damages (including direct, indirect or consequential), expenses, or legal fees (including appellate) that might derive, arise out of or result from the implementation of the proposed project/work by the Permittee. 11 The Permittee shall be obligated at the time of submission of its Permit applIcation, to provide a detail of any other existing improvements located over, under, upon or through the Property and the Permittee's accompanying plans and specifications shall clearly indicate how the Permittee will comply with required clearances between the requested permitted activity and existing improvements located over~ under and upon the Property, mcludmg complIance with other permitted users duly adopted and published standards. 12 That attached hereto are Supplemental Conditions to this Permit which are incorporated herein and made a part hereof. 13 If Permittee should violate any of the terms or conditions of the Permit and shall not correct or remedy same within ten (10) business days of receiving written notice of said violation from QCDD, then in that event, QCDO may, at its option, revoke, cancel and terminate this Permit. 14 This Permit shall automatically expire and be of no further force and effect, if commencement of the works which are the subject of this Permit has not occurred within 180 days from the date of this Permit, unless a written request for an extension is received by QCDD prior to the expiration date in which event an automatic 90 day extension is granted. However, only one such automatic extension is available, after which thiS Permit expires and a new permit application must be submitted. Common:.Masters:qcddpennitfonn.doc Page 2 of 8 1/15/99 15 This Permit may not be assigned by the Permittee without the prior WrItten approval of QCDD and if any of the works which are the subject of this Permit are conveyed, assigned, transferred, gifted to any third party or are operated by a third party, then the Permittee shall be obligated to provide a copy of this Permit and its conditions to said successor, assign or operating entity Further, such successor, assign or operating entity shall be subject to and obligated to comply with all provisions of this Permit. 16 This Permit shall continue in perpetuity unless it expires or is terminated as herein provided. 17 In any litigation, including breach, enforcement or interpretation arising out of this Permit, the prevailing party to this Permit shall be entitled to recover all of its costs and expenses, including reasonable attorneys fees and costs. QUANTUM COMMUNITY DEVELOPMENT DISTRICT BY NAME TYPED. TITLE WIlNESSES Permittee BY Signature NAME TYPED. Print Name ADDRESS. Signature Print Name Common:.Masters:qcddpermitform.doc Page 3 of 8 1/15/99 OWNER PERMIT INFORMATION Name Address ATTORNEY Name Address ENGINEER Name Address OTHER REPRESENTA TIVE/PROFESSIONAL Name Address Common:.Maslers:qcddpermilfonn.doc Page 4 of 8 Business Phone Other Business Phone Other Business Phone Other Business Phone Other 1/15/99 SUPPLEMENTAL CONDITIONS TO PERMIT NO. A. GENERAL CONDITIONS 1 Forty-eight (48) hours prior to a pre-construction meeting if one is scheduled and before commencement of the permitted activity, notification shall be given by the Permittee to QCDD'S Engineer, Mock, Roos and Associates, Inc., at 561-683-3113 QCDD'S Engmeer shall establish points of construction, if applicable, which will require inspection by QCDD'S Engineer prior to construction of the permitted activity When the Permittee considers the permitted activIty complete, the Permittee shall notIfy QCDD'S Engineer and schedule an on-site final inspection which shall be held in the presence of a representative of the Permittee and QCDD'S Engineer 2 Implementation of the permitted works shall be carried out in full accordance with those plans and specifications which have been submitted to and approved by QCDD and any deViation from such plans and specifications shall require approval from the office of QCDD'S Engineer prior to implementation. Further, QCDD reserves the right to revoke or amend this Permit if. following its issuance, it is determined that the plans and specifications, as previously approved, require modificatlon in order to protect the health, safety or welfare of the public or prevent adverse impacts to property interests owned by QCDD or others. 3 The permitted activity shall be implemented, constructed and/or linstalled in full accordance with the approved plans and specifications. Deviations from the approved plans or specifications shall be coordinated with and approved by QCDD'S Engineer prior to implementation of any such deviation. 4 When working in a QCDD road right-of-way, not more than one-half (I12) of the road or street shall be closed and traffic shall be controlled so as to provide for the safety and minimum hindrance to the public All traffic control operations shall conform to the most current issue of the Florida Department of Transportation publication "Manual on Traffic Controls and safe Practices for Street and Highway Construction, Maintenance and Utility Operations." - 5 QCDD'S Engineer shall be the final authority as to the quality and quantity of the material and works required to satisfy the terms and conditions of this Permit as they relate to QCDD improvements and facihties. 6 UPON COMPLETION OF THE PERMITTED ACTIVITY AND AFTER ITS FINAL INSPECTION AND ACCEPTANCE BY QCDD'S ENGINEER THE Permittee SHALL DELIVER TO QCDD'S OFFICE ONE COMPLETE SET OF THE FINAL "RECORD DRAWINGS" FAILURE TO PROVIDE THE FINAL RECORD DRAWINGS MAY RESULT IN THE REVOCATION, CANCELLATION AND TERMINATION OF THIS PERMIT 7 Roadway Pavement replacement shall be carried out in accordance with the City of Boynton Beach and FOOT requirements. 8 If, within one (I) year after the date of QCDD'S acceptance of any pavement replacement work. such work is found to be defective by QCDD, the Permittee shall promptly and, without cost to QCDD and in accordance with QCDD'S written instructions, correct such defective work, or, if it has been rejected by QCDD, remove it from the site and replace it with non-defective work. If Permittee does not promptly comply with the terms of such QCDD instructions. or in an emergency where delay may cause serious risk of injury, loss or damage, QCDD may~ if it so elects, have the defective work corrected, or the rejected work removed and replaced, and all of the direct and indirect costs of such removal, replacement or correction, including compensation for additional professional services, shall be paid by the Permittee. 9 If any of the herein permitted works are to be constructed or implemented within an area over which QCDD has a real property interest (Le., either fee tide or easement) the Permittee prior to Common:.Masters:qcddpermitform.doc Page 5 of 8 1/15/99 commencement or implementation of the permitted works shall be required to provide to QCDD an insurance certificate in accordance with the attached "Insurance Coverage" requirements, whIch coverage must be maintained until such time as the permitted works have been implemented or constructed. 10 This Permit may be terminated or modified if the permitted works are located within an area over which QCDD has a real property interest and QCDD'S real property interest is subsequently conveyed to another governmental entity 11 The above Conditions shall be continuing obligations of the Permittee and shall be comphed with in the event of any subsequent maintenance, repair, replacement or modification of the permitted improvement. B. UNDERGROUND IMPROVEMENTS - CONDITIONS I All underground improvements (said term is defined to include but not be limited to utilities, equipment of any nature whatsoever and structures) shall have a minimum cover of thirty (30) inches below profile grade of QCDD roadways and minimum cover of forty-two (42) inches below bottom elevation of waterways. 2 Unless otherwise approved by QCDD all underground facilities shall maintain a mimmum clearance of twelve (12) inches, either over or under existing culverts, and, if required by QCDD, protected. 3 Any affected QCDD works, facilities or improvements shall be left in a non-defective equivalent or better condition as existed before construction. An inspection by QCDD'S Engineer and Permittee shall be made of the road right-of-way located within the permitted construction area no later than twenty-four (24) hours before commencement of the permitted work activity 4 All permitted activity and installations shall be implemented and constructed in a workmanlike manner using best engineering and construction practices. 5 Trenches shall be refilled in a thoroughly compacted manner so that no future settling will occur 6 The Permittee shall, at the request of QCDD'S Engmeer or his duly authorized representative, submit copies of density reports of density determinations by an independent testing laboratory If density reports are requested, they shall be furnished pnor to final inspection. 7 The finished surface of any excavated area shall be replaced with the same type matenal as existed when the work began, such as sod for sod; shell for shell. etc. 8 Where existing ground, slopes, shoulders and/or ditches are disturbed, they shall be stabilized, as directed by QCDD or its duly authorized representative, in a manner that will afford protection against erosion or settling. 9 All pavement crossmgs~ if made subsequent to final placement of base material and pavement surface, shall, except as may be otherwise authorized by issuance of a special condition which if granted shall be attached hereto, be made by jacking. boring or auguring, and shall contain an adequate casing if required by QCDD'S Engineer 10 The above Conditions shall be continuing obligations of the Permittee and shall be complied with in the event of any subsequent maintenance, repair, replacement or modification of the permitted improvement. Common:.Maslers:qcddpermilform.doc Page 6 of 8 1/15/99 C. SPECIAL CONDITIONS 1 If either of the following two situations is applicable, the attached Special NPDES Permit Conditions shall apply, namely. (a) The works that are intended to be implemented or constructed by the Permittee under this Permit require coverage under an Environmental Protection Agency National Pollutant Discharge Elimination System Permit, or (b) The works which are the subject of this Penn it impact upon or affect works and facilities of QCDD that are subject to the Environmental Protection Agency National Pollutant Discharge Elimination System Permit (NPDES) Stonnwater Regulations. Common:.Masters:qcddpennitform.doc Page 7 of 8 1/15/99 SPECIAL NPDES PERMIT CONDITIONS The following Special Conditions are applicable to the attached Permit No. t If the works of the Permittee require the obtaining of an Environmental Protection Agency NPDES Permit, then the Permittee shall be required to obtain the appropriate NPDES Permit and provide a copy of the NPDES Permit and NPDES stormwater pollution prevention plan to QCDD prior to commencement of the subject works. 2 The Permittee shall be required to, (a) implement a maintenance program for the permitted works, (b) carry out an annual inspection of the permitted works and (c) following inspection, have an inspection report prepared by a qualified professional. The Permittee shall be responsible for retaining a copy of said inspection report and providmg a copy of same to QCDD by February t st of each year 3 If any of the works which are the subject of this Permit are conveyed, assigned, transferred, gifted to any third party or are operated by a third party, then the Permittee shall be obligated to provide a copy of this Permit and its conditions to said successor. assign or operating entity Further, such successor, assign or operating entity shall be obligated to comply with all of the conditions of this Permit including, without limitation, implementation of the above mentioned maintenance program and the provision of the annual inspection report to QCDD 4 If any act of negligence, omission or commission by the Permittee or third party operator should adversely affect QCDD'S obligations under QCDD'S NPDES Permit, then the Permittee within forty-eight hours following receipt of written notice by QCDD of such act shall promptly cease or rectify same otherwise this Permit shall be immediately suspended until such time as reinstated by QCDD in writing. 5 If, following receipt of a QCDD written notice of violation of the above conditions, the Permittee should fail to remedy same within ten business days from the-date of receipt of said notice, then QCDD shall have the right but not the obligation to initiate such remedial activity as QCDD deems necessary and appropriate. Any and all costs so incurred by QCDD shall be paid by the Permittee to QCDD within ten business days following receipt of a QCDD invoice for same and if not paid QCDD may thereafter revoke this Permit without further notice or hearing. Common:.Masters:qcddpennitfonn.doc Page 8 of8 1/15/99 EXHIBIT "A" INSURANCE REQUIREMENTS Below is shown the MINIMUM acceptable insurance to be carried under this Agreement: I. Commercial General Liability. (A) Bodily Injury Limit: $1,000,000 $1,000,000 Each Occurrence Annual Aggregate Property Damage Limit: $1,000,000 $1,000,000 Each Occurrence Annual Aggregate II. (B) or a Combined Single Limit of Bodily Injury and Property Damage. $1,000,000 Each Occurrence $1,000,000 Annual Aggregate (C) The Commercial General Liability shall include Contractual LiabilIty Comprehensive Automobile Liability' (A) Bodily Injury Limit: $ 500,000 $1,000,000 Each Person Each Occurrence Property Damage Limit: $ 500,000 Each Person (B) or a Combined Single Limit of Bodily Injury and Property Damage Liability' $1,000,000 Each Person $1,000,000 Each Occurrence III Workers Compensation and Employers Liability Statutory Limits $100,000 Each Accident $500,000 Disease-Policy Limit $100,000 Disease-Each Employee IV Umbrella Excess Liability Insurance: (A) $1,000,000 $1,000,000 Each Occurrence Annual Aggregate (B) The aforementioned umbrella coverage shall be no more restrictive than coverage required for the underlying policies. V Notice of Cancellation. The Insurance afforded above may not be terminated or reduced unless thirty (30) days prior written notice of such termination or reduction is mailed to QCDD (unless terminated for non-payment in which event ten (10) days notice is required). VI. Insurance Certificate: Quantum Community Development District shall be listed as an additional insured for the above Commercial and Umbrella LiabilIty insurance coverage and a certificate of insurance reflecting same shall be delivered to Quantum Community Development Distnct prior to commencement of construction of the permitted works.